You are on page 1of 2

PROYECTO ESTUDIO CARRETERA ALFAMAYO - QUILLABAMBA

RELACION DE MUROS DE CONTENCION

N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

PROGRESIVA
De
A
86+430
86+445
87+415
87+425
87+425
87+435
87+775
87+785
87+845
87+855
88+060
88+085
89+150
89+170
89+930
89+950
90+635
90+655
90+655
90+665
90+775
90+785
90+815
90+855
91+195
91+205
91+810
91+830
94+610
94+635
95+555
95+565
95+670
95+705
100+675
100+685
100+875
100+885
101+415
101+425
103+385
103+410
103+485
103+495
103+890
103+410
105+295
105+350
106+795
106+805
106+835
106+845
107+595
107+615
107+600
107+610
107+755
107+765
108+155
108+165
110+605
110+615
115+350
115+370
115+915
115+925
115+925
115+930
115+930
115+970
115+970
115+990
115+990
116+005
116+005
116+040
116+695
116+715
118+245
118+270
123+575
123+585
123+585
123+595
132+675
132+685
132+750
132+770
135+275
135+285
135+345
135+370
136+505
136+525
137+005
137+015
138+835
138+845
139+005
139+030
Total LONGITUD

M4
h=2.50 m

TIPOS DE MURO
M5
M6
M7
h=3.00 m h=3.50 m h=4.00 m
15.00

M8
h=4.50 m

10.00
10.00
10.00
10.00
7.50

7.50

10.00
20.00

20.00
20.00
10.00
10.00
10.00

30.00

10.00
20.00
25.00
10.00
15.00

20.00
10.00

10.00
10.00
25.00
10.00
20.00
20.00

35.00
10.00
10.00

20.00
10.00
10.00
10.00
10.00
20.00
10.00
5.00
40.00
20.00
15.00
15.00
10.00
10.00
10.00

20.00
20.00
15.00

10.00
20.00

187.50

125.00

97.50

10.00
150.00

10.00
25.00
20.00
10.00
10.00
15.00
300.00

VOLUMEN CORTE (m3)

LONG.

M4
h=2.50 m

(m)
15.00
10.00
10.00
10.00
10.00
25.00
20.00
20.00
20.00
10.00
10.00
40.00
10.00
20.00
25.00
10.00
35.00
10.00
10.00
10.00
25.00
10.00
20.00
55.00
10.00
10.00
20.00
10.00
10.00
10.00
10.00
20.00
10.00
5.00
40.00
20.00
15.00
35.00
20.00
25.00
10.00
10.00
10.00
20.00
10.00
25.00
20.00
10.00
10.00
25.00
860.00

TIPOS DE MURO
M1 - M7 Muros Tipo Ciclopeo

2.10
393.75

2.80
3.47
350.00
338.33
1737.58

4.37
655.50

2.68
804.00

1.65
309.38

1.90
237.50

2.50
375.00

804.00
2.80
840.00

4.99
935.63

6.01
751.25

8.04
1206.00

9.00
2,700.00

2.20
214.50
1976.38
7.01
683.48
6276.35

1763.00

M6
h=3.50 m

VOLUMEN RELLENO (m3)

M7
h=4.00 m

M8
h=4.50 m

38.80
80.4
48.20
50.50
76.28

43.88

173.20
318.80

139.20
127.80
74.60
34.80
77.30

336.75

78.70
223.60
370.75
107.80
45.60

222.60
129.80

38.20
49.40
53.80
89.40

274.40
88.60
68.80

112.80
53.60
66.00
58.00
181.80
58.80
57.20
680.00
260.00
108.00
58.80
39.60
34.60
45.50

150.30
180.40
95.25

56.60
153.00

620.38
Area Material gravoso

AREA /MURO
VOLUMEN TOTAL
VOL. TOTAL CCiclopeo (m3)
VOL. TOTAL CArmado (m3)
ancho de Solado (m)
Area solado e=0.10m (m2)
Total solado e=0.10m (m2)
Perimetro Encofrado (m)
Area de Encofrado (m2)
Total Area de Encofrado (m2)
Total Acero de refuerzo (Kg)

M5
h=3.00 m
87.30

663.10

706.53

110.70

146.40
355.88
447.40
141.90
134.30
228.75

1,390.30

4,184.53

M4
h=2.50 m

87.30
38.80
80.40
48.20
50.50
293.35
318.80
139.20
127.80
74.60
34.80
414.05
78.70
223.60
370.75
107.80
268.20
129.80
38.20
49.40
0.00
53.80
0.00
363.80
88.60
68.80
112.80
0.00
53.60
66.00
58.00
181.80
58.80
57.20
680.00
260.00
108.00
209.10
180.40
134.85
34.60
45.50
56.60
153.00
146.40
355.88
447.40
141.90
134.30
339.45

M5
h=3.00 m
41.25

M6
h=3.50 m

M7
h=4.00 m

M8
h=4.50 m

24.30
51.3
27.80
40.80
30.30

7.28

98.70
179.40

74.00
67.40
38.60
17.90
53.90

282.90

37.80
190.00
242.75
52.30
33.15

192.80
101.90

18.40
27.70
26.40
56.00

347.55
49.50
36.70

60.40
25.90
36.50
31.60
105.40
36.70
44.35
562.80
175.40
68.40
41.10
18.00
16.40
27.40

101.40
102.20
57.15

302.25
118.40

327.33
0.6

648.40
0.75

396.20
0.9

54.10

100.50
250.13
264.60
92.10
97.10
151.50

863.90
1.05

3,154.73
1.2

Nota : Para el caso del calculo de rellenos se ha considerado el descuento del Volumen del Material gravoso de 30cm de ancho por
la respectiva altura (Ver plano sistemicos) y ver Formulas en casillero respectivo
La formula de los casilleros de relleno indican lo sgte:
area de relleno por longitud de muro menos area del material gravoso por longitud de muro.
7,564.83

5,390.55

M8 Concreto Armado

You might also like