Professional Documents
Culture Documents
CONQUAS
CONQUAS
THE BCA
CONSTRUCTION QUALITY ASSESSMENT SYSTEM
CONQUAS
Copyright @ 2008 by the Building and Construction Authority, Singapore. All rights
reserved. No part may be reproduced, in any form or by any means, without permission in
writing from the publisher.
While every effort has been made to ensure the accuracy of the information presented in
this publication, neither the Authority nor its employees or agents can accept responsibility
for any loss or damage incurred in connection with the use of the contents.
ii
CONQUAS
CONTENTS
1.0
INTRODUCTION.................................................................................1
1.1
1.2
1.3
2.0
CONQUAS..........................................................................................3
2.1
2.2
2.3
2.4
3.0
Objectives of CONQUAS
Scope of CONQUAS
Derivation of CONQUAS
Components to be assessed
The Weightages
CONQUAS Assessor
Sampling
THE ASSESSMENT...........................................................................6
3.1
3.2
3.3
3.4
3.5
Assessment Approach
Structural Works Assessment
Architectural Works Assessment
M&E Works Assessment
Computation of CONQUAS Score
APPENDICES
Appendix 1
Appendix 2
Appendix 3
Appendix 4
Appendix 5
iii
CONQUAS
1.0 INTRODUCTION
1.1 Objectives of CONQUAS
The Construction Quality Assessment System or CONQUAS was
developed by the Building and Construction Authority (BCA) in
conjunction with major public sector agencies and various leading
industry professional bodies, organizations and firms to measure the
quality level achieved in a completed project.
CONQUAS was designed with three objectives:
(a)
(b)
(c)
The
Structural Works,
Architectural Works and
Mechanical & Electrical (M&E) Works.
CONQUAS
CONQUAS
2.0 CONQUAS
2.1 Components to be assessed
The CONQUAS assessment is divided into three main components Structural Works, Architectural Works and M&E Works.
(a)
Structural Works
The structural integrity of the building is of paramount importance
as the costs of failure and repairs are very significant. The
assessment of Structural Works comprises:
(i)
(ii)
(iii)
(b)
Architectural Works
Architectural Works deal mainly with the finishes and
components. This is the part where the quality and standard of
workmanship are most visible. The assessment covers:
(i)
CONQUAS
(ii)
(c)
(ii)
Site inspection of final installed works such as the AirHandling Unit (AHU), cooling tower, fire alarm control
panel, etc.
(iii)
CONQUAS
Commercial,
Industrial,
Institution &
others
CAT A
Commercial,
Industrial,
Institution &
others
Private Housing
Public Housing
CAT C
CAT D
Structural
Works
Architectural
Works
25%
30%
25%
35%
30%
55%
60%
65%
60%
65%
M&E Works
20%
10%
10%
5%
5%
CONQUAS
Score
100%
100%
100%
100%
100%
Components
CAT B
CAT B
Landed
Housing
Note : In general, projects with central cooling system having cooling tower, chiller
system, etc are classified under CAT A. Otherwise, it will be classified under
CAT B. Appendix 5 provides a guide with listing of buildings under the various
categories.
2.4 Sampling
As it is impractical to assess all elements in a building, CONQUAS uses
a sampling system for the assessment. The sampling system, which is
based on the gross floor area of the building, will ensure that the
assessment adequately represents the entire building.
CONQUAS
CONQUAS
Weightage %
Formwork
15
Rebar
20
Finished Concrete
25
Concrete Quality
15
15
Total
100
* If total precast concrete volume exceeds 20% of total structural concrete volume,
assessment will be carried out for precast concrete construction. The points will be
distributed proportionately between formwork/rebar assessment and precast concrete
assessment based on the respective concrete volume percentage.
CONQUAS
For a typical reinforced concrete structure, selection of samples for
assessment is based on the following guidelines:
Items
GFA per
Sample
Min
Sample
Max
Sample
Remarks
Structural Elements
500 m2
30
150
1a
Structural Elements
1500 m2
30
50
Concrete Compressive
Strength
100%
Declaration by Qualified
Person
100%
Declaration by Qualified
Person
5,000 m2
2
sets
20
sets
NDT - Electro-Covermeter
test for concrete cover
5,000 m2
2
sets
20
sets
CONQUAS
The distribution of points for Structural Steelwork and Pre-stressed
Concrete are as follows:
Structural Steelwork
Weightage %
40
Metal Decking
20
Erection Tolerances
10
10
20
Total
100
Pre-stressed Concrete
Weightage %
25
Sheathing
25
25
Debonding
25
Total
100
Min Sample
250
Metal Decking
250
Erection Tolerances
500
500
Items
Structural Elements
CONQUAS
Weightage %
Total
Internal Finishes
Breakdown
56
Floor
16
Internal Wall
16
Ceiling
Door
Window
Component
Roof
External Wall
12
12
External Work*
22
Pre-packed Plaster
10
Total
100
Note: Assessment for internal wet area waterproofing process will be waived and
points allocated automatically if the appointed contractor for such works is
accredited under the SCI Accreditation Scheme for Waterproofing Specialist
Contractors.
10
CONQUAS
Floor
Internal Wall
Ceiling
Door
Window
Component
M&E Fitting
Element Weightage
16 points
16 points
6 points
6 points
6 points
6 points
*15 points
Defect Category
Defect Weightage
Finishing
4.8
2.4
4.8
Hollowness
1.6
Jointing
2.4
Finishing
4.0
2.4
4.8
Hollowness
2.4
Jointing
2.4
Finishing
0.9
0.9
1.8
Roughness
1.5
Jointing
0.9
0.6
0.6
1.8
Functionality
1.8
Accessories Defects
1.2
0.6
0.6
1.2
Functionality
1.8
Accessories Defects
1.8
0.6
0.6
1.8
Functionality
1.8
Accessories Defects
1.2
*1.5
*3.0
*4.5
Functionality
*4.5
Accessories Defects
*1.5
* Illustration refers to CONQUAS Category B projects only. For projects in other categories, weightages at
defect level will be distributed in similar proportions
11
CONQUAS
The assessment is based on the sampling guidelines as set out below:
Items
GFA per
Sample
Min
Sample
Max
Sample
Remarks
Internal Finishes
500 m2
30
150
1a
Internal Finishes
70 m2
30
800
1b
Internal Finishes
70 m2
30
600
External Wall
50%
External Work
Pre-packed Plaster
5a
Field Window
Watertightness Test
(WTT)
20
100
5b
Field Window
Watertightness Test
(WTT)
25%
Conducted by BCA
Self-Testing with declaration
by Qualified Person
10% of all bathrooms and/or
toilets (by location)
all will be tested if < 20 nos
not required for non-housing
project if < 20 nos
6a
20
100
6b
100%
10,000 m2
1
set
5
sets
12
CONQUAS
The computed number of locations will be distributed according to
"Principal", "Circulation" and "Service" based on the percentages set out
in the four categories of buildings as below:
CAT A
CAT B
Commercial
Industrial
Institution
Others
Housing
Principal
60%
Service
Circulation
Locations
CAT C
CAT D
Non-Housing
Public
Housing
Landed
Properties
40%
60%
40%
40%
15%
40%
15%
40%
40%
25%
20%
25%
20%
20%
Link-way / Shelter - 10m length section per sample and minimum 2 samples
Apron & Drain
- 10m length section per sample and minimum 2 samples
Roadwork & Carpark - 10m length section per sample and minimum 1 sample
Footpaths & Turfing - 10m length section per sample and minimum 2 samples
Playground
- 1 location
Court
- 1 location
Fencing & Gate
- 10m length section per sample and minimum 1 sample
Swimming Pool
- 10m length section per sample and minimum 1 sample
Club House
- 1 location
Guard House
- 1 location
Electrical Substation - 1 location
13
CONQUAS
Each item in the External Works will be assessed separately and all the
locations listed above must be assessed where applicable.
Under the material & functional tests, self-testing items like field window
water-tightness test for 25% of windows and 100% wet area
watertightness test (including flat roof) and the use of pre-packed plaster
for all plastering works are based on declaration by the project Qualified
Person (QP). In general, declaration on passing for self-testing is based
on first-time-right basis.
14
CONQUAS
CAT A
CAT B
CAT C
CAT D
10
10
80
100
100%
_
100%
15
CONQUAS
Points Allocated
2
1
2
2
4
2
1
1
1
1
3
2
4
1
2
1
3
1
2
2
1
2
2
5
1
1
16
CONQUAS
The assessment of Basic M&E Fittings will be carried out during the
Internal Finishes assessment.
17
CONQUAS
CAT A
Electrical
1. Embedded conduit
2. Main cables
3. Surface conduits
4. Cable tray, ladder & trunking
5. Distribution board
ACMV
1. Air handling unit
2. Pump
3. Cooling tower
4. Chiller
5. Pipework
6. Split unit / Window air conditioner
7. Air-con comfort
8. Ductwork
9. Fire-rated duct
10. Dampers
11. Fire Dampers
12. Flexible ducts
13. Flexible connectors
Fire Protection
1. Wet / Dry riser
2. Sprinkler
3. Fire Alarm
4. Hosereel
Plumbing & Sanitary
1. Concealed pipes
2. Exposed pipes
3. Water tank
4. Pump
Minimum Samples
Maximum Samples
CAT B
1,000 m2 per
sample
1,500 m2 per
sample
2+
1
1+
1+
2+
2+
1
1+
1+
2+
1+
1
1
1
1
2+
1+
3+
1
1+
1
2
1
CAT C
3,500 m2 per
sample
CAT D
3,500 m2 per
sample
2+
1+
1+
2+
1+
1
1
1
1
1+
1
1
3+
2+
1+
1+
1
1+
1+
1
1
1+
1+
1+
4+
1
1
1+
4+
1
1
4+
1
1
35
70
25
50
10
20
1+
10
20
18
CONQUAS
Roofing System
Nos of Toilet
External Wall
Commercial (CAT A)
Reinforced Concrete system with 31%
precast concrete volume and steelworks at
75% to 25% cost ratio
Flat Roof
10 nos
Full Glass Curtain Wall
Weightage
%
0.69x35% = 24.1%
0.31X35% = 10.9%
25
5
5
15
15
100
Weightage
%
40
10
10
20
80
100
Score
22.3
8.0
20.5
5.0
5.0
10.5
12.5
83.8
Score
33.2
NA
8.3
10.0
19.5
71
88.8
(A)
Individual
Score
83.8
88.8
(B)
Cost
Proportion
75%
25%
(A) X (B)
62.9
22.2
85.1
19
CONQUAS
Weightage
%
16
16
6
6
6
6
4
12
6
1
Score
8
2
6.6
1.4
1
2
4
96
100
NA
1.0
2.0
3.2
68.7
71.6
Cat A
Score
15%
20%
10%
15%
15%
75%
50%
12.2
18.4
8.8
11.2
12.8
63.4
42.3
100%
50%
100%
86.9
43.4
85.7
9.3
9.0
5.8
3.6
4.1
4.6
2.5
10.1
4.5
1.0
20
CONQUAS
(A)
Actual
Score
85.1
71.6
85.7
(B)
CAT A
(A) X (B)
25%
55%
20%
100%
21.3
39.4
17.1
77.8
21
Appendix 1a
Item*
1
Formwork
1a
Formwork dimensions
and openings for services
1b
1c
Condition of formwork,
props & bracing
2a
Standards
1)
2)
3)
1)
2)
3)
4)
1)
2)
3)
4)
1)
2)
2b
1)
2c
Cover provision
1)
2d
1)
22
Appendix 1a
Item*
2e
Rebar Condition
3a
3b
Standards
2)
1)
2)
1)
2)
Tolerance for opening: +10 for size and 25mm for location
3)
4)
5)
6)
7)
1)
2)
3)
4)
Appendix 1a
Item*
Standards
within the element: 10mm
3c
Exposed surface
Precast Specific
Requirements
4a
Lifting points/inserts
4b
4c
4d
Sleeve
system/connections
Interface/joint
requirements
Cast-in steel
items/welded & bolted
connections
5)
1)
2)
3)
4)
5)
No cracks or damages
1)
2)
1)
2)
3)
4)
1)
Joint taper:
Over 3m length: 6mm
Maximum for entire length: 9mm
2)
3)
4)
5)
1)
2)
3)
24
Appendix 1a
Item*
Standards
Structure Quality
5a
1)
5b
Reinforcement (Rebar)
1)
2)
3)
25
Appendix 1a
Item*
Standards
Non-destructive testing
6a
6b
Electro-Covermeter test
for concrete cover
1)
2)
3)
4)
1)
2)
3)
For each reading, full point for 5mm and half point for
>5mm to 8mm. For each location, no point will be
awarded if any of the 4 readings exceeds 12mm.
4)
For the assessment of concrete cube test results, the percentage of points shall be awarded based
on the percentage of non-compliance as tabulated in the table below:
Percentage of Points awarded
Percentage of non-compliance
100%
0 - 2.5%
75%
2.6 - 5.0%
50%
5.1 - 7.5%
25%
7.6 - 10%
0%
> 10%
* An item is deemed to have failed if any one of the standards is not met.
26
Appendix 1b
Item*
1
Main member/Partial
assembled component
1a
Physical dimensions
1b
1c
1d
Welding
Bolting
Standards
1)
2)
3)
1)
2)
3)
1)
Weld size, length and profile shall meet the structural steel
specifications and drawings
2)
3)
4)
1)
2)
3)
4)
5)
6)
27
Appendix 1b
Standards
Item*
2
Metal decking
2a
2b
Shear studs
1)
2)
3)
4)
5)
6)
1)
2)
3)
4)
1)
2c
Erection tolerances
3a
Column verticality
1)
3b
Column position
1)
3c
Beam level
1)
2)
1)
3d
Beam position
28
Appendix 1b
Standards
Item*
4
4a
Thickness of coating
1)
4b
Condition
1)
No visible damages
2)
1)
2)
# For test records, the following table would be used to determine the points awarded:
Points awarded
20
15
10
5
0
* An item is deemed to have failed if any one of the standards is not met.
29
Appendix 1c
Item*
1
Standards
1)
2)
Installation of sheathing
Debonding
1)
2)
3)
4)
1)
2)
3)
1)
2)
3)
* An item is deemed to have failed if any one of the standards is not met.
30
Appendix 2
Item*
1
Floors
1a
General Requirements
1b
1c
Screed finish
Tiled finish
Standards
1)
Finishing
No stain marks
Consistent colour tone
Floor divider provided where required
2)
3)
4)
Hollowness / Delamination
No hollow sound when tapped with a hard object
No sign of delamination
5)
Jointing
Consistent skirting thickness
No visible gap between wall & skirting
1)
2)
3)
1)
2)
3)
Joints are aligned and consistent with skirting and wall tiles
4)
5)
6)
No visible lippage
7)
31
Appendix 2
Item*
1d
1e
1f
Timber floor
Carpet
Raised Floor
Standards
1)
No warpage
2)
3)
4)
1)
2)
3)
1)
2)
3)
32
Appendix 2
Item*
2
Internal Walls
2a
General
2b
2c
2d
2e
Plaster Finish
Tiled Finish
Cladding
Architectural Coating
Standards
1)
Finishing
No stain marks
Consistent colour tone
No rough / patchy surface
2)
3)
4)
Hollowness / Delamination
No hollow sound when tapped with a hard object
No sign of delamination
5)
Jointing
Straightness of corners and joints
1)
2)
3)
1)
2)
3)
4)
5)
No visible lippage
1)
2)
3)
4)
1)
2)
33
Appendix 2
Item*
2f
2g
2h
2i
2j
Painting
Pre-cast concrete
planks
Wall Paper
Glass Blocks
Standards
1)
2)
3)
4)
5)
1)
2)
1)
2)
3)
4)
1)
2)
3)
1)
2)
3)
4)
No warpage
5)
No cracks
34
Appendix 2
Item*
3
Ceilings
3a
General Requirements
3b
3c
Standards
1)
Finishing
No stain marks
Consistent colour tone
No patchy surface
2)
3)
4)
Roughness
No rough surface
5)
Jointing
Consistent, aligned and neat
1)
2)
3)
4)
1)
2)
3)
35
Appendix 2
Item*
4
Doors
4a
General Requirements
Standards
1)
2)
3)
4)
Functionality
Ease in opening, closing and locking
No squeaky sound during swinging the leaf
5)
Accessories Defects
Lock sets with good fit and no stains
No sign of corrosion in ironmongery
No missing or defective accessories
36
Appendix 2
Item*
5
Windows
5a
General Requirements
Standards
1)
2)
3)
4)
Functionality
Ease in opening, closing and locking
No sign of rainwater leakage
No squeaky sound during swinging the leaf
5)
Accessories Defects
Lock sets with good fit and aligned
No sign of corrosion
No missing or defective accessories
Countersunk screws levelled and flushed. No overtightened screws
Stainless steel screws at hinges for swing window
37
Appendix 2
Item*
6
6a
Components
General Requirements
Standards
*
**
1)
2)
3)
4)
Functionality
Functional, secured and safe
5)
Accessories Defects
No missing accessories
No sign of corrosion
No visible damages / defects
* An item is deemed to have failed if any one of the standards is not met
38
Appendix 2
Construction
1a
General Requirements
1b
1c
Flat Roof
Pitched Roof
Standards
1)
Stain / Painting
No stain marks
Good paint works
2)
3)
4)
5)
Chokage / Ponding
No sign of chokage and ponding
6)
Construction
No sign of leaking
Proper dressing for any protrusion
Neat & secured installation of fixtures
1)
2)
3)
4)
5)
1)
No leaking
2)
No rust or stains
3)
4)
5)
39
Appendix 2
Item*
1d
1e
Waterproofing
(exposed)
Gutters
Standards
6)
7)
1)
2)
3)
4)
5)
6)
No paint defects
1)
2)
3)
4)
5)
* An item is deemed to have failed if any one of the standards is not met
40
Appendix 2
Item*
General Requirements
1)
Evenness / Roughness
Overall surface should be even, not wavey & not
patchy
2)
Staining / Painting
No visible stain marks
Good paint works
3)
Cracking / Damages
No visible damage / defects
4)
Jointing / Alignment
External features visually in alignment
Corners of wall maintained at right angles and straight
Consistent joint width, neat & aligned
Plaster Finish
1)
As above
Tiled Finish
1)
2)
1)
2)
3)
4)
5)
1)
2)
3)
4)
No efflorescence
Claddings / Curtain
Walls
Facing Brickwork
41
Appendix 2
Item*
Architectural Coating
Painting
Standards
1)
2)
3)
1)
2)
3)
* An item is deemed to have failed if any one of the standards is not met
42
Appendix 2
Item*
1
1a
1b
General Requirements
(basis for assessment)
Link-Way / Shelter
Standards
1)
2)
3)
4)
5)
6)
7)
1)
2)
3)
4)
5)
1)
Drain
Free flowing and no ponding of water
2)
Drain Cover
level and do not jolt or rock
Gaps between drain covers and side of drain between
5-10mm wide
Drain grating properly painted
3)
Apron 1
Bitumen joints with neat edges and sufficient length
No ponding
4)
5)
Inspection Chamber
Inspection chambers are level with surrounding without
depression and with tolerance of
Covers to be level with frames
43
Appendix 2
Item*
1c
1d
1e
Playground
Standards
1)
2)
Road Surface
No ponding
Road painting according to drawings; dimensional
tolerance of 5mm
Gaps between aeration slabs properly filled up with
sand
Aeration slabs stable and not broken
3)
4)
Road Sign
Provided according to specifications
Firm and secured at base with footing if required
Metal parts below ground are corrosion treated
5)
1)
2)
Turfing
No depression or bald patches
Turfing done evenly, no dead grass or weeds
3)
4)
5)
Other Fixtures
as per Internal Finishes - Components
1)
2)
3)
4)
5)
44
Appendix 2
Standards
Item*
1f
1g
1h
1i
Court
Swimming Pool
Club House
1)
2)
3)
4)
5)
1)
2)
3)
4)
5)
1)
2)
3)
4)
5)
1)
2)
3)
4)
5)
45
Appendix 2
Standards
Item*
1j
1k
Guard House
Electrical Substation
1)
2)
3)
4)
5)
1)
2)
3)
4)
5)
* An item is deemed to have failed if any one of the standards is not met
46
Appendix 2
Item*
Standards
Plastering
1)
1)
2)
1)
2)
1)
1)
For the assessment of the field window water-tightness test, the number of points shall be
awarded based on the percentage of non-compliance as tabulated in the table below :
Points Awarded for
BCA Field Test (80%)
Percentage of non-compliance
0%
(15-x)* 8/15
(15-x)* 2/15
15%
Note:
47
Appendix 2
For the assessment of the wet area water-tightness test, the number of points shall be awarded
based on the percentage of non-compliance as tabulated in the table below :
Percentage of non-compliance
0%
(2-x)* 4/2
(2-x)* 1/2
0% < x < 2%
2%
Note:
* An item is deemed to have failed if any one of the standards is not met.
48
Appendix 3
Item*
1
Embedded Conduits
Installation
1)
2)
3)
4)
5)
Secured Properly
6)
Bent Properly
7)
Properly Supported
1)
Fire Stop
2)
3)
1)
2)
3)
4)
5)
6)
7)
No Visible Damage
Main Cables
No Visible Damage
Surface Conduits
Installation
Support
Fire Stop
49
Appendix 3
Item*
No Visible Damage
Standards
8)
1)
2)
3)
4)
5)
6)
1)
2)
3)
4)
5)
Support
Fire Stop
No Visible Damage
Distribution Board
Circuit Diagram
No Visible Damage
* An item is deemed to have failed if any one of the standards is not met
50
Appendix 3
Part 2: Quality Standards for ACMV Works
Standards
Item*
1
Ductwork
Location & Installation
1)
Paints
2)
Support
3)
1)
2)
3)
1)
Support
2)
Sufficient Radius
3)
1)
2)
3)
No Visible Damage
Fire-Rated Ducts
Location & Installation
Access Panel
No Visible Damage
Flexible Ducts
No Visible Damage
Flexible Connectors
Location & Installation
Length Limit
No Visible Damage
51
Appendix 3
Item*
5
Standards
Dampers
Location & Installation
1)
2)
3)
1)
2)
3)
4)
1)
2)
3)
4)
Cool air is not blocked by wall, beam, shelving or other builtin furniture in the room
