Tarifa
US$/hora
Mano de Obra
US$/hra
Gln/hora
26
108
297
77
200
53
3.0
5.9
6.4
4.1
5.1
4.1
3.5
18.5
30
11
18
7.5
CARGUIO
PALA
EXC345
CF 992C
ACARREO
CAM 777F
CAM 777F
CAM 777F
NRO PASE
5
20
5
Tiempo de Carguio
2.3
5.3
4.3
EXC 345
CF 966
VOLQ
VOLQ
4
5
1.3
1.8
D2
US$/hora
14
74
120
44
72
30
Total PU
US$/hora
43.0
187.9
423.4
125.1
277.1
87.1
Observ.
Origen
VOLQUETES
Suro Sur F2
Sub Plan
Suro Sur F2
Sub Plan
Tarifa T/C
US$/Hr
43.0
43.0
43.0
43.0
Ciclo
min
15.0
20.0
25.0
10.0
Ciclo
hr
0.3
0.3
0.4
0.2
Rend.
Viaje/hr
4.00
3.00
2.40
6.00
Rend .
TM/Hora
83.93
62.95
50.36
125.89
Costo
US$/tm
0.51
0.68
0.85
0.34
Produccion
Hras
Efec.
15.8
15.8
15.8
15.8
30.0
18.0
8.0
30.0
25.0
0.5
0.3
0.1
0.5
0.4
2.00
3.33
7.50
2.00
2.40
41.96
69.94
157.37
41.96
50.36
1.02
0.61
0.27
1.02
0.85
15.8
15.8
15.8
15.8
15.8
PAD_Fase7
PAD_Fase5
Botadero Alumbre W
Botadero Alumbre
Tipo
Material
Mineral
Mineral
Desmonte
Desmonte
PAD_Fase7
PAD_Fase5
PAD_Suro Norte
Botadero Contratas
Botadero Suro Norte
Mineral
Mineral
Mineral
Desmonte
Desmonte
2.50
1.50
0.50
3.50
1.5
43.0
43.0
43.0
43.0
43.0
PAD_Fase7
PAD_Fase5
Botadero Alumbre
Botadero Alumbre W
Mineral
Mineral
Desmonte
Desmonte
1.50
2.00
1.00
2.50
187.9
187.9
187.9
187.9
15.0
20.0
10.0
20.0
0.3
0.3
0.2
0.3
4.00
3.00
6.00
3.00
368.00
276.00
552.00
276.00
0.51
0.68
0.34
0.68
15.8
15.8
15.8
15.8
PAD_Fase7
PAD_Fase5
PAD_Suro Norte
Botadero Contratas
Mineral
Mineral
Mineral
Desmonte
2.5
1.5
0.50
3.50
187.9
187.9
187.9
187.9
25.0
15.0
8.0
30.0
0.4
0.250
0.1
0.5
2.40
4.00
7.50
2.00
220.80
368.00
690.00
184.00
0.85
0.51
0.27
1.02
15.8
15.8
15.8
15.8
Destino
Distancia (Km)
1.50
2.00
2.50
1.00
* Todo acceso a construir deber tener un mximo de 9% de gradiente, deben cumplir las especificaciones de diseo, muros de seguridad, cunetas, p
escorrentas de agua, esta mejora nos permitir mantener velocidad constante mayor tiempo, reduciendo los tiempos de ciclo.
* Control de carga de volquetes y camiones, se evaluara la carga adecuada de acuerdo a su diseo.
* Control de rendimiento efectivo de acuerdo a la carga asignada.
* Emprender plan conjunto con mantenimiento para tener mayor disponibilidad mecnica de los equipos de acarreo. Cumplimiento 80%
22
80%
90%
oduccion
TM/Dia
1329.42
997.06
797.65
1994.13
664.71
1107.85
2492.66
664.71
797.65
5829.12
4371.84
8743.68
4371.84
3497.47
5829.12
10929.60
2914.56
HEP
22
DM
80% UT
90%
CARGA
CARGUIO
PALA RH90C
EXCV 345
CF 992C
Cargador 966
RECIBE
Material
Tarifa T/C
US$/Hr
Nro
Pases
Ciclo
Ciclo
ACARREO
Rend .
Costo
Produccion
min/car
ga
hr
CAP/VIAJE
TM/Hora
US$/TM
Horas Efec.
TM/Dia
CAM 777F
Varios
422.8
5.00
2.3
0.04
92.00
2400.00
0.18
15.8
38,016.0
CAM 777F
Varios
125.1
17.00
5.3
0.09
92.00
1041.51
0.12
15.8
16,497.5
125.1
5.00
1.3
0.02
21.00
969.23
0.13
15.8
15,352.6
276.9
87.1
6.00
4.3
1.8
0.07
0.03
92.00
21.00
1283.72
700.00
0.22
0.12
15.8
15.8
20,334.1
11,088.0
CAM 777F
Varios
VOLQ 15m3 Varios
* Hallar la granulometra adecuada para que los equipos no pierdan eficiencia por presencia del exceso de material grueso o frente duro.
* Control constante de rendimientos de acuerdo a catlogos y tiempo de vida del equipo.
* Practicas operacionales que reduzcan demoras operativas.
DATOS:
junio-12
30
TONELAJE ROCA:
642,040.0
256,816.0
6.1
7.0
2.55
9.5
1,032.2
B:
S:
Densidad Mat:
H:
Toneladas x taladro
MALLA 7 X 6,1
PERFORACION
MINERAL SUAVE
Metros perforados:
2,363.7
N Tal :
248.8
ROCA
DM45E-04
Metros Totales Perforados
N Total de Taladros
9,904.0
1,042.5
9,904.0
N Total de Taladros
1,042.5
TM Roca producidas
642,040.0
Velocidad de Perforacion:
Tiempo total requerido de perforacion:
40.0
247.6
68%
14.96
m/h
448.8
0.6
16.6
COSTO PERFORACION
8.6
12.2
9,904.0
85,174.0
Combustible perforadora
Precio galon
Consumo Hora:
Costo - Hora:
4.1
17.9
73.4
Horas Requeridas
247.6
18,171.3
Costos Adicionales
C. operativos
Administrativos, operativos y de mantto
Epp
Mano de obra
Alimentacin
65.0
1,773.3
354.7
2,192.9
P.UNITARIO($)
945.0
5,440.0
3,200.0
485.0
1,860.0
1,275.0
132.0
26.0
1,390.0
1,390.0
245.0
VOLADURA
PRECIO DE 1KG DE EXPLOSIVO:
128,396.3
13.0
0.1644
$/mp
0.9
0.4
0.1
0.0
0.2
0.1
0.0
0.0
0.0
0.0
0.0
AP:
5.0 5.0
Densidad
Emulsion:
Anfo:
NA
Diesel - 2
1 Galon Diesel
0.50
0.50
0.47
0.03
3.8
0.031
0.88
Datos:
Expl. : 64
N Taladros
Taladro
Altura de Carga
Costo unitario exp.
Densidad lineal (Kg / m)
Kg. Expl / tal :
TM/Tal
Total explosivo a utilizar por mes (kg)
Costo Lineal:
Costo / tal :
Costo Total en explosivo / mes :
1.3
1,043.0
6.75
5.0
0.171
0.598
30.3
151.3
615.6
157,841.7
18.1
90.4
0.25 Kg/Tal
94,321.7
Booster Pentolita
Fanel Dual
Retardos
Detonador Ensamblado
Cantidad
1,043.0
1,043.0
80.0
30.0
Precio
4.1
5.8
2.8
2.6
Costo
4,224.2
6,012.9
224.0
78.3
10,539.3
17,050.0
114,267.4
0.178
78,920.9
74,659.1
1279.4 Gl
1,043.0
1,043.0
80.0
30.0
0.342
242,663.7
9,406.3
dias
385,224.0
4.2
4.8
2.6
9.5
485.3
MINERAL DURO
Metros perforados:
7,540.3
N Tal:
793.7
722,040.0
1,615.8
MALLA 5 x 4.3
Unidades
9.0
0.7
0.4
0.8
1.0
1.0
1.7
2.0
0.2
0.2
0.5
Requerimientos (und)
10.0
1.0
1.0
1.0
1.0
1.0
2.0
2.0
1.0
1.0
1.0
Costo
9,450.0
5,440.0
3,200.0
485.0
1,860.0
1,275.0
264.0
52.0
1,390.0
1,390.0
245.0
25,051.0
P.U
0.58
Costos:
0.29
0.58
0.03
4.1
0.27
0.03
DENSIDAD
ANFO
0.79
DE MEZCLAS
EXPLOSIVAS
(gr / cc)
Costo Total
0.598
EM.
1.59
HA 19
0.87
HA 28
0.91
HA 37
0.97
HA 46
1.17
HA 55
1.26
HA 64
1.31
HA 73
1.35
DATOS:
TONELAJE ROCA:
477,960.0
80,000.0
6.1
7.0
2.6
9.5
1,032.2
B:
S:
Densidad Mat:
H:
Toneladas x taladro
PERF
DESMONTE SUAVE (CARBON)
Metros perforados:
736.3
N Tal :
77.5
DM45E-04
Metros Totales Perforados
N Total de Taladros
TM Roca producidas
5,445.9
573.3
477,960.0
Velocidad de Perforacion:
Tiempo total requerido de perforacion(hrs)
40.0
136.1
68%
15.0
448.8
0.3
9.1
COSTO PERFORACION
Combustible perforadora
Precio:
Consumo Hora:
Costo - Hora:
Horas Requeridas
Costos Adici
C. operativos
Administrativos, operativos y de
mantto
P.UNITARIO($)
945.0
5,440.0
3,200.0
485.0
1,860.0
1,275.0
132.0
26.0
1,390.0
1,390.0
245.0
COSTO TOTAL MENSUAL -
VOLADURA
PRECIO DE 1KG DE EXPLOSIVO:
AP:
Emulsion:
Anfo:
NA
Diesel - 2
1 Galon Diesel
5.0
0.50
0.50
0.47
0.03
3.8
Datos:
Expl. :
N Taladros
Taladro
Altura de Carga
Costo unitario exp.
Densidad lineal (Kg / m)
Kg. Expl / tal :
TM/Tal
Total explosivo a utilizar por mes (kg)
Costo Lineal:
Costo / tal :
Costo Total en explosivo / mes :
0.79
574.0
6.75
5.5
0.598
18.1
99.7
832.7
57,244.0
10.8
59.6
34,207.4
Booster Pentolita
Fanel Dual
Retardos
Detonador Ensamblado
Cantidad
574.0
574.0
200.0
40.0
Costo total en accesorios / mes
28,622.0
27,076.4
463.98 Gl
574.0
574.0
200.0
40.0
FASE 2 Y FASE 3
30
dias
MALLA 7 X 6,1
PERFORACION
DESMONTE DURO
Metros perforados:
N Tal:
ROCA
Metros Totales Perforados
5,445.9
N Total de Taladros
573.3
m/h
or metro perforados
8.6
12.2
5,445.9
46,834.6
ustible perforadora
4.1
17.9
73.4
136.1
9,991.8
Costos Adicionales
Epp
Mano de obra
65.0
975.1
Alimentacin
195.0
Costos Adicionales
1,235.1
$/mp
0.9
0.4
0.1
0.0
0.2
0.1
0.0
Unidades
5.0
0.4
0.2
0.5
0.5
0.5
0.9
Requerimientos (und)
5.0
1.0
1.0
1.0
1.0
1.0
1.0
5,000.0
60,000.0
60,000.0
20,000.0
STO TOTAL MENSUAL - ACCESORIOS
0.0
0.0
0.0
0.0
1.1
0.1
0.1
0.3
2.0
1.0
1.0
1.0
Densidad
P.U
0.58
Costos:
0.29
0.58
0.03
4.1
0.27
0.03
DENSIDAD
ANFO
58,061.5
14.1
0.1215
5.0
0.031
0.88
EM.
0.171
DE MEZCLAS
HA 19
HA 28
HA 37
EXPLOSIVAS
HA 46
HA 55
HA 64
0.12 Kg/Tal
(gr / cc)
HA 73
Precio
4.1
5.8
2.8
2.6
Costo
2,324.7
3,309.1
560.0
104.4
6,298.2
5,005.4
17,050.0
45,511.0
0.095
78,920.9
101,735.6
0.217
103,572.5
0.1
397,960.0
5.7
6.5
2.3
9.5
802.8
MONTE DURO
4,709.6
495.7
REQUIERE PERFORAR
Costo
4,725.0
5,440.0
3,200.0
485.0
1,860.0
1,275.0
132.0
52.0
1,390.0
1,390.0
245.0
20,194.0
Costo Total
0.598
0.79
1.59
0.87
0.91
0.97
1.17
1.26
1.31
1.35
SE REQUIERE
MINA
(US$/ TM
ROCA)
2012
Proyectado
Abr
Junio
Transporte
Carguio
Perforacion
Voladura
Oper. Botaderos
Mtto. de Vias
E. Soporte Mina
Adm. Oper. Mina
0.51
0.10
0.21
0.13
0.02
0.10
0.15
0.08
0.37
0.15
0.14
0.14
0.03
0.07
0.11
0.06
1.31
1.08