Name of Work
Estimate Cost
= Rs. 17,59,51,700.00
GENERAL DESCRIPTION
( As per separate sheet attached herewith)
LEAD
1.
CALCULATION
1.00 Kms
6.00 Kms
Total
7.00 Kms
Say
2. Bulk Asphalt
Koyali Refinery to Bagodara
7.00 Kms
120.00 Kms
Bagodara to Bhachau
268.00 Kms
Bhachau to Bhuj
77.00 Kms
25.40 Kms
8.80 Kms
Total
499.20 Kms
Say 499.00 Kms
3. Murrum / Sand
Avg. lead
5.00 Kms
Executive Engineer
R. & B. Division Bhuj
QUARRY CHART
Certificate
Executive Engineer
R. & B. Division Bhuj
Kera Dehisara Gadhsisa Naredi Mothala Road starts from Bhuj Bhuj
Mundra Road bet. km 20/00 to 21/00 and ends at Deshalpar Nalia Road bet. 57/00
to 58/00. The road is an important SH . The length of road is (from km 0/00 to
53/00) 53.00 kms. The existing road is slngle lane B.T. surface heaving 3.75 mtr.
Width carriage way. This road connects Mundra Mandvi & Abadasa Taluka by
shortest route.
2: Necessity
The traffic of Matel Kaptchi Betonies mine, Gangaji Pilgrim place
and about 26 villages along the road ply on this road. Due to this, the road is an
important link for developing infrastructure facilities to the industries to be
established on around the area.
The Central Govt. has declared special economical zone for port around
Mundra city due to SEZ & free excises duty in earthquake many industries has
established around Mandvi & Mundra Taluka. Due to this, traffic intensity on this
road increased and increases day by day. It may chance to accident. Hence it is
indeed to widen to two lane existing 3.75 mtr. carriage for permanent restoration.
This road has been sanctioned under std. two lane programmed in budget lump
Item. Principally sanction given this work by Govt. of Gujarat, R & B Department
vide letter No SHR/14/2015/D, Dt 17/10/2015.
Carriage way is proposed under std. two lane programmed bet. km 116/00 to
29/00.
The investment priorities are governed by traffic demand, assessed
benefits and cost of the project. Demand plays the important role, which governs
which type of facility / infrastructure to be created. This in turn determines likely
benefits and costs to develop the same. A highway project of this nature calls for
significant investment. Prediction of accurate estimation of traffic has direct bearing
on design of the facility and the viability of project. Recognizing this, efforts are
made to carefully assess all the parameters that help in predicting the traffic
demand in future.
3 : Terrain
The terrain along road alignment is generally plain and passes through agricultural
area. The terrain along the alignment is generally plain. At some places rolling
gradient is achieved which is an average 2.0mt.
ground.
(i)
(ii)
Sr.No.
Chainage
Length
(In Kms.)
Existing
carriage way
width
Remarks.
(1)
53.50
3.75 mt.
Single lane B.T.
Surface
Total :-
53.50
3.75 to 7.0mt.
wide carriage
way.
bet. km 16/00 to
29/00
The existing avg. formation width is 7.50 mt. There are 1 no of Junction from SH
to SH is indeed to improve this junction.
(B)
Drainage
The total numbers of cross drainage structures existing on project corridor is
28 Nos. Out of that, 2 No Major bridge, Box culvert 12.00 mtr. wide, 1 No slab
drain which is old & narrow, 1 No causeway & 21 Nos Pipe Drains which are
7.50mt width O/O
The general no defects noticed during visual inspection of C.D. structures,
are width is not as per standard and cracks in masonry of parapet wall/Head wall
etc.. Existing H. P. Drains are not as S.H. Std. having NP-3 Pipe.
No.
1
2
2
2
3
Major Bridge
Box culvert
Slab drain
Causeway (42.00 long)
Pipe Drain
Total:-
1 Nos
--1 Nos
1 Nos
21 Nos.
24 Nos.
Width >12
Total
Mt.
Nos.
1 Nos
3 Nos
------4 Nos
2 Nos
3 Nos
1 Nos
1 Nos
21 Nos.
28 Nos.
All HP Drains which are less than 12.00 mtr. width. out of 21 Nos, 15Nos HP Drian
widen and 6 Nos of HP drain are to be replaced with Box culvert due insufficient of
water way.
6:
clay,
Surfacing
Bituminous
2
225.00
Thickness in mm
Base
Boulder
(WBM)
Soling
3
4
300.00
---
Total.
5
525.00
Laboratory CBR
Design data is taken as per survey carried by GEO TEST HOUSE Vadodara
Gujarat vide latter No FVPL/H/08/897 5/10/2015
Description
Value
Units
10.00
20.00
MSA
Total thickness
665
mm
40
115
250
260
665
mm
mm
mm
mm
30
50
75
200
mm
mm
mm
mm
3
3
10.00
YEAR
PLATE-IV
Base(WBM)
Granular Sub base
Total Thickness
8.0
150
300
805
mm
mm
mm
Proposed work
The Design for Two - Lane flexible pavement for these road is designed for
20 years life, considering the design CBR of 6.00 as per IRC: 37-2001. The VDF
for design of crust is taken as 4.50 and traffic growth rate is 5.0% as per GEO
TEST HOUSE Vadodara Gujarat vide latter No FVPL/H/08/897 5/10/20153. As per
the final design, total crust thickness for proposed work is worked out as 805mm
with considering the above features.
(A) Road work
(1)
(2)
Widening portion
300mm
150mm
WBM
200mm
WMM
75mm
BM
50mm
DBM
30mm
BC
.9 Materials:The various materials for construction of these road may be available from
the places mentioned as below. The leads mentioned as below.
Sr.
Materials
No.
2.
3.
Murrum/ sand
4.
5.
NP-3 Pipes
6.
1.
Name of
Avg. Lead
Quarry
(in Km.)
Gadhsisa
9 Km.
Gadhsisa
9 Km.
locally
5 Km.
Koyli Refinery
487 Km.
Naranapar
factory
Koyli Refinery
34.50Km.
487 Km.
1.7 Rates:Rates are adopted as per S.O.R. of Kutchh. District for the your 2015-16 and
the Nos. S.O.R. Items are supported with rate analysis.
Executive Engineer,
R. & B. Division,
Bhuj - Kachchh
Referen
ce in
MORT
8.13 803
Description
Unit
Qty.
Rate
Amount
Day
Day
0.03
0.75
278.40
278.40
8.35
208.80
Hour
10.00
60.00
600.0
Hour
0.50
234.00
117.00
Liter
1500.00
120.00
180000.00
Kgs
150.00
50.00
Total
7500.00
188434.15
18843.41
207277.56
20727.76
d) overheads 10 % on (a+b+c)
Total
e) contractors profit 10% on
(a+b+c+d)
Cost for 600 sm t= a+b+c+d+e
Rate per smt =(a+b+c+d+e)/600
Total
say
228005.31
380.00
380.00
Executive Engineer
R. & B. Division Bhuj
ROAD - WORKS
Approach of C. D. W O K S
Plans
C. D. WOrks
Gadhsisa - Junction