Bulk Electric System

Definition Reference
Document
Version 2 | April 2014
This technical reference was created by the Definition of Bulk Electric System drafting team
to assist entities in applying the definition. It should be read in concert with the complete
definition, found in the NERC Glossary of Terms, and any guidance issued by the ERO. The
process for handling requests for exceptions to the definition is found in Appendix 5c of the
NERC Rules of Procedure. Both the NERC Glossary of Terms and Rules of Procedure are
posted on the NERC website.

3353 Peachtree Road NE


Suite 600, North Tower
Atlanta, GA 30326
NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
404-446-2560 | www.nerc.com
1of85

Table of Contents

TableofContents......................................................................................................................................................3
Introduction...............................................................................................................................................................4
I. ListofFigures......................................................................................................................................................8
II. Inclusions..........................................................................................................................................................10
III. Exclusions..........................................................................................................................................................27
IV. HierarchicalApplicationoftheDefinition........................................................................................................68
V. AvailabilityofExceptionProcess......................................................................................................................84
VI. VersionHistory..................................................................................................................................................85

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
2of85

Introduction

DuringthecourseofProject201017DefinitionofBulkElectricSystem(DBES),severalcommentersrequested
thattheStandardDraftingTeam(SDT)createareferencedocumentexplaininghowthereviseddefinition
shouldbeapplied.Thisdocumentisintendedtoprovidesuchareference.

Disclaimer
ThisdocumentisnotanofficialpositionofNERCandwillnotbebindingonenforcementdecisionsoftheNERC
ComplianceMonitoringandEnforcementProgram.Thisreferencedocumentreflectstheprofessionalopinion
oftheDBESSDT,giveningoodfaithforillustrativepurposesonly.

Background
OnNovember18,2010FERCissuedOrderNo.743anddirectedNERCtorevisethedefinitionoftheBulkElectric
System(BES)sothatthedefinitionencompassesallElementsandFacilitiesnecessaryforthereliableoperation
andplanningoftheinterconnectedBulkPowerSystem.Therevisionstothedefinitionweredevelopedintwo
phases.ThefinalreviseddefinitionwasapprovedbytheFederalEnergyRegulatoryCommission(FERCorthe
Commission)onMarch20,2014.

Purpose
Thepurposeofthisdocumentistoassisttheindustrywiththeapplicationofthereviseddefinition.Examples
areprovidedwhereappropriatebutshouldnotbeconsideredasallinclusive.Thedocumentisintendedto
provideclarificationandexplanationsfortheapplicationofthereviseddefinitioninaconsistent,continentwide
basisforthemajorityofBESElements.

Definition
BulkElectricSystem(BES):Unlessmodifiedbythelistsshownbelow,allTransmissionElementsoperatedat100
kVorhigherandRealPowerandReactivePowerresourcesconnectedat100kVorhigher.Thisdoesnotinclude
facilitiesusedinthelocaldistributionofelectricenergy.

Inclusions:

I1Transformerswiththeprimaryterminalandatleastonesecondaryterminaloperatedat100kVor
higherunlessexcludedbyapplicationofExclusionE1orE3.

I2Generatingresource(s)includingthegeneratorterminalsthroughthehighsideofthestepup
transformer(s)connectedatavoltageof100kVorabovewith:

Grossindividualnameplateratinggreaterthan20MVA.Or,

Grossplant/facilityaggregatenameplateratinggreaterthan75MVA.

I3BlackstartResourcesidentifiedintheTransmissionOperatorsrestorationplan.

I4Dispersedpowerproducingresourcesthataggregatetoatotalcapacitygreaterthan75MVA(gross
nameplaterating),andthatareconnectedthroughasystemdesignedprimarilyfordeliveringsuch
capacitytoacommonpointofconnectionatavoltageof100kVorabove.Thus,thefacilities
designatedasBESare:

Theindividualresources,and

Thesystemdesignedprimarilyfordeliveringcapacityfromthepointwherethoseresources
aggregatetogreaterthan75MVAtoacommonpointofconnectionatavoltageof100kVorabove.

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
3of85

Introduction

I5Staticordynamicdevices(excludinggenerators)dedicatedtosupplyingorabsorbingReactivePower
thatareconnectedat100kVorhigher,orthroughadedicatedtransformerwithahighsidevoltageof
100kVorhigher,orthroughatransformerthatisdesignatedinInclusionI1unlessexcludedby
applicationofExclusionE4.

Exclusions:

E1Radialsystems:AgroupofcontiguoustransmissionElementsthatemanatesfromasinglepointof
connectionof100kVorhigherand:

OnlyservesLoad.Or,

Onlyincludesgenerationresources,notidentifiedinInclusionsI2,I3,orI4,withanaggregate
capacitylessthanorequalto75MVA(grossnameplaterating).Or,

WheretheradialsystemservesLoadandincludesgenerationresources,notidentifiedinInclusions
I2,I3orI4,withanaggregatecapacityofnonretailgenerationlessthanorequalto75MVA(gross
nameplaterating).
Note1Anormallyopenswitchingdevicebetweenradialsystems,asdepictedonprintsoroneline
diagramsforexample,doesnotaffectthisexclusion.
Note2Thepresenceofacontiguousloop,operatedatavoltagelevelof50kVorless,between
configurationsbeingconsideredasradialsystems,doesnotaffectthisexclusion.

E2Ageneratingunitormultiplegeneratingunitsonthecustomerssideoftheretailmeterthatserve
allorpartoftheretailLoadwithelectricenergyif:(i)thenetcapacityprovidedtotheBESdoesnot
exceed75MVA,and(ii)standby,backup,andmaintenancepowerservicesareprovidedtothe
generatingunitormultiplegeneratingunitsortotheretailLoadbyaBalancingAuthority,orprovided
pursuanttoabindingobligationwithaGeneratorOwnerorGeneratorOperator,orunderterms
approvedbytheapplicableregulatoryauthority.

E3Localnetworks(LN):AgroupofcontiguoustransmissionElementsoperatedatlessthan300kVthat
distributepowertoLoadratherthantransferbulkpoweracrosstheinterconnectedsystem.LNs
emanatefrommultiplepointsofconnectionat100kVorhighertoimprovethelevelofservicetoretail
customersandnottoaccommodatebulkpowertransferacrosstheinterconnectedsystem.TheLNis
characterizedbyallofthefollowing:

Limitsonconnectedgeneration:TheLNanditsunderlyingElementsdonotincludegeneration
resourcesidentifiedinInclusionsI2,I3,orI4anddonothaveanaggregatecapacityofnonretail
generationgreaterthan75MVA(grossnameplaterating);

RealPowerflowsonlyintotheLNandtheLNdoesnottransferenergyoriginatingoutsidetheLNfor
deliverythroughtheLN;and

NotpartofaFlowgateortransferpath:TheLNdoesnotcontainanypartofapermanentFlowgate
intheEasternInterconnection,amajortransferpathwithintheWesternInterconnection,ora
comparablemonitoredFacilityintheERCOTorQuebecInterconnections,andisnotamonitored
FacilityincludedinanInterconnectionReliabilityOperatingLimit(IROL).

E4ReactivePowerdevicesinstalledforthesolebenefitofaretailcustomer(s).

NoteElementsmaybeincludedorexcludedonacasebycasebasisthroughtheRulesofProcedure
exceptionprocess.

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
4of85

Introduction

Summary
AnunderstandingofthecoredefinitionandeachInclusionandExclusionisnecessarytoaccuratelyand
consistentlyapplytheBESdefinition.(ItshouldbenotedthattheBESdefinitionappliestoACandDCelectrical
facilities.)TheapplicationofthebrightlineBESdefinitionisathreestepprocessthat,whenappropriately
applied,willidentifythevastmajorityofBESElementsinaconsistentmannerthatcanbeappliedona
continentwidebasis.

FERCOrderNo.773directedimplementationoftherevisedBESdefinitiontotakeintoaccounttheimpactof
sub100kVloopedFacilitiesregardlessofvoltagelevel.Thisalteredpreviousguidanceontheevaluationof
radialsystems.Thedraftingteamdevelopedatechnicaljustificationsettingathresholdof50kVasthevalue
whereloopedfacilitieshadpotentialimpactontheBES,i.e.,ifaloopedFacilitywasbelow50kV,anentitycould
stillapplyExclusionE1asitwasshownthatloopedfacilitiesbelow50kVhadnoimpactonthereliabilityofthe
BES.Configurationsasshowninthediagramsdealingwiththeradialsystemandlocalnetworkexclusionsas
wellasthesystemdiagramsreflectthisfinding.

STEP1:COREDEFINITION:Thecoredefinitionisusedtoestablishthebrightlineof100kV,theoverall
demarcationpointbetweenBESandnonBESElements.ThecoreBESdefinitionidentifiestheRealPowerand
ReactivePowerresourcesconnectedat100kVorhigher,asincludedintheBES.Tofullyappreciatethescopeof
thecoredefinition,anunderstandingofthetermElementisneeded.ElementisdefinedintheNERC
Glossaryas:Anyelectricaldevicewithterminalsthatmaybeconnectedtootherelectricaldevicessuchasa
generator,transformer,circuitbreaker,bussection,ortransmissionline.Anelementmaybecomprisedofone
ormorecomponents.

STEP2:INCLUSIONS:ThisstepinvolvesapplyingthespecificInclusions,providesadditionalclarificationforthe
purposesofidentifyingspecificElementsthatareincludedintheBES.TheInclusionsaddressTransmission
ElementsandRealPowerandReactivePowerresourceswithspecificcriteriatoprovideforaconsistent
determinationofwhetheranElementisclassifiedasBESornonBES.TherearefiveInclusionsintheDefinition.
ThefacilitiesdescribedinInclusionsI1,I2,I4andI5areeachoperated(iftransformersInclusionI1)or
connected(ifgeneratingresources,dispersedpowerproducingresourcesorReactivePowerresources
InclusionsI2,I4andI5)atorabovethe100kVthreshold.InclusionI3encompassesBlackstartResources
identifiedinaTransmissionOperatorsrestorationplan,whicharenecessaryforthereliableoperationofthe
interconnectiontransmissionsystemandshouldbeincludedintheBESregardlessoftheirsize(MVA)orthe
voltageatwhichtheyareconnected.

STEP3:EXCLUSIONS:ThisstepevaluatesspecificsituationsforpotentialexclusionfromtheBES.Theexclusion
languageiswrittentospecificallyidentifyElementsorgroupsofElementsforexclusionfromtheBES.Stepthree
(3)shouldbeappliedinthefollowingsequence:

ExclusionE2(BehindtheMeterGeneration)providesforthespecificexclusionofcertainRealPowerresources
thatresidebehindtheretailmeter(onthecustomersside)andsupersedesthemoregeneralInclusionI2
(GeneratingResources).Behindthemetergenerationthatmeetsthesespecificcriteriadonotaffectreliability
oftheBESbecausethenetcapacitysuppliedtotheBESislessthan75MVAandthespecificcriteriaimpose
obligationstosupportreliabilitywhentheresourcesareunavailable.

ExclusionE4(ReactivePowerDevices)providesforthespecificexclusionofReactivePowerdevicesinstalledfor
thesolebenefitofaretailcustomer(s)andsupersedesthemoregeneralInclusionI5(StaticorDynamicReactive
PowerDevices).ReactivePowerdevicesinstalledforthesolebenefitofaretailcustomerare,bydefinition,not
requiredforoperationoftheinterconnectedtransmissionsystem.

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
5of85

Introduction

ExclusionE3(LocalNetworks)providesfortheexclusionoflocalnetworksthatmeetthespecificcriteria
identifiedintheexclusionlanguage.ExclusionE3doesnotallowfortheexclusionofRealPowerandReactive
PowerresourcescapturedbyInclusionsI2throughI5.Ininstanceswhereatransformer(underInclusionI1)isan
Elementofalocalnetwork(underExclusionE3),thetransformerwouldbeexcludedpursuanttoExclusionE3.
ExclusionE3maynotbeusedtoexcludetransmissionElements(capturedbythecoredefinitionandInclusion
I1)whenRealPowerresourcesarepresentthatarecapturedbyInclusionI2,I3,orI4.Thisassuresthat
interconnectionfacilitiesforBESgeneratorsarenotexcluded.

