You are on page 1of 13

COST DATE FOR ERECTION OF 132 KV DC LINE WITH PANTHER ACSR CONDUCTOR

(DATA FOR 1 KM)


Sl.
No.
1.

Description

Unit Quantity

Rate
Rs.

Amount
Rs.

a) Towers with accessories

MT

15

0.80

12.000

b) Bolts & Nuts including spring washers

MT

0.75

0.80

0.600

2.

Foundation materials

LS

KM

0.65

0.650

3.

Earthing materials

0.02

0.060

4.

PANTHER ACSR Conductor

KM

6.1

1.37

8.357

5.

Insulators

LS

KM

1.30

1.300

6.

Hardware & Accessories for conductor

LS

KM

0.60

0.600

7.

High tensile galvanised steel wire 7/3.15mm

KM

1.01

0.20

0.202

8.

Hardware & Accessories for steel wire

LS

KM

0.03

0.030

SETS

Total Material Cost :

23.799

9.

Spares @ 3%

0.71

10.

Surveys, Lands & rights, tree/crop


compensation, works to be executed
as per PTCC approval etc.

2.50

2.50

11.

Erection charges

3.00

3.00

Add work contract tax @ 4%


SUB-TOTAL
Price escalation @ 10%
Contingencies @ 3%
Establishment charges and
Other overhead charges @ 10.75%
TOTAL
\\vboxsrv\conversion_tmp\scratch8926\[90249299.xls.ms_office.xls]2x50 (LILO)

0.12
30.13
3.01
33.15
0.99
34.14
3.67
37.81
37.81
OR SAY Rs.38.00 LAKHS

COST ESTIMATE FOR PROVIDING OFC EQUIPMENT FOR 132 kV SUB-STATION


S.No
Description
Units
Qty
Unit
Total
Rate.
Amount
1
Fibre Optic Cable of ADSS type with
kMs.
DWSM, 24 Fibre capacity & following
Accessories

2
3
4
5
6
6.1

9.2

6.2

6.3

i) Suspension Clamp sets.


ii) Tension Clamp sets
iii) 4R Stock bridge Vibration dampers
Splice boxes (OFC-OFC)
Splice boxes (OFC-OFAC)
Fibre distribution panels for termination of
fibres of 24 Fibre capacity. (Nos.)
Fibre approach cable of 24 Fibre capacity
OLTE, MUX equipments
Two directional PDH type OLTE equipment
with capacity of 8 Mbps in each direction
with 1+1 protection at optical level and hot
stand by power supply system, primary
Multiplexer, Digital Distribution Frame,
Engineering Order Wire Telephone.
Three directional PDH type OLTE
equipment with capacity of 8 Mbps in each
direction with 1+1 protection at optical level
and hot stand by power supply system,
Primary Multiplexer, Digital Cross Connect,
Digital Distribution Frame, Engineering
order wire Telephone.
Main Distribution Frame (MDF) with Krone
tag block & tool for 100 terminations of
Voice & Data Circuits.
Spares for OLTE equipment of 8 Mbps
capacity suitable accessories.

Nos.
Nos.
Nos.
kMs.

23

1.17

26.91

15
3

0.036
0.036

0.54
0.108

2
3

0.15
0.50

0.3
1.50

10

10.5

0.03

6.4

Nos.

Nos.

Nos.

Nos.

0.15

9.5

7
8
9
10
11
12
13
14

Note:

Network Management System comprising


of Personnal Computer (P IV, 2.8 + GHz,
120 GB HDD, 10/100 Mbps, ETH Card,
1.44 MB FDD with Serial Ports-4 Nos, USB
Ports-4 Nos, Optical Mouse, Optical
keyboard etc., Computer Table, Computer
Chair, Inkjet Printer and Software for
configuration. All necessary Software (OS,
Antivirus, Drivers, Printer etc.) with License
version shall be supplied in the form CD
also.
EPAXs (16 / 16)
EPB Telephones
48V / 50A Float Cum Boost Charger (1+1)
48V / 250AH SMF VRLA Battery set
1.5 ton Split AC Units along with
Stabilizers
6 Pair Telephone Cable
1 Pair Telephone Cable
16 Sq.mm Battery Cable
A) Sub total
B) Excise Duty @ 14.42%
C) Sub total
D) CST @ 2% on C
E) Sub total
F) Errection and Commissioning @ 6%
GRAND TOTAL (Rs. In Lakhs)

Nos.

