Professional Documents
Culture Documents
TIPO DE RIEGO
CULTIVO
AREA (ha)
PALTA
DESCRIPCION0.00
1 CAA AZUCAR
2 Kc Promedio
3 Eo (mm/dia)
4
5
6
7
8
9
10
11
12
13
14
A GRAVEDAD (surcos)
PALTO HASS (Mantenimiento)
8.45
ENE
0.00
8.45
0.75
3.92
2.94
0.00
0.00
0.00
2.94
0.40
7.35
73.50
31.00
2278.50
19,253.33
FEB
0.00
8.45
0.75
5.34
4.01
0.00
0.00
0.00
4.01
0.40
10.01
100.13
28.00
2803.50
23,689.58
MAR
0.00
8.45
0.75
4.99
3.74
0.00
0.00
0.00
3.74
0.40
9.36
93.56
31.00
2900.44
24,508.70
ABR
0.00
8.45
0.75
4.28
3.21
0.00
0.00
0.00
3.21
0.40
8.03
80.25
30.00
2407.50
20,343.38
MAY
0.00
8.45
0.75
3.42
2.57
0.00
0.00
0.00
2.57
0.40
6.41
64.13
31.00
1987.88
16,797.54
JUN
0.00
8.45
0.65
2.99
1.94
0.00
0.00
0.00
1.94
0.40
4.86
48.59
30.00
1457.63
12,316.93
JUL
0.00
8.45
0.65
2.42
1.57
0.00
0.00
0.00
1.57
0.40
3.93
39.33
31.00
1219.08
10,301.18
AGOSTO
0.00
8.45
0.65
2.00
1.30
0.00
0.00
0.00
1.30
0.40
3.25
32.50
31.00
1007.50
8,513.38
SET
0.00
8.45
0.65
2.14
1.39
0.00
0.00
0.00
1.39
0.40
3.48
34.78
30.00
1043.25
8,815.46
OCT
0.00
8.45
0.65
2.64
1.72
0.00
0.00
0.00
1.72
0.40
4.29
42.90
31.00
1329.90
11,237.66
NOV
0.00
8.45
0.75
3.56
2.67
0.00
0.00
0.00
2.67
0.40
6.68
66.75
30.00
2002.50
16,921.13
DIC
0.00
8.45
0.75
4.13
3.10
0.00
0.00
0.00
3.10
0.40
7.74
77.44
31.00
2400.56
20,284.75
8.50
41.83
30.15
0.00
0.00
0.00
30.15
4.80
75.38
753.84 3.416360289
365.00
22838.23
192,983.00
DESCRIPCION0.00
PALTA
ARROZ
Kc Promedio
Eo (mm/dia)
ETp (mm/dia) (ETO*Kc)
P. EFECTIVA (mm/dia)
APORTE CAPILAR (Gw)
ALMAC. DE AGUA (Wo)
NECESIDADES NETAS (mm/dia)
EFIC. APLICACION
NECESIDA. TOTALES mm/dia (8/9)
DEMANDA UNITARIA (m3/ha/dia)
DIAS DEL MES
DEMANDA HIDRICA m3/ha/mes
MODULO DE RIEGO m3/mes
ENE
0.00
8.45
0.75
3.92
2.94
0.00
0.00
0.00
2.94
0.95
3.09
30.95
31.00
959.37
8,106.66
FEB
0.00
8.45
0.75
5.34
4.01
0.00
0.00
0.00
4.01
0.95
4.22
42.16
28.00
1180.42
9,974.56
MAR
0.00
8.45
0.75
4.99
3.74
0.00
0.00
0.00
3.74
0.95
3.94
39.39
31.00
1221.24
10,319.45
ABR
0.00
8.45
0.75
4.28
3.21
0.00
0.00
0.00
3.21
0.95
3.38
33.79
30.00
1013.68
8,565.63
MAY
0.00
8.45
0.75
3.42
2.57
0.00
0.00
0.00
2.57
0.95
2.70
27.00
31.00
837.00
7,072.65
JUN
0.00
8.45
0.65
2.99
1.94
0.00
0.00
0.00
1.94
0.95
2.05
20.46
30.00
613.74
5,186.08
JUL
0.00
8.45
0.65
2.42
1.57
0.00
0.00
0.00
1.57
0.95
1.66
16.56
31.00
513.29
4,337.34
AGOSTO
0.00
8.45
0.65
2.00
1.30
0.00
0.00
0.00
1.30
0.95
1.37
13.68
31.00
424.21
3,584.58
SET
0.00
8.45
0.65
2.14
1.39
0.00
0.00
0.00
1.39
0.95
1.46
14.64
30.00
439.26
3,711.77
OCT
0.00
8.45
0.65
2.64
1.72
0.00
0.00
0.00
1.72
0.95
1.81
18.06
31.00
559.96
4,731.64
NOV
0.00
8.45
0.75
3.56
2.67
0.00
0.00
0.00
2.67
0.95
2.81
28.11
30.00
843.16
7,124.68
DIC
0.00
8.45
0.75
4.13
3.10
0.00
0.00
0.00
3.10
0.95
3.26
32.61
31.00
1010.76
8,540.95
8.50
41.83
30.15
0.00
0.00
0.00
30.15
11.40
31.74
317.41
365.00
9616.09
81,256.00
1.43846749
OFERTA DE AGUA
DESCRIPCION
Agua superficial (canal de regadio) lps
m3/h
Tiempo de operacion (h/ha/semana)
Volumen disponible (m3/ha/semana)
m3/ha/mes
Volumen parcelario (m3/mes)
ENE
15.00
54.00
10.00
540.00
2160.00
18252.00
FEB
15.00
54.00
10.00
540.00
2160.00
18252.00
MAR
ABR
15.00
54.00
10.00
540.00
2160.00
18252.00
15.00
54.00
10.00
540.00
2160.00
18252.00
MAY
15.00
54.00
10.00
540.00
2160.00
18252.00
JUN
15.00
54.00
10.00
540.00
2160.00
18252.00
JUL
15.00
54.00
10.00
540.00
2160.00
18252.00
AGOSTO
15.00
54.00
10.00
540.00
2160.00
18252.00
SET
15.00
54.00
10.00
540.00
2160.00
18252.00
OCT
15.00
54.00
10.00
540.00
2160.00
18252.00
NOV
15.00
54.00
10.00
540.00
2160.00
18252.00
DIC
15.00
54.00
10.00
540.00
2160.00
18252.00
TOTAL
180.00
648.00
120.00
6480.00
25920.00
219024.00
DEMANDA m3/mes
OFERTA m3/mes
DIFERENCIA
ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGOSTO
SET
OCT
NOV
DIC
TOTAL
19253.33
18252.00
-1001.33
23689.58
18252.00
-5437.58
24508.70
18252.00
-6256.70
20343.38
18252.00
-2091.38
16797.54
18252.00
1454.46
12316.93
18252.00
5935.07
10301.18
18252.00
7950.82
8513.38
18252.00
9738.63
8815.46
18252.00
9436.54
11237.66
18252.00
7014.35
16921.13
18252.00
1330.88
20284.75
18252.00
-2032.75
26041.00
ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGOSTO
SET
OCT
NOV
DIC
TOTAL
8106.66
18252.00
10145.34
9974.56
18252.00
8277.44
10319.45
18252.00
7932.55
8565.63
18252.00
9686.37
7072.65
18252.00
11179.35
5186.08
18252.00
13065.92
4337.34
18252.00
13914.66
3584.58
18252.00
14667.42
3711.77
18252.00
14540.23
4731.64
18252.00
13520.36
7124.68
18252.00
11127.32
8540.95
18252.00
9711.05
137768.00
192983.00
219024.00
DEMANDA m3/mes
OFERTA m3/mes
DIFERENCIA
81256.00
219024.00
Chart Title
30000.00
Chart Title
20000.00
14.00
16000.00
25000.00
20000.00
14000.00
12.00
12000.00
10.00
10000.00
15000.00
8.00
8000.00
6.00
6000.00
10000.00
4000.00
4.00
2000.00
5000.00
0.00
0.00
1
Row 79
6
7
Row 80
8
9 10
11
12
Chart Title
16.00
18000.00
2.00
1
5
Row 87
6
7
Row 88
10
11
12
0.00
10
12
14
Chart Title
12
10
8
6
4
2
0
10
11
12
JUN
JUL
AGO
SEP
OCT
NOV
DIC
ENE
FEB
MAR
ABR
MAY
Chart Title
25000000
Chart Title
20000000
1.4
1.2
15000000
1
10000000
0.8
5000000
0.6
0.4
0.2
0
1
10
11
12
DISEO AGRONMICO:
PROYECTO: INSTALACION DE UN SISTEMA DE RIEGO TECNIFICADO POR GOTEO"
DENSIDAD DE PLANTA
PALTO HASS
Cultivo
Distancia Entre Plantas
4.00
5.00
Und/Ha
0.00
500.00
Franco
mm.h
10.00
5.00
4.00
0.40
2.00
N de Hileras / Ha
Densidad de Plantas por ha
Und
l/h
l/h/m
m
mm/h
2.70
6.75
4,000.00
2.70
m3/h/ha
l/s/ha
27.00
7.50
5.34
mm/da
Decimal
Precipitacion Efectiva
mm/da
Lmina a Reponer
mm/da
mm/da
Eficiencia
Necesidad de Riego
mm/da
Necesidad de Riego
m3/ha/dia
0.75
4.01
FEBRERO
0.00
0.00
4.01
4.01
0.95
4.22
42.16
metros/ha
Nmero de Goteros
unidades/ha
Necesidad de Riego
mm/da
Precipitacin Horaria
mm/h
Tiempo de Riego
h/da
2,000.00
5,000.00
4.22
2.70
1.56
ha
AREA NETA
ha
N Turnos
ha
m3/h/Turno
lps/turno
8.45
7.74
4.96
5.00
1.55
41.80
11.61
10000
Q= K.H
H
0.8
0.83333333
x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
K
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
H
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
Q lph
1
1.395
1.694
1.945
2.165
2.363
2.545
2.713
2.871
3.020
3.161
3.296
3.425
3.549
3.669
3.784
3.896
4.004
4.110
4.212
4.312
4.409
4.504
4.597
4.688
4.777
4.865
4.950
5.034
5.117
2.70
3.77
4.57
5.25
5.85
6.38
6.87
7.33
7.75
8.15
8.54
8.90
9.25
9.58
9.91
10.22
10.52
10.81
11.10
11.37
11.64
11.90
12.16
12.41
12.66
12.90
13.1
13.4
13.6
13.8
16.00
14.00
0.89842782
12.00
10.00
0.91620573
91.6205727
8.37942735
8.00
6.00
4.00
2.00
0.00
UNIDADES
LOCALIZACIN
SUPERFICIE
CHAO
ha
CULTIVO (s)
S1=1.93 S2=0.24,
S3=1.61, S4=1.02,
S5=1.60
FUENTE DE AGUA
Eto
DISTANCIAMIENTO DEL CULTIVO HILERAS
FACTOR DE CULTIVO
7.74
PALTO HASS
PENDIENTE (SLOPE)
EFICIENCIA
DATOS
Pozo
%
95
mm/da
5.34
5.00
Kc
0.75
mm/da
4.22
0%
PRECIPITACION EFECTIVA
mm/da
0.00
mm.dia
4.22
Etc
FACTOR DE LAVADO
GOTEO
mm/hr
INTERVALO DE RIEGO
2.70
diario
hrs
1.56
hrs
7.81
NMERO DE TURNOS / DA
CAPACIDAD DE RIEGO
CAUDAL DE MANGUERA
5.00
m3/h/ha
27.00
l/h/m
6.75
lph
2.70
0.40
5.00
56
2
Has
0.61
m3/hr
16.42
2
Has
1.57
m3/hr
31.86
m.c.a.
m.c.a.
6.75
C.R.
27.00
m3/h/ha
TURNOS DE RIEGO
SISTEMAS DE RIEGO OR GOTEO
TURNO
II
III
AREA DE
SECTORES
TURNO
(VLVULA)
(ha)
1.56
1.51
1.57
IV
1.54
1.56
7.73
AREA
SECTOR}
(ha)
CAUDAL
SECTOR
(m3/h)
CAUDAL
SECTOR
(l/s)
V1
0.779
21.03
5.84
V2
0.779
21.03
5.84
V3
0.758
20.46
5.68
V4
0.757
20.44
5.68
V5
0.522
14.10
3.92
V6
0.522
14.10
3.92
V7
0.522
14.08
3.91
V8
0.769
20.77
5.77
V9
0.769
20.76
5.77
V10
0.778
21.00
5.83
V11
0.778
21.00
5.83
7.73
CAUDAL
TURNO
(m3/h)
CAUDAL
TURNO (l/s)
CULTIVO
TIEMPO RIEGO
(h)
42.06
11.68
PALTO HASS
1.56
40.90
11.36
PALTO HASS
1.56
42.27
11.74
PALTO HASS
1.56
41.53
11.54
PALTO HASS
1.56
42.00
11.67
PALTO HASS
1.56
7.81
V: Q / (3600. A) ; A: (3.14/4)*((Di/1000)2)
TURNO
TRAMO
A-T
CAUDAL
m3.h
lps
42.06
11.68
Ext (mm)
140
DIAMETRO
Int (mm)
Int (m)
129.8
0.1298
clase
5
T- U
42.06
11.68
110
102
0.102
U-X
21.03
5.84
90
83.4
0.0834
U-W
21.16
5.88
90
83.4
0.0834
COTA
INICIAL
59.6
COTA
FINAL
58
60.7
59.6
60.8
58.9
62
58.9
6.2548
TURNO
TRAMO
A-R
II
CAUDAL
m3.h
lps
40.90
11.36
Ext (mm)
140
DIAMETRO
Int (mm)
Int (m)
133
0.133
clase
5
R-S
40.90
11.36
140
133
0.133
S-Z
20.46
5.68
75
69.4
0.0694
S- T
20.46
5.68
140
133
0.133
T-Y
20.46
5.68
75
69.4
0.0694
7.7000
3.5520
DIF.