ExclusionE1(RadialSystems)providesfortheexclusionoftransmissionElementsfromradialsystemsthatmeet
thespecificcriteriaidentifiedintheexclusionlanguage.ExclusionE1doesnotallowfortheexclusionofReal
PowerandReactivePowerresourcescapturedbyInclusionsI2throughI5.Ininstanceswhereatransformer
(underInclusionI1)isanElementofaradialsystem(underExclusionE1),thetransformerwouldbeexcluded
pursuanttoExclusionE1.ExclusionE1maynotbeusedtoexcludetransmissionElements(capturedbythecore
definitionandInclusionI1)whenRealPowerresourcesarepresentthatarecapturedbyInclusionI2,I3,orI4.
ThisassuresthatinterconnectionfacilitiesforBESgeneratorsarenotexcluded.

ThisReferenceDocumenthasbeendividedintosectionstoaccuratelyillustratehowspecificpartsofthe
definitionareapplied,andthenhowthehierarchalapplicationofthedefinitionisaccomplished.SectionIisa
listoffigures.SectionsIIandIIIprovideillustrativediagramswithaccompanyingtext,whereappropriate,
describingtheapplicationoftheBESdefinition,groupedaccordingtothespecificinclusionorexclusion.Section
IVprovidesaseriesofsystemdiagramsthatdepictthehierarchicalapplicationofthedefinition.SectionV
establishesthelinkagetotheRulesofProcedureExceptionProcess.

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
6of85

I.

List of Figures

FigureI11:TypicalTwoWindingTransformer(BES)..............................................................................................11
FigureI12:TypicalThreeWindingTransformer(BES)...........................................................................................11
FigureI13:TypicalTwoWindingTransformer(nonBES)......................................................................................11
FigureI14:TypicalThreeWindingTransformer(nonBES)....................................................................................12
FigureI21:SingleGenerator(BES).........................................................................................................................13
FigureI22:SingleGenerator(nonBES)..................................................................................................................14
FigureI23:MultipleGeneratorsataSingleSite(BES)...........................................................................................15
FigureI24:MultipleGeneratorsataSingleSite(BES&nonBES).........................................................................16
FigureI25:MultipleGeneratorsataSingleSite(BES)...........................................................................................17
FigureI26:MultipleGeneratorsataSingleSite(BES&nonBES).........................................................................18
FigureI41:DispersedGenerationSite(SingleVoltageTransformation)WindFarm..........................................21
FigureI42:DispersedGenerationSite(UnknownCollectorSystemConfiguration)WindFarm........................22
FigureI43:DispersedGenerationSite(SingleVoltageTransformation)SolarArray..........................................23
FigureI44:DispersedGenerationSite(MultipleVoltageTransformations)SolarArray....................................24
FigureI51:ReactiveResources(BES&nonBES)...................................................................................................26
FigureE11:RadialSystem:ServingOnlyLoad.......................................................................................................31
FigureE12:MultipleRadialSystems(UnderlyingLoopFacilities<50kV).............................................................32
FigureE13:ImpactofSub100kVLoopedFacilities..............................................................................................33
FigureE14:RadialSystem:SingleBESGenerationResource.................................................................................34
FigureE15:RadialSystem:SinglenonBESGenerationResource.........................................................................35
FigureE16:RadialSystem:BlackstartResource....................................................................................................36
FigureE17:RadialSystem:Multiple(BES&nonBES)GenerationResources(NonRetail)..................................37
FigureE18:RadialSystem:Multiple(nonBES)GenerationResources(NonRetail).............................................38
FigureE19:RadialSystem:Multiple(nonBES)GenerationResources(NonRetail).............................................39
FigureE110:RadialSystem:Multiple(nonBES)GenerationResources(Retail&NonRetail).............................40
FigureE111:RadialSystem:GenerationResource(NonRetail)&ServingLoad..................................................41
FigureE112:RadialSystem:GenerationResource(NonRetail)&ServingLoad..................................................42
FigureE113:RadialSystem:GenerationResource(NonRetail)&ServingLoad..................................................43
FigureE114:RadialSystem:GenerationResource(NonRetail)&ServingLoad..................................................44
FigureE115:RadialSystem:GenerationResource(Retail&NonRetail)&ServingLoad.....................................45
FigureE116:RadialSystem:NormallyOpenSwitchingDevicebetweenLoadServingRadialSystems................46
FigureE117:RadialSystem:NormallyOpenSwitchingDevicebetweenLoadServingRadialSystemswitha<50
kVLoop....................................................................................................................................................................48
FigureE118:ImpactofSub100kVLoopedFacilities(SwitchingDevicesIdentifiedN.O.>100kV&N.C.<100kV
&>50kV)................................................................................................................................................................49
NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
7of85

ListofFigures

FigureE119:RadialSystem:NormallyClosedSwitchingDevice(>100kV)betweenLoadServingRadialSystems
witha<50kVLoop.................................................................................................................................................50
FigureE120:ImpactofSub100kVLoopedFacilities(SwitchingDevicesIdentifiedN.C.>100kV&N.C.<100kV
&>50kV)................................................................................................................................................................51
FigureE21:BehindtheMeterGeneration:NetCapacitytotheBESLessThan75MVA......................................53
FigureE22:BehindtheMeterGeneration:NetCapacitytotheBESGreaterThan75MVA................................54
FigureE31:LocalNetwork(nonBES)withRetail&NonRetailGenerationResources&ServingLoad...............57
FigureE32:LocalNetwork(BES)withRetail&NonRetailGenerationResources&ServingLoad.......................58
FigureE33:LocalNetwork(BES)withRetail&NonRetailGenerationResources&ServingLoad.......................59
FigureE34:LocalNetwork(nonBES)withSub100kVLoop.................................................................................61
FigureE35:LocalNetwork(BES)withSub100kVLoop........................................................................................62
FigureE36:LocalNetwork(nonBES)withSub100kVLoopedFacilities(SwitchingDevicesIdentified:N.O.>100
kV&N.C.<100kV/>50kV)....................................................................................................................................63
FigureE37:LocalNetwork(BES)withSub100kVLoopedFacilities(SwitchingDevicesIdentified:N.O.>100kV
&N.C.<100kV/<50kV).........................................................................................................................................64
FigureE38:LocalNetwork(nonBES)withSub100kVLoopedFacilities(SwitchingDevicesIdentified:N.C.>100
kV&N.C.<100kV/>50kV)....................................................................................................................................65
FigureE39:LocalNetwork(BES)withSub100kVLoopedFacilities(SwitchingDevicesIdentified:N.C.>100kV&
N.C.<100kV/>50kV).............................................................................................................................................66
FigureS11:SystemDiagramBaseDiagram.........................................................................................................70
FigureS12:SystemDiagramAssumptions..........................................................................................................71
Figure S13: System Diagram Application of Core Definition........................................................................72
FigureS14:SystemDiagramApplicationofInclusionI1.....................................................................................73
FigureS15:SystemDiagramApplicationofInclusionI2.....................................................................................74
FigureS16:SystemDiagramApplicationofInclusionI3.....................................................................................75
FigureS17:SystemDiagramApplicationofCoreDefinition&Inclusions........................................................76
FigureS18:SystemDiagramApplicationofExclusionE2....................................................................................77
FigureS19:SystemDiagramApplicationofExclusionE3....................................................................................78
FigureS19a:SystemDiagramApplicationofExclusionE3(EmbeddedLocalNetwork).....................................79
FigureS19b:SystemDiagramApplicationofExclusionE3(EmbeddedRadialSystems)....................................80
FigureS110:SystemDiagramApplicationofExclusionE1(Part1).....................................................................81
FigureS110a:SystemDiagramApplicationofExclusionE1(Part2)...................................................................82
FigureS111:SystemDiagramFullApplicationofBESDefinition........................................................................83

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
8of85

II. Inclusions
EachinclusionisshownbelowwithbothtextanddiagramsexplaininghowtoapplytheBESdefinitionforthe
specificconfigurationshown.Theseexamplesarenottobeconsideredallinclusive,andsimplyreflectthe
professionalopinionoftheDBESSDTandareprovidedingoodfaithforillustrativepurposesonly.This
documentisnotanofficialpositionofNERCandwillnotbebindingonenforcementdecisionsoftheNERC
ComplianceMonitoringandEnforcementProgram.

ThesectiononInclusionI3doesnotincludediagrams,astherearenoapplicationconfigurationissues
associatedwithit.BlackstartResourcesareincludedintheBESregardlessofconfigurationorlocation.

DiagramsonlyshowapplicationofthedefinitiontothespecificElementinquestion.Forexample,inFigureI11
below,onlythewindingsofthetransformerareshownasbeingincludedintheBES.Thelinescomingoutofthe
transformerarenotdelineatedasBESornonBES,asnoassumptionsarebeingmadeastowhereandhow
thoselinesconnectinthebigpicture.

Keytodiagramcolorcoding:

BlueindicatesthatanElementisincludedintheBES

GreenindicatesthatanElementisnotincludedintheBES

Orangeindicatespointsofconnection

BlackindicatesElementsthatarenotevaluatedforthespecificinclusiondepictedintheindividual
diagramsbeingshown

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
9of85

Inclusions

II.1 BES Inclusion I1


I1.Transformerswiththeprimaryterminalandatleastonesecondaryterminaloperatedat100kVorhigher
unlessexcludedunderExclusionE1[radial]orE3[localnetwork].

Note:FiguresI11throughI14aredepictionsoftheapplicationofInclusionI1andareintendedtoassistthe
userduringthehierarchicalapplicationoftheBESdefinition.

FiguresI11throughI14depictvarioustypesoftransformersandoperatingconfigurationstypicallyutilized
intheelectricutilityindustry.

FigureI11:TypicalTwoWindingTransformer(BES)

FigureI12:TypicalThreeWindingTransformer(BES)

FigureI13:TypicalTwoWindingTransformer(nonBES)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
10of85

Inclusions

FigureI14:TypicalThreeWindingTransformer(nonBES)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
11of85

Inclusions

II.2 BES Inclusion I2


I2.Generatingresource(s)includingthegeneratorterminalsthroughthehighsideofthestepuptransformer(s)
connectedatavoltageof100kVorabovewith:
a)Grossindividualnameplateratinggreaterthan20MVA.Or,
b)Grossplant/facilityaggregatenameplateratinggreaterthan75MVA.

Note:FiguresI21throughI26aredepictionsoftheapplicationofInclusionI2andareintendedtoassistthe
userduringthehierarchicalapplicationoftheBESdefinition.

Interpretationoftheorstatementintheinclusiondefinitionisahierarchicaloperatorthathasseveralstepsas
showninthefollowingdiagrams.

Thepresenceofasystemservice,astationservice,orageneratorauxiliarytransformerdoesnotaffectthe
applicationofInclusionI2.Transformersassociatedwithsystemservice,stationservice,orgeneratorauxiliaries
areevaluatedunderthecoredefinitionandInclusionI1.

FigureI21depictsasinglegeneratorwithgrossindividualnameplateratinggreaterthan20MVAconnected
throughthehighsideofthestepuptransformerconnectedatavoltageof100kVorabove.Byapplicationof
InclusionI2,thisgeneratorisidentifiedasaBESElement.

FigureI21:SingleGenerator(BES)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
12of85

Inclusions

FigureI22depictsasinglegeneratorwithgrossindividualnameplateratinglessthan20MVAconnected
throughthehighsideofthestepuptransformerconnectedatavoltageof100kVorabove.Byapplicationof
I2,thisgeneratorisnotaBESElement.

FigureI22:SingleGenerator(nonBES)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
13of85

Inclusions

FigureI23depictsasitewithmultiplegeneratorsconnectedthroughthehighsideofthestepuptransformer(s)
atavoltageof100kVorabovewithagrossaggregatenameplaterating(connected@100kVorabove)greater
than75MVA;therefore,byapplicationofInclusionI2,allofthegenerators(connected@100kVorabove)are
includedintheBES.

FigureI23:MultipleGeneratorsataSingleSite(BES)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
14of85

Inclusions

FigureI24depictsasitewithmultiplegeneratorsconnectedthroughthehighsideofthestepuptransformer(s)
atavoltageof100kVorabovewithanaggregatenameplaterating(connected@100kVorabove)lessthan75
MVA.ByapplicationofInclusionI2,onlythosegeneratorswithagrossnameplateratinggreaterthan20MVA
connectedthroughthehighsideofthestepuptransformer(s)atavoltageof100kVoraboveareincludedin
theBES.

FigureI24:MultipleGeneratorsataSingleSite(BES&nonBES)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
15of85

Inclusions

FigureI25depictsasitewithmultiplegeneratorsconnectedthroughthehighsideofthestepuptransformer(s)atavoltageof100kVorabovewitha
grossaggregatenameplaterating(connected@100kVorabove)greaterthan75MVA.ByapplicationofInclusionI2,allofthesegenerators(connected
@100kVorabove)areincludedintheBES.InaccordancewithInclusionI2,thegenerators,includingthegeneratorterminalsthroughthemultiplestep
uptransformerswithahighsideconnectionvoltageof100kVorabove,areconsideredtobeasingleBESElement.Thestepuptransformersandthe
interconnectingbusworkareinstalledforthepurposeofsteppingupthevoltageoutputofthegeneratortoavoltageof100kVorabove.

FigureI25:MultipleGeneratorsataSingleSite(BES)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
16of85

Inclusions

FigureI26depictsasitewithmultiplegeneratorsconnectedthroughthehighsideofthestepuptransformer(s)atavoltageof100kVorabovewitha
grossaggregatenameplaterating(connected@100kVorabove)lessthan75MVA.Therefore,onlythegeneratorsthatmeetthesingleunitinclusion
criteriaofgrossnameplateratingofgreaterthan20MVAareincludedintheBES.Thegeneratorwiththe25MVAgrossindividualnameplateratingis
notincludedintheBESorinthegenerationsitetotalbecausethestepuptransformersandtheinterconnectingbusworkareinstalledforthepurposeof
servingLoad.TheNERCGlossaryofTermsUsedinNERCReliabilityStandardsdefinesLoadasanendusedeviceorcustomerthatreceivespowerfrom
theelectricsystem.

FigureI26:MultipleGeneratorsataSingleSite(BES&nonBES)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
17of85

Inclusions

II.3 BES Inclusion I3

I3.BlackstartResourcesidentifiedintheTransmissionOperatorsrestorationplan.
InclusionI3includesBlackstartResourcesidentifiedintheTransmissionOperatorsrestorationplan.Blackstart
ResourcesareincludedintheBESregardlessofconfigurationorlocation.

TheNERCGlossaryofTermsUsedinNERCReliabilityStandardsdefinesBlackstartResourceasfollows:
Ageneratingunit(s)anditsassociatedsetofequipmentwhichhastheabilitytobestarted
withoutsupportfromtheSystemorisdesignedtoremainenergizedwithoutconnectiontothe
remainderoftheSystem,withtheabilitytoenergizeabus,meetingtheTransmission
Operatorsrestorationplanneedsforrealandreactivepowercapability,frequencyandvoltage
control,andthathasbeenincludedintheTransmissionOperatorsrestorationplan.

TheTransmissionOperatorsrestorationplanreferstotherestorationplanidentifiedinReliabilityStandard
EOP005SystemRestorationfromBlackstartResources.

FigureswerenotspecificallydevelopedforInclusionI3duetothesimplicityofthelanguageintheinclusion.In
SectionIV:HierarchicalApplicationoftheDefinition,thesystemdiagramsincludeaBlackstartResource
example.

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
18of85

Inclusions

II.4 BES Inclusion I4

I4.Dispersedpowerproducingresourcesthataggregatetoatotalcapacitygreaterthan75MVA(gross
nameplaterating),andthatareconnectedthroughasystemdesignedprimarilyfordeliveringsuchcapacitytoa
commonpointofconnectionatavoltageof100kVorabove.Thus,thefacilitiesdesignatedasBESare:

Theindividualresources,and

Thesystemdesignedprimarilyfordeliveringcapacityfromthepointwherethoseresourcesaggregate
togreaterthan75MVAtoacommonpointofconnectionatavoltageof100kVorabove.

Note:FiguresI41throughI44aredepictionsoftheapplicationofInclusionI4andareintendedtoassistthe
userduringthehierarchicalapplicationoftheBESdefinition.

Dispersedpowerproducingresourcesaresmallscalepowergenerationtechnologiesusingasystemdesigned
primarilyforaggregatingcapacityprovidinganalternativeto,oranenhancementof,thetraditionalelectric
powersystem.Examplescouldincludebutarenotlimitedto:solar,geothermal,energystorage,flywheels,
wind,microturbines,andfuelcells.

Common Point of Connection


ThecommonpointofconnectioniswheretheindividualtransmissionElement(s)ofthecollectorsystemis
connectedtothe100kVorhigherTransmissionsystem.(Note:Thispointistypicallyspecifiedintherespective
TransmissionOwnerandGeneratorOperatorInterconnectionAgreements.)

Collector Systems
FERCOrdersNo.773and773AidentifiedaconcernthattheCommissionexpressedregardingdispersedpower
collectorsystems.TheSDThasaddressedcollectorsystemsinaclearfashionthatleavesnoroomforarbitrary
determinationsandeliminatestheunintendedconsequencesofcategoricallyincludingaspartoftheBES,assets
thatmayincludelocaldistributionfacilities.

Thebasisofthisdeterminationtakesintoaccountthesignificantdifferencesincollectorsystemconfigurations
thatexisttodaythatdonotlendthemselvestoacontinentwidebrightlinedetermination.Thisresultedin
properlyidentifyingtheportionsofthecollectorsystemwhichconsistentlyprovideareliabilitybenefittothe
interconnectedtransmissionnetwork.Theresultidentifiesthepointofaggregationof75MVAandaboveand
theinterconnectingfacilitiestotheinterconnectedtransmissionnetwork.Theaggregationthresholdis
consistentwiththeaggregationofcapacityinInclusionI4andrecognizesthatthelossofthosefacilitiesresultin
alossof75MVAcapacityorgreatertotheBES.

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
19of85

Inclusions

FigureI41depictsadispersedgenerationsiteandsubstationdesignwithasingletransformationofvoltage.

FigureI41:DispersedGenerationSite(SingleVoltageTransformation)WindFarm

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
20of85

Inclusions

FigureI42depictsadispersedgenerationsiteandsubstationdesignwithunknowncollectorsystem
configuration.

FigureI42:DispersedGenerationSite(UnknownCollectorSystemConfiguration)WindFarm

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
21of85

Inclusions

FigureI43depictsadispersedgenerationsiteandsubstationdesignwithasingletransformationofvoltage.

FigureI43:DispersedGenerationSite(SingleVoltageTransformation)SolarArray

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
22of85

Inclusions

FigureI44depictsadispersedgenerationsiteandsubstationdesignwithmultiplelevelsofvoltage
transformation.

Dispersed generation site and substation design (multiple transformations of voltage level) with a gross
aggregate nameplate rating of 80 MVA (Individual Photovoltaic Bank Rating: 20 MVA). By application of
Inclusion I4 the Photovoltaic Cells & Inverters (generator units) are included in the BES.
Green indicates the portions of the Collector System that are not included in the BES.
Blue identifies BES dispersed power producing resources (Photovoltaic Cells & Inverters) and the
BES Elements between the point of aggregation and the common point of connection.

Photovoltaic
Cells &
Inverters
(Banks)

The point of aggregation is where the individual


generator name plate ratings of the dispersed
generation total > 75 MVA (actual 80 MVA) and a
failure would result in loss of 75 MVA capacity or
greater to the BES.

< 100kV
< 100kV

< 100kV
> 100kV

> 100kV

The common point of connection is where the individual transmission Element(s) of the collector
system is connected to the 100 kV or higher Transmission system. (Note: This point is typically
specified in the respective Transmission Owner and Generator Operator Interconnection
Agreements.)

FigureI44:DispersedGenerationSite(MultipleVoltageTransformations)SolarArray

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
23of85

Inclusions

II.4 BES Inclusion I5

I5.Staticordynamicdevices(excludinggenerators)dedicatedtosupplyingorabsorbingReactivePowerthatare
connectedat100kVorhigher,orthroughadedicatedtransformerwithahighsidevoltageof100kVorhigher,
orthroughatransformerthatisdesignatedinInclusionI1.

InclusionI5identifiesstaticordynamicdevices(identifiedasReactiveResourcesthroughoutthedocumentto
simplifythediagrams)connectedviaanyofthemethodsidentifiedbythequalifiersregardlessoftheamountof
ReactivePoweroutput/input.ItisimportanttonoteInclusionI5identifiesonlythosestaticordynamic
devicestobeincludedbymeetingthequalifyingconnectioncriteria,anddoesnotincludeanyofthe
associatingqualifiers(i.e.,associateddedicatedtransformers).Inthefollowingexamples,severalreactive
resources(electricallydepictedascapacitors)areidentifiedwithvariousconnectionmethods.

Note:FigureI51depictstheapplicationofInclusionI5andisintendedtoassisttheuserduringthehierarchical
applicationoftheBESdefinition.

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
24of85

Inclusions

FigureI51depictsseveraldifferentmethodsofconnectingreactiveresourcestypicallyutilizedintheelectric
utilityindustry

FigureI51:ReactiveResources(BES&nonBES)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
25of85

III. Exclusions
Eachexclusion,withtheexceptionofExclusionE4,isshownbelowwithbothtextanddiagramsexplaininghow
toapplytheBESdefinitionforthespecificconfigurationshown.Theseexamplesarenottobeconsideredall
inclusive,andsimplyreflecttheprofessionalopinionoftheDBESSDTandareprovidedingoodfaithfor
illustrativepurposesonly.ThisdocumentisnotanofficialpositionofNERCandwillnotbebindingon
enforcementdecisionsoftheNERCComplianceMonitoringandEnforcementProgram.

ThesectiononExclusionE4doesnotincludediagrams,astherearenoapplicationconfigurationissues
associatedwithit.

DiagramsonlyshowapplicationofthedefinitiontothespecificElementinquestion,aspreviouslyexplained.

Keytodiagramcolorcoding:

BlueindicatesthatanElementisincludedintheBES.

GreenindicatesthatanElementisnotincludedintheBES.

Orangeindicatespointsofconnection

BlackindicatesElementsthatarenotevaluatedforthespecificexclusiondepictedintheindividual
diagramsbeingshown

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
26of85

Exclusions

III.1 BES Exclusion E1


E1.Radialsystems:AgroupofcontiguoustransmissionElementsthatemanatesfromasinglepointof
connectionof100kVorhigherand:
a.) OnlyservesLoad.Or,
b.) Onlyincludesgenerationresources,notidentifiedinInclusionsI2,I3,orI4,withanaggregatecapacity
lessthanorequalto75MVA(grossnameplaterating).Or,
c.) WheretheradialsystemservesLoadandincludesgenerationresources,notidentifiedinInclusionsI2,
I3,orI4,withanaggregatecapacityofnonretailgenerationlessthanorequalto75MVA(gross
nameplaterating).
Note1Anormallyopenswitchingdevicebetweenradialsystems,asdepictedonprintsoroneline
diagramsforexample,doesnotaffectthisexclusion.
Note2Thepresenceofacontiguousloop,operatedatavoltagelevelof50kVorless,between
configurationsbeingconsideredasradialsystems,doesnotaffectthisexclusion.

Single point of connection


Thesinglepointofconnectionof100kVorhigheriswheretheradialsystemwillbeginifitmeetsthecriteria
ofExclusionE1,includingpartsa,b,orc.Forexample,thestartoftheradialsystemmaybeahardtapofthe
Transmissionline,orcouldbethetappointwithinaringorbreakerandahalfbusconfiguration.

Theconnectiontotheradialsystemmustbefromonlyonepointat100kVorhigher.Anygroupofcontiguous
transmissionElementsthathavemultipleconnectionsat100kVorhigherdonotqualifyforExclusionE1.

Normallyopenswitchingdevicesbetweenradialsystems,willnotdisqualifyaradialsystemfromthisexclusion.

FERCOrderNo.773directedimplementationoftherevisedBESdefinitiontotakeintoaccounttheimpactof
sub100kVloopedFacilitiesregardlessofvoltagelevelalteringpreviousguidanceontheevaluationofradial
systems.Thismeantthatiftherewasaconnectionatthesub100kVlevelbetweentwosystemsthatwould
previouslyhavebeenconsideredasradial,saidsystemscouldnotbeevaluatedforpossibleradialsystem
exclusion.However,thedraftingteamdevelopedatechnicaljustificationestablishing50kVasathreshold
valueforsub100kVloopedfacilities.Ifthesub100kVloopis50kVorless,itwasshownthatitwouldnothave
animpactontheBESandthusanentitycouldstillapplyExclusionE1totheconfiguration.Iftheloopin
questionwasgreaterthan50kV,thenanentitycouldnotconsiderthesystemsasradialandwouldneedto
evaluatethemunderthecriteriaofExclusionE3ifseekingtoexcludetheFacilitiesfromtheBES.

Theevaluationofsub100kVloopsassociatedwiththeevaluationofElementsundertheE1exclusionisusedas
aqualifierforthepotentialexclusionoftheElementsthatoperateatorabove100kV.

FailuretomeetthebrightlinecriteriaestablishedbyExclusionE1doesnotresultintheinclusionof
thesub100kVloopsintheBES.

OrderNo.773,paragraph155states:

Thus,theCommission,whiledisagreeingwithNERCsinterpretation,doesnotproposetoincludethe
below100kVelementsinfigure3inthebulkelectricsystem,unlessdeterminedotherwiseinthe
exceptionprocess.

OrderNo.773A,paragraph36states:
Moreover,asnotedintheFinalRule,thesub100kVelementscomprisingradialsystemsandlocal
networkswillnotbeincludedinthebulkelectricsystem,unlessdeterminedotherwiseintheexception
process.
NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
27of85

Exclusions

Evaluation of single points of connection within radial systems under consideration


Iftheradialsystembeingevaluatedforexclusionemanatesfromasinglepointofconnectionof100kVorhigher
butdoesnotmeetthecriteriaestablishedinExclusionE1,includingpartsa,b,orc,thentheradialsystemdoes
notqualifyforexclusionfromtheBESasaradialsystemdescribedinExclusionE1anditsparts.However,
furtherevaluationoftheunderlyingElementswithintheoriginalradialsystemmaybeappropriate.Underlying
radialsystems,whichemanatefromasinglepointofconnectionof100kVorhigher,mayqualifyforexclusion
asradialsystemsofcontiguoustransmissionElementswithintheoriginalareaofconsiderationifthecriterion
establishedinExclusionE1,includingpartsa,b,orc,ismetfortheseFacilities.Suchevaluationsarenotshown
inthefiguresinthissectionwhichconcentrateonthebiggerpicture,butaredetailedinthesummarydiagrams
inSectionIVwherethehierarchicalapplicationofthedefinitionisdescribedandshown.(SeeFiguresS110and
S110aofthisdocumenttoviewexamplesofthehierarchicalapplicationoftheBESdefinitionwithrespectto
ExclusionE1.)

"transmission Element"
ThewordtransmissionisnotcapitalizedandisusedasaqualifiertothewordElementandismeantto
differentiatebetweenthetypesofElementsthatareidentifiedintheNERCGlossaryofTermsUsedinNERC
ReliabilityStandardsdefinitionofElement.

Element(NERCGlossaryofTerms):
Anyelectricaldevicewithterminalsthatmaybeconnectedtootherelectricaldevicessuchasa
generator,transformer,circuitbreaker,bussection,ortransmissionline.Anelementmaybecomprised
ofoneormorecomponents.

Theuseofthewords:agroupofcontiguoustransmissionElements,meansElementsat100kVorhigherthat
areconnectedinacontiguousmanner.ThisgroupofcontiguoustransmissionElementsservestheradialsystem
butdoesnotincludetheElementsthatareoperatedbelow100kV.

Non-retail Generation
Nonretailgenerationisanygenerationthatisnotbehindaretailcustomersmeter.Theradialsystemis
limitedtolessthan75MVAofnonretailgeneration.

RetailgenerationisbehindthemetergenerationwithallorsomeofthegenerationservingLoad.TheNERC
GlossaryofTermsUsedinNERCReliabilityStandardsdefinesLoadasan end-use device or customer that
receives power from the electric system.

ForretailgenerationmeetingthecriteriaestablishedbyExclusionE2,theretailgenerationnotconsumedonsite
canflowtotheBESprovidedthenetcapacitytotheBESdoesnotexceed75MVA.

TheMVAnameplateratingofretailgenerationcanaffecttheabilityofanentitytoutilizeExclusionE1(See
E1.b).

Reactive Resources
ExclusionE1providesfortheexclusionoftransmissionElementsfromradialsystemsthatmeetthespecific
criteriaidentifiedintheexclusionlanguage.ThisdoesnotallowfortheexclusionofReactivePowerresources
capturedbyInclusionI5.ExclusionE1onlyspeakstothetransmissioncomponentoftheradialsystem.

Generation Limits
Therearetwoconditionsunderwhichgenerationresourcescanpreventaradialsystemfromqualifyingfor
ExclusionE1:
1. AnygenerationwithintheradialsysteminquestionisidentifiedinInclusionI2,I3,orI4;or
NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
28of85

Exclusions

2. Theaggregatenameplatecapacityofthenonretailgenerationcapacitywithintheradialsystemin
questionexceeds75MVA.

Ifeitheroftheseconditionsapplies,theradialsystemdoesnotqualifyforExclusionE1.

ExclusionE1allowsfortheexclusionofcontiguoustransmissionElements(i.e.,transformers,circuitbreakers,
bussections,Transmissionlines,etc.)emanatingfromasinglepointofconnectionatavoltageof100kVor
higher.

Note:FiguresE11throughE120aredepictionsoftheapplicationofExclusionE1,andareintendedtoassistthe
userduringthehierarchicalapplicationoftheBESdefinition.

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
29of85

Exclusions

E1.aServes Load Only

FigureE11depictsaradialsystemthatcontainsonlyLoad.ThereisnolimittotheamountofLoadwithinthe
radialsystem.

FigureE11:RadialSystem:ServingOnlyLoad

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
30of85

Exclusions

FigureE12depictsaconfigurationthatcontainstwoseparateradialsystemsduetotheunderlyingloop
operatingatavoltageof<50kV.

FigureE12:MultipleRadialSystems(UnderlyingLoopFacilities<50kV)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
31of85

Exclusions

FigureE13depictsaconfigurationthatcontainsasub100kVloop(greaterthan50kV),whichcannotbe
evaluatedunderthecriteriaestablishedinExclusionE1andcanonlybeevaluatedunderthecriteriaestablished
inExclusionE3(SeediagramE34).

FigureE13:ImpactofSub100kVLoopedFacilities

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
32of85

Exclusions

E1.bGeneration Only

FigureE14depictsaradialsystemwithasinglegenerationresource(nonretail)andnoLoad.

FigureE14:RadialSystem:SingleBESGenerationResource

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
33of85

Exclusions

FigureE15depictsaradialsystemwithasinglegenerationresource(nonretail)andnoLoad.

FigureE15:RadialSystem:SinglenonBESGenerationResource

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
34of85

Exclusions

FigureE16depictsaradialsystemwithaBlackstartResource,andnoLoad.TheRadialSystemdoesnotmeet
theexclusioncriteriaofE1.bduetothepresenceoftheBlackstartResource.

FigureE16:RadialSystem:BlackstartResource

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
35of85

Exclusions

FigureE17depictsaradialsystemwithmultiplegenerationresources(nonretail)andnoLoad.Sincethearea
underconsiderationdoesnotmeetthecriteriaestablishedbyExclusionE1.b,furtherevaluationofthe
underlyingElementsmaybeappropriate.EachunderlyingElementmustmeetthecriteriaestablishedby
ExclusionE1,includingpartsa,b,orc,toqualifyforexclusionfromtheBES.Suchevaluationsarenotshownin
FigureE17,whichconcentratesonthebiggerpicture,butaredetailedinthesummarydiagramsinSectionIV
wherethehierarchicalapplicationofthedefinitionisdescribedandshown.

FigureE17:RadialSystem:Multiple(BES&nonBES)GenerationResources(NonRetail)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
36of85

Exclusions

FigureE18depictsaradialsystemwithmultiplegenerationresourcesandnoLoad.Theaggregategross
nameplatevaluesofthegenerationresourcesexceedthe75MVAthresholdestablishedbyExclusionE1.b.
SincetheareaunderconsiderationdoesnotmeetthecriteriaestablishedbyExclusionE1.b,furtherevaluation
oftheunderlyingElementsmaybeappropriate.EachunderlyingElementmustmeetthecriteriaestablishedby
ExclusionE1,includingpartsa,b,orc,toqualifyforexclusionfromtheBES.Suchevaluationsarenotshownin
FigureE18,whichconcentratesonthebiggerpicture,butaredetailedinthesummarydiagramsinSectionIV
wherethehierarchicalapplicationofthedefinitionisdescribedandshown.

> 100 kV

The single point of connection is where the radial


system (group of contiguous transmission
Elements) emanates at a voltage of 100 kV or
higher from the Transmission system.

Blue identifies the BES (included)


radial system. The depicted radial
system does not meet the exclusion
criteria established in Exclusion E1b
due to the presence of > 75 MVA
gross aggregate nameplate rating of
connected non-retail generation
(actual 85 MVA).

15 MVA
Generator Site
Boundary

< 100kV
> 100kV
> 100 kV

> 100kV
< 100kV

Generator Site
Boundary

18 MVA

The non-retail generators have gross


individual nameplate ratings < 20 MVA
(actual 18 MVA, 16 MVA, 15 MVA, 14
MVA, 12 MVA, & 10 MVA). By
application of Inclusion I2 these units are
not considered a BES Element.

< 100kV / > 100kV

< 100kV / > 100kV

Generator Site
Boundary

Generator Site
Boundary
16 MVA

10 MVA

Generator Site Boundary

12 MVA
> 100kV
< 100kV

< 100kV
> 100kV

14 MVA
Generator Site Boundary

FigureE18:RadialSystem:Multiple(nonBES)GenerationResources(NonRetail)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
37of85

Exclusions

FigureE19depictsaradialsystemwithmultiplegenerationresourcesandnoLoad.

> 100 kV

The single point of connection is where the radial


system (group of contiguous transmission
Elements) emanates at a voltage of 100 kV or
higher from the Transmission system.

Green identifies the BES


(excluded) radial system. The
depicted radial system meets the
exclusion criteria established in
Exclusion E1b due to the presence of
< 75 MVA gross aggregate
nameplate rating of connected nonretail generation (actual 69 MVA).

15 MVA
< 100kV
> 100kV

Generator Site
Boundary

> 100 kV

Generator Site
Boundary

> 100kV
< 100kV
18 MVA

The non-retail generators have gross


individual nameplate ratings < 20 MVA
(actual 18 MVA, 15 MVA, 14 MVA, 12
MVA, & 10 MVA). By application of
Inclusion I2 these units are not considered a
BES Element.

< 100kV / > 100kV


Generator Site
Boundary
10 MVA

Generator Site Boundary

12 MVA
> 100kV
< 100kV

< 100kV
> 100kV

14 MVA
Generator Site Boundary

FigureE19:RadialSystem:Multiple(nonBES)GenerationResources(NonRetail)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
38of85

Exclusions

FigureE110depictsaradialsystemwithmultiplegenerationresources(retailandnonretail)andnoLoad.The
customerownedgeneration(retail)andassociatedcustomerownedequipmentareexcludedfromtheBESby
applicationofExclusionE2andisnotconsideredacomponentoftheaggregatedtotalgenerationwithinthe
radialsystem.

FigureE110:RadialSystem:Multiple(nonBES)GenerationResources(Retail&NonRetail)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
39of85

Exclusions

E1.c - Generation and Serves Load

FigureE111depictsaradialsystemwithgenerationresources(nonretail)thatalsoservesLoad.Sincethearea
underconsiderationdoesnotmeetthecriteriaestablishedbyExclusionE1.c,furtherevaluationofthe
underlyingElementsmaybeappropriate.EachunderlyingElementmustmeetthecriteriaestablishedby
ExclusionE1,includingpartsa,b,orc,toqualifyforexclusionfromtheBES.Suchevaluationsarenotshownin
FigureE111,whichconcentratesonthebiggerpicture,butaredetailedinthesummarydiagramsinSectionIV
wherethehierarchicalapplicationofthedefinitionisdescribedandshown.

FigureE111:RadialSystem:GenerationResource(NonRetail)&ServingLoad

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
40of85

Exclusions

FigureE112depictsaradialsystemwithgenerationresources(nonretail)thatalsoservesLoad.

FigureE112:RadialSystem:GenerationResource(NonRetail)&ServingLoad

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
41of85

Exclusions

FigureE113depictsaradialsystemwithgenerationresources(nonretail)thatalsoservesLoad.Sincethearea
underconsiderationdoesnotmeetthecriteriaestablishedbyExclusionE1.c,furtherevaluationofthe
underlyingElementsmaybeappropriate.EachunderlyingElementmustmeetthecriteriaestablishedby
ExclusionE1,includingpartsa,b,orc,toqualifyforexclusionfromtheBES.Suchevaluationsarenotshownin
FigureE113,whichconcentratesonthebiggerpicture,butaredetailedinthesummarydiagramsinSectionIV
wherethehierarchicalapplicationofthedefinitionisdescribedandshown.
> 100 kV

Blue identifies the BES (included)


radial system. The depicted radial
system does not meet the exclusion
criteria established in Exclusion E1c
due to the presence of > 75 MVA
gross aggregate nameplate rating of
connected non-retail generation
(actual 85 MVA).

The single point of connection is where the radial


system (group of contiguous transmission
Elements) emanates at a voltage of 100 kV or
higher from the Transmission system.

17 MVA

> 100 kV

> 100kV
< 100kV

Generator Site
Boundary

18 MVA

The non-retail generators have gross


individual nameplate ratings < 20 MVA
(actual 18 MVA, 18 MVA, 17 MVA, 17
MVA, & 15 MVA). By application of
Inclusion I2 these units are not considered a
BES Element.

< 100kV / > 100kV


Generator Site
Boundary

To Load

18 MVA

< 100kV
> 100kV
Generator Site Boundary

> 100kV
< 100kV
17 MVA

Generator Site
Boundary

< 100kV
> 100kV

15 MVA
< 100kV
> 100kV

The substation
transformers are not
part of the BES since
both (primary and
secondary) terminals
are not operated at >
100 kV as per
Inclusion I1.

Generator Site Boundary


To Load
< 100kV / > 100kV

FigureE113:RadialSystem:GenerationResource(NonRetail)&ServingLoad

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
42of85

Exclusions

FigureE114depictsaradialsystemwithgenerationresources(nonretail)thatalsoservesLoad.

> 100 kV

The single point of connection is where the radial


system (group of contiguous transmission
Elements) emanates at a voltage of 100 kV or
higher from the Transmission system.

Green identifies the BES


(excluded) radial system. The
depicted radial system meets the
exclusion criteria established in
Exclusion E1b due to the presence of
< 75 MVA gross aggregate
nameplate rating of connected nonretail generation (actual 69 MVA).

15 MVA
Generator Site
Boundary

< 100kV
> 100kV
> 100 kV

> 100kV
< 100kV

Generator Site
Boundary

18 MVA

The non-retail generators have gross


individual nameplate ratings < 20 MVA
(actual 18 MVA, 15 MVA, 14 MVA, 12
MVA, & 10 MVA). By application of
Inclusion I2 these units are not considered a
BES Element.

< 100kV / > 100kV


Generator Site
Boundary

To Load
10 MVA

< 100kV / > 100kV

Generator Site Boundary

12 MVA
> 100kV
< 100kV
14 MVA
Generator Site Boundary

The substation transformers


are not part of the BES
since both (primary and
secondary) terminals are
not operated at > 100 kV as
per Inclusion I1.

To Load

< 100kV
> 100kV
< 100kV
> 100kV

FigureE114:RadialSystem:GenerationResource(NonRetail)&ServingLoad

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
43of85

Exclusions

FigureE115depictsaradialsystemwithgenerationresources(retailandnonretail)thatalsoservesLoad.

FigureE115:RadialSystem:GenerationResource(Retail&NonRetail)&ServingLoad

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
44of85

Exclusions

Normally open switching device


Radialsystemsshouldbeassessedwithallnormallyopen(N.O.)devicesintheopenposition.N.O.devices
installedatanyvoltagelevelwillnotpreventtheowneroroperatorfromusingthisexclusion.TheN.O.
device(s)mustbeidentifiedassuchonprintsandonelinediagramsthatareusedbytheoperatingentity.

FigureE116depictsmultipleradialsystemsseparatedbyaN.O.switchingdeviceoperatedat100kVorabove.
> 100 kV
The single point of connection is where
the radial system (group of contiguous
transmission Elements) emanates at a
voltage of 100 kV or higher from the
Transmission system.

The single point of connection is


where the radial system (group of
contiguous transmission
Elements) emanates at a voltage
of 100 kV or higher from the
Transmission system.

> 100 kV

Green identifies non-BES


(excluded) radial systems.

The normally open (N.O.)


device between the radial
systems does not affect this
exclusion.

The substation transformers are not part of


the BES since both (primary and
secondary) terminals are not operated at >
100 kV as per Inclusion I1.

Substation
Boundary

> 100kV
< 100kV

Normally Open
(N.O.)

Substation
Boundary

> 100kV
< 100kV
< 100 kV

< 100 kV

To Load
The normally open (N.O.) device
between the radial sub-100 kV systems
does not affect this exclusion.

Normally Open
(N.O.)

To Load

FigureE116:RadialSystem:NormallyOpenSwitchingDevicebetweenLoadServingRadialSystems

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
45of85

Exclusions

FERCOrderNo.773directedimplementationoftherevisedBESdefinitiontotakeintoaccounttheimpactof
sub100kVloopedFacilitiesregardlessofvoltagelevelalteringpreviousguidanceontheevaluationofradial
systems.Thismeantthatiftherewasaconnectionatthesub100kVlevelbetweentwosystemsthatwould
previouslyhavebeenconsideredasradial,saidsystemscouldnotbeevaluatedforpossibleradialsystem
exclusion.However,thedraftingteamdevelopedatechnicaljustificationestablishing50kVasathresholdvalue
forsub100kVloopedfacilities.Ifthesub100kVloopis50kVorless,itwasshownthatitwouldnothavean
impactontheBESandthusanentitycouldstillapplyExclusionE1totheconfiguration.Iftheloopinquestion
wasgreaterthan50kV,thenanentitycouldnotconsiderthesystemsasradialandwouldneedtoevaluate
themunderthecriteriaofExclusionE3ifseekingtoexcludetheFacilitiesfromtheBES.

Theevaluationofsub100kVloopsassociatedwiththeevaluationofElementsundertheE1exclusionisusedas
aqualifierforthepotentialexclusionoftheElementsthatoperateatorabove100kV.

FailuretomeetthebrightlinecriteriaestablishedbyExclusionE1doesnotresultintheinclusionof
thesub100kVloopsintheBES.

OrderNo.773,paragraph155states:
Thus,theCommission,whiledisagreeingwithNERCsinterpretation,doesnotproposetoincludethe
below100kVelementsinfigure3inthebulkelectricsystem,unlessdeterminedotherwiseinthe
exceptionprocess.

OrderNo.773A,paragraph36states:
Moreover,asnotedintheFinalRule,thesub100kVelementscomprisingradialsystemsandlocal
networkswillnotbeincludedinthebulkelectricsystem,unlessdeterminedotherwiseintheexception
process.

Note:FiguresE117throughE120depictscenariosthatrequireevaluationbasedonthecriteriaestablishedin
theBESdefinitionasrevisedbytheFERCOrderanddescribedabove.

FigureE118depictsasituationwhichcannotbeevaluatedunderthecriteriaestablishedinExclusionE1andcan
onlybeevaluatedundertheExclusionE3criteriasincetheunderlyingloopis>50kV(seeFigureE36).

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
46of85

Exclusions

FigureE117:RadialSystem:NormallyOpenSwitchingDevicebetweenLoadServingRadialSystemswitha<50
kVLoop

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
47of85

Exclusions

FigureE118depictsasituationwhichcannotbeevaluatedunderthecriteriaestablishedinExclusionE1andcan
onlybeevaluatedundertheExclusionE3criteriasincetheunderlyingloopis>50kV(seeFigureE36).

> 100 kV
The single point of connection is where
the radial system (group of contiguous
transmission Elements) emanates at a
voltage of 100 kV or higher from the
Transmission system.

The single point of connection is


where the radial system (group of
contiguous transmission
Elements) emanates at a voltage
of 100 kV or higher from the
Transmission system.

> 100 kV

The normally open (N.O.)


device between the radial
systems does not affect this
exclusion.

The substation transformers are not part of


the BES since both (primary and
secondary) terminals are not operated at >
100 kV as per Inclusion I1.

Substation
Boundary

> 100kV
< 100kV / > 50kV

Normally Open
(N.O.)

Substation
Boundary

> 100kV
< 100kV / > 50kV
< 100 kV / > 50 kV

< 100 kV / > 50 kV

To Load
The normally closed (N.C.) device
between the radial systems operating at
voltages < 100kV and > 50 kV affects this
exclusion.

Normally Closed
(N.C.)

To Load

FigureE118:ImpactofSub100kVLoopedFacilities(SwitchingDevicesIdentifiedN.O.>100kV&N.C.<100kV
&>50kV)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
48of85

Exclusions

FigureE119depictsmultipleradialsystemswithaN.C.switchingdeviceoperatedat100kVorabovewithan
underlyingloopoperatingatvoltageslessorequalto50kV.

FigureE119:RadialSystem:NormallyClosedSwitchingDevice(>100kV)betweenLoadServingRadialSystems
witha<50kVLoop

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
49of85

Exclusions

FigureE120depictsasituationwhichcannotbeevaluatedunderthecriteriaestablishedinExclusionE1andcan
onlybeevaluatedundertheExclusionE3criteriasincetheunderlyingloopis>50kV(seeFiguresE38).

> 100 kV
The single point of connection is where
the radial system (group of contiguous
transmission Elements) emanates at a
voltage of 100 kV or higher from the
Transmission system.

The single point of connection is


where the radial system (group of
contiguous transmission
Elements) emanates at a voltage
of 100 kV or higher from the
Transmission system.

> 100 kV

The normally closed (N.C.)


device between the radial
systems operating at voltages
> 100kV requires evaluation
based on Exclusion E3.

The substation transformers are not part of


the BES since both (primary and
secondary) terminals are not operated at >
100 kV as per Inclusion I1.

Substation
Boundary

> 100kV
< 100kV / > 50kV

Normally Closed
(N.C.)

Substation
Boundary

> 100kV
< 100kV / > 50kV
< 100 kV / > 50 kV

< 100 kV / > 50 kV

To Load
The normally closed (N.C.) device
between the radial systems operating at
voltages < 100kV and > 50 kV requires
evaluation based on Exclusion E3.

Normally Closed
(N.C.)

To Load

FigureE120:ImpactofSub100kVLoopedFacilities(SwitchingDevicesIdentifiedN.C.>100kV&N.C.<100kV
&>50kV)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
50of85

Exclusions

III.2 BES Exclusion E2

E2.Ageneratingunitormultiplegeneratingunitsonthecustomerssideoftheretailmeterthatserveallorpart
oftheretailcustomerLoadwithelectricenergyonthecustomerssideoftheretailmeterif:(i)thenetcapacity
providedtotheBESdoesnotexceed75MVA,and(ii)standby,backup,andmaintenancepowerservicesare
providedtothegeneratingunitormultiplegeneratingunitsortotheretailLoadbyaBalancingAuthority,or
providedpursuanttoabindingobligationwithaGeneratorOwnerorGeneratorOperator,orunderterms
approvedbytheapplicableregulatoryauthority.

ExclusionE2providesfortheexclusionoftheRealPowerresourcesthatresidebehindtheretailmeter(onthe
customersside)andsupersedesInclusionI2.TheexclusionisarestatementoftheexclusioninSectionIII.c.4of
theEROStatementofComplianceRegistryCriteria(v.5),asclarifiedbytheSDTinresponsetoindustry
commentsandrecommendations:

Asageneralmatter,acustomerownedoroperatedgenerator/generationthatservesallor
partofretailloadwithelectricenergyonthecustomerssideoftheretailmetermaybe
excludedasacandidateforregistrationbasedonthesecriteriaif(i)thenetcapacityprovidedto
theBulkPowerSystemdoesnotexceedthecriteriaaboveortheRegionalEntityotherwise
determinesthegeneratorisnotmaterialtotheBulkPowerSystemand(ii)standby,backupand
maintenancepowerservicesareprovidedtothegeneratorortotheretailloadpursuanttoa
bindingobligationwithanothergeneratorowner/operatororundertermsapprovedbythelocal
regulatoryauthorityortheFederalEnergyRegulatoryCommission,asapplicable.

ExclusionE2isdedicatedtothesituationfacedbybehindthemeter(i.e.,retailcustomerowned)generation
thatarequalifyingfacilitiesasdefinedbythePublicUtilityRegulatoryPoliciesAct(PURPA)intheUS(e.g.,see18
CFRPart292fortheregulationsthatareapplicableintheUS),andsimilarlysituatedfacilitiesinCanada.These
facilitiesoftenreferredtoascombinedheatandpower(CHP)facilitiesarecommonlyemployedatpetroleum
refineries,chemicalandfoodprocessingplants,pulpandpapermills,steelmills,andlargecommercial
applicationsrequiringbothelectricalandthermalenergy.

TheprimarypurposeofretailcustomerownedgenerationinthecontextofExclusionE2istheintegrityofsteam
productionthatsupportsamanufacturingprocess.TheelectricalLoadofthathostprocessdoesnotexist
withoutsteam.However,ExclusionE2mightapplytoothersituationsaswell.

ExclusionE2referencesthenetgeneration(inMWs)sincethatishowthegenerationisoperated,andthe
residual(net)amountexportedtotheBESiswhatisdeemedrelevanttotheexclusionandreliability,notthe
nameplateratinginMVA.TheRealPower(physical)exportissubjecttoa75MVAthreshold.Condition(ii)in
ExclusionE2isderivedfromFERCorprovincialregulationsapplicabletoqualifyingcogenerationandsmall
powerproductionfacilities(i.e.,QFs).Forexample,see18CFR292.101and292.305(b)fortherequirements
specifictotheUS.Condition(ii)requiresthatthegenerationservingtheretailcustomerLoadselfprovide
reserves(i.e.,standby,backup,andmaintenancepower),andisessentialfortheintegrityoftheexclusion.
Thesereservesmaintainsteamgenerationandtheloadtosustainthemanufacturingprocess.IntheUS,the
termsandconditionsofstandby,backup,andmaintenanceservicesaredefinedandadministeredbyState
PublicServiceCommissions(PSC)(i.e.,theapplicableregulatoryauthorityintheUS)subjecttoFERCoversight.
TheseservicesareprovidedundercontractortariffwithGeneratorOwners,GeneratorOperators,orBalancing
AuthoritiesinregionsthatdonothaveIndependentSystemOperators(ISOs)orRegionalTransmission
Operators(RTOs),andprovidedbyISOsandRTOswhereorganizedmarketsoperate.Thesetermsand
conditionswillbeunderstoodinBalancingAuthorityAreaswhereitisapplicable,asitreflectsexistingindustry
practice.

MultipleconnectionpointstotheBESdonotprecludetheuseofExclusionE2.
NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
51of85

Exclusions

Net capacity
ThenetcapacitydeterminationforExclusionE2isthenetflowtotheBESasmeasuredbyintegratedhourly
revenuemeteringforthemostrecent12monthperiod.PeriodsofnetcapacitytotheBESthatexceedthe
thresholdvaluewhendirectedbytheapplicableBalancingAuthoritydonotprecludetheabilitytoutilizethis
exclusion.

Note:FiguresE21andE22aredepictionsoftheapplicationofExclusionE2andareintendedtoassisttheuser
duringthehierarchicalapplicationoftheBESdefinition.

FigureE21depictscustomerownedgenerationresidingbehindtheretailmeter.Thecogenerationoperationis
resultinginanetcapacitytotheBESof50MVA.

Cogeneration Operation: Net capacity to the BES is < 75 MVA (Actual 50


MVA) and standby power has been secured in accordance with the language
in Exclusion E2

> 100kV

The point of connection is where


the customer owned equipment is
connected to the 100 kV or higher
Transmission system. (Note: This
point is specified in the respective
Interconnection Agreements.)

50 MVA to BES

100 MVA to
Industrial Process

> 100kV/< 100kV

Boiler

> 100kV
< 100kV

150 MVA

Customer owned generation


behind the customers meter
is excluded from the BES by
application of Exclusion E2:
Net capacity to the BES
is less than 75 MVA
(Actual 50MVA), and
Standby power has been
secured in accordance
with the language in
Exclusion E2.

FigureE21:BehindtheMeterGeneration:NetCapacitytotheBESLessThan75MVA

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
52of85

Exclusions

FigureE22depictscustomerownedgenerationresidingbehindtheretailmeter.Thecogenerationoperationis
resultinginanetcapacitytotheBESof100MVA.

FigureE22:BehindtheMeterGeneration:NetCapacitytotheBESGreaterThan75MVA

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
53of85

Exclusions

III.3 BES Exclusion E3

E3.Localnetworks(LN):AgroupofcontiguoustransmissionElementsoperatedatlessthan300kVthat
distributepowertoLoadratherthantransferbulkpoweracrosstheinterconnectedsystem.LNsemanatefrom
multiplepointsofconnectionat100kVorhighertoimprovethelevelofservicetoretailcustomers,andnotto
accommodatebulkpowertransferacrosstheinterconnectedsystem.TheLNischaracterizedbyallofthe
following:

Limitsonconnectedgeneration:TheLNanditsunderlyingElementsdonotincludegenerationresources
identifiedinInclusionsI2,I3,orI4,anddonothaveanaggregatecapacityofnonretailgeneration
greaterthan75MVA(grossnameplaterating);

RealPowerflowsonlyintotheLNandtheLNdoesnottransferenergyoriginatingoutsidetheLNfor
deliverythroughtheLN;and

NotpartofaFlowgateortransferpath:TheLNdoesnotcontainanypartofapermanentFlowgatein
theEasternInterconnection,amajortransferpathwithintheWesternInterconnection,oracomparable
monitoredFacilityintheERCOTorQuebecInterconnections,andisnotamonitoredFacilityincludedin
anInterconnectionReliabilityOperatingLimit(IROL).

ExclusionE3isanexclusionforthecontiguoustransmissionElementsthatoperateatorabove100kVbutless
than300kVandemanatefrommultiplepointsofconnectionat100kVorhigher.Thelocalnetworkexclusionis
notdependentontheexistenceofaswitchingdeviceatthepointsofconnectiontotheBES(i.e.,automatic
interruptingdevice,manualdisconnects,etc.).Generationresourcesconnectedwithinthelocalnetwork,power
flowcriteria,andElementclassification(i.e.,Flowgate,transferpath)arequalifiersforthisexclusion.

ExclusionE3doesnotallowfortheexclusionofgenerationresourcesthatmeetthecriteriaforgeneration
resourcesasdescribedinInclusionsI2,I3,andI4.Reactiveresourcesthatmeetthecriteriadescribedin
InclusionI5cannotbeexcludedbyapplicationofExclusionE3.ThepresenceofReactiveresourcesdoesnot
precludetheabilitytoinvokeExclusionE3.ExclusionE3allowsfortheexclusionofcontiguoustransmission
Elements(i.e.,transformers,circuitbreakers,bussections,andtransmissionlines)emanatingfrommultiple
pointsofconnectionatavoltageof100kVorhigher.

ThepowerflowcriteriondescribestheRealtimeoperationalcharacteristicsofthelocalnetwork.And,by
definition,thelocalnetwork,cannotbepartofadesignatedFlowgateortransferpath.

FERCOrderNo.773directedimplementationoftherevisedBESdefinitiontotakeintoaccounttheimpactof
sub100kVloopedFacilitiesregardlessofvoltagelevelalteringpreviousguidanceontheevaluationoflocal
networks.Thismeantthatiftherewasaconnectionatthesub100kVlevelbetweentwosystemsthatwould
previouslyhavebeenconsideredasradial,saidsystemscouldnotbeevaluatedforpossibleradialsystem
exclusion.However,thedraftingteamdevelopedatechnicaljustificationestablishing50kVasathresholdvalue
forsub100kVloopedfacilities.Ifthesub100kVloopis50kVorless,itwasshownthatitwouldnothavean
impactontheBESandthusanentitycouldstillapplyExclusionE1totheconfiguration.Iftheloopinquestion
wasgreaterthan50kV,thenanentitycouldnotconsiderthesystemsasradialandwouldneedtoevaluate
themunderthecriteriaofExclusionE3ifseekingtoexcludetheFacilitiesfromtheBES.

Theevaluationofsub100kVloopsassociatedwiththeevaluationofElementsundertheE3exclusionisusedas
aqualifierforthepotentialexclusionoftheElementsthatoperateatorabove100kV.

FailuretomeetthebrightlinecriteriaestablishedbyExclusionE3doesnotresultintheinclusionof
thesub100kVloopsintheBES.

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
54of85

Exclusions

OrderNo.773,paragraph155states:
Thus,theCommission,whiledisagreeingwithNERCsinterpretation,doesnotproposetoincludethe
below100kVelementsinfigure3inthebulkelectricsystem,unlessdeterminedotherwiseinthe
exceptionprocess.

OrderNo.773A,paragraph36states:
Moreover,asnotedintheFinalRule,thesub100kVelementscomprisingradialsystemsandlocal
networkswillnotbeincludedinthebulkelectricsystem,unlessdeterminedotherwiseintheexception
process.

Entitiesshouldbepreparedtojustifylocalnetworkdeterminations.

Reactive Resources
ReactiveresourcesthatmeetthecriteriadescribedinInclusionI5cannotbeexcludedbyapplicationofExclusion
E3.ThepresenceofreactiveresourcesdoesnotprecludetheabilitytoinvokeExclusionE3.
Generation Limits
TherearetwoconditionsunderwhichgenerationresourcescanpreventanetworkfromqualifyingforExclusion
E3:
1. Theaggregatenameplatecapacityofthenonretailgenerationcapacitywithinthenetworkinquestion
exceeds75MVA;or
2. AnygenerationwithinthelocalnetworkinquestionisidentifiedinInclusionI2,I3,orI4.

Ifeitheroftheseconditionsapplies,thenetworkdoesnotqualifyforExclusionE3.

Power Flow at BES Interface


AnentitywhodeterminesthatalloraportionofitsFacilitiesmeetthelocalnetworkexclusionshouldbeableto
demonstrate,byinspectionofactualsystemdata,thatflowofpowerisalwaysintothelocalnetworkateach
pointofinterfacewiththeBESatalltimes.TheSDTsintentwasthathourlyintegratedpowerflowvaluesover
thecourseofthemostrecenttwoyearperiodwouldbesufficienttomakesuchademonstration.

InorderfortransmissionElementstoqualifyforExclusionE3,powerflowdirectionatallpointsofBESinterface
mustbeintothelocalnetworkunderalloperatingconditions.Therefore,thesecondcharacteristicofExclusion
E3(E3.b)that:theLNdoesnottransferenergyoriginatingoutsidetheLNfordeliverythroughtheLNwill
alsobesatisfiedinthatenergyisnotbeingtransferredthroughthelocalnetwork.

Voltage Thresholds
ThelocalnetworkexclusionappliestoelectrictransmissionElementsoperatedbelow300kV,andcannotextend
toanyFacilitiesoperatedabove300kV.Facilitiesoperatedbelow100kVareexcludedfromtheBESby
applicationofthecoredefinition.

IfthecandidatelocalnetworkdoesnotqualifyforExclusionE3,thenfurtherevaluationoftheunderlying
Elementsmaybeappropriatebasedonothercriteriawithinthedefinition.EachunderlyingElementmustmeet
thecriteriaestablishedbyExclusionE3,includingpartsa,b,andc,toqualifyforexclusionfromtheBES.Such
evaluationsarenotshowninFiguresE31throughE39,whichconcentrateonthebiggerpicture,butare
detailedinthesummarydiagramsinSectionIVwherethehierarchicalapplicationofthedefinitionisdescribed
andshown.
Note:FiguresE31throughE39aredepictionsoftheapplicationofExclusionE3andareintendedtoassistthe
userduringthehierarchicalapplicationoftheBESdefinition.
NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
55of85

Exclusions

FigureE31depictsanexcludedlocalnetworkwhichcontainsretailandnonretailgenerationresourcesandalsoservesLoad.Thelocalnetworkoperates
atavoltageof138kVandhasnonretailgenerationresourceswithanaggregatenameplateratingof40MVAandpoweronlyflowsintothelocal
networkateachpointofconnection.

FigureE31:LocalNetwork(nonBES)withRetail&NonRetailGenerationResources&ServingLoad

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
56of85

Exclusions

FigureE32showshowthepresenceofaBESgeneratoraffectsthestatusofapotentiallocalnetwork.Notethatfurtherevaluationofunderlying
elementsmayberequiredtocompletethefullapplicationofthedefinition.Asnotedabove,suchevaluationisnotshownintheindividualsectionsof
thisdocumentbutmaybeseeninthesystemdiagrams.

FigureE32:LocalNetwork(BES)withRetail&NonRetailGenerationResources&ServingLoad
NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
57of85

Exclusions

FigureE33depictsalocalnetworkwhichcontainsretailandnonretailgenerationresourcesandalsoservesLoad.Thelocalnetworkdoesnotmeetthe
criteriaestablishedbyExclusionE3inthatpowerflowsoutofthelocalnetworkatoneofthepointsofconnectiontotheinterconnectedTransmission
system.Notethatfurtherevaluationofunderlyingelementsmayberequiredtocompletethefullapplicationofthedefinition.Asnotedabove,such
evaluationisnotshownintheindividualsectionsofthisdocumentbutmaybeseeninthesystemdiagrams.

FigureE33:LocalNetwork(BES)withRetail&NonRetailGenerationResources&ServingLoad

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
58of85

Exclusions

FERCOrderNo.773directedimplementationoftherevisedBESdefinitiontotakeintoaccounttheimpactof
sub100kVloopedFacilitiesregardlessofvoltagelevelalteringpreviousguidanceontheevaluationofradial
systems.Thismeantthatiftherewasaconnectionatthesub100kVlevelbetweentwosystemsthatwould
previouslyhavebeenconsideredasradial,saidsystemscouldnotbeevaluatedforpossibleradialsystem
exclusion.However,thedraftingteamdevelopedatechnicaljustificationestablishing50kVasathresholdvalue
forsub100kVloopedfacilities.Ifthesub100kVloopis50kVorless,itwasshownthatitwouldnothavean
impactontheBESandthusanentitycouldstillapplyExclusionE1totheconfiguration.Iftheloopinquestion
wasgreaterthan50kV,thenanentitycouldnotconsiderthesystemsasradialandwouldneedtoevaluate
themunderthecriteriaofExclusionE3ifseekingtoexcludetheFacilitiesfromtheBES.
Theevaluationofsub100kVloopsassociatedwiththeevaluationofElementsundertheE3exclusionisusedas
aqualifierforthepotentialexclusionoftheElementsthatoperateatorabove100kV.

FailuretomeetthebrightlinecriteriaestablishedbyExclusionE3doesnotresultintheinclusionof
thesub100kVloopsintheBES.

OrderNo.773,paragraph155states:
Thus,theCommission,whiledisagreeingwithNERCsinterpretation,doesnotproposetoincludethe
below100kVelementsinfigure3inthebulkelectricsystem,unlessdeterminedotherwiseinthe
exceptionprocess.

OrderNo.773A,paragraph36states:
Moreover,asnotedintheFinalRule,thesub100kVelementscomprisingradialsystemsandlocal
networkswillnotbeincludedinthebulkelectricsystem,unlessdeterminedotherwiseintheexception
process.

Note:FiguresE34throughE39depictscenariosthatrequireevaluationbasedonthecriteriaestablishedinthe
BESdefinitionasrevisedbytheFERCOrderanddescribedabove.

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
59of85

Exclusions

FigureE34depictsasituationwhichrequiresevaluationbasedontheExclusionE3criteria(seeFigureE13).

FigureE34:LocalNetwork(nonBES)withSub100kVLoop

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
60of85

Exclusions

FigureE35duplicatestheconfigurationofFigureE34,howeversincepowerisflowingoutofthepotentiallocal
network,thisconfigurationdoesnotqualifyasalocalnetworkbasedontheExclusionE3criteria.

FigureE35:LocalNetwork(BES)withSub100kVLoop

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
61of85

Exclusions

FigureE36depictsasituationwhichrequiresevaluationbasedontheExclusionE3criteria(seeFigureE118).

FigureE36:LocalNetwork(nonBES)withSub100kVLoopedFacilities(SwitchingDevicesIdentified:N.O.>100
kV&N.C.<100kV/>50kV)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
62of85

Exclusions

FigureE37duplicatestheconfigurationofFigureE36,howeversincepowerisflowingoutofthepotentiallocal
network,thisconfigurationdoesnotqualifyasalocalnetworkbasedontheExclusionE3criteria.Sincethearea
underconsiderationdoesnotmeetthecriteriaestablishedbyExclusionE3,furtherevaluationoftheunderlying
Elementsmaybeappropriate.EachunderlyingElementmustmeetthecriteriaestablishedbyExclusionE3,
includingpartsa,b,orc,toqualifyforexclusionfromtheBES.SuchevaluationsarenotshowninFigureE39,
whichconcentratesonthebiggerpicture,butaredetailedinthesummarydiagramsinSectionIVwherethe
hierarchicalapplicationofthedefinitionisdescribedandshown.

< 300 kV
The presence of the sub-100 kV loop establishes
multiple points of connection at a voltage level
of 100 kV or higher to the Transmission
System.

Power
Flow

< 300 kV

Power
Flow

The network does not meet the


exclusion criteria established in
Exclusion E3 due to power
flowing out of the networked
system (E3b.).

The substation transformers are not part of


the BES since both (primary and
secondary) terminals are not operated at >
100 kV as per Inclusion I1.

The normally open (N.O.)


device between the radial
systems does not affect this
exclusion.

Normally Open
(N.O.)

Substation
< 300kV
Boundary
< 100kV / > 50kV

< 300kV
Substation < 100kV / > 50kV
Boundary

< 100 kV / > 50 kV

< 100 kV / > 50 kV

< 100 kV / > 50 kV


To Load
The normally closed (N.C.) device
Normally Closed
between the sub-100 kV systems
(N.C.)
establishes a loop configuration which
requires evaluation based on Exclusion E3.

To Load

FigureE37:LocalNetwork(BES)withSub100kVLoopedFacilities(SwitchingDevicesIdentified:N.O.>100kV
&N.C.<100kV/<50kV)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
63of85

Exclusions

FigureE38depictsasituationwheretheconfigurationestablishesmultipleloopsthatrequireevaluationbased
ontheExclusionE3criteria(seeFigureE120).

FigureE38:LocalNetwork(nonBES)withSub100kVLoopedFacilities(SwitchingDevicesIdentified:N.C.>100
kV&N.C.<100kV/>50kV)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
64of85

Exclusions

FigureE39depictsasituationwheretheconfigurationestablishesmultipleloopsthatrequireevaluationbased
ontheExclusionE3criteria.Sincetheareaunderconsiderationdoesnotmeetthecriteriaestablishedby
ExclusionE3,furtherevaluationoftheunderlyingElementsmaybeappropriate.EachunderlyingElementmust
meetthecriteriaestablishedbyExclusionE3,includingpartsa,b,orc,toqualifyforexclusionfromtheBES.
SuchevaluationsarenotshowninFigureE39,whichconcentratesonthebiggerpicture,butaredetailedinthe
summarydiagramsinSectionIVwherethehierarchicalapplicationofthedefinitionisdescribedandshown.

FigureE39:LocalNetwork(BES)withSub100kVLoopedFacilities(SwitchingDevicesIdentified:N.C.>100kV&
N.C.<100kV/>50kV)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
65of85

Exclusions

III.4 BES Exclusion E4


E4.ReactivePowerdevicesinstalledforthesolebenefitofaretailcustomer(s).
ExclusionE4isdependentontheintendedfunctionoftheReactiveResource;therefore,figureswerenot
developedforExclusionE4duetothesimplicityofthelanguageintheexclusion.

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
66of85

IV. Hierarchical Application of the Definition


Thehierarchicalapplicationofthedefinitionisdepictedinaseriesofdiagramsbasedonafictionalsystem
configurationandfollowsthesequencedapplicationofthedefinitiondescribedbelow.

TheapplicationofthebrightlineBESdefinitionisathreestepprocessthat,whenappropriatelyapplied,will
identifythevastmajorityofBESElementsinaconsistentmannerthatcanbeappliedonacontinentwidebasis.

STEP1:COREDEFINITION:Thecoredefinitionisusedtoestablishthebrightlineof100kV,theoverall
demarcationpointbetweenBESandnonBESElements.ThecoreBESdefinitionidentifiestheRealPowerand
ReactivePowerresourcesconnectedat100kVorhigher,asincludedintheBES.Tofullyappreciatethescopeof
thecoredefinition,anunderstandingofthetermElementisneeded.ElementisdefinedintheNERC
Glossaryas:Anyelectricaldevicewithterminalsthatmaybeconnectedtootherelectricaldevicessuchasa
generator,transformer,circuitbreaker,bussection,ortransmissionline.Anelementmaybecomprisedofone
ormorecomponents.

STEP2:INCLUSIONS:ThisstepinvolvesapplyingthespecificInclusions,providesadditionalclarificationforthe
purposesofidentifyingspecificElementsthatareincludedintheBES.TheInclusionsaddressTransmission
ElementsandRealPowerandReactivePowerresourceswithspecificcriteriatoprovideforaconsistent
determinationofwhetheranElementisclassifiedasBESornonBES.TherearefiveInclusionsintheDefinition.
ThefacilitiesdescribedinInclusionsI1,I2,I4andI5areeachoperated(iftransformersInclusionI1)or
connected(ifgeneratingresources,dispersedpowerproducingresourcesorReactivePowerresources
InclusionsI2,I4andI5)atorabovethe100kVthreshold.InclusionI3encompassesBlackstartResources
identifiedinaTransmissionOperatorsrestorationplan,whicharenecessaryforthereliableoperationofthe
interconnectiontransmissionsystemandshouldbeincludedintheBESregardlessoftheirsize(MVA)orthe
voltageatwhichtheyareconnected.

STEP3:EXCLUSIONS:ThisstepevaluatesspecificsituationsforpotentialexclusionfromtheBES.Theexclusion
languageiswrittentospecificallyidentifyElementsorgroupsofElementsforexclusionfromtheBES.Stepthree
(3)shouldbeappliedinthefollowingsequence:

ExclusionE2(BehindtheMeterGeneration)providesforthespecificexclusionofcertainRealPowerresources
thatresidebehindtheretailmeter(onthecustomersside)andsupersedesthemoregeneralInclusionI2
(GeneratingResources).Behindthemetergenerationthatmeetsthesespecificcriteriadonotaffectreliability
oftheBESbecausethenetcapacitysuppliedtotheBESislessthan75MVAandthespecificcriteriaimpose
obligationstosupportreliabilitywhentheresourcesareunavailable.

ExclusionE4(ReactivePowerDevices)providesforthespecificexclusionofReactivePowerdevicesinstalledfor
thesolebenefitofaretailcustomer(s)andsupersedesthemoregeneralInclusionI5(StaticorDynamicReactive
PowerDevices).ReactivePowerdevicesinstalledforthesolebenefitofaretailcustomerare,bydefinition,not
requiredforoperationoftheinterconnectedtransmissionsystem.

ExclusionE3(LocalNetworks)providesfortheexclusionoflocalnetworksthatmeetthespecificcriteria
identifiedintheexclusionlanguage.ExclusionE3doesnotallowfortheexclusionofRealPowerandReactive
PowerresourcescapturedbyInclusionsI2throughI5.Ininstanceswhereatransformer(underInclusionI1)isan
Elementofalocalnetwork(underExclusionE3),thetransformerwouldbeexcludedpursuanttoExclusionE3.
ExclusionE3maynotbeusedtoexcludetransmissionElements(capturedbythecoredefinitionandInclusion
I1)whenRealPowerresourcesarepresentthatarecapturedbyInclusionI2,I3,orI4.Thisassuresthat
interconnectionfacilitiesforBESgeneratorsarenotexcluded.

