You are on page 1of 11

1180 MW Combine Cycle Power Plant BHIKKI

Project Site Visit 500/220/132 KV Grid Station


Sheikhupura-Lahore

Date
:Saturday 16th April 2016
Location
:Sheikhupura/Lahore 500/220/132 KV Gird Station
Time
:11:00 A.M to 1:00 P.M
Subject
: Project Site Visit Report
Purpose of Visit : HEI Scope of Work as Per NTDC Additional Requirement
Prepared By
: Muhammad Saqib / Syed Salman Assistant Manager Electrical (HEI)
Participants:
1- Mr.Ren Shinzen (HEI)
2-Mr.Muhammad Saqib (HEI)
3-Mr Syed Salman Hussain (HEI)
4-Mr.Zhang (HEI)
5-Mr.Sony (HEI)
6-Mr.Asif Raza (Siemens Pakistan)
7-Sufyan Qureshi (Deputy Manager 500 KV Grid Station Sheikhupura/Lahore)
8-Asim Iqbal (Superintendent Engineer 500KV Grid Station Sheikhupura/Lahore)
1 / 11

1180 MW Combine Cycle Power Plant BHIKKI

2 / 11

1180 MW Combine Cycle Power Plant BHIKKI


Reference to our site visit to Sheikhupura/Lahore grid station Following below points noted:
1-Exisiting 500KV Transmission Lines Connected Between 500KV Gatti GS to 500KV Sheikupura/Lahore GS
Total 110 KM.
2-After HEI 1180 MW Bikki Power Plant Project the 500KV Transmission Lines Connect Gatti to Bhikki and Bhikki
to Sheikupura /Lahore.
3-Total Length of Gatti to Bhikki GS is 92 KM (Roughly Estimated).

4-Total Length of Bhikki to Sheikhiupura/Lahore 18KM (Roughly Estimated).


4-As per Our observation after site Visit HEI/Alstom require some changes in Transmission Lines Protection Relay
Settings. and further there is no need of any additional protection panel or Protection relay require as per NTDC
additional Requirements in last meeting Regarding Bhikki Switch Yard.
5-Major changes in Distance Protection Relays setting due to change in Transmission Lines Distances.
6-HEI/Alstom shall foresee Telecom SCADA Gatti/Sheikpura/Lahore existing 500KV Grid station design with
respect to New Bhikki Power Plant 500KV Grid station design & equipments further also check all Provision require
for interfacing of Bhikki Alstom 500KV Switch yard with existing equipment in Gatti/Sheikpura/Lahore Substation.
Major Equipment List of Sheikhpura /Lahore 500KV Grid Station
Type

Model

Make

Panels

Auto recloser relay

CCRP01

GEC

SET I

Distance relay

Micro mho (SHNB102)

GEC

Auto recloser relay

RAAAM

Distance relay

RAZFE

Over current

MCGG82

SDH

MSE-5100

SET I
SET II

ABB
GEC

SET II
SET II

Alstom

Telecom Panel

PLC(Power Line Carrier)

T-390

MICOM

Telecom Panel

PLC (Power Line Carrier)

NSD-570

ABB

Telecom Panel

3 / 11

1180 MW Combine Cycle Power Plant BHIKKI


PROTECTION PANELS SET-1 & SET-2

4 / 11

1180 MW Combine Cycle Power Plant BHIKKI


SCADA & TELECOM PANEL

5 / 11

1180 MW Combine Cycle Power Plant BHIKKI

SCADA & TELECOM PANEL

6 / 11

1180 MW Combine Cycle Power Plant BHIKKI


SPACE AVAILABLE FOR FUTURE PRTECTION PANELS WITH CABLE TRAY AND TRENCH
ARRANGEMENTS.

7 / 11

1180 MW Combine Cycle Power Plant BHIKKI


GANTRY FOUNDATION

8 / 11

1180 MW Combine Cycle Power Plant BHIKKI


OTHER EQUIPMENTS

9 / 11

1180 MW Combine Cycle Power Plant BHIKKI


OTHER EQUIPMENTS

10 / 11

1180 MW Combine Cycle Power Plant BHIKKI

11 / 11

You might also like