Professional Documents
Culture Documents
(MOP)
Page 1 of 6
REVISION
DETAIL/S
AUTHOR
APPROVED BY
DATE APPROVED
Edward Carlo
Gaspar
1. DESCRIPTION
To be able to integrate U900 F2 Technology under Project Latitude
3. BACKGROUND
3G Technology U900 F2 Activation under Project Latitude
4. PROPONENT
Name
Position
Ericson Blue Sta
Maria
Maria Kristina
Estacio
Karen Garcia
Dept./Div.
Engineer
AEI/RCM
Sr.
Engineer
Manager
AEI/RCM
Signature
Date
AEI/RCM
<Division Head>
Note: Required Signatories
Minor up to Section Head
Major up to Department Head
Critical up to Division Head
10:00H-04:00H
6. CHANGE CATEGORY
Minor
Major
Critical
METHOD OF PROCEDURE
(MOP)
Page 2 of 6
Product : HUAWEI
SITE
NAME
REGION
UBBP
UMPT
UPEU
FANC
POWER
CABLE
NL122
CANDABA
NLZ
NL110
PNIQUIPAM
NLZ
NL1147
ALIAGA
NLZ
NL228
GENTINIO
NLZ
NL236
QUEZONNE
NLZ
NL1430
RICARDONE
NLZ
NL1110
ISIDRONE
NLZ
NL136
LUBAO
NLZ
NL137
NLZ
NLZ
NL105
LUBAO2
STATERESA
1
UB3LUBAO
NLZ
NL87
MARINGIN
NLZ
NL164
STARITPAM
NLZ
NL115
YES
NO
Description
SO REF#
MOP REF#
Other Network Element (NE)
Affected
Remarks:
11.
METHOD OF PROCEDURE
(MOP)
Page 3 of 6
Product
Version
Remarks
Huawei
BTS3900
V900R015ENGC00SPH536
BTS3900
V100R010C10SPC255
SOFTWARE
Version
Remarks
Product
Huawei
BTS3900
V900R015ENGC00SPH536
BTS3900
V100R010C10SPC255
12.
PEOPLE INVOLVED DURING IMPLEMENTATION OF THE
ACTIVITY
Company
Department
HUAWEI
HUAWEI
HUAWEI
WIRELESS
WIRELESS
WIRELESS
GLOBE
RAN
13.
Name
Role
Contact
Number
Rebo Guardiano
Rizza Alvaro
Sherwin
Magtibay
GT SCC NOC
RAN
Doer
Doer
Doers IS (Escalation
1)
Activity Monitoring
09053698455
09154068645
09159866978
09054169217
SUPPORTING DOCUMENTS
Reference Number
14.
Description
Start Time
End Time
Activity
09:00H
10:00H
10:00H
02:00H
Responsible
HT NOC & GT
NOC
HT NOC
Remarks
No Downtime
No Downtime
METHOD OF PROCEDURE
(MOP)
Page 4 of 6
03:00H
03:00H
04:00H
Revert procedure
HT NOC & GT
NOC
HT NOC
No Downtime
No Downtime
17.
18.
PRE-ACTIVITY PROCEDURES
Export the current configuration of the BSC; through MML commands: EXP CFGMML
Save all existing alarms, before & after the activity.
Advise GT NOC RAN before the start of the activity.
19.
METHOD OF PROCEDURE
(MOP)
Page 5 of 6
21.
REVERT BACK PROCEDURES
For HT NOC Side
1. Load the script for removing U900 technology.
LATEST TIME TO REVERT : 05:00
22.
METHOD OF PROCEDURE
(MOP)
Page 6 of 6