You are on page 1of 9

DB POWER LIMITED, RAIGARH

2 X 600 MW Power Plant

DB / SOP / GF

SOP for GRID FAILURE


Issue No:

Issue Date:

Revision:

Revision Date:

File no:

WORK INSTRUCTIONS
FOR
GRID FAILURE
[DB / SOP / GF]

Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name:

Name:

Designation:

Designation:

Designation:

Page 1 of 9

DB POWER LIMITED, RAIGARH


2 X 600 MW Power Plant

DB / SOP / GF

SOP for GRID FAILURE


Issue No:

Issue Date:

Revision:

Revision Date:

File no:

Page 2 of 9

Amendment Record
Amendment
Rev
No.

Amendment
Date

Nature of Change

Page
No.

Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name:

Name:

Designation:

Designation:

Designation:

ACK No.

DB POWER LIMITED, RAIGARH


2 X 600 MW Power Plant

DB / SOP / GF

SOP for GRID FAILURE


Issue No:

Issue Date:

Revision:

Revision Date:

File no:

Page 3 of 9

1.0 Purpose:
This Procedure is intended to provide guidance and instructions for carrying out for
Grid failure
2.0 Responsibility:
1. All the personnel involved in carrying out /supervising the above activities are
required to ensure implementation of this procedure.
2. In the event of any changes required in the procedure such changes may be
requested with Site in charge, who would take appropriate action with approval
from respective departmental heads.
3.0 Grid Failure:
In the event of a black out, the initial moments are extremely precious and it requires
the right decision to be taken at first instance for speedy restoration of the system.
Any lapse or delay in taking the right initial decision may prove to be very costly.
Hence, it is of paramount importance that all the operating personnel of Generating
Station Should well aware of the activity so that plant would not suffer any damage.
All important auxiliaries are supplied from EMERGENCY PANEL which in turn hook up
with DGDB and redundant supply connected more than 1 DG Supply.
Station DC source are also available to cater the immediate situation arises.
ACTION PLAN DURING BLACK OUT CONDITIONS
So, for ensuring a healthy shutdown the following activities are to be carried out
without fail.
UNIT STATUS IMMEDIATELY AFTER GRID FAILURE OR BLACK OUT
1.
2.
3.
4.

Boiler, Turbine and Generator in tripped condition.


Failure of all HT and LT supply.
All equipment in tripped condition.
Loss of normal lighting and DC lighting is available.

Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name:

Name:

Designation:

Designation:

Designation:

DB POWER LIMITED, RAIGARH


2 X 600 MW Power Plant

DB / SOP / GF

SOP for GRID FAILURE


Issue No:

Issue Date:

Revision:

Revision Date:

File no:

Page 4 of 9

5. 220 V DC supply is available.


6. Turbine Speed may increase beyond 3000 r.pm.
EQUIPMENT AT RISK:
1. All bearings of Turbine and Generator.
--- needs proper Lubrication.
2. All bearings of turbine driven BFPs
--- needs proper Lubrication.
3. Generator
--- needs Seal oil at the ends of Casing for Sealing Hydrogen.
4. Air-pre Heaters
--- Basket needs cooling for uneven heating.
5. LP turbine diaphragm
--- Entry of steam into the condenser to be restricted.
6. Flame Scanners
7. Turbine

--- needs sufficient cooling.


--- Rotor needs uniform cooling.

PROCEDURE DETAILS:
Black Out Following checks & activities are also to be ensured immediately
during Station
Instant Happenings:
Turbine Tripped. All Main Steam HP Stop Valve, HP Control Valve and IP Stop Valve, IP
Control Valve gets Closed & Trip Oil Pr. becomes to Zero. Turbine Speed is reducing.
Generator and field circuit breakers have opened as Load & Generator Voltage
becomes to Zero.
Boiler Tripped. All running Coal Mill along with Coal Feeder Tripped. LOTV are Closed as
well as all nozzle Valves. To ensure more safety individual corners oil Manual valves
also kept shut.
SH & RH Block V/v as well as all individual Pneumatic Isolating & Control Valves are
closed.
400 KV LINE 1 & LINE 2 Breaker Tripped.
Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name:

Name:

Designation:

Designation:

Designation:

DB POWER LIMITED, RAIGARH


2 X 600 MW Power Plant

DB / SOP / GF

SOP for GRID FAILURE


Issue No:

Issue Date:

Revision:

Revision Date:

File no:

Page 5 of 9

All Running Equipments got tripped as no Power is available.


