BRIDGE & ROOF CO. (I) LTD.


(A GOVT. OF INDIA ENTERPRISE)
DATE : 11.07.16
PROJECT : DESIGN, DETAILED ENGINEERING, SUPPLY, FABRICATION, INSTALLATION, TESTING, FOUNDATION WORK, FIRE PROTECTION
SYSTEM, OTHER CIVIL WORKS
ETC. FOR DOUBLE DECK FLOATING ROOF TYPE CRUDE STORAGE TANKS AT PARADIP REFINERY.
NIT NO.:

RHQCC16035 & RHQCC16036

Pre-Bid Queries I
SL.
NO.
A.
1.

2.

3.

SUBJECT

REF. CL. NO

QUERIES

Equipment
Data
Sheet
(Mechanical), Anexure-2 For
Crude Storage Tanks 201-Tk012/013/014
&
Crude
Storage
Tanks
201-Tk015/016/017/108

Corrosion Allowance (Internal / External) has been specified as


1.5 mm/1.5 mm. Please clarify about the different parts where
this has to be applied.

DRAWING NO. PJ-ENGG-02,


Anexure-3

In the GAD (schematic) we find corrosion allowance for wetted


floating roof has been specified as 5 mm which we feel may be a
typographical error. As such please clarify the same.

DRAWING NO. PJ-ENGG-02,


Anexure-3

In the GAD (schematic) against the layout of shell girth we find


there are 6 shell girths @ 2500 mm which makes a height of 15
m for the tank. However the tank height has been stated as 13.6
m(upto top of shell plate). Please clarify regarding the height of
the tank.

Technical
Corrosion
allowance

Corrosion
allowance
for
wetted
Floating
Roof
Height of the tank

However no Corrosion Allowance for floating roof has been


specified. Please clarify about the Corrosion Allowance that is to
be considered for floating roof.

IOCLS REPLY

PAGE : 2 OF 2
DATE : 11.07.16
PROJECT : DESIGN, DETAILED ENGINEERING, SUPPLY, FABRICATION, INSTALLATION, TESTING, FOUNDATION WORK, FIRE PROTECTION
SYSTEM, OTHER CIVIL WORKS
ETC. FOR DOUBLE DECK FLOATING ROOF TYPE CRUDE STORAGE TANKS AT PARADIP REFINERY.
NIT NO.:

RHQCC16035 & RHQCC16036

Pre-Bid Queries I

4.

Liquid level

DRAWING NO. PJ-ENGG-02,


Anexure-3
& Equipment
Data Sheet (Mechanical),
Anexure-2 For Crude Storage
Tanks 201-Tk-012/013/014
& Crude Storage Tanks 201Tk-015/016/017/108

In the GAD (schematic) design liquid height has been specified as


12.75 m whereas the test pressure has been specified as full of
water + ATM. Moreover as per Equipment Data Sheet
(Mechanical) note no. 5.13 the maximum operating liquid level
has been stated as 13.5/14 m while the HLL is mentioned as 12
m in the GAD. For all the 7 tanks against note no. 5.11 it is
specified hydro test condition= Full of water + ATM pressure.
Please note that as this is a floating roof tank of height of 13.61
m, the above stated maximum operating liquid level of 13.5/14 m
is not possible.
So, there is confusion and contradiction in the above
data. As such please clarify regarding the followings:
i)

Maximum design liquid level.

ii)

Maximum hydro static liquid level during hydro test as


well as design
Maximum operating liquid level.