COTAS
1.6
1.6
1.1
1.1
1.9
1.9
3.1
3.1
2.1032
AREA
VELOCIDAD
m2
m/s
0.01388587
0.82
COTA
INICIAL
59.5
COTA
FINAL
58
0.01388587
0.82
60.9
59.5
0.00378084
1.50
65
60.9
0.01388587
0.41
57.9
60.9
0.00378084
1.50
60.9
57.9
DIF.
COTAS
1.5
1.5
1.4
1.4
4.1
4.1
-3
-3
3
3
7.0000
CARGA
FINAL
3.919
2.319
2.801
4.916
13.9548
CARGA
FINAL
3.271
1.732
5.879
-2.909
4.682
12.6552
TURNO
TRAMO
A-R
III
CAUDAL
m3.h
lps
42.27
11.74
Ext (mm)
140
DIAMETRO
Int (mm)
Int (m)
133
0.133
clase
5
R-K
42.27
11.74
140
133
0.133
K-L
14.10
3.92
90
85.6
0.0856
K-M
14.10
3.92
140
133
0.133
M- N
14.10
3.92
90
85.6
0.0856
M-O
14.10
3.92
140
133
0.133
O-P
14.10
3.92
90
85.6
0.0856
0.9860
2.0854
AREA
VELOCIDAD
m2
m/s
0.01388587
0.85
COTA
INICIAL
59.5
COTA
FINAL
58
0.01388587
0.85
61.25
59.5
0.00575198
0.68
64.75
61.25
0.01388587
0.28
61.85
61.25
0.00575198
0.68
65.1
61.85
0.01388587
0.28
62.35
61.85
0.00575198
0.68
65.3
62.35
DIF.
COTAS
1.5
1.5
1.75
1.75
3.5
3.5
0.6
0.6
3.25
3.25
0.5
0.5
2.95
2.95
14.0500
CARGA
FINAL
3.382
1.916
3.964
0.638
3.517
0.539
3.205
17.1602
TURNO
TRAMO
A-E
IV
CAUDAL
m3.h
lps
41.53
11.54
Ext (mm)
140
DIAMETRO
Int (mm)
Int (m)
133
0.133
clase
5
E-H
20.77
5.77
63
59.8
0.0598
E-G
20.77
5.77
140
133
0.133
4.4932
TURNO
TRAMO
A-B
CAUDAL
m3.h
lps
42.00
11.67
Ext (mm)
140
DIAMETRO
Int (mm)
Int (m)
133
0.133
clase
5
B-C
42.00
11.67
140
133
0.133
C-J
21.00
5.83
63
59.8
0.0598
C-D
21.00
5.83
140
133
0.133
D-I
21.00
5.83
63
59.8
0.0598
COTA
FINAL
58
58.6
55.1
58.2
55.1
1.0616
9.0715
COTA
INICIAL
59.5
0.6152
DIF.
COTAS
1.5
1.5
3.5
3.5
3.1
3.1
8.1000
AREA
VELOCIDAD
m2
m/s
0.01388587
0.84
COTA
INICIAL
51.55
COTA
FINAL
58
0.01388587
0.84
53.25
51.55
0.00280719
2.08
57
53.25
0.01388587
0.42
53.75
53.25
0.00280719
2.08
57.8
53.75
DIF.
COTAS
-6.45
-6.45
1.7
1.7
3.75
3.75
0.5
0.5
4.05
4.05
3.5500
CARGA
FINAL
2.412
7.993
3.249
13.6548
CARGA
FINAL
-6.209
1.989
8.285
0.585
8.587
13.2367
2.7
l/h
0.4
13.50
m3,h,ha
3.75
l,s,ha
(l/s)
0.209
CAUDAL
ACUM.
(l/s)
0.21
DIAMETRO
INTERNO
(mm)
83.40
(m)
5.000
LONGITUD
ACUM.
(m)
5.00
PERDIDA
HF
(m.c.a.)
0.0001902
PERDIDA
ACUM.
(m.c.a.)
0.00
PERDIDA
ACUM.
(PSI)
0.00
VELOCID.
CRITICA
(m/s)
0.04
0.209
0.42
83.40
5.000
10.00
0.00
0.00
0.00
0.08
0.209
0.209
0.63
83.40
5.000
15.00
0.00
0.00
0.00
0.11
0.83
83.40
5.000
20.00
0.00
0.00
0.01
0.15
5
6
0.209
1.04
83.40
5.000
25.00
0.00
0.01
0.01
0.19
0.209
1.25
83.40
5.000
30.00
0.00
0.01
0.02
0.23
0.209
1.46
83.40
5.000
35.00
0.01
0.02
0.03
0.27
0.209
1.67
83.40
5.000
40.00
0.01
0.02
0.04
0.31
0.209
1.88
83.40
5.000
45.00
0.01
0.03
0.05
0.34
10
0.209
2.09
83.40
5.000
50.00
0.01
0.04
0.06
0.38
11
0.209
2.30
83.40
5.000
55.00
0.01
0.06
0.08
0.42
12
0.209
2.50
83.40
5.000
60.00
0.01
0.07
0.10
0.46
13
14
0.209
0.209
2.921
2.71
2.92
83.40
83.40
5.000
5.000
65.00
70.00
0.02
0.02
0.09
0.11
0.13
0.15
0.50
0.53
0.209
0.21
83.40
5.000
5.00
0.00
0.00
0.00
0.04
0.209
0.42
83.40
5.000
10.00
0.00
0.00
0.00
0.08
0.209
0.63
83.40
5.000
15.00
0.00
0.00
0.00
0.11
0.209
0.83
83.40
5.000
20.00
0.00
0.00
0.01
0.15
0.209
1.04
83.40
5.000
25.00
0.00
0.01
0.01
0.19
0.209
1.25
83.40
5.000
30.00
0.00
0.01
0.02
0.23
0.209
1.46
83.40
5.000
35.00
0.01
0.02
0.03
0.27
0.209
1.67
83.40
5.000
40.00
0.01
0.02
0.04
0.31
0.209
1.88
83.40
5.000
45.00
0.01
0.03
0.05
0.34
10
0.209
2.09
83.40
5.000
50.00
0.01
0.04
0.06
0.38
11
0.209
2.30
83.40
5.000
55.00
0.01
0.06
0.08
0.42
12
0.209
2.50
83.40
5.000
60.00
0.01
0.07
0.10
0.46
13
14
0.209
0.209
2.921
2.71
2.92
83.40
83.40
5.000
5.000
65.00
70.00
140.00
0.02
0.02
0.09
0.11
0.22
0.13
0.15
0.50
0.53
TRAMO
CAUDAL
N
1
LONGITUD
5.843
CALCULOS HIDRAULICOS EN LATERAL DE RIEGO
LATERAL
CAUDAL
(l/s)
1
28
0.209
0.209
DIAMETRO
INTERNO
(mm)
14.2
14.2
CHRISTIANSEN
(m)
PERDIDA
HF
(m)
49.58
64.72
8.47
11.05
LONGITUD
Fc
PERDIDA
FINAL
(m.c.a.)
VELOCID.
CRITICA
(m/s)
0.37
0.37
3.09
4.03
1.32
1.32
cotas lateral
cota inicial
cota final
Dif. Cotas
57.50
57.80
-0.30
FACTOR
OBSERV.