Immediate Checks & Activities:
DC System: The following points to be noted during emergency condition:
a) DC Lube oil pump:
Ensure that DC EOP (lube oil pump) has started on auto and check lube oil pressure &
amps. Isolate gland sealing system by closing the seal steam supply Control & Manual
valve & manual valve at APRDS station and break the vacuum by opening Vacuum
breaker instantly.
In case DC lube oil pump does not take start on auto the following actions have
to be ensured:
1. Start DC lube oil pump (EOP) from LOCAL by changing Selector Switch in TEST
mode.
2. If still, DC lube oil pump does not start, AC AOP-1/ AC AOP-2 has to be started on
resumption of Power supply in Emergency Board from DG set.
3. If there is delay in starting of DG set or resumption of station supply, then kill the
vacuum by opening the Vacuum breaker valve manually at speed below 2300 rpm
& Isolate gland sealing system by closing the seal steam supply Control & Manual
valve & also Manual valve at APRDS station.
b) DC jacking oil pump:
1. Ensure that DC Jacking oil pump has started on auto and check JOP Pressure &
Amps.
2. Isolate gland sealing system by closing the seal steam supply Control & Manual
valve & also Manual valve at APRDS station and break the vacuum by opening
Vacuum breaker instantly.
In case DC Jacking oil pump does not take start on auto the following actions
have to be ensured:
1. Start DC Jacking oil pump (JOP) from LOCAL by changing Selector Switch in TEST
Mode.
Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name:

Name:

Designation:

Designation:

Designation:

DB POWER LIMITED, RAIGARH


2 X 600 MW Power Plant

DB / SOP / GF

SOP for GRID FAILURE


Issue No:

Issue Date:

Revision:

Revision Date:

File no:

Page 6 of 9

2. If still, DC Jacking oil pump does not start, AC JOP-2 has to be started on
resumption of Power supply in Emergency Board from DG set.
3. If there is delay in starting of DG set or resumption of station supply, then kill the
vacuum by opening the Vacuum breaker valve manually at speed below 2300 rpm
& Isolate gland sealing system by closing the seal steam supply control & Manual
valve & also Manual valve at APRDS station as no Lube Oil Pump is running.
4. If DC EOP is running, Vacuum can be killed as soon as Turbine Tripped after BLACK
OUT Occurred.
5. Put turbine on barring gear, if not, hand barring to be started after turbine speed
comes to zero.
c) Seal oil pump:
Ensure that DC Seal Oil Pump had started on auto. Check Seal Oil, H2 Pressure & Seal
Oil/ H2 DP.
In case DC Seal oil pump does not take start on auto the following actions have to be
ensured:
1. Start DC Seal oil pump (JOP) from LOCAL by changing Selector Switch in TEST
Mode.
2. If still, DC Seal oil pump does not start, AC Seal Oil Pump -2 has to be started on
resumption of Power supply in Emergency Board from DG set.
3. In case of DCSOP or ACSOP does not start, then immediately H2 purging by CO2
should be started.
d) Ensure DC/AC lub oil pump & AC JOP of TDBFP running and follow the same
procedure followed for the Turbine.
e) DC scanner air fan:
1. Ensure DC Scanner Air Fan had started & Emergency Air Damper is opened. Note
Scanner Air Discharge Pr. & Amps from MCC/ Local Panel.
2. In case DC Scanner Air Fan does not take start on auto, it should be started from
LOCAL by changing Selector Switch in TEST mode or AC Scanner Fan has to be
started on resumption of Power supply in Emergency Board from DG set.
f) APH Air Motor:
Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name:

Name:

Designation:

Designation:

Designation:

DB POWER LIMITED, RAIGARH


2 X 600 MW Power Plant

DB / SOP / GF

SOP for GRID FAILURE


Issue No:

Issue Date:

Revision:

Revision Date:

File no:

Page 7 of 9

1. Ensure APH Air motor should come in service. If air motor is not running, open the
by-pass manual valve of solenoid valve from Field.
2. Start APH motor on availability of supply from DG set.
3. In case of BOTH or ANY APH is not Rotating (no availability of Air Pressure), Rotate
the APH by Opening Coupling Guard with help of Maintenance Team.
Further Checks:
1. 220V batteries are healthy as well as Note 220V Main & S/B DCDB Voltage from
Local
2. UPS batteries are healthy as well as Note 230V ACDB & 110 V ACDB Voltage from
Local.
3. DCS Power as well as operation from DCS is available.
4. Note Turbine Coasting Down Time. Closely watch on Turbine Vibration & Axial Shift
5. Lube oil is not draining out from centrifuge.
6. All emergency DC illuminations have cut in.
7. QC NRVs of LP Heater- 2 & 3, HP Heater -5A/5B & Deaerator are shut/close.
8. Close boiler blow down valve manually.
9. Shut HP 6A & 6B Ex. Motorized valve manually.
10. Note down all alarms & relay acted in GRP Panel, and Turbine Oil Temperature as
well as Turbine Bearing Metal Temperature.
11. Bearing Temperature of All running Fans, Mills & Pumps after Tripping as Lube oil
Pumps of all equipments also tripped.
12. Ensure 11KV/ 6.6 KV Station Switch Board, Unit Switch Board 11KV, 6.6 KV Unit
Switch Board and Incomer Breakers are open. So, 415 V Unit PCC & Station PMCC
Incomer Breakers are also tripped on Under Voltage.
13. Ensure that all 11KV/6.6 KV motor Feeders are tripped.

