You are on page 1of 9

RCC DESIGN REPORT FOR SEWAGE PUMPING STATION IN

KARAVE GAON
Client

Navi Mumbai Municipal Corporation


Belapur Bhavan, CBD-Belapur
Navi Mumbai 400614

Contractor

Ajay Construction
Agroli Gaon CBD-Belapur
Navi Mumbai 400614

Consultant

Yash Engineering Consultants Pvt. Ltd.


Shop No. 69, Vindhya Commercial Complex
Sector 11, CBD Belapur, Navi Mumbai

APRIL 2013
Client:

Navi Mumbai Municipal Corporation

Project:

RCC Design Report For Sewage Job No:


Pumping Station In Karave Gaon

Title:

Design Report

Prepared by
ORIGINAL

Reviewed by
NAME

Approved by
NAME

NITIN

DATE

SIGNATURE

NAME

SAMEER BENDRE

SIGNATURE

SAMEER BENDRE

SIGNATURE

REVISION

NAME

NAME

NAME

DATE

SIGNATURE

SIGNATURE

SIGNATURE

REVISION

NAME

NAME

NAME

DATE

SIGNATURE

SIGNATURE

SIGNATURE

Notice
The data contained herein shall not be disclosed, duplicated, or used in whole or in part for any purpose other than to evaluate the proposal,
provided that if a contract is awarded to this offer as a result of, or in connection with, the submission of these data, the propose shall have the
right to duplicate, use or disclose the data to the extent provided in the agreement. This restriction shall not limit the right to use information
contained in the data if it is obtained from another source without restriction.
All trademarks that appear in the document have been used for identification purposes only and belong to their respective companies.

CONTENTS
SR.NO.

DESIGN ASPECT

PG. NO.

Preamble

Design Data

2-3

Design of slabs

4-6

Design of pump house(staad file )

7-68

Design of receiving and screen chamber(staad file)

69-113

Check for Safe Bearing capacity and Buoyancy

114-115

Check for crack width

116-121

NMMC
YECPL

RCC DESIGN OF SEWAGE PUMPING STATION


1) PREAMBLE :

This is the circular tank of 4 m diameter and depth 8.43 m. It is a underground tank.
Ground water table is considered at ground for buoyancy checking.
Whole structure is analysed and designed using Staad pro software.

Severe

condition of exposure is considered. The structure is checked against safe bearing capacity
and buoyancy. Wet well raft slab, side walls and receiving /screen chamber walls are checked
for cracking.

Client Circulation

NMMC
YECPL

2) DESIGN DATA :1)


2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)

Diameter of tank
Roof level of Tank
Top level of Tank
Bottom level of tank
Water level in Tank
Finished Ground Level
Average Ground Level
Ground water level
Height of tank
Level of slab supporting pump
Invert level of inlet pipe
Invert level of channel
Top level of channel
S.B.C.at founding level
Clear Cover to Reinforcement
a) Raft slab
b) Wall water face
c) Wall other face
e) Slab of non water retaining structures

=
=
=
=
=
=
=
=
=
=
=
=
=
=

4000
11.13
+6.63
-1.8
+0.7
+6.13
+5.73
+4.63
8430
+6.63
+1.45
+0.7
+6.63
2000

=
=
=
=

45
45
45
20

f) Beam
g) Column

=
=

30
45

mm
mm
m
m
m
m
m
m
mm
m
m
m
m
T/m2
mm
mm
mm
mm
mm
mm

Materials :a)

Grade of Concrete

M 30

b)

Grade of Reinforcement Steel

Fe 415

Client Circulation

NMMC
YECPL

REFERENCE CODES:1)
2)

IS 456 - 2000
IS3370 (PART - I & II) - 2009

Code of practice for Plain and Reinforced concrete


Code of practice for Concrete structures for
the storage of liquids
Criteria for earthquake resistant construction of

3)
4)

IS1893 (Part-I)- 2002


IS 13920 : 1993

building
Ductile Detailing of Reinforced concrete
Structures subjected to seismic forces.
Code of practice for design load for building and

5)

IS 875 : 1987

structures.

