Activities carried out under the sections

1.These are overall activities, section may elaborate it to further to sub activities.
2. You may get such activities as per the contract work orders. Please include the
same if not considered below.
3. Addition of activities is valuable to find hazards.

Turbine Maint
1)
2)

3)
4)
5)

6)
7)
8)
9)
10)
11)
12)
13)
14)
15)

Material handling------A) Machine parts


B)Fabrication material
Maint- valve replacement/leakage containment
A) Steam line
B) Hot water
C) Water line
D) H2 line
E) Oil line
F) Air line
G) Chemical line
Insulating hot line
Fabrication- various activities
Transportation of material
A) Manually
B) By hand trolley
C) By vehicle
D)By cranes
Working at height
On line maint of valve
Sand Basting
Removal of insulating material (HTP IPT, Valves)
Fixing of insulating material (HTP IPT, Valves)
Hot operation
Material stores
Channel line maint.
Cooling tower maint.
Under water maint. work

Elect maint
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)

Material handling-----A) Big motor


B) Small motors
Maint of SWGR panel
Maint of cables
New electric cabling
New Tamp electric cabling
Underground cable maint
Underground cable laying
Transformer maint
ESP maint
ESP overhaul
EOT crane maint

Page No

Doc. No. KHTPS/EPP/LAA


-1-

Issue/Revision No.: 01/00

Issue/Revision Date: 01.01.2013

12)
13)
14)
15)
16)
17)
18)
19)
20)
21)
22)
23)
24)
25)
26)

Lift maint
Chimney light maint
Lighting maint at height
Ventilation fan maint
Tower light maint
Street light maint
Plant light maint
Room/cabin light maint
Room air cooler maint
Room A/C Maint
24v light fixture maint
Temp lighting
Welding M/C supply provision
Online HV maint
Cable jointing

Elect Testing
1)
2)

3)
4)
5)

On line elect Testing-----A) HV


maint RTD/ at various level
Hot area
Dusty area
Moist area
Cabling
Maint of valves ----a) Prumalic
b) Electrical
Storage of material

Operation activities
1)
2)

Reading monitoring
Plant inspection -----------A) Running plant
B) Overhauling
c) Valve operation at ground level
d) Valve operation at height
e) Cleaning
f) Emergency handling
g) Clinker removal
h) SWGR control panel operation
i) Damper operation
j) Coal choke up removal
k) Reject gate operation
l) Reject belt area cleaning
m) Operation of
auxiliary/pumps/Machines
n) Operation of vent/drain
o) Oil gum cleaning & operation

Page No

Doc. No. KHTPS/EPP/LAA


-2-

Issue/Revision No.: 01/00

Issue/Revision Date: 01.01.2013

Boiler maint
a) Fabrication
b)Material handling
c) Tube leakage maint
d) Air heater maint basket replacement
e) Air heater basket removal
e) Boiler tube handling during overhaul
f) Handling of Big machines
g) Alignment and maint of fan/moter m/C
h) Coal feeder maint
i) Coal pipe leakage maint
j) Coal mill maint
k) Reject Belt maint
l) Clinker Grinder maint
m) Boiler overhaul activities----A) Super heater maint B) ECO tube maint C)Water wall
maint D) Scaffoldin E) Hyd. testing F) Internal inspection
n) Oil handling plant maint---A) Pile line maint
B)Storage tank maint
o)Air compressor maint
p) Soot blower maint
q) Oil gun maint
r) Clinker removal
s) Coal bunker maint
t) Hot pipe maint
u) Water pipe maint
v) Damper maint
w) Tub oil system maint

ASH Handling plant


1)

Deashing ---thr system


Ground unloading

2)
3)
4)
5)
6)
7)

Clinker Grinder operation


ASH sump valve operation
ASH pump operation
C/G maint
C/G pipe line maint
ASH sump pipe maint-----A) Height

Page No

Doc. No. KHTPS/EPP/LAA


-3-

Issue/Revision No.: 01/00

Issue/Revision Date: 01.01.2013

8)
9)
10)
11)
12)
13)
14
15)

Ash pump maint


SWGR operation
Pipe line transport &Handling
Recovery water tank maint
Recovery water tank valve operation
Fabrication
) Material handling
ASH disposal
A) Fly ash thr truck

Activities in CHP
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.

Page No

Operation of plant from control room Start up /running / shut


down
Issuing permits for maint work mechanical / electrical
Plant inspection (Taking rounds)
Cleaning of plant
Housekeeping
Maint of plant
Wagon unloading BOBR / top open
Track maint
Material handling
Material planning/placing/storing
Coal stacking reclaiming
Coal blending
Bunker scrapping
Roller replacement
Belt maint
Belt jointing
Pull cord maint
Lighting ( providing illumination at work place, replacement of
damaged fixtures/bulbs)
Ventilation( providing fresh air at work place)
Announcement system maint( Siren, sounding before starting
auxiliary)
Electrical cable maint/proper dressing/ cleaning of accumulated
coal dust
Air system maint
Dust suppression
Vehicle movement
Diesel /petrol stock & filling station
Lub oil stock & filling station
Transformer oil stock & filling station
Scrap maint /removal/dumping at place
Maintenance of Steel & RCC structure
Maint of cover sheets of Belt gallery, Crusher/transfer housed
Maintenance of road
Maintenance of stairs/ platforms/ railing/toe guards/roof/

Doc. No. KHTPS/EPP/LAA


-4-

Issue/Revision No.: 01/00

Issue/Revision Date: 01.01.2013

Page No

Doc. No. KHTPS/EPP/LAA


-5-

Issue/Revision No.: 01/00

Issue/Revision Date: 01.01.2013