- MINUTE OF MEETING -
Subject:
Page n
Date of Meeting:
15-16/03/2012
Amman, Jordan
ATTENDEES:
Name:
Company:
Position:
SOC
Director General
Alwan A. R. Alwan
SOC
Ahmed Khazaal
SOC
SOC
SOC
Hussein A. T. AlShawi
SOC
Jasim M. AbdulRasool
SOC
Laith M. Hayawi
GE Oil&Gas Turbomachinery
Paolo Raffini
Hani J. Jalil
GE Oil&Gas Turbomachinery
Sales Manager
Amir Nashif
Sales Manager
Pasquale Onorato
Marco Salvemini
Mumtaz Rushdi
Aiser H. Tobia
Ali Al-Niamey
Commercial Director
Wathiq Derzi
Oil&Gas Consultant
1 General
1.1
General Overview
SOCs DG addressed to the attendees the strategic importance
of Zubair 2 crude oil pumping station for Iraq oil export
objectives. As part of the station, the #4 main turbopump units
are the most critical equipment which require immediate
attention to assure a continuous & reliable pumping of crude
oil.
1.2
Meeting Objectives
The objective of the meeting was to examine and define a
complete fast-track rehabilitation & control upgrade plan to
assure reliability & availability of the 4 main GE turbopump
units as per original design conditions.
1.3
2 Technical
GE
23/03/2012
2.1
Definition of scope.
On the basis of Site Survey Report here attached, dated 3
February 2012, the parties had an extensive discussion on the
scope of activities relevant to the following equipment related
to turbopump units TP-2A/B/C/D:
- Gas Turbine Package, including Starting system and
Auxiliaries,
- Gas Turbine Filter House and Inlet Air Duct,
- Gas Turbine Exhaust and Stack,
- Fire & Gas Detection System,
- Fire Fighting System,
- Load Gear,
- Main Pump,
- Instruments installed on gas turbine and centrifugal pump,
- Control Systems,
- Electrical Equipment.
2.2
3 Rehabilitation Program
3.1
23/03/2012
3.2
SOC requested GE and Baghdad Co. to conduct a site visit to
collect further information on the units that are running.
3.3
GE is ready to provide remote support and assistance to
support SOC in troubleshooting the technical issues above or
any other issue as they may occur. For easy reference please
find Florence Customer Service Center telephone number and
e-mail: 0039 055 427 2500 - customer.service.center@ge.com
As a local entry-point, you may contact our Basrah-based GE
Oil&Gas Operation Performance Manager cell. # 07809168518
3.4
Following deep discussion between parties, given the
complexity of the project and based on the active discussion
between the parties, SOC is requesting an integrated EPC
project approach to minimize unforeseen events or
contingencies during execution.
3.5
SOC has instructed GE to focus and develop the maintenance
program only on the main oil turbopumps unit and not on the
booster compressors or the Frame3 GE turbogenerator.
3.6
SOC will provide GE with CD including the complete list SOC
of
spare parts relevant to the turbopump package available on
stock in SOC warehouse. SOC to provide this document within.
3.7
Contract PRJ-10-4128 Control Upgrade of Zubair 2 main
turbopump units. With reference to SOC letter ref. E195, dated
12/03/2012, SOC has requested Baghdad Company to act
quickly to fulfill contractual procedures enabling L/C
establishment.
3.8
GE also presented the capability of supplying and installing
new additional turbopumps to the same station should it be
required by SOC.
Signatures: