You are on page 1of 589

27in142r3

Scheduling/Leveling Report - 18-Apr-16 - PM.exe


===============================================
Default
Project..................................................Ma
x-CL14(2)R6-UP004
Projects:
Max-CL14(2)R6-UP004........................................
.....Max - CL14.2 Rev.06 - Update 15-Apr-2016
Scheduling/Leveling Settings:
----------------------------General
------Scheduling
......................................................Yes
Leveling
........................................................No
Ignore relationships to and from other projects
.................No
Make open-ended activities critical
.............................No
Use Expected Finish Dates
.......................................Yes
Schedule automatically when a change affects dates
..............No
Level resources during scheduling
...............................No
Recalculate assignment costs after scheduling
...................No
When scheduling progressed activities use
.......................Retained Logic
Calculate start-to-start lag from
...............................Early Start
Define critical activities as Total Float less than
or equal to .0
Compute Total Float As
..........................................Finish Float
Calculate float based on finish date of
.........................Each project
Calendar for scheduling Relationship Lag
........................Predecessor Activity Calendar
Page 1

27in142r3
Advanced
-------Calculate multiple float
paths...................................Yes
Calculate multiple float paths
using.............................Total Float
Number of paths to
calculate.....................................10
Statistics:
----------#
Projects...................................................
....1
#
Activities.................................................
....7558
# Not
Started....................................................
1647
# In
Progress...................................................
.250
#
Completed..................................................
....5661
#
Relationships..............................................
....18149
# Activities with
Constraint.....................................21
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN3355
S1, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN3375
S03, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN3485
S04, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN3495
S05, Bearing
Delivery
Page 2

Activity:
Delivery
Activity:
Delivery
Activity:
Delivery
Activity:
Gantry
Activity:
Delivery
Activity:
Delivery
Activity:
Delivery
Activity:
Delivery
Activity:
Delivery
Activity:
Delivery
Activity:
Delivery
Activity:
Delivery
Activity:
Delivery
Activity:
from Authorities
Activity:

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS06PT1DECN3505
S06, Bearing
Project:
Max-CL14(2)R6-UP004
CO-STS08PT1DECN3515
S08, Bearing
Project:
Max-CL14(2)R6-UP004
CO-STS12PT1DECN3525
S12, Bearing
Project:
Max-CL14(2)R6-UP004
CO-STS13PT2DECN3055
Installation of
Project:
Max-CL14(2)R6-UP004
CO-STS20PT1DECN3535
S20 & S21, Bearing
Project:
Max-CL14(2)R6-UP004
CO-STS23PT1DECN3545
S23, Bearing
Project:
Max-CL14(2)R6-UP004
CO-STS24PT1DECN3555
S24, Bearing
Project:
Max-CL14(2)R6-UP004
CO-STS25PT1DECN3565
S25, Bearing
Project:
Max-CL14(2)R6-UP004
CO-STS26PT1DECN4465
S26, Bearing
Project:
Max-CL14(2)R6-UP004
CO-STS27PT1DECN3575
S27, Bearing
Project:
Max-CL14(2)R6-UP004
CO-STS28PT1DECN3585
S28, Bearing
Project:
Max-CL14(2)R6-UP004
CO-STS30VS1DECN3885
S30, Bearing
Project:
Max-CL14(2)R6-UP004
CO-STS31PT1DECN3905
S31, Bearing
Project:
Max-CL14(2)R6-UP004
CO-UTDWTADNL14SHD005
Shutdown Approval
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL06PIP005
TRAM AREA FREE TO
Page 3

27in142r3
WORK (NOTICE TO TENDER "PS1/17.1"
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPRDGENCTDSTD038
Receipt of
Variation Order for Milestone 1 Corridor from Engineer /
Client
Errors:
------Warnings:
--------Activities without
predecessors..................................1
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPRDGENCTDSTD005
Contract Award /
Letter of Acceptance
Activities without
successors....................................1
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDCOD005
Project Completion
Out-of-sequence
activities.......................................202
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENTRT055
Trial Trenches For
Permanent Execution Works (BOQ - Bill 02 Remaining Qty)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRLGTAPP005
Lighting System Drawing Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRSMDAPP005
Smoke Detector Drawing Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWS01PAVEAR005
Excavation /
Embankment (Inc. Abutment Protection Slope)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRMISCOMFIN005
Installation of
Traffic Signs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRMISCOMFIN020
Curbs Painting
Page 4

Activity:
Road Marking
Activity:
preparation
Activity:
Subbase CBR

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-RWDMRMISCOMFIN025
Installation of
Project:
Max-CL14(2)R6-UP004
CO-RWDMRS02PAVEAR010
Sub grade
Project:
Max-CL14(2)R6-UP004
CO-RWDMRS02PAVLAY005
250mm Granular

Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS02PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS02PAVLAY015
Installation of
Curbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS02PAVLAY020
150mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS02PAVLAY030
50mm Sand Bed &
Vehicular tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAGENSHDAPP020
Road Marking /
Traffic Signs - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAS01PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAS01PAVLAY015
Installation of
Curbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAS01PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02GENINT015
Completion of Line
1 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINDEC010
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINDEC015
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINPNT005
Piers - Surface
Preparation and Painting
Page 5

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECCPR010
Drilling and
Installation of Dowels Between Bridges (including Bridge
S2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINPNT010
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINPNT015
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINPNT020
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECPTT015
Removal of Portal
Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03MISFINDEC025
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01005
Staging /
Scaffolding (incl. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECPTT15
Installation of
Portal Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINDEC005
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINDEC020
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINPNT015
Deck Slabs Painting inside Box Girders
Page 6

Activity:
Scaffolding
Activity:
Scaffolding

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS08PT1DECN04005
Staging /
Project:
Max-CL14(2)R6-UP004
CO-STS08PT1DECN05005
Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1GENTRA005
Approvals for
Traffic Management & Erection of Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1GENTRA020
Installation of
Gantry over the Metro (Span 5)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1GENTRA035
Installation of
Gantry over the Service Road (Span 4)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN02005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINPNT015
Abutments - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINPNT020
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAB2075
Backfilling Behind Abutment Back Wall
Page 7

Activity:
Preparation

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS10MISFINDEC005
Deck Slab Surface

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINDEC025
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINDEC008
Installation of
heighted Barrier and Aluminium Fence for LRT metro
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINPNT010
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINPNT020
Abutments - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINPNT025
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02045
Pier "2" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINDEC005
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINPNT015
Deck Slabs Page 8

27in142r3
Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal (Inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01005
Staging /
Scaffolding (Inc. Simply Supported Beams (if required))
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN02005
Staging /
Scaffolding (Inc. Simply Supported Beams (if required))
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01275
Pile Cap Column Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02110
Pier "2" Pier cap Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINDEC020
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Page 9

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECAPP040
Deck Slab Gantry Drawing Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD16175
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN04005
Staging /
Scaffolding (incl. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN04040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1GENTRA005
Approvals for
Traffic Management & Erection of Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1GENTRA015
Installation of
Portal Frames (Span 3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1GENTRA15
Installation of
Single Lane Gantry (Span-2 & 3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14300
Pier "14" Column 3
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14305
Pier "14" Column 3
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECAPP020
Deck Slab Bottom
Page 10

27in142r3
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18065
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19165
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN04005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN04040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECD1765
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Slab & PT

Page 11

27in142r3
CO-STS25PT3DECAPP015
Deck Slab Bottom
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINDEC015
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN02005
Staging /
Scaffolding
Activity:
Slab & PT

Page 12

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP34110
Pier "34" Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINDEC120
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINDEC70
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18370
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINDEC005
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISMSEEMB005
Installation of MSE
Wall after construction of Abutment Backwall
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISRETGEN20
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN04040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP005
External
Installation of Bridge Railings for Wet Utilities - S26
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP010
External
Installation of Bridge Railings for Wet Utilities - S27
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP020
External
Installation of Bridge Railings for Wet Utilities - S22
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP40
External
Installation of Bridge Railings for Wet Utilities - S27A
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01TRY010
Internal
Installation of Bridge Trays for Electrical Utilities - S26
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP010
Installation of 600
dia GRE waterline inside 1200 dia AC pipe
Page 13

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP010
DEWA Water Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP035
Review and Approve
Construction Method Proposal By Engineer / DEWA-WD
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP045
Approval of
Excavation NOC's from DEWA ED (Over Head Lines)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL02APP005
DEWA Water Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL02APP025
Prepare and Submit
Construction Method Proposal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL06PIP010
Installation of
ducts for 1x11kv ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIMARL07PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP012
Pipe Laying NDRC
(1) / (2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP015
Construction of
chambers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP025
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP030
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP035
Construction of
chambers & Thrust Blocks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP040
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP045
Setting out /
Page 14

27in142r3
Excavation
Activity:
Activity:
Thrust Blocks
Activity:
Activity:
Excavation
Activity:
Activity:
(1) / (2)
Activity:
Thrust Blocks
Activity:
Activity:
Excavation
Activity:
Activity:
chambers
Activity:
Activity:
Excavation
Activity:
Activity:
chambers
Activity:
Activity:
Excavation

Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL04PIP050
Pipe Laying
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL04PIP055
Construction of
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL04PIP060
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL04PIP065
Setting out /
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL04PIP070
Pipe Laying
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL04PIP073
Pipe Laying NDRC
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL04PIP075
Construction of
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL04PIP080
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL05PIP005
Setting out /
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL05PIP010
Pipe Laying
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL05PIP015
Construction of
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL05PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL05PIP025
Setting out /
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL05PIP030
Pipe Laying
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL05PIP040
Construction of
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL05PIP045
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL05PIP050
Setting out /
Page 15

Activity:
Activity:
chambers
Activity:
Activity:
Thrust Block
Activity:
Activity:
Excavation
Activity:
Activity:
Activity:
Activity:
Excavation
Activity:
Activity:
Activity:
Excavation
Activity:
Excavation

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL05PIP055
Pipe Laying
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL05PIP060
Construction of
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL05PIP065
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL05PIP080
Construction of
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL05PIP085
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP005
Setting out /
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP010
Pipe Laying 600 dia
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP023
Pipe Laying 315 dia
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP025
Setting out /
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP030
Pipe Laying 600 dia
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP043
Pipe Laying 315 dia
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP045
Setting out /
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP105
Setting out /

Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP110
Pipe Laying 600 dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP123
Pipe Laying 315 dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL02FIN005
Installation of
Covers, Frames, Ladders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL02PIP010
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:

Page 16

27in142r3
CO-UTSTOUNDL02PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL02SHD005
Drainage - Test &
Connect new pipe (Engineer / RTA Release Provisional Sums)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSLGT005
Receive of Lighting
System Material Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSSMD005
Receive of Smoke
Detector Material Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC040
Contractor Issuance
of HVAC & Ventilation System Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC065
1st Submittal of
HVAC & Ventilation System Detailed Design (By Subcontractor
/ Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT040
Contractor Issuance
of Lighting System Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT045
1st Submittal of
Lighting System Subcontractor Conceptual Design (By
Subcontractor / Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD040
Contractor Issuance
of Smoke Detector Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD050
1st Review of Smoke
Detector Conceptual Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBUO005
Receive of Marker
Buoys Subcontractor Vendor List (By Contractor / Authority)
Activity:

Activities with Actual Dates > Data


Date.........................1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECAPP030
Deck Slab Top Slab
- Drawings Approval
Milestone Activities with invalid
relationships..................0
Finish milestone and predecessors have different
Page 17

27in142r3
calendars.......23
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN3355
S1, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN3375
S03, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1GENTRA005
Approvals for
Traffic Management & Erection of Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4465
S26, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN3885
S30, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDCOD005
Project Completion
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Page 18

27in142r3
Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Scheduling/Leveling Results:
Page 19

27in142r3
---------------------------# Projects
Scheduled/Leveled.....................................1
# Activities
Scheduled/Leveled...................................7558
# Relationships with other
projects..............................0
Data
Date.......................................................
.15-Apr-16
Earliest Early Start
Date........................................15-Apr-16
Latest Early Finish
Date.........................................10-Dec-16
Number of float
paths............................................10
Exceptions:
----------Critical
Activities..............................................117
7
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSADSLOAPIP010
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSADSLOAPIP020
Lay 2x24 Fibre
Optic SCADA Cable in Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSADSLOAPIP030
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSADSLOAPIP040
Installation of
Fiber Distribution Frame
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSADSLOAPIP060
Installation of FDF
Panel
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSADSLOAPIP070
Installation of
Instrument Panel
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP010
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP020
Lay 2x24 Fibre
Optic SCADA Cable in ducts
Page 20

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP030
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP040
Installation of
Fiber Distribution Frame
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP050
Installation of
Remote Terminal Units
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP060
Installation of FDF
Panel
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP070
Installation of
Instrument Panel
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP110
Hardware
modification of Existing RTU
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP160
DEWA-WD Scada Testing & Commissioning
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2EAR005
Bridges S22, S23 &
S24 Completed (Including Painting)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2EAR010
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2EAR015
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2FIN005
Installation of
Road Marking / Traffic Signs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2FIN010
Inspection By RTA /
Engineer / Police
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2FIN15
Reinstated Marina
Road Open to Traffic
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2LAY005
Granular Subbase
CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2LAY010
Installation of
Curbs & Concrete Barriers
Page 21

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2LAY015
Wet-mix Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2LAY020
AC Base Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2LAY025
AC Wearing Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRHVCAPP005
HVAC & Ventilation
- Drawing Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRHVCAPP010
HVAC & Ventilation
- Drawing Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRHVCCON015
HVAC & Ventilation
- Installation Inside Bridge S27
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRHVCCON20
HVAC & Ventilation
- Installation Inside Bridge S27A
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRLGTAPP005
Lighting System Drawing Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRLGTAPP010
Lighting System Drawing Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRLGTCON005
Lighting System Installation Inside Bridge S25
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRLGTCON010
Lighting System Installation Inside Bridge S26
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRLGTCON015
Lighting System Installation Inside Bridge S27
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRLGTCON020
Lighting System Installation Inside Bridge S28
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRLGTCON20
Lighting System Installation Inside Bridge S27A
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRSMDAPP005
Smoke Detector Drawing Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRSMDAPP010
Smoke Detector Page 22

27in142r3
Drawing Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRSMDCON005
Smoke Detector Installation Inside Bridge S25
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRSMDCON010
Smoke Detector Installation Inside Bridge S26
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRSMDCON015
Smoke Detector Installation Inside Bridge S27
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRSMDCON020
Smoke Detector Installation Inside Bridge S28
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRSMDCON20
Smoke Detector Installation Inside Bridge S27A
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01GENINT005
Completion of
Approach Slab (Bridge S28)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01MISFIN010
Installation of
Lighting Poles / Feeder Pillar / Earthing / Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01MISFIN015
Installation of
Traffic Signs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01MISFIN025
Installation of
Road Marking
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01PAVLAY005
250mm Granular
Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01PAVLAY015
Installation of
Curbs
Project:
Max-CL14(2)R6-UP004
Page 23

Activity:
Macadam
Activity:
Activity:
Activity:
Wearing Course
Activity:
Guard Rail

27in142r3
CO-RWBWIS01PAVLAY020

150mm Wet-mix

Project:
Max-CL14(2)R6-UP004
CO-RWBWIS01PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
CO-RWBWIS01PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
CO-RWBWIS01PAVLAY030
Tack Coat / 50mm AC
Project:
Max-CL14(2)R6-UP004
CO-RWBWNMISCOMFIN005
Installation of

Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNMISCOMFIN010
Installation of
Lighting Poles / Feeder Pillar / Earthing / Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNMISCOMFIN015
Installation of
Traffic Signs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNMISCOMFIN020
Curbs Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNMISCOMFIN025
Installation of
Road Marking
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01GENINT005
Completion of Line
5-4, 5-5 and 5-6 Stormwater Drainage Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01GENINT020
Completion of Line
4-3 to Line 4-6 Irrigation Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01PAVLAY005
250mm Granular
Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01PAVLAY015
Construction of
Concrete Barriers
Page 24

Activity:
Macadam
Activity:
Activity:
Activity:
Wearing Course
Activity:
Embankment
Activity:
preparation
Activity:
Subbase CBR

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-RWBWNS01PAVLAY020
150mm Wet-mix
Project:
Max-CL14(2)R6-UP004
CO-RWBWNS01PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
CO-RWBWNS01PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
CO-RWBWNS01PAVLAY030
Tack Coat / 50mm AC
Project:
Max-CL14(2)R6-UP004
CO-RWBWNS02PAVEAR005
Excavation /
Project:
Max-CL14(2)R6-UP004
CO-RWBWNS02PAVEAR010
Sub grade
Project:
Max-CL14(2)R6-UP004
CO-RWBWNS02PAVLAY005
250mm Granular

Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS02PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS02PAVLAY015
Construction of
Concrete Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS02PAVLAY020
150mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS02PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS02PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS02PAVLAY030
Tack Coat / 50mm AC
Wearing Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03PAVLAY005
250mm Granular
Subbase CBR
Page 25

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03PAVLAY015
Installation of
Curbs & Concrete Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03PAVLAY020
150mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03PAVLAY030
Tack Coat / 50mm AC
Wearing Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04PAVLAY005
250mm Granular
Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04PAVLAY015
Installation of
Curbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04PAVLAY020
150mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04PAVLAY030
Tack Coat / 50mm AC
Wearing Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWFHORHOCOMFIN002
Installation of
Gantries
Page 26

Activity:
Engineer
Activity:
Contractor

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-RWFHORHOCOMFIN005
Final Inspection by
Project:
Max-CL14(2)R6-UP004
CO-RWFHORHOCOMFIN010
Rectify Comments by

Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWFHORHOCOMFIN015
Final Handing Over
to Engineer & Client
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARMISCOMFIN005
Construction of
Piers Protection Barriers (8 No.)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARMISCOMFIN007
Installation/Reinstatement of Chain Link Fence
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARMISCOMFIN010
Installation of
Lighting Poles / Feeder Pillar / Earthing / Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARMISCOMFIN015
Installation of
Traffic Signs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARMISCOMFIN020
Curbs Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARMISCOMFIN025
Construction of
Side Walk Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARMISCOMFIN030
Installation of
Road Marking
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01GENINT025
Completion of
Bridge S24
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01PAVLAY005
250mm Granular
Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01PAVLAY010
Foundation for
Street lighting poles
Page 27

Activity:
Curbs
Activity:
Macadam
Activity:
Activity:
Activity:
Wearing Course
Activity:
Bridge S25
Activity:
Embankment
Activity:
preparation

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-RWLARS01PAVLAY015
Installation of
Project:
Max-CL14(2)R6-UP004
CO-RWLARS01PAVLAY020
150mm Wet-mix
Project:
Max-CL14(2)R6-UP004
CO-RWLARS01PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
CO-RWLARS01PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
CO-RWLARS01PAVLAY030
Tack Coat / 50mm AC
Project:
Max-CL14(2)R6-UP004
CO-RWLARS02GENINT015
Completion of
Project:
Max-CL14(2)R6-UP004
CO-RWLARS02PAVEAR005
Excavation /
Project:
Max-CL14(2)R6-UP004
CO-RWLARS02PAVEAR010
Sub grade

Project:
Max-CL14(2)R6-UP004
CO-RWLARS02PAVLAY005
150 mm Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS02PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS02PAVLAY015
Installation of
Curbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS02PAVLAY020
220mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS02PAVLAY025
Sand 1 Lift of 40mm
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS02PAVLAY030
Block Pavers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03GENINT005
Completion of
Bridge S24
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:

Page 28

Activity:
preparation
Activity:
Subbase CBR

27in142r3
CO-RWLARS03PAVEAR010

Sub grade

Project:
Max-CL14(2)R6-UP004
CO-RWLARS03PAVLAY005
250mm Granular

Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03PAVLAY015
Installation of
Curbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03PAVLAY020
150mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03PAVLAY030
Tack Coat / 50mm AC
Wearing Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAMISCOMFIN010
Installation of
Lighting Poles / Feeder Pillar / Earthing / Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAMISCOMFIN015
Installation of
Traffic Signs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAMISCOMFIN025
Installation of
Road Marking
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS01PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS01PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS01PAVLAY005
250mm Granular
Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS01PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS01PAVLAY015
Installation of
Page 29

27in142r3
Curbs
Activity:
Macadam
Activity:
Activity:
Activity:
Wearing Course

Project:
Max-CL14(2)R6-UP004
CO-RWSRAS01PAVLAY020
150mm Wet-mix
Project:
Max-CL14(2)R6-UP004
CO-RWSRAS01PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
CO-RWSRAS01PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
CO-RWSRAS01PAVLAY030
Tack Coat / 50mm AC

Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02GENINT020
Completion of Line
1 Spare Duct Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02PAVLAY005
250mm Granular
Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02PAVLAY015
Installation of
Curbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02PAVLAY020
150mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01MISFIN010
Installation of
Lighting Poles / Feeder Pillar / Earthing / Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01MISFIN015
Installation of
Traffic Signs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01MISFIN025
Installation of
Page 30

27in142r3
Road Marking
Activity:
Embankment
Activity:
preparation
Activity:
Subbase CBR

Project:
Max-CL14(2)R6-UP004
CO-RWSZRS01PAVEAR005
Excavation /
Project:
Max-CL14(2)R6-UP004
CO-RWSZRS01PAVEAR010
Sub grade
Project:
Max-CL14(2)R6-UP004
CO-RWSZRS01PAVLAY005
250mm Granular

Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01PAVLAY015
Installation of
Curbs & Concrete Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01PAVLAY020
150mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01PAVLAY030
50mm AC Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STFHOBHOCOMFIN005
Final Inspection by
Engineer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STFHOBHOCOMFIN010
Rectify Comments by
Contractor
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STFHOBHOCOMFIN015
Final Handing Over
to Engineer & Client
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STFHOBHOCOMGNR005
Installation of
Marker Buoys
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STFHOBHOCOMGNR010
Removal of Causeway
(Bridge S26, 27, S27A & 28)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINDEC065
Road Signage
Project:
Max-CL14(2)R6-UP004
Page 31

27in142r3
CO-STS02MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINPNT005
Deck Slab - Surface
Preparation and Painting (Over SZR)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECPTT015
Removal of Portal
Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECPTT015
Removal of Portal
Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1GENINT5
Completion of 600mm
dia water (Line 15) DEWA-WD
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01005
Staging /
Scaffolding (incl. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01045
Rebar for Top Slab
Activity:

Page 32

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECPTT005
Threading, Post
Tensioning & Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECPTT15
Installation of
Portal Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC005
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC008
Installation of
heighted Barrier and Aluminium Fence for LRT metro
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC010
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC015
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC020
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC025
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC030
Installation of
Ducts & Interlock Tiles
Page 33

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC035
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC040
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC045
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC050
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC055
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC060
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINPNT005
Deck Slab - Surface
Preparation and Painting (Over SZR)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINPNT010
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINPNT015
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINPNT020
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN03030
Bottom slab and Web
Page 34

27in142r3
curing
Activity:
Formwork

Project:
Max-CL14(2)R6-UP004
CO-STS08PT1DECN03035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN04005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN04015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN04020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN04025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN04030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN04035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN04040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN04045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN04050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN04055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN05010
Formwork - Bottom
Page 35

27in142r3
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN05015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN05020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN05025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN05030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN05035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN05040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN05045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN05050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN05055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECPTT005
Threading, Post
Tensioning & Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECPTT015
Removal of Portal
Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1GENTRA010
Installation of
Portal Frames Over SZR (Span 3 & Span 4)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07035
Pile Cap - Concrete
Page 36

27in142r3
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07045
Pier "7" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07050
Pier "7" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07055
Pier "7" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07060
Pier "7" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07065
Pier "7" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07070
Pier "7" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07075
Pier "7" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07080
Pier "7" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07085
Pier "7" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07090
Pier "7" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07095
Pier "7" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07100
Pier "7" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07105
Pier "7" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Page 37

27in142r3
Activity:
CO-STS08PT1PIEP07110
Pier "7" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07115
Pier "7" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07120
Pier "7" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07130
Pier "7" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08065
Pier "8" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08070
Pier "8" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08075
Pier "8" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08080
Pier "8" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08085
Pier "8" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08090
Pier "8" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08095
Pier "8" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08100
Pier "8" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08110
Pier "8" Head Page 38

27in142r3
Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09110
Pier "9" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECPTT010
Threading, Post
Tensioning & Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECPTT015
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06130
Pier "6" Head Page 39

27in142r3
Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINDEC065
Road Sign Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC005
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC010
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC015
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC050
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISMSEEMB005
Installation of MSE
Wall after construction of Abutment Backwall
Page 40

Activity:
Installation

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS12MISMSEEMB010
Coping Beam

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISMSEEMB015
Installation of
Precast Shear Key Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISMSEEMB020
Construction of
Cast in Situ Barriers and Sidewalks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN05010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN05015
Bottom slab and web
steel Reinforcement + PT Ducts
Page 41

Activity:
Activity:
slab and webs
Activity:
curing
Activity:
Formwork

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS12PT1DECN05020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
CO-STS12PT1DECN05025
Concrete for Bottom
Project:
Max-CL14(2)R6-UP004
CO-STS12PT1DECN05030
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS12PT1DECN05035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN05040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN05045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN05050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN05055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN3525
S12, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECPTT005
Threading, Post
Tensioning & Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03090
Pier "3" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04090
Pier "4" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05230
Pier "5" Column 5
Head - Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01010
Formwork - Bottom
Slab and Cantilever
Page 42

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03050
Concrete Top Slab
Page 43

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECPTT005
Post Tensioning &
Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1050
Installation of
Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1055
Backwall Installation of Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1060
Backwall Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1065
Backwall - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1070
Backwall - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1075
Backfilling Behind Abutment Back Wall
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINDEC050
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINDEC060
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECPTT015
Removal of Portal
Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINDEC005
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINDEC025
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINDEC055
Road Signage
Page 44

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC005
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC010
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC015
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC025
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC030
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC035
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC040
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC060
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Page 45

27in142r3
CO-STS20PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECPTT005
Threading, Post
Tensioning & Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC005
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC010
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC015
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC020
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC025
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC035
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC040
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC050
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:

Page 46

27in142r3
CO-STS21MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC060
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC065
Road Sign Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01015
Bottom slab and web
steel Reinforcement and Installation of Voids
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01060
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINDEC015
Prime Coat /
Asphalt regulating layer
Activity:

Page 47

Activity:
Course

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS22MISFINDEC045
Asphalt Wearing

Project:
Max-CL14(2)R6-UP004
CO-STS22MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINDEC060
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINDEC025
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINDEC050
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINDEC055
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC005
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC010
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC015
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC020
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC025
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC040
Installation of
Activity:

Page 48

27in142r3
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC050
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC055
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC065
Road Sign Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD16235
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD16245
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD16255
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD16265
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17285
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Page 49

27in142r3
Activity:
CO-STS24PT1DECD17295
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17305
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17315
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17325
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17335
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17345
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17355
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17365
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17375
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01040
Installation of Top
Page 50

27in142r3
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03015
Bottom slab and web
Page 51

27in142r3
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05055
Curing Top Slab
Page 52

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECPTT005
Threading, Post
Tensioning & Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1GENDIV040
Reinstatement of
Existing lanes after the completion of Bridge S24 works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12125
Pier "12" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13045
Pier "13" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13050
Pier "13" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13055
Pier "13" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13080
Pier "13" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13085
Pier "13" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13090
Pier "13" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13095
Pier "13" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13100
Pier "13" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13105
Pier "13" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13110
Pier "13" Pier cap
- Concrete Pouring
Page 53

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13115
Pier "13" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13125
Pier "13" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14130
Pile Cap Column 2 Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14135
Pile Cap Column 2 Curing / Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14140
Pier "14" Column 2
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14145
Pier "14" Column 2
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14150
Pier "14" Column 2
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14155
Pier "14" Column 2
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14160
Pier "14" Column 2
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14165
Pier "14" Column 2
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14170
Pier "14" Column 2
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14175
Pier "14" Column 2
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14180
Pier "14" Column 2
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14185
Pier "14" Column 2
Head - Installation of Mould - Flare Type 8 (2.5x2.5m;
Width=4.63m; Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Page 54

27in142r3
Activity:
CO-STS24PT1PIEP14190
Pier "14" Column 2
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14195
Pier "14" Column 2
Head - Curing / Removal of Mould - Flare Type 8 (2.5x2.5m;
Width=4.63m; Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14200
Pier "14" Beams
(Col.1 and Col.2 ) - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14205
Pier "14" Beams
(Col.1 and Col.2 ) - Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14210
Pier "14" Beams
(Col.1 and Col.2 ) - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14215
Pier "14" Beams
(Col.1 and Col.2 ) - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14225
Pier "14" Column 1
Head - Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14230
Pile Cap Column 2 Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14235
Pier "14" Column 2
Head - Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14290
Pier "14" Column 3
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14295
Pier "14" Column 3
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14310
Pier "14" Column 3
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14315
Pier "14" Column 3
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14320
Pier "14" Column 3
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14325
Pier "14" Column 3
Page 55

27in142r3
Head - Installation of Mould - Flare Type 8 (2.5x2.5m;
Width=4.63m; Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14330
Pier "14" Column 3
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14335
Pier "14" Column 3
Head - Curing / Removal of Mould - Flare Type 8 (2.5x2.5m;
Width=4.63m; Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14340
Pier "14" Beams
(Col.2 and Col.3 ) - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14345
Pier "14" Beams
(Col.2 and Col.3 ) - Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14350
Pier "14" Beams
(Col.2 and Col.3 ) - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14355
Pier "14" Beams
(Col.2 and Col.3 ) - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14365
Pier "14" Column 3
Head - Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC010
Construction of
Cast in Situ Barriers Stg-1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC015
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC025
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC035
Installation of
Page 56

27in142r3
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC050
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC055
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC70
Construction of
Cast in Situ Barriers Stg-3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINPNT010
Deck Slabs External Surface Preparation and Painting Stg-1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINPNT015
Deck Slabs Painting inside Box Girders Stg-1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINPNT25
Deck Slabs External Surface Preparation and Painting Stg-3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINPNT35
Deck Slabs Painting inside Box Girders Stg-3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Page 57

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18075
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18085
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18095
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18105
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18115
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18125
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18135
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18145
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18155
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19175
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19185
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19195
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19205
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19215
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19225
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19235
Concrete Top Slab
Page 58

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19245
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19255
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20275
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20285
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20295
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20305
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20315
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20325
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20335
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20345
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20355
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD21375
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD21385
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD21395
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD21405
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD21415
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD21425
Rebar for Top Slab
Page 59

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD21435
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD21445
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD21455
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECPTT005
Threading, Post
Tensioning & Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECD1705
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECD1715
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECD1725
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECD1735
Rebar for Top Slab
Page 60

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECD1745
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECD1755
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECD1765
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECD1775
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECD1785
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECD1795
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECN01065
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECN01075
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECN01085
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECN01095
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECN01105
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECN01115
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECN01125
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECN01135
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECN01145
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECN01155
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECN05005
Staging /
Scaffolding
Page 61

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECN05010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECN05015
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECN05020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECN05025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECN05030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECN05035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECN05040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECN05045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECN05050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECN05055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECPTT002
Threading Of Post
Tensioning Strands
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECPTT005
Post Tensioning &
Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22110
Pier "22" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINDEC025
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINDEC045
Asphalt Wearing
Course
Page 62

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINDEC050
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINDEC055
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECPTT002
Threading Of Post
Tensioning Strands
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECPTT005
Post Tensioning &
Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECPTT010
Removal of External
Page 63

27in142r3
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05015
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECPTT002
Threading Of Post
Tensioning Strands
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECPTT005
Post Tensioning &
Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINDEC010
Construction of
Page 64

27in142r3
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINDEC015
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC005
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC010
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC015
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC020
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC025
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC050
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC055
Road Markings
Page 65

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINPNT015
Abutments &
Retaining Walls - Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINPNT020
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISRETGEN005
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISRETGEN010
Construction of
Retaining Wall
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISRETGEN015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISRETGEN020
Construction of
Cast in Situ Barriers and Sidewalks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Page 66

Activity:
Activity:
Activity:
Scaffolding

27in142r3
CO-STS28PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS28PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS28PT1DECN03005
Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECPTT005
Post Tensioning &
Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2045
Pile Cap Waterproofing (incl. 2mm HDPE Liner) / Backfilling (inc.
Reinstate Revetment)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2050
Installation of
Page 67

27in142r3
Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2055
Backwall Installation of Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2060
Backwall Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2065
Backwall - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2070
Backwall - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2075
Backfilling Behind Abutment Back Wall
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2080
Approach Slab
Construction
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAPP045
Retaining Wall Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAPP050
Retaining Wall Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINDEC135
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINDEC145
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINDEC155
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINDEC165
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINDEC65
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINDEC75
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINDEC85
Installation of
Ducts & Interlock Tiles
Page 68

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINPNT25
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1365
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1375
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1385
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1395
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1405
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1415
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1425
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1435
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1445
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1455
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1465
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN3895
Removal of
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings (Stage 1 & 2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINAPP010
Approval of the
Profile drawings (Stage 1 & 2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINAPP10
Surveying and
Submittal of Deck slab profile drawings (Stage 3)
Page 69

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINAPP20
Approval of the
Profile drawings (Stage 3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINDEC005
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINDEC010
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINDEC015
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINDEC020
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINDEC025
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINDEC050
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINDEC055
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Page 70

27in142r3
Activity:
CO-STS31MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Page 71

Activity:
Activity:
Activity:
Activity:
Scaffolding

27in142r3
CO-STS31PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS31PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS31PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS31PT1DECN02005
Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECPTT005
Threading, Post
Tensioning & Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1GENTRA005
Approvals for
Traffic Management & Erection of Gantry
Project:
Max-CL14(2)R6-UP004
Page 72

Activity:
Portal Frames

27in142r3
CO-STS31PT1GENTRA007

Modification of

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1GENTRA010
Installation of
Portal Frames (Span 2 & Span 3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06130
Pier "6" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07210
Pier "7" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN03100
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN03110
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN03120
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN03130
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN03140
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN03150
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN03160
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN03170
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN03180
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN03190
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN04005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Page 73

27in142r3
Activity:
CO-STS31PT2DECN04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN04015
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN04020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN04025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN04030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN04035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN04040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN04045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN04050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN04055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN05005
Staging /
Scaffolding (Inc. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN05010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN05015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN05020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN05025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN05030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN05035
Removal of Web
Page 74

27in142r3
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN05040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN05045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN05050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN05055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECPTT005
Threading, Post
Tensioning & Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECPTT015
Removal of Portal
Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08350
Pier "9" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Page 75

27in142r3
Activity:
CO-STS31PT2PIEP09045
Pier "9" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09050
Pier "9" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09055
Pier "9" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09060
Pier "9" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09065
Pier "9" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09070
Pier "9" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09075
Pier "9" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09080
Pier "9" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09085
Pier "9" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09090
Pier "9" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09095
Pier "9" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09100
Pier "9" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09105
Pier "9" Column
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09110
Pier "9" Column
Head - Installation of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09115
Pier "9" Column
Page 76

1
1
1
1
1
1
1
1
1
1
1
1
1
1

27in142r3
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09120
Pier "9" Column 1
Head - Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09125
Pier "9" Column 2
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09130
Pier "9" Column 2
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09135
Pier "9" Column 2
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09140
Pier "9" Column 2
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09145
Pier "9" Column 2
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09150
Pier "9" Column 2
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09155
Pier "9" Column 2
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09160
Pier "9" Column 2
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09165
Pier "9" Column 2
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09170
Pier "9" Column 2
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09175
Pier "9" Column 2
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09180
Pier "9" Column 2
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09185
Pier "9" Column 2
Head - Steel Reinforcement
Page 77

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09190
Pier "9" Column 2
Head - Installation of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09195
Pier "9" Column 2
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09200
Pier "9" Column 2
Head - Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09205
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09210
Pier "9" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10110
Pier "10" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3DECN05015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3DECN05020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3DECN05025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3DECN05030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3DECN05035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3DECN05040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3DECN05045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3DECN05050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3DECN05055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Page 78

27in142r3
Activity:
CO-STS31PT3DECPTT005
Threading, Post
Tensioning & Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINDEC005
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINDEC025
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISMSEEMB005
Installation of MSE
Wall after construction of Abutment Backwall
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISMSEEMB010
Coping Beam
Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISMSEEMB015
Installation of
Precast Shear Key Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISMSEEMB020
Construction of
Cast in Situ Barriers and Sidewalks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2055
Backwall Installation of Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2060
Backwall Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2065
Backwall - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2070
Backwall - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2075
Backfilling Behind Abutment Back Wall
Project:
Max-CL14(2)R6-UP004
Page 79

27in142r3
Activity:
CO-UTBRGCAUL01PIP010
External
Installation of Bridge Railings for Wet Utilities - S27
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP015
External
Installation of Bridge Railings for Wet Utilities - S28
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP025
External
Installation of Bridge Railings for Wet Utilities - S24
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP030
External
Installation of Bridge Railings for Wet Utilities - S25
Stg-1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP040
External
Installation of Bridge Railings for Wet Utilities - S20
S21 / S04
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP60
External
Installation of Bridge Railings for Wet Utilities - S25
Stg-3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP70
External
Installation of Bridge Railings for Wet Utilities - S30
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01TRY005
Internal
Installation of Bridge Trays for Electrical Utilities Stg-1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01TRY010
Internal
Installation of Bridge Trays for Electrical Utilities Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01TRY020
Internal
Installation of Bridge Trays for Electrical Utilities Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01TRY30
Internal
Installation of Bridge Trays for Electrical Utilities Stg-3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTCAUL04PIP005
Installation of
Nos. of DU ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTCAUL04PIP020
Installation of
Nos. of DU ducts
Project:
Max-CL14(2)R6-UP004
Page 80

S25

S26
S28
S25
4
4

27in142r3
Activity:
CO-UTDWTADNL15FIN005
Installation of Air
valve and Butterfly valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15FIN010
Finishing Work (for
Line 15 All Length)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP010
Installation of 600
dia GRE waterline inside 1200 dia AC pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP015
Grouting, Concrete
surround & Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP020
Setting out /
Excavation for Pit & Removal of 1200 dia AC pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP025
Installation of 600
dia GRE waterline inside 1200 dia AC pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP030
Grouting, Concrete
surround & Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP035
Setting out /
Excavation for Pit & Removal of 1200 dia AC pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP040
Installation of 600
dia GRE waterline inside 1200 dia AC pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP045
Grouting, Concrete
surround & Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP050
Valve Chambers /
Foundations for Valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP060
Installation of 600
dia GRE waterline inside 1200 dia AC pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP065
Grouting, Concrete
surround & Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP65
Request for Shut
down
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP75
Shut down &
Connection works
Page 81

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP005
DEWA Water Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP010
DEWA Water Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP025
Prepare and Submit
Construction Method Proposal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP035
Review and Approve
Construction Method Proposal By Engineer / DEWA-WD
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP040
Submittal of
Application for Excavation NOC's to DEWA ED (Over Head
Lines)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP045
Approval of
Excavation NOC's from DEWA ED (Over Head Lines)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01PIP003
Construction of
Approved Proposal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01PIP010
1200 dia Waterline
Protection by GRE pipe with steel sleeve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01PIP020
Finishing Works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLCAUL12PIP005
Installation of
12x11kv Cables + 4 Nos. spare + 4 Nos. LV Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLCAUL12PIP010
Installation of
12x11kv Cables + 4 Nos. spare + 4 Nos. LV Cables
Page 82

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLCAUL12PIP020
Installation of
18x11kv Cables + 6 Nos. spare
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLCAUL12PIP035
Installation of
12x11kv Cables + 4 Nos. spare + 4 Nos. LV Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLCAUL12PIP040
Installation of
12x11kv Cables + 4 Nos. spare + 4 Nos. LV Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLCAUL12PIP050
Installation of
18x11kv Cables + 6 Nos. spare
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETICAUL06PIP005
Installation of 4
Nos. + 4 Nos. of ETISALAT ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETICAUL06PIP020
Installation of 4
Nos. + 4 Nos. of ETISALAT ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETICAUL06PIP20
Connection to
existing network
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04APP005
Irrigation Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04APP010
Irrigation Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP010
2Wx150 dia Duct
Crossings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP020
1Wx300 dia Duct
Crossings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP025
Setting out /
Page 83

