Professional Documents
Culture Documents
40'-9" (12.42m)
!
550HC long section
38'-1" (11.6m)
Configuration I
290 HC/550 HC
/630EC-H Tower
315 ft (96m)
max. Hook height
Configuration II
290 HC/550 HC Tower
293 ft (89.4m)
max. Hook height
Configuration III
290 HC Tower
225 ft (68.6m)
max. Hook height
290 HC base section
40'-9" (12.42m)
Reinforced
section
40'-9" (12.42m)
4.14m
13'-7"
40'-9" (12.42m)
40'-9" (12.42m)
5.8m
Transition
section
19'-0"
5.8m
Transition
section
19'-0"
40'-9" (12.42m)
40'-9" (12.42m)
40'-9" (12.42m)
316 EC-H12
TOWER CRANE
230 ft (70m)
Configuration V
290 HC Tower
184 ft (56.2m)
max. Hook height
Configuration IV
290 HC Tower
212 ft (64.5m)
max. Hook height
FREESTANDING
stationary
Revised 0506
76'-1"
23.2m
3m
8.8m
9'-10"
28'-10"
5.1m
316 EC-H 12
16'-9"
230 ft (70m)
213 ft (65m)
197 ft (60m)
Jib Layout
131 ft (40m)
Hook Heights
No. of Tower
Elements
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17 3
Tower Element
Type
630EC-H BS
550HC STS
550HC STS
550HC STS
550HC STS
550HC STS
550HC STS
550HC STS
550HC STS
Transition
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
550 HC and
290 HC
rail-travelling undercarriage
feet
meters
feet
meters
48
67
86
105
125
144
163
182
201
220
233
247
260
274
288
301
315
14.7
20.5
26.3
32.1
37.9
43.7
49.5
55.3
61.1
66.9
71.1
75.2
79.4
83.5
87.6
91.8
96
76
95
114
133
152
171
190
209
228
247
260
274
288
301
315
328
23
28.8
34.6
40.4
46.2
52
57.8
63.6
69.4
75.2
79.4
83.5
87.6
91.8
95.9
100.1
No. of Tower
Elements
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17 3
Tower Element
Type
550HC STS
550HC STS
550HC STS
550HC STS
550HC STS
550HC STS
550HC STS
550HC STS
550HC STS
Transition
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
550 HC
550 HC
32'-10"
10m
19'-0"
5.8m
tower sections
on 19'-0" (5.8m)
8'-6"
2.6m
19'-0"
5.8m
1'-4"
0.4m
19'-0"
5.8m
1'-0"
0.3m
base section
8'-6"
2.6m
27'-11"
8.5m
630 EC-H
630 EC-H
tower sections
on 40'-9" (12.42m)
40'-9"
12.42m
550 HC and
290 HC
Configuration II
27'-11"
8.5m
Configuration I 1
32'-10"
10m
rail-travelling undercarriage
feet
meters
feet
meters
27
46
65
84
103
122
142
161
180
199
212
226
239
253
267
280
293 1
8.3
14.1
19.9
25.7
31.5
37.3
43.1
48.9
54.7
60.5
64.7
68.8
72.9
77.1
81.2
85.4
89.4 1
54
73
92
111
130
149
168
187
206
225
239
252
266
279
293
307
320 1,4
16.4
22.2
28
33.8
39.6
45.4
51.2
57
62.8
68.6
72.7
76.9
81
85.2
89.3
93.4
97.6 1,4
316 EC-H 12
Hook Heights
Configuration III 1
290 HC
8'-2"
2.5m
8'-2"
2.5m
No. of Tower
Elements
1
2
3
4
5
6
7
8
9
10
Tower Element
Type
290HC RBS
290HC BS
290HC BS
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
10"
0.26m
290 HC
40'-9"
12.42m
on 40'-9" (12.42m)
reinforced base section
10"
0.26m
40'-9"
12.42m
on 40'-9" (12.42m)
reinforced base section
meters
48
89
130
143
157
171
184
198
212
225
14.7
27.2
39.6
43.7
47.9
52
56.1
60.3
64.5
68.6
No. of Tower
Elements
Configuration V
No. of Tower
Elements
1
2
3
4
5
6
7
8
9
10
11 3
Tower Element
Type
290HC BS
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
290 HC
290HC RBS
290HC BS
290HC RTS
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
290HC STS
meters
48
89
103
116
130
143
157
171
184
198
212
14.7
27.2
31.3
35.4
39.6
43.7
47.9
52
56.1
60.3
64.5
19'-8"
6m
10"
0.26m
40'-9"
12.42m
on 40'-9" (12.42m)
standard base section
12'-6"
3.8m
290 HC
8'-2"
2.5m
1
2
3
4
5
6
7
8
9
10
11
Tower Element
Type
NOTE!
16'-3" 40'-9"
4.95m 12.42m
290 HC
290 HC
290 HC
Configuration IV 1
rail-travellingundercarriage
feet
meters
feet
meters
48
62
75
89
103
116
130
143
157
171 2
184 2
14.7
18.9
23
27.2
31.3
35.4
39.6
43.7
47.9
52 2
56.2 2
64
77
91
105
118
132
145
159
173
186 2,4
19.4
23.6
27.7
31.9
36
40.1
44.3
48.4
52.6
56.7 2,4
10'-0" x 10'-0"
3.05m x 3.05m
SLAB OPENING
Recommended
316 EC-H 12
2-Part Line
Jib Tip
Radius
Maximum
Capacity Radius
230 ft
70m
234'-11"
71.6m
26,460 lbs 73 ft
12 000 kg 22.4m
lbs 26,460 26,460 23,410 20,590 18,320 16,470 14,900 13,580 11,770 10,320 9,150 8,160 7,320 6,610
kg 12 000 12 000 10 620 9 340 8 310 7 470 6 760 6 160 5 340 4 680 4 150 3 700 3 320 3000
213 ft
65m
218'-6"
66.6m
26,460 lbs 76 ft
12 000 kg 23.3m
lbs 26,460 26,460 24,450 21,520 19,160 17,220 15,590 14,220 12,320 10,820 9,610 8,580 7,720
kg 12 000 12 000 11 090 9 760 8 690 7 810 7 070 6 450 5 590 4 910 4 360 3 890 3 500
197 ft
60m
202'-1"
61.6m
26,460 lbs 80 ft
12 000 kg 24.3m
lbs 26,460 26,460 25,570 22,510 20,040 18,030 16,340 14,900 12,940 11,380 10,100 9,040
kg 12 000 12 000 11 600 10 210 9 090 8 180 7 410 6 760 5 870 5 160 4 580 4 100
180 ft
55m
185'-8"
56.6m
26,460 lbs 83 ft
12 000 kg 25.2m
lbs 26,460 26,460 26,460 23,460 20,900 18,810 17,060 15,560 13,540 11,900 10,580
kg 12 000 12 000 12 000 10 640 9 480 8 530 7 740 7 060 6 140 5 400 4 800
164 ft
50m
169'-4"
51.6m
26,460 lbs 85 ft
12 000 kg 25.9m
lbs 26,460 26,460 26,460 24,250 21,610 19,440 17,640 16,120 14,020 12,350
kg 12 000 12 000 12 000 11 000 9 800 8 820 8 000 7 310 6 360 5 600
148 ft
45m
152'-11"
46.6m
26,460 lbs 87 ft
12 000 kg 26.4m
lbs 26,460 26,460 26,460 24,760 22,070 19,860 18,030 16,470 14,330
kg 12 000 12 000 12 000 11 230 10 010 9 010 8 180 7 470 6 500
131 ft
40m
136'-6"
41.6m
26,460 lbs 88 ft
12 000 kg 26.8m
Capacity
ft
m
66
20
72
22
82
25
92
28
102
31
112
34
121
37
131
40
148
45
164
50
180
55
197
60
213
65
230
70
2-Part Line
21,000 lbs/9 530 kg
18,000 lbs/8 160 kg
16,760 lbs
7 600 kg
14,330 lbs
6 500 kg
12,350 lbs
5 600 kg
10,580 lbs
4 800 kg
9,040 lbs
4 100 kg
7,720 lbs
3 500 kg
6,610 lbs
3 000 kg
0
60
18.3
70
21.3
80
24.4
90 100
27.4 30.5
110
33.5
120
36.6
131
40
148
45
164
50
180
55
197
60
213
65
230
70
ft
m
316 EC-H 12
Tie-in Details
Hydraulic Top
Climbing Unit
[Site conditions
Tie-in struts
Connection
plates (2) by
contractor
TIE-IN ASSEMBLY
dependent]
[Site conditions
Direction of jib
when climbing.
Tie-in collar
Face of
structure
dependent]
Centerline of crane
Tie-In
Assembly
Tie-In
Assembly
TOP CLIMBING
316 EC-H 12
Foundation Details
8'-0" (2.45m)
outside to outside
Minimum 8'-6"
clearance 2.6m
on concrete footing
8'-0" (2.45m)
outside to outside
Minimum 8'-6"
clearance 2.6m
7'-7" (2.3m)
outside to outside
8'-2"
2.5m
Minimum
clearance
Reinforcing
steel each way
Foundation
anchors (4)
Foundation
anchors (4)
7'-3" o.c.
2.2m o.c.
Reinforcing
steel each way
Pinned
6'-6" o.c.
1.98m o.c.
6'-6" o.c.
1.98m o.c.
Reinforcing
steel each way
10
3.1 '-3"
1m o.c.
o.c
.
10
3.1 '-3"
1m o.c.
o.c
.
7'-3" o.c.
Reinforcing
steel each way
2.2m o.c.
7'-3" o.c.
2.2m o.c.
Reinforcing
steel each way
Undercarriage Details
Minimum
clearance
Foundation
anchors (4)
7'-3" o.c.
2.2m o.c.
Reinforcing
steel each way
Bolted
9'2.8 2" o
m .c.
o.c
.
Bolted
19'-0"
5.8m
on rail-travelling undercarriage
Minimum
clearance
19'-0"
5.8m
12'-6"
3.8m
19'-8"
6m
32'-10"
10m
32'-10"
10m
16'-3"
4.95m
27'-11"
8.5m
27'-11"
8.5m
Minimum
clearance
19'-8"
6m
32'-10"
10m
630 EC-H
Rail
gauge
32'-10"
10m
550 HC
Rail
gauge
Rail
gauge
290 HC
NOTE! For information regarding rail-travelling, static undercarriages and centralballast configurations, see 316 EC-H 12 Operation Manual.
316 EC-H 12
Gear
3-speed gearbox
Electromagnetic gear shifting
Eddy current brake
2-Part Line
8L-242
1
2
3
up to 26,460 lbs
118 fpm
up to 12 000 kg
@ 36 m/min
up to 9,260 lbs
289 fpm
up to 4 200 kg
@ 88 m/min
up to 3,090 lbs
640 fpm
up to 1 400 kg
@ 195 m/min
IMPORTANT Capacities and line speeds indicated will vary depending on the amount of hoist wire rope installed. This crane model may be equipped with a hoist until other than
that specified in the data shown above. To verify, check serial number and refer to 316 EC-H 12 Operation Manual for additional information.
Motor Information
Drive Unit
Horsepower
Kilowatts
14.7 hp
11 kW
Speed
0 - 377 fpm
Trolley (VFD)
2 x 8.4 hp
2 x 6.3 kW
2 x 10 hp
2 x 7.5 kW
0 - 115 m/min
0.7 rpm
82 fpm
25 m/min
Power Requirements
480 V phase-phase, 277 V each phase to ground with 120 phase shift between phases. Do not use an Open-Delta supply.
Travelling: 195 Amperes (when using a 290 HC travelling undercarriage. If alternate undercarriage is used, contact Bigge for
power requirements.)