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
67of85

HierarchicalApplicationoftheDefinition

ExclusionE1(RadialSystems)providesfortheexclusionoftransmissionElementsfromradialsystemsthatmeet
thespecificcriteriaidentifiedintheexclusionlanguage.ExclusionE1doesnotallowfortheexclusionofReal
PowerandReactivePowerresourcescapturedbyInclusionsI2throughI5.Ininstanceswhereatransformer
(underInclusionI1)isanElementofaradialsystem(underExclusionE1),thetransformerwouldbeexcluded
pursuanttoExclusionE1.ExclusionE1maynotbeusedtoexcludetransmissionElements(capturedbythecore
definitionandInclusionI1)whenRealPowerresourcesarepresentthatarecapturedbyInclusionI2,I3,orI4.
ThisassuresthatinterconnectionfacilitiesforBESgeneratorsarenotexcluded.

Keytodiagramcolorcoding:

BlueindicatesthatanElementisincludedintheBES

GreenindicatesthatanElementisnotincludedintheBES

Orangeindicatespointsofconnection

BlackindicatesElementsthatarenotevaluatedforthespecificexclusiondepictedintheindividual
diagramsbeingshown.

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
68of85

HierarchicalApplicationoftheDefinition

FigureS11:SystemDiagramBaseDiagram
NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
69of85

HierarchicalApplicationoftheDefinition

345kV
345kV
< 100kV

345kV
< 100kV

345kV
230kV

345kV
230kV

750 MVA

1100 MVA
230kV
230kV
138kV

230kV
138kV

230kV
138kV

230kV
138kV

To Load

250 MVA

< 100kV

< 100kV / 230kV

138kV

M
15 MVA
To Load

To Load

< 100kV

< 100kV

138kV

138kV

< 100kV
138kV

138kV
To Load

< 100kV

< 100kV

138kV
<100kV

138kV
69kV

138kV

138kV
<100kV

To Load

138kV
69kV

25 MVA

15 MVA
Blackstart Resource

69kV
13.2kV
69kV

5 MVA

69kV / < 69kV

To Load
13.2kV

13.2kV

69kV

69kV

10 MVA
< 100kV
138kV

10 MVA
< 100kV
138kV

138kV
< 100kV
To Load

15 MVA
69kV
138kV

< 100kV
To Load

To Load

<69 kV

15 MVA

138kV

69kV
138kV

< 100kV
138kV

Assumptions:
Blue indicates designated monitored Facility of a permanent
Flowgate in the Eastern Interconnection, a major transfer path
within the Western Interconnection, or a comparable
monitored Facility in the ERCOT or Quebec
Interconnections, or is a monitored Facility included in an
Interconnection Reliability Operating Limit (IROL).

138kV
< 100kV
To Load

150 MVA
< 100kV / 138kV

FigureS12:SystemDiagramAssumptions

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
70of85

HierarchicalApplicationoftheDefinition

Figure S13: System Diagram Application of Core Definition

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
71of85

HierarchicalApplicationoftheDefinition

345kV
345kV
< 100kV

345kV
< 100kV

345kV
230kV

1100 MVA

345kV
230kV

750 MVA
230kV

230kV
138kV

230kV
138kV

230kV
138kV

230kV
138kV

To Load

250 MVA

< 100kV

< 100kV / 230kV

138kV

M
15 MVA
To Load

To Load

< 100kV

< 100kV

138kV

138kV

< 100kV
138kV

138kV
To Load

< 100kV

< 100kV

138kV
<100kV

138kV
69kV

138kV

138kV
<100kV

To Load

138kV
69kV

25 MVA

15 MVA
Blackstart Resource

69kV
13.2kV
69kV

5 MVA

< 100kV
To Load

To Load

<69 kV

15 MVA

138kV

69kV / < 69kV

To Load
13.2kV

13.2kV

69kV

69kV

138kV
< 100kV
To Load

Step 2a: Application of Inclusion I1.


15 MVA
69kV
138kV

10 MVA
< 100kV
138kV

10 MVA
< 100kV
138kV

69kV
138kV

< 100kV
138kV

138kV

Blue indicates all transformers with the primary terminal and at


least one secondary terminal operated at 100 kV (BES).

< 100kV
To Load

Green indicates transformers that do not have a primary


terminal and at least one secondary terminal operated at 100 kV
(non-BES).
Note: Generator step-up transformers are addressed by
Inclusion I2 (Step 2b.).

FigureS14:SystemDiagramApplicationofInclusionI1
NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
72of85

150 MVA
< 100kV / 138kV

HierarchicalApplicationoftheDefinition

FigureS15:SystemDiagramApplicationofInclusionI2

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
73of85

HierarchicalApplicationoftheDefinition

345kV
345kV
< 100kV

345kV
< 100kV

345kV
230kV

1100 MVA

345kV
230kV

750 MVA
230kV

230kV
138kV

230kV
138kV

230kV
138kV

230kV
138kV

To Load

250 MVA

< 100kV

< 100kV / 230kV

138kV

M
15 MVA
To Load

To Load

< 100kV

< 100kV

138kV

138kV

< 100kV
138kV

138kV
To Load

< 100kV

< 100kV

138kV
<100kV

138kV
69kV

138kV

138kV
<100kV

To Load

138kV
69kV

25 MVA

15 MVA
Blackstart Resource

69kV
13.2kV
69kV

5 MVA

< 100kV
To Load

To Load

<69 kV

69kV / < 69kV

To Load
13.2kV

13.2kV

69kV

69kV

15 MVA

138kV
138kV
< 100kV
To Load

138kV

15 MVA
69kV
138kV

10 MVA
< 100kV
138kV

10 MVA
< 100kV
138kV

69kV
138kV

< 100kV

Step 2c: Application of Inclusion I3.


< 100kV
138kV

To Load

Blue indicates Blackstart Resources identified in the


Transmission Operators restoration plan (BES).
Note: Sub-100 kV Blackstart Resource Cranking Path
remains non-BES due to the presence of Load feed from
intermediate 69 kV bus.

FigureS16:SystemDiagramApplicationofInclusionI3

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
74of85

150 MVA
< 100kV / 138kV

HierarchicalApplicationoftheDefinition

345kV
345kV
< 100kV

345kV
< 100kV

345kV
230kV

345kV
230kV

750 MVA

1100 MVA
230kV
230kV
138kV

230kV
138kV

230kV
138kV

230kV
138kV

To Load

250 MVA

< 100kV

< 100kV / 230kV

138kV

M
15 MVA
To Load

To Load

< 100kV

< 100kV

138kV

138kV

< 100kV
138kV

138kV
To Load

< 100kV

< 100kV

138kV
<100kV

138kV
69kV

138kV

138kV
<100kV

To Load

138kV
69kV

25 MVA

15 MVA
Blackstart Resource

69kV
13.2kV
69kV

5 MVA

< 100kV
To Load

To Load

<69 kV

69kV / < 69kV

To Load
13.2kV

13.2kV

69kV

69kV

15 MVA

138kV
138kV
< 100kV
To Load

138kV

15 MVA
69kV
138kV

10 MVA
< 100kV
138kV

10 MVA
< 100kV
138kV

69kV
138kV

< 100kV

< 100kV
138kV

Blue indicates all Elements identified as BES by


application of the core definition and the applicable
Inclusions.
Green indicates all Elements identified as non-BES by
application of the core definition and the applicable
Inclusions.

To Load

150 MVA
< 100kV / 138kV

FigureS17:SystemDiagramApplicationofCoreDefinition&Inclusions
NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
75of85

HierarchicalApplicationoftheDefinition

345kV
345kV
< 100kV

345kV
< 100kV

345kV
230kV

345kV
230kV

750 MVA

1100 MVA
230kV
230kV
138kV

230kV
138kV

230kV
138kV

230kV
138kV

To Load
100 MVA
to BES

250 MVA

< 100kV

< 100kV / 230kV

138kV

M
15 MVA
To Load

To Load

< 100kV

< 100kV

138kV

138kV

< 100kV
138kV

138kV
To Load

< 100kV

< 100kV

138kV
<100kV

138kV
69kV

138kV

138kV
<100kV

To Load

138kV
69kV

25 MVA

15 MVA
Blackstart Resource

69kV
13.2kV
69kV

5 MVA

10 MVA
< 100kV
138kV

To Load
69kV / < 69kV

To Load
13.2kV

13.2kV

69kV

69kV

10 MVA
< 100kV
138kV

138kV
< 100kV
To Load

15 MVA
69kV
138kV

< 100kV

To Load

<69 kV

15 MVA

138kV

69kV
138kV

138kV

Step 3a: Application of Exclusion E2.

< 100kV

< 100kV
138kV

Blue indicates the generating unit that exceeds the net


capacity threshold (> 75 MVA) provided to the BES and
is identified as BES since it does not meet the exclusion
criteria established in Exclusion E2.
Green indicates the generating unit that meets the
criteria for exclusion under Exclusion E2 and is
identified as non-BES.

FigureS18:SystemDiagramApplicationofExclusionE2
NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
76of85

To Load

150 MVA

25 MVA
to BES

< 100kV / 138kV

HierarchicalApplicationoftheDefinition

FigureS19:SystemDiagramApplicationofExclusionE3
NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
77of85

HierarchicalApplicationoftheDefinition

FigureS19a:SystemDiagramApplicationofExclusionE3(EmbeddedLocalNetwork)

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
78of85

HierarchicalApplicationoftheDefinition

345kV
345kV
< 100kV

345kV
< 100kV

345kV
230kV

345kV
230kV

750 MVA

1100 MVA
230kV
230kV
138kV

230kV
138kV

230kV
138kV

230kV
138kV

To Load
100 MVA
to BES

250 MVA

< 100kV

< 100kV / 230kV

138kV

M
15 MVA
To Load

To Load

To Load

< 100kV

138kV
<100kV

138kV

< 100kV

< 100kV

138kV

138kV

< 100kV
138kV

138kV

Continued evaluation from Step


3b.2ii (Figure S1-9a) for
identified embedded radial
systems.

< 100kV

138kV
69kV

138kV
<100kV

To Load

138kV
69kV

25 MVA

15 MVA
Blackstart Resource

69kV
13.2kV
69kV

5 MVA

10 MVA
< 100kV
138kV

To Load
69kV / < 69kV

To Load
13.2kV

13.2kV

69kV

69kV

10 MVA
< 100kV
138kV

138kV
< 100kV
To Load

15 MVA
69kV
138kV

< 100kV

To Load

<69 kV

15 MVA

138kV

69kV
138kV

< 100kV
138kV

Step 3b.2iii Application of Exclusion E1.

138kV
< 100kV

The shaded area constitutes the only facilities being


evaluated by the application of Exclusion E1 on this
diagram. Green indicates radial facilities that meet the
criteria established by Exclusion E1a & E1b.
The single points of connection are where the
radial systems (group of contiguous
transmission Elements) emanate at a voltage of
100 kV or higher from the Transmission system.

FigureS19b:SystemDiagramApplicationofExclusionE3(EmbeddedRadialSystems)
NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
79of85

To Load

150 MVA

25 MVA
to BES

< 100kV / 138kV

HierarchicalApplicationoftheDefinition

FigureS110:SystemDiagramApplicationofExclusionE1(Part1)
NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
80of85

HierarchicalApplicationoftheDefinition

FigureS110a:SystemDiagramApplicationofExclusionE1(Part2)
NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
81of85

HierarchicalApplicationoftheDefinition

FigureS111:SystemDiagramFullApplicationofBESDefinition
NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
82of85

V.

Availability of Exception Process

IntheeventthattheBESdefinitiondesignatesanElementasBESthatanentitybelievesisnotnecessaryforthe
reliableoperationoftheinterconnectedTransmissionnetworkordesignatesanElementasnonBESthatan
entitybelievesisnecessaryforthereliableoperationoftheinterconnectedTransmissionnetwork,theERO
RulesofProcedureexceptionprocessmaybeutilizedonacasebycasebasistoeitherincludeorexcludean
Element.

TheexceptionprocesscanbefoundinSection5CoftheERORulesofProcedure:ProcedureforRequestingand
ReceivinganExceptionfromtheApplicationoftheNERCDefinitionofBulkElectricSystem.

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
83of85

VI. Version History

Version

Date

Action

Change Tracking

April 2013

Final Reference Document for Phase 1 BES


definition

New

April 2014

Updated to reflect definition approved by


FERC on March 20, 2014

Revision

NERC|BulkElectricSystemDefinitionReferenceDocument|April2014
84of85