27in142r3
Excavation
Activity:
Crossings
Activity:
Excavation

Project:
Max-CL14(2)R6-UP004
CO-UTIRRADNL04PIP030
2Wx150 dia Duct
Project:
Max-CL14(2)R6-UP004
CO-UTIRRADNL04PIP040
Setting out /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP045
2Wx150 dia Extension of Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP050
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP055
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP060
1x200 dia Extension of Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP065
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP070
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP075
1x200 dia Extension of Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP080
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP085
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP090
Extension of Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP095
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRCAUL07PIP015
Installation of 150
dia GRP for TSE Supply
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL08PIP004
Installation of 150
dia GRP for TSE Supply (Bridge S25)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL08PIP015
Installation of 150
dia GRP for TSE Supply (Bridge S24)
Page 84

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL08PIP075
Installation of 150
dia GRP for TSE Supply (Bridge S20 / Bridge S21)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL08PIP75
Installation of 150
dia GRP for TSE Supply (Bridge S30)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON005
Preparation Works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON010
Utility Room Wall
Reinforcement - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON015
Utility Room Wall
Formwork - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON020
Utility Room Wall
Concrete - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON025
Utility Room Wall
Curing / Removal of Formwork - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON030
Utility Room Wall
Reinforcement - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON035
Utility Room Wall
Formwork - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON040
Utility Room Wall
Concrete - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON045
Utility Room Wall
Curing / Removal of Formwork - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON050
Utility Room Top
Slab Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON055
Utility Room Top
Slab Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON060
Utility Room Top
Slab Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON065
Utility Room Top
Slab Curing / Removal of Formwork
Page 85

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWIFIN005
Installation of
Platforms, Handrails, Frames, Covers and Ladders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWIFIN010
Bridge Utilities
Final Connections - Electrical
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANFIN010
Bridge Utilities
Final Connections - HDPE Sewer and GRP Irrigation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANFIN015
Bridge Utilities
Final Connections - GRE Potable Water pipes
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANFIN030
Bridge Utilities
Final Connections - Electrical (Landside only)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTCAUL16PIP015
Installation of
2x300 dia GRE Water pipes (Bridge S28)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTCAUL16PIP17
Construction of
Chamber at island & connections
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTMARL17PIP010
Installation of
2x300 dia GRE Water pipes (Bridge S25)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTMARL17PIP012
SCADA Installation of 2x24 Fibre Optic Cable (Bridge S25)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTMARL17PIP025
Installation of
2x300 dia GRE Water pipes (Bridge S24)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTMARL17PIP027
SCADA Installation of 2x24 Fibre Optic Cable (Bridge S24)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTRTAADSL01PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTRTAADSL01PIP010
Construction of
Spare Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTRTAADSL01PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWCAUL01PIP005
Installation of 315
dia HDPE Rising Main (Bridge S28)
Page 86

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWMARL02PIP010
Installation of
dia HDPE Rising Main (Bridge S25)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWMARL02PIP030
Installation of
dia HDPE Rising Main (Bridge S24)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05FIN005
Installation of
Accessories, Covers & Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP010
Pipe Laying 600
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP023
Pipe Laying 315
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP025
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP030
Pipe Laying 600
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP040
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP043
Pipe Laying 315
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP045
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP050
Pipe Laying 600
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP055
Construction of
chambers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP060
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP063
Pipe Laying 315
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP065
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP070
Pipe Laying 600
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP073
Pipe Laying 600
Page 87

315
315

dia
dia

dia

dia

dia

dia

dia
dia

27in142r3
NDRC
Activity:
chambers
Activity:
Activity:
Activity:
Excavation
Activity:
Activity:
chambers
Activity:
Activity:
Activity:
Excavation
Activity:
Activity:
chambers

Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP075
Construction of
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP080
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP083
Pipe Laying 315 dia
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP084
Setting out /
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP090
Pipe Laying 600 dia
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP095
Construction of
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP100
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP103
Pipe Laying 315 dia
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP105
Setting out /
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP110
Pipe Laying 600 dia
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP115
Construction of

Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP120
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP123
Pipe Laying 315 dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05SHD005
Drainage - Test &
Connect new pipe (Engineer / RTA Release Provisional
Sums-including Shutdown Approval)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-DMSTWGENDEMGEN005
Demobilization of
Temporary Site Facilities
Project:
Max-CL14(2)R6-UP004
Activity:
PO-DMSTWGENSTCGEN005
Final Site
Clearance
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDCSTKODOCASB005
As-Built Drawings
Activity:

Page 88

27in142r3
Submittal
Activity:
Submittal

Project:
Max-CL14(2)R6-UP004
PO-RUDUTTKODOCASB005
As-Built Drawings

Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDUTTKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDUTTKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDUTTKODOCOAM005
O&M Manuals
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDUTTKODOCOAM010
O&M Manuals
Approval
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDWTTKODOCASB005
As-Built Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDWTTKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDWTTKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDWTTKODOCOAM005
O&M Manuals
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDWTTKODOCOAM010
O&M Manuals
Approval
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUELETKODOCASB005
As-Built Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUELETKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUELETKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUELETKODOCOAM005
O&M Manuals
Submittal
Project:
Max-CL14(2)R6-UP004
Page 89

Activity:
Approval
Activity:
Submittal

27in142r3
PO-RUELETKODOCOAM010

O&M Manuals

Project:
Max-CL14(2)R6-UP004
PO-RUETITKODOCASB005
As-Built Drawings

Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUETITKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUETITKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUETITKODOCOAM005
O&M Manuals
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUETITKODOCOAM010
O&M Manuals
Approval
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUIRRTKODOCASB005
As-Built Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUIRRTKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUIRRTKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUIRRTKODOCOAM005
O&M Manuals
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUIRRTKODOCOAM010
O&M Manuals
Approval
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUPWSTKODOCASB005
As-Built Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUPWSTKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUPWSTKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUPWSTKODOCOAM005
O&M Manuals
Submittal
Page 90

Activity:
Approval
Activity:
Submittal

27in142r3
Project:
Max-CL14(2)R6-UP004
PO-RUPWSTKODOCOAM010
O&M Manuals
Project:
Max-CL14(2)R6-UP004
PO-RURODTKODOCASB005
As-Built Drawings

Project:
Max-CL14(2)R6-UP004
Activity:
PO-RURODTKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RURODTKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RURODTKODOCOAM005
O&M Manuals
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RURODTKODOCOAM010
O&M Manuals
Approval
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSEWTKODOCASB005
As-Built Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSEWTKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSEWTKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSEWTKODOCOAM005
O&M Manuals
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSEWTKODOCOAM010
O&M Manuals
Approval
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSTOTKODOCASB005
As-Built Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSTOTKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSTOTKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSTOTKODOCOAM005
O&M Manuals
Page 91

27in142r3
Submittal
Activity:
Approval
Activity:
Submittal

Project:
Max-CL14(2)R6-UP004
PO-RUSTOTKODOCOAM010
O&M Manuals
Project:
Max-CL14(2)R6-UP004
PO-RUSWITKODOCASB005
As-Built Drawings

Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSWITKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSWITKODOCOAM005
O&M Manuals
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSWITKODOCOAM010
O&M Manuals
Approval
Project:
Max-CL14(2)R6-UP004
Activity:
PO-STBRITKODOCASB005
As-Built Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-STBRITKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-STBRITKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-STBRITKODOCOAM005
O&M Manuals
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-STBRITKODOCOAM010
O&M Manuals
Approval
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDCOD005
Project Completion
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSHVC010
Submittal of HVAC &
Ventilation System Material Recommendation /
Prequalification (By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSHVC015
Review of HVAC &
Ventilation System Material Recommendation /
Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSHVC020
Review of HVAC &
Ventilation System Material Recommendation /
Page 92

27in142r3
Prequalification (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSHVC022
Review of HVAC &
Ventilation System Material Recommendation /
Prequalification and Approval (By RTA / Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSHVC040
HVAC & Ventilation
System Material Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSLGT010
Submittal of
Lighting System Material Recommendation / Prequalification
(By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSLGT015
Review of Lighting
System Material Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSLGT020
Review of Lighting
System Material Recommendation / Prequalification (By
Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSLGT025
Review of Lighting
System Material Recommendation / Prequalification &
Approval (By RTA / Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSLGT040
Lighting System
Material Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSSMD010
Submittal of Smoke
Detector Material Recommendation / Prequalification (By
Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSSMD015
Review of Smoke
Detector Material Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSSMD020
Review of Smoke
Detector Material Recommendation / Prequalification (By
Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSSMD025
Review of Smoke
Detector Material Recommendation / Prequalification &
Approval (By RTA / Engineer)
Project:
Max-CL14(2)R6-UP004
Page 93

27in142r3
Activity:
PR-PRTCSMATPVSSMD040
Smoke Detector
Material Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG075
1st Review of Road
Ganties Design By Engineer / RTA
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG080
2nd Submittal of
Road Ganties Design to Engineer / RTA
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG085
2nd Review of Road
Ganties Design By Engineer / RTA
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG090
Manufacturing /
Delivery of Road Gantries and Accessories to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRMSE075
Precasting of Shear
Key Slab / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC020
Review of HVAC &
Ventilation System Subcontractor Recommendation /
Prequalification and Approval (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC040
Contractor Issuance
of HVAC & Ventilation System Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC065
1st Submittal of
HVAC & Ventilation System Detailed Design (By Subcontractor
/ Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC070
1st Review of HVAC
& Ventilation System Detailed Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC075
2nd Submittal of
HVAC & Ventilation System Detailed Design (By Subcontractor
/ Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC080
2nd Review of HVAC
& Ventilation System Detailed Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT020
Review of Lighting
System Subcontractor Recommendation / Prequalification and
Approval (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT040
Contractor Issuance
Page 94

27in142r3
of Lighting System Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT050
1st Review of
Lighting System Conceptual Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT055
2nd Submittal of
Lighting System Conceptual Design (By Subcontractor /
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT060
2nd Review of
Lighting System Conceptual Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT065
1st Submittal of
Lighting System Detailed Design (By Subcontractor /
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT070
1st Review of
Lighting System Detailed Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT075
2nd Submittal of
Lighting System Detailed Design (By Subcontractor /
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT080
2nd Review of
Lighting System Detailed Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD020
Review of Smoke
Detector Subcontractor Recommendation / Prequalification
and Approval (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD045
1st Submittal of
Smoke Detector Subcontractor Conceptual Design (By
Subcontractor / Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD050
1st Review of Smoke
Detector Conceptual Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD055
2nd Submittal of
Smoke Detector Conceptual Design (By Subcontractor /
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD060
2nd Review of Smoke
Detector Conceptual Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Page 95

27in142r3
Activity:
PR-PRTCSSUBPVSSMD065
1st Submittal
Smoke Detector Detailed Design (By Subcontractor /
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD070
1st Review of
Detector Detalied Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD075
2nd Submittal
Smoke Detector Detailed Design (By Subcontractor /
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD080
2nd Review of
Detector Detailed Design (By Engineer / RTA)

of

Smoke
of

Smoke

Activities with unsatisfied


constraints..........................0
Activities with unsatisfied
relationships........................0
Activities with external
dates...................................0
Activities that are not on any float
paths.......................7307
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSADNLOAPIP010
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSADNLOAPIP020
Lay 2x24 Fibre
Optic SCADA Cable in ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSADNLOAPIP030
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSADSLOAPIP010
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSADSLOAPIP020
Lay 2x24 Fibre
Optic SCADA Cable in Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSADSLOAPIP030
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSADSLOAPIP040
Installation of
Fiber Distribution Frame
Page 96

Activity:
Panel

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-ASDWSADSLOAPIP060
Installation of FDF

Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSADSLOAPIP070
Installation of
Instrument Panel
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP010
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP020
Lay 2x24 Fibre
Optic SCADA Cable in ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP030
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP040
Installation of
Fiber Distribution Frame
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP050
Installation of
Remote Terminal Units
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP060
Installation of FDF
Panel
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP070
Installation of
Instrument Panel
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP100
Installation of
Instrument Panel
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP110
Hardware
modification of Existing RTU
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP160
DEWA-WD Scada Testing & Commissioning
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP70
Installation of
Fiber Distribution Frame
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP80
Installation of
Remote Terminal Units
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASDWSINTLOAPIP90
Installation of FDF
Panel
Page 97

Activity:
Activity:
Activity:
Activity:
Activity:
Activity:
Blinding, WP &
Activity:
Blinding, WP &
Activity:
Blinding, WP &
Activity:
Blinding, WP &
Activity:
Blinding, WP &
Activity:
Works
Activity:
Membrane Works

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONBAS010
Base Slab - Part A
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONBAS020
Base Slab - Part B
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONBAS030
Base Slab - Part C
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONBAS040
Base Slab - Part D
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONBAS050
Base Slab - Part E
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONEAR010
Part A, Excavation,
Screed
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONEAR020
Part E, Excavation,
Screed
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONEAR030
Part B, Excavation,
Screed
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONEAR040
Part D, Excavation,
Screed
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONEAR050
Part C, Excavation,
Screed
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONFIN160
Surface Preparation
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONFIN170
Waterproofing

Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWRETCONFIN180
Backfilling works
including laying of longitudinal perforated pipe and filter
media
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWRETCONFIN200
Concrete Barriers
and Fences
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWRETCONFIN220
Completion of
Retaining wall
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWRETCONWAL010
Wall, Part 01,
Steel, FW, Concreting & Deshuttering
Page 98

Activity:
Steel, FW,
Activity:
Steel, FW,
Activity:
Steel, FW,
Activity:
Steel, FW,
Activity:
Steel, FW,
Activity:
Steel, FW,
Activity:
Steel, FW,
Activity:
Steel, FW,
Activity:
Steel, FW,
Activity:
Steel, FW,
Activity:
Steel, FW,
Activity:
Steel, FW,
Activity:
Steel, FW,
Activity:
Steel, FW,
Activity:

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONWAL020
Wall, Part 02,
Concreting & Deshuttering
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONWAL030
Wall, Part 03,
Concreting & Deshuttering
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONWAL035
Wall, Part 04,
Concreting & Deshuttering
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONWAL040
Wall, Part 05,
Concreting & Deshuttering
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONWAL060
Wall, Part 06,
Concreting & Deshuttering
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONWAL065
Wall, Part 07,
Concreting & Deshuttering
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONWAL070
Wall, Part 08,
Concreting & Deshuttering
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONWAL090
Wall, Part 09,
Concreting & Deshuttering
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONWAL095
Wall, Part 10,
Concreting & Deshuttering
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONWAL100
Wall, Part 11,
Concreting & Deshuttering
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONWAL120
Wall, Part 12,
Concreting & Deshuttering
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONWAL125
Wall, Part 13,
Concreting & Deshuttering
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONWAL130
Wall, Part 14,
Concreting & Deshuttering
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETCONWAL150
Wall, Part 15,
Concreting & Deshuttering
Project:
Max-CL14(2)R6-UP004
CO-ASERWRETGENAPP010
Retaining Wall Page 99

27in142r3
Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWRETGENAPP020
Retaining Wall Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWS01PAVEAR010
Partial Clearance
from BESIX near Station 4
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWS01PAVEAR020
Partial Clearance
from BESIX near Station 3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWS01PAVEAR030
Final Clearance
from BESIX
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWS01PAVEAR040
DEWA/NDRC NOC
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWS01PAVEAR050
Earthworks &
compaction to Formation Level
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWS01PAVLAY010
Granular Sub base
150mm
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWS01PAVLAY020
Wet mix 150mm
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWS01PAVLAY030
Kerb stones
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWS01PAVLAY040
Sand filling &
Interlock
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWS01PAVLAY050
Signage, Pavement
Marking & Cleaning
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWS01PAVLAY060
Installation of
Guard Rails
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWS02PAVEAR010
Clearence from
BESIX near Station 5
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWS02PAVEAR020
Earthworks &
compaction to Formation Level
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWS02PAVLAY010
Granular Sub base
150mm
Project:
Max-CL14(2)R6-UP004
Page 100

Activity:
Activity:
Activity:
Interlock

27in142r3
CO-ASERWS02PAVLAY020
Wet mix 150mm
Project:
Max-CL14(2)R6-UP004
CO-ASERWS02PAVLAY030
Kerb stones
Project:
Max-CL14(2)R6-UP004
CO-ASERWS02PAVLAY040
Sand filling &

Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWS02PAVLAY050
Signage, Pavement
Marking & Cleaning
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWS02PAVLAY055
Temporary Tying to
Existing Pavement (both sections)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWS02PAVLAY060
Permanent Tying to
Existing Pavement (both sections)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-ASERWS02PAVLAY065
Installation of
Guard Rails
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMMARCAUEAR005
Construction of
Causeway & Protection Slopes
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMMARCAUGEN005
Application /
Notification for Approval for Marine works to Commence
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMMARCAUGEN010
Causeway Survey
Works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO01APP005
Notification to
Engineer for Obstruction 01 - Existing Substation / Pump
Station & Engineer Instruction
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO01APP010
Receive Engineer
Resolution and Submit Drawings For Existing Substation /
Pump Station Resolution (Bridge S10 - Span 2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO01APP015
Review and Approve
Drawings For Existing Substation / Pump Station Resolution
(Bridge S10 - Span 2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO01CON005
Construction of
Proposal for Obstruction 01 For Bridge S10 (Pier 4 & Span
2)
Project:
Max-CL14(2)R6-UP004
Page 101

27in142r3
Activity:
CO-GNCOMOBSO02APP005
Notification to
Engineer for Obstruction 02 - Existing Victory Team /
DEWA-ED Fence & Engineer Instruction
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO02APP010
Prepare and Submit
Drawings / Permit For Existing Victory Team / DEWA-ED Fence
(Utilities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO02APP015
Review and Approve
Drawings / Permit For Existing Victory Team / DEWA-ED Fence
(Utilities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO03APP005
Notification to
Engineer for Obstruction 03 - Existing Compound Fence @
Bridges S31/32 & Engineer Instruction
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO03APP010
Prepare and Submit
Drawings / Permit For Existing Compound Fence @ Bridges
S31/32 (Utilities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO03APP015
Review and Approve
Drawings / Permit For Existing Compound Fence @ Bridges
S31/32 (Utilities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO03CON005
Construction of
Resolution for Obstruction 03 For Utilities
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO04APP005
Notification to
Engineer for Obstruction 04 - Existing Seawater Intake Pump
Station & Engineer Instruction
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO04APP010
Prepare and Submit
Drawings / Permit For Existing Seawater Intake Pump Station
(Utilities / Bridges)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO04APP015
Review and Approve
Drawings / Permit For Existing Seawater Intake Pump Station
(Utilities / Bridges)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO04CON005
Construction of
Resolution for Obstruction 04 For Utilities / Bridges
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO05APP005
Notification to
Engineer for Obstruction 01 - Existing Fence at MERAAS Road
Page 102

27in142r3
& Engineer Instruction
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO05APP010
Prepare and Submit
Drawings For Existing Fence at MERAAS Road (Utilities /
Bridges)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO05APP015
Review and Approve
Drawings For Existing Fence at MERAAS Road (Utilities /
Bridges)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO05CON005
Construction of
Resolution for Obstruction 05 For Utilities / Bridges
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO06APP005
Notification to
Engineer for Obstruction 06/07 - Existing Substations For
Milestone 1 & Engineer Instruction
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO06APP010
Prepare and Submit
Drawings For Existing Substations For Milestone 1
(Utilities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO06APP015
Review and Approve
Drawings For Existing Substations For Milestone 1
(Utilities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMOBSO06CON005
Construction of
Resolution for Obstruction 06/07 For Utilities (NDRC for
Drainage Line - Milestone 1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENBOR005
Prepare and Submit
Bore Hole Location Layout (1st Phase) - Interchange 5.5
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENBOR010
Review and Approve
Bore Hole Location Layout By Engineer (1st Phase) Interchange 5.5
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENBOR015
Apply Bore Holes
Investigation At Approved Locations (1st Phase) Interchange 5.5
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENBOR020
Submittal of Bore
Hole Reports (1st Phase) - Interchange 5.5
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENBOR025
Approval of Bore
Page 103

27in142r3
Hole Reports (1st Phase) - Interchange 5.5
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENBOR030
Prepare and Submit
Bore Hole Location Layout (2nd Phase) - Marina Road
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENBOR035
Review and Approve
Bore Hole Location Layout By Engineer (2nd Phase) - Marina
Road
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENBOR040
Apply Bore Holes
Investigation At Approved Locations (2nd Phase) - Marina
Road
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENBOR045
Submittal of Bore
Hole Reports (2nd Phase) - Marina Road
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENBOR050
Approval of Bore
Hole Reports (2nd Phase) - Marina Road
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENBOR055
Prepare and Submit
Bore Hole Location Layout (3rd Phase) - Causeway
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENBOR060
Review and Approve
Bore Hole Location Layout By Engineer (3rd Phase) Causeway
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENBOR065
Apply Bore Holes
Investigation At Approved Locations (3rd Phase) - Causeway
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENBOR070
Submittal of Bore
Hole Reports (3rd Phase) - Causeway
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENBOR075
Approval of Bore
Hole Reports (3rd Phase) - Causeway
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENSUR005
General Survey for
Road & Utility Alignment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENSUR010
General Survey for
Bridges Alignment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENTRT005
Prepare and Submit
Trial Trenches Location Layout (1st Phase) - Interchange
5.5
Page 104

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENTRT010
Review and Approve
Trial Trenches Location Layout By Engineer (1st Phase) Interchange 5.5
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENTRT015
Apply Trial
Trenches Investigation At Approved Locations (1st Phase) Interchange 5.5
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENTRT020
Submittal of Trial
Trenches Reports (1st Phase) - Interchange 5.5
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENTRT025
Approval of Trial
Trenches Reports (1st Phase) - Interchange 5.5
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENTRT030
Prepare and Submit
Trial Trenches Location Layout (2nd Phase) - Marina Road
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENTRT035
Review and Approve
Trial Trenches Location Layout By Engineer (2nd Phase) Marina Road
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENTRT040
Apply Trial
Trenches Investigation At Approved Locations (2nd Phase) Marina Road
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENTRT042
Apply / Approval
Trial Trenches Investigation (2nd Phase) - Marina Road at
S22 Bridge
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENTRT045
Submittal of Trial
Trenches Reports (2nd Phase) - Marina Road
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENTRT050
Approval of Trial
Trenches Reports (2nd Phase) - Marina Road
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMPSWGENTRT055
Trial Trenches For
Permanent Execution Works (BOQ - Bill 02 Remaining Qty)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN005
Receive PRT
Manufacturer Details from Engineer / Client (for Tram
Works)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN010
Coordination
Page 105

27in142r3
Meeting With PRT Manufacturer / Parsons / Client /
Contractor (for Tram Works)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN015
Receive General
Bridge PRT Manufacturer Requirements
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN020
Material Submittals
(If Required)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN025
Material Approval
(If Required)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN030
Receive PRT
Manufacturer Requirements for Bridge S5
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN035
Receive PRT
Manufacturer Requirements for Bridge S6
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN040
Receive PRT
Manufacturer Requirements for Bridge S10
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN045
Receive PRT
Manufacturer Requirements for Bridge S20
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN050
Receive PRT
Manufacturer Requirements for Bridge S21
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN055
Receive PRT
Manufacturer Requirements for Bridge S22
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN060
Receive PRT
Manufacturer Requirements for Bridge S23
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN065
Receive PRT
Manufacturer Requirements for Bridge S24
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN070
Receive PRT
Manufacturer Requirements for Bridge S25
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN075
Receive PRT
Manufacturer Requirements for Bridge S26
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN080
Receive PRT
Manufacturer Requirements for Bridge S27
Page 106

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN085
Receive PRT
Manufacturer Requirements for Bridge S28
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN090
Receive PRT
Manufacturer Requirements for Bridge S31
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMSTRPRTGEN095
Receive PRT
Manufacturer Requirements for Bridge S32
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSMERAPP005
Prepare and Submit
Drawings For MERAAS Road Detour
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSMERAPP010
Review and Approve
Drawings For MERAAS Road Detour
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSMEREAR005
Demolition of
Existing Asphalt / Curbs / Others
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSMEREAR010
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSMEREAR015
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSMERFIN005
Installation of
Road Marking / Traffic Signs / Safety Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSMERFIN010
Inspection By RTA /
Engineer / Police
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSMERFIN015
Detour Road Open to
Traffic
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSMERLAY005
Granular Subbase
CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSMERLAY020
AC Base Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSMERLAY025
AC Wearing Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSSZRAPP005
Prepare and Submit
Drawings For SZR Road Arrangement (S2, S8, S11) Incl.
Median Piling
Page 107

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSSZRAPP010
Review and Approve
Drawings For SZR Road Arrangement (S2, S8, S11) Incl.
Median Piling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSSZRAPP015
Prepare and Submit
METRO Permit For Metro Gantry Erection (S2, S8, S11)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSSZRAPP020
Review and Approve
METRO Permit for Metro Gantry Erection (S2, S8, S11)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSSZRCON005
Road Modification
Works for Piling & Gantry Erection on SZR (S2, S8, S11)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSSZRCON010
Preparation Works
At METRO Location for Gantry Erections (S2, S8, S11)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSSZRCON020
Gantry Erection at
Bridge S11
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSSZRCON030
Gantry Erection at
Bridge S14
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSSZRCON040
Gantry Erection at
Bridge S02
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSSZRCON050
Gantry Erection at
Bridge S08
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSSZRCON060
Gantry Erection at
Bridge S31
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSSZRCON070
Gantry Erection at
Bridge S03
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSSZRCON080
Procurement &
Delivery of simply supported beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTEMPIL030
Temporary Works for
Bridge S09 Pile caps
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTEMPIL040
Temporary Works for
Bridge S10 Pile caps
Project:
Max-CL14(2)R6-UP004
Page 108

27in142r3
Activity:
CO-GNCOMTMSTEMPIL050
Temporary Works for
Bridge S14 Pile caps
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTEMPIL060
Temporary Works for
Bridge S07 Pile caps
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTEMPIL070
Temporary Works for
Bridge S11 Pile caps
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM1APP005
Stage 1 - Prepare
and Submit Drawings For Marina Road 1 Lane Closure (Both
Sides)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM1APP010
Stage 1 - Review
and Approve Drawings For Marina Road 1 Lane Closure (Both
Sides)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM1APP015
Stage 2 - Prepare
and Submit Drawings For Diversion on Proposed Widened
Marina Road
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM1APP020
Stage 2 - Review
and Approve Drawings For Diversion on Proposed Widened
Marina Road
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM1APP025
Stage 3 - Prepare
and Submit Drawings For Marina Road Closure to 1 Lane (Both
Sides)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM1APP035
Stage 3 - Review
and Approve Drawings For Marina Road Closure to 1 Lane
(Both Sides)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM1S1C005
Marina Road 1 Lane
Closure (Both Sides) to start Trial Trenches & Open to
Traffic
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM1S1C010
Demolition of
Existing Barrier / Asphalt / Relocation of Lighting Poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM1S2C005
Permanent Road
Widening Completed & Divert Traffic
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM1S2C010
Marina Road 1 Lane
Page 109

27in142r3
Closure (Both Sides) to commence Piling works & Open to
Traffic
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM1S2C015
Demolition of
Existing Barriers / Removal of Existing Signage Gantry /
Asphalt for Piling of S22,S23,S24
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM1S3C005
Approval and Road
Closure From 2 Lanes to 1 Lane (Both Sides)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM1S3C010
Road Modification
Works for the start of Deck Slab Construction Works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2APP005
Prepare and Submit
Drawings For Marina Road Reinstatement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2APP010
Review and Approve
Drawings For Marina Road Reinstatement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2EAR005
Bridges S22, S23 &
S24 Completed (Including Painting)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2EAR010
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2EAR015
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2FIN005
Installation of
Road Marking / Traffic Signs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2FIN010
Inspection By RTA /
Engineer / Police
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2FIN15
Reinstated Marina
Road Open to Traffic
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2LAY005
Granular Subbase
CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2LAY010
Installation of
Curbs & Concrete Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2LAY015
Wet-mix Macadam
Page 110

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2LAY020
AC Base Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-GNCOMTMSTM2LAY025
AC Wearing Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRHVCAPP005
HVAC & Ventilation
- Drawing Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRHVCAPP010
HVAC & Ventilation
- Drawing Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRHVCCON005
HVAC & Ventilation
- Installation Inside Bridge S25
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRHVCCON010
HVAC & Ventilation
- Installation Inside Bridge S26
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRHVCCON015
HVAC & Ventilation
- Installation Inside Bridge S27
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRHVCCON020
HVAC & Ventilation
- Installation Inside Bridge S28
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRHVCCON20
HVAC & Ventilation
- Installation Inside Bridge S27A
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRHVCCON30
HVAC & Ventilation
- Installation Inside Bridge S25 Stg-3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRLGTAPP005
Lighting System Drawing Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRLGTAPP010
Lighting System Drawing Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRLGTCON005
Lighting System Installation Inside Bridge S25
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRLGTCON010
Lighting System Installation Inside Bridge S26
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRLGTCON015
Lighting System Installation Inside Bridge S27
Project:
Max-CL14(2)R6-UP004
Page 111

27in142r3
Activity:
CO-PSMSCGNRLGTCON020
Lighting System Installation Inside Bridge S28
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRLGTCON20
Lighting System Installation Inside Bridge S27A
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRSMDAPP005
Smoke Detector Drawing Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRSMDAPP010
Smoke Detector Drawing Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRSMDCON005
Smoke Detector Installation Inside Bridge S25
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRSMDCON010
Smoke Detector Installation Inside Bridge S26
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRSMDCON015
Smoke Detector Installation Inside Bridge S27
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRSMDCON020
Smoke Detector Installation Inside Bridge S28
Project:
Max-CL14(2)R6-UP004
Activity:
CO-PSMSCGNRSMDCON20
Smoke Detector Installation Inside Bridge S27A
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIGENSHDAPP005
Road Alignment /
Profile - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIGENSHDAPP010
Road Alignment /
Profile - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIGENSHDAPP015
Road Marking /
Traffic Signs - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIGENSHDAPP020
Road Marking /
Traffic Signs - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIGENSHDAPP025
Road Street
Lighting - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIGENSHDAPP030
Road Street
Lighting - Drawings Approval (inc. Authrities)
Page 112

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01GENINT005
Completion of
Approach Slab (Bridge S28)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01MISFIN010
Installation of
Lighting Poles / Feeder Pillar / Earthing / Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01MISFIN015
Installation of
Traffic Signs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01MISFIN025
Installation of
Road Marking
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01PAVLAY005
250mm Granular
Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01PAVLAY015
Installation of
Curbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01PAVLAY020
150mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWIS01PAVLAY030
Tack Coat / 50mm AC
Wearing Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNGENSHDAPP005
Road Alignment /
Profile - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNGENSHDAPP010
Road Alignment /
Profile - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Page 113

27in142r3
Activity:
CO-RWBWNGENSHDAPP015
Road Marking /
Traffic Signs - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNGENSHDAPP020
Road Marking /
Traffic Signs - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNGENSHDAPP025
Road Street
Lighting - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNGENSHDAPP030
Road Street
Lighting - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNMISCOMFIN005
Installation of
Guard Rail
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNMISCOMFIN010
Installation of
Lighting Poles / Feeder Pillar / Earthing / Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNMISCOMFIN015
Installation of
Traffic Signs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNMISCOMFIN020
Curbs Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNMISCOMFIN025
Installation of
Road Marking
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01GENINT005
Completion of Line
5-4, 5-5 and 5-6 Stormwater Drainage Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01GENINT010
Completion of Line
14-1 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01GENINT015
Completion of Line
15-1 and Line 15-2 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01GENINT025
Completion of Line
6-6 to 6-9 Sewerage Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01GENINT030
Completion of Line
7-2, 7-3 and 7-4 DEWA ED - 132 kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01GENINT035
Completion of Line
8 DEWA ED - 11 kv Installation
Project:
Max-CL14(2)R6-UP004
Page 114

27in142r3
Activity:
CO-RWBWNS01GENINT045
Completion of Line
5-3 Etisalat Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01PAVLAY015
Construction of
Concrete Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01PAVLAY020
150mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS01PAVLAY030
Tack Coat / 50mm AC
Wearing Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS02GENINT005
Completion of Line
5-2 and 5-3 Stormwater Drainage Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS02GENINT010
Completion of Line
14-2 and 14-3 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS02GENINT015
Completionf of Line
4-1 and 4-2 Irrigation Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS02GENINT020
Completion of Line
15-3 and 15-4 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS02GENINT025
Completion of Line
6-3, 6-4 and 6-5 Sewerage Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS02GENINT030
Completion of Line
7-1 DEWA ED - 132 kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS02GENINT040
Completion of Line
5-2 Etisalat Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS02PAVLAY030
Tack Coat / 50mm AC
Wearing Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03GENINT005
Completion of Line
Page 115

27in142r3
5-1 Stormwater Drainage Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03GENINT010
Completion of Line
11 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03GENINT015
Completion of Line
12 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03GENINT020
Completion of Line
13 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03GENINT025
Completion of Line
14-3 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03GENINT030
Completion of Line
15-4 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03GENINT035
Completion of Line
4 DEWA ED-132kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03GENINT040
Completion of Line
6-2 and 6-3 Sewerage Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03GENINT045
Completion of Line
6 DEWA ED-132kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03GENINT050
Completion of Line
5 DEWA ED-132kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03GENINT055
Completion of Line
6 DEWA ED-11kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03PAVLAY005
250mm Granular
Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Page 116

27in142r3
Activity:
CO-RWBWNS03PAVLAY015
Installation of
Curbs & Concrete Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03PAVLAY020
150mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS03PAVLAY030
Tack Coat / 50mm AC
Wearing Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04GENINT005
Completion of Line
5-1 Storm water Drainage Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04GENINT010
Completion of Line
9 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04GENINT015
Completion of Line
10 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04GENINT020
Completion of Line
4 DEWA ED-132kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04GENINT025
Completion of Line
6-1 Sewerage Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04GENINT030
Completion of Line
6 DEWA ED-11kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04GENINT035
Completion of Line
5 Etisalat Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04GENINT040
Completion of Line
5 DEWA ED-132kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04PAVLAY005
250mm Granular
Page 117

27in142r3
Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04PAVLAY015
Installation of
Curbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04PAVLAY020
150mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWNS04PAVLAY030
Tack Coat / 50mm AC
Wearing Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWGENSHDAPP005
Road Alignment /
Profile - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWGENSHDAPP010
Road Alignment /
Profile - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWGENSHDAPP015
Road Marking /
Traffic Signs - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWGENSHDAPP020
Road Marking /
Traffic Signs - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWGENSHDAPP025
Road Street
Lighting - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWGENSHDAPP030
Road Street
Lighting - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWS01GENINT005
Completion of
Bridge S11 - Approach Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWS01GENINT010
Completion of
Bridge S01 - Removal of Scaffolding & Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWS01GENINT015
Completion of
Bridge S09 - Removal of Scaffolding (Stage 2) & Painting
Page 118

Activity:
Guard Rail

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-RWBWWS01MISFIN005
Installation of

Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWS01MISFIN010
Installation of
Lighting Poles / Feeder Pillar / Earthing / Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWS01MISFIN015
Installation of
Traffic Signs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWS01MISFIN020
Curbs Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWS01MISFIN025
Installation of
Road Marking
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWS01PAVEAR005
Excavation /
Embankment (Inc. Abutment Protection Slope)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWS01PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWS01PAVLAY005
250mm Granular
Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWS01PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWS01PAVLAY015
Installation of
Curbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWS01PAVLAY020
150mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWS01PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWS01PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWBWWS01PAVLAY030
Tack Coat / 50mm AC
Wearing Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRGENSHDAPP005
Road Alignment /
Profile - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRGENSHDAPP010
Road Alignment /
Page 119

27in142r3
Profile - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRGENSHDAPP015
Road Marking /
Traffic Signs - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRGENSHDAPP020
Road Marking /
Traffic Signs - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRGENSHDAPP025
Road Street
Lighting - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRGENSHDAPP030
Road Street
Lighting - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRMISCOMFIN005
Installation of
Traffic Signs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRMISCOMFIN015
Installation of
Lighting Poles / Feeder Pillar / Earthing / Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRMISCOMFIN020
Curbs Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRMISCOMFIN025
Installation of
Road Marking
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS01GENINT010
Completion of Line
5 Irrigation Protection slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS01GENINT015
Completion of Line
9 DEWA ED - 11kv
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS01GENINT020
Completion of Line
2 DU Slab Protection
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS01PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS01PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS01PAVLAY005
250mm Granular
Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS01PAVLAY015
Installation of
Page 120

27in142r3
Curbs
Activity:
Macadam
Activity:
Vehicular tiles
Activity:
Poles / Cables

Project:
Max-CL14(2)R6-UP004
CO-RWDMRS01PAVLAY020
150mm Wet-mix
Project:
Max-CL14(2)R6-UP004
CO-RWDMRS01PAVLAY022
50mm Sand Bed &
Project:
Max-CL14(2)R6-UP004
CO-RWDMRS01REMCLR005
Removal of Lighting

Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS01REMCLR010
Clearing & Grubbing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS02GENINT005
Completion of Line
5 Irrigation Protection slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS02GENINT010
Completion of Line
9 DEWA ED - 11kv
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS02GENINT015
Completion of Line
2 DU Slab Protection
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS02PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS02PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS02PAVLAY005
250mm Granular
Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS02PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS02PAVLAY015
Installation of
Curbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS02PAVLAY020
150mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWDMRS02PAVLAY030
50mm Sand Bed &
Vehicular tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAGENSHDAPP005
Road Alignment /
Page 121

27in142r3
Profile - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAGENSHDAPP010
Road Alignment /
Profile - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAGENSHDAPP015
Road Marking /
Traffic Signs - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAGENSHDAPP020
Road Marking /
Traffic Signs - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAGENSHDAPP025
Road Street
Lighting - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAGENSHDAPP030
Road Street
Lighting - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAS01GENINT005
Completion of Line
6 Storm Water Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAS01MISFIN010
Installation of
Lighting Poles / Feeder Pillar / Earthing / Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAS01MISFIN015
Installation of
Traffic Signs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAS01MISFIN020
Curbs Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAS01MISFIN025
Installation of
Road Marking
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAS01PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAS01PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAS01PAVLAY005
250mm Granular
Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAS01PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWERAS01PAVLAY015
Installation of
Page 122

27in142r3
Curbs
Activity:
Macadam
Activity:
Activity:
Activity:
Wearing Course

Project:
Max-CL14(2)R6-UP004
CO-RWERAS01PAVLAY020
150mm Wet-mix
Project:
Max-CL14(2)R6-UP004
CO-RWERAS01PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
CO-RWERAS01PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
CO-RWERAS01PAVLAY030
Tack Coat / 50mm AC

Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWJLTGENSHDAPP005
Road Alignment /
Profile - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWJLTGENSHDAPP010
Road Alignment /
Profile - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWJLTGENSHDAPP015
Road Marking /
Traffic Signs - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWJLTGENSHDAPP020
Road Marking /
Traffic Signs - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWJLTGENSHDAPP025
Road Street
Lighting - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWJLTGENSHDAPP030
Road Street
Lighting - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWJLTS01GENINT005
Completion of Line
1 Tabreed Chilled Water Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWJLTS01GENINT010
Completion of Line
12 DEWA ED 11 kv protection
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWJLTS01MISFIN005
Installation of
Guard Rail
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWJLTS01MISFIN010
Installation of
Lighting Poles / Feeder Pillar / Earthing / Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWJLTS01MISFIN015
Installation of
Traffic Signs
Page 123

Activity:
Activity:
Road Marking
Activity:
Embankment
Activity:
preparation
Activity:
Subbase CBR

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-RWJLTS01MISFIN020
Curbs Painting
Project:
Max-CL14(2)R6-UP004
CO-RWJLTS01MISFIN025
Installation of
Project:
Max-CL14(2)R6-UP004
CO-RWJLTS01PAVEAR005
Excavation /
Project:
Max-CL14(2)R6-UP004
CO-RWJLTS01PAVEAR010
Sub grade
Project:
Max-CL14(2)R6-UP004
CO-RWJLTS01PAVLAY005
250mm Granular

Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWJLTS01PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWJLTS01PAVLAY015
Installation of
Curbs & Construction of Concrete Barrier
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWJLTS01PAVLAY020
150mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWJLTS01PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWJLTS01PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWJLTS01PAVLAY030
Tack Coat / 50mm AC
Wearing Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARGENSHDAPP005
Road Alignment /
Profile - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARGENSHDAPP010
Road Alignment /
Profile - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARGENSHDAPP015
Road Marking /
Traffic Signs - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARGENSHDAPP020
Road Marking /
Traffic Signs - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARGENSHDAPP025
Road Street
Page 124

27in142r3
Lighting - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARGENSHDAPP030
Road Street
Lighting - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARMISCOMFIN005
Construction of
Piers Protection Barriers (8 No.)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARMISCOMFIN007
Installation/Reinstatement of Chain Link Fence
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARMISCOMFIN010
Installation of
Lighting Poles / Feeder Pillar / Earthing / Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARMISCOMFIN015
Installation of
Traffic Signs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARMISCOMFIN020
Curbs Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARMISCOMFIN025
Construction of
Side Walk Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARMISCOMFIN030
Installation of
Road Marking
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01GENINT005
Completion of Line
6 Irrigation Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01GENINT010
Completion of Line
3 DU ITS Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01GENINT015
Completion of Line
10 / 11 DEWA ED - 11kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01GENINT020
Completion of Line
8 DEWA ED - 132kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01GENINT025
Completion of
Bridge S24
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01GENINT045
Completion of Line
1 District Cooling Protection
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01GENINT055
Completion of Line
Page 125

27in142r3
3 & 2 Seawater Intake 800 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01GENINT065
Completion of Line
3 & 2 Seawater Intake 600 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01PAVLAY005
250mm Granular
Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01PAVLAY015
Installation of
Curbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01PAVLAY020
150mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS01PAVLAY030
Tack Coat / 50mm AC
Wearing Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS02GENINT005
Completion of Line
3 DU Slab Protection
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS02GENINT015
Completion of
Bridge S25
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS02GENINT020
Completion of Line
3 Seawater Intake 800 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS02GENINT025
Completion of Line
3 Seawater Intake 600 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS02GENINT050
Completion of Line
10 / 11 DEWA ED - 11kv Installation
Page 126

Activity:
Embankment
Activity:
preparation

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-RWLARS02PAVEAR005
Excavation /
Project:
Max-CL14(2)R6-UP004
CO-RWLARS02PAVEAR010
Sub grade

Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS02PAVLAY005
150 mm Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS02PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS02PAVLAY015
Installation of
Curbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS02PAVLAY020
220mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS02PAVLAY025
Sand 1 Lift of 40mm
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS02PAVLAY030
Block Pavers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03GENINT005
Completion of
Bridge S24
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03GENINT010
Completion of Line
2 District Cooling Protection
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03GENINT015
Completion of Line
3 Seawater Intake 800 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03GENINT020
Completion of Line
3 Seawater Intake 600 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03GENINT035
Completion of Line
10 / 11 DEWA ED - 11kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03PAVLAY005
250mm Granular
Page 127

27in142r3
Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03PAVLAY015
Installation of
Curbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03PAVLAY020
150mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWLARS03PAVLAY030
Tack Coat / 50mm AC
Wearing Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAGENSHDAPP005
Road Alignment /
Profile - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAGENSHDAPP010
Road Alignment /
Profile - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAGENSHDAPP015
Road Marking /
Traffic Signs - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAGENSHDAPP020
Road Marking /
Traffic Signs - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAGENSHDAPP025
Road Street
Lighting - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAGENSHDAPP030
Road Street
Lighting - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAGENSHDAPP035
Submittal of
Application for Excavation NOC's to DEWA ED (Over Head
Lines)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAGENSHDAPP040
Approval of
Excavation NOC's from DEWA ED (Over Head Lines)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAMISCOMFIN010
Installation of
Page 128

27in142r3
Lighting Poles / Feeder Pillar / Earthing / Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAMISCOMFIN015
Installation of
Traffic Signs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAMISCOMFIN025
Installation of
Road Marking
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS01GENINT005
Completion of Line
1-1 SWI 600 dia Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS01GENINT010
Completion of Line
1-2 SWI 800 dia Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS01GENINT015
Completion of Line
1 DEWA ED - 11kv
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS01GENINT020
Completion of Line
1 DU Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS01GENINT025
Completion of Line
1 Etisalat
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS01GENINT030
Completion of Line
2 DEWA ED - 132 kv Protection
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS01PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS01PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS01PAVLAY005
250mm Granular
Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS01PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS01PAVLAY015
Installation of
Curbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS01PAVLAY020
150mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Page 129

Activity:
Activity:
Activity:
Wearing Course

27in142r3
CO-RWSRAS01PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
CO-RWSRAS01PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
CO-RWSRAS01PAVLAY030
Tack Coat / 50mm AC

Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02GENINT005
Completion of Line
2 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02GENINT010
Completion of Line
1 DEWA ED - 132 kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02GENINT015
Completion of Line
1 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02GENINT020
Completion of Line
1 Spare Duct Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02GENINT025
Completion of Line
1 DEWA ED - 11 kv Protection
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02GENINT030
Completion of Line
1 DU Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02GENINT035
Completion of Line
1 Etisalat
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02GENINT040
Completion of Line
2 DEWA ED - 132 kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02PAVLAY005
250mm Granular
Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSRAS02PAVLAY015
Installation of
Page 130

27in142r3
Curbs
Activity:
Macadam
Activity:
Activity:
Activity:
Wearing Course

Project:
Max-CL14(2)R6-UP004
CO-RWSRAS02PAVLAY020
150mm Wet-mix
Project:
Max-CL14(2)R6-UP004
CO-RWSRAS02PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
CO-RWSRAS02PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
CO-RWSRAS02PAVLAY030
Tack Coat / 50mm AC

Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRGENSHDAPP005
Road Alignment /
Profile - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRGENSHDAPP010
Road Alignment /
Profile - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRGENSHDAPP015
Road Marking /
Traffic Signs - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRGENSHDAPP020
Road Marking /
Traffic Signs - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRGENSHDAPP025
Road Street
Lighting - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRGENSHDAPP030
Road Street
Lighting - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01GENINT005
Completion of Line
11 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01GENINT010
Completion of Line
12 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01GENINT015
Completion of Line
9 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01GENINT020
Completion of Line
13 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01GENINT025
Completion of Line
10 DEWA WD Installation
Page 131

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01GENINT030
Completion of Line
6-1 to Line 6-3 Sewerage Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01GENINT035
Completion of Line
5-1 Etisalat Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01GENINT040
Completion of Line
5 DEWA ED 132 kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01GENINT045
Completion of Line
6 DEWA ED 11 kv protection
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01MISFIN010
Installation of
Lighting Poles / Feeder Pillar / Earthing / Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01MISFIN015
Installation of
Traffic Signs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01MISFIN025
Installation of
Road Marking
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01PAVEAR005
Excavation /
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01PAVEAR010
Sub grade
preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01PAVLAY005
250mm Granular
Subbase CBR
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01PAVLAY010
Foundation for
Street lighting poles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01PAVLAY015
Installation of
Curbs & Concrete Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01PAVLAY020
150mm Wet-mix
Macadam
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01PAVLAY022
Prime Coat
Project:
Max-CL14(2)R6-UP004
Activity:
CO-RWSZRS01PAVLAY025
85mm AC Base Course
Project:
Max-CL14(2)R6-UP004
Page 132

Activity:
Course
Activity:
Marker Buoys

27in142r3
CO-RWSZRS01PAVLAY030

50mm AC Wearing

Project:
Max-CL14(2)R6-UP004
CO-STFHOBHOCOMGNR005
Installation of

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STFHOBHOCOMGNR007
Anti scour rock
works for Marine Bridges piers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STFHOBHOCOMGNR010
Removal of Causeway
(Bridge S26, 27, S27A & 28)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINDEC005
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINDEC010
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINDEC015
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINDEC020
Demolition of
Existing Barrier on Existing Bridge & Removal of Side Walk
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINDEC025
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINDEC030
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINDEC035
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINDEC040
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINDEC045
Installation of
Lighting Poles & Street Lighting Cables
Page 133

Activity:
Course

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS01MISFINDEC050
Asphalt Wearing

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINDEC055
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINDEC060
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINDEC065
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal (inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval (inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECAPP035
Deck Slab Closure
Pour - Drawing Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECAPP045
Deck Slab Closure
Page 134

27in142r3
Pour - Drawing Approval (inc. Authorities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECCPR005
Approval of 1 Lane
Closure of Existing Live Traffic over Existing Bridge
(including Bridge S2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECCPR007
Erection of
Scaffolding system for the widening works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECCPR010
Drilling and
Installation of Dowels Between Bridges (including Bridge
S2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECCPR015
Construction of
Closure Pour (including Bridge S2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD02055
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD02065
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD02075
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD02085
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD02095
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD02105
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD02115
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD02125
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD02135
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD02145
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD03155
Formwork - Bottom
Slab and Cantilever
Page 135

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD03165
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD03175
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD03185
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD03195
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD03205
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD03215
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD03225
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD03235
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD03245
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD04255
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD04265
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD04275
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD04285
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD04295
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD04305
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD04315
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD04325
Concrete Top Slab
Page 136

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD04335
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECD04345
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN02005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Page 137

Activity:
Activity:
slab and webs
Activity:
curing
Activity:
Formwork

27in142r3
CO-STS01PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
CO-STS01PT1DECN03025
Concrete for Bottom
Project:
Max-CL14(2)R6-UP004
CO-STS01PT1DECN03030
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS01PT1DECN03035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECN3355
S1, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECPTT005
Threading, Post
Tensioning & Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1GENINT005
Commence Piling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEAPP015
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEAPP020
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEAPP025
Pier Column Page 138

27in142r3
Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEAPP030
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP02005
Piling - Platform
Level / Piling Works @ P2 (4 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP02010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP02015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP02020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP02025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP02030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP02035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP02040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP02045
Pier "2" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP02050
Pier "2" Column Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP02055
Pier "2" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP02060
Pier "2" Column Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP02065
Pier "2" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Page 139

27in142r3
Activity:
CO-STS01PT1PIEP02070
Pier "2" Head Installation of Mould - Flare Type 1 (Dia=1.8m; Width=4m;
Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP02075
Pier "2" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP02080
Pier "2" Head Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP02085
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP02090
Pier "2" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP03005
Piling - Platform
Level / Piling Works @P3 (6 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP03010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP03015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP03020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP03025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP03030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP03035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP03040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP03045
Pier "3" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Page 140

27in142r3
Activity:
CO-STS01PT1PIEP03050
Pier "3" Column Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP03055
Pier "3" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP03060
Pier "3" Column Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP03065
Pier "3" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP03070
Pier "3" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP03075
Pier "3" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP03080
Pier "3" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP03085
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS01PT1PIEP03090
Pier "3" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINDEC003
Construction of
Cast in Situ Barriers (over SZR)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINDEC005
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINDEC010
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Page 141

27in142r3
Activity:
CO-STS02MISFINDEC012
Installation of
heighted Barrier and Aluminium Fence for LRT metro
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINDEC020
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINDEC025
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINDEC030
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINDEC035
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINDEC038
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINDEC050
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINDEC055
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINPNT005
Deck Slab - Surface
Preparation and Painting (Over SZR)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINPNT010
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINPNT015
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02MISFINPNT020
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECAPP005
Deck Slab
Page 142

27in142r3
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECAPP035
Deck Slab Gantry Drawing Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECAPP040
Deck Slab Gantry Drawing Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN01040
Installation of Top
Page 143

27in142r3
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN02005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN03015
Bottom slab and web
Page 144

27in142r3
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN03030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN03035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN04005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN04015
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN04020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN04025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN04030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN04035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN04040
Installation of Top
slab scaffolding & Formwork
Page 145

Activity:
Activity:
Activity:
Activity:
Scaffolding

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS02PT1DECN04045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS02PT1DECN04050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS02PT1DECN04055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS02PT1DECN05005
Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN05010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN05015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN05020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN05025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN05030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN05035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN05040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN05045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN05050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN05055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN06005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN06010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN06015
Bottom slab and web
steel Reinforcement + PT Ducts
Page 146

Activity:
Activity:
slab and webs
Activity:
curing
Activity:
Formwork

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS02PT1DECN06020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
CO-STS02PT1DECN06025
Concrete for Bottom
Project:
Max-CL14(2)R6-UP004
CO-STS02PT1DECN06030
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS02PT1DECN06035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN06040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN06045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN06050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECN06055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECPTT005
Threading, Post
Tensioning & Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1DECPTT015
Removal of Portal
Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1GENINT005
Receipt of NOC for
Piling from DEWA WD Line 20-3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1GENINT010
Receipt of NOC for
Piling from DEWA WD Line 21-2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1GENTRA007
Approvals for
Traffic Management & Erection of Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1GENTRA015
Installation of
Portal Frames Over SZR (Span 3 & Span 4)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1GENTRA020
Installation of
Gantry over the Metro (Span 2)
Page 147

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1GENTRA025
Installation of
Gantry over the Service Road (Span 3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1GENTRA045
Installation of
Gantry over the Service Road (Span 4)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEAPP015
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEAPP020
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEAPP025
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEAPP030
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04005
Piling - Platform
Level / Piling Works @ P4(8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04035
Pile Cap - Concrete
Page 148

27in142r3
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04045
Pier "4" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04050
Pier "4" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04055
Pier "4" Column
stage 1 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04060
Pier "4" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04065
Pier "4" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04070
Pier "4" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04075
Pier "4" Column
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04080
Pier "4" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04085
Pier "4" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04090
Pier "4" Head Installation of Mould - Flare Type 3 (Dia=2.3m; Width=5.8m;
Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04095
Pier "4" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04100
Pier "4" Head Curing / Removal of Mould - Flare Type 3 (Dia=2.3m;
Width=5.8m; Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04105
Pile Cap Page 149

27in142r3
Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP04110
Pier "4" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05005
Piling - Platform
Level / Piling Works @ P5 (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05045
Pier "5" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05050
Pier "5" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05055
Pier "5" Column
stage 1 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05060
Pier "5" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05065
Pier "5" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Page 150

27in142r3
Activity:
CO-STS02PT1PIEP05070
Pier "5" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05075
Pier "5" Column
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05080
Pier "5" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05085
Pier "5" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05090
Pier "5" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05095
Pier "5" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05100
Pier "5" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05105
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP05110
Pier "5" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06005
Piling - Platform
Level / Piling Works @ P6 (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Page 151

27in142r3
Activity:
CO-STS02PT1PIEP06030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06045
Pier "6" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06050
Pier "6" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06055
Pier "6" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06060
Pier "6" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06065
Pier "6" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06070
Pier "6" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06075
Pier "6" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06080
Pier "6" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06085
Pier "6" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06090
Pier "6" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06095
Pier "6" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06100
Pier "6" Head Page 152

27in142r3
Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06105
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP06110
Pier "6" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07005
Piling - Platform
Level / Piling Works @ P7 (2 Nos. - 2000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07045
Pier "7" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07050
Pier "7" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07055
Pier "7" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07060
Pier "7" Column
stage 1 - Curing / Removal of Mould
Page 153

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07065
Pier "7" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07070
Pier "7" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07075
Pier "7" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07080
Pier "7" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07085
Pier "7" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07090
Pier "7" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07095
Pier "7" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07100
Pier "7" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07105
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP07110
Pier "7" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08005
Piling - Platform
Level / Piling Works @ P8 (2 Nos. - 2000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08020
Pile Cap - Blinding
Concrete
Page 154

Activity:
Reinforcement

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS02PT1PIEP08025
Pile Cap - Steel

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08045
Pier "8" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08050
Pier "8" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08055
Pier "8" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08060
Pier "8" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08065
Pier "8" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08070
Pier "8" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08075
Pier "8" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08080
Pier "8" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08085
Pier "8" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08090
Pier "8" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08095
Pier "8" Column
Page 155

27in142r3
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08100
Pier "8" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08105
Pier "8" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08110
Pier "8" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08115
Pier "8" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08120
Pier "8" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP08130
Pier "8" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09005
Piling - Platform
Level / Piling Works @ P9 (5 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09007
Piling - Platform
Level / Piling Works @ P9 (Remaining 3 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09030
Pile Cap Page 156

27in142r3
Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09045
Pier "9" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09050
Pier "9" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09055
Pier "9" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09060
Pier "9" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09065
Pier "9" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09070
Pier "9" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09075
Pier "9" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09080
Pier "9" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09085
Pier "9" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09090
Pier "9" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09095
Pier "9" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09100
Pier "9" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Page 157

27in142r3
Activity:
CO-STS02PT1PIEP09105
Pier "9" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09110
Pier "9" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09115
Pier "9" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09120
Pier "9" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP09130
Pier "9" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10005
Piling - Platform
Level / Piling Works @ P10 (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10007
Piling - Platform
Level / Piling Works @ P10 (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Page 158

27in142r3
Activity:
CO-STS02PT1PIEP10040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10045
Pier "10" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10050
Pier "10" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10055
Pier "10" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10060
Pier "10" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10065
Pier "10" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10070
Pier "10" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10075
Pier "10" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10080
Pier "10" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10085
Pier "10" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10090
Pier "10" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10095
Pier "10" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10100
Pier "10" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10105
Pier "10" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10110
Pier "10" Head Installation of Mould - Flare Type 3 (Dia=2.3m; Width=5.8m;
Page 159

27in142r3
Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10115
Pier "10" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10120
Pier "10" Head Curing / Removal of Mould - Flare Type 3 (Dia=2.3m;
Width=5.8m; Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS02PT1PIEP10130
Pier "10" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03MISFINDEC005
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03MISFINDEC010
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03MISFINDEC015
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03MISFINDEC020
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03MISFINDEC025
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Page 160

Activity:
Course

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS03MISFINDEC045
Asphalt Wearing

Project:
Max-CL14(2)R6-UP004
CO-STS03MISFINDEC050
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03MISFINDEC060
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECAPP035
Deck Slab Gantry Drawing Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECAPP040
Deck Slab Gantry Drawing Approval
Project:
Max-CL14(2)R6-UP004
Activity:

Page 161

27in142r3
Activity:
CO-STS03PT1DECD10385
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD10395
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD10405
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD10415
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD10425
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD10435
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD10445
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD10455
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD10465
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD10475
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD11055
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD11065
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD11075
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD11085
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD11095
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD11105
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD11135
Curing Top Slab
Page 162

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD11375
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD11385
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD11395
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD12175
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD12185
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD12195
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD12205
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD12215
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD12225
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD12235
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD12245
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD12255
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD12265
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD16275
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD16285
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD16295
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD16305
Concrete for Bottom
slab and webs
Page 163

Activity:
curing
Activity:
Formwork

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS03PT1DECD16315
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS03PT1DECD16325
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD16335
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD16345
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD16355
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECD16365
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN01055
Curing Top Slab
Page 164

Activity:
Scaffolding

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS03PT1DECN02005
Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN03005
Staging /
Scaffolding (incl. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Page 165

Activity:
curing
Activity:
Formwork

27in142r3
CO-STS03PT1DECN03030

Bottom slab and Web

Project:
Max-CL14(2)R6-UP004
CO-STS03PT1DECN03035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECN3375
S03, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECPTT005
Threading, Post
Tensioning & Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1DECPTT015
Removal of Portal
Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1GENINT005
Services clear for
Piling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1GENINT5
Completion of 600mm
dia water (Line 15) DEWA-WD
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1GENTRA005
Approvals for
Traffic Management & Erection of Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1GENTRA010
Modification of
Portal Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1GENTRA015
Installation of
Portal Frames (Span 1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Page 166

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEAPP015
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEAPP020
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEAPP025
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEAPP030
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11005
Piling - Platform
Level / Piling Works @ P11 (9 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11045
Pier "11" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11050
Pier "11" Column
Page 167

27in142r3
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11055
Pier "11" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11060
Pier "11" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11065
Pier "11" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11070
Pier "11" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11075
Pier "11" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11080
Pier "11" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11085
Pier "11" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11090
Pier "11" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11095
Pier "11" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11100
Pier "11" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11105
Pier "11" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11110
Pier "11" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11115
Pier "11" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11120
Pier "11" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Page 168

27in142r3
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP11130
Pier "11" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12005
Piling - Platform
Level / Piling Works @ P12 (9 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12045
Pier "12" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12050
Pier "12" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12055
Pier "12" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12060
Pier "12" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Page 169

27in142r3
Activity:
CO-STS03PT1PIEP12065
Pier "12" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12070
Pier "12" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12075
Pier "12" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12080
Pier "12" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12085
Pier "12" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12090
Pier "12" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12095
Pier "12" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12100
Pier "12" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12105
Pier "12" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12110
Pier "12" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12115
Pier "12" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12120
Pier "12" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP12130
Pier "12" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Page 170

27in142r3
Activity:
CO-STS03PT1PIEP16005
Piling - Platform
Level / Piling Works @ P16 (18 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16045
Pier "16" Column 1
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16050
Pier "16" Column 1
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16055
Pier "16" Column 1
stage 1 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16060
Pier "16" Column 1
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16065
Pier "16" Column 1
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16070
Pier "16" Column 1
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16075
Pier "16" Column 1
stage 2 - Concrete Pouring
Page 171

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16080
Pier "16" Column 1
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16085
Pier "16" Column 1
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16090
Pier "16" Column 1
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16095
Pier "16" Column 1
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16100
Pier "16" Column 1
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16105
Pier "16" Column 1
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16110
Pier "16" Column 1
Head - Installation of Mould - Flare Type 3 (Dia=2.3m;
Width=5.8m; Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16115
Pier "16" Column 1
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16120
Pier "16" Column 1
Head - Curing / Removal of Mould - Flare Type 3 (Dia=2.3m;
Width=5.8m; Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16125
Pier "16" Column 2
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16130
Pier "16" Column 2
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16135
Pier "16" Column 2
stage 1 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16140
Pier "16" Column 2
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16145
Pier "16" Column 2
stage 2 - Steel Reinforcement (inc. Scaffolding)
Page 172

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16150
Pier "16" Column 2
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16155
Pier "16" Column 2
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16160
Pier "16" Column 2
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16165
Pier "16" Column 2
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16170
Pier "16" Column 2
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16175
Pier "16" Column 2
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16180
Pier "16" Column 2
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16185
Pier "16" Column 2
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16190
Pier "16" Column 2
Head - Installation of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=5.16)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16195
Pier "16" Column 2
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16200
Pier "16" Column 2
Head - Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=5.16)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16205
Pier "16" Column 3
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16210
Pier "16" Column 3
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16215
Pier "16" Column 3
stage 1 - Concrete Pouring
Page 173

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16220
Pier "16" Column 3
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16225
Pier "16" Column 3
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16230
Pier "16" Column 3
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16235
Pier "16" Column 3
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16240
Pier "16" Column 3
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16245
Pier "16" Column 3
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16250
Pier "16" Column 3
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16255
Pier "16" Column 3
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16260
Pier "16" Column 3
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16265
Pier "16" Column 3
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16270
Pier "16" Column 3
Head - Installation of Mould - Flare Type 3 (Dia=2.3m;
Width=5.8m; Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16275
Pier "16" Column 3
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16280
Pier "16" Column 3
Head - Curing / Removal of Mould - Flare Type 3 (Dia=2.3m;
Width=5.8m; Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16285
Pile Cap Waterproofing / Backfilling
Page 174

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS03PT1PIEP16290
Pier "16" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04MISFINDEC005
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04MISFINDEC010
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04MISFINDEC015
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04MISFINDEC020
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04MISFINDEC025
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04MISFINDEC050
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04MISFINDEC060
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Page 175

27in142r3
Activity:
CO-STS04MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECAPP035
Deck Slab Gantry Drawing Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECAPP040
Deck Slab Gantry Drawing Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN01005
Staging /
Scaffolding (incl. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Page 176

Activity:
slab and webs
Activity:
curing
Activity:
Formwork

27in142r3
CO-STS04PT1DECN01025

Concrete for Bottom

Project:
Max-CL14(2)R6-UP004
CO-STS04PT1DECN01030
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS04PT1DECN01035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN02005
Staging /
Scaffolding (incl. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECN02050
Concrete Top Slab
Page 177

Activity:
Activity:
Delivery

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS04PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS04PT1DECN3485
S04, Bearing

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECPTT005
Threading, Post
Tensioning & Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1DECPTT015
Removal of Portal
Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1GENINT005
Completion of Line
3 Irrigation main Installation - 600 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1GENINT015
Completion of Line
18 - 300mm DEWA-WD
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1GENTRA005
Approvals for
Traffic Management & Erection of Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1GENTRA015
Installation of
Portal Frames (Span 1 & Span 2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEAPP015
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEAPP020
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEAPP025
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEAPP030
Pier Column Drawings Approval
Page 178

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17005
Piling - Platform
Level / Piling Works @ P17 (12 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17045
Pier "17" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17050
Pier "17" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17055
Pier "17" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17060
Pier "17" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17065
Pier "17" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17070
Pier "17" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17075
Pier "17" Column
Page 179

27in142r3
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17080
Pier "17" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17085
Pier "17" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17090
Pier "17" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17095
Pier "17" Column
stage 3- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17100
Pier "17" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17105
Pier "17" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17110
Pier "17" Head Installation of Mould - Flare Type 5 (Dia=2.5m; Width=7m;
Height=6.32m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17115
Pier "17" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17120
Pier "17" Head Curing / Removal of Mould - Flare Type 5 (Dia=2.5m;
Width=7m; Height=6.32m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17125
Pier "17" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17130
Pier "17" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17135
Pier "17" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17140
Pier "17" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17145
Pile Cap Page 180

27in142r3
Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP17150
Pier "17" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18005
Piling - Platform
Level / Piling Works @ P18 Column 1 (2 Nos. - 2000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18010
Pile Cap Column 1 Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18015
Pile Cap Column 1 Pile Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18020
Pile Cap Column 1 Blinding Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18025
Pile Cap Column 1 Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18030
Pile Cap Column 1 Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18035
Pile Cap Column 1 Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18040
Pile Cap Column 1 Curing / Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18045
Pier "18" Column 1
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18050
Pier "18" Column 1
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18055
Pier "18" Column 1
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18060
Pier "18" Column 1
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18065
Pier "18" Column 1
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Page 181

27in142r3
Activity:
CO-STS04PT1PIEP18070
Pier "18" Column 1
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18075
Pier "18" Column 1
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18080
Pier "18" Column 1
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18085
Pier "18" Column 1
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18090
Pier "18" Column 1
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18095
Pier "18" Column 1
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18100
Pier "18" Column 1
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18105
Pier "18" Column 1
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18110
Pier "18" Column 1
Head - Installation of Mould - Flare Type 9 (3.0x2.5m;
Width=5.13m; Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18115
Pier "18" Column 1
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18120
Pier "18" Column 1
Head - Curing / Removal of Mould - Flare Type 9 (3.0x2.5m;
Width=5.13m; Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18125
Piling - Platform
Level / Piling Works @ P18 Column 2 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18130
Pile Cap Column 2 Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18135
Pile Cap Column 2 Pile Head Cutting
Project:
Max-CL14(2)R6-UP004
Page 182

27in142r3
Activity:
CO-STS04PT1PIEP18140
Pile Cap Column 2 Blinding Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18145
Pile Cap Column 2 Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18150
Pile Cap Column 2 Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18155
Pile Cap Column 2 Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18160
Pile Cap Column 2 Curing / Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18165
Pier "18" Column 2
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18170
Pier "18" Column 2
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18175
Pier "18" Column 2
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18180
Pier "18" Column 2
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18185
Pier "18" Column 2
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18190
Pier "18" Column 2
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18195
Pier "18" Column 2
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18200
Pier "18" Column 2
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18205
Pier "18" Column 2
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18210
Pier "18" Column 2
stage 3 - Installation of Pier Mould
Page 183

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18215
Pier "18" Column 2
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18220
Pier "18" Column 2
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18225
Pier "18" Column 2
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18230
Pier "18" Column 2
Head - Installation of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18235
Pier "18" Column 2
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18240
Pier "18" Column 2
Head - Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18245
Pile Cap Column 2 Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18250
Pier "18" Column 2
Head - Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18255
Pier "18" Beams
(Col.1 and Col.2 ) - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18260
Pier "18" Beams
(Col.1 and Col.2 ) - Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18265
Pier "18" Beams
(Col.1 and Col.2 ) - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18270
Pier "18" Beams
(Col.1 and Col.2 ) - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18275
Pile Cap Column 1 Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18280
Pier "18" Column 1
Head - Installation of Bearings / Grouting
Page 184

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18285
Piling - Platform
Level / Piling Works @ P18 Column 3 (4 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18290
Pile Cap Column 3 Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18295
Pile Cap Column 3 Pile Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18300
Pile Cap Column 3 Blinding Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18305
Pile Cap Column 3 Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18310
Pile Cap Column 3 Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18315
Pile Cap Column 3 Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18320
Pile Cap Column 3 Curing / Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18325
Pier "18" Column 3
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18330
Pier "18" Column 3
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18335
Pier "18" Column 3
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18340
Pier "18" Column 3
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18345
Pier "18" Column 3
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18350
Pier "18" Column 3
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18355
Pier "18" Column 3
Page 185

27in142r3
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18360
Pier "18" Column 3
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18365
Pier "18" Column 3
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18370
Pier "18" Column 3
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18375
Pier "18" Column 3
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18380
Pier "18" Column 3
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18385
Pier "18" Column 3
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18390
Pier "18" Column 3
Head - Installation of Mould - Flare Type 9 (3.0x2.5m;
Width=5.13m; Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18395
Pier "18" Column 3
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18400
Pier "18" Column 3
Head - Curing / Removal of Mould - Flare Type 9 (3.0x2.5m;
Width=5.13m; Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18405
Pier "18" Beams
(Col.2 and Col.3 ) - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18415
Pier "18" Beams
(Col.2 and Col.3 ) - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18420
Pier "18" Beams
(Col.2 and Col.3 ) - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18425
Pile Cap Column 3 Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS04PT1PIEP18430
Pier "18" Column 3
Page 186

27in142r3
Head - Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05MISFINDEC005
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05MISFINDEC010
Intallation of
Bearing Cover Plates & Access Doors & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05MISFINDEC015
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05MISFINDEC020
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05MISFINDEC025
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05MISFINDEC050
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05MISFINDEC060
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05MISFINPNT005
Piers - Surface
Preparation and Painting
Page 187

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01005
Staging /
Scaffolding (incl. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01035
Removal of Web
Formwork
Page 188

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECN3495
S05, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECPTT005
Threading, Post
Tensioning & Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1DECPTT15
Installation of
Portal Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1GENINT005
Completion of Line
19 - 300mm DEWA-WD
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1GENINT010
Completion of Line
3 Irrigation main Installation - 600 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEAPP015
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEAPP020
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEAPP025
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEAPP030
Pier Column Page 189

27in142r3
Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01000
Piling - Platform
Level / Piling Works @ P1 (4 Nos. - 2000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01005
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01010
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01015
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01020
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01025
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01030
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01035
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01040
Pier "1" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01045
Pier "1" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01050
Pier "1" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01055
Pier "1" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01060
Pier "1" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01065
Pier "1" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Page 190

27in142r3
Activity:
CO-STS05PT1PIEP01070
Pier "1" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01075
Pier "1" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01080
Pier "1" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01085
Pier "1" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01090
Pier "1" Column
stage 3- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01095
Pier "1" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01100
Pier "1" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01105
Pier "1" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01110
Pier "1" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01115
Pier "1" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01120
Pier "1" Pier cap Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01125
Pier "1" Pier cap Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01130
Pier "1" Pier cap Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01135
Pier "1" Pier cap Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Page 191

27in142r3
Activity:
CO-STS05PT1PIEP01140
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS05PT1PIEP01145
Pier "1" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06MISFINDEC005
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06MISFINDEC010
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06MISFINDEC015
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06MISFINDEC020
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06MISFINDEC025
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06MISFINDEC050
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06MISFINDEC060
Installation of
Page 192

27in142r3
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECN01005
Staging /
Scaffolding (incl. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECN01030
Bottom slab and Web
Page 193

27in142r3
curing
Activity:
Formwork

Project:
Max-CL14(2)R6-UP004
CO-STS06PT1DECN01035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECN3505
S06, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECPTT005
Threading, Post
Tensioning & Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1GENINT005
Completion of Line
3 Irrigation main Installation - 600 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1GENINT010
Completion of Line
19 - 300mm DEWA-WD
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEAPP015
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEAPP020
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEAPP025
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Page 194

27in142r3
Activity:
CO-STS06PT1PIEAPP030
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEAPP035
Submittal of
Temporary Detour (if Required)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEAPP045
Approval of
Temporary Detour (if Required)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEAPP055
Construction of
Temporary Detour (If Required)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02005
Piling - Platform
Level / Piling Works @ P2 (18 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02045
Pier "2" Column 1
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02050
Pier "2" Column 1
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02055
Pier "2" Column 1
stage 1 - Concrete Pouring
Page 195

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02060
Pier "2" Column 1
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02065
Pier "2" Column 1
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02070
Pier "2" Column 1
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02075
Pier "2" Column 1
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02080
Pier "2" Column 1
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02085
Pier "2" Column 1
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02090
Pier "2" Column 1
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02095
Pier "2" Column 1
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02100
Pier "2" Column 1
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02105
Pier "2" Column 1
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02110
Pier "2" Column 1
Head - Installation of Mould - Flare Type 3 (Dia=2.3m;
Width=5.8m; Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02115
Pier "2" Column 1
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02120
Pier "2" Column 1
Head - Curing / Removal of Mould - Flare Type 3 (Dia=2.3m;
Width=5.8m; Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02125
Pier "2" Column 2
stage 1 - Steel Reinforcement (inc. Scaffolding)
Page 196

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02130
Pier "2" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02135
Pier "2" Column
stage 1 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02140
Pier "2" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02145
Pier "2" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02150
Pier "2" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02155
Pier "2" Column
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02160
Pier "2" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02165
Pier "2" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02170
Pier "2" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02175
Pier "2" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02180
Pier "2" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02185
Pier "2" Column
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02190
Pier "2" Column
Head - Installation of Mould - Flare Type 12 (Dia=1.8m;
Width=4m; Height=4.48; Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02195
Pier "2" Column
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Page 197

2
2
2
2
2
2
2
2
2
2
2
2
2

27in142r3
Activity:
CO-STS06PT1PIEP02200
Pier "2" Column 2
Head - Curing / Removal of Mould - Flare Type 12 (Dia=1.8m;
Width=4m; Height=4.48; Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02205
Pier "2" Column 3
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02210
Pier "2" Column 3
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02215
Pier "2" Column 3
stage 1 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02220
Pier "2" Column 3
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02225
Pier "2" Column 3
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02230
Pier "2" Column 3
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02235
Pier "2" Column 3
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02240
Pier "2" Column 3
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02245
Pier "2" Column 3
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02250
Pier "2" Column 3
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02255
Pier "2" Column 3
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02260
Pier "2" Column 3
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02265
Pier "2" Column 3
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02270
Pier "2" Column 3
Page 198

27in142r3
Head - Installation of Mould - Flare Type 12 (Dia=1.8m;
Width=4m; Height=4.48; Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02275
Pier "2" Column 3
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02280
Pier "2" Column 3
Head - Curing / Removal of Mould - Flare Type 12 (Dia=1.8m;
Width=4m; Height=4.48; Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02285
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS06PT1PIEP02290
Pier "2" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINDEC005
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINDEC010
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINDEC015
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINDEC020
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINDEC025
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINDEC040
Installation of
Page 199

27in142r3
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINDEC050
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINDEC060
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal (Inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval (Inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN01005
Staging /
Scaffolding (Inc. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Page 200

27in142r3
Activity:
CO-STS07PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN02005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN02035
Removal of Web
Page 201

27in142r3
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN03030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN03035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECPTT005
Threading, Post
Tensioning & Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1DECPTT010
Removal of External
Page 202

27in142r3
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1GENINT005
Services clear for
Piling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN01100
Staging /
Scaffolding (Inc. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN01110
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN01120
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN01130
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN01140
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN01150
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN01160
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN01170
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN01180
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN01190
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN01200
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN02100
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN02110
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN02120
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN02130
Formwork for Webs
Page 203

Activity:
slab and webs
Activity:
curing
Activity:
Formwork

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS07PT1MIDN02140
Concrete for Bottom
Project:
Max-CL14(2)R6-UP004
CO-STS07PT1MIDN02150
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS07PT1MIDN02160
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN02170
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN02180
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN02190
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN02200
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN03100
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN03110
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN03120
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN03130
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN03140
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN03150
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN03160
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN03170
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN03180
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Page 204

27in142r3
CO-STS07PT1MIDN03190
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1MIDN03200
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEAPP015
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEAPP020
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEAPP025
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEAPP030
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03005
Piling - Platform
Level / Piling Works @ P3 (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03040
Pile Cap - Curing /
Activity:

Page 205

27in142r3
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03045
Pier "3" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03050
Pier "3" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03055
Pier "3" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03060
Pier "3" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03065
Pier "3" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03070
Pier "3" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03075
Pier "3" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03080
Pier "3" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03085
Pier "3" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03090
Pier "3" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03095
Pier "3" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03100
Pier "3" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03105
Pier "3" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03110
Pier "3" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Page 206

Activity:
Concrete Pouring

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS07PT1PIEP03115
Pier "3" Head -

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03120
Pier "3" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP03130
Pier "3" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04005
Piling - Platform
Level / Piling Works @ P4 (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04045
Pier "4" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04050
Pier "4" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Page 207

27in142r3
Activity:
CO-STS07PT1PIEP04055
Pier "4" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04060
Pier "4" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04065
Pier "4" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04070
Pier "4" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04075
Pier "4" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04080
Pier "4" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04085
Pier "4" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04090
Pier "4" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04095
Pier "4" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04100
Pier "4" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04105
Pier "4" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04110
Pier "4" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04115
Pier "4" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04120
Pier "4" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Page 208

27in142r3
Activity:
CO-STS07PT1PIEP04125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS07PT1PIEP04130
Pier "4" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC008
Installation of
heighted Barrier and Aluminium Fence for LRT metro
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC010
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC015
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC025
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC050
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINDEC060
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINPNT005
Deck Slab - Surface
Preparation and Painting (Over SZR)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINPNT010
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINPNT015
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08MISFINPNT020
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Page 209

27in142r3
CO-STS08PT1DECAPP020
Deck Slab Bottom
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECAPP035
Deck Slab Gantry Drawing Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECAPP040
Deck Slab Gantry Drawing Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN03030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN03035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN04005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN05005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
Slab & PT

Page 210

27in142r3
Activity:
CO-STS08PT1DECN05010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECN3515
S08, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1DECPTT015
Removal of Portal
Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1GENINT005
Completion of Line
4 Drainage Installation - 500 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1GENINT010
Receipt of NOC for
Piling from DEWA WD Line 20-2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1GENTRA005
Approvals for
Traffic Management & Erection of Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1GENTRA010
Installation of
Portal Frames Over SZR (Span 3 & Span 4)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1GENTRA020
Installation of
Gantry over the Metro (Span 5)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1GENTRA030
Installation of
Gantry over the Service Road (Span 3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1GENTRA035
Installation of
Gantry over the Service Road (Span 4)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEAPP015
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEAPP020
Pier Head Drawings Submittal
Page 211

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEAPP025
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEAPP030
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07005
Piling - Platform
Level / Piling Works @ P7 (3 Nos. -1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP07130
Pier "7" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08005
Piling - Platform
Level / Piling Works @ P8 (2 Nos. - 2000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08035
Pile Cap - Concrete
Page 212

27in142r3
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08045
Pier "8" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08050
Pier "8" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08055
Pier "8" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08060
Pier "8" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08065
Pier "8" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08070
Pier "8" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08075
Pier "8" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08080
Pier "8" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08085
Pier "8" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08090
Pier "8" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08095
Pier "8" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08100
Pier "8" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08105
Pile Cap Page 213

27in142r3
Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP08110
Pier "8" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09005
Piling - Platform
Level / Piling Works @ P9 (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09045
Pier "9" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09050
Pier "9" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09055
Pier "9" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09060
Pier "9" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09065
Pier "9" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Page 214

27in142r3
Activity:
CO-STS08PT1PIEP09070
Pier "9" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09075
Pier "9" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09080
Pier "9" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09085
Pier "9" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09090
Pier "9" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09095
Pier "9" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09100
Pier "9" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09105
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP09110
Pier "9" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10005
Piling - Platform
Level / Piling Works @ P10 (2 Nos. - 2000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Page 215

27in142r3
Activity:
CO-STS08PT1PIEP10030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10045
Pier "10" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10050
Pier "10" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10055
Pier "10" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10060
Pier "10" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10065
Pier "10" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10070
Pier "10" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10075
Pier "10" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10080
Pier "10" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10085
Pier "10" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10090
Pier "10" Head Installation of Mould - Flare Type 3 (Dia=2.3m; Width=5.8m;
Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10095
Pier "10" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10100
Pier "10" Head Page 216

27in142r3
Curing / Removal of Mould - Flare Type 3 (Dia=2.3m;
Width=5.8m; Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10105
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT1PIEP10110
Pier "10" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN02005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Page 217

27in142r3
CO-STS08PT2DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECPTT010
Threading, Post
Tensioning & Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2DECPTT015
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05005
Piling - Platform
Level / Piling Works @ P5 (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05045
Pier "5" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05050
Pier "5" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05055
Pier "5" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05060
Pier "5" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:

Page 218

27in142r3
Activity:
CO-STS08PT2PIEP05065
Pier "5" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05070
Pier "5" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05075
Pier "5" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05080
Pier "5" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05085
Pier "5" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05090
Pier "5" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05095
Pier "5" Column
stage 3- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05100
Pier "5" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05105
Pier "5" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05110
Pier "5" Head Installation of Mould - Flare Type 3 (Dia=2.3m; Width=5.8m;
Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05115
Pier "5" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05120
Pier "5" Head Curing / Removal of Mould - Flare Type 3 (Dia=2.3m;
Width=5.8m; Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP05130
Pier "5" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Page 219

27in142r3
Activity:
CO-STS08PT2PIEP06005
Piling - Platform
Level / Piling Works @ P6 (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06045
Pier "6" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06050
Pier "6" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06055
Pier "6" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06060
Pier "6" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06065
Pier "6" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06070
Pier "6" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06075
Pier "6" Column
stage 2- Concrete Pouring
Page 220

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06080
Pier "6" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06085
Pier "6" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06090
Pier "6" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06095
Pier "6" Column
stage 3- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06100
Pier "6" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06105
Pier "6" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06110
Pier "6" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06115
Pier "6" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06120
Pier "6" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS08PT2PIEP06130
Pier "6" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINDEC005
Deck Slab Surface
Preparation
Page 221

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINDEC010
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINDEC015
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINDEC020
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINDEC025
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINDEC050
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINDEC060
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINPNT015
Abutments - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09MISFINPNT020
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Page 222

27in142r3
Activity:
CO-STS09PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD01050
Concrete Top Slab
Page 223

Activity:
Activity:
Scaffolding

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS09PT1DECD01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS09PT1DECD02005
Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD03015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD03025
Concrete for Bottom
Page 224

27in142r3
slab and webs
Activity:
curing
Activity:
Formwork

Project:
Max-CL14(2)R6-UP004
CO-STS09PT1DECD03030
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS09PT1DECD03035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD04005
Staging /
Scaffolding (Inc. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD04015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD04020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD04025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD04030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD04035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD04040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD04045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD04050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Page 225

Activity:
Activity:
Scaffolding

27in142r3
CO-STS09PT1DECD04055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS09PT1DECD05005
Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD05010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD05015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD05020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD05025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD05030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD05035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD05040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD05045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD05050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECD05055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECPTT005
Threading, Post
Tensioning & Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1GENINT005
Completion of Line
6 Drainage Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN01100
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN01110
Formwork - Bottom
Page 226

27in142r3
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN01120
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN01130
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN01140
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN01150
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN01160
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN01170
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN01180
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN01190
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN01200
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN02100
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN02110
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN02120
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN02130
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN02140
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN02150
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN02160
Removal of Web
Formwork
Page 227

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN02170
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN02180
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN02190
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN02200
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN03100
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN03110
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN03120
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN03130
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN03140
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN03150
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN03160
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN03170
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN03180
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN03190
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN03200
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN04100
Staging /
Scaffolding (Inc. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN04110
Formwork - Bottom
Slab and Cantilever
Page 228

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN04120
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN04130
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN04140
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN04150
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN04160
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN04170
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN04180
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN04190
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN04200
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN05100
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN05110
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN05120
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN05130
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN05140
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN05150
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN05160
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Page 229

27in142r3
Activity:
CO-STS09PT1MIDN05170
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN05180
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN05190
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1MIDN05200
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEAPP015
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEAPP020
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEAPP025
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEAPP030
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11005
Piling - Platform
Level / Piling Works @ P11 (2 Nos. - 2000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11030
Pile Cap Installation of Shutter
Page 230

Activity:
Pouring

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS09PT1PIEP11035
Pile Cap - Concrete

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11045
Pier "11" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11050
Pier "11" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11055
Pier "11" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11060
Pier "11" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11065
Pier "11" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11070
Pier "11" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11075
Pier "11" Column
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11080
Pier "11" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11085
Pier "11" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11090
Pier "11" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11095
Pier "11" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11100
Pier "11" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Page 231

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11105
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP11110
Pier "11" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12005
Piling - Platform
Level / Piling Works @ P12 (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12045
Pier "12" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12050
Pier "12" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12055
Pier "12" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12060
Pier "12" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12065
Pier "12" Column
Page 232

27in142r3
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12070
Pier "12" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12075
Pier "12" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12080
Pier "12" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12085
Pier "12" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12090
Pier "12" Head Installation of Mould - Flare Type 1 (Dia=1.8m; Width=4m;
Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12095
Pier "12" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12100
Pier "12" Head Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12105
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT1PIEP12110
Pier "12" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECAPP005
Deck Slab
Scaffolding - Drawings Submittal (Inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECAPP010
Deck Slab
Scaffolding - Drawings Approval (Inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Page 233

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECD06005
Staging /
Scaffolding (Inc. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN06010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN06015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN06020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN06025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN06030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN06035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN06040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN06045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN06050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN06055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN07005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN07010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN07015
Bottom slab and web
steel Reinforcement + PT Ducts
Page 234

Activity:
Activity:
slab and webs
Activity:
curing
Activity:
Formwork

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS09PT2DECN07020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
CO-STS09PT2DECN07025
Concrete for Bottom
Project:
Max-CL14(2)R6-UP004
CO-STS09PT2DECN07030
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS09PT2DECN07035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN07040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN07045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN07050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN07055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN08005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN08010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN08015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN08020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN08025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN08030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN08035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN08040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Page 235

27in142r3
CO-STS09PT2DECN08045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN08050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECN08055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECPTT002
Threading Of Post
Tensioning Strands
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECPTT005
Post Tensioning &
Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAB2005
Piling - Platform
Level / Piling Works @ Abutment 2 (3 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAB2010
PIle Cap Excavation to Formation Level
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAB2015
Pile Cap - Piles
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAB2020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAB2025
Pile Cap Installation of Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAB2030
Pile Cap Installation of Shutters
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAB2035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAB2040
Pile Cap - Curing /
Removal of Shutters
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAB2045
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAB2050
Installation of
Bearings / Grouting
Activity:

Page 236

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAB2055
Backwall Installation of Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAB2060
Backwall Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAB2065
Backwall - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAB2070
Backwall - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAB2075
Backfilling Behind Abutment Back Wall
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAB2080
Approach Slab
Construction
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAPP015
Piling / Abutment
Foundation - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAPP020
Piling / Abutment
Foundation - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAPP025
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAPP030
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAPP035
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAPP040
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAPP055
Abutment Wall Page 237

27in142r3
Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEAPP060
Abutment Wall Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13005
Piling - Platform
Level / Piling Works @ P13 (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13045
Pier "13" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13050
Pier "13" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13055
Pier "13" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13060
Pier "13" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13065
Pier "13" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Page 238

27in142r3
Activity:
CO-STS09PT2PIEP13070
Pier "13" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13075
Pier "13" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13080
Pier "13" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13085
Pier "13" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13090
Pier "13" Head Installation of Mould - Flare Type 1 (Dia=1.8m; Width=4m;
Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13095
Pier "13" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13100
Pier "13" Head Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13105
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP13110
Pier "13" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14005
Piling - Platform
Level / Piling Works @ P14 (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Page 239

27in142r3
Activity:
CO-STS09PT2PIEP14030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14045
Pier "14" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14050
Pier "14" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14055
Pier "14" Column
stage 1 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14060
Pier "14" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14065
Pier "14" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14070
Pier "14" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14075
Pier "14" Column
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14080
Pier "14" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14085
Pier "14" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14090
Pier "14" Head Installation of Mould - Flare Type 1 (Dia=1.8m; Width=4m;
Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14095
Pier "14" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14100
Pier "14" Head Page 240

27in142r3
Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14105
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP14110
Pier "14" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP15005
Piling - Platform
Level / Piling Works @ P15 (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP15010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP15015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP15020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP15025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP15030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP15035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP15040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP15045
Pier "15" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP15050
Pier "15" Column Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP15055
Pier "15" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP15060
Pier "15" Column Curing / Removal of Mould
Page 241

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP15065
Pier "15" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP15070
Pier "15" Head Installation of Mould - Flare Type 1 (Dia=1.8m; Width=4m;
Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP15075
Pier "15" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP15080
Pier "15" Head Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP15085
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP15090
Pier "15" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP16005
Piling - Platform
Level / Piling Works @ P16 (6 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP16010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP16015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP16020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP16025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP16030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP16035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP16040
Pile Cap - Curing /
Removal of Shutter
Page 242

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP16045
Pier "16" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP16050
Pier "16" Column Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP16055
Pier "16" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP16060
Pier "16" Column Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP16065
Pier "16" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP16070
Pier "16" Head Installation of Mould - Flare Type 1 (Dia=1.8m; Width=4m;
Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP16075
Pier "16" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP16080
Pier "16" Head Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP16085
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP16090
Pier "16" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP17005
Piling - Platform
Level / Piling Works @ P17 (6 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP17010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP17015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP17020
Pile Cap - Blinding
Concrete
Page 243

Activity:
Reinforcement

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS09PT2PIEP17025
Pile Cap - Steel

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP17030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP17035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP17040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP17045
Pier "17" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP17050
Pier "17" Column Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP17055
Pier "17" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP17060
Pier "17" Column Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP17065
Pier "17" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP17070
Pier "17" Head Installation of Mould - Flare Type 1 (Dia=1.8m; Width=4m;
Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP17075
Pier "17" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP17080
Pier "17" Head Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP17085
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS09PT2PIEP17090
Pier "17" Head Installation of Bearings / Grouting
Page 244

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINDEC005
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINDEC010
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINDEC015
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINDEC020
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINDEC025
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINDEC050
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINDEC060
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINDEC065
Road Sign Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINPNT005
Piers - Surface
Page 245

27in142r3
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal (Inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval (Inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN01005
Staging /
Scaffolding (Inc. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN01030
Bottom slab and Web
curing
Page 246

Activity:
Formwork

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS10PT1DECN01035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN02005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN03005
Staging /
Scaffolding
Page 247

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN03030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN03035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECPTT005
Threading, Post
Tensioning & Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1GENINT005
Completion of Line
4 DEWA-ED 11kv Electrical Slewing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1GENINT010
Completion of Line
2 Drainage Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1GENINT015
Completion of Line
19 - 300mm DEWA-WD
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Page 248

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEAPP015
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEAPP020
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEAPP025
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEAPP030
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03005
Piling - Platform
Level / Piling Works @ P3 (3 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03007
Piling - Platform
Level / Piling Works @ P3 (10 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03045
Pier "3" Column 1
Page 249

27in142r3
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03050
Pier "3" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03055
Pier "3" Column
stage 1 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03060
Pier "3" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03065
Pier "3" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03070
Pier "3" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03075
Pier "3" Column
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03080
Pier "3" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03085
Pier "3" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03090
Pier "3" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03095
Pier "3" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03100
Pier "3" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03105
Pier "3" Column
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03110
Pier "3" Column
Head - Installation of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03115
Pier "3" Column
Head - Concrete Pouring
Page 250

1
1
1
1
1
1
1
1
1
1
1
1
1

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03120
Pier "3" Column 1
Head - Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03125
Pier "3" Column 2
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03130
Pier "3" Column 2
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03135
Pier "3" Column 2
stage 1 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03140
Pier "3" Column 2
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03145
Pier "3" Column 2
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03150
Pier "3" Column 2
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03155
Pier "3" Column 2
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03160
Pier "3" Column 2
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03165
Pier "3" Column 2
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03170
Pier "3" Column 2
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03175
Pier "3" Column 2
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03180
Pier "3" Column 2
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03185
Pier "3" Column 2
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Page 251

27in142r3
Activity:
CO-STS10PT1PIEP03190
Pier "3" Column 2
Head - Installation of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03195
Pier "3" Column 2
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03200
Pier "3" Column 2
Head - Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03205
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP03210
Pier "3" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04005
Piling - Platform
Level / Piling Works @ P4 (3 Nos. - 2000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04045
Pier "4" Column 1
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Page 252

27in142r3
Activity:
CO-STS10PT1PIEP04050
Pier "4" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04055
Pier "4" Column
stage 1 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04060
Pier "4" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04065
Pier "4" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04070
Pier "4" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04075
Pier "4" Column
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04080
Pier "4" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04085
Pier "4" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04090
Pier "4" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04095
Pier "4" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04100
Pier "4" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04105
Pier "4" Column
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04110
Pier "4" Column
Head - Installation of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04115
Pier "4" Column
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04120
Pier "4" Column
Page 253

1
1
1
1
1
1
1
1
1
1
1
1
1

1
1

27in142r3
Head - Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04125
Pier "4" Column 2
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04130
Pier "4" Column 2
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04135
Pier "4" Column 2
stage 1 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04140
Pier "4" Column 2
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04145
Pier "4" Column 2
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04150
Pier "4" Column 2
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04155
Pier "4" Column 2
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04160
Pier "4" Column 2
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04165
Pier "4" Column 2
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04170
Pier "4" Column 2
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04175
Pier "4" Column 2
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04180
Pier "4" Column 2
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04185
Pier "4" Column 2
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04190
Pier "4" Column 2
Head - Installation of Mould - Flare Type 1 (Dia=1.8m;
Page 254

27in142r3
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04195
Pier "4" Column 2
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04200
Pier "4" Column 2
Head - Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04205
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP04210
Pier "4" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05005
Piling - Platform
Level / Piling Works @ P5 (22 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05045
Pier "5" Column 1
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05050
Pier "5" Column 1
stage 1 - Installation of Pier Mould
Page 255

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05055
Pier "5" Column 1
stage 1 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05060
Pier "5" Column 1
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05065
Pier "5" Column 1
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05070
Pier "5" Column 1
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05075
Pier "5" Column 1
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05080
Pier "5" Column 1
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05085
Pier "5" Column 1
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05090
Pier "5" Column 1
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05095
Pier "5" Column 1
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05100
Pier "5" Column 1
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05105
Pier "5" Column 1
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05110
Pier "5" Column 1
Head - Installation of Mould - Flare Type 3 (Dia=2.3m;
Width=5.8m; Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05115
Pier "5" Column 1
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05120
Pier "5" Column 1
Head - Curing / Removal of Mould - Flare Type 3 (Dia=2.3m;
Width=5.8m; Height=5.46m, Breadth=3.6m)
Page 256

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05125
Pier "5" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05130
Pier "5" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05135
Pier "5" Column
stage 1 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05140
Pier "5" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05145
Pier "5" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05150
Pier "5" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05155
Pier "5" Column
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05160
Pier "5" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05165
Pier "5" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05170
Pier "5" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05175
Pier "5" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05180
Pier "5" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05185
Pier "5" Column
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05190
Pier "5" Column
Head - Installation of Mould - Flare Type 12 (Dia=1.8m;
Width=4m; Height=4.48; Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Page 257

2
2
2
2
2
2
2
2
2
2
2
2
2
2

27in142r3
Activity:
CO-STS10PT1PIEP05195
Pier "5" Column 2
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05200
Pier "5" Column 2
Head - Curing / Removal of Mould - Flare Type 12 (Dia=1.8m;
Width=4m; Height=4.48; Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05205
Pier "5" Column 3
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05210
Pier "5" Column 3
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05215
Pier "5" Column 3
stage 1 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05220
Pier "5" Column 3
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05225
Pier "5" Column 3
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05230
Pier "5" Column 3
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05235
Pier "5" Column 3
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05240
Pier "5" Column 3
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05245
Pier "5" Column 3
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05250
Pier "5" Column 3
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05255
Pier "5" Column 3
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05260
Pier "5" Column 3
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05265
Pier "5" Column 3
Page 258

27in142r3
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05270
Pier "5" Column 3
Head - Installation of Mould - Flare Type 12 (Dia=1.8m;
Width=4m; Height=4.48; Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05275
Pier "5" Column 3
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05280
Pier "5" Column 3
Head - Curing / Removal of Mould - Flare Type 12 (Dia=1.8m;
Width=4m; Height=4.48; Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05285
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS10PT1PIEP05290
Pier "5" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINDEC003
Construction of
Cast in Situ Barriers (over SZR)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINDEC005
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINDEC008
Installation of
heighted Barrier and Aluminium Fence for LRT metro
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINDEC010
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINDEC015
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINDEC020
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINDEC025
Intallation of
Page 259

27in142r3
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINDEC050
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINDEC055
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINPNT005
Deck Slab - Surface
Preparation and Painting (Over SZR)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINPNT010
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINPNT015
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINPNT020
Abutments - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11MISFINPNT025
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Page 260

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECAPP035
Deck Slab Gantry Drawing Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECAPP040
Deck Slab Gantry Drawing Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN01055
Curing Top Slab
Page 261

Activity:
Scaffolding

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS11PT1DECN02005
Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Page 262

Activity:
curing
Activity:
Formwork

27in142r3
CO-STS11PT1DECN03030

Bottom slab and Web

Project:
Max-CL14(2)R6-UP004
CO-STS11PT1DECN03035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN04005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN04015
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN04020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN04025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN04030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN04035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN04040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN04045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN04050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN04055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Page 263

Activity:
Scaffolding

27in142r3
CO-STS11PT1DECN05005

Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN05010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN05015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN05020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN05025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN05030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN05035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN05040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN05045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN05050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECN05055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECPTT005
Threading, Post
Tensioning & Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1DECPTT015
Removal of Portal
Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1GENINT010
Completion of Line
1 Drainage Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1GENINT015
Receipt of NOC for
Piling from DEWA WD Line 20-1
Project:
Max-CL14(2)R6-UP004
Page 264

27in142r3
Activity:
CO-STS11PT1GENINT020
Receipt of NOC for
Piling from DEWA WD Line 21-1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1GENTRA005
Approvals for
Traffic Management & Erection of Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1GENTRA010
Installation of
Gantry over the Service Road (Span 3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1GENTRA015
Installation of
Portal Frames Over SZR (Span 3 & Span 4)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1GENTRA018
Installation of
Gantry over the Sevice Road (Span 4)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1GENTRA020
Installation of
Gantry over the Metro (Span 5)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEAPP015
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEAPP020
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEAPP025
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEAPP030
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06005
Piling - Platform
Level / Piling Works @ P6 (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06015
Pile Cap - Pile
Head Cutting
Page 265

Activity:
Concrete
Activity:
Reinforcement

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS11PT1PIEP06020
Pile Cap - Blinding
Project:
Max-CL14(2)R6-UP004
CO-STS11PT1PIEP06025
Pile Cap - Steel

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06045
Pier "6" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06050
Pier "6" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06055
Pier "6" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06060
Pier "6" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06065
Pier "6" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06070
Pier "6" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06075
Pier "6" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06080
Pier "6" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06085
Pier "6" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06090
Pier "6" Column
Page 266

27in142r3
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06095
Pier "6" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06100
Pier "6" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06105
Pier "6" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06110
Pier "6" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06115
Pier "6" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06120
Pier "6" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP06130
Pier "6" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07005
Piling - Platform
Level / Piling Works @ P7 (2 Nos. - 2000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07030
Pile Cap Page 267

27in142r3
Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07045
Pier "7" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07050
Pier "7" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07055
Pier "7" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07060
Pier "7" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07065
Pier "7" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07070
Pier "7" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07075
Pier "7" Column
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07080
Pier "7" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07085
Pier "7" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07090
Pier "7" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07095
Pier "7" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07100
Pier "7" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Page 268

27in142r3
Activity:
CO-STS11PT1PIEP07105
Pier "7" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07110
Pier "7" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07115
Pier "7" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07120
Pier "7" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP07130
Pier "7" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08005
Piling - Platform
Level / Piling Works @ P8 (2 Nos. - 2000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Page 269

27in142r3
Activity:
CO-STS11PT1PIEP08045
Pier "8" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08050
Pier "8" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08055
Pier "8" Column
stage 1 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08060
Pier "8" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08065
Pier "8" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08070
Pier "8" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08075
Pier "8" Column
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08080
Pier "8" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08085
Pier "8" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08090
Pier "8" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08095
Pier "8" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08100
Pier "8" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08105
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP08110
Pier "8" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Page 270

27in142r3
Activity:
CO-STS11PT1PIEP09005
Piling - Platform
Level / Piling Works @ P9 (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09045
Pier "9" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09050
Pier "9" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09055
Pier "9" Column
stage 1 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09060
Pier "9" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09065
Pier "9" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09070
Pier "9" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09075
Pier "9" Column
stage 2 - Concrete Pouring
Page 271

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09080
Pier "9" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09085
Pier "9" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09090
Pier "9" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09095
Pier "9" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09100
Pier "9" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09105
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP09110
Pier "9" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP10005
Piling - Platform
Level / Piling Works @ P10 (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP10010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP10015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP10020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP10025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP10030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP10035
Pile Cap - Concrete
Pouring
Page 272

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP10040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP10045
Pier "10" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP10050
Pier "10" Column Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP10055
Pier "10" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP10060
Pier "10" Column Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP10065
Pier "10" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP10070
Pier "10" Head Installation of Mould - Flare Type 1 (Dia=1.8m; Width=4m;
Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP10075
Pier "10" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP10080
Pier "10" Head Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP10085
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT1PIEP10090
Pier "10" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Page 273

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN06005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN06010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN06015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN06020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN06025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN06030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN06035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN06040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN06045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN06050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN06055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN07005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN07010
Formwork - Bottom
Slab and Cantilever
Page 274

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN07015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN07020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN07025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN07030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN07035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN07040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN07045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN07050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECN07055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECPTT002
Threading Of Post
Tensioning Strands
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECPTT005
Post Tensioning &
Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAB2005
Piling - Platform
Level / Piling Works @ Abutment 2 (3 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAB2010
PIle Cap Excavation to Formation Level
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAB2015
Pile Cap - Piles
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAB2020
Pile Cap - Blinding
Concrete
Page 275

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAB2025
Pile Cap Installation of Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAB2030
Pile Cap Installation of Shutters
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAB2035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAB2040
Pile Cap - Curing /
Removal of Shutters
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAB2045
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAB2050
Installation of
Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAB2055
Backwall Installation of Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAB2060
Backwall Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAB2065
Backwall - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAB2070
Backwall - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAB2075
Backfilling Behind Abutment Back Wall
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAB2080
Approach Slab
Construction
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAPP015
Pier Column Page 276

27in142r3
Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAPP020
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAPP025
Piling / Abutment
Foundation - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAPP030
Piling / Abutment
Foundation - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAPP035
Abutment Wall Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAPP040
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAPP045
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEAPP050
Abutment Wall Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEP11005
Piling - Platform
Level / Piling Works @ P11 (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEP11010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEP11015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEP11020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEP11025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEP11030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEP11035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Page 277

27in142r3
Activity:
CO-STS11PT2PIEP11040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEP11045
Pier "11" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEP11050
Pier "11" Column Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEP11055
Pier "11" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEP11060
Pier "11" Column Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEP11065
Pier "11" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEP11070
Pier "11" Head Installation of Mould - Flare Type 1 (Dia=1.8m; Width=4m;
Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEP11075
Pier "11" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEP11080
Pier "11" Head Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEP11085
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS11PT2PIEP11090
Pier "11" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC005
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Page 278

Activity:
Preparation

27in142r3
CO-STS12MISFINDEC010

Deck Slab Surface

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC015
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC020
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC025
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC050
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC055
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINPNT015
Abutments & MSE
Walls - Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISFINPNT020
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISMSEEMB002
MSE Wall &
Page 279

27in142r3
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISMSEEMB005
Installation of MSE
Wall after construction of Abutment Backwall
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISMSEEMB010
Coping Beam
Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISMSEEMB015
Installation of
Precast Shear Key Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISMSEEMB020
Construction of
Cast in Situ Barriers and Sidewalks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISRETGEN10
Piling Works (9Nos.
@ 1000mm dia.)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISRETGEN20
Pile Cap Works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISRETGEN50
Construction of
Retaining Wall
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISRETGEN60
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12MISRETGEN70
Construction of
Cast in Situ Barriers and Sidewalks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Page 280

Activity:
Scaffolding

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS12PT1DECN04005
Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN04055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN05005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN05010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN05015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN05020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN05025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Page 281

Activity:
curing
Activity:
Formwork

27in142r3
CO-STS12PT1DECN05030

Bottom slab and Web

Project:
Max-CL14(2)R6-UP004
CO-STS12PT1DECN05035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN05040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN05045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN05050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN05055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECN3525
S12, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECPTT005
Threading, Post
Tensioning & Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1GENINT010
Completion of Line
9 DEWA WD Installation - 1200 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1GENINT015
Completion of Line
8 DEWA WD Installation - 300 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1GENINT020
Completion of Line
4 DEWA ED-132kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1GENINT025
Completion of Line
10 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1GENINT030
Completion of Line
5 DEWA ED-132kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1GENINT035
Completion of Line
6 DEWA ED-11kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Page 282

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEAPP015
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEAPP020
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEAPP025
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEAPP030
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03005
Piling - Platform
Level / Piling Works @ (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03045
Pier "3" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03050
Pier "3" Column
Page 283

27in142r3
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03055
Pier "3" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03060
Pier "3" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03065
Pier "3" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03070
Pier "3" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03075
Pier "3" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03080
Pier "3" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03085
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP03090
Pier "3" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04005
Piling - Platform
Level / Piling Works @ P4 (3 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04030
Pile Cap Page 284

27in142r3
Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04045
Pier "4" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04050
Pier "4" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04055
Pier "4" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04060
Pier "4" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04065
Pier "4" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04070
Pier "4" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04075
Pier "4" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04080
Pier "4" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04085
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP04090
Pier "4" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05005
Piling - Platform
Level / Piling Works @ P5 Column 1 (1 Nos. - 2000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05010
Pile Cap Column 1 Page 285

27in142r3
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05015
Pile Cap Column
Pile Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05020
Pile Cap Column
Blinding Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05025
Pile Cap Column
Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05030
Pile Cap Column
Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05035
Pile Cap Column
Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05040
Pile Cap Column
Curing / Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05045
Pier "5" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05050
Pier "5" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05055
Pier "5" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05060
Pier "5" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05065
Pier "5" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05070
Pier "5" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05075
Pier "5" Column
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05080
Pier "5" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Page 286

1 1 1 1 1 1 1
1
1
1
1
1
1
1

27in142r3
Activity:
CO-STS12PT1PIEP05085
Pier "5" Column 1
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05090
Pier "5" Column 1
Head - Installation of Mould - Flare Type 10 (Dia=2m;
Width=4m; Height=5.16; Breadth=2m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05095
Pier "5" Column 1
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05100
Pier "5" Column 1
Head - Curing / Removal of Mould - Flare Type 10 (Dia=2m;
Width=4m; Height=5.16; Breadth=2m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05105
Piling - Platform
Level / Piling Works @ P5 Column 2 (1 Nos. - 2000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05110
Pile Cap Column 2
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05115
Pile Cap Column 2
Pile Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05120
Pile Cap Column 2
Blinding Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05125
Pile Cap Column 2
Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05130
Pile Cap Column 2
Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05135
Pile Cap Column 2
Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05140
Pile Cap Column 2
Curing / Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05145
Pier "5" Column 2
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05150
Pier "5" Column 2
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Page 287

27in142r3
Activity:
CO-STS12PT1PIEP05155
Pier "5" Column 2
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05160
Pier "5" Column 2
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05165
Pier "5" Column 2
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05170
Pier "5" Column 2
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05175
Pier "5" Column 2
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05180
Pier "5" Column 2
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05185
Pier "5" Column 2
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05190
Pier "5" Column 2
Head - Installation of Mould - Flare Type 10 (Dia=2m;
Width=4m; Height=5.16; Breadth=2m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05195
Pier "5" Column 2
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05200
Pier "5" Column 2
Head - Curing / Removal of Mould - Flare Type 10 (Dia=2m;
Width=4m; Height=5.16; Breadth=2m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05205
Pier "5" Beams
(Col.1 and Col.2 ) - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05210
Pier "5" Beams
(Col.1 and Col.2 ) - Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05215
Pier "5" Beams
(Col.1 and Col.2 ) - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05220
Pier "5" Beams
(Col.1 and Col.2 ) - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Page 288

27in142r3
Activity:
CO-STS12PT1PIEP05225
Pile Cap Column 1 Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05230
Pier "5" Column 5
Head - Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT1PIEP05235
Pile Cap Column 2 Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Page 289

Activity:
Formwork

27in142r3
CO-STS12PT2DECN01035

Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN02005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Page 290

27in142r3
Activity:
CO-STS12PT2DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECPTT002
Threading Of Post
Tensioning Strands
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECPTT005
Post Tensioning &
Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1005
Piling - Platform
Level / Piling Works @ Abutment (3 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1010
PIle Cap Excavation to Formation Level
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1015
Pile Cap - Piles
Head Cutting
Project:
Max-CL14(2)R6-UP004
Page 291

Activity:
Concrete

27in142r3
CO-STS12PT2PIEAB1020

Pile Cap - Blinding

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1025
Pile Cap Installation of Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1030
Pile Cap Installation of Shutters
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1040
Pile Cap - Curing /
Removal of Shutters
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1045
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1050
Installation of
Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1055
Backwall Installation of Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1060
Backwall Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1065
Backwall - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1070
Backwall - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1075
Backfilling Behind Abutment Back Wall
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAB1080
Approach Slab
Construction
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAPP010
Piling / Pile Cap Drawings Approval
Page 292

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAPP015
Piling / Abutment
Foundation - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAPP020
Piling / Abutment
Foundation - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAPP025
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAPP030
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAPP035
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAPP040
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAPP045
MSE Wall Design Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAPP050
MSE Wall Design Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAPP055
Abutment Wall Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEAPP060
Abutment Wall Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP01005
Piling - Platform
Level / Piling Works @ P1 (8 Nos.- 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP01010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP01015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP01020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP01025
Pile Cap - Steel
Page 293

27in142r3
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP01030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP01035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP01040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP01045
Pier "1" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP01050
Pier "1" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP01055
Pier "1" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP01060
Pier "1" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP01065
Pier "1" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP01070
Pier "1" Head Installation of Mould - Flare Type 3 (Dia=2.3m; Width=5.8m;
Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP01075
Pier "1" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP01080
Pier "1" Head Curing / Removal of Mould - Flare Type 3 (Dia=2.3m;
Width=5.8m; Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP01085
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP01090
Pier "1" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02005
Piling - Platform
Page 294

27in142r3
Level / Piling Works @ P2 (8 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02045
Pier "2" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02050
Pier "2" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02055
Pier "2" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02060
Pier "2" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02065
Pier "2" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02070
Pier "2" Head Installation of Mould - Flare Type 3 (Dia=2.3m; Width=5.8m;
Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02075
Pier "2" Head Concrete Pouring
Page 295

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02080
Pier "2" Head Curing / Removal of Mould - Flare Type 3 (Dia=2.3m;
Width=5.8m; Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02085
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS12PT2PIEP02090
Pier "2" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINDEC005
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINDEC010
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINDEC015
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINDEC020
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINDEC025
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Page 296

27in142r3
CO-STS13MISFINDEC050
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINDEC060
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal (Inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval (Inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECN04005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECN04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECN04015
Bottom slab and web
steel Reinforcement + PT Ducts
Activity:

Page 297

Activity:
Activity:
slab and webs
Activity:
curing
Activity:
Formwork

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS13PT1DECN04020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
CO-STS13PT1DECN04025
Concrete for Bottom
Project:
Max-CL14(2)R6-UP004
CO-STS13PT1DECN04030
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS13PT1DECN04035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECN04040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECN04045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECN04050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECN04055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECN05005
Staging /
Scaffolding (Inc. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECN05010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECN05015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECN05020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECN05025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECN05030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECN05035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECN05040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Page 298

27in142r3
CO-STS13PT1DECN05045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECN05050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECN05055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECPTT005
Threading, Post
Tensioning & Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1GENINT005
Services clear for
1st Piling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEAPP015
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEAPP020
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEAPP025
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEAPP030
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09005
Piling - Platform
Level / Piling Works @ P9 (12 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09020
Pile Cap - Blinding
Concrete
Activity:

Page 299

Activity:
Reinforcement

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS13PT1PIEP09025
Pile Cap - Steel

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09045
Pier "9" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09050
Pier "9" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09055
Pier "9" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09060
Pier "9" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09065
Pier "9" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09070
Pier "9" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09075
Pier "9" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09080
Pier "9" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09085
Pier "9" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09090
Pier "9" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09095
Pier "9" Column
Page 300

27in142r3
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09100
Pier "9" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09105
Pier "9" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09110
Pier "9" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09115
Pier "9" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09120
Pier "9" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP09130
Pier "9" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10005
Piling - Platform
Level / Piling Works @ P10 (10 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10035
Pile Cap - Concrete
Page 301

27in142r3
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10045
Pier "10" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10050
Pier "10" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10055
Pier "10" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10060
Pier "10" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10065
Pier "10" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10070
Pier "10" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10075
Pier "10" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10080
Pier "10" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10085
Pier "10" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10090
Pier "10" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10095
Pier "10" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10100
Pier "10" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10105
Pier "10" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Page 302

27in142r3
Activity:
CO-STS13PT1PIEP10110
Pier "10" Head Installation of Mould - Flare Type 3 (Dia=2.3m; Width=5.8m;
Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10115
Pier "10" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10120
Pier "10" Head Curing / Removal of Mould - Flare Type 3 (Dia=2.3m;
Width=5.8m; Height=5.46m, Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT1PIEP10130
Pier "10" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Page 303

Activity:
Activity:
slab and webs
Activity:
curing
Activity:
Formwork

27in142r3
CO-STS13PT2DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
CO-STS13PT2DECN01025
Concrete for Bottom
Project:
Max-CL14(2)R6-UP004
CO-STS13PT2DECN01030
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS13PT2DECN01035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN02005
Staging /
Scaffolding (incl. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN02045
Rebar for Top Slab
Page 304

Activity:
Activity:
Activity:
Scaffolding

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS13PT2DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS13PT2DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS13PT2DECN03005
Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN03030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN03035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECN3055
Installation of
Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECPTT002
Threading Of Post
Tensioning Strands
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECPTT005
Post Tensioning &
Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECPTT010
Removal of External
Page 305

27in142r3
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2DECPTT015
Removal of Portal
Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEAPP015
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEAPP020
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEAPP025
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEAPP030
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06005
Piling - Platform
Level / Piling Works @ P6 4 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Page 306

27in142r3
Activity:
CO-STS13PT2PIEP06040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06045
Pier "6" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06050
Pier "6" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06055
Pier "6" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06060
Pier "6" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06065
Pier "6" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06070
Pier "6" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06075
Pier "6" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06080
Pier "6" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06085
Pier "6" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06090
Pier "6" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06095
Pier "6" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06100
Pier "6" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP06105
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Page 307

27in142r3
Activity:
CO-STS13PT2PIEP06110
Pier "6" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07005
Piling - Platform
Level / Piling Works @ P7 (12 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07045
Pier "7" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07050
Pier "7" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07055
Pier "7" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07060
Pier "7" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07065
Pier "7" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07070
Pier "7" Column
stage 2 - Installation of Pier Mould
Page 308

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07075
Pier "7" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07080
Pier "7" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07085
Pier "7" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07090
Pier "7" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07095
Pier "7" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07100
Pier "7" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07105
Pier "7" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07110
Pier "7" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07115
Pier "7" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07120
Pier "7" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP07130
Pier "7" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08005
Piling - Platform
Level / Piling Works @ P8 (12 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08010
Pile Cap Excavation
Page 309

Activity:
Head Cutting
Activity:
Concrete
Activity:
Reinforcement

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS13PT2PIEP08015
Pile Cap - Pile
Project:
Max-CL14(2)R6-UP004
CO-STS13PT2PIEP08020
Pile Cap - Blinding
Project:
Max-CL14(2)R6-UP004
CO-STS13PT2PIEP08025
Pile Cap - Steel

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08045
Pier "8" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08050
Pier "8" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08055
Pier "8" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08060
Pier "8" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08065
Pier "8" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08070
Pier "8" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08075
Pier "8" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08080
Pier "8" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08085
Pier "8" Column
Page 310

27in142r3
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08090
Pier "8" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08095
Pier "8" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08100
Pier "8" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08105
Pier "8" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08110
Pier "8" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08115
Pier "8" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08120
Pier "8" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS13PT2PIEP08130
Pier "8" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINDEC005
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINDEC010
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINDEC015
Intallation of
Page 311

27in142r3
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINDEC020
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINDEC025
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINDEC050
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINDEC060
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal (Inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval (Inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Page 312

27in142r3
CO-STS14PT1DECAPP015
Deck Slab Bottom
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECAPP035
Deck Slab Gantry Drawing Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECAPP040
Deck Slab Gantry Drawing Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN01005
Staging /
Scaffolding (Inc. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN01050
Concrete Top Slab
Activity:
Slab & PT

Page 313

Activity:
Activity:
Scaffolding

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS14PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS14PT1DECN02005
Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN03025
Concrete for Bottom
Page 314

27in142r3
slab and webs
Activity:
curing
Activity:
Formwork

Project:
Max-CL14(2)R6-UP004
CO-STS14PT1DECN03030
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS14PT1DECN03035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN04005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN04015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN04020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN04025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN04030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN04035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN04040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN04045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN04050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Page 315

Activity:
Activity:
Scaffolding

27in142r3
CO-STS14PT1DECN04055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS14PT1DECN05005
Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN05010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN05015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN05020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN05025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN05030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN05035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN05040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN05045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN05050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN05055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN06005
Staging /
Scaffolding (Inc. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN06010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN06015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN06020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN06025
Concrete for Bottom
slab and webs
Page 316

Activity:
curing
Activity:
Formwork

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS14PT1DECN06030
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS14PT1DECN06035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN06040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN06045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN06050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECN06055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECPTT005
Threading, Post
Tensioning & Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1DECPTT015
Removal of Portal
Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1GENINT005
Completion of Line
3 Drainage Installation - 250 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1GENTRA005
Approvals for
Traffic Management & Erection of Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1GENTRA015
Installation of
Gantries (Span 3 & Span 4)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEAPP015
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEAPP020
Pier Column Page 317

27in142r3
Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEAPP025
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEAPP030
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11005
Piling - Platform
Level / Piling Works @ P11 (10 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11035
Pier "11" Pile Cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11045
Pier "11" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11050
Pier "11" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11055
Pier "11" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11060
Pier "11" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Page 318

27in142r3
Activity:
CO-STS14PT1PIEP11065
Pier "11" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11070
Pier "11" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11075
Pier "11" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11080
Pier "11" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11085
Pier "11" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11090
Pier "11" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11095
Pier "11" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11100
Pier "11" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11105
Pier "11" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11110
Pier "11" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11115
Pier "11" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11120
Pier "11" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP11130
Pier "11" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Page 319

27in142r3
Activity:
CO-STS14PT1PIEP12005
Piling - Platform
Level / Piling Works @ P12 (10 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12045
Pier "12" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12050
Pier "12" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12055
Pier "12" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12060
Pier "12" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12065
Pier "12" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12070
Pier "12" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12075
Pier "12" Column
stage 2- Concrete Pouring
Page 320

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12080
Pier "12" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12085
Pier "12" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12090
Pier "12" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12095
Pier "12" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12100
Pier "12" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12105
Pier "12" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12110
Pier "12" Head Installation of Mould - Flare Type 4 (Dia=2.5m; Width=5.8m;
Height=5.33m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12115
Pier "12" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12120
Pier "12" Head Curing / Removal of Mould - Flare Type 4 (Dia=2.5m;
Width=5.8m; Height=5.33m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP12130
Pier "12" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13005
Piling - Platform
Level / Piling Works @ P13 (12 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13015
Pile Cap - Pile
Head Cutting
Page 321

Activity:
Concrete
Activity:
Reinforcement

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS14PT1PIEP13020
Pile Cap - Blinding
Project:
Max-CL14(2)R6-UP004
CO-STS14PT1PIEP13025
Pile Cap - Steel

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13045
Pier "13" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13050
Pier "13" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13055
Pier "13" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13060
Pier "13" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13065
Pier "13" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13070
Pier "13" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13075
Pier "13" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13080
Pier "13" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13085
Pier "13" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13090
Pier "13" Column
Page 322

27in142r3
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13095
Pier "13" Column
stage 3- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13100
Pier "13" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13105
Pier "13" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13110
Pier "13" Head Installation of Mould- Flare Type 1 (Dia=1.8m; Width=4m;
Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13115
Pier "13" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13120
Pier "13" Head Curing / Removal of Mould- Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP13130
Pier "13" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14005
Piling - Platform
Level / Piling Works @ P14 (12 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14030
Pile Cap Page 323

27in142r3
Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14045
Pier "14" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14050
Pier "14" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14055
Pier "14" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14060
Pier "14" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14065
Pier "14" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14070
Pier "14" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14075
Pier "14" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14080
Pier "14" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14085
Pier "14" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14090
Pier "14" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14095
Pier "14" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14100
Pier "14" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Page 324