(Parts I to IV)

3) A. DESIGN CALCULATION OF ONE WAY SLAB FOR SLAB WALKWAY:Client Circulation

NMMC
YECPL

concrete grade
grade of steel
density of concrete
span Lx
span Ly
effective cover
effective depth
provide D
breadth
eff.depth d

30
415
25
0.85
1.25
20
30.36
150
1000
125

N/mm2
N/mm2
N/mm2
m
m
mm
mm
mm
mm
mm

LOADING ON SLAB
dead load

3.75

kN/m

live load
floor finish
total load
factor load
say

1.5
1
6.25
9.375
10

kN/m2
kN/m2
kN/m2
kN/m2
kN/m2

0.25

BENDING MOMENT CALCULATION


Mu=wl2/8
0.7
CHECK FOR d
Mu=0.138fckbd2
dreq
AREA CALCULATION
Ast x
Ast min
Ast pro
dia of bar

0.6

1.25

0.25

0.85
Leffx
Leffx

0.725
0.85
0.725

KN-m

12.6 OK

15
180
180
10
436.333
spacing
3
spacing provided
200
provide 10 mm@200mm c/c main bar
provide 8mm@200 mm c/c distribution bar

Client Circulation

mm2

mm

NMMC
YECPL

3) B. DESIGN CALCULATION OF ONE WAY SLAB FOR WW FLOOR SLAB:-

one way slab


Ly
concrete grade
grade of steel
density of concrete
span Lx
span Ly
effective cover
effective depth
provide D
breadth
eff.depth d
LOADING ON SLAB
dead load
live load
floor finish
total load
factor load
say

30
415
25
1.63
3.63
20
58.21
150
1000
125

N/mm2
N/mm2
N/mm2
m
m
mm
mm
mm
mm
mm

Lx

3.63

2.2

1.63

3.4

0.23

1.4

3.75
10
1

kN/m2
kN/m2
kN/m2

1.63

14.75
22.12
5

kN/m2

Leffx

kN/m2

Leffx

25

kN/m2

3.63

0.23

1.52
5
1.63
1.52
5

BENDING MOMENT CALCULATION


Mu=wl2/8
7.3
KN-m
CHECK FOR d
Mu=0.138fckbd2
dreq
AREA CALCULATION
Ast x
Ast min
Ast pro
dia of bar

41.9 OK

164
180
180
12
628.3
spacing
2
spacing provided
200
provide 12mm@200 mm c/c main bar

mm2

mm

provide 8mm@200 mm c/c distribution bar


Client Circulation

NMMC
YECPL

3) C. DESIGN CALCULATION OF ONE WAY SLAB FOR WW ROOF SLAB:-

one way slab


Ly
concrete grade
grade of steel
density of concrete
span Lx
span Ly
effective cover
effective depth
provide D
breadth
eff.depth d
LOADING ON SLAB
dead load
live load
floor finish
total load
factor load
say

30
415
25
1.63
3.63
20
58.21
150
1000
125

Lx

3.75
1.5
1
6.25
9.375
10

kN/m2
kN/m2
kN/m2
kN/m2
kN/m2
kN/m2

2.2

1.63

3.4

0.23

BENDING MOMENT CALCULATION


Mu=wl2/8
2.9
CHECK FOR d
Mu=0.138fckbd2
dreq
AREA CALCULATION

N/mm2
N/mm2
N/mm2
m
m
mm
mm
mm
mm
mm

3.63

1.4

3.63

0.23

1.63
Leffx
Leffx

1.525
1.63
1.525

KN-m

26.5OK

Ast x
65
Ast min
180
Ast pro
180
mm2
dia of bar
8
spacing
279.2533
spacing provided
200
mm
provide 8 mm@200mm c/c main bar
provide 8mm@200 mm c/c distribution bar