General System Description

For processing applications for new connections, these are divided into
following five categories:CATEGORY-1
General connections for load upto 15 KW
CATEGORY-2
a) Tariff B-1 & B-2 for industrial supply tubewell connections at
400 volts for load upto 70 KW.
b) Other supplies and general connections above 15 KW and upto
to 40 KW at 400 Volts.
CATEGORY-3
a) Tariff B-2 for Industrial supply at 400 Volts for load above 70
KW but not exceeding 500 KW.
b) Tariff C-1 for Bulk Supply at 400 Volts.
c) Other supplies and general connections above, 40 KW but not
exceeding 500 KW.
CATEGORY-4
a) Tariff B-3 at KV or 33 KV for load not exceeding 5000 KW.
b) Tariff C-2 for Bulk Supply at 11 KV or 33 KV.
c) Other supplies and general connections at 11 KV or 33 KV for
load not exceeding 5000 KW.
CATEGORY-5
a) Tariff B-4 for Industrial Supply at 66 KV or 132 KV or 220 KV
for all loads.
b) Tariff C-3 for Bulk Supply at 66 KV or 132 KV for all loads.
c) Other supplies and general connections at 66 KV or 132 KV 220
KV for all loads.

COMPANY / CIRCLE / DIVISION / SUB-DIVISIONAL OFFICE

Procedure

New connection, Change of Name,


Change of Tariff and Reduction / Extension of
Load

Reference
Description

Category-II
Authority

Da
ys

Category-III
Authority

Registration
of application

XEN (Op)

2.

Visit to site for


technical
feasibility and
Survey.
Preparation of
Estimate
Approval of
Connection
Issue of Demand
Notices.
Verification of
Test Reports
Issue of
SCO/Work Order/
Instructions
Approval of Store
requisition/Issue
of material and
execution of work
order /
Installation of
service
Installation of
metering
equipments

-do-

4.
5.
6.
7.

8.

9.

Page
3 of 88

General System Description

1.

3.

Code
cp-02

Days

Category-III
Authority

Day
s

Dir: (P&E)
Company

Head
Draftsman
O/o S.E (Op)
S.E. (Op)

-do-

10

-do-

-do-

-do-

14

-do-

-do-

10

-do-

-do-

SDO (Op)

XEN (Op)

-do-

XEN/SDO
(Op) SDO
(M&T)

10

Chief
Executive
Dir: (P&E)

XEN (Op)

XEN (Op)

S.E (Op)

Dir: (P&E)

PD (Const)
SDO (Op)

45

SE (Op) XEN
(M&T)
XEN (Op)

15

15

PD (Construct)
XEN (Op)

30

XEN (Op) SDO


(M&T)
SDO (Op)

53

73

106

COMPANY / CIRCLE / DIVISION / SUB-DIVISIONAL OFFICE

Procedure

New connection, Change of Name,


Change of Tariff and Reduction / Extension of
Load

Reference

Code
cp-02

Page
4 of 88

General System Description


CATEGORY -V

1.

Description
Registration of application

2.

Visit to site for technical feasibility and Survey

3.

Preparation of Estimate

4.
5.
6.
7.

Approval of connection
Issue of Demand Notices
Verification of Test Report
Issue of SCO / Work Order / Instructions.

8.

Approval of Store requisition / Issue of material


and execution of work order / Installation of
service.
Installation of metering equipments

9.

Authority
Dir (Planning and
Engg.)
Dir: Design (T&G)
office of C.E.
Design (T&G)
-doVetting by C.E.
Design (T&G)
Authority
Chief Executive
Director (P&E)
Chief Executive
CE Design (T&D)
CE (GSC)/PD
(GSC)
P.D (GSC)

Days
1

S.E
XEN (P&I)
XEN (M&T)
DD (T*I)

15

15

10
14
21
7
10