Nos.
Nos.
Nos.
Nos.
Nos.
kMs.
kMs.
kMs.

1
2
25

3.49
2.00
0.02

4.00
0.50

1
1

1.70
1.50

1.70
1.50

2
0.5
0.5
0.5

0.03
0.50
0.20
1.30

0.06
0.25
0.10
0.65
48.27
6.960
55.23
1.10
56.33
3.38
59.71

or SAY Rs. 60.00 Lakhs


1. If PLCC is established, only two communication channels can be made available.
Sd/Chief Engineer / Telecom

COST DATA FOR ERECTION OF 132 KV DC/SC LINE (DATA FOR 1 KM)
Sl.
No.

Description

Unit

Quantity

a) Towers with accessories

MT

15

0.80

12.00

b) Bolts & Nuts

MT

0.75

0.80

0.60

2.

Foundation materials

LS

LS

0.65

0.65

3.

Earthing materials

SETS

0.02

0.06

4.

PANTHER ACSR Conductor

KM

3.05

1.37

4.18

5.

Insulators

LS

LS

1.30

1.30

6.

Hardware & Accessories for conductor

LS

LS

0.60

0.60

7.

High tensile galvanised steel wire 7/3.15mm

KM

1.01

0.20

0.20

8.

Hardware & Accessories for earthwire

LS

LS

0.03

0.03

1.

Rate
(Rs.Lakhs)

Amount
(Rs.Lakhs)

Total Material Cost

19.62

9.

Spares @ 3%

0.59

10.

Surveys, Lands & rights, tree/crop


compensation, works to be executed
as per PTCC approval etc.

LS

LS

2.50

2.50

11.

Erection charges

LS

LS

3.00

3.00

12.

Work Contract Tax

0.12
25.83
2.58
28.41

SUB-TOTAL
Price escalation @ 10%

Add 3% towards contingencies

0.85
29.26

Establishment charges and


Other overhead charges @ 10.75%

3.15
TOTAL

32.41
or say Rs.33.00 lakhs

\\vboxsrv\conversion_tmp\scratch8926\[90249299.xls.ms_office.xls]2x50 (LILO)

COST DATA FOR ERECTION OF 132/33 kV SUBSTATION WITH 2x50 MVA POWER
TRANSFORMERS WITH 2NOs.132KV INCOMING AND 4NOs. 33KV OUTGOING
FEEDERS(LILO)
Sl.
No.
1
2
3
4.
5.
6.
7
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36

Item
50 MVA Transformers
132 kV Breakers
33 kV Breakers
132 kV Current Transformers
33 kV Current Transformers
132 kV Potential Transformers.
33 kV Potential Transformers.
132 kV CVTs.
132 kV Lightining Arrestors
33 kV Lightining Arrestors
132 kV Isolators
33 kV Isolators
33 kV Twin Feeder control & Relay Panels
132 kV Feeder control & Relay Panels
Transformer HV&LV Control Panels
LTAC Panels
Battery set
Station Transformer
Control & Power Cables
Structures
Bolts & Nuts
33 kV 5 MVAR Shunt Capacitor Banks
Control House
Bus bar Jumpers, insulators,
Earth connectors clamps & connectors etc.,
Foundations for Structures & Trs.
Fire Protection Equipment
Land & Rights, levelling etc.,
Roads & Bridges
Enclosers & Sidings
Office & Stores
Sanitary System
Water System
Electricty System
Cable Laying System
General Substation equipment
Diesel Generator set

Unit

Quantity

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
No.
Nos.
No.
No.
No.
KM
MT
MT
Sets
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS

2
4
6
12
18
3
3
4
12
21
7
12
2
2
2
1
1
1
20
40
2.5
0
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS

Rate
Amount
(Rs. lakhs) (Rs. lakhs)
400.000
800.000
11.000
44.000
3.200
19.200
0.900
10.800
0.250
4.500
0.940
2.820
0.140
0.420
2.600
10.400
0.370
4.440
0.050
1.050
1.330
9.310
0.310
3.720
1.370
2.740
5.400
10.800
7.130
14.260
1.120
1.120
2.770
2.770
1.100
1.100
0.500
10.000
0.800
32.000
0.800
2.000
9.890
0.000
40.000
40.000
5.000
5.000
7.500
7.500
52.000
52.000
3.000
3.000
20.000
20.000
21.000
21.000
15.000
15.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
8.000
8.000
2.500
2.500
4.000
4.000

SUB - TOTAL

1173.450
29.624
39.498
59.247
1301.819
130.182
1432.000
42.960
1474.960
158.558

TOTAL

1633.519

Spares @ 3%
Transport & Insurance @ 4%
Erection charges @ 6%
Price escalation @10%
Contingencies @ 3%
Establishment and overhead
charges @ 10.75%

OR SAY Rs. 1638.00 LAKHS

COST DATA FOR ERECTION 132/33 kV SUBSTATION WITH 2 X 50 MVA POWER TRANSFORMERS
(RADIAL)
Sl.
No.
1
2
3
4.
5.
6.
7
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36

Item

Unit

Quantity

21.50 MVA Power Transformer


16 MVA
132 kV Breakers
33 kV Breakers
132 kV Current Transformers
33 kV Current Transformers
132 kV Potential Transformers.
33 kV Potential Transformers.
132 kV CVTs.
132 kV Lightining Arrestors
33 kV Lightining Arrestors
132 kV Isolators
33 kV Isolators
33 kV Twin Feeder control & Relay Panels
132 kV Feeder control & Relay Panels
Transformer HV&LV Control Panels
LTAC Panels
Battery set
Station Transformer
Control & Power Cables
Structures
Bolts & Nuts
33 kV 5 MVAR Shunt Capacitor Banks
Control House
Bus bar Jumpers, insulators,
Earthing system
Foundations for Structures & Trs.
Fire Protection Equipment
Land & Rights, levelling etc.,
Roads & Bridges
Enclosers & Sidings
Sanitary System
Water System
Electricty System
Cable Laying System
General Substation equipment including Air
coolers,water coolers,PC with Printer etc
Diesel generator set
SUB - TOTAL
Spares @ 3%
Transport & Insurance @ 4%
Erection charges @ 6%

Nos.

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
No.
Nos.
No.
No.
No.
KM
MT
MT
Sets
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS

Price escalation @ 10%


Contingencies @ 3%
Establishment & overhead charges @ 10.75%
TOTAL

3
6
9
18
3
3
2
9
21
5
12
2
1
2
1
1
1
15
50
2.5
0
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS

Rate
(Rs. lakhs)
230.00
37.500
11.00
3.20
0.90
0.25
0.94
0.14
2.60
0.37
0.05
1.33
0.32
1.37
5.40
9.00
1.12
2.37
1.10
0.50
0.80
0.80
9.89
40.00
5.00
7.50
52.00
3.00
20.00
21.00
15.00
2.00
2.00
2.00
8.00

Amount
(Rs. lakhs)
230.00
37.500
33.00
19.20
8.10
4.50
2.82
0.42
5.20
3.33
1.05
6.65
3.84
2.74
5.40
18.00
1.12
2.37
1.10
7.50
40.00
2.00
0.00
40.00
5.00
7.50
52.00
3.00
20.00
21.00
15.00
2.00
2.00
2.00
8.00

LS
LS

2.50
4.00

2.50
4.00
619.84
11.59
15.45
23.18
670.06
67.01
737.07
22.11
759.18
81.61
840.79

or say Rs.841.00 Lakhs


\\vboxsrv\conversion_tmp\scratch8926\[90249299.xls.ms_office.xls]2x50 (LILO)

COST DATA FOR ERECTION 132/33 kV SUBSTATION WITH 1 X 16 MVA POWER


TRANSFORMER (RADIAL)
Sl.
No.

