Description
Unit Quantity
Rate
Rs.
Amount
Rs.
MT
15
0.80
12.000
MT
0.75
0.80
0.600
2.
Foundation materials
LS
KM
0.65
0.650
3.
Earthing materials
0.02
0.060
4.
KM
6.1
1.37
8.357
5.
Insulators
LS
KM
1.30
1.300
6.
LS
KM
0.60
0.600
7.
KM
1.01
0.20
0.202
8.
LS
KM
0.03
0.030
SETS
23.799
9.
Spares @ 3%
0.71
10.
2.50
2.50
11.
Erection charges
3.00
3.00
0.12
30.13
3.01
33.15
0.99
34.14
3.67
37.81
37.81
OR SAY Rs.38.00 LAKHS
2
3
4
5
6
6.1
9.2
6.2
6.3
Nos.
Nos.
Nos.
kMs.
23
1.17
26.91
15
3
0.036
0.036
0.54
0.108
2
3
0.15
0.50
0.3
1.50
10
10.5
0.03
6.4
Nos.
Nos.
Nos.
Nos.
0.15
9.5
7
8
9
10
11
12
13
14
Note:
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
kMs.
kMs.
kMs.
1
2
25
3.49
2.00
0.02
4.00
0.50
1
1
1.70
1.50
1.70
1.50
2
0.5
0.5
0.5
0.03
0.50
0.20
1.30
0.06
0.25
0.10
0.65
48.27
6.960
55.23
1.10
56.33
3.38
59.71
COST DATA FOR ERECTION OF 132 KV DC/SC LINE (DATA FOR 1 KM)
Sl.
No.
Description
Unit
Quantity
MT
15
0.80
12.00
MT
0.75
0.80
0.60
2.
Foundation materials
LS
LS
0.65
0.65
3.
Earthing materials
SETS
0.02
0.06
4.
KM
3.05
1.37
4.18
5.
Insulators
LS
LS
1.30
1.30
6.
LS
LS
0.60
0.60
7.
KM
1.01
0.20
0.20
8.
LS
LS
0.03
0.03
1.
Rate
(Rs.Lakhs)
Amount
(Rs.Lakhs)
19.62
9.
Spares @ 3%
0.59
10.
LS
LS
2.50
2.50
11.
Erection charges
LS
LS
3.00
3.00
12.
0.12
25.83
2.58
28.41
SUB-TOTAL
Price escalation @ 10%
0.85
29.26
3.15
TOTAL
32.41
or say Rs.33.00 lakhs
\\vboxsrv\conversion_tmp\scratch8926\[90249299.xls.ms_office.xls]2x50 (LILO)
COST DATA FOR ERECTION OF 132/33 kV SUBSTATION WITH 2x50 MVA POWER
TRANSFORMERS WITH 2NOs.132KV INCOMING AND 4NOs. 33KV OUTGOING
FEEDERS(LILO)
Sl.
No.
1
2
3
4.
5.
6.
7
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36
Item
50 MVA Transformers
132 kV Breakers
33 kV Breakers
132 kV Current Transformers
33 kV Current Transformers
132 kV Potential Transformers.
33 kV Potential Transformers.
132 kV CVTs.
132 kV Lightining Arrestors
33 kV Lightining Arrestors
132 kV Isolators
33 kV Isolators
33 kV Twin Feeder control & Relay Panels
132 kV Feeder control & Relay Panels
Transformer HV&LV Control Panels
LTAC Panels
Battery set
Station Transformer
Control & Power Cables
Structures
Bolts & Nuts
33 kV 5 MVAR Shunt Capacitor Banks
Control House
Bus bar Jumpers, insulators,
Earth connectors clamps & connectors etc.,
Foundations for Structures & Trs.
Fire Protection Equipment
Land & Rights, levelling etc.,
Roads & Bridges
Enclosers & Sidings
Office & Stores
Sanitary System
Water System
Electricty System
Cable Laying System
General Substation equipment
Diesel Generator set
Unit
Quantity
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
No.
Nos.
No.
No.
No.
KM
MT
MT
Sets
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
2
4
6
12
18
3
3
4
12
21
7
12
2
2
2
1
1
1
20
40
2.5
0
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
Rate
Amount
(Rs. lakhs) (Rs. lakhs)
400.000
800.000
11.000
44.000
3.200
19.200
0.900
10.800
0.250
4.500
0.940
2.820
0.140
0.420
2.600
10.400
0.370
4.440
0.050
1.050
1.330
9.310
0.310
3.720
1.370
2.740
5.400
10.800
7.130
14.260
1.120
1.120
2.770
2.770
1.100
1.100
0.500
10.000
0.800
32.000
0.800
2.000
9.890
0.000
40.000
40.000
5.000
5.000
7.500
7.500
52.000
52.000
3.000
3.000
20.000
20.000
21.000
21.000
15.000
15.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
8.000
8.000
2.500
2.500
4.000
4.000
SUB - TOTAL
1173.450
29.624
39.498
59.247
1301.819
130.182
1432.000
42.960
1474.960
158.558
TOTAL
1633.519
Spares @ 3%
Transport & Insurance @ 4%
Erection charges @ 6%
Price escalation @10%
Contingencies @ 3%
Establishment and overhead
charges @ 10.75%
COST DATA FOR ERECTION 132/33 kV SUBSTATION WITH 2 X 50 MVA POWER TRANSFORMERS
(RADIAL)
Sl.
No.
1
2
3
4.
5.
6.
7
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36
Item
Unit
Quantity
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
No.
Nos.
No.
No.
No.
KM
MT
MT
Sets
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
3
6
9
18
3
3
2
9
21
5
12
2
1
2
1
1
1
15
50
2.5
0
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
Rate
(Rs. lakhs)
230.00
37.500
11.00
3.20
0.90
0.25
0.94
0.14
2.60
0.37
0.05
1.33
0.32
1.37
5.40
9.00
1.12
2.37
1.10
0.50
0.80
0.80
9.89
40.00
5.00
7.50
52.00
3.00
20.00
21.00
15.00
2.00
2.00
2.00
8.00
Amount
(Rs. lakhs)
230.00
37.500
33.00
19.20
8.10
4.50
2.82
0.42
5.20
3.33
1.05
6.65
3.84
2.74
5.40
18.00
1.12
2.37
1.10
7.50
40.00
2.00
0.00
40.00
5.00
7.50
52.00
3.00
20.00
21.00
15.00
2.00
2.00
2.00
8.00
LS
LS
2.50
4.00
2.50
4.00
619.84
11.59
15.45
23.18
670.06
67.01
737.07
22.11
759.18
81.61
840.79
Item
Unit
Quantity
Rate
(Rs. lakhs)
Amount
(Rs. lakhs)
16 MVA Transformers
No.
125.00
125.00
132 kV Breakers
Nos.
11.00
22.00
33 kV Breakers
Nos.
3.20
16.00
4.
Nos.
0.90
5.40
5.
33 kV Current Transformers
Nos.
15
0.25
3.75
6.
Nos.
0.94
2.82
33 kV Potential Transformers.
Nos.
0.14
0.42
8.
132 kV CVTs.
Nos.
2.60
5.20
9.
Nos.
0.37
2.22
10.
33 kV Lightining Arrestors
Nos.
15
0.05
0.75
11.
132 kV Isolators
Nos.
1.33
5.32
12.
33 kV Isolators
Nos.
11
0.32
3.52
13.
No.
1.37
2.74
14.
No.
5.40
5.40
15.
No.
9.00
9.00
16.
LTAC Panels
No.
1.12
1.12
17.
Battery set
No.
2.37
2.37
18.
Station Transformer
No.
1.10
1.10
19.
KM
15
0.50
7.50
20.
Structures
MT
30
0.60
18.00
21.
MT
0.60
1.20
240.83
22.
Sets
9.89
0.00
23.
Control House
LS
LS
25.00
25.00
24.
LS
LS
5.00
5.00
25.
LS
LS
15.00
15.00
26.
LS
LS
1.00
1.00
27.
LS
LS
20.00
20.00
28.
LS
LS
10.00
10.00
29.
LS
LS
15.00
15.00
30.
LS
LS
2.00
2.00
31.
Sanitary System
LS
LS
2.00
2.00
32.
Water System
LS
LS
2.00
2.00
33.
Electricty System
LS
LS
2.00
2.00
34.
LS
LS
8.00
8.00
35.
LS
LS
6.50
6.50
SUB - TOTAL
354.33
Spares @ 3%
Transport & Insurance @ 4%
Erection charges @ 6%
6.42
8.57
12.85
382.17
38.22
420.38
12.61
433.00
Contingencies @ 3%
Establishment & overhead
charges @ 10.75%
46.55
TOTAL
479.54
or say Rs.480.00 lakhs
Item
Unit
Quantity
Rate
Amount
(Rs. lakhs) (Rs. lakhs)
16MVA Transformer(released)
No.
37.50
37.50
132 kV Breakers
Nos.
11.00
33.00
33 kV Breakers
Nos.
3.20
16.00
4.
Nos.
0.90
8.10
5.
33 kV Current Transformers
Nos.
12
0.25
3.00
6.
Nos.
0.94
2.82
33 kV Potential Transformers.
Nos.
0.14
0.42
8.
132 kV CVTs.
Nos.
2.60
5.20
9.
Nos.
0.37
3.33
10.
33 kV Lightining Arrestors
Nos.
18
0.05
0.90
11.
132 kV Isolators
Nos.
1.33
7.98
12.
33 kV Isolators
Nos.
11
0.32
3.52
13.
No.
1.37
2.74
14.
No.
5.40
10.80
15.
No.
9.00
9.00
16.
LTAC Panels
No.
1.12
1.12
17.
Battery set
No.
2.37
2.37
18.
Station Transformer
No.
1.10
1.10
19.
KM
10
0.50
5.00
20.
Structures
MT
40
0.60
24.00
21.
MT
0.60
1.20
179.10
22.
9.89
0.00
23.
Control House
LS
LS
25.00
25.00
24.
LS
LS
5.00
5.00
25.
LS
LS
15.00
15.00
26.
LS
LS
1.00
1.00
27.
LS
LS
20.00
20.00
28.
LS
LS
10.00
10.00
29.
LS
LS
15.00
15.00
30.
LS
LS
2.00
2.00
31.
Sanitary System
LS
LS
2.00
2.00
32.
Water System
LS
LS
2.00
2.00
33.
Electricty System
LS
LS
2.00
2.00
34.
LS
LS
8.00
8.00
35.
LS
LS
6.50
6.50
SUB - TOTAL
Spares @ 3%
Transport & Insurance @ 4%
Erection charges @ 6%
Sets
292.60
5.37
7.16
10.75
315.88
31.59
347.47
10.42
357.90
38.47
TOTAL
396.37
COST DATA FOR PLCC ON THE 132 kV LINE WITH NEW SUB-STATION (PER LINK)
Sl.
Item
No.
A. PLCC EQUIPMENT
Unit
Quantity
1.
2.
3.
4.a)
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Nos.
3.60
7.20
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
KM
KM
KM
1
25
1
1
1
2
2
1
1
0.5
0.6
0.1
3.20
0.01
0.80
1.10
0.30
0.35
0.90
0.80
0.80
0.20
0.08
0.80
3.20
0.25
0.80
1.10
0.30
0.70
1.80
0.80
0.80
0.10
0.05
0.08
0.45
17.63
B.
VSAT EQUIPMENT
TDMA/FTDMA VSAT equipment with all accessories
1.2 M Antenna with IFL cable & Termination
2 Watt VSAT RF Terminal with LNA, SSPA and down
convertor and VSAT base band equipment with one
Ethernet port, two serial one 2 W voice port, cables
and connectors
Nos.
Nos.
1
1
0.15
1.50
0.15
1.50
-48 V Inverter
Spares @ 3%
SUB-TOTAL (B)
SUB-TOTAL (A+B)
Nos.
0.05
0.05
0.051
1.751
19.379
1.
i.
ii.
iii.
Rate
(Rs.)
1.550
20.93
2.09
23.02
0.91
23.93
2.57
26.50
Contingencies @3%
i.
ii.
b i.
ii.
iii.
kbps
kbps
4500
4500
0.216
0.09
0.031
0.011
0.06
0.408
2.650
29.563
Amount
(Rs.)
Item
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
1.
Each
12
1408
16896
2.
Each
10
413
4130
3.
Each
10
135
1350
4.
Back clamp
Each
10
51
510
5.
Stay Sets
Each
510
3060
6.
Set
4050
4050
7.
KM
3.06
33576
102743
8.
Each
27
303
8181
9.
Set
12
1029
12348
LS
LS
15400
15400
LS
LS
2500
2500
171168
4598
3% Contingencies on Materials
5135
Labour
22350
Transport
4090
17117
224457
22446
246903
TOTAL
Price Escalation @ 10%
GRAND TOTAL
or SAY Rs.2.50 Lakhs
\\vboxsrv\conversion_tmp\scratch8926\[90249299.xls.ms_office.xls]2x50 (LILO)
Item
Unit
Quantity
Rate
Amount
(Rs. lakhs) (Rs. lakhs)
132 kV Breakers
No.
11.000
11.000
Nos.
0.900
2.700
132 kV CVTs
Nos.
2.600
5.200
No.
5.400
5.400
132 kV Isolators
Nos.
1.330
2.660
Nos.
0.370
1.110
Cables
KM
0.500
2.500
Structures (Galvanised)
MT
11
0.800
8.800
MT
0.55
0.800
0.440
10.
LS
LS
2.500
2.500
11
LS
LS
3.500
3.500
12
LS
LS
0.200
0.200
13
LS
LS
0.500
0.500
14
LS
LS
0.000
0.000
15
LS
LS
0.000
0.000
16
Water System
LS
LS
0.200
0.200
17
LS
LS
0.700
0.700
SUB - TOTAL
47.410
Spares @ 3%
1.194
1.592
Erectior charges @ 6%
2.389
52.585
5.259
57.844
Contingencies @ 3%
1.735
59.579
6.405
65.984
GRAND TOTAL
OR SAY Rs.66.00 LAKHS