O.K.
O.K.
OBSERV.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
2.7
l/h
0.4
13.50
m3,h,ha
3.75
l,s,ha
(l/s)
0.225
CAUDAL
ACUM.
(l/s)
0.22
DIAMETRO
INTERNO
(mm)
83.40
(m)
5.000
LONGITUD
ACUM.
(m)
5.00
PERDIDA
HF
(m.c.a.)
0.0002166
PERDIDA
ACUM.
(m.c.a.)
0.00
PERDIDA
ACUM.
(PSI)
0.00
VELOCID.
CRITICA
(m/s)
0.04
0.225
0.45
83.40
5.000
10.00
0.00
0.00
0.00
0.08
0.225
0.225
0.67
83.40
5.000
15.00
0.00
0.00
0.00
0.12
0.90
83.40
5.000
20.00
0.00
0.00
0.01
0.16
0.225
1.12
83.40
5.000
25.00
0.00
0.01
0.01
0.21
0.225
1.35
83.40
5.000
30.00
0.00
0.01
0.02
0.25
0.225
1.57
83.40
5.000
35.00
0.01
0.02
0.03
0.29
0.225
1.80
83.40
5.000
40.00
0.01
0.03
0.04
0.33
0.225
2.02
83.40
5.000
45.00
0.01
0.04
0.05
0.37
10
0.225
2.25
83.40
5.000
50.00
0.01
0.05
0.07
0.41
11
0.225
2.47
83.40
5.000
55.00
0.01
0.06
0.09
0.45
12
13
0.225
0.225
2.921
2.70
2.92
83.40
83.40
5.000
5.000
60.00
65.00
0.02
0.02
0.08
0.10
0.12
0.14
0.49
0.53
0.225
0.22
83.40
5.000
5.00
0.00
0.00
0.00
0.04
0.225
0.45
83.40
5.000
10.00
0.00
0.00
0.00
0.08
0.225
0.67
83.40
5.000
15.00
0.00
0.00
0.00
0.12
0.225
0.90
83.40
5.000
20.00
0.00
0.00
0.01
0.16
0.225
1.12
83.40
5.000
25.00
0.00
0.01
0.01
0.21
0.225
1.35
83.40
5.000
30.00
0.00
0.01
0.02
0.25
0.225
1.57
83.40
5.000
35.00
0.01
0.02
0.03
0.29
0.225
1.80
83.40
5.000
40.00
0.01
0.03
0.04
0.33
0.225
2.02
83.40
5.000
45.00
0.01
0.04
0.05
0.37
10
0.225
2.25
83.40
5.000
50.00
0.01
0.05
0.07
0.41
11
0.225
2.47
83.40
5.000
55.00
0.01
0.06
0.09
0.45
12
13
0.225
0.225
2.921
2.70
2.92
83.40
83.40
5.000
5.000
60.00
65.00
65.00
0.02
0.02
0.08
0.10
0.20
0.12
0.14
0.49
0.53
TRAMO
CAUDAL
N
1
LONGITUD
5.843
CALCULOS HIDRAULICOS EN LATERAL DE RIEGO
LATERAL
CAUDAL
(l/s)
1
74
0.225
0.225
DIAMETRO
INTERNO
(mm)
14.2
14.2
CHRISTIANSEN
(m)
PERDIDA
HF
(m)
64.42
72.74
12.53
14.15
LONGITUD
Fc
PERDIDA
FINAL
(m.c.a.)
VELOCID.
CRITICA
(m/s)
0.37
0.37
4.57
5.16
1.42
1.42
cotas lateral
cota inicial
cota final
Dif. Cotas
57.50
57.80
-0.30
FACTOR
OBSERV.
O.K.
O.K.
OBSERV.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
2.7
l/h
0.4
13.50
m3,h,ha
3.75
l,s,ha
(l/s)
0.355
CAUDAL
ACUM.
(l/s)
0.36
DIAMETRO
INTERNO
(mm)
83.40
(m)
5.000
LONGITUD
ACUM.
(m)
5.00
PERDIDA
HF
(m.c.a.)
0.0004827
PERDIDA
ACUM.
(m.c.a.)
0.00
PERDIDA
ACUM.
(PSI)
0.00
VELOCID.
CRITICA
(m/s)
0.07
0.355
0.71
83.40
5.000
10.00
0.00
0.00
0.00
0.13
0.355
0.355
1.07
83.40
5.000
15.00
0.00
0.01
0.01
0.20
1.42
83.40
5.000
20.00
0.01
0.01
0.02
0.26
0.355
1.78
83.40
5.000
25.00
0.01
0.02
0.03
0.33
0.355
2.13
83.40
5.000
30.00
0.01
0.03
0.04
0.39
0.355
2.49
83.40
5.000
35.00
0.01
0.04
0.06
0.46
0.355
2.84
83.40
5.000
40.00
0.02
0.06
0.09
0.52
0.355
3.20
83.40
5.000
45.00
0.02
0.09
0.12
0.59
10
11
0.355
0.355
3.907
3.55
3.91
83.40
83.40
5.000
5.000
50.00
55.00
0.03
0.03
0.11
0.14
0.16
0.21
0.65
0.72
0.355
0.36
83.40
5.000
5.00
0.00
0.00
0.00
0.07
0.355
0.71
83.40
5.000
10.00
0.00
0.00
0.00
0.13
0.355
1.07
83.40
5.000
15.00
0.00
0.01
0.01
0.20
0.355
1.42
83.40
5.000
20.00
0.01
0.01
0.02
0.26
0.355
1.78
83.40
5.000
25.00
0.01
0.02
0.03
0.33
0.355
2.13
83.40
5.000
30.00
0.01
0.03
0.04
0.39
0.355
2.49
83.40
5.000
35.00
0.01
0.04
0.06
0.46
0.355
2.84
83.40
5.000
40.00
0.02
0.06
0.09
0.52
0.355
3.20
83.40
5.000
45.00
0.02
0.09
0.12
0.59
10
11
0.355
0.355
3.907
3.55
3.91
83.40
83.40
5.000
5.000
50.00
55.00
110.00
0.03
0.03
0.11
0.14
0.29
0.16
0.21
0.65
0.72
TRAMO
CAUDAL
N
1
LONGITUD
7.815
CALCULOS HIDRAULICOS EN LATERAL DE RIEGO
LATERAL
CAUDAL
(l/s)
1
74
0.355
0.355
DIAMETRO
INTERNO
(mm)
CHRISTIANSEN
(m)
PERDIDA
HF
(m)
87.24
62.47
37.81
27.07
LONGITUD
14.2
14.2
13.79
Fc
PERDIDA
FINAL
(m.c.a.)
VELOCID.
CRITICA
(m/s)
0.37
0.37
13.80
9.88
2.24
2.24
cotas lateral
cota inicial
cota final
Dif. Cotas
57.50
57.80
-0.30
FACTOR
OBSERV.
CHEQUEAR
CHEQUEAR
OBSERV.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
2.7
l/h
0.4
13.50
m3,h,ha
3.75
l,s,ha
(l/s)
0.710
CAUDAL
ACUM.
(l/s)
0.71
DIAMETRO
INTERNO
(mm)
85.60
(m)
5.000
LONGITUD
ACUM.
(m)
5.00
PERDIDA
HF
(m.c.a.)
0.0014347
PERDIDA
ACUM.
(m.c.a.)
0.00
PERDIDA
ACUM.
(PSI)
0.00
VELOCID.
CRITICA
(m/s)
0.12
0.710
1.42
85.60
5.000
10.00
0.00
0.01
0.01
0.25
0.710
0.710
2.13
85.60
5.000
15.00
0.01
0.02
0.02
0.37
2.84
85.60
5.000
20.00
0.02
0.03
0.05
0.49
0.710
3.55
85.60
5.000
25.00
0.02
0.06
0.08
0.62
0.710
4.26
85.60
5.000
30.00
0.03
0.09
0.13
0.74
0.710
4.97
85.60
5.000
35.00
0.04
0.13
0.19
0.86
0.710
5.68
85.60
5.000
40.00
0.05
0.19
0.27
0.99
0.710
6.39
85.60
5.000
45.00
0.07
0.25
0.36
1.11
10
11
0.710
0.710
7.815
7.10
7.81
85.60
85.60
5.000
5.000
50.00
55.00
0.08
0.10
0.33
0.43
0.48
0.61
1.23
1.36
0.710
0.71
85.60
5.000
5.00
0.00
0.00
0.00
0.12
0.710
1.42
85.60
5.000
10.00
0.00
0.01
0.01
0.25
0.710
2.13
85.60
5.000
15.00
0.01
0.02
0.02
0.37
0.710
2.84
85.60
5.000
20.00
0.02
0.03
0.05
0.49
0.710
3.55
85.60
5.000
25.00
0.02
0.06
0.08
0.62
0.710
4.26
85.60
5.000
30.00
0.03
0.09
0.13
0.74
0.710
4.97
85.60
5.000
35.00
0.04
0.13
0.19
0.86
0.710
5.68
85.60
5.000
40.00
0.05
0.19
0.27
0.99
0.710
6.39
85.60
5.000
45.00
0.07
0.25
0.36
1.11
10
11
0.710
0.710
7.815
7.10
7.81
85.60
85.60
5.000
5.000
50.00
55.00
110.00
0.08
0.10
0.33
0.43
0.86
0.48
0.61
1.23
1.36
TRAMO
CAUDAL
N
1
LONGITUD
15.630
CALCULOS HIDRAULICOS EN LATERAL DE RIEGO
Fc
PERDIDA
FINAL
(m.c.a.)
VELOCID.
CRITICA
(m/s)
0.37
0.37
34.10
33.93
4.49
4.49
cotas lateral
cota inicial
57.50
0.00
cota final
34.10
-0.30
34.66
Dif. Cotas
LATERAL
CAUDAL
(l/s)
1
74
0.710
0.710
DIAMETRO
INTERNO
(mm)
CHRISTIANSEN
(m)
PERDIDA
HF
(m)
64.10
63.78
93.43
92.96
LONGITUD
14.2
14.2
FACTOR
57.80
-0.30
OBSERV.
CHEQUEAR
CHEQUEAR
OBSERV.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
2.7
l/h
0.4
13.50
m3,h,ha
3.75
l,s,ha
(l/s)
0.218
CAUDAL
ACUM.
(l/s)
0.22
DIAMETRO
INTERNO
(mm)
85.60
(m)
5.000
LONGITUD
ACUM.
(m)
5.00
PERDIDA
HF
(m.c.a.)
0.0001808
PERDIDA
ACUM.
(m.c.a.)
0.00
PERDIDA
ACUM.
(PSI)
0.00
VELOCID.
CRITICA
(m/s)
0.04
0.218
0.44
85.60
5.000
10.00
0.00
0.00
0.00
0.08
0.218
0.218
0.65
85.60
5.000
15.00
0.00
0.00
0.00
0.11
0.87
85.60
5.000
20.00
0.00
0.00
0.01
0.15
5
6
0.218
1.09
85.60
5.000
25.00
0.00
0.01
0.01
0.19
0.218
1.31
85.60
5.000
30.00
0.00
0.01
0.02
0.23
0.218
1.52
85.60
5.000
35.00
0.01
0.02
0.02
0.26
8
9
0.218
0.218
1.958
1.74
1.96
85.60
85.60
5.000
5.000
40.00
45.00
0.01
0.01
0.02
0.03
0.03
0.05
0.30
0.34
0.218
0.22
85.60
5.000
5.00
0.00
0.00
0.00
0.04
0.218
0.44
85.60
5.000
10.00
0.00
0.00
0.00
0.08
0.218
0.65
85.60
5.000
15.00
0.00
0.00
0.00
0.11
0.218
0.87
85.60
5.000
20.00
0.00
0.00
0.01
0.15
0.218
1.09
85.60
5.000
25.00
0.00
0.01
0.01
0.19
0.218
1.31
85.60
5.000
30.00
0.00
0.01
0.02
0.23
0.218
1.52
85.60
5.000
35.00
0.01
0.02
0.02
0.26
8
9
0.218
0.218
1.958
1.74
1.96
85.60
85.60
5.000
5.000
40.00
45.00
90.00
0.01
0.01
0.02
0.03
0.06
0.03
0.05
0.30
0.34
TRAMO
CAUDAL
N
1
LONGITUD
3.916
CALCULOS HIDRAULICOS EN LATERAL DE RIEGO
LATERAL
CAUDAL
(l/s)
1
74
0.218
0.218
DIAMETRO
INTERNO
(mm)
14.2
14.2
CHRISTIANSEN
(m)
PERDIDA
HF
(m)
59.64
59.17
10.96
10.87
LONGITUD
Fc
PERDIDA
FINAL
(m.c.a.)
VELOCID.
CRITICA
(m/s)
0.37
0.37
4.00
3.97
1.37
1.37
cotas lateral
cota inicial
cota final
Dif. Cotas
57.50
57.80
-0.30
FACTOR
OBSERV.
O.K.
O.K.
OBSERV.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
2.7
l/h
0.4
13.50
m3,h,ha
3.75
l,s,ha
(l/s)
0.218
CAUDAL
ACUM.
(l/s)
0.22
DIAMETRO
INTERNO
(mm)
85.60
(m)
5.000
LONGITUD
ACUM.
(m)
5.00
PERDIDA
HF
(m.c.a.)
0.0001808
PERDIDA
ACUM.
(m.c.a.)
0.00
PERDIDA
ACUM.
(PSI)
0.00
VELOCID.
CRITICA
(m/s)
0.04
0.218
0.44
85.60
5.000
10.00
0.00
0.00
0.00
0.08
0.218
0.218
0.65
85.60
5.000
15.00
0.00
0.00
0.00
0.11
0.87
85.60
5.000
20.00
0.00
0.00
0.01
0.15
5
6
7
8
9
0.218
1.09
85.60
5.000
25.00
0.00
0.01
0.01
0.19
0.218
0.218
0.218
0.218
1.31
1.52
1.74
1.96
85.60
85.60
85.60
85.60
5.000
5.000
5.000
5.000
30.00
35.00
40.00
45.00
0.00
0.01
0.01
0.01
0.01
0.02
0.02
0.03
0.02
0.02
0.03
0.05
0.23
0.26
0.30
0.34
TRAMO
CAUDAL
N
1
LONGITUD
OBSERV.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
1.958
1
0.218
0.22
85.60
5.000
5.00
0.00
0.00
0.00
0.04
0.218
0.44
85.60
5.000
10.00
0.00
0.00
0.00
0.08
0.218
0.65
85.60
5.000
15.00
0.00
0.00
0.00
0.11
0.218
0.87
85.60
5.000
20.00
0.00
0.00
0.01
0.15
0.218
1.09
85.60
5.000
25.00
0.00
0.01
0.01
0.19
0.218
1.31
85.60
5.000
30.00
0.00
0.01
0.02
0.23
0.218
1.52
85.60
5.000
35.00
0.01
0.02
0.02
0.26
8
9
0.218
0.218
1.958
1.74
1.96
85.60
85.60
5.000
5.000
40.00
45.00
90.00
0.01
0.01
0.02
0.03
0.06
0.03
0.05
0.30
0.34
3.916
CALCULOS HIDRAULICOS EN LATERAL DE RIEGO
LATERAL
CAUDAL
(l/s)
1
74
0.218
0.218
DIAMETRO
INTERNO
(mm)
14.2
14.2
CHRISTIANSEN
(m)
PERDIDA
HF
(m)
94.24
59.20
17.31
10.88
LONGITUD
Fc
PERDIDA
FINAL
(m.c.a.)
VELOCID.
CRITICA
(m/s)
0.37
0.37
6.32
3.97
1.37
1.37
cotas lateral
cota inicial
cota final
Dif. Cotas
57.50
57.80
-0.30
FACTOR
OBSERV.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
2.7
l/h
0.4
13.50
m3,h,ha
3.75
l,s,ha
(l/s)
0.245
CAUDAL
ACUM.
(l/s)
0.24
DIAMETRO
INTERNO
(mm)
85.60
(m)
5.000
LONGITUD
ACUM.
(m)
5.00
PERDIDA
HF
(m.c.a.)
0.0002222
PERDIDA
ACUM.
(m.c.a.)
0.00
PERDIDA
ACUM.
(PSI)
0.00
VELOCID.
CRITICA
(m/s)
0.04
0.245
0.49
85.60
5.000
10.00
0.00
0.00
0.00
0.09
0.245
0.245
0.73
85.60
5.000
15.00
0.00
0.00
0.00
0.13
0.98
85.60
5.000
20.00
0.00
0.01
0.01
0.17
0.245
1.22
85.60
5.000
25.00
0.00
0.01
0.01
0.21
0.245
1.47
85.60
5.000
30.00
0.01
0.01
0.02
0.26
7
8
0.245
0.245
1.958
1.71
1.96
85.60
85.60
5.000
5.000
35.00
40.00
0.01
0.01
0.02
0.03
0.03
0.04
0.30
0.34
0.245
0.24
85.60
5.000
5.00
0.00
0.00
0.00
0.04
0.245
0.49
85.60
5.000
10.00
0.00
0.00
0.00
0.09
0.245
0.73
85.60
5.000
15.00
0.00
0.00
0.00
0.13
0.245
0.98
85.60
5.000
20.00
0.00
0.01
0.01
0.17
0.245
1.22
85.60
5.000
25.00
0.00
0.01
0.01
0.21
0.245
1.47
85.60
5.000
30.00
0.01
0.01
0.02
0.26
7
8
0.245
0.245
1.958
1.71
1.96
85.60
85.60
5.000
5.000
35.00
40.00
80.00
0.01
0.01
0.02
0.03
0.06
0.03
0.04
0.30
0.34
TRAMO
CAUDAL
N
1
LONGITUD
3.916
CALCULOS HIDRAULICOS EN LATERAL DE RIEGO
LATERAL
CAUDAL
(l/s)
1
74
0.245
0.245
DIAMETRO
INTERNO
(mm)
14.2
14.2
CHRISTIANSEN
(m)
PERDIDA
HF
(m)
67.78
89.86
15.30
20.29
LONGITUD
Fc
PERDIDA
FINAL
(m.c.a.)
VELOCID.
CRITICA
(m/s)
0.37
0.37
5.59
7.41
1.55
1.55
cotas lateral
cota inicial
cota final
Dif. Cotas
57.50
57.80
-0.30
FACTOR
OBSERV.
O.K.
O.K.
OBSERV.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
2.7
l/h
0.4
13.50
m3,h,ha
3.75
l,s,ha
(l/s)
0.222
CAUDAL
ACUM.
(l/s)
0.22
DIAMETRO
INTERNO
(mm)
133.00
(m)
5.000
LONGITUD
ACUM.
(m)
5.00
PERDIDA
HF
(m.c.a.)
0.0000170
PERDIDA
ACUM.
(m.c.a.)
0.00
PERDIDA
ACUM.
(PSI)
0.00
VELOCID.
CRITICA
(m/s)
0.02
0.222
0.44
133.00
5.000
10.00
0.00
0.00
0.00
0.03
0.222
0.222
0.67
133.00
5.000
15.00
0.00
0.00
0.00
0.05
0.89
133.00
5.000
20.00
0.00
0.00
0.00
0.06
0.222
1.11
133.00
5.000
25.00
0.00
0.00
0.00
0.08
0.222
1.33
133.00
5.000
30.00
0.00
0.00
0.00
0.10
0.222
1.55
133.00
5.000
35.00
0.00
0.00
0.00
0.11
0.222
1.77
133.00
5.000
40.00
0.00
0.00
0.00
0.13
TRAMO
CAUDAL
N
1
LONGITUD
0.222
2.00
133.00
5.000
45.00
0.00
0.00
0.00
0.14
10
0.222
2.22
133.00
5.000
50.00
0.00
0.00
0.01
0.16
11
0.222
2.44
133.00
5.000
55.00
0.00
0.01
0.01
0.18
12
13
0.222
0.222
2.884
2.66
2.88
133.00
133.00
5.000
5.000
60.00
65.00
0.00
0.00
0.01
0.01
0.01
0.01
0.19
0.21
0.222
0.22
133.00
5.000
5.00
0.00
0.00
0.00
0.02
0.222
0.44
133.00
5.000
10.00
0.00
0.00
0.00
0.03
0.222
0.67
133.00
5.000
15.00
0.00
0.00
0.00
0.05
0.222
0.89
133.00
5.000
20.00
0.00
0.00
0.00
0.06
0.222
1.11
133.00
5.000
25.00
0.00
0.00
0.00
0.08
0.222
1.33
133.00
5.000
30.00
0.00
0.00
0.00
0.10
0.222
1.55
133.00
5.000
35.00
0.00
0.00
0.00
0.11
0.222
1.77
133.00
5.000
40.00
0.00
0.00
0.00
0.13
0.222
2.00
133.00
5.000
45.00
0.00
0.00
0.00
0.14
10
0.222
2.22
133.00
5.000
50.00
0.00
0.00
0.01
0.16
11
0.222
2.44
133.00
5.000
55.00
0.00
0.01
0.01
0.18
12
13
0.222
0.222
2.884
2.66
2.88
133.00
133.00
5.000
5.000
60.00
65.00
130.00
0.00
0.00
0.01
0.01
0.02
0.01
0.01
0.19
0.21
5.768
CALCULOS HIDRAULICOS EN LATERAL DE RIEGO
LATERAL
CAUDAL
(l/s)
1
74
0.222
0.222
DIAMETRO
INTERNO
(mm)
14.2
14.2
CHRISTIANSEN
(m)
PERDIDA
HF
(m)
63.37
73.16
12.05
13.91
LONGITUD
Fc
PERDIDA
FINAL
(m.c.a.)