Item

Unit

Quantity

Rate
(Rs. lakhs)

Amount
(Rs. lakhs)

16 MVA Transformers

No.

125.00

125.00

132 kV Breakers

Nos.

11.00

22.00

33 kV Breakers

Nos.

3.20

16.00

4.

132 kV Current Transformers

Nos.

0.90

5.40

5.

33 kV Current Transformers

Nos.

15

0.25

3.75

6.

132 kV Potential Transformers.

Nos.

0.94

2.82

33 kV Potential Transformers.

Nos.

0.14

0.42

8.

132 kV CVTs.

Nos.

2.60

5.20

9.

132 kV Lightining Arrestors

Nos.

0.37

2.22

10.

33 kV Lightining Arrestors

Nos.

15

0.05

0.75

11.

132 kV Isolators

Nos.

1.33

5.32

12.

33 kV Isolators

Nos.

11

0.32

3.52

13.

33 kV Twin Feeder control & Relay


Panels

No.

1.37

2.74

14.

132 kV Feeder control & Relay Panels

No.

5.40

5.40

15.

Transformer HV&LV Control Panels

No.

9.00

9.00

16.

LTAC Panels

No.

1.12

1.12

17.

Battery set

No.

2.37

2.37

18.

Station Transformer

No.

1.10

1.10

19.

Control & Power Cables

KM

15

0.50

7.50

20.

Structures

MT

30

0.60

18.00

21.

Bolts & Nuts

MT

0.60

1.20
240.83

22.

33 kV 5 MVAR Shunt Capacitor Banks

Sets

9.89

0.00

23.

Control House

LS

LS

25.00

25.00

24.

Bus bar Jumpers, insulators, earth


connectors clamps & connectors etc.,

LS

LS

5.00

5.00

25.

Foundations for Structures & Trs.

LS

LS

15.00

15.00

26.

Fire Protection Equipment

LS

LS

1.00

1.00

27.

Land & Rights, levelling etc.,

LS

LS

20.00

20.00

28.

Roads & Bridges

LS

LS

10.00

10.00

29.

Enclosers & Sidings

LS

LS

15.00

15.00

30.

Office & Stores

LS

LS

2.00

2.00

31.

Sanitary System

LS

LS

2.00

2.00

32.

Water System

LS

LS

2.00

2.00

33.

Electricty System

LS

LS

2.00

2.00

34.

Cable Laying System

LS

LS

8.00

8.00

35.

General Substation equipment

LS

LS

6.50

6.50

SUB - TOTAL

354.33

Spares @ 3%
Transport & Insurance @ 4%
Erection charges @ 6%

6.42
8.57
12.85
382.17

Price escalation @ 10%

38.22

420.38
12.61
433.00

Contingencies @ 3%
Establishment & overhead
charges @ 10.75%

46.55
TOTAL

479.54
or say Rs.480.00 lakhs

COST DATA FOR ERECTION 132/33 kV SUBSTATION WITH 1 X 16 MVA POWER


TRANSFORMER
Sl.
No.

Item

Unit

Quantity

Rate
Amount
(Rs. lakhs) (Rs. lakhs)

16MVA Transformer(released)

No.

37.50

37.50

132 kV Breakers

Nos.

11.00

33.00

33 kV Breakers

Nos.

3.20

16.00

4.

132 kV Current Transformers

Nos.

0.90

8.10

5.

33 kV Current Transformers

Nos.

12

0.25

3.00

6.

132 kV Potential Transformers.

Nos.

0.94

2.82

33 kV Potential Transformers.

Nos.

0.14

0.42

8.

132 kV CVTs.

Nos.

2.60

5.20

9.

132 kV Lightining Arrestors

Nos.

0.37

3.33

10.

33 kV Lightining Arrestors

Nos.

18

0.05

0.90

11.

132 kV Isolators

Nos.

1.33

7.98

12.

33 kV Isolators

Nos.

11

0.32

3.52

13.

33 kV Twin Feeder control & Relay Panels

No.

1.37

2.74

14.

132 kV Feeder control & Relay Panels

No.

5.40

10.80

15.

Transformer HV&LV Control Panels

No.

9.00

9.00

16.

LTAC Panels

No.

1.12

1.12

17.

Battery set

No.

2.37

2.37

18.

Station Transformer

No.

1.10

1.10

19.

Control & Power Cables

KM

10

0.50

5.00

20.

Structures

MT

40

0.60

24.00

21.

Bolts & Nuts

MT

0.60

1.20
179.10

22.

33 kV 5 MVAR Shunt Capacitor Banks

9.89

0.00

23.

Control House

LS

LS

25.00

25.00

24.

Bus bar Jumpers, insulators, earth


connectors clamps & connectors etc.,

LS

LS

5.00

5.00

25.

Foundations for Structures & Trs.

LS

LS

15.00

15.00

26.

Fire Protection Equipment

LS

LS

1.00

1.00

27.

Land & Rights, levelling etc.,

LS

LS

20.00

20.00

28.

Roads & Bridges

LS

LS

10.00

10.00

29.

Enclosers & Sidings

LS

LS

15.00

15.00

30.

Office & Stores

LS

LS

2.00

2.00

31.

Sanitary System

LS

LS

2.00

2.00

32.

Water System

LS

LS

2.00

2.00

33.

Electricty System

LS

LS

2.00

2.00

34.

Cable Laying System

LS

LS

8.00

8.00

35.

General Substation equipment

LS

LS

6.50

6.50

SUB - TOTAL
Spares @ 3%
Transport & Insurance @ 4%
Erection charges @ 6%

Sets

292.60
5.37
7.16
10.75
315.88
31.59
347.47
10.42
357.90

Price escalation @10%


Contingencies @ 3%
Establishment & overhead
charges @ 10.75%

38.47
TOTAL

396.37

COST DATA FOR PLCC ON THE 132 kV LINE WITH NEW SUB-STATION (PER LINK)
Sl.
Item
No.
A. PLCC EQUIPMENT

Unit

Quantity

1.
2.
3.
4.a)
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.

PLCC TERMINAL (TWIN CHANNEL)


Protection Couplers
VFT
EPAX
EPB Phones
48 V / 150 AH Battery
48 V / 35 A Charger
Digital Multimeter
A/C Units 1.5 ton capacity
Wave Traps (630A/0.2 m H)
Copuling Units (P/P)
Co-axial cable
6 Pair telephone cable
1 Pair telephone cable with connectors
16 Sq. mm battery cable
Spares for item 1-4 @ 3%
SUB-TOTAL (A)

Nos.

3.60

7.20

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
KM
KM
KM

1
25
1
1
1
2
2
1
1
0.5
0.6
0.1

3.20
0.01
0.80
1.10
0.30
0.35
0.90
0.80
0.80
0.20
0.08
0.80

3.20
0.25
0.80
1.10
0.30
0.70
1.80
0.80
0.80
0.10
0.05
0.08
0.45
17.63

B.

VSAT EQUIPMENT
TDMA/FTDMA VSAT equipment with all accessories
1.2 M Antenna with IFL cable & Termination
2 Watt VSAT RF Terminal with LNA, SSPA and down
convertor and VSAT base band equipment with one
Ethernet port, two serial one 2 W voice port, cables
and connectors

Nos.
Nos.

1
1

0.15
1.50

0.15
1.50

-48 V Inverter
Spares @ 3%
SUB-TOTAL (B)
SUB-TOTAL (A+B)

Nos.

0.05

0.05
0.051
1.751
19.379

1.
i.
ii.

iii.

Rate
(Rs.)

Insurance, Transport & CST @ 8%

1.550
20.93
2.09

Erection & Commission charges for A&B including


provision of earthing system for VSAT 10%

23.02
0.91
23.93
2.57
26.50

Contingencies @3%

i.
ii.