Seal Penetration
5)
No Leakage
6)
Access Door
No Visible Damage
Fire Dampers
Location & Installation
Access Door
No Visible Damage
No Visible Damage
52
Appendix 3
Item*
8
Standards
Air-Con Comfort
Temperature
1)
Air Flow
2)
Relative Humidity
3)
1)
2)
3)
4)
5)
6)
1)
2)
3)
4)
5)
Support
No Visible Damage
10
Pump
Location & Installation
Electrical Termination
No Visible Damage
53
Appendix 3
Item*
11
12
Standards
Cooling Tower
Self-Earthing System
1)
2)
3)
No Visible Damage
4)
Pipework
including Chilled water, Hot
water, Steam, Condenser
water, Condenser drain,
Cold Water make-up,
water treatment and
refrigerant
1)
2)
Fire Stop
3)
4)
1)
2)
3)
4)
5)
6)
No Visible Damage
13
Chiller
Location & Installation
54
Appendix 3
Item*
No Leakage
Standards
7)
No sign of leakage
No Visible Damage
* An item is deemed to have failed if any one of the standards is not met
55
Appendix 3
Part 3: Quality Standards for Fire Protection Works
Item*
Standards
1)
2)
3)
4)
Landing valve painted red for wet riser / yellow for dry riser
5)
6)
7)
8)
9)
1)
2)
3)
4)
Pipe Support
5)
Wall/Floor Penetration
6)
Wall/Floor Penetration
No Visible Damage
Sprinkler
Location & Installation
No Visible Damage
56
Appendix 3
Standards
Item*
Fire Alarm
Location & Installation
1)
2)
3)
Paints
4)
5)
1)
2)
3)
3)
4)
No Visible Damage
Hosereel
Location & Installation
Paints
No Visible Damage
* An item is deemed to have failed if any one of the standards is not met
57
Appendix 3
Item*
1
Concealed Pipes
Location & Installation
Alignment
1)
2)
3)
Proper joints
4)
5)
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
No Visible Damage
Exposed Pipes
Location & Installation
Alignment
Clearance
No Visible Damage
58
Appendix 3
Item*
3
Water Tank
Location & Installation
Standards
1)
2)
3)
4)
5)
Netting
6)
Clearance
7)
No Visible Damage
8)
No visible damage
9)
1)
2)
3)
4)
Electrical Termination
No Visible Damage
* An item is deemed to have failed if any one of the standards is not met
59
Appendix 3
Part 5: Quality Standards for Basic M&E Fittings
Standards
Item*
1
General Requirements
2a
2b
2c
Pipes
Fittings
1)
2)
3)
4)
Functionality
Functional and safe
5)
Accessories Defects
No missing accessories
No visible damage / defects
1)
No damage or chokage
2)
3)
1)
2)
3)
No leakage at joints
4)
5)
6)
1)
2)
No leakage at joints
60
Appendix 3
Item*
M&E Fittings
3a
Installation
Standards
3)
No chipping or cracks
4)
5)
6)
7)
8)
9)
10)
2)
No stains
3)
3b
Safety
1)
3c
Damages
1)
No visible damage
* An item is deemed to have failed if any one of the standards is not met
61
Appendix 4
Defects Grouping
Defects Description
Floor
Wall
Finishing
Alignment & Evenness
Finishing
Alignment & Evenness
Crack & Damages
Roughness
Jointing
Ceiling
Door
Window
Component
M&E Fittings
Joints, Pointing
62
Appendix 5
CAT B
CAT C
CAT D
Commercial, Industrial,
Private Housing,
Public Housing
Landed Housing
Commercial, Institution,
Industrial & others
of building without
Semi-Detached
Terrace House
Bungalow
Cluster Housing
e.g.
e.g.
Bank
Condominium
Office Building
Apartments
Shopping Complex
School
Hotel
Factory
Supermarket
Warehouse
Airport
Hospital
Mixed Development
University
Regional Library
Conference Hall
Arts and Cultural Centre
Mixed Development
with Central Cooling
Note: The above is only meant to be a general guide in determining the Category of project. The
actual grouping might vary depending on the project details in the application.
63