VELOCID.
CRITICA
(m/s)
0.37
0.37
4.40
5.08
1.40
1.40
cotas lateral
cota inicial
cota final
Dif. Cotas
57.50
57.80
-0.30
FACTOR
OBSERV.
O.K.
O.K.
OBSERV.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
2.7
l/h
0.4
13.50
m3,h,ha
3.75
l,s,ha
(l/s)
0.206
CAUDAL
ACUM.
(l/s)
0.21
DIAMETRO
INTERNO
(mm)
59.80
(m)
5.000
LONGITUD
ACUM.
(m)
5.00
PERDIDA
HF
(m.c.a.)
0.0009032
PERDIDA
ACUM.
(m.c.a.)
0.00
PERDIDA
ACUM.
(PSI)
0.00
VELOCID.
CRITICA
(m/s)
0.07
0.206
0.41
59.80
5.000
10.00
0.00
0.00
0.01
0.15
0.206
0.206
0.62
59.80
5.000
15.00
0.01
0.01
0.01
0.22
0.82
59.80
5.000
20.00
0.01
0.02
0.03
0.29
0.206
1.03
59.80
5.000
25.00
0.02
0.04
0.05
0.37
0.206
1.24
59.80
5.000
30.00
0.02
0.06
0.08
0.44
0.206
1.44
59.80
5.000
35.00
0.03
0.08
0.12
0.51
0.206
1.65
59.80
5.000
40.00
0.03
0.12
0.17
0.59
0.206
1.85
59.80
5.000
45.00
0.04
0.16
0.23
0.66
10
0.206
2.06
59.80
5.000
50.00
0.05
0.21
0.30
0.73
11
0.206
2.27
59.80
5.000
55.00
0.06
0.27
0.39
0.81
12
0.206
2.47
59.80
5.000
60.00
0.07
0.34
0.48
0.88
13
14
0.206
0.206
2.884
2.68
2.88
59.80
59.80
5.000
5.000
65.00
70.00
0.08
0.09
0.42
0.51
0.60
0.73
0.95
1.03
0.206
0.21
59.80
5.000
5.00
0.00
0.00
0.00
0.07
0.206
0.41
59.80
5.000
10.00
0.00
0.00
0.01
0.15
0.206
0.62
59.80
5.000
15.00
0.01
0.01
0.01
0.22
0.206
0.82
59.80
5.000
20.00
0.01
0.02
0.03
0.29
0.206
1.03
59.80
5.000
25.00
0.02
0.04
0.05
0.37
0.206
1.24
59.80
5.000
30.00
0.02
0.06
0.08
0.44
0.206
1.44
59.80
5.000
35.00
0.03
0.08
0.12
0.51
0.206
1.65
59.80
5.000
40.00
0.03
0.12
0.17
0.59
0.206
1.85
59.80
5.000
45.00
0.04
0.16
0.23
0.66
10
0.206
2.06
59.80
5.000
50.00
0.05
0.21
0.30
0.73
11
0.206
2.27
59.80
5.000
55.00
0.06
0.27
0.39
0.81
12
0.206
2.47
59.80
5.000
60.00
0.07
0.34
0.48
0.88
13
14
0.206
0.206
2.884
2.68
2.88
59.80
59.80
5.000
5.000
65.00
70.00
140.00
0.08
0.09
0.42
0.51
1.03
0.60
0.73
0.95
1.03
TRAMO
CAUDAL
N
1
LONGITUD
5.768
CALCULOS HIDRAULICOS EN LATERAL DE RIEGO
LATERAL
CAUDAL
(l/s)
1
74
0.206
0.206
DIAMETRO
INTERNO
(mm)
14.2
14.2
CHRISTIANSEN
(m)
PERDIDA
HF
(m)
53.73
79.87
8.97
13.34
LONGITUD
Fc
PERDIDA
FINAL
(m.c.a.)
VELOCID.
CRITICA
(m/s)
0.37
0.37
3.28
4.87
1.30
1.30
cotas lateral
cota inicial
cota final
Dif. Cotas
57.50
57.80
-0.30
FACTOR
OBSERV.
O.K.
O.K.
OBSERV.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
2.7
l/h
0.4
13.50
m3,h,ha
3.75
l,s,ha
(l/s)
0.208
CAUDAL
ACUM.
(l/s)
0.21
DIAMETRO
INTERNO
(mm)
59.80
(m)
5.000
LONGITUD
ACUM.
(m)
5.00
PERDIDA
HF
(m.c.a.)
0.0009212
PERDIDA
ACUM.
(m.c.a.)
0.00
PERDIDA
ACUM.
(PSI)
0.00
VELOCID.
CRITICA
(m/s)
0.07
0.208
0.42
59.80
5.000
10.00
0.00
0.00
0.01
0.15
0.208
0.208
0.63
59.80
5.000
15.00
0.01
0.01
0.01
0.22
0.83
59.80
5.000
20.00
0.01
0.02
0.03
0.30
0.208
1.04
59.80
5.000
25.00
0.02
0.04
0.05
0.37
0.208
1.25
59.80
5.000
30.00
0.02
0.06
0.08
0.45
0.208
1.46
59.80
5.000
35.00
0.03
0.09
0.12
0.52
0.208
1.67
59.80
5.000
40.00
0.04
0.12
0.17
0.59
0.208
1.88
59.80
5.000
45.00
0.04
0.16
0.23
0.67
10
0.208
2.08
59.80
5.000
50.00
0.05
0.22
0.31
0.74
11
0.208
2.29
59.80
5.000
55.00
0.06
0.28
0.39
0.82
12
0.208
2.50
59.80
5.000
60.00
0.07
0.35
0.49
0.89
13
14
0.208
0.208
2.917
2.71
2.92
59.80
59.80
5.000
5.000
65.00
70.00
0.08
0.09
0.43
0.52
0.61
0.74
0.96
1.04
0.208
0.21
59.80
5.000
5.00
0.00
0.00
0.00
0.07
0.208
0.42
59.80
5.000
10.00
0.00
0.00
0.01
0.15
0.208
0.63
59.80
5.000
15.00
0.01
0.01
0.01
0.22
0.208
0.83
59.80
5.000
20.00
0.01
0.02
0.03
0.30
0.208
1.04
59.80
5.000
25.00
0.02
0.04
0.05
0.37
0.208
1.25
59.80
5.000
30.00
0.02
0.06
0.08
0.45
0.208
1.46
59.80
5.000
35.00
0.03
0.09
0.12
0.52
0.208
1.67
59.80
5.000
40.00
0.04
0.12
0.17
0.59
0.208
1.88
59.80
5.000
45.00
0.04
0.16
0.23
0.67
10
0.208
2.08
59.80
5.000
50.00
0.05
0.22
0.31
0.74
11
0.208
2.29
59.80
5.000
55.00
0.06
0.28
0.39
0.82
12
0.208
2.50
59.80
5.000
60.00
0.07
0.35
0.49
0.89
13
14
0.208
0.208
2.917
2.71
2.92
59.80
59.80
5.000
5.000
65.00
70.00
140.00
0.08
0.09
0.43
0.52
1.05
0.61
0.74
0.96
1.04
TRAMO
CAUDAL
N
1
LONGITUD
5.834
CALCULOS HIDRAULICOS EN LATERAL DE RIEGO
LATERAL
CAUDAL
(l/s)
1
74
0.208
0.208
DIAMETRO
INTERNO
(mm)
14.2
14.2
CHRISTIANSEN
(m)
PERDIDA
HF
(m)
56.24
53.79
9.58
9.16
LONGITUD
Fc
PERDIDA
FINAL
(m.c.a.)