27in142r3
Activity:
CO-STS14PT1PIEP14105
Pier "14" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14110
Pier "14" Head Installation of Mould - Flare Type 4 (Dia=2.5m; Width=5.8m;
Height=5.33m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14115
Pier "14" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14120
Pier "14" Head Curing / Removal of Mould - Flare Type 4 (Dia=2.5m;
Width=5.8m; Height=5.33m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP14130
Pier "14" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15005
Piling - Platform
Level / Piling Works @ P15 (4 Nos. - 1000 dia) - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15006
Asphalt Cutting for
Piling works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15008
Piling - Platform
Level / Piling Works @ P15 (6 Nos. - 1000 dia) - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Page 325

Activity:
Pouring

27in142r3
CO-STS14PT1PIEP15035

Pile Cap - Concrete

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15045
Pier "15" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15050
Pier "15" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15055
Pier "15" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15060
Pier "15" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15065
Pier "15" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15070
Pier "15" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15075
Pier "15" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15080
Pier "15" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15085
Pier "15" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15090
Pier "15" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15095
Pier "15" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15100
Pier "15" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15105
Pier "15" Head Steel Reinforcement
Page 326

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15110
Pier "15" Head Installation of Mould - Flare Type 4 (Dia=2.5m; Width=5.8m;
Height=5.33m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15115
Pier "15" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15120
Pier "15" Head Curing / Removal of Mould - Flare Type 4 (Dia=2.5m;
Width=5.8m; Height=5.33m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS14PT1PIEP15130
Pier "15" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC005
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC010
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC015
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC020
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC025
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC030
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC035
Installation of
Lighting Poles & Street Lighting Cables
Page 327

Activity:
Precast Kerbs

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS20MISFINDEC040
Installation of

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC045
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC050
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINDEC060
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal (Inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval (Inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01005
Staging /
Page 328

27in142r3
Scaffolding (Inc. Simply Supported Beams (if required))
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN02005
Staging /
Scaffolding (Inc. Simply Supported Beams (if required))
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN02030
Bottom slab and Web
curing
Page 329

Activity:
Formwork

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS20PT1DECN02035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECN3535
S20 & S21, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECPTT005
Threading, Post
Tensioning & Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEAPP015
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEAPP020
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEAPP025
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEAPP030
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01125
Piling - Platform
Level / Piling Works @ P1 Column (6 Nos. - 2000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01130
Pile Cap Column Page 330

27in142r3
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01135
Pile Cap Column
Pile Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01140
Pile Cap Column
Blinding Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01145
Pile Cap Column
Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01150
Pile Cap Column
Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01155
Pile Cap Column
Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01160
Pile Cap Column
Curing / Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01165
Pier "1" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01170
Pier "1" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01175
Pier "1" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01180
Pier "1" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01185
Pier "1" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01190
Pier "1" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01195
Pier "1" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01200
Pier "1" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Page 331

27in142r3
Activity:
CO-STS20PT1PIEP01205
Pier "1" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01210
Pier "1" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01215
Pier "1" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01220
Pier "1" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01225
Pier "1" Column
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01230
Pier "1" Column
Head - Installation of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01235
Pier "1" Column
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01240
Pier "1" Column
Head - Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01245
Pier "1" Pier cap Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01250
Pier "1" Pier cap Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01255
Pier "1" Pier cap Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01260
Pier "1" Pier cap Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01275
Pile Cap Column Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP01280
Pier "1" Column
Head - Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Page 332

27in142r3
Activity:
CO-STS20PT1PIEP02005
Piling - Platform
Level / Piling Works @ P2 (4 Nos. - 2000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02045
Pier "2" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02050
Pier "2" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02055
Pier "2" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02060
Pier "2" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02065
Pier "2" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02070
Pier "2" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02075
Pier "2" Column
stage 2- Concrete Pouring
Page 333

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02080
Pier "2" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02085
Pier "2" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02090
Pier "2" Head Installation of Mould - Flare Type 7 (2.5x4m; Width=13.29m;
Height=8.5m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02095
Pier "2" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02100
Pier "2" Head Curing / Removal of Mould - Flare Type 7 (2.5x4m;
Width=13.29m; Height=8.5m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02105
Pier "2" Pier cap Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02110
Pier "2" Pier cap Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02115
Pier "2" Pier cap Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02120
Pier "2" Pier cap Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS20PT1PIEP02130
Pier "2" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC005
Construction of
Cast in Situ Barriers
Page 334

Activity:
Preparation

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS21MISFINDEC010
Deck Slab Surface

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC015
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC020
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC025
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC035
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC040
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC050
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC060
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINDEC065
Road Sign Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21PT1GENINT010
Completion of Line
5 DEWA ED 33kv Temporary Diversion
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECAPP005
Deck Slab
Page 335

27in142r3
Scaffolding - Drawings Submittal (Inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECAPP010
Deck Slab
Scaffolding - Drawings Approval (Inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01005
Staging /
Scaffolding (Inc. Simply Supported Beams (if required))
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01015
Bottom slab and web
steel Reinforcement and Installation of Voids
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Page 336

27in142r3
CO-STS21VS1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1DECN01060
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1PIEAPP015
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1PIEAPP020
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1PIEAPP025
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS21VS1PIEAPP030
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINDEC005
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINDEC010
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINDEC015
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINDEC020
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINDEC025
Installation of
Activity:

Page 337

27in142r3
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINDEC030
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINDEC050
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINDEC060
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Page 338

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN02005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Page 339

Activity:
slab and webs
Activity:
curing
Activity:
Formwork

27in142r3
CO-STS22PT1DECN02025

Concrete for Bottom

Project:
Max-CL14(2)R6-UP004
CO-STS22PT1DECN02030
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS22PT1DECN02035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN03030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN03035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN03050
Concrete Top Slab
Page 340

Activity:
Activity:
Scaffolding

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS22PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS22PT1DECN04005
Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN04015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN04020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN04025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN04030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN04035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN04040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN04045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN04050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN04055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN05005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN05010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN05015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN05020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN05025
Concrete for Bottom
Page 341

27in142r3
slab and webs
Activity:
curing
Activity:
Formwork

Project:
Max-CL14(2)R6-UP004
CO-STS22PT1DECN05030
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS22PT1DECN05035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN05040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN05045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN05050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECN05055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECPTT005
Threading, Post
Tensioning & Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1GENINT005
Commence Piling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1GENINT010
Verification for
Interference between 200 uPVC Drainage Line
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEAPP015
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEAPP020
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEAPP025
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEAPP030
Pier Head Page 342

27in142r3
Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03005
Piling - Platform
Level / Piling Works @ P3 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03045
Pier "3" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03050
Pier "3" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03055
Pier "3" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03060
Pier "3" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03065
Pier "3" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03070
Pier "3" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Page 343

27in142r3
Activity:
CO-STS22PT1PIEP03075
Pier "3" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03080
Pier "3" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03085
Pier "3" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03090
Pier "3" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03095
Pier "3" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03100
Pier "3" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03105
Pier "3" Pier cap Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03110
Pier "3" Pier cap Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03115
Pier "3" Pier cap Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03120
Pier "3" Pier cap Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP03130
Pier "3" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04005
Piling - Platform
Level / Piling Works @ P4 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Page 344

Activity:
Head Cutting
Activity:
Concrete
Activity:
Reinforcement

27in142r3
CO-STS22PT1PIEP04015

Pile Cap - Pile

Project:
Max-CL14(2)R6-UP004
CO-STS22PT1PIEP04020
Pile Cap - Blinding
Project:
Max-CL14(2)R6-UP004
CO-STS22PT1PIEP04025
Pile Cap - Steel

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04045
Pier "4" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04050
Pier "4" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04055
Pier "4" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04060
Pier "4" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04065
Pier "4" Column
stage 2- Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04070
Pier "4" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04075
Pier "4" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04080
Pier "4" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04085
Pier "4" Head Steel Reinforcement
Page 345

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04090
Pier "4" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04095
Pier "4" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04100
Pier "4" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04105
Pier "4" Pier cap Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04110
Pier "4" Pier cap Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04115
Pier "4" Pier cap Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04120
Pier "4" Pier cap Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP04130
Pier "4" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05005
Piling - Platform
Level / Piling Works P5 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05025
Pile Cap - Steel
Reinforcement
Page 346

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05045
Pier "5" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05050
Pier "5" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05055
Pier "5" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05060
Pier "5" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05065
Pier "5" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05075
Pier "5" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05080
Pier "5" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05085
Pier "5" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05090
Pier "5" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05095
Pier "5" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05100
Pier "5" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Page 347

27in142r3
Activity:
CO-STS22PT1PIEP05105
Pier "5" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05110
Pier "5" Pier cap Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05115
Pier "5" Pier cap Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05120
Pier "5" Pier cap Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05125
Pier "5" Pier cap Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05130
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP05135
Pier "5" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06005
Piling - Platform
Level / Piling Works P6 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06040
Pile Cap - Curing /
Page 348

27in142r3
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06045
Pier "6" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06050
Pier "6" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06055
Pier "6" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06060
Pier "6" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06065
Pier "6" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06070
Pier "6" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06075
Pier "6" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06080
Pier "6" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06085
Pier "6" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06090
Pier "6" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06095
Pier "6" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06100
Pier "6" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06105
Pier "6" Pier cap Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06110
Pier "6" Pier cap Page 349

27in142r3
Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06115
Pier "6" Pier cap Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06120
Pier "6" Pier cap Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP06130
Pier "6" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07005
Piling - Platform
Level / Piling Works @ P7 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07045
Pier "7" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07050
Pier "7" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Page 350

27in142r3
Activity:
CO-STS22PT1PIEP07055
Pier "7" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07060
Pier "7" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07065
Pier "7" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07070
Pier "7" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07075
Pier "7" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07080
Pier "7" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07085
Pier "7" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07090
Pier "7" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07095
Pier "7" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07100
Pier "7" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07105
Pier "7" Pier cap Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07110
Pier "7" Pier cap Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07115
Pier "7" Pier cap Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07120
Pier "7" Pier cap Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Page 351

27in142r3
Activity:
CO-STS22PT1PIEP07125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP07130
Pier "7" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08005
Piling - Platform
Level / Piling Works @ P8 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08045
Pier "8" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08050
Pier "8" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08055
Pier "8" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08060
Pier "8" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08065
Pier "8" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Page 352

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08070
Pier "8" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08075
Pier "8" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08080
Pier "8" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08085
Pier "8" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08090
Pier "8" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08095
Pier "8" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08100
Pier "8" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08105
Pier "8" Pier cap Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08110
Pier "8" Pier cap Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08115
Pier "8" Pier cap Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08120
Pier "8" Pier cap Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS22PT1PIEP08130
Pier "8" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Page 353

Activity:
Profile drawings

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS23MISFINAPP010
Approval of the

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINDEC005
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINDEC010
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINDEC015
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINDEC020
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINDEC025
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINDEC050
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINDEC055
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Page 354

27in142r3
Activity:
CO-STS23MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD08285
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD08295
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD08305
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD08315
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD08325
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD08335
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD08345
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD08355
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD08365
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Page 355

27in142r3
Activity:
CO-STS23PT1DECD08375
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD09065
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD09075
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD09085
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD09095
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD09105
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD09115
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD09125
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD09135
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD09145
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD09155
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD10175
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD10185
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD10195
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD10205
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD10215
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD10225
Removal of Web
Page 356

27in142r3
Formwork
Project:
Max-CL14(2)R6-UP004
CO-STS23PT1DECD10235
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD10245
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD10255
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD10265
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD11395
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD11405
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD11415
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD11425
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD11435
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD11445
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD11455
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD11465
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD11475
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD11485
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD12505
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD12515
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD12525
Formwork for Webs
Activity:

Page 357

Activity:
slab and webs
Activity:
curing
Activity:
Formwork

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS23PT1DECD12535
Concrete for Bottom
Project:
Max-CL14(2)R6-UP004
CO-STS23PT1DECD12545
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS23PT1DECD12555
Removal of Web

Project:
Max-CL14(2)R6-UP004
CO-STS23PT1DECD12565
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD12575
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD12585
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECD12595
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:

Page 358

Activity:
Activity:
Activity:
Scaffolding

27in142r3
CO-STS23PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS23PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS23PT1DECN02005
Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Page 359

Activity:
slab and webs
Activity:
curing
Activity:
Formwork

27in142r3
CO-STS23PT1DECN03025

Concrete for Bottom

Project:
Max-CL14(2)R6-UP004
CO-STS23PT1DECN03030
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS23PT1DECN03035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN04005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN04015
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN04020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN04025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN04030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN04035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN04040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN04045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECN04050
Concrete Top Slab
Page 360

Activity:
Activity:
Delivery

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS23PT1DECN04055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS23PT1DECN3545
S23, Bearing

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECPTT005
Threading, Post
Tensioning & Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1DECPTT10
Removal of Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1GENINT005
Commence Piling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEAPP015
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEAPP020
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEAPP025
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEAPP030
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09005
Piling - Platform
Level / Piling Works @ P9 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09020
Pile Cap - Blinding
Page 361

27in142r3
Concrete
Activity:
Reinforcement

Project:
Max-CL14(2)R6-UP004
CO-STS23PT1PIEP09025
Pile Cap - Steel

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09045
Pier "9" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09050
Pier "9" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09055
Pier "9" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09060
Pier "9" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09065
Pier "9" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09070
Pier "9" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09075
Pier "9" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09080
Pier "9" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09085
Pier "9" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09090
Pier "9" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Page 362

Activity:
Concrete Pouring

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS23PT1PIEP09095
Pier "9" Head -

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09100
Pier "9" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09105
Pier "9" Pier cap Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09110
Pier "9" Pier cap Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09115
Pier "9" Pier cap Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09120
Pier "9" Pier cap Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP09130
Pier "9" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10005
Piling - Platform
Level / Piling Works @ P10 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Page 363

Activity:
Pouring

27in142r3
CO-STS23PT1PIEP10035

Pile Cap - Concrete

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10045
Pier "10" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10050
Pier "10" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10055
Pier "10" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10060
Pier "10" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10065
Pier "10" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10070
Pier "10" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10075
Pier "10" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10080
Pier "10" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10085
Pier "10" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10090
Pier "10" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10095
Pier "10" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10100
Pier "10" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Page 364

27in142r3
Activity:
CO-STS23PT1PIEP10105
Pier "10" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10110
Pier "10" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10115
Pier "10" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10120
Pier "10" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP10130
Pier "10" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11005
Piling - Platform
Level / Piling Works @ P11 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11045
Pier "11" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Page 365

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11050
Pier "11" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11055
Pier "11" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11060
Pier "11" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11065
Pier "11" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11070
Pier "11" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11075
Pier "11" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11080
Pier "11" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11085
Pier "11" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11090
Pier "11" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11095
Pier "11" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11100
Pier "11" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11105
Pier "11" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11110
Pier "11" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11115
Pier "11" Pier cap
- Concrete Pouring
Page 366

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11120
Pier "11" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS23PT1PIEP11130
Pier "11" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC005
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC010
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC015
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC020
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC025
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC050
Installation of
Page 367

27in142r3
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC055
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINDEC065
Road Sign Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECAPP035
Deck Slab Gantry Drawing Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECAPP040
Deck Slab Gantry Drawing Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD15065
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Page 368

27in142r3
Activity:
CO-STS24PT1DECD15075
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD15085
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD15095
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD15105
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD15115
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD15125
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD15135
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD15145
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD15155
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD16175
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD16185
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD16195
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD16205
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD16215
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD16225
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD16235
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD16245
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Page 369

27in142r3
CO-STS24PT1DECD16255
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD16265
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17285
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17295
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17305
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17315
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17325
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17335
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17345
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17355
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17365
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECD17375
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01025
Concrete for Bottom
slab and webs
Activity:

Page 370

Activity:
curing
Activity:
Formwork

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS24PT1DECN01030
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS24PT1DECN01035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN02055
Curing Top Slab
Page 371

Activity:
Scaffolding

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS24PT1DECN03005
Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN04005
Staging /
Scaffolding (incl. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN04015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN04020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN04025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Page 372

Activity:
curing
Activity:
Formwork

27in142r3
CO-STS24PT1DECN04030

Bottom slab and Web

Project:
Max-CL14(2)R6-UP004
CO-STS24PT1DECN04035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN04040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN04045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN04050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN04055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECN05055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Page 373

Activity:
Delivery

27in142r3
CO-STS24PT1DECN3555

S24, Bearing

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECPTT005
Threading, Post
Tensioning & Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1GENDIV035
Traffic Diversion
Works to take up S24 P13 Piling works and S24 P14-2 Pile
Cap Works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1GENDIV040
Reinstatement of
Existing lanes after the completion of Bridge S24 works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1GENINT025
Completion of Line
6 Irrigation Main Installation - 300 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1GENINT030
Completion of Line
3 DU ITS Ducts Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1GENINT035
Completion of Line
3 SWI Installation - 600 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1GENINT040
Slewing of Line
11-3 Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1GENINT045
Slewing of Line
11-4 Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1GENINT050
Completion of Line
3 SWI Installation - 800 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1GENINT055
Receipt of NOC for
Piling from DU/ITS Line 5
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1GENTRA005
Approvals for
Traffic Management & Erection of Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1GENTRA015
Installation of
Portal Frames (Span 3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1GENTRA15
Installation of
Page 374

27in142r3
Single Lane Gantry (Span-2 & 3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1GENTRA25
Installation of
Single Lane Gantry (Span-1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEAPP015
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEAPP020
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEAPP025
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEAPP030
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12000
Piling - Platform
Level / Piling Works @ P12 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12005
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12010
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12015
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12020
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12025
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12030
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Page 375

27in142r3
Activity:
CO-STS24PT1PIEP12035
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12040
Pier "12" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12045
Pier "12" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12050
Pier "12" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12055
Pier "12" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12060
Pier "12" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12065
Pier "12" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12070
Pier "12" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12075
Pier "12" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12080
Pier "12" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12085
Pier "12" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12090
Pier "12" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12095
Pier "12" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12100
Pier "12" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Page 376

27in142r3
Activity:
CO-STS24PT1PIEP12105
Pier "12" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12110
Pier "12" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12115
Pier "12" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12120
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP12125
Pier "12" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13000
Piling - Platform
Level / Piling Works @ P13 (9 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13005
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13010
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13015
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13020
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13025
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13030
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13035
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13040
Pier "13" Column
stage 1- Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13045
Pier "13" Column
stage 1 - Installation of Pier Mould
Page 377

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13050
Pier "13" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13055
Pier "13" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13080
Pier "13" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13085
Pier "13" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13090
Pier "13" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13095
Pier "13" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13100
Pier "13" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13105
Pier "13" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13110
Pier "13" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13115
Pier "13" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13120
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP13125
Pier "13" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14000
Piling - Platform
Level / Piling Works @ P14 Column 1 (2 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14005
Pile Cap Column 1 Excavation
Page 378

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14010
Pile Cap Column 1 Pile Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14015
Pile Cap Column 1 Blinding Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14020
Pile Cap Column 1 Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14025
Pile Cap Column 1 Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14030
Pile Cap Column 1 Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14035
Pile Cap Column 1 Curing / Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14040
Pier "14" Column 1
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14045
Pier "14" Column 1
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14050
Pier "14" Column 1
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14055
Pier "14" Column 1
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14060
Pier "14" Column 1
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14065
Pier "14" Column 1
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14070
Pier "14" Column 1
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14075
Pier "14" Column 1
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14080
Pier "14" Column 1
Page 379

27in142r3
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14085
Pier "14" Column 1
Head - Installation of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14090
Pier "14" Column 1
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14095
Pier "14" Column 1
Head - Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14100
Piling - Platform
Level / Piling Works @ P14 Column 2 (3 Nos. - 2000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14105
Pile Cap Column 2 Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14110
Pile Cap Column 2 Pile Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14115
Pile Cap Column 2 Blinding Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14120
Pile Cap Column 2 Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14125
Pile Cap Column 2 Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14130
Pile Cap Column 2 Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14135
Pile Cap Column 2 Curing / Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14140
Pier "14" Column 2
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14145
Pier "14" Column 2
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14150
Pier "14" Column 2
Page 380

27in142r3
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14155
Pier "14" Column 2
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14160
Pier "14" Column 2
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14165
Pier "14" Column 2
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14170
Pier "14" Column 2
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14175
Pier "14" Column 2
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14180
Pier "14" Column 2
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14185
Pier "14" Column 2
Head - Installation of Mould - Flare Type 8 (2.5x2.5m;
Width=4.63m; Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14190
Pier "14" Column 2
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14195
Pier "14" Column 2
Head - Curing / Removal of Mould - Flare Type 8 (2.5x2.5m;
Width=4.63m; Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14200
Pier "14" Beams
(Col.1 and Col.2 ) - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14205
Pier "14" Beams
(Col.1 and Col.2 ) - Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14210
Pier "14" Beams
(Col.1 and Col.2 ) - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14215
Pier "14" Beams
(Col.1 and Col.2 ) - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14220
Pile Cap Column 1 Page 381

27in142r3
Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14225
Pier "14" Column 1
Head - Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14230
Pile Cap Column 2 Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14235
Pier "14" Column 2
Head - Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14240
Piling - Platform
Level / Piling Works @ P14 Column 3 (2 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14245
Pile Cap Column 3 Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14250
Pile Cap Column 3 Pile Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14255
Pile Cap Column 3 Blinding Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14260
Pile Cap Column 3 Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14265
Pile Cap Column 3 Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14270
Pile Cap Column 3 Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14275
Pile Cap Column 3 Curing / Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14280
Pier "14" Column 3
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14285
Pier "14" Column 3
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14290
Pier "14" Column 3
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Page 382

27in142r3
Activity:
CO-STS24PT1PIEP14295
Pier "14" Column 3
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14300
Pier "14" Column 3
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14305
Pier "14" Column 3
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14310
Pier "14" Column 3
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14315
Pier "14" Column 3
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14320
Pier "14" Column 3
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14325
Pier "14" Column 3
Head - Installation of Mould - Flare Type 8 (2.5x2.5m;
Width=4.63m; Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14330
Pier "14" Column 3
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14335
Pier "14" Column 3
Head - Curing / Removal of Mould - Flare Type 8 (2.5x2.5m;
Width=4.63m; Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14340
Pier "14" Beams
(Col.2 and Col.3 ) - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14345
Pier "14" Beams
(Col.2 and Col.3 ) - Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14350
Pier "14" Beams
(Col.2 and Col.3 ) - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14355
Pier "14" Beams
(Col.2 and Col.3 ) - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP14360
Pile Cap Column 3 Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Page 383

27in142r3
Activity:
CO-STS24PT1PIEP14365
Pier "14" Column 3
Head - Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15005
Piling - Platform
Level / Piling Works @ P15 (9 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15045
Pier "15" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15050
Pier "15" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15055
Pier "15" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15060
Pier "15" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15065
Pier "15" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15070
Pier "15" Column
stage 2 - Installation of Pier Mould
Page 384

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15075
Pier "15" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15080
Pier "15" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15085
Pier "15" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15090
Pier "15" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15095
Pier "15" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15100
Pier "15" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15105
Pier "15" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15110
Pier "15" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15115
Pier "15" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15120
Pier "15" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP15130
Pier "15" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16005
Piling - Platform
Level / Piling Works @ P16 (9 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16010
Pile Cap Excavation
Page 385

Activity:
Head Cutting
Activity:
Concrete
Activity:
Reinforcement

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS24PT1PIEP16015
Pile Cap - Pile
Project:
Max-CL14(2)R6-UP004
CO-STS24PT1PIEP16020
Pile Cap - Blinding
Project:
Max-CL14(2)R6-UP004
CO-STS24PT1PIEP16025
Pile Cap - Steel

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16045
Pier "16" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16050
Pier "16" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16055
Pier "16" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16060
Pier "16" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16065
Pier "16" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16070
Pier "16" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16075
Pier "16" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16080
Pier "16" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16085
Pier "16" Head Page 386

27in142r3
Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16090
Pier "16" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16095
Pier "16" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16100
Pier "16" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16105
Pier "16" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16110
Pier "16" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16115
Pier "16" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16120
Pier "16" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP16130
Pier "16" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17005
Piling - Platform
Level / Piling Works @ P17 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17025
Pile Cap - Steel
Page 387

27in142r3
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17045
Pier "17" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17050
Pier "17" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17055
Pier "17" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17060
Pier "17" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17065
Pier "17" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17070
Pier "17" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17075
Pier "17" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17080
Pier "17" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17085
Pier "17" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17090
Pier "17" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17095
Pier "17" Head Concrete Pouring
Page 388

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17100
Pier "17" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17105
Pier "17" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17110
Pier "17" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17115
Pier "17" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17120
Pier "17" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS24PT1PIEP17130
Pier "17" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC005
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC010
Construction of
Cast in Situ Barriers Stg-1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC015
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC020
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC025
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Page 389

Activity:
Precast Kerbs

27in142r3
CO-STS25MISFINDEC030

Installation of

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC050
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC055
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINDEC70
Construction of
Cast in Situ Barriers Stg-3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINPNT010
Deck Slabs External Surface Preparation and Painting Stg-1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINPNT015
Deck Slabs Painting inside Box Girders Stg-1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25MISFINPNT25
Deck Slabs External Surface Preparation and Painting Stg-3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECAPP030
Deck Slab Top Slab
Page 390

27in142r3
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18065
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18075
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18085
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18095
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18105
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18115
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18125
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18135
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18145
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD18155
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19165
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19175
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19185
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19195
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19205
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19215
Removal of Web
Formwork
Page 391

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19225
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19235
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19245
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD19255
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20265
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20275
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20285
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20295
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20305
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20315
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20325
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20335
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20345
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD20355
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD21365
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD21375
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD21385
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Page 392

Activity:
slab and webs
Activity:
curing
Activity:
Formwork

27in142r3
CO-STS25PT1DECD21395

Concrete for Bottom

Project:
Max-CL14(2)R6-UP004
CO-STS25PT1DECD21405
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS25PT1DECD21415
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD21425
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD21435
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD21445
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECD21455
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Page 393

Activity:
Scaffolding

27in142r3
CO-STS25PT1DECN03005

Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN03030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN03035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN04005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN04015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN04020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN04025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN04030
Bottom slab and Web
Page 394

27in142r3
curing
Activity:
Formwork

Project:
Max-CL14(2)R6-UP004
CO-STS25PT1DECN04035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN04040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN04045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN04050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN04055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1DECN3565
S25, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1GENINT010
Slewing of Line
11-7 Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1GENINT015
Slewing of Line
11-6 Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1GENINT020
Slewing of Line
11-5 Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1GENINT025
Slewing of Line
11-4 Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1GENINT030
Completion of Line
3 DU ITS Ducts Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1GENINT035
Completion of Line
3 SWI - 800 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1GENINT040
Completion of Line
3 SWI - 600 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1GENINT045
Receipt of NOC for
Piling from DU/ITS Line 6-1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1GENINT050
Receipt of NOC for
Piling from DU/ITS Line 6-2
Project:
Max-CL14(2)R6-UP004
Page 395

27in142r3
Activity:
CO-STS25PT1GENINT055
Receipt of NOC for
Piling from DU/ITS Line 6-3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1GENTRA010
Installation of
Gantry over Du Compound Entrance
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEAPP015
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEAPP020
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEAPP025
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEAPP030
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18005
Piling - Platform
Level / Piling Works @ P18 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18035
Pile Cap - Concrete
Pouring
Page 396

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18045
Pier "18" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18050
Pier "18" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18055
Pier "18" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18060
Pier "18" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18065
Pier "18" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18070
Pier "18" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18075
Pier "18" Column
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18080
Pier "18" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18085
Pier "18" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18090
Pier "18" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18095
Pier "18" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18100
Pier "18" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18105
Pier "18" Pier cap
- Steel Reinforcement
Page 397

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18110
Pier "18" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18115
Pier "18" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18120
Pier "18" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP18130
Pier "18" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19005
Piling - Platform
Level / Piling Works @ P19 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19045
Pier "19" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19050
Pier "19" Column
Page 398

27in142r3
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19055
Pier "19" Column
stage 1 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19060
Pier "19" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19065
Pier "19" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19070
Pier "19" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19075
Pier "19" Column
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19080
Pier "19" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19085
Pier "19" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19090
Pier "19" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19095
Pier "19" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19100
Pier "19" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19105
Pier "19" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19110
Pier "19" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19115
Pier "19" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19120
Pier "19" Pier cap
Page 399

27in142r3
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP19130
Pier "19" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20005
Piling - Platform
Level / Piling Works @ P20 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20045
Pier "20" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20050
Pier "20" Column Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20055
Pier "20" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20060
Pier "20" Column Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Page 400

27in142r3
Activity:
CO-STS25PT1PIEP20065
Pier "20" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20070
Pier "20" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20075
Pier "20" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20080
Pier "20" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20085
Pier "20" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20090
Pier "20" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20095
Pier "20" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20100
Pier "20" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20105
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP20110
Pier "20" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21005
Piling - Platform
Level / Piling Works @ P21 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Page 401

Activity:
Reinforcement

27in142r3
CO-STS25PT1PIEP21025

Pile Cap - Steel

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21045
Pier "21" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21050
Pier "21" Column Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21055
Pier "21" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21060
Pier "21" Column Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21065
Pier "21" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21070
Pier "21" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21075
Pier "21" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21080
Pier "21" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21085
Pier "21" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21090
Pier "21" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Page 402

27in142r3
Activity:
CO-STS25PT1PIEP21095
Pier "21" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21100
Pier "21" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21105
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT1PIEP21110
Pier "21" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECN01105
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECN01115
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECN01125
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECN01135
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECN01145
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT2DECN01155
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3DECAPP030
Deck Slab Top Slab
- Drawings Approval
Page 403

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEAPP015
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEAPP020
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEAPP025
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEAPP030
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22005
Piling - Platform
Level / Piling Works @ P22 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22045
Pier "22" Column Page 404

27in142r3
Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22050
Pier "22" Column Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22055
Pier "22" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22060
Pier "22" Column Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22065
Pier "22" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22070
Pier "22" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22075
Pier "22" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22080
Pier "22" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22085
Pier "22" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22090
Pier "22" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22095
Pier "22" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22100
Pier "22" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22105
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS25PT3PIEP22110
Pier "22" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINAPP005
Surveying and
Page 405

27in142r3
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINDEC005
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINDEC010
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINDEC015
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINDEC020
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINDEC025
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINDEC050
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINDEC055
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Page 406

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN02005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Page 407

Activity:
Activity:
Activity:
Activity:
Scaffolding

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS26PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS26PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS26PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS26PT1DECN03005
Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN03030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN03035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN04005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN04015
Bottom slab and web
steel Reinforcement + PT Ducts
Page 408

Activity:
Activity:
slab and webs
Activity:
curing
Activity:
Formwork

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS26PT1DECN04020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
CO-STS26PT1DECN04025
Concrete for Bottom
Project:
Max-CL14(2)R6-UP004
CO-STS26PT1DECN04030
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS26PT1DECN04035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN04040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN04045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN04050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN04055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4065
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4075
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4085
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4095
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4105
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4115
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4125
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4135
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4145
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Page 409

27in142r3
Activity:
CO-STS26PT1DECN4155
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4165
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4175
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4185
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4195
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4205
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4215
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4225
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4235
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4245
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4255
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4265
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4275
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4285
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4295
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4305
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4315
Removal of Web
Page 410

27in142r3
Formwork
Project:
Max-CL14(2)R6-UP004
CO-STS26PT1DECN4325
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4335
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4345
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4355
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4365
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4375
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4385
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4395
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4405
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4415
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4425
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4435
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4445
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4455
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECN4465
S26, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECPTT005
Threading, Post
Tensioning & Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1DECPTT010
Removal of External
Activity:

Page 411

27in142r3
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1GENINT005
Services clear for
Piling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEAPP015
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEAPP020
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEAPP025
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEAPP030
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23005
Piling - Platform
Level / Piling Works @ P23 (9 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23010
Pile Cap - Sheet
Piling / Dewatering / Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Page 412

27in142r3
Activity:
CO-STS26PT1PIEP23040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23045
Pier "23" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23050
Pier "23" Column Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23055
Pier "23" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23060
Pier "23" Column Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23065
Pier "23" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23070
Pier "23" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23075
Pier "23" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23080
Pier "23" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23085
Pier "23" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23090
Pier "23" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23095
Pier "23" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23100
Pier "23" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23105
Pile Cap Waterproofing (incl. 2mm HDPE Liner) / Backfilling /
Removal of Sheet Piles
Page 413

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP23110
Pier "23" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24005
Piling - Platform
Level / Piling Works @ P24 (9 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24010
Pile Cap - Sheet
Piling / Dewatering / Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24045
Pier "24" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24050
Pier "24" Column Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24055
Pier "24" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24060
Pier "24" Column Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24065
Pier "24" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24070
Pier "24" Head Page 414

27in142r3
Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24075
Pier "24" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24080
Pier "24" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24085
Pier "24" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24090
Pier "24" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24095
Pier "24" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24100
Pier "24" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24105
Pile Cap Waterproofing (incl. 2mm HDPE Liner) / Backfilling /
Removal of Sheet Piles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP24110
Pier "24" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25005
Piling - Platform
Level / Piling Works @ P25 (9 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25010
Pile Cap - Sheet
Piling / Dewatering / Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Page 415

27in142r3
Activity:
CO-STS26PT1PIEP25030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25045
Pier "25" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25050
Pier "25" Column Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25055
Pier "25" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25060
Pier "25" Column Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25065
Pier "25" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25070
Pier "25" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25075
Pier "25" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25080
Pier "25" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25085
Pier "25" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25090
Pier "25" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25095
Pier "25" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Page 416

27in142r3
Activity:
CO-STS26PT1PIEP25100
Pier "25" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25105
Pile Cap Waterproofing (incl. 2mm HDPE Liner) / Backfilling /
Removal of Sheet Piles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP25110
Pier "25" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26005
Piling - Platform
Level / Piling Works @ P26 (9 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26010
Pile Cap - Sheet
Piling / Dewatering / Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26045
Pier "26" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26050
Pier "26" Column Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26055
Pier "26" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26060
Pier "26" Column Page 417

27in142r3
Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26065
Pier "26" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26070
Pier "26" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26075
Pier "26" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26080
Pier "26" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26085
Pier "26" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26090
Pier "26" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26100
Pier "26" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26105
Pile Cap Waterproofing (incl. 2mm HDPE Liner) / Backfilling /
Removal of Sheet Piles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26195
Pier "26" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT1PIEP26200
Pier "26" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Page 418

27in142r3
CO-STS26PT2DECAPP020
Deck Slab Bottom
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECPTT002
Threading Of Post
Tensioning Strands
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT2DECPTT005
Post Tensioning &
Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
Slab & PT

Page 419

27in142r3
Activity:
CO-STS26PT2DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05015
Bottom slab and web
steel Reinforcement + PT Ducts (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Page 420

27in142r3
CO-STS26PT3DECN05045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECN05055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECPTT002
Threading Of Post
Tensioning Strands
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECPTT005
Post Tensioning &
Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS26PT3DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINDEC005
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINDEC010
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINDEC015
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINDEC020
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINDEC025
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Activity:

Page 421

Activity:
Course

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS27MISFINDEC045
Asphalt Wearing

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINDEC050
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINDEC055
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Page 422

27in142r3
Activity:
CO-STS27PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN02005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN02040
Installation of Top
Page 423

27in142r3
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN03030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN03035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECN3575
S27, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECPTT005
Threading, Post
Tensioning & Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1DECPTT010
Removal of External
Page 424

27in142r3
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1GENINT005
Services clear for
Piling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEAPP015
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEAPP020
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEAPP025
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEAPP030
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27005
Piling - Platform
Level / Piling Works @ P27 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27010
Pile Cap - Sheet
Piling / Dewatering / Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Page 425

27in142r3
Activity:
CO-STS27PT1PIEP27040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27045
Pier "27" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27050
Pier "27" Column Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27055
Pier "27" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27060
Pier "27" Column Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27065
Pier "27" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27070
Pier "27" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27075
Pier "27" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27080
Pier "27" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27085
Pier "27" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27090
Pier "27" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27095
Pier "27" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27100
Pier "27" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27105
Pile Cap Waterproofing (incl. 2mm HDPE Liner) / Backfilling /
Removal of Sheet Piles
Page 426

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP27110
Pier "27" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28005
Piling - Platform
Level / Piling Works @ P28 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28010
Pile Cap - Sheet
Piling / Dewatering / Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28045
Pier "28" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28050
Pier "28" Column Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28055
Pier "28" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28060
Pier "28" Column Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28065
Pier "28" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28070
Pier "28" Head Page 427

27in142r3
Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28075
Pier "28" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28080
Pier "28" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28085
Pier "28" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28090
Pier "28" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28095
Pier "28" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28100
Pier "28" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28105
Pile Cap Waterproofing (incl. 2mm HDPE Liner) / Backfilling /
Removal of Sheet Piles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP28110
Pier "28" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29005
Piling - Platform
Level / Piling Works @ P29 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29010
Pile Cap - Sheet
Piling / Dewatering / Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Page 428

27in142r3
Activity:
CO-STS27PT1PIEP29030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29045
Pier "29" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29050
Pier "29" Column Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29055
Pier "29" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29060
Pier "29" Column Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29065
Pier "29" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29070
Pier "29" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29075
Pier "29" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29080
Pier "29" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29085
Pier "29" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29090
Pier "29" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29095
Pier "29" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Page 429

27in142r3
Activity:
CO-STS27PT1PIEP29100
Pier "29" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29105
Pile Cap Waterproofing (incl. 2mm HDPE Liner) / Backfilling /
Removal of Sheet Piles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS27PT1PIEP29110
Pier "29" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC005
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC010
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC015
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC020
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC025
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC050
Installation of
Page 430

27in142r3
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC055
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINPNT015
Abutments &
Retaining Walls - Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISFINPNT020
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISRETGEN005
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISRETGEN010
Construction of
Retaining Wall
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISRETGEN015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28MISRETGEN020
Construction of
Cast in Situ Barriers and Sidewalks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECAPP030
Deck Slab Top Slab
Page 431

27in142r3
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN02005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN02025
Concrete for Bottom
slab and webs
Page 432

Activity:
curing
Activity:
Formwork

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS28PT1DECN02030
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS28PT1DECN02035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECN03055
Curing Top Slab
Page 433

Activity:
Delivery

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS28PT1DECN3585
S28, Bearing

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECPTT002
Threading Of Post
Tensioning Strands
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECPTT005
Post Tensioning &
Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1GENINT005
Services clear for
Piling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2002
Platform
Preparation for Piling works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2005
Piling - Platform
Level / Piling Works @ Abutment 2 (18 Nos. - 1200 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2010
PIle Cap Excavation to Formation Level
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2015
Pile Cap - Piles
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2025
Pile Cap Installation of Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2030
Pile Cap Installation of Shutters
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2040
Pile Cap - Curing /
Removal of Shutters
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2045
Pile Cap Page 434

27in142r3
Waterproofing (incl. 2mm HDPE Liner) / Backfilling (inc.
Reinstate Revetment)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2050
Installation of
Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2055
Backwall Installation of Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2060
Backwall Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2065
Backwall - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2070
Backwall - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2075
Backfilling Behind Abutment Back Wall
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAB2080
Approach Slab
Construction
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAPP045
Retaining Wall Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAPP050
Retaining Wall Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAPP055
Abutment Wall Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAPP060
Abutment Wall Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAPP065
Revetment Works Revetment Removal Method Statement / Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAPP075
Revetment Works Revetment Removal Method Statement / Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAPP105
Piling / Pile Cap Drawings Submittal
Page 435

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAPP110
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAPP325
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAPP630
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAPP820
Piling / Abutment
Foundation - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEAPP915
Piling / Abutment
Foundation - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP34005
Piling - Platform
Level / Piling Works @ P34 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP34010
Pile Cap - Sheet
Piling / Dewatering / Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP34015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP34020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP34025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP34030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP34035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP34040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP34085
Pier "34" Pier Cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP34090
Pier "34" Pier Cap
Page 436

27in142r3
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP34095
Pier "34" Pier Cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP34100
Pier "34" Pier Cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP34105
Pile Cap Waterproofing (incl. 2mm HDPE Liner) / Backfilling /
Removal of Sheet Piles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP34110
Pier "34" Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP35002
Platform
Preparation for Piling works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP35005
Piling - Platform
Level / Piling Works @ P35 (17 Nos. - 1200 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP35010
Pile Cap - Sheet
Piling / Dewatering / Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP35015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP35020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP35025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP35030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP35035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP35040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP35085
Pier "35" Pier cap
- Steel Reinforcement
Page 437

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP35090
Pier "35" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP35095
Pier "35" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP35100
Pier "35" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP35105
Pile Cap Waterproofing (incl. 2mm HDPE Liner) / Backfilling /
Removal of Sheet Piles (inc. Reinstate Revetment)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS28PT1PIEP35110
Pier "35" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINAPP10
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINAPP20
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINDEC100
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINDEC110
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINDEC120
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINDEC130
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINDEC140
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINDEC150
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINDEC160
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINDEC170
Installation of
Lighting Poles & Street Lighting Cables
Page 438

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINDEC60
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINDEC70
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINDEC80
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINDEC90
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINPNT15
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINPNT25
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29MISFINPNT35
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN01010
Formwork - Bottom
Page 439

27in142r3
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN01045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN02005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN02035
Removal of Web
Formwork
Page 440

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN03020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN03025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN03030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN03035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECPTT005
Threading, Post
Tensioning & Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1DECPTT010
Removal of External
Formwork & Scaffold
Page 441

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEAPP015
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEAPP020
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEAPP025
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEAPP030
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP30005
Piling - Platform
Level / Piling Works @ P30 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP30010
Pile Cap - Sheet
Piling / Dewatering / Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP30015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP30020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP30025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP30030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP30035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP30040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP30065
Pier "30" Head Page 442

27in142r3
Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP30070
Pier "30" Head Installation of Mould - Flare Type 6 (2.5x4m; Width=11.6m;
Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP30075
Pier "30" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP30080
Pier "30" Head Curing / Removal of Mould - Flare Type 6 (2.5x4m;
Width=11.6m; Height=7.8m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP30085
Pier "30" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP30090
Pier "30" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP30095
Pier "30" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP30100
Pier "30" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP30105
Pile Cap Waterproofing (incl. 2mm HDPE Liner) / Backfilling /
Removal of Sheet Piles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP30110
Pier "30" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP31005
Piling - Platform
Level / Piling Works @ P31 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP31010
Pile Cap - Sheet
Piling / Dewatering / Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP31015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP31020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Page 443

Activity:
Reinforcement

27in142r3
CO-STS29PT1PIEP31025

Pile Cap - Steel

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP31030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP31035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP31040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP31085
Pier "31" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP31090
Pier "31" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP31095
Pier "31" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP31100
Pier "31" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP31105
Pile Cap Waterproofing (incl. 2mm HDPE Liner) / Backfilling /
Removal of Sheet Piles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP31110
Pier "31" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP32005
Piling - Platform
Level / Piling Works @ P32 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP32010
Pile Cap - Sheet
Piling / Dewatering / Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP32015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP32020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP32025
Pile Cap - Steel
Page 444

27in142r3
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP32030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP32035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP32040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP32085
Pier "32" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP32090
Pier "32" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP32095
Pier "32" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP32100
Pier "32" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP32105
Pile Cap Waterproofing (incl. 2mm HDPE Liner) / Backfilling /
Removal of Sheet Piles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP32110
Pier "32" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP33005
Piling - Platform
Level / Piling Works @ P33 (8 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP33010
Pile Cap - Sheet
Piling / Dewatering / Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP33015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP33020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP33025
Pile Cap - Steel
Reinforcement
Page 445

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP33030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP33035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP33040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP33085
Pier "33" Pier cap
- Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP33090
Pier "33" Pier cap
- Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP33095
Pier "33" Pier cap
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP33100
Pier "33" Pier cap
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP33105
Pile Cap Waterproofing (incl. 2mm HDPE Liner) / Backfilling /
Removal of Sheet Piles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS29PT1PIEP33110
Pier "33" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINAPP10
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINAPP20
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINDEC105
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINDEC125
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINDEC135
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Page 446

Activity:
Course

27in142r3
CO-STS30MISFINDEC145

Asphalt Wearing

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINDEC155
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINDEC165
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINDEC65
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINDEC75
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINDEC85
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINPNT15
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINPNT25
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30MISFINPNT35
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECAPP45
Deck Slab
Scaffolding - Drawings Submittal (inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECAPP55
Deck Slab
Scaffolding - Drawings Approval (inc. Simply Supported
Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECAPP65
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECAPP75
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECAPP85
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECAPP95
Deck Slab Top Slab
- Drawings Approval
Page 447

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1365
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1375
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1385
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1395
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1405
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1415
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1425
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1435
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1445
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1455
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN1465
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN3885
S30, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1DECN3895
Removal of
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEAPP30
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEAPP40
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEAPP50
Pier Column Drawings Submittal
Page 448

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEAPP60
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEAPP70
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEAPP80
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP17090
Piling - Platform
Level / Piling Works @ P2 (4 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP17100
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP17110
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP17120
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP17130
Pier "2" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP17140
Pier "2" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP17150
Pier "2" Column Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP17160
Pier "2" Column Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP17170
Pier "2" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP17180
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP17190
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP17200
Pile Cap - Curing /
Page 449

27in142r3
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP17210
Pier "2" Head Installation of Mould - Flare Type 1 (Dia=1.8m; Width=4m;
Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP17220
Pier "2" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP17230
Pier "2" Head Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP17240
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP17250
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP17260
Pier "2" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18270
Piling - Platform
Level / Piling Works @P18 (2 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18280
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18290
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18300
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18310
Pier "3" Column Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18320
Pier "3" Column Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18330
Pier "3" Column Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18340
Pier "3" Column Page 450

27in142r3
Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18350
Pier "3" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18360
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18370
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18380
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18390
Pier "3" Head Installation of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18400
Pier "3" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18410
Pier "3" Head Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18420
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18430
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS30VS1PIEP18440
Pier "3" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings (Stage 1 & 2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINAPP010
Approval of the
Profile drawings (Stage 1 & 2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINDEC010
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINDEC015
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Page 451

27in142r3
Activity:
CO-STS31MISFINDEC020
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINDEC025
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINDEC055
Road Markings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINDEC060
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31MISFINPNT015
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECN3905
S31, Bearing
Delivery
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1DECPTT015
Removal of Portal
Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1GENINT010
Slewing of DEWA-ED
11 KV Cable Line 3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1GENINT015
Completion of Line
7 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1GENINT020
Completion of Line
5 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1GENINT025
Completion of Line
Page 452

27in142r3
3 DEWA ED-132kv Slab Protections
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1GENINT030
Completion of Line
2 Irrigation main Installation - 600 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1GENINT035
Completion of Line
1 SWI Installation - 600 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1GENINT040
Completion of Line
1 DU / ITS Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1GENINT045
Completion of Line
1 SWI Installation - 800 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1GENINT050
Slewing of Etisalat
Cables - Line 2-3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1GENINT060
Completion of Line
1 Irrigation Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1GENTRA005
Approvals for
Traffic Management & Erection of Gantry
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1GENTRA007
Modification of
Portal Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1GENTRA010
Installation of
Portal Frames (Span 2 & Span 3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEAPP015
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEAPP020
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEAPP025
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Page 453

27in142r3
Activity:
CO-STS31PT1PIEAPP030
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06005
Piling - Platform
Level / Piling Works @ P6 (12 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06045
Pier "6" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06050
Pier "6" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06055
Pier "6" Column
stage 1 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06060
Pier "6" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06065
Pier "6" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06070
Pier "6" Column
stage 2 - Installation of Pier Mould
Page 454

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06075
Pier "6" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06080
Pier "6" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06085
Pier "6" Column
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06090
Pier "6" Column
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06095
Pier "6" Column
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06100
Pier "6" Column
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06105
Pier "6" Head Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06110
Pier "6" Head Installation of Mould - Flare Type 4 (Dia=2.5m; Width=5.8m;
Height=5.33m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06115
Pier "6" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06120
Pier "6" Head Curing / Removal of Mould - Flare Type 4 (Dia=2.5m;
Width=5.8m; Height=5.33m, Breadth=2.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP06125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07005
Piling - Platform
Level / Piling Works @ P7 (14 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07015
Pile Cap - Pile
Head Cutting
Page 455

Activity:
Concrete
Activity:
Reinforcement

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS31PT1PIEP07020
Pile Cap - Blinding
Project:
Max-CL14(2)R6-UP004
CO-STS31PT1PIEP07025
Pile Cap - Steel

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07045
Pier "7" Column 1
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07050
Pier "7" Column 1
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07055
Pier "7" Column 1
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07060
Pier "7" Column 1
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07065
Pier "7" Column 1
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07070
Pier "7" Column 1
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07075
Pier "7" Column 1
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07080
Pier "7" Column 1
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07085
Pier "7" Column 1
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07090
Pier "7" Column 1
Page 456

27in142r3
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07095
Pier "7" Column 1
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07100
Pier "7" Column 1
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07105
Pier "7" Column 1
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07110
Pier "7" Column 1
Head - Installation of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07115
Pier "7" Column 1
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07120
Pier "7" Column 1
Head - Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07125
Pier "7" Column 2
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07130
Pier "7" Column 2
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07135
Pier "7" Column 2
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07140
Pier "7" Column 2
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07145
Pier "7" Column 2
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07150
Pier "7" Column 2
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07155
Pier "7" Column 2
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07160
Pier "7" Column 2
Page 457

27in142r3
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07165
Pier "7" Column 2
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07170
Pier "7" Column 2
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07175
Pier "7" Column 2
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07180
Pier "7" Column 2
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07185
Pier "7" Column 2
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07190
Pier "7" Column 2
Head - Installation of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07195
Pier "7" Column 2
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07200
Pier "7" Column 2
Head - Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07205
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT1PIEP07210
Pier "7" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN05010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN05015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN05020
Formwork for Webs
Page 458

Activity:
slab and webs
Activity:
curing
Activity:
Formwork

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS31PT2DECN05025
Concrete for Bottom
Project:
Max-CL14(2)R6-UP004
CO-STS31PT2DECN05030
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS31PT2DECN05035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN05040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN05045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN05050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECN05055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2DECPTT015
Removal of Portal
Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08180
Piling - Platform
Level / Piling Works @ P9 (4 Nos. - 2000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08190
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08200
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08210
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08220
Pier "9" Column 1
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08230
Pier "9" Column 1
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08240
Pier "9" Column 1
Page 459

27in142r3
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08250
Pier "9" Column 1
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08260
Pier "9" Column 1
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08270
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08280
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08290
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08300
Pier "9" Column 1
Head - Installation of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08310
Pier "9" Column 1
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08320
Pier "9" Column 1
Head - Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08330
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08340
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08350
Pier "9" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08360
Pier "9" Column 1
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08370
Pier "9" Column 1
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08380
Pier "9" Column 1
Page 460

27in142r3
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08390
Pier "9" Column 2
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08400
Pier "9" Column 2
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08410
Pier "9" Column 2
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08420
Pier "9" Column 2
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08430
Pier "9" Column 2
stage 2 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08440
Pier "9" Column 2
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08450
Pier "9" Column 2
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08460
Pier "9" Column 2
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08470
Pier "9" Column 2
Head - Installation of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08480
Pier "9" Column 2
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08490
Pier "9" Column 2
Head - Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08500
Pier "9" Column 1
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08510
Pier "9" Column 1
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08520
Pier "9" Column 1
Page 461

27in142r3
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08530
Pier "9" Column 1
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08540
Pier "9" Column 1
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08550
Pier "9" Column 2
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08560
Pier "9" Column 2
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08570
Pier "9" Column 2
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08580
Pier "9" Column 2
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP08590
Pier "9" Column 2
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09005
Piling - Platform
Level / Piling Works @ P9 (4 Nos. - 2000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09045
Pier "9" Column 1
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09050
Pier "9" Column 1
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09055
Pier "9" Column 1
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09060
Pier "9" Column 1
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09065
Pier "9" Column 1
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09070
Pier "9" Column 1
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Page 462

27in142r3
Activity:
CO-STS31PT2PIEP09075
Pier "9" Column 1
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09080
Pier "9" Column 1
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09085
Pier "9" Column 1
stage 3 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09090
Pier "9" Column 1
stage 3 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09095
Pier "9" Column 1
stage 3 - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09100
Pier "9" Column 1
stage 3 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09105
Pier "9" Column 1
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09110
Pier "9" Column 1
Head - Installation of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09115
Pier "9" Column 1
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09120
Pier "9" Column 1
Head - Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09205
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP09210
Pier "9" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10005
Piling - Platform
Level / Piling Works @ P10 (4 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Page 463

Activity:
Head Cutting
Activity:
Concrete
Activity:
Reinforcement

27in142r3
CO-STS31PT2PIEP10015

Pile Cap - Pile

Project:
Max-CL14(2)R6-UP004
CO-STS31PT2PIEP10020
Pile Cap - Blinding
Project:
Max-CL14(2)R6-UP004
CO-STS31PT2PIEP10025
Pile Cap - Steel

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10045
Pier "10" Column
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10050
Pier "10" Column
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10055
Pier "10" Column
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10060
Pier "10" Column
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10065
Pier "10" Column
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10070
Pier "10" Column
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10075
Pier "10" Column
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10080
Pier "10" Column
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10085
Pier "10" Head Steel Reinforcement
Page 464

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10090
Pier "10" Head Installation of Mould - Flare Type 2 (Dia=2.3m; Width=5.8m;
Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10095
Pier "10" Head Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10100
Pier "10" Head Curing / Removal of Mould - Flare Type 2 (Dia=2.3m;
Width=5.8m; Height=5.46m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10105
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT2PIEP10110
Pier "10" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3DECN05005
Staging /
Scaffolding (Inc. Simply Supported Beams)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3DECN05010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3DECPTT005
Threading, Post
Tensioning & Grouting (inc. Blisters)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3DECPTT010
Removal of External
Formwork & Scaffold & Simply Supported Beams
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11005
Piling - Platform
Level / Piling Works @ P11 (4 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11025
Pile Cap - Steel
Reinforcement
Page 465

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11045
Pier "11" Column 1
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11050
Pier "11" Column 1
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11055
Pier "11" Column 1
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11060
Pier "11" Column 1
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11065
Pier "11" Column 1
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11070
Pier "11" Column 1
stage 2 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11075
Pier "11" Column 1
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11080
Pier "11" Column 1
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11085
Pier "11" Column 1
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11090
Pier "11" Column 1
Head - Installation of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11095
Pier "11" Column 1
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Page 466

27in142r3
Activity:
CO-STS31PT3PIEP11100
Pier "11" Column 1
Head - Curing / Removal of Mould - Flare Type 1 (Dia=1.8m;
Width=4m; Height=4.18)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11165
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS31PT3PIEP11170
Pier "11" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINAPP005
Surveying and
Submittal of Deck slab profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINAPP010
Approval of the
Profile drawings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINDEC005
Deck Slab Surface
Preparation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINDEC010
Prime Coat /
Asphalt regulating layer
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINDEC015
Intallation of
Bearing Cover Plates & Access Doors
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINDEC020
Installation of
Bottom Slab Lighting System
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINDEC025
Construction of
Cast in Situ Barriers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINDEC030
Installation of
Precast Kerbs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINDEC035
Installation of
Ducts & Interlock Tiles
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINDEC040
Installation of
Lighting Poles & Street Lighting Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINDEC045
Asphalt Wearing
Course
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINDEC050
Road Markings
Page 467

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINDEC055
Road Signage
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINDEC060
Installation of
Expansion Joints / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINPNT005
Piers - Surface
Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINPNT010
Deck Slabs External Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINPNT015
Abutments & MSE
Walls - Surface Preparation and Painting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISFINPNT020
Deck Slabs Painting inside Box Girders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISMSEEMB002
MSE Wall &
Embankment
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISMSEEMB005
Installation of MSE
Wall after construction of Abutment Backwall
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISMSEEMB010
Coping Beam
Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISMSEEMB015
Installation of
Precast Shear Key Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISMSEEMB020
Construction of
Cast in Situ Barriers and Sidewalks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISRETGEN20
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISRETGEN30
Construction of
Retaining Wall
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISRETGEN35
Construction of
Culverts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISRETGEN40
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32MISRETGEN50
Construction of
Page 468

27in142r3
Cast in Situ Barriers and Sidewalks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECAPP005
Deck Slab
Scaffolding - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECAPP010
Deck Slab
Scaffolding - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECAPP015
Deck Slab Bottom
Slab & PT - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECAPP020
Deck Slab Bottom
Slab & PT - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECAPP025
Deck Slab Top Slab
- Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECAPP030
Deck Slab Top Slab
- Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN01005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN01010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN01015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN01020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN01025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN01030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN01035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN01040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN01045
Rebar for Top Slab
Page 469

Activity:
Activity:
Activity:
Scaffolding

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS32PT1DECN01050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS32PT1DECN01055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
CO-STS32PT1DECN02005
Staging /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN02010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN02015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN02020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN02025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN02030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN02035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN02040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN02045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN02050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN02055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN03005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN03010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN03015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN03020
Formwork for Webs
Page 470

Activity:
slab and webs
Activity:
curing
Activity:
Formwork

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-STS32PT1DECN03025
Concrete for Bottom
Project:
Max-CL14(2)R6-UP004
CO-STS32PT1DECN03030
Bottom slab and Web
Project:
Max-CL14(2)R6-UP004
CO-STS32PT1DECN03035
Removal of Web

Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN03040
Installation of Top
slab scaffolding & Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN03045
Rebar for Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN03050
Concrete Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN03055
Curing Top Slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN04005
Staging /
Scaffolding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN04010
Formwork - Bottom
Slab and Cantilever
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN04015
Bottom slab and web
steel Reinforcement + PT Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN04020
Formwork for Webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN04025
Concrete for Bottom
slab and webs
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN04030
Bottom slab and Web
curing
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECN04035
Removal of Web
Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1DECPTT010
Removal of External
Formwork & Scaffold
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1GENINT005
Completion of Line
1 DU / ITS
Page 471

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1GENINT010
Completion of Line
5 DEWA WD Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1GENINT015
Completion of Line
2 DEWA ED-132kv Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1GENINT020
Completion of Line
1 Irrigation Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1GENINT025
Completion of Line
1 Etisalat Duct Installation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1GENINT035
Completion of Line
1 SWI Installation - 600 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1GENINT35
Completion of Line
1 SWI Installation - 800 Dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2005
Piling - Platform
Level / Piling Works @ Abutment 2 (3 Nos. - 1000 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2010
PIle Cap Excavation to Formation Level
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2015
Pile Cap - Piles
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2025
Pile Cap Installation of Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2030
Pile Cap Installation of Shutters
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2040
Pile Cap - Curing /
Removal of Shutters
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2045
Pile Cap Page 472

27in142r3
Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2050
Installation of
Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2055
Backwall Installation of Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2060
Backwall Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2065
Backwall - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2070
Backwall - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2075
Backfilling Behind Abutment Back Wall
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAB2080
Approach Slab
Construction
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAPP005
Piling / Pile Cap Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAPP010
Piling / Pile Cap Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAPP015
Piling / Abutment
Foundation - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAPP020
Piling / Abutment
Foundation - Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAPP025
Pier Head Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAPP030
Pier Head Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAPP035
Pier Column Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Page 473

27in142r3
Activity:
CO-STS32PT1PIEAPP040
Pier Column Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAPP045
MSE Wall Design Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAPP050
MSE Wall Design Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAPP055
Abutment Wall Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEAPP060
Abutment Wall Drawings Approval
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12005
Piling - Platform
Level / Piling Works @ P12 (4 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12045
Pier "12" Column 1
- Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12050
Pier "12" Column 1
- Installation of Pier Mould
Page 474

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12055
Pier "12" Column 1
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12060
Pier "12" Column 1
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12065
Pier "12" Column 1
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12070
Pier "12" Column 1
Head - Installation of Mould - Flare Type 11 (Dia=1.5m;
Width=3.5m; Height=5.1; Breadth=1.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12075
Pier "12" Column 1
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12080
Pier "12" Column 1
Head - Curing / Removal of Mould - Flare Type 11 (Dia=1.5m;
Width=3.5m; Height=5.1; Breadth=1.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12085
Pier "12" Column 2
- Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12090
Pier "12" Column 2
- Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12095
Pier "12" Column 2
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12100
Pier "12" Column 2
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12105
Pier "12" Column 2
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12110
Pier "12" Column 2
Head - Installation of Mould - Flare Type 11 (Dia=1.5m;
Width=3.5m; Height=5.1; Breadth=1.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12115
Pier "12" Column 2
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12120
Pier "12" Column 2
Page 475

27in142r3
Head - Curing / Removal of Mould - Flare Type 11 (Dia=1.5m;
Width=3.5m; Height=5.1; Breadth=1.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP12130
Pier "12" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13005
Piling - Platform
Level / Piling Works @ P13 (4 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13045
Pier "13" Column 1
- Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13050
Pier "13" Column 1
- Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13055
Pier "13" Column 1
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13060
Pier "13" Column 1
- Curing / Removal of Mould
Page 476

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13065
Pier "13" Column 1
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13070
Pier "13" Column 1
Head - Installation of Mould - Flare Type 11 (Dia=1.5m;
Width=3.5m; Height=5.1; Breadth=1.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13075
Pier "13" Column 1
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13080
Pier "13" Column 1
Head - Curing / Removal of Mould - Flare Type 11 (Dia=1.5m;
Width=3.5m; Height=5.1; Breadth=1.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13085
Pier "13" Column 2
- Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13090
Pier "13" Column 2
- Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13095
Pier "13" Column 2
- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13100
Pier "13" Column 2
- Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13105
Pier "13" Column 2
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13110
Pier "13" Column 2
Head - Installation of Mould - Flare Type 11 (Dia=1.5m;
Width=3.5m; Height=5.1; Breadth=1.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13115
Pier "13" Column 2
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13120
Pier "13" Column 2
Head - Curing / Removal of Mould - Flare Type 11 (Dia=1.5m;
Width=3.5m; Height=5.1; Breadth=1.5m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP13125
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Page 477

27in142r3
Activity:
CO-STS32PT1PIEP13130
Pier "13" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14005
Piling - Platform
Level / Piling Works @ P14 (5 Nos. - 1500 dia)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14010
Pile Cap Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14015
Pile Cap - Pile
Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14020
Pile Cap - Blinding
Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14025
Pile Cap - Steel
Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14030
Pile Cap Installation of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14035
Pile Cap - Concrete
Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14040
Pile Cap - Curing /
Removal of Shutter
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14045
Pier "14" Column 1
stage 1 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14050
Pier "14" Column 1
stage 1 - Installation of Pier Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14055
Pier "14" Column 1
stage 1- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14060
Pier "14" Column 1
stage 1 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14065
Pier "14" Column 1
stage 2 - Steel Reinforcement (inc. Scaffolding)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14070
Pier "14" Column 1
stage 2 - Installation of Pier Mould
Page 478

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14075
Pier "14" Column 1
stage 2- Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14080
Pier "14" Column 1
stage 2 - Curing / Removal of Mould
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14085
Pier "14" Column 1
Head - Steel Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14090
Pier "14" Column 1
Head - Installation of Mould - Flare Type 12 (Dia=1.8m;
Width=4m; Height=4.48; Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14095
Pier "14" Column 1
Head - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14100
Pier "14" Column 1
Head - Curing / Removal of Mould - Flare Type 12 (Dia=1.8m;
Width=4m; Height=4.48; Breadth=3.6m)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14165
Pile Cap Waterproofing / Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-STS32PT1PIEP14170
Pier "14" Head Installation of Bearings / Grouting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP005
External
Installation of Bridge Railings for Wet Utilities - S26
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP010
External
Installation of Bridge Railings for Wet Utilities - S27
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP015
External
Installation of Bridge Railings for Wet Utilities - S28
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP020
External
Installation of Bridge Railings for Wet Utilities - S22
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP025
External
Installation of Bridge Railings for Wet Utilities - S24
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP030
External
Installation of Bridge Railings for Wet Utilities - S25
Page 479

27in142r3
Stg-1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP035
External
Installation of Bridge Railings for Wet Utilities - S23
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP040
External
Installation of Bridge Railings for Wet Utilities - S20 /
S21 / S04
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP40
External
Installation of Bridge Railings for Wet Utilities - S27A
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP60
External
Installation of Bridge Railings for Wet Utilities - S25
Stg-3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01PIP70
External
Installation of Bridge Railings for Wet Utilities - S30
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01TRY005
Internal
Installation of Bridge Trays for Electrical Utilities - S25
Stg-1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01TRY010
Internal
Installation of Bridge Trays for Electrical Utilities - S26
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01TRY015
Internal
Installation of Bridge Trays for Electrical Utilities - S27
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01TRY020
Internal
Installation of Bridge Trays for Electrical Utilities - S28
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTBRGCAUL01TRY20
Internal
Installation of Bridge Trays for Electrical Utilities S27A
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDCSMARL01APP005
District Cooling
System - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDCSMARL01APP010
District Cooling
System - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDCSMARL01APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Page 480

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDCSMARL01APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDCSMARL01PIP005
Protection slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDCSMARL02APP005
District Cooling
System - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDCSMARL02APP010
District Cooling
System - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDCSMARL02PIP005
Protection slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTADSL01APP005
DU / ITS - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTADSL01APP010
DU / ITS - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTADSL01APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTADSL01APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTADSL01APP025
Submittal of
Application for Excavation NOC's to DEWA ED (Over Head
Lines)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTADSL01APP030
Approval of
Excavation NOC's from DEWA ED (Over Head Lines)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTADSL01FIN005
Installation of
Cables & Covers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTADSL01PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTADSL01PIP010
Construction of JRC
manholes
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTADSL01PIP015
Lay 2W ITS + 4W DU
ducts
Page 481

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTADSL01PIP020
Lay 2W ITS + 4W DU
ducts - Proposed "JBR to SZR" (Duct 2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTADSL01PIP025
Protection slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTADSL01PIP030
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTADSL01SHD005
Change Over For
Commissioning
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTADSL01SHD010
Connect to new Line
(Engineer / RTA Release Provisional Sums)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTADSL01SHD015
Removal of old
cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTCAUL04APP005
DU - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTCAUL04APP010
DU - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTCAUL04PIP005
Installation of 4
Nos. of DU ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTCAUL04PIP010
Installation of 4
Nos. of DU ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTCAUL04PIP015
Installation of 4
Nos. of DU ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTCAUL04PIP020
Installation of 4
Nos. of DU ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL02APP005
Line 2 DU / ITS
Ducts protection with Concrete Surround - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL02APP010
Line 2 DU / ITS
Ducts protection with Concrete Surround - Drawings Approval
(inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL02PIP005
Setting out /
Page 482

27in142r3
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL02PIP010
Protection slab for
existing cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL02PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL03APP005
DU / ITS - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL03APP010
DU / ITS - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL03APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL03APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL03APP025
Submittal of
Slewing/Temporary Support of DU / ITS Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL03APP035
Approval of
Slewing/Temporary Support of DU / ITS Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL03FIN005
Installation of
Cables, frames and covers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL03PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL03PIP010
Lay 9W DU ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL03PIP015
Construction of JRC
manholes
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL03PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL03SHD005
Change Over For
Commissioning
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL03SHD010
Connect to new Line
(Engineer / RTA Release Provisional Sums)
Project:
Max-CL14(2)R6-UP004
Page 483

Activity:
cables

27in142r3
CO-UTDUTMARL03SHD015

Removal of old

Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL03TMP005
Temporary Slewing /
Support For DU / ITS Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL05APP005
Line 5 Submittal of
Application for Piling / Excavation NOC's from DU / ITS
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL05APP010
Line 5 Approval of
Piling / Excavation NOC's from DU / ITS
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL06APP005
Line 6-1 Submittal
of Application for Piling / Excavation NOC's to DU / ITS
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL06APP010
Line 6-1 Approval
of Piling / Excavation NOC's from DU / ITS
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL06APP015
Line 6-2 Submittal
of Application for Piling / Excavation NOC's to DU / ITS
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL06APP020
Line 6-2 Approval
of Piling / Excavation NOC's from DU / ITS
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL06APP025
Line 6-3 Submittal
of Application for Piling / Excavation NOC's to DU / ITS
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDUTMARL06APP030
Line 6-3 Approval
of Piling / Excavation NOC's from DU / ITS
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL08APP005
DEWA Water Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL08APP010
DEWA Water Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL08APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL08APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL08PIP005
Setting out /
Excavation
Page 484

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL08PIP010
300 dia Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL08SHD005
Water - Test &
Connect new pipe (Engineer / RTA Release Provisional Sums)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL08SHD010
Water - Removal of
existing water pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL09APP005
DEWA Water Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL09APP010
DEWA Water Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL09APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL09APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL09FIN005
Installation of
Wash out valve, Air valve and Butterfly valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL09FIN5
Installation of
valve chamber
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL09PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL09PIP010
1200 dia Pipe
Laying and protection by GRE pipe with steel sleeve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL09PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL09PIP035
Valve Chambers /
Foundations for Valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL09SHD005
Water - Test &
Connect new pipe (Engineer / RTA Release Provisional Sums)
- Using Existing Valves
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL09SHD010
Water - Removal of
existing water pipe
Page 485

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL10APP005
DEWA Water Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL10APP010
DEWA Water Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL10APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL10APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL10FIN005
Installation of Air
valve and Butterfly valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL10PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL10PIP010
600 dia Pipe Laying
and protection by GRE pipe with steel sleeve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL10PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL10PIP035
Valve Chambers /
Foundations for Valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL10SHD005
Water - Test &
Connect new pipe (Engineer / RTA Release Provisional Sums)
- Using Existing Valves
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL10SHD010
Water - Removal of
existing water pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL11APP005
DEWA Water Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL11APP010
DEWA Water Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL11APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL11APP020
Approval of
Page 486

27in142r3
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL11APP025
Prepare and Submit
Construction Method Proposal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL11APP030
Review and Approve
Construction Method Proposal By Engineer / DEWA-WD
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL11PIP003
Construction of
Approved Proposal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL11PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL11PIP010
1200 dia Waterline
Protection by GRE pipe with steel sleeve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL11PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL11PIP020
Finishing Works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL12APP005
DEWA Water Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL12APP010
DEWA Water Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL12APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL12APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL12APP025
Prepare and Submit
Construction Method Proposal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL12APP030
Review and Approve
Construction Method Proposal By Engineer / DEWA-WD
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL12PIP003
Construction of
Approved Proposal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL12PIP005
Setting out /
Excavation
Page 487

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL12PIP010
600 dia Waterline
Protection by GRE pipe with steel sleeve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL12PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL12PIP020
Finishing Works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL12PIP025
Protection of
Existing Motorized Butterfly Valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL13APP005
DEWA Water Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL13APP010
DEWA Water Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL13APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL13APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL13APP025
Prepare and Submit
Construction Method Proposal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL13APP030
Review and Approve
Construction Method Proposal By Engineer / DEWA-WD
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL13FIN005
Installation of
Wash out valve and Butterfly valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL13PIP003
Construction of
Approved Proposal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL13PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL13PIP010
600 dia Waterline
Protection by GRE pipe with steel sleeve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL13PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL13PIP020
Valve Chambers /
Page 488

27in142r3
Foundations for Valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL13PIP030
Finishing Works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14APP005
DEWA Water Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14APP010
DEWA Water Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14APP025
Prepare and Submit
Construction Method Proposal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14APP030
Review and Approve
Construction Method Proposal By Engineer / DEWA-WD
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14FIN15
Installation of Air
valve and Butterfly valve - Using Existing Valves
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14FIN25
Finishing Work (for
Line 14 All Length)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14PIP003
Construction of
Approved Proposal (for Line 14 All Length)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14PIP010
1200 dia Waterline
Protection by GRE pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14PIP020
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14PIP025
1200 dia Waterline
Protection by GRE pipe
Page 489

Activity:
Activity:
Excavation

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-UTDWTADNL14PIP030
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTDWTADNL14PIP035
Setting out /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14PIP040
1200 dia Waterline
Protection by GRE pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14PIP045
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14PIP050
Valve Chambers /
Foundations for Valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14PIP135
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14PIP140
1200 dia Waterline
Protection by GRE pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14PIP145
Valve Chambers /
Foundations for Valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14PIP150
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14SHD005
Shutdown Approval
from Authorities
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL14SHD010
Water - Test &
Connect new pipe (Engineer / RTA Release Provisional Sums)
- Using Existing Valves
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15APP005
DEWA Water Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15APP010
DEWA Water Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Page 490

27in142r3
Activity:
CO-UTDWTADNL15APP025
Prepare and Submit
Construction Method Proposal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15APP030
Review and Approve
Construction Method Proposal By Engineer / DEWA-WD
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15FIN005
Installation of Air
valve and Butterfly valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15FIN010
Finishing Work (for
Line 15 All Length)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP005
Setting out /
Excavation for Pit & Removal of 1200 dia AC pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP020
Setting out /
Excavation for Pit & Removal of 1200 dia AC pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP035
Setting out /
Excavation for Pit & Removal of 1200 dia AC pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP040
Installation of 600
dia GRE waterline inside 1200 dia AC pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP050
Valve Chambers /
Foundations for Valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP055
Setting out /
Excavation for Pit & Removal of 1200 dia AC pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP65
Request for Shut
down
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADNL15PIP75
Shut down &
Connection works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP005
DEWA Water Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP010
DEWA Water Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Page 491

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP025
Prepare and Submit
Construction Method Proposal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP035
Review and Approve
Construction Method Proposal By Engineer / DEWA-WD
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP040
Submittal of
Application for Excavation NOC's to DEWA ED (Over Head
Lines)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01APP045
Approval of
Excavation NOC's from DEWA ED (Over Head Lines)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01PIP003
Construction of
Approved Proposal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01PIP010
1200 dia Waterline
Protection by GRE pipe with steel sleeve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL01PIP020
Finishing Works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL02APP005
DEWA Water Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL02APP010
DEWA Water Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL02APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL02APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL02APP025
Prepare and Submit
Construction Method Proposal
Page 492

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL02APP030
Review and Approve
Construction Method Proposal By Engineer / DEWA-WD
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL02APP035
Submittal of
Application for Excavation NOC's to DEWA ED (Over Head
Lines)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL02APP040
Approval of
Excavation NOC's from DEWA ED (Over Head Lines)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL02PIP003
Construction of
Approved Proposal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL02PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL02PIP010
600 dia Waterline
Protection by GRE pipe with steel sleeve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL02PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL02PIP020
Finishing Works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL05APP005
DEWA Water Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL05APP010
DEWA Water Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL05APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL05APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL05FIN005
Installation of
Gate valve and Butterfly valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL05PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL05PIP010
300 dia Pipe Laying
Project:
Max-CL14(2)R6-UP004
Page 493

27in142r3
CO-UTDWTADSL05PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL05PIP020
Valve Chambers /
Foundations for Valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL05SHD005
Water - Test &
Connect new pipe (Engineer / RTA Release Provisional Sums)
- Using Existing Valves
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL05SHD010
Water - Removal of
existing water pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL07APP005
DEWA Water Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL07APP010
DEWA Water Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL07APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL07APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL07PIP005
Setting out /
Excavation (Stage 1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL07PIP010
300 dia Pipe Laying
(Stage 1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL07PIP020
300 dia Pipe Laying
and protection by GRE pipe with steel sleeve (Stage 1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL07PIP030
Backfilling (Stage
1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL07PIP035
Traffic Diversion
(if required)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL07PIP040
300 dia Pipe Laying
(Stage 2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL07SHD005
Water - Test &
Connect new pipe (Engineer / RTA Release Provisional Sums)
Activity:

Page 494

27in142r3
- Using Existing Valves
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTADSL07SHD010
Water - Removal of
existing water pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL18APP005
Line 18-1 Submittal
of Application for Piling / Excavation NOC's to DEWA WD
(According to Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL18APP010
Line 18-1 Approval
of Piling / Excavation NOC's from DEWA WD(According to
Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL18APP015
Line 18-2 Submittal
of Application for Piling / Excavation NOC's to DEWA WD
(According to Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL18APP020
Line 18-2 Approval
of Piling / Excavation NOC's from DEWA WD(According to
Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL18PIP010
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL18PIP020
300 dia Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL18PIP030
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL18PIP040
Valve Chambers /
Foundations for Valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL18SHD010
Water - Test &
Connect new pipe (Engineer / RTA Release Provisional Sums)
- Using Existing Valves
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL18SHD020
Water - Removal of
existing water pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL19APP005
Line 19-1 Submittal
of Application for Piling / Excavation NOC's to DEWA
WD(According to Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL19APP010
Line 19-1 Approval
of Piling / Excavation NOC's from DEWA WD(According to
Page 495

27in142r3
Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL19APP015
Line 19-2 Submittal
of Application for Piling / Excavation NOC's to DEWA
WD(According to Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL19APP020
Line 19-2 Approval
of Piling / Excavation NOC's from DEWA WD(According to
Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL19APP025
Line 19-3 Submittal
of Application for Piling / Excavation NOC's to DEWA
WD(According to Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL19APP030
Line 19-3 Approval
of Piling / Excavation NOC's from DEWA WD(According to
Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL19FIN010
Installation of
Valves
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL19PIP010
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL19PIP020
300 dia Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL19PIP030
Valve Chambers /
Foundations for Valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL19PIP040
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL19SHD010
Water - Test &
Connect new pipe (Engineer / RTA Release Provisional Sums)
- Using Existing Valves
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL19SHD020
Water - Removal of
existing water pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL20APP005
Line 20-1 Submittal
of Application for Piling / Excavation NOC's to DEWA
WD(According to Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL20APP010
Line 20-1 Approval
of Piling / Excavation NOC's from DEWA WD(According to
Page 496

27in142r3
Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL20APP015
Line 20-2 Submittal
of Application for Piling / Excavation NOC's to DEWA
WD(According to Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL20APP020
Line 20-2 Approval
of Piling / Excavation NOC's from DEWA WD(According to
Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL20APP025
Line 20-3 Submittal
of Application for Piling / Excavation NOC's to DEWA
WD(According to Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL20APP030
Line 20-3 Approval
of Piling / Excavation NOC's from DEWA WD(According to
Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL21APP005
Line 21-1 Submittal
of Application for Piling / Excavation NOC's to DEWA
WD(According to Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL21APP010
Line 21-1 Approval
of Piling / Excavation NOC's from DEWA WD(According to
Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL21APP015
Line 21-2 Submittal
of Application for Piling / Excavation NOC's to DEWA
WD(According to Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL21APP020
Line 21-2 Approval
of Piling / Excavation NOC's from DEWA WD(According to
Engineer Resolution Design)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL21APP25
Line 21-2
Construction of Approved Proposal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL21FIN010
Installation of
Valves
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL21PIP010
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL21PIP020
300 dia Pipe Laying
Page 497

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL21PIP030
Valve Chambers /
Foundations for Valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL21PIP040
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL21SHD010
Water - Test &
Connect new pipe (Engineer / RTA Release Provisional Sums)
- Using Existing Valves
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTDWTUNDL21SHD020
Water - Removal of
existing water pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL04APP005
DEWA-ED 132 kv Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL04APP010
DEWA-ED 132 kv Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL04APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL04APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL04PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL04PIP010
Support for
protection slab construction (walls with ducts)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL04PIP015
Opening of Existing
trough cover (After DEWA Permit)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL04PIP018
Manual Removal of
existing dune sand
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL04PIP020
Slewing of pilot
cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL04PIP025
Lay 3 Nos. Spare
power cable laying inside trough
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL04PIP030
Sand Filling
Page 498

Activity:
cables
Activity:
placement
Activity:
Compaction

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-UTELEADNL04PIP035
Sheath test for new
Project:
Max-CL14(2)R6-UP004
CO-UTELEADNL04PIP040
Trough cover
Project:
Max-CL14(2)R6-UP004
CO-UTELEADNL04PIP050
Backfilling &

Project:
Max-CL14(2)R6-UP004
CO-UTELEADNL04PIP060
Testing Works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL05APP005
DEWA-ED 132 kv Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL05APP010
DEWA-ED 132 kv Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL05APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL05APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL05PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL05PIP010
Support for
protection slab construction (walls with ducts)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL05PIP015
Opening of Existing
trough cover (After DEWA Permit)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL05PIP020
Manual Removal of
existing dune sand
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL05PIP025
Slewing of pilot
cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL05PIP030
Lay 3 Nos. Spare
power cable laying inside trough
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL05PIP035
Sand Filling
Project:
Max-CL14(2)R6-UP004
Activity:

Page 499

Activity:
cables
Activity:
placement
Activity:
Compaction

27in142r3
CO-UTELEADNL05PIP040

Sheath test for new

Project:
Max-CL14(2)R6-UP004
CO-UTELEADNL05PIP045
Trough cover
Project:
Max-CL14(2)R6-UP004
CO-UTELEADNL05PIP050
Backfilling &

Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL05PIP060
Testing Works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL06APP005
DEWA-ED 132 kv Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL06APP010
DEWA-ED 132 kv Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL06APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL06APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL06PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL06PIP010
Installation of
Polystyrene sheet 50mm
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL06PIP015
Installation of
Protection slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL06PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07APP005
DEWA-ED 132 kv Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07APP010
DEWA-ED 132 kv Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07APP020
Approval of
Page 500

27in142r3
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07PIP010
Installation of
Protection slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07PIP015
Installation of
Polystyrene sheet 50mm
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07PIP020
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07PIP025
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07PIP030
Installation of
Protection slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07PIP035
Installation of
Polystyrene sheet 50mm
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07PIP040
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07PIP045
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07PIP050
Installation of
Protection slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07PIP055
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07PIP060
Installation of
Polystyrene sheet 50mm
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07PIP065
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07PIP070
Extension of
existing duct
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADNL07PIP075
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL01APP005
DEWA-ED 132 kv Page 501

27in142r3
Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL01APP010
DEWA-ED 132 kv Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL01APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL01APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL01APP20
Submittal of
Application for Excavation NOC's to DEWA ED (Over Head
Lines)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL01APP25
Approval of
Excavation NOC's from DEWA ED (Over Head Lines)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL01PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL01PIP010
Installation of
Polystyrene sheet 50mm
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL01PIP015
Installation of
Protection slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL01PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL01PIP025
Construction of
Safety Concrete Barriers for Exiting Pylons
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL02APP005
DEWA-ED 132 kv Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL02APP010
DEWA-ED 132 kv Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL02APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL02APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Page 502

Activity:
Excavation

27in142r3
CO-UTELEADSL02PIP005

Setting out /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL02PIP007
Support for
protection slab construction (walls with ducts)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL02PIP010
Opening of Existing
trough cover (After DEWA Permit)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL02PIP015
Manual Removal of
existing dune sand
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL02PIP020
Slewing of pilot
cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL02PIP025
Lay 3 Nos. Spare
power cable laying inside trough
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL02PIP030
Sand Filling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL02PIP040
Sheath test for new
cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL02PIP050
Trough cover
placement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL02PIP060
Backfilling &
Compaction
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL02PIP070
Testing Works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL03APP005
DEWA-ED 132 kv Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL03APP010
DEWA-ED 132 kv Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL03APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL03APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL03PIP005
Setting out /
Page 503

27in142r3
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL03PIP010
Installation of
Protection slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL03PIP015
Installation of
Polystyrene sheet 50mm
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEADSL03PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEMARL08APP005
DEWA-ED 132 kv Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEMARL08APP010
DEWA-ED 132 kv Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEMARL08APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEMARL08APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEMARL08PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEMARL08PIP010
Installation of
Polystyrene sheet 50mm
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEMARL08PIP015
Installation of
Protection slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELEMARL08PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL06APP005
DEWA-ED - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL06APP010
DEWA-ED - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL06APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL06APP020
Approval of
Excavation NOC's from DEWA ED
Page 504

Activity:
Excavation

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-UTELLADNL06PIP005
Setting out /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL06PIP010
Installation of
ducts for 1x11kv ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL06PIP015
Concrete Encasement
of ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL06PIP020
Bitumen painting of
ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL06PIP025
Cable Pulling of
1x11kv cable in ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL06PIP030
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL06SHD005
Electrical Approval of DEWA-ED & Shut Down of 11kv Cable
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL06SHD010
Electrical Diconnect power and connect to new line (Engineer / RTA
Release Provisional Sums)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL06SHD015
Electrical Removal of old cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL08APP005
DEWA-ED - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL08APP010
DEWA-ED - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL08APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL08APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL08PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL08PIP010
Installation of
Page 505

27in142r3
Polystyrene sheet 50mm
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL08PIP015
Installation of
Protection slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADNL08PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL01APP005
DEWA-ED - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL01APP010
DEWA-ED - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL01APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL01APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL01APP025
Submittal of
Application for Excavation NOC's to DEWA ED (Over Head
Lines)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL01APP030
Approval of
Excavation NOC's from DEWA ED (Over Head Lines)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL01PIP005
Setting out /
Excavation (Line1-1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL01PIP010
Installation of
Polystyrene sheet 50mm (Line1-1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL01PIP015
Installation of
Protection slab (Line1-1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL01PIP020
Backfilling
(Line1-1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL01PIP025
Setting out /
Excavation (Line1-2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL01PIP030
Installation of
Protection slab (Line1-2)
Project:
Max-CL14(2)R6-UP004
Page 506

27in142r3
Activity:
CO-UTELLADSL01PIP035
Installation of
Polystyrene sheet 50mm (Line1-2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL01PIP040
Backfilling
(Line1-2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL01PIP045
Setting out /
Excavation (Line1-3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL01PIP050
Installation of
Protection slab (Line1-3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL01PIP055
Installation of
Polystyrene sheet 50mm (Line1-3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL01PIP060
Backfilling
(Line1-3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL03APP005
DEWA-ED - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL03APP010
DEWA-ED - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL03APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL03APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL03PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL03PIP010
Slewing of Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL03PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL04APP005
DEWA-ED - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL04APP010
DEWA-ED - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLADSL04PIP005
Setting out /
Page 507

27in142r3
Excavation
Activity:
Activity:
Activity:
Submittal
Activity:
Approval (inc.
Activity:
12x11kv Cables
Activity:
12x11kv Cables
Activity:
18x11kv Cables
Activity:
Submittal

Project:
Max-CL14(2)R6-UP004
CO-UTELLADSL04PIP010
Slewing of Cables
Project:
Max-CL14(2)R6-UP004
CO-UTELLADSL04PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTELLCAUL12APP005
DEWA-ED - Drawings
Project:
Max-CL14(2)R6-UP004
CO-UTELLCAUL12APP010
DEWA-ED - Drawings
Authrities)
Project:
Max-CL14(2)R6-UP004
CO-UTELLCAUL12PIP035
Installation of
+ 4 Nos. spare + 4 Nos. LV Cables
Project:
Max-CL14(2)R6-UP004
CO-UTELLCAUL12PIP040
Installation of
+ 4 Nos. spare + 4 Nos. LV Cables
Project:
Max-CL14(2)R6-UP004
CO-UTELLCAUL12PIP050
Installation of
+ 6 Nos. spare
Project:
Max-CL14(2)R6-UP004
CO-UTELLDBNL12APP005
DEWA-ED - Drawings

Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLDBNL12APP010
DEWA-ED - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLDBNL12PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLDBNL12PIP010
Installation of
Protection slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLDBNL12PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL05APP005
DEWA-ED - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL05APP010
DEWA-ED - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL05PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Page 508

27in142r3
CO-UTELLMARL05PIP010
Slewing of Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL05PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL09APP005
DEWA-ED Line 9 Slab
Protection for existing Cables - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL09APP010
DEWA-ED Line 9 Slab
Protection for existing Cables - Drawings Approval (inc.
Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL09PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL09PIP010
Lowering of
existing cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL09PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL10APP005
DEWA-ED - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL10APP010
DEWA-ED - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL10APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL10APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL10PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL10PIP010
Installation of
Polystyrene sheet 50mm
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL10PIP015
Installation of
Protection slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL10PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11APP005
DEWA-ED - Drawings
Submittal
Activity:

Page 509

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11APP010
DEWA-ED - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP010
Slewing of Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP015
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP025
Slewing of Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP030
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP035
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP040
Slewing of Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP045
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP050
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP055
Slewing of Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP060
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP065
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP070
Slewing of Cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP075
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP080
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP084
Installation of
Protection slab
Page 510

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP090
Installation of
Polystyrene sheet 50mm
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP095
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP100
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP105
Installation of
Protection slab
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP110
Installation of
Polystyrene sheet 50mm
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTELLMARL11PIP115
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL01APP005
Etisalat - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL01APP010
Etisalat - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL01APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL01APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL01APP025
Approval & Delivery
of Free Issue Materials
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL01APP030
Submittal of
Application for Excavation NOC's to DEWA ED (Over Head
Lines)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL01APP035
Approval of
Excavation NOC's from DEWA ED (Over Head Lines)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL01FIN005
Installation of
Cables, frames and covers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL01PIP005
Setting out /
Excavation
Page 511

Activity:
existing cables
Activity:
ducts
Activity:
Manholes
Activity:
Activity:
Commissioning

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-UTETIADSL01PIP010
Protection slab for
Project:
Max-CL14(2)R6-UP004
CO-UTETIADSL01PIP015
Lay 20W Etisalat
Project:
Max-CL14(2)R6-UP004
CO-UTETIADSL01PIP020
Construction of
Project:
Max-CL14(2)R6-UP004
CO-UTETIADSL01PIP025
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTETIADSL01SHD005
Change Over For

Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL01SHD010
Connect to new Line
(Engineer / RTA Release Provisional Sums)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL01SHD015
Removal of old
cables
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL02APP005
Etisalat - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL02APP010
Etisalat - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL02APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL02APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL02APP025
Approval & Delivery
of Free Issue Materials
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL02PIP005
Setting out /
Excavation (Line 2-1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL02PIP010
Protection slab for
existing cables (Line 2-1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL02PIP015
Backfilling (Line
2-1)
Page 512

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL02PIP020
Setting out /
Excavation (Line 2-2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL02PIP025
Protection slab for
existing cables (Line 2-2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL02PIP030
Backfilling (Line
2-2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL02PIP035
Setting out /
Excavation (Line 2-3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL02PIP040
Slewing of cables
(Line 2-3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIADSL02PIP045
Backfilling (Line
2-3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETICAUL06APP005
Etisalat - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETICAUL06APP010
Etisalat - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETICAUL06APP015
Approval & Delivery
of Free Issue Materials
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETICAUL06PIP005
Installation of 4
Nos. + 4 Nos. of ETISALAT ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETICAUL06PIP010
Installation of 4
Nos. + 4 Nos. of ETISALAT ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETICAUL06PIP015
Installation of 4
Nos. + 4 Nos. of ETISALAT ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETICAUL06PIP020
Installation of 4
Nos. + 4 Nos. of ETISALAT ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETICAUL06PIP20
Connection to
existing network
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL04APP005
Etisalat - Drawings
Page 513

27in142r3
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL04APP010
Etisalat - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL04APP015
Approval & Delivery
of Free Issue Materials
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL04PIP005
Setting out /
Excavation (Line 4-1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL04PIP010
Relocation of Ducts
(Line (4-1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL04PIP015
Backfilling (Line
4-1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL04PIP020
Setting out /
Excavation (Line 4-2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL04PIP025
Relocation of Ducts
(Line (4-2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL04PIP030
Backfilling (Line
4-2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL05APP005
Etisalat - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL05APP010
Etisalat - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL05APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL05APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL05APP025
Approval & Delivery
of Free Issue Materials
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL05PIP005
Setting out /
Excavation (Line 5-1)
Project:
Max-CL14(2)R6-UP004
Page 514

27in142r3
Activity:
CO-UTETIDBNL05PIP010
Protection slab for
existing cables (Line 5-1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL05PIP015
Backfilling (Line
5-1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL05PIP020
Setting out /
Excavation (Line 5-2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL05PIP025
Protection slab for
existing cables (Line 5-2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL05PIP030
Backfilling (Line
5-2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL05PIP035
Setting out /
Excavation (Line 5-3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL05PIP040
Protection slab for
existing cables (Line 5-3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIDBNL05PIP045
Backfilling (Line
5-3)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIMARGENINT005
Completion of
Bridge Deckslab S24
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIMARGENINT010
Completion of
Bridge Deckslab S25
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIMARL07APP000
Etisalat - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIMARL07APP010
Etisalat - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIMARL07APP015
Approval & Delivery
of Free Issue Materials
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIMARL07PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIMARL07PIP010
Installtion of
Ducts & Cables
Page 515

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTETIMARL07PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04APP005
Irrigation Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04APP010
Irrigation Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP010
2Wx150 dia Duct
Crossings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP020
1Wx300 dia Duct
Crossings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP030
2Wx150 dia Duct
Crossings
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP035
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP045
2Wx150 dia Extension of Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADNL04PIP050
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL01APP005
Irrigation Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL01APP010
Irrigation Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL01APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL01APP020
Approval of
Excavation NOC's from DEWA ED
Page 516

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL01FIN005
Installation of
Wash out valve and air valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL01PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL01PIP010
600 dia Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL01PIP015
Valve Chambers /
Foundations for Valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL01PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL01PIP025
Setting out /
Excavation (Stage 1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL01PIP030
600 dia Pipe Laying
(Stage 1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL01PIP035
Backfilling (Stage
1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL01PIP045
600 dia pipe Laying
(Stage 2) - Under Existing Diverted Road
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL01SHD005
Irrigation - Test &
Connect new pipe (Engineer / RTA Release Provisional Sums)
- Using Existing Valves
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL01SHD010
Irrigation Removal of existing pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL02APP005
Irrigation Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL02APP010
Irrigation Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL02APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL02APP020
Approval of
Excavation NOC's from DEWA ED
Page 517

Activity:
Excavation

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-UTIRRADSL02PIP005
Setting out /

Project:
Max-CL14(2)R6-UP004
CO-UTIRRADSL02PIP010
600 dia Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL02PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL02SHD005
Irrigation - Test &
Connect new pipe (Engineer / RTA Release Provisional Sums)
- Using Existing Valves
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRADSL02SHD010
Irrigation Removal of existing pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRCAUL07APP005
Irrigation Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRCAUL07APP010
Irrigation Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRCAUL07PIP015
Installation of 150
dia GRP for TSE Supply
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRCAUL07PIP020
Installation of 150
dia GRP for TSE Supply
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRCAUL07PIP025
Installation of 150
dia GRP for TSE Supply
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL05APP005
Irrigation Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL05APP010
Irrigation Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL05APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL05APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL05PIP005
Setting out /
Excavation
Activity:

Page 518

Activity:
Protection works

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-UTIRRMARL05PIP010
Line 6 Slab

Project:
Max-CL14(2)R6-UP004
CO-UTIRRMARL05PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL06APP005
Irrigation Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL06APP015
Irrigation Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL06APP020
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL06APP025
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL06PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL06PIP010
300 dia Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL06PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL06PIP020
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL06PIP025
300 dia Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL06PIP030
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL06PIP035
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL06PIP040
300 dia Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL06PIP045
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL06PIP45
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL06PIP55
300 dia Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:

Page 519

27in142r3
CO-UTIRRMARL06PIP65
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL06SHD005
Irrigation Connect new pipe (Engineer / RTA Release Provisional
- Using Existing Valves
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL06SHD010
Irrigation Removal of existing pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL08APP005
Irrigation Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL08APP010
Irrigation Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL08APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL08APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL08FIN005
Installation
Wash out valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL08PIP004
Installation
dia GRP for TSE Supply (Bridge S25)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL08PIP015
Installation
dia GRP for TSE Supply (Bridge S24)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL08PIP045
Installation
dia GRP for TSE Supply (Bridge S23)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL08PIP060
Installation
dia GRP for TSE Supply (Bridge S22)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL08PIP075
Installation
dia GRP for TSE Supply (Bridge S20 / Bridge S21)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRMARL08PIP75
Installation
dia GRP for TSE Supply (Bridge S30)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRUNDL03APP100
Irrigation Drawings Submittal
Activity:

Page 520

Test &
Sums)

of
of 150
of 150
of 150
of 150
of 150
of 150

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRUNDL03APP105
Irrigation Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRUNDL03PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRUNDL03PIP010
250 dia Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRUNDL03PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRUNDL03SHD005
Irrigation - Test &
Connect new pipe (Engineer / RTA Release Provisional Sums)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTIRRUNDL03SHD010
Irrigation Removal of existing pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMFOADNL01APP010
Military Fibre
Optic Cables - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMFOADNL01APP020
Military Fibre
Optic Cables - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMFOADNL01PIP010
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMFOADNL01PIP020
Execution of
Military Fibre Optic Cables works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMFOADNL01PIP030
Backfilling
including Shutdown
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMFOADSL01APP010
Military Fibre
Optic Cables - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMFOADSL01APP020
Military Fibre
Optic Cables - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMFOADSL01PIP010
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMFOADSL01PIP020
Execution of
Military Fibre Optic Cables works
Project:
Max-CL14(2)R6-UP004
Page 521

27in142r3
Activity:
CO-UTMFOADSL01PIP030
Backfilling
including Shutdown
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMFOINTL01APP010
Military Fibre
Optic Cables - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMFOINTL01APP020
Military Fibre
Optic Cables - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMFOINTL01PIP010
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMFOINTL01PIP020
Execution of
Military Fibre Optic Cables works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMFOINTL01PIP030
Backfilling
including Shutdown
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWIAPP005
Utility Room Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWIAPP010
Utility Room Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON005
Preparation Works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON010
Utility Room Wall
Reinforcement - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON015
Utility Room Wall
Formwork - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON020
Utility Room Wall
Concrete - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON025
Utility Room Wall
Curing / Removal of Formwork - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON030
Utility Room Wall
Reinforcement - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON035
Utility Room Wall
Formwork - Stage 2
Project:
Max-CL14(2)R6-UP004
Page 522

27in142r3
Activity:
CO-UTMISSHABWICON040
Utility Room Wall
Concrete - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON045
Utility Room Wall
Curing / Removal of Formwork - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON050
Utility Room Top
Slab Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON055
Utility Room Top
Slab Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON060
Utility Room Top
Slab Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWICON065
Utility Room Top
Slab Curing / Removal of Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWIFIN005
Installation of
Platforms, Handrails, Frames, Covers and Ladders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHABWIFIN010
Bridge Utilities
Final Connections - Electrical
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANAPP005
Wet Utilities Shaft
1 - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANAPP010
Wet Utilities Shaft
1 - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANAPP015
Wet Utilities Shaft
2 - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANAPP020
Wet Utilities Shaft
2 - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANAPP025
Electrical
Utilities Shaft - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANAPP030
Electrical
Utilities Shaft - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON005
Wet Utility Shaft 1
Piling Works
Page 523

Activity:
Excavation

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-UTMISSHALANCON010
Wet Utility Shaft 1

Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON015
Wet Utility
Pile Head Cutting
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON020
Wet Utility
Blinding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON025
Wet Utility
Bottom Slab Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON030
Wet Utility
Bottom Slab - Installation of Shutters
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON035
Wet Utility
Bottom Slab - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON040
Wet Utility
Curing / Removal of Shutters
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON045
Wet Utility
Installation of Shutters for Mass Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON050
Wet Utility
Pouring Mass Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON055
Wet Utility
Wall Reinforcement - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON060
Wet Utility
Wall Formwork - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON065
Wet Utility
Wall Concrete - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON070
Wet Utility
Wall Curing / Removal of Formwork - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON072
Wet Utility
Wall Waterproofing & Backfill
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON075
Wet Utility
Page 524

Shaft 1
Shaft 1
Shaft 1
Shaft 1
Shaft 1
Shaft 1
Shaft 1
Shaft 1
Shaft 1
Shaft 1
Shaft 1
Shaft 1
Shaft 1
Shaft 1

27in142r3
Wall Reinforcement - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON080
Wet Utility
Wall Formwork - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON085
Wet Utility
Wall Concrete - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON090
Wet Utility
Wall Curing / Removal of Formwork - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON095
Wet Utility
Wall Reinforcement - Stage 3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON100
Wet Utility
Wall Formwork - Stage 3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON105
Wet Utility
Wall Concrete - Stage 3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON110
Wet Utility
Wall Curing / Removal of Formwork - Stage 3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON115
Wet Utility
Top Slab Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON120
Wet Utility
Top Slab Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON125
Wet Utility
Top Slab Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON130
Wet Utility
Top Slab Curing / Removal of Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON135
Wet Utility
Piling Works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON140
Wet Utility
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON145
Wet Utility
Pile Head Cutting
Project:
Max-CL14(2)R6-UP004
Page 525

Shaft 1
Shaft 1
Shaft 1
Shaft 1
Shaft 1
Shaft 1
Shaft 1
Shaft 1
Shaft 1
Shaft 1
Shaft 1
Shaft 2
Shaft 2
Shaft 2

Activity:
Blinding

27in142r3
CO-UTMISSHALANCON150

Wet Utility Shaft 2

Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON155
Wet Utility
Bottom Slab Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON160
Wet Utility
Bottom Slab - Installation of Shutters
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON165
Wet Utility
Bottom Slab - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON170
Wet Utility
Curing / Removal of Shutters
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON175
Wet Utility
Installation of Shutters for Mass Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON180
Wet Utility
Pouring Mass Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON185
Wet Utility
Wall Reinforcement - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON190
Wet Utility
Wall Formwork - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON195
Wet Utility
Wall Concrete - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON200
Wet Utility
Wall Curing / Removal of Formwork - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON202
Wet Utility
Wall Waterproofing & Backfill
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON205
Wet Utility
Wall Reinforcement - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON210
Wet Utility
Wall Formwork - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON215
Wet Utility
Wall Concrete - Stage 2
Page 526

Shaft 2
Shaft 2
Shaft 2
Shaft 2
Shaft 2
Shaft 2
Shaft 2
Shaft 2
Shaft 2
Shaft 2
Shaft 2
Shaft 2
Shaft 2
Shaft 2

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON220
Wet Utility Shaft 2
Wall Curing / Removal of Formwork - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON225
Wet Utility Shaft 2
Wall Reinforcement - Stage 3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON230
Wet Utility Shaft 2
Wall Formwork - Stage 3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON235
Wet Utility Shaft 2
Wall Concrete - Stage 3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON240
Wet Utility Shaft 2
Wall Curing / Removal of Formwork - Stage 3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON245
Wet Utility Shaft 2
Top Slab Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON250
Wet Utility Shaft 2
Top Slab Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON255
Wet Utility Shaft 2
Top Slab Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON260
Wet Utility Shaft 2
Top Slab Curing / Removal of Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON270
Electrical Utility
Shaft Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON280
Electrical Utility
Shaft Blinding
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON285
Electrical Utility
Shaft Bottom Slab Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON290
Electrical Utility
Shaft Bottom Slab - Installation of Shutters
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON295
Electrical Utility
Shaft Bottom Slab - Concrete Pouring
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON300
Electrical Utility
Page 527

27in142r3
Shaft Curing / Removal of Shutters
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON305
Electrical Utility
Shaft Installation of Shutters for Mass Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON310
Electrical Utility
Shaft Pouring Mass Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON315
Electrical Utility
Shaft Wall Reinforcement - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON320
Electrical Utility
Shaft Wall Formwork - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON325
Electrical Utility
Shaft Wall Concrete - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON330
Electrical Utility
Shaft Wall Curing / Removal of Formwork - Stage 1
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON332
Electrical Utility
Shaft Wall Waterproofing & Backfill
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON335
Electrical Utility
Shaft Wall Reinforcement - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON340
Electrical Utility
Shaft Wall Formwork - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON345
Electrical Utility
Shaft Wall Concrete - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON350
Electrical Utility
Shaft Wall Curing / Removal of Formwork - Stage 2
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON355
Electrical Utility
Shaft Wall Reinforcement - Stage 3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON360
Electrical Utility
Shaft Wall Formwork - Stage 3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON365
Electrical Utility
Shaft Wall Concrete - Stage 3
Project:
Max-CL14(2)R6-UP004
Page 528

27in142r3
Activity:
CO-UTMISSHALANCON370
Electrical Utility
Shaft Wall Curing / Removal of Formwork - Stage 3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON375
Electrical Utility
Shaft Top Slab Reinforcement
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON380
Electrical Utility
Shaft Top Slab Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON385
Electrical Utility
Shaft Top Slab Concrete
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANCON390
Electrical Utility
Shaft Top Slab Curing / Removal of Formwork
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANFIN005
Installation of
Platforms, Handrails, Frames, Covers and Ladders - Wet
Utilities Shaft
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANFIN010
Bridge Utilities
Final Connections - HDPE Sewer and GRP Irrigation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANFIN015
Bridge Utilities
Final Connections - GRE Potable Water pipes
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANFIN020
Installation of
Frames, Covers and Ladders - Electrical Utilities Shaft
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANFIN025
Installation of
Platforms, Handrails, Frames, Covers and Ladders Electrical Utilities Shaft
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTMISSHALANFIN030
Bridge Utilities
Final Connections - Electrical (Landside only)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTCAUL16APP005
Potable Water
Supply - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTCAUL16APP010
Potable Water
Supply - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTCAUL16PIP005
Installation of
2x300 dia GRE Water pipes (Bridge S26)
Project:
Max-CL14(2)R6-UP004
Page 529

27in142r3
Activity:
CO-UTPOTCAUL16PIP007
SCADA Installation of 2x24 Fibre Optic Cable (Bridge S26)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTCAUL16PIP010
Installation of
2x300 dia GRE Water pipes (Bridge S27)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTCAUL16PIP012
SCADA Installation of 2x24 Fibre Optic Cable (Bridge S27)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTCAUL16PIP015
Installation of
2x300 dia GRE Water pipes (Bridge S28)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTCAUL16PIP017
SCADA Installation of 2x24 Fibre Optic Cable (Bridge S28)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTCAUL16PIP17
Construction of
Chamber at island & connections
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTMARL17APP005
Potable Water
Supply - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTMARL17APP010
Potable Water
Supply - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTMARL17APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTMARL17APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTMARL17PIP010
Installation of
2x300 dia GRE Water pipes (Bridge S25)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTMARL17PIP012
SCADA Installation of 2x24 Fibre Optic Cable (Bridge S25)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTMARL17PIP025
Installation of
2x300 dia GRE Water pipes (Bridge S24)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTMARL17PIP027
SCADA Installation of 2x24 Fibre Optic Cable (Bridge S24)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTMARL17PIP080
Installation of
2x300 dia GRE Water pipes (Bridge S23)
Page 530

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTMARL17PIP082
SCADA Installation of 2x24 Fibre Optic Cable (Bridge S23)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTMARL17PIP095
Installation of
2x300 dia GRE Water pipes (Bridge S20 to S22)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTPOTMARL17PIP097
SCADA Installation of 2x24 Fibre Optic Cable (Bridge S20 to S22)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTRTAADSL01APP005
RTA Spare Duct Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTRTAADSL01APP010
RTA Spare Duct Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTRTAADSL01PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTRTAADSL01PIP010
Construction of
Spare Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTRTAADSL01PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04APP005
Sewerage - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04APP010
Sewerage - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04FIN005
Installation of
Frames, Covers and Ladders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP010
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Page 531

Activity:
(1) / (2)
Activity:
chambers
Activity:
Activity:
Excavation

27in142r3
CO-UTSEWADNL04PIP012

Pipe Laying NDRC

Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL04PIP015
Construction of
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL04PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL04PIP025
Setting out /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP030
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP035
Construction of
chambers & Thrust Blocks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP040
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP045
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP050
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP055
Construction of
Thrust Blocks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP060
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP065
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP070
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP073
Pipe Laying NDRC
(1) / (2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP075
Construction of
Thrust Blocks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL04PIP080
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL05APP005
Sewerage - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Page 532

27in142r3
Activity:
CO-UTSEWADNL05APP015
Sewerage - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL05APP020
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL05APP025
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL05FIN005
Installation of
Frames, Covers and Ladders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL05PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL05PIP010
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL05PIP015
Construction of
chambers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL05PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL05PIP025
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL05PIP030
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL05PIP040
Construction of
chambers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL05PIP045
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL05PIP050
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL05PIP055
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL05PIP060
Construction of
chambers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL05PIP065
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL05PIP070
Setting out /
Excavation
Page 533

Activity:
Activity:
Thrust Block
Activity:
Activity:
Submittal

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL05PIP075
Pipe Laying
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL05PIP080
Construction of
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL05PIP085
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL06APP005
Sewerage - Drawings

Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06APP010
Sewerage - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06FIN195
Construction of
chambers & Thrust Blocks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06FIN200
Installation of
Frames, Covers and Ladders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP005
TRAM AREA FREE TO
WORK (NOTICE TO TENDER "PS1/17.1"
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP010
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP015
Pipe Laying and
Concrete Surround
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP020
Construction of
chambers & Thrust Blocks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP025
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP027
TRAM AREA FREE TO
WORK (NOTICE TO TENDER "PS1/17.1"
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP030
Setting out /
Page 534

27in142r3
Excavation
Activity:
Activity:
(1)

Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL06PIP035
Pipe Laying
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL06PIP037
Pipe Laying NDRC

Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP040
Construction of
chambers & Thrust Blocks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP045
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP047
TRAM AREA FREE TO
WORK (NOTICE TO TENDER "PS1/17.1"
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP050
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP055
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP057
Pipe Laying NDRC
(1) / (2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP060
Construction of
chambers & Thrust Blocks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP065
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP067
TRAM AREA FREE TO
WORK (NOTICE TO TENDER "PS1/17.1"
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP070
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP075
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP080
Construction of
chambers & Thrust Blocks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP085
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP087
TRAM AREA FREE TO
WORK (NOTICE TO TENDER "PS1/17.1"
Project:
Max-CL14(2)R6-UP004
Page 535

Activity:
Excavation
Activity:
Activity:
(1) / (2)

27in142r3
CO-UTSEWADNL06PIP090

Setting out /

Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL06PIP095
Pipe Laying
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL06PIP097
Pipe Laying NDRC

Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP100
Construction of
chambers & Thrust Blocks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP105
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP107
TRAM AREA FREE TO
WORK (NOTICE TO TENDER "PS1/17.1"
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP110
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP115
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP117
Pipe Laying NDRC
(1) / (2)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP120
Construction of
chambers & Thrust Blocks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP125
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP127
TRAM AREA FREE TO
WORK (NOTICE TO TENDER "PS1/17.1"
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP130
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP135
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP140
Construction of
chambers & Thrust Blocks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP145
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP147
TRAM AREA FREE TO
WORK (NOTICE TO TENDER "PS1/17.1"
Page 536

Activity:
Excavation
Activity:
Activity:
(1)
Activity:
Thrust Blocks

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL06PIP150
Setting out /
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL06PIP155
Pipe Laying
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL06PIP157
Pipe Laying NDRC
Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL06PIP160
Construction of

Project:
Max-CL14(2)R6-UP004
CO-UTSEWADNL06PIP165
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP167
TRAM AREA FREE TO
WORK (NOTICE TO TENDER "PS1/17.1"
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP170
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP175
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP177
Pipe Laying NDRC
(1)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP185
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP245
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP255
Pipe Laying and
Concrete Surround
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP265
Construction of
chambers & Thrust Blocks
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWADNL06PIP275
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWCAUL01APP005
Sewerage - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWCAUL01APP010
Sewerage - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:

Page 537

27in142r3
Activity:
CO-UTSEWCAUL01PIP005
Installation of 315
dia HDPE Rising Main (Bridge S28)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWCAUL01PIP010
Installation of 315
dia HDPE Rising Main (Bridge S27)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWCAUL01PIP015
Installation of 315
dia HDPE Rising Main (Bridge S26)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWMARL02APP005
Sewerage - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWMARL02APP010
Sewerage - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWMARL02APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWMARL02APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWMARL02PIP010
Installation of 315
dia HDPE Rising Main (Bridge S25)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWMARL02PIP030
Installation of 315
dia HDPE Rising Main (Bridge S24)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWMARL03APP005
Sewerage - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWMARL03APP010
Sewerage - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWMARL03APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWMARL03APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWMARL03PIP010
Installation of 315
dia HDPE Rising Main (Bridge S23)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWMARL03PIP030
Installation of 315
dia HDPE Rising Main (Bridge S22)
Page 538

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSEWMARL03PIP050
Installation of 315
dia HDPE Rising Main (Bridge S20 / Bridge S21)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05APP005
Drainage - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05APP010
Drainage - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05APP025
Submittal for NOC
Permit from RTA/Metro Contractor
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05APP030
Review & Approvals
of NOC Permit from RTA/Metro Contractor
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05FIN005
Installation of
Accessories, Covers & Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP010
Pipe Laying 600 dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP015
Construction of
chambers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP023
Pipe Laying 315 dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP025
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP030
Pipe Laying 600 dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP035
Construction of
chambers
Page 539

Activity:
Activity:
Activity:
Excavation
Activity:
Activity:
chambers
Activity:
Activity:
Activity:
Excavation
Activity:
Activity:
NDRC
Activity:
chambers
Activity:
Activity:
Activity:
Excavation
Activity:
Activity:
chambers
Activity:
Activity:

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP040
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP043
Pipe Laying 315 dia
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP045
Setting out /
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP050
Pipe Laying 600 dia
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP055
Construction of
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP060
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP063
Pipe Laying 315 dia
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP065
Setting out /
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP070
Pipe Laying 600 dia
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP073
Pipe Laying 600 dia
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP075
Construction of
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP080
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP083
Pipe Laying 315 dia
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP084
Setting out /
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP090
Pipe Laying 600 dia
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP095
Construction of
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP100
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP103
Pipe Laying 315 dia
Project:
Max-CL14(2)R6-UP004
Page 540

Activity:
Excavation
Activity:
Activity:
chambers

27in142r3
CO-UTSTOADNL05PIP105

Setting out /

Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP110
Pipe Laying 600 dia
Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP115
Construction of

Project:
Max-CL14(2)R6-UP004
CO-UTSTOADNL05PIP120
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05PIP123
Pipe Laying 315 dia
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOADNL05SHD005
Drainage - Test &
Connect new pipe (Engineer / RTA Release Provisional
Sums-including Shutdown Approval)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL01APP005
Drainage - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL01APP010
Drainage - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL01FIN005
Installation of
Covers, Frames, Ladders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL01PIP002
Temporary Diversion
to commence Piling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL01PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL01PIP010
Construction of
chambers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL01PIP015
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL01PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL01SHD005
Drainage - Test &
Connect new pipe (Engineer / RTA Release Provisional Sums)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL01SHD010
Drainage - Removal
of existing pipe
Project:
Max-CL14(2)R6-UP004
Activity:

Page 541

Activity:
Submittal

27in142r3
CO-UTSTOUNDL02APP005

Drainage - Drawings

Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL02APP010
Drainage - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL02FIN005
Installation of
Covers, Frames, Ladders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL02PIP002
Temporary Diversion
for to commence Piling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL02PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL02PIP010
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL02PIP015
Construction of
chambers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL02PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL02SHD005
Drainage - Test &
Connect new pipe (Engineer / RTA Release Provisional Sums)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL02SHD010
Drainage - Removal
of existing pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL03APP005
Drainage - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL03APP010
Drainage - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL03FIN005
Installation of
Covers, Frames, Ladders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL03PIP002
Temporary Diversion
for to commence Piling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL03PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL03PIP010
Pipe Laying
Page 542

Activity:
chambers

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-UTSTOUNDL03PIP015
Construction of

Project:
Max-CL14(2)R6-UP004
CO-UTSTOUNDL03PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL03SHD005
Drainage - Test &
Connect new pipe (Engineer / RTA Release Provisional Sums)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL03SHD010
Drainage - Removal
of existing pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL04APP005
Drainage - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL04APP010
Drainage - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL04FIN005
Installation of
Covers, Frames
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL04PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL04PIP010
Pipe Laying and
Concrete Surround
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL04PIP015
Construction of
chambers
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL04PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL04SHD005
Drainage - Test &
Connect new pipe (Engineer / RTA Release Provisional Sums)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL04SHD010
Drainage - Removal
of existing pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL06APP005
Drainage - Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSTOUNDL06APP010
Drainage - Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:

Page 543

Activity:
Cap

27in142r3
CO-UTSTOUNDL06PIP005

Installation of End

Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBADSL01APP005
Seawater Intake Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBADSL01APP010
Seawater Intake Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBADSL01APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBADSL01APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBADSL01FIN005
Installation of Air
valve & Wash out valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBADSL01FIN010
Installation of
Covers, Frames, Ladders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBADSL01PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBADSL01PIP010
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBADSL01PIP015
Construction of Air
valve chamber
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBADSL01PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBADSL01PIP025
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBADSL01PIP030
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBADSL01PIP035
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBADSL01SHD005
SWI - Test &
Connect new pipe (Engineer / RTA Release Provisional Sums)
- Using Existing Valves
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBADSL01SHD010
SWI - Removal of
existing pipe
Page 544

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBMARL03APP005
Seawater Intake Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBMARL03APP010
Seawater Intake Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBMARL03PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBMARL03PIP010
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBMARL03PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBMARL03PIP020
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBMARL03PIP025
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBMARL03PIP030
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBMARL03PIP035
Slab protection
works
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBMARL03PIP040
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBMARL03PIP045
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBMARL03PIP050
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBMARL03SHD005
SWI- Test & Connect
new pipe (Engineer / RTA Release Provisional Sums) - Using
Existing Valves
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWBMARL03SHD010
SWI - Removal of
existing pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSADSL01APP005
Seawater Intake Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSADSL01APP010
Seawater Intake Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Page 545

27in142r3
Activity:
CO-UTSWSADSL01APP015
Submittal of
Application for Excavation NOC's to DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSADSL01APP020
Approval of
Excavation NOC's from DEWA ED
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSADSL01FIN005
Installation of Air
valve
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSADSL01FIN010
Installation of
Covers, Frames, Ladders
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSADSL01PIP005
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSADSL01PIP010
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSADSL01PIP015
Construction of Air
valve chamber
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSADSL01PIP020
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSADSL01PIP025
Setting out /
Excavation
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSADSL01PIP030
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSADSL01PIP035
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSADSL01PIP040
Protection of
existing 600 dia pipeline
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSADSL01SHD005
SWI- Test & Connect
new pipe (Engineer / RTA Release Provisional - Using
Existing Valves
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSADSL01SHD010
SWI - Removal of
existing pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSMARL03APP005
Seawater Intake Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSMARL03APP010
Seawater Intake Drawings Approval (inc. Authrities)
Page 546

Activity:
Excavation
Activity:
Activity:
Activity:
Excavation
Activity:
Activity:
Activity:
works
Activity:
Excavation

27in142r3
Project:
Max-CL14(2)R6-UP004
CO-UTSWSMARL03PIP005
Setting out /
Project:
Max-CL14(2)R6-UP004
CO-UTSWSMARL03PIP010
Pipe Laying
Project:
Max-CL14(2)R6-UP004
CO-UTSWSMARL03PIP015
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTSWSMARL03PIP020
Setting out /
Project:
Max-CL14(2)R6-UP004
CO-UTSWSMARL03PIP025
Pipe Laying
Project:
Max-CL14(2)R6-UP004
CO-UTSWSMARL03PIP030
Backfilling
Project:
Max-CL14(2)R6-UP004
CO-UTSWSMARL03PIP035
Slab protection
Project:
Max-CL14(2)R6-UP004
CO-UTSWSMARL03PIP040
Setting out /

Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSMARL03PIP045
Pipe Laying
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSMARL03PIP050
Backfilling
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSMARL03SHD005
SWI- Test & Connect
new pipe (Engineer / RTA Release Provisional Sums) - Using
Existing Valves
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTSWSMARL03SHD010
SWI - Removal of
existing pipe
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTTABDBNL01APP005
Tabreed Chilled
Water Pipeline - Drawings Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTTABDBNL01APP010
Tabreed Chilled
Water Pipeline - Drawings Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
CO-UTTABDBNL01PIP005
Extension of
existing 750mm dia Steel sleeve protection (NDRC)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDCSTKODOCASB005
As-Built Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Page 547

27in142r3
Activity:
PO-RUDCSTKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDCSTKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDCSTKODOCOAM005
O&M Manuals
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDCSTKODOCOAM010
O&M Manuals
Approval
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDUTTKODOCASB005
As-Built Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDUTTKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDUTTKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDUTTKODOCOAM005
O&M Manuals
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDUTTKODOCOAM010
O&M Manuals
Approval
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDWTTKODOCASB005
As-Built Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDWTTKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDWTTKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDWTTKODOCOAM005
O&M Manuals
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUDWTTKODOCOAM010
O&M Manuals
Approval
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUELETKODOCOAM005
O&M Manuals
Submittal
Page 548

Activity:
Approval
Activity:
Submittal

27in142r3
Project:
Max-CL14(2)R6-UP004
PO-RUELETKODOCOAM010
O&M Manuals
Project:
Max-CL14(2)R6-UP004
PO-RUETITKODOCASB005
As-Built Drawings

Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUETITKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUETITKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUETITKODOCOAM005
O&M Manuals
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUETITKODOCOAM010
O&M Manuals
Approval
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUIRRTKODOCASB005
As-Built Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUIRRTKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUIRRTKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUIRRTKODOCOAM005
O&M Manuals
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUIRRTKODOCOAM010
O&M Manuals
Approval
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUPWSTKODOCASB005
As-Built Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUPWSTKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUPWSTKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUPWSTKODOCOAM005
O&M Manuals
Page 549

27in142r3
Submittal
Activity:
Approval

Project:
Max-CL14(2)R6-UP004
PO-RUPWSTKODOCOAM010
O&M Manuals

Project:
Max-CL14(2)R6-UP004
Activity:
PO-RURODTKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSEWTKODOCASB005
As-Built Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSEWTKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSEWTKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSEWTKODOCOAM005
O&M Manuals
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSEWTKODOCOAM010
O&M Manuals
Approval
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSTOTKODOCASB005
As-Built Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSTOTKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSTOTKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSTOTKODOCOAM005
O&M Manuals
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSTOTKODOCOAM010
O&M Manuals
Approval
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSWITKODOCASB005
As-Built Drawings
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSWITKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Page 550

27in142r3
Activity:
PO-RUSWITKODOCFTO005
Engineer Issue
Taking Over Certificate
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSWITKODOCOAM005
O&M Manuals
Submittal
Project:
Max-CL14(2)R6-UP004
Activity:
PO-RUSWITKODOCOAM010
O&M Manuals
Approval
Project:
Max-CL14(2)R6-UP004
Activity:
PO-STBRITKODOCASB010
As-Built Drawings
Approval (inc. Authrities)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRMOBGRQSTFAPP005
Preparation and
Submittal of Site Facilities plans to Engineer / RTA / DM
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRMOBGRQSTFAPP010
Engineer's Approval
for Site Facilities plans
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRMOBGRQSTFAPP020
NOC's & Permits
from DM for Site Facilities plans
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRMOBGRQSTFAPP030
Permits from DEWA
Electricity Authority for Site Facilities
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRMOBGRQSTFAPP035
Permits from
Etisalat / DU for Site Facilities
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRMOBGRQSTFAPP040
Ready for Site
Mobilization
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRMOBGRQSTFOFF005
Ground Levelling
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRMOBGRQSTFOFF010
Installation of
Site Offices
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRMOBGRQSTFOFF015
Site Office Fencing
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRMOBGRQSTFOFF020
Site Office Ready
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRMOBGRQSTFPRY005
Submittal /
Approval of Precast Yard Layout
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRMOBGRQSTFPRY010
Ground Levelling
Project:
Max-CL14(2)R6-UP004
Page 551

Activity:
Precast Area
Activity:
Fencing
Activity:
Ready

27in142r3
PR-PRMOBGRQSTFPRY015

Preparation of

Project:
Max-CL14(2)R6-UP004
PR-PRMOBGRQSTFPRY020
Precast Yard
Project:
Max-CL14(2)R6-UP004
PR-PRMOBGRQSTFPRY025
Precast Yard Area

Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRMOBGRQSTFWSP005
Submittal /
Approval of Workshop / Store Area Location Layout
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRMOBGRQSTFWSP010
Ground Levelling
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRMOBGRQSTFWSP015
Preparation of
Workshop / Store Area
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRMOBGRQSTFWSP020
Workshop / Store
Area Fencing
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRMOBGRQSTFWSP025
Workshop / Store
Area Ready
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPODGENCTDMSD005
Milestone 1 Completion of 1200mm DEWA WD + 300mm Sewer + Tram Service
Road
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPRDGENCTDSTD005
Contract Award /
Letter of Acceptance
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPRDGENCTDSTD015
Notice to Commence
/ Commencement Date
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPRDGENCTDSTD030
General Preliminary
Works
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPRDGENCTDSTD035
Complete Issue of
Contract Drawings for Construction by Engineer / Client
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRPRDGENCTDSTD038
Receipt of
Variation Order for Milestone 1 Corridor from Engineer /
Client
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENHSE005
Receive of HSE
Page 552

27in142r3
Forms and Documents (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENHSE010
1st Submittal of
HSE Documents to Engineer
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENHSE015
1st Review of HSE
Documents (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENHSE020
1st Review of HSE
Documents (By Engineer / Client)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENHSE025
2nd Submittal of
HSE Documents to Engineer
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENHSE030
2nd Review of HSE
Documents (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENHSE035
2nd Review of HSE
Documents and Approval (By Engineer / Client)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENLOD005
Contractor to
Submit Preliminary List of Deliverables
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENLOD010
Engineer to Provide
Approved Numbering System for List of Deliverables
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENMSS005
Receive of Method
Statements Forms and Documents (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENMSS010
1st Submittal of
Method Statements to Engineer
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENMSS015
1st Review of
Method Statements (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENMSS020
1st Review of
Method Statements (By Engineer / Client)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENMSS025
2nd Submittal of
Method Statements to Engineer
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENMSS030
2nd Review of
Method Statements (By Engineer)
Project:
Max-CL14(2)R6-UP004
Page 553

27in142r3
Activity:
PR-PRTCSCOSGENMSS035
2nd Review of
Method Statements and Approval (By Engineer / Client)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC008
Receive Design
NOC's & ROW permits from Etisalat
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC010
Prepare and Submit
Construction NOC Permits from Etisalat
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC015
Review and Approve
Construction NOCs from Etisalat
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC020
Issuance of
Construction NOC's from Etisalat
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC022
Receive Design
NOC's & ROW permits from RTA Rail Agency
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC025
Prepare and Submit
Construction NOC Permits from RTA Rail Agency
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC030
Review and Approve
Construction NOCs from RTA Rail Agency
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC040
Issuance of
Construction NOC's from RTA Rail Agency
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC042
Receive Design
NOC's & ROW permits from Military FO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC045
Prepare and Submit
Construction NOC Permits from Military FO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC050
Review and Approve
Construction NOCs from Military FO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC055
Issuance of
Construction NOC's from Military FO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC058
Receive Design
NOC's & ROW permits from RTA ITS Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC060
Prepare and Submit
Construction NOC Permits from RTA ITS Department
Page 554

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC065
Review and Approve
Construction NOCs from RTA ITS Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC070
Issuance of
Construction NOC's from RTA ITS Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC073
Receive Design
NOC's & ROW permits from RTA Public Transport
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC075
Prepare and Submit
Construction NOC Permits from RTA Public Transport
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC080
Review and Approve
Construction NOCs from RTA Public Transport
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC085
Issuance of
Construction NOC's from RTA Public Transport
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC088
Receive Design
NOC's & ROW permits from DU
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC090
Prepare and Submit
Construction NOC Permits from DU
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC095
Review and Approve
Construction NOCs from DU
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC100
Issuance of
Construction NOC's from DU
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC102
Receive Design
NOC's & ROW permits from DEWA-WD and SCADA Water System
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC105
Prepare and Submit
Construction NOC Permits from DEWA-WD and SCADA Water
System
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC110
Review and Approve
Construction NOCs from DEWA-WD and SCADA Water System
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC115
Issuance of
Construction NOC's from DEWA-WD and SCADA Water System
Project:
Max-CL14(2)R6-UP004
Page 555

27in142r3
Activity:
PR-PRTCSCOSGENNOC118
Receive Design
NOC's & ROW permits from DEWA-ED
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC120
Prepare and Submit
Construction NOC Permits from DEWA-ED
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC125
Review and Approve
Construction NOCs from DEWA-ED
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC130
Issuance of
Construction NOC's from DEWA-ED
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC132
Receive Design
NOC's & ROW permits from DM Irrigation Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC135
Prepare and Submit
for Construction NOC Permits from DM Irrigation Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC140
Review and Approve
Construction NOCs from DM Irrigation Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC145
Issuance of
Construction NOC's from DM Irrigation Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC148
Receive Design
NOC's & ROW permits from DM Horticulture Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC150
Prepare and Submit
for Construction NOC Permits from DM Horticulture
Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC155
Review and Approve
Construction NOCs from DM Horticulture Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC160
Issuance of
Construction NOC's from DM Horticulture Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC162
Receive Design
NOC's & ROW permits from RTA Street Lighting
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC165
Prepare and Submit
for Construction NOC Permits from RTA Street Lighting
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC170
Review and Approve
Page 556

27in142r3
Construction NOCs from RTA Street Lighting
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC175
Issuance of
Construction NOC's from RTA Street Lighting
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC178
Receive Design
NOC's & ROW permits from Tabreed
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC180
Prepare and Submit
for Construction NOC Permits from Tabreed
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC185
Review and Approve
Construction NOCs from Tabreed
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC190
Issuance of
Construction NOC's from Tabreed
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC193
Receive Design
NOC's & ROW permits from Civil Defense
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC195
Prepare and Submit
for Construction NOC Permits from Civil Defense
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC200
Review and Approve
Construction NOCs from Civil Defense
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC205
Issuance of
Construction NOC's from Civil Defense
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC208
Receive Design
NOC's & ROW permits from DM Sewerage Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC210
Prepare and Submit
for Construction NOC Permits from DM Sewerage Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC215
Review and Approve
Construction NOCs from DM Sewerage Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC220
Issuance of
Construction NOC's from DM Sewerage Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC222
Receive Design
NOC's & ROW permits from DM Drainage Department
Project:
Max-CL14(2)R6-UP004
Page 557

27in142r3
Activity:
PR-PRTCSCOSGENNOC225
Prepare and Submit
for Construction NOC Permits from DM Drainage Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC230
Review and Approve
Construction NOCs from DM Drainage Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC235
Issuance of
Construction NOC's from DM Drainage Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC238
Receive Design
NOC's & ROW permits from RTA Spare Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC240
Prepare and Submit
for Construction NOC Permits from RTA Spare Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC245
Review and Approve
Construction NOCs from RTA Spare Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC250
Issuance of
Construction NOC's from RTA Spare Ducts
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC252
Receive Design
NOC's & ROW permits from DM Planning Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC255
Prepare and Submit
for Construction NOC Permits from DM Planning Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC260
Review and Approve
Construction NOCs from DM Planning Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC265
Issuance of
Construction NOC's from DM Planning Department
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC268
Receive Design
NOC's & ROW permits for Trial Trenches
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC270
Prepare and Submit
for Construction NOC Permits for Trial Trenches (All
Authorities)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC275
Review and Approve
Construction NOCs for Trial Trenches (All Authorities)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC280
Issuance of
Page 558

27in142r3
Construction NOC's for Trial Trenches (All Authorities)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC282
Receive Design
NOC's & ROW permits for Boreholes
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC285
Prepare and Submit
for Construction NOC Permits for Boreholes (All
Authorities)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC290
Review and Approve
Construction NOCs for Boreholes (All Authorities)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENNOC300
Issuance of
Construction NOC's for Trial Boreholes (All Authorities)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENQAD005
Receive of QA / QC
Forms and Documents (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENQAD010
1st Submittal of QA
/ QC Documents to Engineer
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENQAD015
1st Review of QA /
QC Documents (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENQAD020
1st Review of QA /
QC Documents (By Engineer / Client)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENQAD025
2nd Submittal of QA
/ QC Documents to Engineer
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENQAD030
2nd Review of QA /
QC Documents (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENQAD035
2nd Review of QA /
QC Documents and Approval (By Engineer / Client)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENSCH005
Prepare & Submit
Preliminary Schedule (within 10d of Letter of Acceptance)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENSCH010
Prepare & Submit
Final Construction Schedule & System (within 28 days from
Letter of Acceptance)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSCOSGENSCH015
Prepare & Submit
Page 559

27in142r3
Shop Drawing Submittal Schedule (within 30 days of Contract
Award)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEKVC005
Receive of 11 KV
Cables Materials Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEKVC010
Submittal of 11 KV
Cables Materials Recommendation / Prequalification (By
Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEKVC015
Review of 11 KV
Cables Materials Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEKVC020
Review of 11 KV
Cables Materials Recommendation / Prequalification (By
Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEKVC025
Review of 11 KV
Cables Materials Recommendation / Prequalification and
Approval (By Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEKVC040
Contractor Issuance
of 11 KV Cables Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEKVC045
11KV Cables
Material Manufacture / Delivery to Site (inc. Factory
Inspection)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEKVC133
Receive of 132 KV
Cables Materials Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEKVC135
Submittal of 132 KV
Cables Materials Recommendation / Prequalification (By
Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEKVC145
Review of 132 KV
Cables Materials Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEKVC155
Review of 132 KV
Cables Materials Recommendation / Prequalification (By
Engineer)
Project:
Max-CL14(2)R6-UP004
Page 560

27in142r3
Activity:
PR-PRTCSMATELEKVC165
Review of 132 KV
Cables Materials Recommendation / Prequalification and
Approval (By Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEKVC205
Contractor Issuance
of 132 KV Cables Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEKVC215
132 KV Cables
Material Manufacture / Delivery to Site (inc. Factory
Inspection)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEKVC225
LOF - 11KV Cables
Material Manufacture / Delivery to Site / Installation
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELELVC005
Receive of LV
Cables Materials Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELELVC010
Submittal of LV
Cables Materials Recommendation / Prequalification (By
Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELELVC015
Review of LV Cables
Materials Recommendation / Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELELVC020
Review of LV Cables
Materials Recommendation / Prequalification (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELELVC025
Review of LV Cables
Cables Materials Recommendation / Prequalification and
Approval (By Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELELVC040
Contractor Issuance
of LV Cables Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELELVC045
LV Cables Material
Manufacture / Delivery to Site (inc. Factory Inspection)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEPVC005
Receive of PVC
Ducts Materials Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEPVC010
Submittal of PVC
Ducts Materials Recommendation / Prequalification (By
Supplier)
Project:
Max-CL14(2)R6-UP004
Page 561

27in142r3
Activity:
PR-PRTCSMATELEPVC015
Review of PVC Ducts
Materials Recommendation / Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEPVC020
Review of PVC Ducts
Materials Recommendation / Prequalification (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEPVC025
Review of PVC Ducts
Materials Recommendation / Prequalification and Approval
(By Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEPVC040
Contractor Issuance
of PVC Ducts Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATELEPVC045
PVC Ducts Material
Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSHVC005
Receive of HVAC &
Ventilation System Material Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSHVC010
Submittal of HVAC &
Ventilation System Material Recommendation /
Prequalification (By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSHVC015
Review of HVAC &
Ventilation System Material Recommendation /
Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSHVC020
Review of HVAC &
Ventilation System Material Recommendation /
Prequalification (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSHVC022
Review of HVAC &
Ventilation System Material Recommendation /
Prequalification and Approval (By RTA / Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSHVC040
HVAC & Ventilation
System Material Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSLGT005
Receive of Lighting
System Material Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSLGT010
Submittal of
Lighting System Material Recommendation / Prequalification
Page 562

27in142r3
(By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSLGT015
Review of Lighting
System Material Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSLGT020
Review of Lighting
System Material Recommendation / Prequalification (By
Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSLGT025
Review of Lighting
System Material Recommendation / Prequalification &
Approval (By RTA / Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSLGT040
Lighting System
Material Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSSMD005
Receive of Smoke
Detector Material Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSSMD010
Submittal of Smoke
Detector Material Recommendation / Prequalification (By
Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSSMD015
Review of Smoke
Detector Material Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSSMD020
Review of Smoke
Detector Material Recommendation / Prequalification (By
Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSSMD025
Review of Smoke
Detector Material Recommendation / Prequalification &
Approval (By RTA / Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATPVSSMD040
Smoke Detector
Material Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODCUR005
Receive of Curbs &
Tiling Materials Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODCUR010
Submittal of Curbs
& Tiling Materials Recommendation / Prequalification (By
Page 563

27in142r3
Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODCUR015
Review of Curbs &
Tiling Materials Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODCUR020
Review of Curbs &
Tiling Materials Recommendation / Prequalification and
Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODCUR040
Contractor Issuance
of Curbs & Tiling Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODCUR045
Curbs & Tiling
Material Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODGUA005
Receive of Road
Guard Rails Materials Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODGUA010
Submittal of Road
Guard Rails Materials Recommendation / Prequalification (By
Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODGUA015
Review of Road
Guard Rails Materials Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODGUA020
Review of Road
Guard Rails Materials Recommendation / Prequalification and
Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODGUA040
Contractor Issuance
of Road Guard Rails Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODGUA045
Road Guard Rails
Material Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODLIT005
Receive of Lighting
System Materials Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODLIT010
Submittal of
Lighting System Materials Recommendation / Prequalification
(By Supplier)
Page 564

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODLIT015
Review of Lighting
System Materials Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODLIT020
Review of Lighting
System Materials Recommendation / Prequalification and
Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODLIT040
Contractor Issuance
of Lighting System Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODLIT045
Lighting System
Material Manufacture / Delivery to Site (inc. Factory
Inspection)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG005
Receive of Road
Signage & Gantries Materials Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG010
Submittal of Road
Signage & Gantries Materials Recommendation /
Prequalification (By Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG015
Review of Road
Signage & Gantries Materials Recommendation /
Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG020
Review of Road
Signage & Gantries Materials Recommendation /
Prequalification (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG025
2nd Submittal of
Road Signage & Gantries Materials Recommendation /
Prequalification (By Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG030
2nd Review of Road
Signage & Gantries Materials Recommendation /
Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG035
2nd Review of Road
Signage & Gantries Materials Recommendation /
Prequalification and Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Page 565

27in142r3
Activity:
PR-PRTCSMATRODRSG040
Contractor Issuance
of Road Signage & Gantries Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG045
1st Review of Road
Signage Drawings and Submittal to Engineer / RTA
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG050
1st Review of Road
Signage IFC Drawings by Engineer / RTA
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG055
2nd Submittal of
Road Signage and Submittal to Engineer / RTA
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG060
2nd Review of Road
Signage and Approval by Engineer / RTA
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG065
Manufacturing &
Delivery of Road Signs Materials
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG070
1st Submittal of
Road Ganties Design to Engineer / RTA
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG075
1st Review of Road
Ganties Design By Engineer / RTA
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG080
2nd Submittal of
Road Ganties Design to Engineer / RTA
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG085
2nd Review of Road
Ganties Design By Engineer / RTA
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODRSG090
Manufacturing /
Delivery of Road Gantries and Accessories to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODSUB005
Receive of
Aggregate & Subbase Materials Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODSUB010
Submittal of
Aggregate & Subbase Materials Recommendation /
Prequalification (By Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODSUB015
Review of Aggregate
& Subbase Materials Recommendation / Prequalification (By
Contractor)
Page 566

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODSUB020
Review of Aggregate
& Subbase Materials Recommendation / Prequalification and
Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODSUB040
Contractor Issuance
of Aggregate & Subbase Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATRODSUB045
Aggregate & Subbase
Material Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRBEA005
Receive of Bridge
Bearing Materials Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRBEA010
1st Submittal of
Bridge Bearing Materials Recommendation / Prequalification
(By Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRBEA015
1st Review of
Bridge Bearing Materials Recommendation / Prequalification
(By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRBEA020
1st Review of
Bridge Bearing Materials Recommendation / Prequalification
and Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRBEA040
Contractor Issuance
of Bridge Bearing Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRBEA041
2nd Submittal of
Bridge Bearing Materials Recommendation / Prequalification
(By Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRBEA042
2nd Review of
Bridge Bearing Materials Recommendation / Prequalification
(By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRBEA043
2nd Review of
Bridge Bearing Materials Recommendation / Prequalification
and Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRBEA044
Finalisation of
Bearing Supplier
Project:
Max-CL14(2)R6-UP004
Page 567

27in142r3
Activity:
PR-PRTCSMATSTRBEA045
Bridge Bearing
Material Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRBPC005
Receive of Bearing
Plate Covers & Access Doors Materials Vendor List (By
Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRBPC010
Submittal of
Bearing Plate Covers & Access Doors Materials
Recommendation / Prequalification (By Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRBPC015
Review of Bearing
Plate Covers & Access Doors Materials Recommendation /
Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRBPC020
Review of Bearing
Plate Covers & Access Doors Materials Recommendation /
Prequalification nd Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRBPC040
Contractor Issuance
of Bearing Plate Covers & Access Doors Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRBPC045
Bearing Plate
Covers & Access Doors Material Manufacture / Delivery to
Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRCON005
Receive of Concrete
Materials Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRCON010
Submittal of
Concrete Materials Recommendation / Prequalification (By
Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRCON015
Review of Concrete
Materials Recommendation / Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRCON020
Review of Concrete
Materials Recommendation / Prequalification and Approval
(By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRCON040
Contractor Issuance
of Concrete Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRCON045
Concrete Material
Page 568

27in142r3
Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTREXP005
Receive of
Expansion Joints Materials Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTREXP010
Submittal of
Expansion Joints Materials Recommendation /
Prequalification (By Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTREXP015
Review of Expansion
Joints Materials Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTREXP020
Review of Expansion
Joints Materials Recommendation / Prequalification and
Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTREXP040
Contractor Issuance
of Expansion Joints Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTREXP045
Expansion Joints
Material Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTREXP45
LOF - Expansion
Joints Material Manufacture / Delivery to Site /
Installation
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRHDP005
Receive of HDPE
Liner Materials Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRHDP010
Submittal of HDPE
Liner Materials Recommendation / Prequalification (By
Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRHDP015
Review of HDPE
Liner Materials Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRHDP020
Review of HDPE
Liner Materials Recommendation / Prequalification and
Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRHDP025
Contractor Issuance
Page 569

27in142r3
of HDPE Liner Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRHDP030
HDPE Liner
Materials Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRMSE005
Receive of MSE Wall
Materials Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRMSE010
Submittal of MSE
Wall Materials Recommendation / Prequalification (By
Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRMSE015
Review of MSE Wall
Materials Recommendation / Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRMSE020
Review of MSE Wall
Materials Recommendation / Prequalification & Approval (By
Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRMSE040
Contractor Issuance
of MSE Wall Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRMSE045
1st Submittal of
MSE Wall Design (By Subcontractor/Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRMSE050
1st Review of MSE
Wall Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRMSE055
2nd Submittal of
MSE Wall Design (By Subcontractor/Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRMSE060
2nd Review of MSE
Wall Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRMSE065
Manufacturing of
MSE Wall Panels Moulds / Facia
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRMSE070
Precasting of MSE
Wall Panels / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRMSE075
Precasting of Shear
Key Slab / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRPIE005
Receive of Pier GRP
Page 570

27in142r3
Moulds Materials Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRPIE010
Submittal of Pier
GRP Moulds Materials Recommendation / Prequalification (By
Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRPIE015
Review of Pier GRP
Moulds Materials Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRPIE020
Review of Pier GRP
Moulds Materials Recommendation / Prequalification and
Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRPIE040
Contractor Issuance
of Pier GRP Moulds Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRPIE045
Pier GRP Moulds
Material Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRREB005
Receive of Rebar
Materials Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRREB010
Submittal of Rebar
Materials Recommendation / Prequalification (By Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRREB015
Review of Rebar
Materials Recommendation / Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRREB020
Review of Rebar
Materials Recommendation / Prequalification and Approval
(By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRREB040
Contractor Issuance
of Rebar Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRREB045
Rebar Material
Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRSCA005
Receive of
Scaffolding & Formwork Materials Vendor List (By Contractor
/ Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRSCA010
Submittal of
Page 571

27in142r3
Scaffolding & Formwork Materials Recommendation /
Prequalification (By Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRSCA015
Review of
Scaffolding & Formwork Materials Recommendation /
Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRSCA020
Review of
Scaffolding & Formwork Materials Recommendation /
Prequalification nd Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRSCA040
Contractor Issuance
of Scaffolding & Formwork Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRSCA045
Scaffolding &
Formwork Material Manufacture / Delivery to Site (inc. Load
Test)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRWPM005
Receive of
Waterproofing Materials Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRWPM010
Submittal of
Waterproofing Materials Recommendation / Prequalification
(By Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRWPM015
Review of
Waterproofing Materials Recommendation / Prequalification
(By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRWPM020
Review of
Waterproofing Materials Recommendation / Prequalification
and Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRWPM040
Contractor Issuance
of Waterproofing Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATSTRWPM045
Waterproofing
Material Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETAIW010
Receive of water
stopper Materials Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETAIW020
Review of water
Page 572

27in142r3
stopper Materials Recommendation / Prequalification (By
Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETAIW030
Review of water
stopper Materials Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETAIW040
Review of water
stopperMaterials Recommendation / Prequalification and
Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETAIW050
Contractor Issuance
of water stopper Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETAIW060
Water stopper
Material Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETGRA005
Receive of Grating
/ Ladder & Cover Materials Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETGRA010
Submittal of
Grating / Ladder & Cover Materials Recommendation /
Prequalification (By Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETGRA015
Review of Grating /
Ladder & Cover Materials Recommendation / Prequalification
(By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETGRA020
Review of Grating /
Ladder & Cover Materials Recommendation / Prequalification
and Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETGRA040
Contractor Issuance
of Grating / Ladder & Cover Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETGRA045
Grating / Ladder &
Cover Material Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETGRP005
Receive of GRP /
GRE Pipes & Fittings Materials Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETGRP010
Submittal of GRP /
Page 573

27in142r3
GRE Pipes & Fittings Materials Recommendation /
Prequalification (By Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETGRP015
Review of GRP / GRE
Pipes & Fittings Materials Recommendation /
Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETGRP020
Review of GRP / GRE
Pipes & Fittings Materials Recommendation /
Prequalification and Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETGRP040
Contractor Issuance
of GRP / GRE Pipes & Fittings Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETGRP045
GRP / GRE Pipes &
Fittings Material Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETHDP005
Receive of HDPE
Pipes & Fittings Materials Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETHDP010
Submittal of HDPE
Pipes & Fittings Materials Recommendation /
Prequalification (By Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETHDP015
Review of HDPE
Pipes & Fittings Materials Recommendation /
Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETHDP020
Review of HDPE
Pipes & Fittings Materials Recommendation /
Prequalification and Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETHDP040
Contractor Issuance
of HDPE Pipes & Fittings Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETHDP045
HDPE Pipes &
Fittings Material Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETVLV005
Receive of Valves &
Fittings Materials Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETVLV010
Submittal of Valves
& Fittings Materials Recommendation / Prequalification (By
Page 574

27in142r3
Supplier)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETVLV015
Review of Valves &
Fittings Materials Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETVLV020
Review of Valves &
Fittings Materials Recommendation / Prequalification and
Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETVLV040
Contractor Issuance
of Valves & Fittings Materials PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSMATWETVLV045
Valves & Fittings
Material Manufacture / Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBELEGEN005
Receive of
Electrical works Subcontractor Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBELEGEN010
Submittal of
Electrical works Subcontractor Recommendation /
Prequalification (By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBELEGEN015
Review of
Electrical works Subcontractor Recommendation /
Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBELEGEN020
Review of
Electrical works Subcontractor Recommendation /
Prequalification and Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBELEGEN040
Contractor Issuance
of Electrical works Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBELEGEN045
Electrical works
Subcontractor Mobilization to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGENGRO005
Receive of Ground
Investigation Subcontractor Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGENGRO010
Submittal of Ground
Investigation Subcontractor Recommendation /
Page 575

27in142r3
Prequalification (By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGENGRO015
Review of Ground
Investigation Subcontractor Recommendation /
Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGENGRO020
Review of Ground
Investigation Subcontractor Recommendation /
Prequalification and Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGENGRO040
Contractor Issuance
of Ground Investigation Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGENGRO045
Ground
Investigation Subcontractor Mobilization to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGENTDC005
Receive of Traffic
diversion consultant Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGENTDC010
Submittal of
Traffic diversion consultant Recommendation /
Prequalification (By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGENTDC015
Review of Traffic
diversion consultant Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGENTDC020
Review of Traffic
diversion consultant Recommendation / Prequalification and
Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGENTDC040
Contractor Issuance
of Traffic diversion consultant PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGENTDC045
Traffic Diversion
Consultant Mobilization to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGENTDC050
Prepare Conceptual
Design for Traffic Diversions scheme and submit for
approval
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGENTDC055
Review and Approve
Conceptual Design for Traffic Diversion Scheme
Page 576

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGNRCAU005
Receive of Causeway
Subcontractor Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGNRCAU010
Submittal of
Causeway Subcontractor Recommendation / Prequalification
(By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGNRCAU015
Review of Causeway
Subcontractor Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGNRCAU020
Review of Causeway
Subcontractor Recommendation / Prequalification (By
Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGNRCAU025
Review of Causeway
Subcontractor Recommendation / Prequalification and
Approval (By RTA / Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGNRCAU040
Contractor Issuance
of Causeway Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGNRCAU045
1st Submittal of
Causeway Subcontractor Method Statement (By Subcontractor /
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGNRCAU050
1st Review of
Causeway Subcontractor Method Statement (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGNRCAU055
2nd Submittal of
Causeway Subcontractor Method Statement (By Subcontractor /
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGNRCAU060
2nd Review of
Causeway Subcontractor Method Statement (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGNRCAU065
Submittal of DM
Marine Causeway Construction NOC (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGNRCAU070
Approval of DM
Marine Causeway Construction NOC (By RTA / DM Marine)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBGNRCAU075
Contractor
Page 577

27in142r3
Mobilization to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSEXR002
RTA / Engineer
Instruction to Release Provisional Sums Package
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSEXR005
Receive of
Expropriation Subcontractor Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSEXR010
Submittal of
Expropriation Subcontractor Recommendation /
Prequalification (By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSEXR015
Review of
Expropriation Subcontractor Recommendation /
Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSEXR020
Review of
Expropriation Subcontractor Recommendation /
Prequalification and Approval (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSEXR040
Contractor Issuance
of Expropriation Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSEXR045
1st Submittal of
Expropriation Subcontractor Method Statement (By
Subcontractor / Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSEXR050
1st Review of
Expropriation Subcontractor Method Statement (By Engineer /
RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSEXR055
2nd Submittal of
Expropriation Subcontractor Method Statement (By
Subcontractor / Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSEXR060
2nd Review of
Expropriation Subcontractor Method Statement (By Engineer /
RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSEXR065
Apply for
Expropriation Permits / Authorities Disconnections (By
Subcontractor / Contractor)
Project:
Max-CL14(2)R6-UP004
Page 578

27in142r3
Activity:
PR-PRTCSSUBPVSEXR070
Approval of
Expropriation Permits / Authorities Disconnections (By
Engineer / RTA / Authorities)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSEXR075
Issuance of Work
Affection Plan (By DM/Parsons)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSEXR080
Issuance of Work
Building Permit (By DM/Parsons)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC002
RTA / Engineer
Instruction to Release Provisional Sums Package
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC005
Receive of HVAC &
Ventilation System Subcontractor Vendor List (By Contractor
/ Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC010
Submittal of HVAC &
Ventilation System Subcontractor Recommendation /
Prequalification (By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC015
Review of HVAC &
Ventilation System Subcontractor Recommendation /
Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC020
Review of HVAC &
Ventilation System Subcontractor Recommendation /
Prequalification and Approval (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC040
Contractor Issuance
of HVAC & Ventilation System Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC045
1st Submittal of
HVAC & Ventilation System Subcontractor Conceptual Design
(By Subcontractor / Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC050
1st Review of HVAC
& Ventilation System Conceptual Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC055
2nd Submittal of
HVAC & Ventilation System Conceptual Design (By
Subcontractor / Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC060
2nd Review of HVAC
Page 579

27in142r3
& Ventilation System Conceptual Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC065
1st Submittal of
HVAC & Ventilation System Detailed Design (By Subcontractor
/ Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC070
1st Review of HVAC
& Ventilation System Detailed Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC075
2nd Submittal of
HVAC & Ventilation System Detailed Design (By Subcontractor
/ Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSHVC080
2nd Review of HVAC
& Ventilation System Detailed Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT002
RTA / Engineer
Instruction to Release Provisional Sums Package
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT005
Receive of Lighting
System Subcontractor Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT010
Submittal of
Lighting System Subcontractor Recommendation /
Prequalification (By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT015
Review of Lighting
System Subcontractor Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT020
Review of Lighting
System Subcontractor Recommendation / Prequalification and
Approval (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT040
Contractor Issuance
of Lighting System Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT045
1st Submittal of
Lighting System Subcontractor Conceptual Design (By
Subcontractor / Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT050
1st Review of
Lighting System Conceptual Design (By Engineer / RTA)
Page 580

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT055
2nd Submittal of
Lighting System Conceptual Design (By Subcontractor /
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT060
2nd Review of
Lighting System Conceptual Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT065
1st Submittal of
Lighting System Detailed Design (By Subcontractor /
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT070
1st Review of
Lighting System Detailed Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT075
2nd Submittal of
Lighting System Detailed Design (By Subcontractor /
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSLGT080
2nd Review of
Lighting System Detailed Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD002
RTA / Engineer
Instruction to Release Provisional Sums Package
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD005
Receive of Smoke
Detector Subcontractor Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD010
Submittal of Smoke
Detector Subcontractor Recommendation / Prequalification
(By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD015
Review of Smoke
Detector Subcontractor Recommendation / Prequalification
(By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD020
Review of Smoke
Detector Subcontractor Recommendation / Prequalification
and Approval (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD040
Contractor Issuance
of Smoke Detector Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Page 581

27in142r3
Activity:
PR-PRTCSSUBPVSSMD045
1st Submittal of
Smoke Detector Subcontractor Conceptual Design (By
Subcontractor / Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD050
1st Review of Smoke
Detector Conceptual Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD055
2nd Submittal of
Smoke Detector Conceptual Design (By Subcontractor /
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD060
2nd Review of Smoke
Detector Conceptual Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD065
1st Submittal of
Smoke Detector Detailed Design (By Subcontractor /
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD070
1st Review of Smoke
Detector Detalied Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD075
2nd Submittal of
Smoke Detector Detailed Design (By Subcontractor /
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBPVSSMD080
2nd Review of Smoke
Detector Detailed Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBRODASP005
Receive of
Asphaltic Subcontractor Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBRODASP010
Submittal of
Asphaltic Subcontractor Recommendation / Prequalification
(By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBRODASP015
Review of Asphaltic
Subcontractor Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBRODASP020
Review of Asphaltic
Subcontractor Recommendation / Prequalification and
Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Page 582

27in142r3
Activity:
PR-PRTCSSUBRODASP040
Contractor Issuance
of Asphaltic Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBRODASP045
Asphaltic Material
Site Mockup Approval
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBRODMAR005
Receive of Pavement
Marking Subcontractor Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBRODMAR010
Submittal of
Pavement Marking Subcontractor Recommendation /
Prequalification (By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBRODMAR015
Review of Pavement
Marking Subcontractor Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBRODMAR020
Review of Pavement
Marking Subcontractor Recommendation / Prequalification and
Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBRODMAR040
Contractor Issuance
of Pavement Marking Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBRODMAR045
Pavement Marking
Subcontractor Mobilization to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBRODRSG005
Receive of Road
Signage Gantry Subcontractor Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBRODRSG010
Submittal of Road
Signage Gantry Subcontractor Recommendation /
Prequalification (By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBRODRSG015
Review of Road
Signage Gantry Subcontractor Recommendation /
Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBRODRSG020
Review of Road
Signage Gantry Subcontractor Recommendation /
Prequalification and Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Page 583

27in142r3
Activity:
PR-PRTCSSUBRODRSG040
Contractor Issuance
of Road Signage Gantry Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBRODRSG045
Road Signage Gantry
Subcontractor Mobilization to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBLT005
Receive of Under
Bridge Lighting Subcontractor Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBLT010
Submittal of Under
Bridge Lighting Subcontractor Recommendation /
Prequalification (By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBLT015
Review of Under
Bridge Lighting Subcontractor Recommendation /
Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBLT020
Review of Under
Bridge Lighting Subcontractor Recommendation /
Prequalification (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBLT025
Review of Under
Bridge Lighting Subcontractor Recommendation /
Prequalification and Approval (By RTA / Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBLT040
Contractor Issuance
of Under Bridge Lighting Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBLT045
1st Submittal of
Under Bridge Lighting Subcontractor Conceptual Design (By
Subcontractor / Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBLT050
1st Review of Under
Bridge Lighting Conceptual Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBLT055
2nd Submittal of
Under Bridge Lighting Conceptual Design (By Subcontractor /
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBLT060
2nd Review of Under
Bridge Lighting Conceptual Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBLT065
1st Submittal of
Page 584

27in142r3
Under Bridge Lighting Detailed Design (By Subcontractor /
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBLT070
1st Review of Under
Bridge Lighting Detailed Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBLT075
2nd Submittal of
Under Bridge Lighting Detailed Design (By Subcontractor /
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBLT080
2nd Review of Under
Bridge Lighting Detailed Design (By Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBUO005
Receive of Marker
Buoys Subcontractor Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBUO010
Submittal of Marker
Buoys Subcontractor Recommendation / Prequalification (By
Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBUO015
Review of Marker
Buoys Subcontractor Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBUO020
Review of Marker
Buoys Subcontractor Recommendation / Prequalification and
Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBUO040
Contractor Issuance
of Marker Buoys Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRBUO045
Manufacturing of
Marker Buoys & Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPIL005
Receive of Piling
Subcontractor Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPIL010
Submittal of Piling
Subcontractor Recommendation / Prequalification (By
Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPIL015
Review of Piling
Subcontractor Recommendation / Prequalification (By
Contractor)
Page 585

27in142r3
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPIL020
Review of Piling
Subcontractor Recommendation / Prequalification and
Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPIL040
Contractor Issuance
of Piling Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPIL045
Piling
Subcontractor Mobilization to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPIL050
Construction of Non
Working Test Pile & Load Test & Submittal to Client (1000
Dia)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPIL055
Approval of Test
Pile by Engineer / Client (1000 Dia Piles)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPIL060
Construction of Non
Working Test Pile & Load Test & Submittal to Client (1500
Dia)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPIL065
Construction of Non
Working Test Pile & Load Test & Submittal to Client (2000
Dia)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPIL070
Construction of Non
Working Test Pile & Load Test & Submittal to Client (2500
Dia)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPIL075
Approval of Test
Pile by Engineer / Client (1500 Dia Piles)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPIL080
Approval of Test
Pile by Engineer / Client (2000 Dia Piles)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPIL085
Approval of Test
Pile by Engineer / Client (2500 Dia Piles)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPNT005
Receive of Painting
Coating Subcontractor Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPNT010
Submittal of
Page 586

27in142r3
Painting Coating Subcontractor Recommendation /
Prequalification (By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPNT015
Review of Painting
Coating Subcontractor Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPNT020
Review of Painting
Coating Subcontractor Recommendation / Prequalification and
Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPNT040
Contractor Issuance
of Painting Coating Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPNT045
Painting Coating
Subcontractor Mobilization to Site & Color Mockup Approval
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPOR005
Receive of Portal
Gantry Subcontractor Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPOR010
Submittal of Portal
Gantry Subcontractor Recommendation / Prequalification (By
Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPOR015
Review of Portal
Gantry Subcontractor Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPOR020
Review of Portal
Gantry Subcontractor Recommendation / Prequalification (By
Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPOR025
Review of Portal
Gantry Subcontractor Recommendation / Prequalification and
Approval (By RTA/Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPOR040
Contractor Issuance
of Portal Gantry Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPOR045
1st Submittal of
Portal Gantry Subcontractor Method Statement / Design (By
Subcontractor / Contractor)
Project:
Max-CL14(2)R6-UP004
Page 587

27in142r3
Activity:
PR-PRTCSSUBSTRPOR050
1st Review of
Portal Gantry Subcontractor Method Statement / Design (By
Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPOR055
2nd Submittal of
Portal Gantry Subcontractor Method Statement / Design (By
Subcontractor / Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPOR060
2nd Review of
Portal Gantry Subcontractor Method Statement / Design (By
Engineer / RTA)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPOR065
Manufacturing of
Portal Gantry & Delivery to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPOS005
Receive of
Postensioning Subcontractor Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPOS010
Submittal of
Postensioning Subcontractor Recommendation /
Prequalification (By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPOS015
Review of
Postensioning Subcontractor Recommendation /
Prequalification (By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPOS020
Review of
Postensioning Subcontractor Recommendation /
Prequalification and Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPOS040
Contractor Issuance
of Postensioning Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBSTRPOS045
Postensioning
Subcontractor Mobilization to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBWETNDR005
Receive of NDRC
Subcontractor Vendor List (By Contractor / Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBWETNDR010
Submittal of NDRC
Subcontractor Recommendation / Prequalification (By
Subcontractor)
Project:
Max-CL14(2)R6-UP004
Page 588

27in142r3
Activity:
PR-PRTCSSUBWETNDR015
Review of NDRC
Subcontractor Recommendation / Prequalification (By
Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBWETNDR020
Review of NDRC
Subcontractor Recommendation / Prequalification and
Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBWETNDR040
Contractor Issuance
of NDRC Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBWETNDR045
NDRC Subcontractor
Mobilization to Site
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBWETSUB005
Receive of Wet
Utilities Subcontractor Vendor List (By Contractor /
Authority)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBWETSUB010
Submittal of Wet
Utilities Subcontractor Recommendation / Prequalification
(By Subcontractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBWETSUB015
Review of Wet
Utilities Subcontractor Recommendation / Prequalification
(By Contractor)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBWETSUB020
Review of Wet
Utilities Subcontractor Recommendation / Prequalification
and Approval (By Engineer)
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBWETSUB040
Contractor Issuance
of Wet Utilities Subcontractor PO
Project:
Max-CL14(2)R6-UP004
Activity:
PR-PRTCSSUBWETSUB045
Wet Utilities
Subcontractor Mobilization to Site

Page 589