Establishment & Other overhead charges @ 10.75%


TOTAL
Recurring Charges per annum
Bandwidth usage charges
1 No. voice circuit (4.8 kbps)
Metering data transmission (2kbps)

b i.
ii.
iii.

DOT charges @ 10% on (a)


WPC charges @ 3.5% on (a)
Annual Maintenance & Repair

kbps
kbps

4500
4500

0.216
0.09
0.031
0.011
0.06
0.408
2.650
29.563

Price Escalation 10%


GRAND TOTAL
or SAY Rs.30.00 lakhs
\\vboxsrv\conversion_tmp\scratch8926\[90249299.xls.ms_office.xls]2x50 (LILO)

Amount
(Rs.)

REC Construction standard No.M11/1979(R-1989) Cost data per KM of 33 kV line with


100 Sq.mm AAA Conductor over 9.1 Mts. PSCC Poles at 105 Mts. Span 75 KG per Sq.Mt. Wind
pressure, working load 280 KGs.
Sl.
No.

Item

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

1.

9.1 M PSCC Pole

Each

12

1408

16896

2.

1.53 M Cross Arm (Channel)

Each

10

413

4130

3.

Top Clamp with cleat

Each

10

135

1350

4.

Back clamp

Each

10

51

510

5.

Stay Sets

Each

510

3060

6.

Bracing Set with double cross arm

Set

4050

4050

7.

100 Sq.mm AAA Conductor

KM

3.06

33576

102743

8.

33 kV Pin-insulator with Pin

Each

27

303

8181

9.

Strain insulator with pin

Set

12

1029

12348

10. Concreting of Pole, Stay sets & Base Concreting

LS

LS

15400

15400

11. Misc. items like coil earthing, pipe earthing, dangerboards

LS

LS

2500

2500

TOTAL COST OF MATERIAL

171168

3% Storage & handling charges on items (1) to (9)

4598

3% Contingencies on Materials

5135

Labour

22350

Transport

4090

10% Estt. & Gen. Charges on material

17117
224457
22446
246903

TOTAL
Price Escalation @ 10%
GRAND TOTAL
or SAY Rs.2.50 Lakhs
\\vboxsrv\conversion_tmp\scratch8926\[90249299.xls.ms_office.xls]2x50 (LILO)

COST DATA FOR ERECTION OF 132 kV BAY EXTENSION (1 No. BAY)


Sl.
No.

Item

Unit

Quantity

Rate
Amount
(Rs. lakhs) (Rs. lakhs)

132 kV Breakers

No.

11.000

11.000

132 kV Current Transformers

Nos.

0.900

2.700

132 kV CVTs

Nos.

2.600

5.200

132 kV Feeder control & Relay Panels

No.

5.400

5.400

132 kV Isolators

Nos.

1.330

2.660

132 kV Lightining Arrestors

Nos.

0.370

1.110

Cables

KM

0.500

2.500

Structures (Galvanised)

MT

11

0.800

8.800

Bolts & Nuts

MT

0.55

0.800

0.440

10.

Bus bar Jumpers, insulators, earth connectors


clamps & connectors etc,

LS

LS

2.500

2.500

11

Foundations for Structures

LS

LS

3.500

3.500

12

Fire Protection Equipment

LS

LS

0.200

0.200

13

Land Levelling etc.

LS

LS

0.500

0.500

14

Roads & Bridges

LS

LS

0.000

0.000

15

Enclosures & Sidings

LS

LS

0.000

0.000

16

Water System

LS

LS

0.200

0.200

17

Cable Laying System

LS

LS

0.700

0.700

SUB - TOTAL

47.410

Spares @ 3%

1.194

Transport & Insurance @ 4%

1.592

Erectior charges @ 6%

2.389
52.585

Price escalation @10%

5.259
57.844

Contingencies @ 3%

1.735
59.579

Establishment and overhead charges @ 10.75%

6.405

65.984

GRAND TOTAL
OR SAY Rs.66.00 LAKHS
\\vboxsrv\conversion_tmp\scratch8926\[90249299.xls.ms_office.xls]2x50 (LILO)