VELOCID.
CRITICA
(m/s)
0.37
0.37
3.50
3.34
1.32
1.32
cotas lateral
cota inicial
cota final
Dif. Cotas
57.50
57.80
-0.30
FACTOR
OBSERV.
O.K.
O.K.
OBSERV.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
2.7
l/h
0.4
13.50
m3,h,ha
3.75
l,s,ha
(l/s)
0.208
CAUDAL
ACUM.
(l/s)
0.21
DIAMETRO
INTERNO
(mm)
59.80
(m)
5.000
LONGITUD
ACUM.
(m)
5.00
PERDIDA
HF
(m.c.a.)
0.0009212
PERDIDA
ACUM.
(m.c.a.)
0.00
PERDIDA
ACUM.
(PSI)
0.00
VELOCID.
CRITICA
(m/s)
0.07
0.208
0.42
59.80
5.000
10.00
0.00
0.00
0.01
0.15
0.208
0.208
0.63
59.80
5.000
15.00
0.01
0.01
0.01
0.22
0.83
59.80
5.000
20.00
0.01
0.02
0.03
0.30
0.208
1.04
59.80
5.000
25.00
0.02
0.04
0.05
0.37
0.208
1.25
59.80
5.000
30.00
0.02
0.06
0.08
0.45
0.208
1.46
59.80
5.000
35.00
0.03
0.09
0.12
0.52
0.208
1.67
59.80
5.000
40.00
0.04
0.12
0.17
0.59
0.208
1.88
59.80
5.000
45.00
0.04
0.16
0.23
0.67
10
0.208
2.08
59.80
5.000
50.00
0.05
0.22
0.31
0.74
11
0.208
2.29
59.80
5.000
55.00
0.06
0.28
0.39
0.82
12
0.208
2.50
59.80
5.000
60.00
0.07
0.35
0.49
0.89
13
14
0.208
0.208
2.917
2.71
2.92
59.80
59.80
5.000
5.000
65.00
70.00
0.08
0.09
0.43
0.52
0.61
0.74
0.96
1.04
0.208
0.21
59.80
5.000
5.00
0.00
0.00
0.00
0.07
0.208
0.42
59.80
5.000
10.00
0.00
0.00
0.01
0.15
0.208
0.63
59.80
5.000
15.00
0.01
0.01
0.01
0.22
0.208
0.83
59.80
5.000
20.00
0.01
0.02
0.03
0.30
0.208
1.04
59.80
5.000
25.00
0.02
0.04
0.05
0.37
0.208
1.25
59.80
5.000
30.00
0.02
0.06
0.08
0.45
0.208
1.46
59.80
5.000
35.00
0.03
0.09
0.12
0.52
0.208
1.67
59.80
5.000
40.00
0.04
0.12
0.17
0.59
0.208
1.88
59.80
5.000
45.00
0.04
0.16
0.23
0.67
10
0.208
2.08
59.80
5.000
50.00
0.05
0.22
0.31
0.74
11
0.208
2.29
59.80
5.000
55.00
0.06
0.28
0.39
0.82
12
0.208
2.50
59.80
5.000
60.00
0.07
0.35
0.49
0.89
13
14
0.208
0.208
2.917
2.71
2.92
59.80
59.80
5.000
5.000
65.00
70.00
140.00
0.08
0.09
0.43
0.52
1.05
0.61
0.74
0.96
1.04
TRAMO
CAUDAL
N
1
LONGITUD
5.834
CALCULOS HIDRAULICOS EN LATERAL DE RIEGO
LATERAL
CAUDAL
(l/s)
1
74
0.208
0.208
DIAMETRO
INTERNO
(mm)
14.2
14.2
CHRISTIANSEN
(m)
PERDIDA
HF
(m)
50.19
54.93
8.55
9.36
LONGITUD
Fc
PERDIDA
FINAL
(m.c.a.)
VELOCID.
CRITICA
(m/s)
0.37
0.37
3.12
3.42
1.32
1.32
cotas lateral
cota inicial
cota final
Dif. Cotas
57.50
57.80
-0.30
FACTOR
OBSERV.
O.K.
O.K.
OBSERV.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
O.K.
UND
TURNO I
TURNO II
TURNO III
TURNO IV
TURNO V
m.c.a
15.00
15.00
15.00
15.00
15.00
m.c.a
15.00
15.00
15.00
15.00
15.00
m.c.a
13.95
12.66
17.16
13.65
13.24
m.c.a
1.40
1.27
1.72
1.37
1.32
m.c.a
1.48
0.23
0.22
0.22
0.22
m.c.a
2.00
2.00
2.00
2.00
2.00
m.c.a
10.00
10.00
10.00
10.00
10.00
m.c.a
5.00
5.00
5.00
5.00
5.00
SEGURIDAD (5%)
m.c.a
3.19
3.06
3.30
3.11
3.09
67.03
64.21
69.40
65.35
64.87
T-I
11.68
42.05
67.03
T - II
11.36
40.90
64.21
T - IIII
11.74
42.26
69.40
T - IV
11.54
41.54
65.35
T-V
11.67
42.01
64.87
8.24
13.73
10.25
7.68
12.80
9.55
8.58
14.29
10.66
7.94
13.23
9.87
7.97
13.28
9.91
DESCRIPCION
(l/s)
(m3/h)
(m.c.a)
Caudal
ADT
Potencia de bomba
Potencia de Motor
*Eficiencia Bomba
*Eficiencia trasmision
**Eficiencia Motor
COSTO OPERACIN
TIEMPO RIEGO
TURNOS
TIEMPO TOTAL RIEGO
POTENCIA DEL MOTOR
TOTAL DE POTENCIA
ENERO
COSTO POR KW.H
TOTAL COSTO
COSTO POR HA
UND
2.07
5
10.35
10.25
106.045
3287.3945133932
0.5664
1861.9802523859
195.9979213038
(HP)
(HP)
(kw/h)
0.80
0.90
0.60
H.DIA
H.DIA
KW.H
KW.DIA
KW.MES
N.S.
N.S. MES
HA.MES