Counterweights*
Counterjib
Jib length
76-ft (23.2m)
60-ft (18.2m)
230-ft (70m)
213-ft (65m)
197-ft (60m)
180-ft (55m)
164-ft (50m)
148-ft (45m)
131-ft (40m)
No. of blocks
7A + 2B
6A + 2B
7A
6A
8A + 1B
6A + 2B
6A + 1B
Weight in lbs
46,410 lbs
41,450 lbs
40,010 lbs
35,050 lbs
48,170 lbs
41,450 lbs
38,250 lbs
Weight in kg
21 050 kg
18 800 kg
18 150 kg
15 900 kg
21 850 kg
18 800 kg
17 350 kg
NOTE! Weight of the A Block is 4,960 lbs (2 250 kg); the B Block is 3,200 lbs (1 450 kg) and the D Block is 5,290 lbs (2 400 kg). Counterweights must be installed from rear to front, i.e. towards the tower. It is recommended that the weight of each counterweight be verified before
installation. Counterweight figures displayed in the chart above are for crane with hoist unit WiW 291 JX 410 installed. If another hoist unit is
installed, refer to the Liebherr 316 EC-H 12 Operation Manual or contact Bigge for additional information.
*IMPORTANT One (1) D Block must be installed beneath the hoist unit frame of the counterjib.
Specifications subject to change without prior notice. For additional information, contact Bigge.
316 EC-H 12
Dimensions
Description
LxWxH
Tower Top
Dimensions
Weight Description
LxWxH
Weight
Jib Section 7
C051.001.611.111
Slewing Assembly
(Complete) 1
Jib Section 7
#621
Slewing Assembly
Upper Part 2
Jib Section 7
C051.023.631.111
Slewing Assembly
Lower Part 3
Jib Section 7
#632
Hoist Unit 4
108 hp (80 kW)
Jib Section 7
#633
Counterjib
A 5
Counterjib
B 6
H
L
H
L
Jib Section 7
#635
Jib Section 7
#634
1,810 lbs
820 kg
1,120 lbs
510 kg
Counterweight Block A
with frame
Jib Section 7
#641
Counterweight Block B
with frame
Jib Assembly 8
230-ft (70m)
630 lbs
285 kg
Base Section
290HC
Jib Assembly 8
213-ft (65m)
Jib Assembly 8
197-ft (60m)
Jib Assembly 8
180-ft (55m)
Jib Assembly 8
164-ft (50m)
Jib Assembly 8
148-ft (45m)
5,070 lbs
2 300 kg
6,500 lbs
2 950 kg
Jib Assembly 8
131-ft (40m)
Transition (P/B)
550HC/290HC
Base Section
630EC-H (B/P)
NOTE! Weights and dimensions are approximate. Scale components before lifting. Consult Operation Manual before erecting, operating, servicing or dismantling crane.
Slewing Assembly Complete includes cab, platforms, two swing motors, slewing ring with support and four non-detachable climbing shoes. Dimensions above are for climbing shoes in transport position.
2
Slewing Assembly Upper Part includes operators cab, platforms and two swing motors.
3
Slewing Assembly Lower Part includes slewing ring, slewing ring support and four non-detachable climbing shoes. Dimensions shown above are with climbing shoes in transport position.
4
Includes 108 hp (80 kW) hoist drive with empty rope drum, switchgear panels, and hoist unit frame. Typical installation of 790 ft (240m) of wire rope weighs approximately 1,190 lbs (540 kg).
5
Counterjib A includes sections #1 (4,980 lbs/2 260 kg), #3 (6,880 lbs/3 120 kg), pendant bars, handrails and D block. Counterjib A is required for jibs 164 ft (50m) and shorter. D block is 5,290
lbs (2 400 kg).
6
Counterjib B includes sections #1, #2 (3,420 lbs/1 550 kg), #3, pendant bars, handrails and D block. Counterjib B is required for jibs 180 ft (55m) and longer. D block weighs 5,290 lbs (2 400 kg).
7
Jib layout details provided in 316EC-H12 Operation Manual. IMPORTANT: Please verify all jib components PROIR to assembly and installation.
8
Jib Assemblies include jib sections, pendant bars, pendant bar connecting pins and plates, trolley drive unit, trolley wire rope, hook block and trolley.
1