CHARGING EMCC BUS:


DG Set Operation:
Ensure that DG set had started on auto & I/C Breaker made ON in Auto within 15 secs.
After Sensing Emergency Board under Voltage & Both I/C of Emergency Board from
Unit PCC made OFF along with I/ C breaker of Emergency Board from DGMCC made
ON. B/C of Emergency PCC came in AUTO. So, Emergency PCC Should be Charged from
DG PCC I/C -1 & B/C. If DG not stated in AUTO, it has to be started by PUSH Button
provided (If any) by putting selection switch in MANUAL or has to be started from PLC
Panel or DG set room & I/C breaker to be closed from locally.

Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name:

Name:

Designation:

Designation:

Designation:

DB POWER LIMITED, RAIGARH


2 X 600 MW Power Plant

DB / SOP / GF

SOP for GRID FAILURE


Issue No:

Issue Date:

Revision:

Revision Date:

File no:

Page 8 of 9

In order to restrict the entry of Steam into the condenser, the following
activities are to be carried out:
1. Isolate gland sealing system by closing the seal steam supply Control & Manual
valve & also Manual valve at APRDS station and break the vacuum by opening
Vacuum breaker instantly after ensuring DC EOP is running.
2. If DC EOP not started in AUTO or taking time to Start and there is delay in starting
of DG set or resumption of station supply, then kill the vacuum by opening the
Vacuum breaker valve manually at speed below 2300 rpm & Isolate gland sealing
system by closing the seal steam supply control & Manual valve & also Manual
valve at APRDS station.
3. Close Seal Steam Motorized Drain V/V. to HP Flash Tank manually & Open Gland
Steam Line Drain to Atmosphere.
4. To Ensure Closing of line drain V/Vs (Motorized & Manual) connected to flash tanks.
5. To Ensure Closing of all MAL drain valves & their Manual isolation valve. So, SLC of
MAL Drain should be made off for ensuring no Drain Valve will open after Power
Restoration.
6. Close Manual isolation valve of HPH-5A & 5B DRIP to Condenser Flash Tank from
Field.
7. Close Manual isolation valve of HPH-6A &6B DRIP to Condenser Flash Tank from
Field.
8. Close manual isolation valve of LPH-2 DRIP to Condenser Flash Tank from Field.
9. Close manual isolation valve of LPH-3 DRIP to Condenser Flash Tank from Field.
10. To Ensure Closing of all motorized drain valves of Extraction Line & their manual
isolation valve.
11. To Ensure Closing of all Dearator extraction line (from CRH) drain Trap Manual
valves to HP /LP Flash Tank.
12. Ensure Closing of all Dearator Extraction line pot drain to LP Flash Tank.
13. Close I/L or O/L Manual Isolation Valve of Gland Steam Leak off control V/v.
14. Close Boiler stop valves manually at 80 mtr. & ensure its IBV is closed.
15. Open CRH line atmospheric drains for quick depressurization of CRH line. & MS
lines drains.
16. Open HPBP warm up line drains & isolate HPBP warm up valves.
17. Observe LP EXHAUST Temperature & Vacuum.
18. To ensure closing of H.P.B.P. and L.P.B.P. valves. There is a chance of Opening of
HPBY-Pass due non availability of HPSU Pump Power supply when Blocking Unit Not
working properly.
Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name:

Name:

Designation:

Designation:

Designation:

DB POWER LIMITED, RAIGARH


2 X 600 MW Power Plant

DB / SOP / GF

SOP for GRID FAILURE


Issue No:

Issue Date:

Revision:

Revision Date:

File no:

Page 9 of 9

STARTING OF EQUIPMENTS ON EMERGENCY BUS after resumption of Power by


DG Set.
Once DG set gets started, following activities are to be carried out:
1.
2.
3.
4.

Check all Units Emergency MCC is charged from DG supply.


Start AOP (AC), note LO pressure & Max. Bearing Metal Temperature
Stop DC EOP.
Start JOP (AC), note JOP pressure. Note Turbine Speed as well as coasting Down
Time.
5. Stop DC JOP.
6. Start one of the AC SOP, note Seal Oil pressure, H2 Pressure & Seal/H2 DP.
7. Stop DC SOP.
8. Start AC Scanner Air Fan. Note Discharge Pressure.
9. Stop DC Scanner Air Fan.
10. Start Both APH Electric Motor, ensure Air Motor is cut out from Field & APH is
rotating.
11. Start OVEF, BCEF.
12. Start Lube Oil Pumps of BFP A, BFP-B & BFP-C.
13. Start JOP of TDBFPs.
14. Start Lube Oil Pump - of ID Fan A & B.
15. Start Lube Oil Pump - of FD Fan A & B.
16. Start Lube Oil Pump - of PA Fan A & B.
17. DG Oil Level to be checked in regular interval after starting of DG if POWER
Resumption is delayed.
18. Emergency AC Lighting has cut in & DC Lights will be cut off automatically.
19. If POWER Resumption is delayed, Change the Power Source of Battery Charger
from Battery to Emergency PCC Source.
20. If POWER Resumption is delayed, Change the Power Source of UPS ACDB from
Battery to Emergency PCC Source

Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name:

Name:

Designation:

Designation:

Designation: