‘TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED LF STANDARD SCHEDULE OF RATES FOR LABOUR ITEMS OF 220 KV & 132 KV TRANSMISSION LINES AND SUBSTATIONS WORKS AND FOR O&M WORKS OF TRANSMISSION SYSTEM FOR THE YEAR 2014-15 (With effect from the date of issue of T.0.0. Ms. No. 24, dated.27.08.2014.) ‘TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED VIDYUT SOUDHA :: HYDERABAD APTRANSCO ~ Standard Schedule of Rates for labour items of 220 kV & 132 kV, Transmissi ‘and substations works and rates for O&M works of Transmission system for the year 2014-15 ‘Communicated — Reg. 7.0.0. No. CE (Construction) / Ms. No. 24 dt, 27.08.2014 Read the following:- Ref 1). 1.0.0.CE (Civil). MsNo.148, dt.21.10.2009 2) T.0.0.Ms. (CE-Construction-2) MS. No.162, dated 26.08.2013 APTRANSCO is communicating Standard Schedule of rates for labour items of 220 kV & 132 KV Transmission lines and substations capital works including O&M works annually for adoption in preparation of estimates. The SSR communicated vide 2" cited above, is updated duly enhancing to the extent of Inflation in labour charges as declared by Government of India for the year 2014-15. Further as per the field conditions / requirements new item rates such as laying of 132kV/220 kV UG Cables in various soil conditions, Layout drawing with Auto-CADD, etc., were included. ORDER Standard Schedule of Rates for labour items of 220 kV & 132 kV Transmission lines and substations works and rates for O&M works of Transmission system for the year 2014-15 approved by Transmission Corporation of Andhra Pradesh Limited is communicated herewith for adoption in preparation of estimates. For all Civil items of EHV Transmission lines & substations works, the rates that are approved by Government of A.P. in the Prevailing common SSR and the provisions made in the orders 1* cited above shall be adopted. ‘The standard scheduled of Rates for 2014-15 1.00. come into force from the date of issue of this (8Y ORDER AND IN THE NAME OF TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED) Sd/-S. SUBRAHMANYAM DIRECTOR (PROJECTS) To ‘The Chief Engineer/Construction/VS/Hyderabad. ‘The Chief Engineer/Transmission/VS/Hyderabad. ‘The Chief Engineer/L1,EA&Opn./VS/Hyderabad. ‘The Chief Engineer/400kV construction/VS/Hyderabad. ‘The Chief Engineer/Telecom/VS/Hyderabad, ‘The Chief Engineer/Civil/VS/Hyderabad ‘The Chief Engineer/Zone/Vijayawada The Superintending Engineer/OMC/Vijayawada. ‘The Superintending Engineer/OMC/Guntur. The Superintending Engineer/OMC/Nellore. The Superintending Engineer/OMC/ Ongole. ‘The Superintending Engineer/OMCY Anantapur. The Superintending Engineer/OMC/Tirupathi ‘The Superintending Engineer/OMC/ Visakhapatnam. ‘The Superintending Engineer/OMC/V ijayanagaram ‘The Superintending Engineer/OMC/Srikakulam. ‘The Superintending Engineer/OMC/Rajahmundry. ‘The Superintending Engineer/OMC/Eluru. ‘The Superintending Engineer/Construction/Kadapa ‘The Superintending Engineer/ O &M /Kadapa The Superintending Engineer/Construction/Kurnool ‘The Superintending Engineer/TLC/LIS/Kurmnool. ‘The Superintending Engineer/400kV/OMC/Vijayawada ‘The Superintending Engineer/400kV/OMC/Kadapa. The Superintending Engineer/400kV/ O &M/Visakhapatnam. ‘The Superintending Engineer/O&M/Kumool ‘The Superintending Engincer/Telecom/Kadapa. The Superintending Engineer/Telecom/V ijayawada. ‘The Superintending Engineer/Telecom/Vishakapatnam, ‘The Superintending Engineer/Civi/TLC/ Vijayawada. The Superintending Engineer /Civil/TLC/Kadapa. ‘The Superintending Engineer /Civil/TLC/ Visakhapatnam The Superintending Engineer/Construction /PM /VS/Hyd. The Superintending Engineer/PM/400 KV /VS/Hyderabad. The Superintending Engineer/LIS /VS/Hyderabad. ‘The Superintending Engineer/O&M/Lines/Transmission/VS/Hyderabad. ‘The Superintending Engineer/O&M/Substations/ Transmission /VS/Hyderabad, ‘The Executive Engineer/Construction/Vijayawada. The Executive Engineer/ Construction /Gunadala. The Executive Engineer/ Construction /Guntur. ‘The Executive Engineer/ Construction ‘Nellore. The Executive Engineer / Construction /Ongole. ‘The Executive Engineer/ Construction /Thirupathi. (Cont...3) ‘The Executive Engineer/ Construction /Rajahmundry. ‘The Executive Engineer/ Construction /Vizag, The Executive Engineer/ Construction /Kumool The Executive Engineer/TLC/LIS/Division-1/Kurnool. ‘The Executive Engineer/TLC/L1S/Division-2/Kurnool. ‘The Executive Engineer/ Construction /Kadapa. ‘The Executive Engineer/Div-1/400kV L&SS/Vijayawada, ‘The Executive Engineer/Div-1/400kV L&SS/Guntur. ‘The Executive Engineer/Div-1/400kV L&SS/Krishnapatnam, ‘The Executive Engineer/Div-1/400kV L&SS/Rajahmundry. The Divisional Engineer/O&M 400kV TL&SS / Vemagiri. The Divisional Engineer/O&M 400kV TL&SS / Rajahmundry. The Divisional Engineer/O&M 400kV TL&SS / Chittoor. ‘The Divisional Engineer/O&M 400kV TL&SS /Manubolu (Nellore district). ‘The Divisional Engineer/O&M 400kV TL&SS /Kalpaka (Visakhapatnam distr The Divisional Engineer /TLC/TRE/Kadapa ‘The Divisional Engineer/TL&SS / Nagarjunasagar ‘The Divisional Engineer/ MRT / EHT / TLC / Vijayawada ‘The Divisional Engineer/ MRT / EHT / TLC / Nellore The Divisional Engineer/ TL&SS / Vijayawada The Divisional Engineer/ TL&SS / Guntur The Divisional Engineer MRT / TL&SS / Vijayawada ‘The Divisional Engineer! MRT / TL&SS / Nellore ‘The Divisional Engineer! TL&SS / Nellore The Divisional Engineer! TL&SS / Ongole ‘The Divisional Engineer’ TL&SS / Bommur The Divisional Engineer/ TL&SS / Nidadavole The Divisional Engineer/ HVDC / TL&SS Circle / Rajahmundry ‘The Divisional Engineer’ MRT / EHT / Rajahmundry ‘The Divisional Engineer/ TL&SS / Gazuwaka ‘The Divisional Engineer’ TL&SS / Garividi ‘The Divisional Engineer/ MRT / TL&SS / Vizag The Divisional Engineer/ TL&SS / Kadapa ‘The Divisional Engineer TL&SS / Yerraguntla ‘The Divisional Engineer/ TL&SS / Tirupathi ‘The Divisional Engineer’ EHT / MRT / Kadapa ‘The Divisional Engineer/ MRT / TL&SS / Kumool ‘The Divisional Engineer/ MRT / TL&SS / Ananthapur The Divisional Engineer/ Windfarms / Ananthapur ‘The Divisional Engineer/ TL&SS / Kurnool (Cont...4) ‘The Divisional Engineer/ TL&SS / Ananthapur jonal Engineer/ O&M / 400 KV / Kurnool The Divisional Engincer/ O&M / 400 KV Lines / Srisailam ‘The Executive Engineer/Civil/TLC/Rajahmundry. ‘The Executive Engineer/Civil/TLC/Kadapa. Divisional Engineer-1/Construction/VS/Hyderabad, Divisional Engineer-2/Construction/VS/Hyderabad, Divisional Engineer-3/Construction/VS/Hyderabad. Divisional Engineer/LIS/VS/Hyderabad. Divisional Engineer/Design/Construction/ VS/Hyderabad. ional Engineer-1/PM/400kV Construction/VS/Hyderabad. Divisional Engineer-2/PM/400kV Construction/VS/Hyderabad. Eme-1/Transmission/VS/Hyderabad, Eme-2/Transmission/VS/Hyderabad. Eme-3/Transmission/VS/Hyderabad. PS to Chairperson Managing Director/APTransco/VS/Hyd. PS to Joint Managing Director! Vigilance & Security)(FAC)/APTransco/VS/Hyderabad. PS to Director /Projects/ APTransco/VS/Hyderabad. ADE/Tech to Director /Grid,Transmissiond& Management/ APTransco/VS/Hyderabad. PS to Director /Finance & Revenue/ APTransco/VS/Hyderabad, ‘The FA & CCA (A,E &RYAPTransco/VS/Hyderabad. ADE/Tech to Chief Engineer/Construction/APTransco/VS/Hyderabad {1 FORWARD BY ORDER // DIVISONAT. ENGINEER-3 fo Chief Engineer(Construction) APTRANSCO. Vidyut Soudha, Hyderabad APTRANSCO SSR 2014-15 INDEX . Page SI Description 9 No, No 1 | Preamble 1 2” | ANNEXURE/ 7 220KV & 132KV Transmission Lines : 3” | ANNEXURE-I 12 220KV & 132KV Substations 4 | ANNEXUREMIT 7 7 Handling charges of Equipments & Line Materials 5 | ANNEXURE-W: = Transport of Protection and Control of Equipment and a Line Materials. 6 | ANNEXURE-V: 22 Handling & Erection of Power Transformers 7 | ANNEXURE- VI 28 O&M works of EHT Lines 8 | ANNEXURE-VII 30 ERECTION OF TELECOM EQUIPMENT 9) ANNEXURE-Vill ue Laying of EHT UG Cables PRE. 1. :AMBLE APTRANSCO SSR 2014-15 ‘The Rates for the item of works (Line & Substations) involved under special conditions in the existing SSR 2014-15 are as follows: () TRANSMISSION LINE WORKS: ha Description of work % Over the basic labour rates. | 1. | River Crossing with JC type towers 100% extra - 2, | 2™ Circuit Stringing with 1 Circuit lives. | 75% extra 7 3. | Works under shutdown: 50% extra 7 This is applicable under the following | conditions only. i. Pre-programmed for interruption of line. ii.Pre-arranged replacement / rectification of line materials. 4, | Dismantling works 75% of Normal Rate. Emergency Works such as break down | 100% extra works. This will not be applicable for pre- | arranged shutdown works. ‘Stringing of railway crossings 100% extra National and State High way crossings | 25% extra | Tree cutting & Jungle Clearance in Tr. | 100% extra = Line works as the works are in scattered areas. ‘9. | DC Works under shutdown 700% extra SUBSTATIONS AND OTHER WORKS: {= Description of work % Over the Basic labour rates ‘Works under shutdown: 50% extra This is applicable under the following | | conditions only. | |i. Pre-programmed for interruption of | equipment | | ii Pre-Programmed replacement of bus in Substation |_| ii. Pre-arranged replacement / | _ rectification of equipment. | APTRANSCO SSR 2014-15 Si_| Description of work % Over the Basic labour rates No. 2. | Dismantling works 75% of Normal Rate. 3. | Emergency Works such as break down | 100% extra a works. This _will_not_be applicable _for_pre- | arranged shutdown works | | 4. Idle trip (No load) rate of the low- | 50% of basic labour rate of loaded bedded trailer for movement of Power | trip. Shortest distance from / to the Transformers. place of availability of low bedded | trailer shall be considered. Note:- However if more than one special condition such as emergency, shutdown, 2 circuit stringing with First circuit live and breakdown etc are applicable for a particular work item / situation, only one condition with maximum extra rate out of applicable special conditions can be allowed. Applying more than one special condition for any item is to be dispensed 2 For EHT Transmission line works, Keeping scattered in nature, some extra provisions are provide and are as follows a. 5% extra provision on the basic rates of APTRANSCO towards scattered area mobilization efforts in general areas Or b. 10% extra provision on the basic rates of APTRANSCO towards scattered area mobilization efforts in difficult areas. The concemed SE/OMC/Construction has to certify that entire line passes through difficult terrain / areas duly furnishing the justification Note:- If 10% extra toward mobilization efforts in difficult areas is applicable for a work, then the 5% extra towards mobilization effort in general areas is not applicable. ¢ Transmission line erection works, Uniform area allowance minimum of 25% on basic labour charges for the entire state as recommended by Board of Chief Engineers will be allowed against weighted average of area allowance mentioned in Schedule of rates except in Greater Municipal corporation limits. If the entire line is with in the Greater Municipal Corporation limits, area allowance shall be considered as mentioned in Common SSR. This uniform area allowance is applicable only for the Transmission line erection works. However area allowance shall be considered as adopted from Common SSR, for the works other than transmission line works. 3(a) 3{b) 3(c) 31d) by APTRANSCO SSR 2014-15 3 10% extra to the rate of earth flat (material) is allowed towards wastage, cleats and overlap etc., while preparing the estimate as the billing for this item is on Running Meters basis and after laying of earth mat. For stringing of conductor for small modification works, if the length of the line is less than 0.5 KM, 0.5KM is considered and if the length of the line is greater than 0.5 KM and less than 1 KM, 1KM is considered, in the preparation of estimate. For survey of small length of lines, if the length of line is less than 1KM, then 1KM is considered for survey of small length of lines in the preparation of estimate. The rates for tree cutting and jungle clearance may be followed as per Common SSR of Govt of Andhra Pradesh. AREA ALLOWANCES: CORPORATIONS & MUNICIPALITIES: a) —(i)_-25% extra over the rates on labour component of works is allowed in all Municipal Corporation Limits of Andhra Pradesh except Greater Hyderabad, Greater Visakhapatnam and Vijayawada municipal Corporations ( up to a belt of 12 Kms. from Municipal Corporation limits ) and other corporations as notified by the Government from time to time. (ii) 40% extra over the rates on labour component of works for Greater Hyderabad, Greater Visakhapatnam and Vijayawada Municipal Corporation (up to a belt of 12 Kms. from Municipal Corporation limits). b) Allow 20% extra over basic rates on labour component of works in all District Headquarters and the remaining Municipal limits (up to a belt of 12 Kms. from Municipal limits) c) For works at Tirumala Hills in Chittoor District, 40% extra over the basic rates of labour component is allowed. d) For works at Horsely hills in Chittoor District, 30% extra over the basic rates of labour component is allowed. e) 20% extra over the basic rates of labour component for Tirupathi Municipal Corporation is allowed. B) e) D) —) APTRANSCO SSR 2014-15 JAIL COMPOUNDS: 15% extra is allowed over basic labour rates for the work in the Jail compounds. Only equivalent number of Man Mazdoor shall be provided in the Jail premises and no women Mazdoor are allowed inside. INDUSTRIAL AREA: 20% over basic rates on labour component works allowed for works situated within 10 Kms belt of Industrial area of, Jeedimetia, Lingampally, Ibrahimpatnam, Tandur in Ranga Reddy District, Ibrahimpatnam, Vuyyuru, Jaggaiahpeta in Krishna District, Macherla, Gurajala, Challapalli in Guntur District Garividi in Vijayanagaram District, Kothur in Mahabubnagar District, Patancheru, Ramachandrapur in Medak District Bibinagar in Nalgonda District, Ramagundam and Godavarikhani in Karimnagar District, Renigunta in Chittoor District and Yerraguntla & Mangampet in Kadapa District, Manchiryal, Mandamari, Bellampalli in Adilabad District, Sarpaka, Kothagudem, Paloncha, Manguguru, Singareni Collieries in Khammam District, Kamalapur, Bhoopalpally of Warangal District, Wadepally of Nalgonda District, Nagapally (Centenary Colony, Begumpet "X’ roads),Takkelapally of Karimnagar District, Hindupur, Tadipatri, Anantapur, Guntakal, Rayalcheruvu, Yadiki of Anantapur District and Adoni, Dhone, Cement Nagar, Nandyal, Kumool, Yemmiganur & Bethamcherla of Kurnool District Anakapally of Vishakhapatnam District. AGENCY / TRIBAL AREAS: a) 25% extra is allowed for the works located with in the interior Agency / Tribal limits, i.e. for the works located with in & upto16 KMs from any all weather route inside Agency / Tribal. b) 40% extra is allowed for the works located with in the interior Agency / Tribal Jimits, i.e, for the works located beyond 16 KMs from any all weather routes inside Agency / Tribal. The extra percentage under Agency / Tribal areas allowance may be allowed on the labour component and on the labour charges in the rates for conveyance of materials. GHAT ROADS: For Ghat Roads steeper than 1 in 20, the length of the road may be taken as 1.5 times the existing length of the road for the purpose of leads only for conveyance of materials based on the certificate for the Ghat Road given by the Superintending Engineer concerned. Under compelling circumstances, the concerned Chief Engineer can adopt the equivalent length of road as 2 % times of actual length Note: If more than one area allowance ( such as those ) for (1) Municipalities (2) Agency / Tribal areas (3) Industrial areas are applicable for a particular situation, only the maximum out of the allowable percentages is to be allowed. 5. APTRANSCO SSR 2014-15 5 14% on basic labour rates towards for contractor's overheads and profit including labour importation is applicable only for Turnkey projects (New substations, Lines, 33kV features & Bay extension works) of more than 1 Crore and not applicable to O&M works and other than turnkey works, . Contractor's over heads and profit including Labour importation 14% is allowed on basic labour rates, ‘The overhead charges include the following, ‘* Site accommodation, setting up plant, access road, water supply, electricity and general site arrangements, Office furniture, equipment and communications. Expenditure on: Corporate office of contractor. Site sigupervision. Documentation and “as built’ drawings. Mobilization / de-mobilization of resources. Labour camps with minimum amenities and transportation to work sites. Light vehicles for site supervision including administrative and managerial requirements. Laboratory equipment and quality control including field and laboratory testing Minor T&P and survey instruments and setting outworks, including verification of line, dimensions, trial pits and bore holes, where require. Watch and ward. Traffic management during construction Expenditure on safe guarding environment. ‘Sundries Financing Expenditure, Sales / Turn over tax. Work Insurance / compensation AutoCAD Tower /Structure drawings of reauired sets. AutoCAD shop drawings of Towers /Structures of required sets AutoCAD Substation layout. Testing and commissioning of the equipment. (i) The area allowances, COP’s and Mobilization charges are not applicable on Fabrication charges and Galvanization Charges. (ji) The area allowance shall be applicable for O&M and RMI works also on par with construction works. (iii) The mobilization charges shall be applicable for O&M & RMI works of lines also on par with construction works. APTRANSCO SSR 2014-15 6 ‘The area allowances are applicable for electrical works (labour), where the value of work is more than Rs.20.00 lakhs (electrical & civil). But this (APTRANSCO SSR) is not applicable for only Civil works. 7.(a) TREE CUTTING AND CLEARING OF JUNGLE Please refer prevailing Common SSR of Board of Chief Engineers. 7(b) THE (LEAD) CONVEYANCE CHARGES FOR TRANSPORTATION OF EQUIPMENT / MATERIALS. Please refer prevailing Common SSR of Board of Chief Engineers. 8 “Erection of Power Transformers and The rates communicated by CE/Transmission vide letter No.CTO-121/F.PTRS erection works/D.No.104/08, Dt.05.07.2008 and subsequent Amendment No.l, dt 16.07.2009 and Amendment No.ll, dt. 21-04-11 on rate contract basis for erection, dismantling, transportation and oil filtration of power transformers through private agency are valid up to 30.09.2014. ‘Area Allowances, Special provisions and any other allowances are not applicable on the rates of rate contract. The rates mentioned under the rate contract include all taxes & duties, allowances and all extra provisions including Transport ete. excluding service tax. In the case of the works of Handling, Erection and Filtration of power Transformers will be carried out by the department, in such cases, area allowances, special provisions other than shutdown charges, taxes and duties are not applicable. () Shutdown charges are applicable only for the works carried out during shutdown period. The same has to be certified by the concemed ‘Superintending Engineer. (ii) Whenever double boom crane is utilized for PTR works of 80 MVA & above capacity, 50% extra over the existing crane charges are applicable. However, the same has to be certified by concerned Superintending Engineer. 10, "1 12, APTRANSCO SSR 2014-15 For Civil items works of Transmission Lines and Substations the prevailing common SSR for engineering departments shall be followed in Toto. Some provisions made in T.0.0.CE (Civil) Ms No.148, dated.21.10.2009 are also applicable for civil works. But the APTRANSCO SSR 2014-15 is not applicable for Civil Works. In respect of Cement and Steel rods the procedure indicated in Common SSR for all Engineering Departments shall be adopted for updating of estimates at the time of finalization of tenders. All statutory levies such as VAT (Works Contract Tax), Service Tax., Cess for labour welfare if any, are based on the prevailing notified rate, shall have to be added in the estimate The S.S.R will come into force with immediate effect until further orders. ‘Sd/-S.SUBRAHMANYAM DIRECTOR (PROJECTS) 1 FORWARD BY ORDER // DIVISON iGINEE! fo Chief Engineer (Construction) APTRANSCO Vidyut Soudha, Hyderabad 8 APTRANSCO SSR 2014-15 ANNEXURE ERECTION OF 220kV & 132 kV TRANSMISSION LINES SS Rate for st | Item me lee Description of Item Unit CLT | 1 [Check Survey. pez marking the tower positions on ground] — kM Jconforming to the approved Profile and tower schedules using GPS, Total stations. Digital theodolites ete ‘the rate is also applicable for re-check survey if any done due to [ROW problems” CL2 | 2 _ Conducting reconnoitery and preliminary survey along bee line with] RRM 3458.00 three altemative routes and furnishing report for selecting the best proposal for approval, including cost & conveyance of all materials, hire charges of equipment, tools and plant, preparation of drawings| land reports. labour charges, complete for finished item of work as per the directions of Engineer-in-charge at site,With Theodolite |iith GPS equipment (As per Clause 4.9 of survey) ‘With total station equipmeny, 3” [Conducting detated survey by taking the levels along the route to a Jcorridor of 15 mtrs. width on either side of alignment, at every 20] Imtrs. interval and wherever there is a steep increase/decrease in| lground profile duly indicating the chainage between angle points, river crossings, railway crossing and major highway crossings and| plotting the profiles and preparation of vicinity maps to the standard| scales. The survey includes clearing of bushes, branches of tree, lcrops and shrubs wherever encountered for detailed survey for viewing. for fixing anchor towers and also taking levels ete required for conducting detailed surveys, Ths work can fe done with Theodblite or with GPS eauoment (ls Jor clause no.49 of survey) oF with soul station equipment This work volves the following items. C3] i) [Tower schedules as per tower spotting requirements plotted on] RKM 11872.00) reproducible tracing of profile original with one extra copy shall be| wedules should be submitted with GPS Ce lordinutes. Idemification of wind zones, collection of Hydraulic Idata of rivers drains from competent authority given . Towers CLA ii) [Taking earth resistivity at an interval of | Km by electrical] Loe 864.00 resisitvity method (4 point method) or by ERM method, iil) [Preparing of PTCC questionnaire, ope sheets extracts with marking] 0.00] Jof the proposed line. Soil resistivity report, tower sketch, station] single line diagram ete. (30 copies/sets) CLS] Sia [upto 25KM Job 4610.00] ‘CL6| 3 iii) b [Above 25KM Job 8451.00] CLa[_3¥)_ [Enumeration and numbering of tees, & marking on tee with white] Each 17.09] letters on yellow paint measuring girth and height of the trees ang| plotting in the profile. The trees enumerated shall be shown in| profile on either side of centre line clearly. up to reguired corridor for 132kV Line -27 Mewes & 220K Line =35 Meters) indicating} Jname of tree, girth & height. Separate tree schedule should be| submitted along with the profile for arriving tree compensation amount 8 APTRANSCO SSR 2014-15 SS Rate for St | teem Description of Item Unit CLal3 Gi) Preparation of ground profiles Tor Railway crossing, River crossing] Fah land EHV powerline crossing separately wherever required exossing [The above rates shall include cost and conveyance of all materials] * 0.00] hire charges of equipment tools & plant, preparation of profile drawing, painting of tees, labour charges, preparation of report etc, Jcomplete for finished item of work as per instructions of Engineer | in-charge. CLO | 4 Excavation of tial pits oF standard dimensions of 1 mir X 1 mir] Each 7434.00} jvidth upto 3 mtrs. depth at 1 KM interval o wherever there is| abnormal change in topography and taking observation of soil strata {for classification of foundation and position of existing ground| water table/depth of water in the existing open wells ifany and back| filling the trial pits after veting by Departmental officials. ‘5 [Setting of stubs with stub:setting template : Erection oF stubs, stub 0.09] jtemplate, fixing of jacks for supporting template, allignment and] levelling for exact location of stubs of stubsetting template dismantling of template after completion of initial curing of C.C. movement of template from one location to other location (A Jminimum lead of 1 KM is adopted), CLIO[@_[2KVP. RE S-Type Towers Toe 6795.00} CL |) [ROKVA.B,C& D-Type Towers Toe. 9902.00) CLIZ]_(@_ [BZ KV Muli circuit Towers Toe. 3494.00] CLI] _@)_[220 KV Muli circuit Towers Toe 12376.00] CLA | (@)_[132kV Narrow based Multi Circuit Towers Single pit] 7810.00] CLIS|_()_[220KV Narrow based Multi Circuit Towers Single pit] __11395.09] CLI6 [(@) _[Pole/siructure for termination of 220/132KV cables Toe. 7644.00) CLIT|_(hy_ [220/132 KV Narrow based tower Toe 11139-09] CLI8 | 6(a)_ [Erection of tower structures, including all types oF extensions] MT ¥498.00) lexcept JC type towers (stub template erection and dismantling are| lnot to be included) (including 3 mtr., 6 mtr, , 9 mtr., & 12 mi. lextensions) CL19 | 6(b)_ [Erection of all types oF narrow based towers 7 multi circuit tower] MT 6302.00] structures / narrow based multi circuit towers structures, including| all types of extensions except JC type towers (stub template erection| land dismantling are not to be included) (including 3 mit., 6 mt. 19 mtr. & 12.mat. extensions) C120 | G(e)_ [Erection of all pes oF JC Type tower siructures, including alll MT 8101.00 types of extensions (stub template erection and dismantling are not| to be included) (including 0’ based, Extended and Truncated) CL22 | 6a) _ [Erection of pole’structure for 2207132 KV eable termination MT $400.00 10 APTRANSCO SSR 2014-15 ‘SS Rate for Sk | Item ‘ Re | ae Description of Item Unit 7 [STRINGING OF POWER CONDUCTOR: Hoisting of tension insulators and Suspension insulators, paving out the conductor, rough sagging.Jointing, tensioning, clipping and fixing o preformed Armour rods and vibration dampers, measuring ground)> clearances wherever necessary.Which excludes the works involved| in the crossing of LT, [kV & 33kV power lines viz dismantling| land restringing of conductor _ C133 | __@_ [3 Nos. Zebra conductors RRM | __38362,00| CL24 | Gi)_ [6 Nos. Zebra conductors RKM 37541,00] C125 |[Giil)_[2 Nos. Panther conductors RKM 2045500] C126 [“(i)_[ Nos. Panther conductors RKM [| _30686.00] C127 [_@)_|6 Nos. Panther conductors RKM_ | _48590.00] C128 | (vi)_ [2 Nos, Moose conductors RKM_| _32303.00] C129 | (Wil) [3 Nos. Moose conductors RKM 8590.00] C130 [ (iti) [6 Nos: Moose conductors RKM 6717.00 CL31 | G)_[ Nos. Bear conductors RKM 38362.00] C132 [0 _[6 Nos. Bear conductors REM 37541,00] CL33 | (ai)_[3 Nos. Dog conductors RKM_| __23014.00] ‘C134 | (xil)_[@ Nos. Dog conductors RKM 3649700} JSTRINGING OF HTLS POWER CONDUCTOR using tension + puller machine: Hoisting of tension insulators and Suspension| insulators. paving out the conductor, rough sagging.Jointing, tensioning. clipping and fixing of preformed Armour rods and| vibration dampers. measuring ground clearances wherever! necessary. Which excludes the works involved in the erossing of LT kV & 33kV power lines viz dismantling and restringing |conductor. C135 [~ @_ [5 Nos Moose Conductors RKM_[_ 180000.00) C136 [_G)_|6 Nos Moose Conductors RKM_| _270000.00] CLI7| Gi) |S Nos Zebra Conductors RKM_| _ 170000.00] CLE | (H)_ [6 Nos Zebra Conductors RKM_| _235000.00] CL39[_()_ [5 Nos Panther Conductors RKM_[_160000.00] C140 | (vi) [6 Nos Panther Conductors RKM_| _240000.00) CLAT|—8 [Stringing of Earthwire: Fixing hardware, paving out earth wire] RKM 6140.00} jointing, tensioning, stringing and clamping of 7/3.15 mm high| tensile walvanised steel wire CLAZ| 9 |Earthing of towers including cost of Excavation, Back-illing,| Nos 3908.00] including cost of 25 mm dia 2,5 mm thick, elass'C’ G.L. pipe of 3.00| [Mars length with 50X6 mm G.L. Flat 4.05 Mirs long, BH Coke. etc., and measuring tower footing resistance, CLA3 [10 "JSlant Earthing of towers including cost of Excavation, Back-filing| Nos 390400 including cost of 25 mm dia 2.5 mm thick, class’C’ G.. pipe of 3.00| /Mtrs length, with SOx6mm G.l. Flat of 4.05 Meters, BH Coke, Sal letc., and measuring tower footing resistance. " APTRANSCO SSR 2014-15 ii SS Rate or “m Description of ttem unit | 200413 aoe . (Bs CUA] TT fearing “oF towers including: cost oF Excavation, Back-iling| Nos 3178.00 including cost of 25 mm dia 2S mm thick, class’ G.l. pipe of 3.00| Mrs length. 8/1 Cake, Salt ete, and measuring tower footing resistance. (Without Gi Flat) for counter poise earthing. : CLAS] 13 [Coumterpoise earthing including clamping devioes and terminal] Ramis 35.00) uss, but excluding cost of steel wire CLE] 13 [Hal round welling oF G:lbolts and nuts oF towers in the section) Each a0 ‘between ground level & upto bottom X-arm level including all bolts ‘connecting the bracings atthe bottom X-arm level and painting the ‘welded portion with one coat of zne rich paint. CLA] 14 [ial round wii: of Guibas and nats OF towers in the Section) Each 200) between ground level & upto bottom X-arm level including all bots | leonneeting the bracings atthe bottom X-arm level and painting the! ‘welded portion with ene coat of zine rich paint- For IC type towers CLAW | 18 [haying of 33 KV 400 sqm XLPE cable Ris 261.00 CLA] _ fo Terimination of 400 sq mm XLPT cable Fach F460 17 ]Dismmaniling & ve sunging oI” 33 KW conductor (all types olf Per Ban 00 lconductors) for crossing of 33 KV Tine during stringing of ENT conductor lines. CEST] 18 Dismantling & ve stringing oF 11 _KV conductor (all types off Per 1357.00) lconductors) tor crossing of 11 KV fine during stringing of EHT] conductor lines CISE| 19 |Bismantiing & re siringing of LT conduclorieables Tor crossing off Per 3500) [LT Hine (all types) daring stinging oF EH lines conductor J) FORWARD BY ORDER // DIVISONAL ENGINEERS Oo Chief Engineer(Construetion) APTRANSCO Vidyut Soudha, Hyderabad SW-S SUBRAHMANYAM DIRECTOR(PROJECTS) 2 APTRANSCO SSR 2014-15 ANNEXURE - I] ERECTION OF 220KV, 132 kV & 33kV SUBSTATIONS lsingle zebra/Moose/Panther conductor including measuring, cutting.clamping and hoisting of suspension insulator assembly to| support the conductor wherever necessary 5 Rate for S| es Deserition of tem vine | aniets | (Rs) oe = @ @ © CST | 1 [Hoisting of Insulators and hardware, stretching the conductor andl Bus | 0453.00 stinging of 220 AV’ bus comprising of three phases with | \Quadraple Moose conductor to 2 tension of 900kgs for single Imoose conductor The maximum length or up to a length of bus | | section of 40m) | C32] 2 |Hoisting of Insulators and hardware, stretching the conductor and] 5114.00] stringing of 220 AV bus comprising of three phases with single \Zebra/Moose conductor to a tension of 900Kgs( ‘The maximum lenuth or up toa length of bus seetion of 40m) C33] 3 [Hoisting of Insulators and hardware, stretching the conductor and] Bus) —10250.00| stringing of 220 AY bus comprising of three phases with Twin| Section \Zebrw/Moore conductor to a tension of 1800Kgs. including fixing lof spacer clampst The maximum length or up to a length of bus section of 40m) C54 [4 _ [Hoisting of Insulators and hardware, stretching the conductor andl Bus] 3114.00 stringing of £82 AY’ bus comprising of three phases with Single} Section Zebra/Moose conductor to a tension of 900kgs.( The maximum] enath or up toa length of bus section of 45m), SS] 5 [Hoisting of Insulators and hardware, stretching the conductor and) Bus | —10230.00 siringing of 132 AV bus comprising of three phases with Twin| Section |Zebrw/Stoose conductor toa tension of 1800kgs including fixing o pacer clamps The maximum length or up toa length of bus section of 45m), C36 [6 |itoisting of Insulators and hardware, stretching the conductor andl Bas) 3637.00 stringing of 33 KV bus comprising of three phases with Single] Section ‘bra/Moose conductor t0 a tension of 450kgs.( The maximurn length or upto length of bus section of 20m) CST [7 |Mloisting of Insulators and hardware, stretching the conductor and] Bus | 6396.00 lsringing of 33 AV bus comprising of three phases with Twin} Section |Zebra/Moove conductor to a tension of 900kgs including fixing 0 spacer clamps( The maximum length or up to a length of bus section of 20m) SH] & _[Voisting of Insulators and hardware, stretching the conductor and] Bus | 3408.00 stringing of 132 AY” bus comprising of two phases with Single| Section |Zebra/Moose conductor 10 a tension of 900kgs.( The maximu| enti or up toa length of bus section of 45m), C39 [9 _ [Fixing of spacers for Twin Moose conductor Each 101,00] [S10 | 10 [Fixing of spacers for Quadruple Moose Conductor Each 140.00] CSIT] 11 |Fixing of Hardware.stretching the ground wire and siringing off Each 76400) earth wire to a tension of 450kgs from pinacle to pinacle. TZ [Fixing of Hardwarestretching the ground wire and stringing off RM 32.09 earth wire to 2 tension of 450kgs from pinacle to ground, ESIS] 13 [Connection of equipment to bus and or another equipment wih} Each 268.00 3 APTRANSCO SSR 2014-15, st. | item No. | No. Description of Item T Rate for 2014-15 (Rs) @ | @ @) @ © csia] 14 (Connection of equipment to bus and or another equipment with |Twin zebra/Moose/Panther conductor including measuring, ‘cutting.clamping and hoisting of suspension insulator assembly to ‘support the conductor wherever necessary. Bach] 41500 css) 15 ‘Connection of equipment to bus and or another equipment with wad zebra/Moose/Panther conductor including measuring, Jeutting.clamping and hoisting of suspension insulator assembly to [support the conductor wherever necessary Each 331.00 [Laying of earth mat including excavation of tenches, welding) lconnecting 10 equipment and connecting lightning shield to earth Imat and earthing of fence posts. drilling and connecting earth rods including connecting cast iron pipes as per Deg. NoSET(PV149/82| ‘with the following sizes of MS. Flats /GI Flats(for 220kV & 132kV) including fabrication, Cie) ia TO0xTémm MS Flat GI Flat RM 79.00 csi] tb 50x Simm MS Flat GI Flat RM 2.0] CIS) Ie 75x Siam MS Flat GI Flat RM 71.00] S19] 16d For laying of earth fat in hard rock in substation / bays extension lan additonal amount to the basic labour rate of SSR will be allowed| las there is no provision in the rate of laying of earth flat for remvoall lot hard rocks. RM 3a.00 C0] 7 Excavation of earth pit, putting cast won pipe with Tlange on one| lend (as per ISS7181/86) of nominal dia 125mm and 2,75 meters long in side the pit including supply and fixing RCC collars 0.75} meter dia (OD), SOmm thick and 0.60meters long in side the pit| backfill the pit in the 25mm size granules of BHcoke for full depth| lof the pit with alternate layers of BH coke and salt of 300mm thick around the earth pipe of 150mm on all the sides of the pipe| including cost and conveyance of BH coke, salt, clamps, C.1.Pipes| land RCC collars, labour charges for all operational and incidental items of work ete.. complete, Each 11402.00) cary is Laying of control eabies of all sizes (from 2 core, 2.5/4 Osqmnm to] 12 core, 2.5/4.0sqmm . both copper and alluminium in cable| lrenches including cost of suitable metalic cable glands with rubber lining. Note: This includes running of cables in control room| where cables are run on cable racks in cable duct. RM 00] 9 Laying of power cables 2] a lupte 50 sqm RM 12.09] aa] 9b labove 50 sqm RM 76.00] 2 [Cable terminations to the switchgear, Marshalling boxes 7 Panel terminal blocksicontro! & relay panels, LTAC panel including| lprovidny suitable ferrules and lugs as per specification (ineluding| [cost of ferrules and lugs) (for 220KV & 132KV). cs2a|__201] [25 sqm Copper_with copper lugs each core at both ends, Nos 37.00] cs25] 207i 14.0 sqm Aluminium with Aluminium lugs each core at both ends, Nos. 29.00) 4 APTRANSCO SSR 2014-15 Ter & | tem Description of tem vai | ores (Rs.) ) | @ GB) (4) 45) $26 | a0 Op os Poer CT wah gs a ae teas — | ost 509 S27] 208 |Above SU sgn Power Cal wi is cova aren Nes] TS CSI] — Tsar of Ting reson _sich an sours ada] ach} 102009 Esthet pipe of 015m lengh wih Sua camps fer Ting rucnrestn comple shape excong costing ere) 2a esan oe Towa Span wih Cane 7 Doe a ok (exclding con o tang charges fom Dep Se site). fan AY Cac aa wT app acre Carag avs] Eas] TT Jincluding grouting of foundation bolts and wiring of cables from| C530] 22.2]132 kV Circuit breakers with support siructure & marshalling boxes] Each 12790.00] CST] BESpss AV Creu res ioding Pe To Pol able Wha] Ea S00 CST] Baap 20 KV Crean Baker wit spp sre mraingl Fak} T5609 ones incl routng of fort Glo & wing ete CSS Hae 7 KY CHa SS a pp aaa mang) Ea TT owes incl eotng of fodatin tls & wing of cate ERO Core Tanto aah [ a 22 SKY Cen Taner Each [81509 223] kV Caen Tr Fach 0509 250 4V Pasa Tanne Esch | 009 2E 1 SOKV Flea raion Each 281300 ZENS Poel wanes Each [e309 ZEap201 Lhing Aro cach [330 ZE SSK Lining Ares Eas] 510 ZEISPOOAV Capacve Votage TANTO Each [030 C344] 22 ol J2KV Capac Vag Tafome Each [150 eS etn sgt in ful sae fr sot pean Ee bd mart CHS] ETRY laos wh ert aN elatng ST veto] Ea] STAD BETW]RO WW Talon witou cank-swteh hang SO coe] Ea} fers est, gman nl chap fo snot peraton leat and manly, CSW] ERIS LV lets wife ca swish ehaag TOT cae] Fa} T6079 strc gant nl shape fr snot pration ana ——ooeEeEe—eee—w 1s aorRansco ssn201415 lie Description of tem une | ores _ (Rs.) a) | @) QB) (4) 5) insulators erection. alignment in full shape for smooth operation by Electrical and manually (C850 | 22.22]3-pote, 132 KV Isolators without earth swtich including solid core] Fach [3911.00] insulators erection, alignment in full shape For smooth operation by Electrical and manually. SST | 22.23]33 KV Isolators including solid core Insulators erection, alignment] Each 1662.00] in full shape for smooth operation, S52 | 22.24)230 kV Bus Post Type Insulators Each 362.00 (C353 | 22.25] 132 KV Bus Post Type Insulators Each 273.00) C354 | 22.26)33 KV Solid Care Insulators Each 183.00] C855 [23 [33 KV 400 V Station Transformer including all necessary] Each | 777.00] lconnections on HV & LV side including cost of lugs (But lexcluding cost of transformer and HG fuse set) 356] 24 [Erection of Control 7 Relay panels, LTAC panels, announciation] Fach | 2272.00] PTDB panels etc.in the control room duly mounting them on channels and grouting them with foundation bolts excluding cost off channels & foundation bolts (for 220kV & 132KV), including man| power support to MRT wing for commissioning, CS57 [25 [Erection of 230 V. 200 Ahi 80 Ah Lead Acid battery in complete] Set 890409 shape fit for charging. C358] 26 [Erection of 220 V. 200 Al’ 80 Ah maintenance free baitery in) Set 2878.00] [complete shape fit for charging ‘C859 | 27_[Ereetion of 220 V. 200 Ah SOAR battery charger Ser 2959.00] ‘€S60 [28 [Erection of Capacitor Bank including series reactor of 7.5 MVAR| Each | 4586.00] [Capacity C361 | 39 [Erection of Marshalling Kiosk Each 764.00] C562 [30 [Frection of Marshalling Boxes Each 371.00} C363] 31 Erection of Lighting pillar box in switchyard on Toundation laid) Each 1023.00) (Excluding pillar box), (for 220kV & 132kV ) C864 | 32 [Fabrication of Main and Auniliary structures, st setting templates] _ MT 3369.00 Foundation bolts. "U" bolts etc..using raw steel such as M.S.Angles| Plates, Channels. R.S.Joists, M.S.rounds, excluding cost of Mild| Steel and transport charges to site C565] 33 |Galvanization of Main and Auxiliary siructares, stub setting] MT 4900.00) templates, foundation bolts, 'U’ bolts ete,using raw steel such as| M.S.Angles, Plates, Channels, R.S.Joists, M.S.rounds, excluding! cost of zine and transport charges to substation site (Cost of zine| should be followed as per IEEMA rates.):The average quantity of Zine required for all angles of tower parts is 60 Kgs. 34 [Setting of stubs with stub setting template for sub-station| |structure:Frection of stub template, fixing of jacks for supporting the template, alignment and leveling of exact location of stubs o' Jstubsetting template, dismantling of template after completion off initial curing of CC C566 | 34.1 [P2ORV Towers Set 3302.00 16 APTRANSCO SSR 2014-15 fate for (Rs) @ 7 ® @ s) 34.2 [1S2KV Towers Set] 2371.00 (C868 [34.3 [B3KV Towers & CPLS Set 392.00 CSG] 344 _DOKV Tsolator Sa_[ 287700 CS7O | HAS [BIKV Tolar Sea_| 177800 CST [346 [220 RV Breaker Se_| 2142.09 CSi2 [347 [TSERV Breaker Set [1606.00 S73) 348 [TRV Breaker Ser 1077.09 CSM [35 [Erection of the main and auxiliary structures ete, using bolis and] MT | 2558.00 nuts S75 [36 |Fining oF 90 rail poles over the Wansforner plinth RM 30909] (C876 [37 [Fixing of T0SIb rail poles over the transformer plinths, RM 595.00] CS77| 38 [Erection of S3KV HG Fuse set Each 618.0) C378 [39 [Erection of S3KV PT Distribution Box Fach 372.09 S79 [ 40 _ [Laying and Terminations of TRV, XLPE 1000 Sqnim Cable RM 730.00 CSR] AT [Erection oF TRV VOB outdoor type Kisok (within built Breaker] Each | 2642.00 CTs, PTs, Surge Arresiors & Relays). Marking 9s per approved layout with the help of surveyor CSET] 42 P2OKV sub-station Each | 3213400 C882] 43_[132 KV substation Each [| 21416.00] CSET |G [Bay | Bays tn one sub-tation Each | _10708.00 45]Auto-CADD drawing with TD copies indlate complete Tand with ldimensions. plan of SS with equipments, location of contro room lequipments, roads, duct routes. earth mat of 100X 16mm & SOX| Sinm fat earth pits.yard lighting Fistures et, C884 [7 _[IS2kV SS Tayout drawing Job $440.00] GSES] PBOKV SS Tayout drawing Tob _667500) C386 [46 |Writing of Teters in control room panels of Tetering on panels] Line 77.09 marshalling boxes, C587 [47 | Supply and installation of Key - Board of size 1552 of Eco Wood) Each | 4280.00 Board with Glass covering with lock and Key arrangments fo providing all the keys of equipment and SS, Note: i. Bore earthing in estimations as per field conditions will be considered on case Ji, 25% excess over CS64 is allowed for JC tower fabrication charges. ‘Sdi-S. SUBRAHMANY AM DIRECTOR(PROJECTS) FORWARD BY ORDER // AR athe APTRANSCO it Sone laid ” APTRANSCO SSR 2014-15 ANNEXURE - 1 ing / Unloading of materials from departmental / Private vehicles in tothe stores yard and stacking and vice-versa Shae fr si xa} Mem Deseo of tem vt aon + [ taaing [on Latin Semen mi T5o| Tar 2 alti mea sri se Maral ae S13] ih frees Mt 08a) — a0 ST [iS or and al pe an HS Tees pa a | al Fr 3 [Csie/Condutr dame dingo esis SEs Prnter acs Bahan | ISH ST] reba ACS Each Dron 3339] 2129 S17“ Mose ACS Each rm 2039 SH_[ a [Mons ACSR Tage Drm oF TSRManlapoey—— eat oo | 9 S19 |e ean ae Task Dn | —Ti7a S110 [fest cat apoe ae fash Bm] 1a STII_[“g[eenint ete abe Cr Each Bam 10 ST [RIS Coe CTAC ble tn Gp OST RERTT tack Des 1530 STI} Ji 2 Coe CTAC bled abs Sates) Each Drm 3539 ST) lee weighing mt er tar Tak eae ao] STIS| [ese weighing onUTgs 900s — Faoh ase [228 1o[ — 289 STIS [Gi [caseconaing Fale fos and weighing mie Han UTR] | ea ae up Nt SETA or TAC pa EES EE STIR | wa) PORN Neral daar fash rao] 139 STI RN Rov dino tah To] ST5O | We] GORN Ken ar Tash Tao} ra STAT | way [RN ang a mse Tah To} T3 SE [wy Fics Tak rao} 139 S125 | vite) |TGOKN Anti-fou dise insulator Each 20] 2.49 (il) |Coading7 Un foading and stacking charges for TOKN 7120KN} SRC insulators. S24 [way is2kv Each airing 229 2A] S135 |e) [220KV - Each airing 3.09 300) 8126 | (ili) [Loading 7 Un loading and stacking charges for 120KN] Each string 350] 3.50} IGOKN SRC insulators for 400kV 5 __[Cases containing Control & Relay Panels Sta7 | tay [33kV Each 308.50) 308.50 ST38_[ WB) IS2RV and 220KV Each 379.60] 379-60 6 |Cases containing CTs, Pts, CVTs ST39_|“G)_JTIKV 10 33KV Rating Each case 3790] 9790] ST30_| (ii) [Above 33KV and up t0 TRV Each case | 458 80[ 458.80] STS | vi) [220KV Rating Each ease | 684.20[ 684.20] 18 APTRANSCO SSR 2014-15 7 [eases containing LAs STs Sakv Each eae 1930] 19:30 S133 T32kV, Each case_| 228.10] 228.10] ST3t [220KV Each ease_| 303.50] 304.50] Loading 7 Un-Loading oF ST3s [SSW Breaker Each set T2A0f 912.40 ST36 T32KV CB. Each set_| 1823.40] 1823.40 S137 220kV SCE. Each set__[ 2278.10] 2278.10 Sta [Station Transformer (100K VA) Each set 350.00| 350.00 ST39) [Station Transformer (250K VA) Each set 419.30) 419.30) STA "220V OAH Battcry (Conventional). (Lead Ack) ‘Set 759.40) 759.40 STH 2200 BOAH Battery (VRLA) (Maintenance Free) Set 332.60] 532.60 STH 220V 200AH Batter) (Comentional) (Lead tei Ser Bao] BASU Sta [2300 SOOAH Batiery Set 1215.60] 1215.60 STAT | _10_[220V Battery Charger with DC distribution Board Set 6.30] 456.30} STH [11 [BCDB for battery Charger, Each 131,60) 131.60] S46 [12 [TSRRV Hardware single Set To70} 10:70 STAT [13 fi32 RV Hardware double Set Tito} 11-19] STa8 [1a] 230 RV Hardware single Se To} 15.0] STA | 15 _[BOKV Hardware double Set Té.10} 16.10] ‘STS | 16 [250 KV Toolators, without insulators including machanism] Set 5630] 436.30} box STST | 17 [SB0KV Solid core inslators Each Gr10f 61.10] STS2_| 18 [T52 RV Toolators (without soild core insulators) Each aro] 342.10} S135 [19 [SRK Solid core insulators Each 360} 37.60) ‘STS4 | 30 [SF RV isolators (without sovd core insulators) Each 31.60) 131.60] STS [21 [ORV Solid core insulators Fach 430 439] S156 [22 [Vibration dampers. mid span compression joints, repair] 100 Nos 51-60) 131-60] sleeves. clamps & connectors ete 2S [Capacitor Banks 37 [a | SMVAR Set T2IS60] 1215.80 Sis8 |b [Neutral OT Each 840, 85.40] [S159] 34 [Scrap tenis Tike MS Serap, Gl Serap, Ferrous Serap ete, Per MT. 238.10] 238.10] [Sted [735 [Scrap items like Conductor serap, Earth wire Serap, et Per MT. 304.50] 304.50] ST6I | 26 [Bolts & Nuts weighing SO Kgs bags including springs] Each bag’ 7.09 7.09 hers. lat washers S162 | 27 [3 1:2 Core LTAC Cable bits (loose) by measuring and Toad | Wis 0.70} 09] luntoad (up t S00 Meters, limited to Rs.l42 per Bit L. (Maximum) S163 | ~38 [Cable bits (oose) up 10 6 Core by measuring and load ual Mis 60} 0.60) icad( up to S00 Meters, limited to Rs.106 per Bit l(Maximum) STG4 | 29 [Cable bits (Toose) above 6 Core by measuring and load 7 wal Mis To0] 09} foad.(up to 500 Meters, limited to Rs. 142 per Bit (Maximum) ‘S165 | 30_|Copper Scrap PerMT Tsao 182.10] ‘S166 [31 [Bawery Scrap PerMT 190.50] 190.50] 18 APTRANSCO SSR 2014-15 STE [32 [Capacitor units Serap Each eo, 820) STO_[ 35 _[BIKV Breaker Und Each TS5Ro[ 153.8 STE | 34 ITRV Breaker Limb Tack T7960) 370.50 ‘STH [35 [B0KV Breaker Limb Fach a STH | 36 [Tyres scrap of all sizes Each +f 1820) 9.35 STH [37 [Epis ov dram Barrel OT) SHS | 38 [Fallot dams Barrel Woo eA STH | 59 220V, 300AH Baileys (VRUAT(Matnsnance ee) 3 sei30) Seg aE | Fach 2619) Bye.) S176 1 Each TRG] TTR) SH [42 SaRV Bashing Each Doo oi Note: | Woading Un Toading s done wih Crane, 15 wd Charges are tobe paid awards labour chet and remaining amounts towards crane hite charges Example: Loading charges of 100 KV Staton Transformer is Rs, 326,90 and in case is loaded by using crane then laourchatues would be s.109.00 & crane hie charges would be RS.217.90, TL |Foading and Un Tonding and counting at Stores for check measuring] land Stock Veritieaiton Purpose SSR for L No. Description of Item ni SUN pt Unie | SSR or STIFF | Tower parts counting om part wise and restocking w Moves yard (for wok] ! : 7 bea Peer | 76.50 eriication purpose) STI |~44 [Labour charges for weighing and restocking of Gl Tower Pans or Bats &] 5 Nuts, Washers (for stock verification purpose) pease | eee STH [45 |Labour charees for loading and unloading of ACSR, AAA Conductor & Earth wite bits for weighiment (For stock veriication purpose). Pert | 304.50 STH [a5 [Counting and Restocking oF Handware (row paris, Al jumper cones, Al] Tensition cones. PA rods, Atcing homs. Al grippers etc) (for stock] Each set sal verification purpose) ST8E_]~47 [Counting and Restocking of 220KV & TSIRV Line accessories ke Damper] MSC Joins, Repair sleves, PA rods, D- Shackles Links, Earthing sets Hangers. Counter Poise Earthing Clamps ee (for stock verification purpose) | Eaeh set ‘30 STR [48 [Counting sad estosking oF issatrs oF varous eapasiios or Weak] — TI scrification purpose) STEEL AP Ponting of Assorted tower pas fom dient pass By oben pawl a | ang und lading into trey at stores STA5"[ “30 for Opening and Repicking of Packing of Pancls Tor check measuring] —__ cal lnupose 31 |For Opening and Repacking of Packing of Breakers for che3k measuring] a purmose sT86 |e) _|20 Kv Each isto S187 [by [RV Each 107.10 sta | te) Each 45.30 sia | and Repacking of Packing of Fragile Materials, and Smal Packages ike woowen, Cartoon Boxes ete. for check measuring purposes. | Each 22.80 eee 2 APTRANSGO SSR 2014-15 1 ‘Crane Hire charges:(Tor departmental works at the premises) St Tem Description of Nem Unit No. | No. 35_ [Foro Tanne Capacity Gane S00 [For arbour = Tour [2229.9 STO Force hoor o pa tao wor ar Hour [101799 i] For 1020 Tone Capaciy eran m0) STH Fort hoor Hour | 3477-70 S19 i For every four pa teat Pour Hour | 1159.20 SE [For hove 20 Tonne Capa crane 0.00 ST For ft how Hoar | 3363.00 SPs Forever, hour or par eo aor hour Hour [188530 ring of Departmental veiele tothe contractor: TW [Sparing of Departmental vehicle iract aaa St | Trem Deseripiion of Rem Unit No. | No. ST96 [36 [Sparing of Departmental vehicle(Lorry) to the contractor fs under emergency] lonty. When departmental lorry is engaged to the Contractor on a particular . ay an amount per day or part there of should be recovered for a total KM) Per say | 2922.90 run up to 100KM on that day plus for every addtional KM rate, which ever is higher, The eun to be worked out taking intial reading at starting. point| pag lind closing reading afterreturing the same starting point duly completing| addvicnat | 24,30 ine transport work a STO7_[ “37 [Providing Teansponaiion wo OfReers Rs/km 500 Note When the departmental lorry is used for transport of fragile and costly equipment, they have to be insured by the contractor in frst place before transport and the same willbe claimed inthe respective work bill f the crane is piven om hire to other than APTRANSCO works, the rate is a minimum of Rs24309.31 (Rs,1013-per hr X 24Hrs) + (Fuel cost & lubricants) per day or part thereofF and the time is to be Feckoned from the time of leaving department premises till reaching back. Sd/-S SUBRAHMANYAM, DIRECTOR(PROJECTS) 1 FORWARD BY ORDER // DIVISONAL. ENGINEER-3 10 Chief Engineer(Construction) APTRANSCO. Vidyut Soudha, Hyderabad er ee 21 APTRANSCO SSR 2014-15 ANNEXURE -IV ‘TRANSPORT OF EQUIPMENTS / MATERIALS. SUNo,_ [Item No, Description of em Per Load The following are the minimum materials / ‘equipment, for each load. One Load = 9.0 MT 1_|ets.Pte vt Tl Ta [20KV 2 Nos 72 [1b [32k : 5 Nos 73 | te [33kV 12 Nos. INOTE: For wansport of S20KV CTs, PTs RCVTs exra provison of Rs, 1807 may be added for each load towards labour for clearing. the obstructions like electrically and telephone lines as the equipment are very tall . 2 __|SF6 Circuit Breakers: Ta_| 2a _[20Kv" Tse T3|_2b | s2kv 23 sets T6 2c kV |2 Nos. 3 Isolators with or without Earth switch including post type insulators: TT 3a_|220kV set Ts 3b | 32kV. 2 Sets| T9 | _3e_]33kV BNos 4 [Lighting Arrestors Ti0_| 4a _|220Kv_ Nos Ta | ab [sa kv Nos Tz] 4e[33kV 24 Nos. 5__[Controt & Relay panels: 6Nos. 6 _|ACSR Conductor and Farth wire drums: TIS] Ga [ACER moose Nor Tit] 6b [ACSR Zebra Nos. TAS] 66] ACSR Panther @Nos. 7.16 | 6. [anh wire of km per each drum 8Nos. 7.17 | 6.6 |Farth wire of }km per each drum Nos. 118 [6 [CABLE DRUMS 0Nos. 7_| Dise tnsulators T_| 7a _[ 70 KN T000 Nos, 7.20 2b 130KN 800 Nos. 8 [Silicon Rubber Insulators 7 721] aa | _20KN BIE Nos 7.22_[ 8b | 120KN 228 Nos. 9 | Wave Traps = 723_| 9a Nos T24 [9b T6 Nos. Sd-SSUBRAHMANYAM DIRECTOR(PROJECTS) FORWARD BY ORDER DIVISONAL ENGINEER-3 (Olo Chief Engineer(Construction) APTRANSCO Vidyut Soudha, Hyderabad iu eee TROTTER Ea TEESE EEE CETEE TSEC EETSE EE 2 APTRANSCO SSR 2014-15 ANNEXURE - V RATES FOR HANDLING & ERECTION OF POWER TRANSFORMERS St |item 5 a | SSR rate for net ne Description of Item Wet emis 1 z 3 Zi aD HANDLING AS JOB WORK BY DEPARTMENT 1 |Loading/Untoading of T&P such as wooden sleepers, winch jacks | packing pieces etc. required for handling the power transformers. PTT [a [Up wo 31.5 MVA wansformers, one load of wooden Sleepers and] Load | 1003.00 Janother load of T&P such as chain pulley block and rail poles ete |(Maximum two loads) PI2 |b |For above 37.5 MVA and up t0 100 MVA transformers, two Toads of] Load | 1003.00 |wooden sleepers and another load of T&P such as chain pulley block, |winch and rail poles ete (Maximum three loads) PTS |e [For the above 100 MVA and up t0 160 MVA wansformers, three loads) Load | 1003.00 | of wooden sleepers and another load of T&P such as winch machine tend rail poles ete (Maximum Four loads) 2 |Loading/Uinloading of fragile material such as T )_|LW bushing | Neutral bushing for 132 KV wansformer PTS |G) [Loading Each_|__30.00 PTS |i) |Unioading Each | __24.00 b)_|132kV Bushings PT6 | (Loading Each _|__118,00 PTT | i) [Unloading Each | 118.00 )_[220kV Bushings PTS |G) [Loading Each_| 23600, PTD | i) [Unloading Each | 236.00 NOTE if loading 7 Un loading is done with Crane, 1/3rd Charges are ro be paid towards labour charges and remaining amount is towards srance hire charges. PTI0| 3 |Coading/Unloading of accessories of wansformer including raidator| Load | 1660.00 pipe line, FCC & RTC panels, conservator tank, turrets LA set frames jand oil barrels ‘A’ frame and header etc, (For SOMVA and above 50| IMVA PTRs without oil barels) ‘4 [Dragging of power transformer main tank duly arranging wooden| lseeper platform providing packing pieces, jacking up the transformer, insertion of wooden sleeper, rail poles arrangement of nullies, steel ropes positioning of winch and anchoring of winch, _[ransformers upto 16 MVA capacity Prt ip 10 10 Mars Ts_| 260200 Pri2 [Over and above 10 Mirs RM_| _ 263.00 b_|Transformers above 16MVA and upio 31.5 MVA capacity PTs [Upto 10 Mes TS_| 35.00 Pri [Over and above 10 Ms. RM_| 483.00 <¢__[Transformers above 31. SMVA and upto 50 MVA capacity Pris [Upto 10 Mies, is _| 3651.00 Pre [Over and above 10 Mis RM_| 563.00 a eeOoereeeeeeeee 2 APTRANSCO SSR 2014-15, SSR rave for Description of Item tne [SSE rater ransfonmer above SMMVA and upio 100 MVA capaci BHT [Up i010 Mis is [aaa PII | JOverand above TOMS RM | 695.06 E [Transformers above [OONTWA and pie 160 MIVA capaci FT| [Up 0 Mis. Ts | CST00 P20 | — Over and above TONS RAT [ fe. 3 [Turning the transformer through 90 degrees includ larrangements as above. [Transformers upto 16 MVA eapacily Bach [236500 1b_[ransformers above TOMVA and upto 31.3 MVA capacity Each | 2966.00 [Transformers above 31 SMVA and upto S0 MVA capacity Each | 3689.00 @_ [Transformers above SOVIVA and upio 100 MVA capacity Each | 02100 © _ [Transformers above 100MVA and upto 160 MVA eapacity Each | 5276.00 © [Turning the transformer through 180 degrees inclu larransements as abo PBT ransforers up to MVA capac Tas [ e000 FIST |b [iransfomers above TGMVA and uptOSTSMIVA capa ach [ 95000 FT3E |e [Transformers above STSMVA and up SOMVA capaciy Tach] 5600.00 F129.| [Transformers above SOMVA and upo TdO MVA capaci Tach [615560 [1P130-[ Transformers above TOOMVA and up 160 MVA capacity Tach [774500 PEST | 7) [Anchoring of transformer including excavation of wench of 45 1x03] 1 Joh [100560] es for anchoring and burying 2 Non. lepers in and removing the same after werk is compleed “FEE | TOD | Movemen of WMT winch Tor anchor Tab | BT [iting Covering he wansformer tain ak To he required hele - tome steeper using jacks and wooden sleepers packing pices fr eating oma rom the truck BIST] a [ansformers upio (6 MVA capes EK Pris |b [Transformers above JGMVA and ups 3ISNIVA capaci Each [4500] PTS |e Transfers above 31SMIVA and upioSOMVA capacity Esch [350700 PT36 | d_[Transformers above SOMVA and upto 100 MVA capacity Each Taio _| PTW7 |e ransfomers above JODMVA and up 160 MIVA capacity Each [959500 9 [Pulling the transformer from platform tothe truck Tor Tonalin from truck othe platform for unloading [Transformers apt To NVA capacity Exh [240 6 [ranstormers above (OMA and upio S13 MVA Capacly Eich [4221.0 ¢ [Transformers above 31.SMVA and upio 30 MVA capacily Each] 4651.00 [Transformers above SOMVA and upto 100 MVA capacity Each 3800.00 | [Transformers above TOOMIVA and up 160 NVA capacity “Exch | 7938.00 10 [Fixing of transformer wheels (o main tank including alignment of PTAS | a_[Transformers upto 16 MVA capacity Job [ 111600 PT44 |b [Transformers above 16MVA and upto 31,5 MVA capacity heb 1317.00 [PV45 |e _ [Transformers above 31. 5MVA and upto $0 MVA capacity Jeb, 1918.00 D746 [~d_ [Transformers above SOMA and upto 100 MVA capacity Tob [2485.00 PT47 |e [Transformers above IOOMVA and upio 160 MVA capacity deb [ 3682.00 PTAE | TT [Arranging gas culter equipment at site including operator and helper to] Jeb) 1859.00 Jremove anchoring of transformer main tank on truck for loading and| unloading including cost of gas) El —————_ ew Ser luni FET ar ONE Goa Tas aan PTS4| (6) Tabove IOOMIVA and up to TOMA Capaciy “ob [2832.00 Pr |e Fenster aire SUV md apo OMA FE PT69|_a_| Transformers upto 16 MVA capacity Each, 1583.00 PT71 | © [Transformers above 31. SMVA and upto 50 MVA capacity Each 2582.00 P72 |_d_ [Transformers above SOMVA and upto 100 MVA capacity Each_| 4021.00 Trisoma steampasor Ei] To 6b Jos Woe ner Ince By Nips RTT ES] ToT a SA dhe he il EE 2s APTRANSCO SSR 2014-15 sr SoRate for B : Description of tem une [SSR rater 57 [Encino emnstormer bashing PTT] a [NV Neutral and tertary bushings Each [3500 TTB] Wy TLSSLV bushings upto 1OOMVA Each [642.00 T79 iid LISLV basings for above OOMVA and upto TOONIVA Foch [0800 TAO et) [EXULV bushings upto 1OOMVA Each | 965.00, PTC [oti 230 RV bushings for above 100MVA and upto TOONIVA Each | 1196.00 PTE] dy 50K Nos erection of tare up © 10OMIVA Tob [1381.00 TPES ai SOK Nox erection of tures for above TOOMVA and up fo Tob | 1812.00 vA | Fae a, Nes eon aT ares up TOON Tob 68-00 TFBS] ety ]1s2kv 3 Nos erection af arets for above TOONVA and up fo ob] 950.00 6oMVn PTR] 6 [fiction oF air Blowers (cooling fans) Ticlading frames and conwal] Jab —| 261000 cubical te. (foreach wansferme) PRET} 7 Jlsection of LA frames (HV & LV sds) Tah] 819.00 TFFRE] Way YF veaion oF ving mechanism box, bevel gear OFOLTC Ter Below | —Eaah | 819.00 To0MIVA FTES] Jin tion of dnving mechanim box, bel ear GFOLTC TOOMVA | Each] 165500 ond shove 10OMVA P90 Btby Ji) section oF OLTC consenatar ak wih Sand Torup to TOMVA. | Each | 05% 0 FIST | fay tsecion oF OLTC consenator nk with Gand for above TOMA” | Each] T5800 and upto 1oOMV' Erection of pipeline FIST | a [itunes io STSNIVA panty Fach | 35400 FIS5 |b |Transtoners above STSMVA and upc SOMVA capaci Each [#2800 PIS] <[Traisiomers above SOMVA and upto TOO MVA capacity Each] 1403.00 PISS | “a ]irusorners above JOMVA and upto TOD NIVA capacity Each [175400 PT96} 10" [rection of Thernometer, presse Relief valve and vent pipe | Each] 354.00 PI57 | ficcon of Thermometer, pressure Ree valve and ven pipe Bach] 3800 ic.100N1VA and above PTR TT ]iection of detachable OCT Toctading connecting eral umper ith OLTC tank PASE] “a [ansonmers apo 31S NVA capaci tah_[ aT PT99 |b [Transformers above 31 SMVA and upto 100 MVA capacity Each 4100.60 PT00] ~e—[Teansfomners above JOOMVA and upto 160 MVA capacity Each [571.00 @TIOT] TE Jp. vecten of separate, cooler bay inelading A ame header pipe and] — Bay —| $866.00 tends of ansformers upto 100 PRs MVA capacity. PTTOH] —|iiiseation of para, cooler bay including &rame header pipes | Bay 63500 an ends of tasters above 100 MVA and up to I6OMVA PTRs Tadd [Removal of old worn oa gakeis and replacement wilt new ga insiuting cuting, pasting of gasket wth all accessories including cos ot adesives, Exel. cop eover PTT] “a Transformers apo 16 MVA capaci Toe [0 FTIOG] _b[ihanstomars 31.SMVA and 80 MVA capaci Tob | 3526.00 sh (a —————T 26 APTRANSCO SSR 201415 3 em Sitar tor No._|No. bos 2014-15 PrIOS] 6 STOO NIV and upto TAOTIVA capac Tob [53700 TSU Removal oF old wor out gakes and replacement wih new ask ncingcuting, pasting ot gasket with all accessories including cos| Joradhesves. or op cover The following rates are exclusive of crane], hire charges whih are payable a actuals PT106[ a_[ Transformers upto 16 MVA capacity Job 1136.00 PTIO7| b [Transformers JL.SMIVA and SO MA capaci Tob [00 PHTOR|—eTransfomers 100 VIVA and upto 160 MIVA capaci Tob [ 1657.00 PTIO9| 14 Erection of supporting suas and arth War for HV LW Newel] Jeb] S300 [© JON. FICTERATION OF TRANSFORMERS AS JOB WORK BY | |DEPARTMENT FATTO] 1 oonding Untoaing OTAKU OT Ter To] PITTI] Fang of LT Cable om AC Supply pant Wr eonneaing Pipa] ob] 53600 lec rn ier to ransformer and back fiter and Vieewera PHS] 5a wloaing of hal vasforner oi bares Bore | 5 PLUS] 4 [Loading unloading foil drums Barel_| 600 SOI topping for transformer through oil filter: ~ EI |ransformer ale filed with ol PITIa| aw |anstomers onto ST SNA capa an PITTS] 6 [iranstomnars above STSNIVA and up 50 MIVA capasiy when te) Esch] T3800 transformers received with ranstormer el FITIG] 52 |iraratimners above SOMVA apo 160 MVA capaaiy When tie) Bam] iat —] ransfooer is recived empty wih Nitopen [assisting labour for harng afl fora peiod oF ¥ days dang timo PFT] a | Fora period of ays for Transformers uno STS MIVA capaciy | Each S77 PHTIE] [Foca porod OFF dips Yor Transfoamar above STS MIVA and upio 100] Esch | 05500 vA capacity FITTS] efor pod ofS dip for Transformers shove TOO NVA and up TO] Eas] Ter MVA capacity PFTGO] a [Over and above’ days Tor Transformer upio 31S VA capacity | perday_ [T0700 FHTSI] “b [Over and above 3 days fr Transformers above 31S MIVA and opto TOO) per day 95000 IMVA capacity BITES] “eJOver and above 3 days Tort raTormers above 100 NVA and pio TO] per day TaTS IMVAcapaciy FTE] 7A |Diamaniing of Conor cables OF poner tansTormer Tor amanging] Job ~~ 65000 pulling of warafornermainank out of plinth for fled transformer | improvement of wansfommereapaciy FFTSG) CH) |laying of contol cables forthe wansfomners which ae eeelved wi] Job | —TFAT.00 on completion of wiring on the transformer and complete wiring o lke transforiner ow the tank F.CCDM bon ete. (Cor old repalred transformers) PTT] Fhitine of iter maine i snch jad om exng place To wear] RMP TOT transformer or wo the convenient place manually (where movement o esctor waiters mot possible a APTRANSCO SSR 2014-15 ‘Sk item ‘SSR rate for asia Deseription of Item Unit | Sirus 9” [Labour charges for amangement for vaccum filling Tor the power lransformer for prescribed time duration for SOMVA and above PTRs| which are received at site with nitrogen gas filled. PTI26| (@)_[Below 1OOMVA PTRs Tob | 267000 PTI27| (6) [Above 1OOMVA PTRs, Tob | 3222.00, PT128[ 10 [Loading Unloading of S KL Storage tanker, Tob 864.00 TT” [Hire charges fora private wactor for wanspont of KL of oil iter PTI29) ___[UptoS0KM TS) 409800 [PT30[ [Beyond 30 KM perkM | 79.00 12 [Providing of oll tanker on daily hire charges PTIS1| a _{IOKL capacity Perday | 128800 PT132|_b [20 KL capacity [Per day [2356.00 13 [Transportation of 10 KL & 20 KL oil tanker (including return trip charges), (a) or (b) only applicable PT133[___ [Minimum amount upto 50 KM. Ts__|_ 6735.00 PT134|— |More than 50 KM. KM. 32.00) 14 [Unloading of oil tanker at site and loading the same after |completion of the job PTS TO KL capacity Tob _ | s0R6.00 T5(i) [Complete wiring up of the wansformer Indicating, systems cooler Jcomtrol fans and motor driving mechanism of OLTC panel providing suitable ferrules and lugs. PTI36| a) [T6315 MVA Transformer TS_| 13100 PTI37|_6) [50 MVA Transformer LS] 1946.00 PT138|_c)_|100 MVA Transformer Ts__|_ 2212.00, PTI39{—@)_|160 MVA Transformer 1s [2212.00 T5¢iD|Complete wiring up of the transformer Indicating systems cooler contro fans and motor driving mechanism of OLTC panel providing| suitable ferrules and lugs excluding OLTC pane! PTV40|a)_|T631.5 MVA Transformer ts__|_ 7671.00 PTI4T|_6) [50 MVA Transformer Ls] 9972.00 PTV42| e) [100 MVA Transformer ES] 1060.00 PTIa3| 4) [160 MVA Transformer TS__| 1060.00 PTI48] 16 [Draining oF oil from main tank OF the tansformer into empty oll Grams] KL 374.00 and stacking them neatly as directed by the APTRANSCO Engineer ai PTV4S| 17 [Unloading oF 20 KL oil storage taken at site and loading the same after] Job | 3356.00 | somletion ofthe job Dy [insurance for fragile material during ransportation, rection, dismantling may be paid as per actuals from department side for [department works. Si-S SUBRAHMANVAM DIRECTOR(PROJECTS) 1 RORWARD BY ORDER /! DIVISONAL ENGINEER-3 fo Chief Engineer(Construction) APTRANSCO. Vidyut Soudha, Hyderabad i Te ee ee aa 8 APTRANSCO SSR 2014-15, ANNEXURE - VI Rates for O&M works of EHT Lines SSR etna Deseription of work Unit | 2014-15 ft [ea (Rs) OMT | T |(@)Providing of Vibration dampers ( for 220KV & 132 KV Times] oo | aia |(Excluding Material & Transportation cost) ‘OM |—|(O). Providing of spacer damper for 400 KW twin Moose lines Excluding Material & Transportation cost) feee| eae 7 [Painting of towers with two coats of aluminum paint using Aluminam ipaint 1st grade containing 306 Kg of Aluminum paste for 18 liters of] thinner Ist coat is to be applied before erection of towers and 2nd cost! \ after stringing and half round welding including cost of paint, cost of] brushes, labour charges et., complete. ‘OMS | GafFirst coat of Ist Grade Aluminum Paint duly seratching and cleaning of towers including labour charges, cost of paint, brushes ete. Savi | eceee ‘OM | —(O]Labour charges for painting including seratching and cleaning of towers lof 1st coat of Alluminum with out cost of paint & brushes. ene |e ‘OMS |~G|(*) Second coat of Ist Grade Aluminium Paint duly seratching and] cleaning of towers including labour charges, cost ofpint, brushes, etc. | MT | 2131 OMS] —C4I(*) Labour charges for painting including scratching and cleaning of : towers of 2nd coat of Aluminum with out cost of paint & brushes. Mr 578) (7) : The requirement of 2nd coat isto be justified by the concerned Divisional Engineer/Execuive Engineer before execution of the work. 3 [Painting of towers with single coat of red oxide paint of Tt Grade, including scratching and cleaning of towers. ‘OMT | GlOne coat of Ist Grade Red Oxide Paint including labour charges for scratching and cleaning of towers including cost of paint, brushes etc. _| MT | 2281 ‘OMB | ~ (labour charges for painting of towers including seratching and cleaning lnftowers without cost of pain & brushes eid | Eee ‘OM9 | 4 [Providing of Arcing Homs for 132 KV line on both tower side and line| sie i. two per sing (Excluding Material & Transporation cosh] Pe | 913 lieRty & Pullies) ome OMT] “5 [Providing of Atcing Home for 132 KW Tine (Excluding Material Bp] 4 ‘Transportation cost)(without lefty & Pullies) OMIT] 6 [Providing of Arcing Hors for 220 KV line on both tower side and Tine idee to persng (Excluding Materia & Transporation oma] PE" | 134 lefty & Pullies) ome OMI2] 7 [Providing oF Areing Horns for 220 KW Tine (Excluding Material @T 5 | a4 [iransportation cost without lefty & Pullies) MIS] [Providing of Missing angles! Replacement of rusted angles on the] p_, existing towers departmentally (including transporaton charges &| et 102] Excluding cost of tower pars, bolts & auts) OMIA] [Replacement of insulators at Suspension tower of 132 KV Unel Pe” | a9 (Excluding Material & Transportation cost) string ‘OMIS| TO ]Replacement of insulators at Tension tower of 132 RW line (Excludingl Pet | gq LL Material & Transportation cost) string MIG] TT [Replacement of insulators at Suspension tower of 220 KV line) Per | 64 Excluding Material & Transportation cost) string 2 APTRANSCO SSR 2014-15, TR jen Desrpion of work unt | 21s [ne i OMIT) 1 Recent oss asin ove PHU RV Tne cg) Fe] Mac & Tanspraon [Re] 4000.00] [1520] 2.4 [Only excavation and back filing of sol without laying of cable Ri] 1500.00 [U1S21]~ 2.8 Excavation and backling of suitable thermal backfill for maintainings soil] Cum] 4000.00] thermal resistance value of 120 degrees [WIS 22] 2.6 [Laying of cable excluding excavation and backing Ril 400,00 2.7 |Laying of eable by Horizontal Directional Driling (HDD) incl. cost of [250 mm HDPE Pipe UWIS23] a) |Soi/Morrem.sof rock (upto $000 PSI) per each pipe Rl 9800.00 UIS24] b) |Soit/Hard rock (5000 PSI upto 9000 PSI) per each pipe Rant| —16000.00 3 |LAYING OF CO-AXIAL CABLE UIS25]a)_|300sq.mm. co-axial copper cable conductor PVC Insulated 66KV grade] Rr 15.0] across the cable UiS26] by _|300sq.mmsingle core copper cable conductor PVC Insulated 6 ORV grade] Ri T5200) lacross the cable [U1S27]~c) _]300sq:mm. co-asal eopper cable conductor PVC insulated @GRW grade on] Rr T5200] pote mounted termination tower inchuding cost of cleats UIS28|B_|300sq.mm-single core copper cable conductor PVC insulated 6OKW grade] Rn 15.09] lon pole mounted termination tower including cost of cleats. 4 |For pulling optical fiber cable the following items shall be done while [excavation of trenches as per specifications [U1S29] a) _|Supply of HDPE duct pipe of ODAD 40/33 mm dia and associated natevall RM] 100.0] lof standard make as per the specification of the contracvtender and laying} jointing, bedding of above HDPE duct pipe in the already excavated XLPE| cable tench including sealing the section ends as per the specification of the contracvtender. 'UIS30[b) _ [Supply of RCC joint chambers (12007760730 mmm) WILT with base and top| Each] 700000] plates as per the specification of the eontracvtender and erection of RCC| Jioim chambers for every IKM in HDPE duct enroot as per thel specification of the contracttender 3_|CABLE JOINTING [ointing of cable excluding coat of premoulded saight ough Joints} Protection box, 3-phase solid bond link box without SVL. / 3-phase cross lbond tink box with SVL, including excavation of pit for single ciruit cable, providing cement concrete base and walls ete, including cost of Jeement, stl ete. labour charges and all incidental items of work for Hfnished item of work including design of pit providing. joint bey identification mark including. providing necessary T&P for jointing viz. tarpaulin tent, OG Set, Air Conditioner et., complete wherever necessary for complete item of work. ‘This includes loading, unloading and| transportation ofall materials to work spot as per drawing and preparation UIS31 a) [With excavation of joint bay size (OmX4m) and laying oF CC(T:2:4) bed] Nes} —300000.00] land sand bed and back filling UiS32| — b)__ [Jointing charges for cross bonding jointTnormal joins Nox] 150000.00) ‘6 [TERMINATION CHARGES Termination of cable excluding cost of out door type cable terminations land single phase link boxes without SVL complete and all incidental iter lof work finished item of work including providing necessary T&P viz,| tarpaulin tent, DG set, ait conditioner, scaffolding ete complete wherever necessary for complete item of work ]U1S33] a) [132 KV tower mounted type cable end temminations including erection on) — Each) —350000.00] lower in all respects 26 [APTRANSCO SSR2014-15. Tem Nm | SLNo. Description of Materia Work SSR UNIT | 201415 Tis 34 by 132 KV Outdoor wype cable end terminations with silicon materials [complete inal respect Each! 3000000 Uis33| J) 132 kV SP6 type cable end terminations complete in all respect Each] —300000,0] juts 36] 7a Providing earthing of joint bays with copper flat of eross section equivalent lo the earthing cable and run all around the joint bay, providing earth) electrodes of steel rods coated with copper a per standards and treated) lwith suitable earth enhancing compound to get an effective diameter and} lwelding the copper flat 10 the electrodes by exothermic weldng. The] earthing scheme drawing shall be got approved with all eath resistance] calculations considerting the fault currents earth leads from link box to earth pit and connecing lug fixtures, fasteners shall be supplied, Length o the earth lead willbe as per site condition connivance. Each] 2500000] juiss7] 7 [Excavation ofearh pit at CTT Tower, puting east iron pipe with Hange on Jone end (as per ISS7181/86) of nominal dia 125 mm and 2.7 metres lon] inside the pit including supply and fixing of RCC Collars 0.75 mir. dia |(OD) Somm thick and 0.60 mits. long inside the pt, backfill the pit inthe [25mm size granules of BH coke for full depth of the pit with alternate layers of BE Coke and salt of 300mm thick around the earth pipe o: 150mm on all the sides of the pipe including cost and conveyance of BH |Cokessaltclamps.Cl pipes and RCC collars, Isbour charges for all loperational and incidental items of work et., complete(as per SSR 2013-| 1a) Each] 10650.0] Uisse} fe Provision for RCC (1-2) Tor any unforeseen requirement whenever necessary at culverts, drains, nala,bridges.(eate to be taken as per CSSR) Cam] (rte vo | taken asp csr) uIs39] 86 Supplying, iting and placing of HYSD, TMT bar reinforcement |(TISCO/SAILIVSP) in foundtions, colums’, beams slabs wherever lnecessitedfor the work as per the drawings furnished by he field engineer] including cutting , bending, cranking, tying grill in position including cost Jot binding wire scaffolding et (rat to be taken as per CSSR) MT] Gatetote| taken as per ssh] [CONNECTION OF LINK BOXES fais ao) — ay Erection of single phase link boxes, providing sultble supporing] arrangements, sheath bonding cable, connecting earth leads, with all lugs| ixtures, clamps, bolts and nuts etc., complete including excavation| providing concrete box with walls of 75mm thick RCC for inserting link boxes, and refilling, ce. including earthing as per the directions of site engineer. Each] 3000.00] usa by Erection of 3 phase link boxes making connections with earth leads with] lugs, fixtures, fasteners sheath bonding cable et., including excavation, providing RCC conerete wall box of 75mm thick for inserting link boxes, land refilling ete. including earthing as per the directions of site engineer. Each] 4000050] isa] 10 Erection of Lightning Arrestors on special type tower including cost of hardware, jumpering with suitable conductor between line conductor and| the pole mounted terminations including labour charges and insurance for [al incidental and operational items of work. Each] 5000.00 uisaa} a [Road cutting charges and charges for way Teaves to be paid for various |Government and other agencies is] 6000.00] juisaa] 12 Site testing and commissioning (including phase sequence text, megger tet] KM} 20000000] continuity test, HV test ete.) ‘S'S SUBRAHMANYAM FORWARD BY ORDER / DIVISONAL ENGINE ‘Oo Chet Engncor(Consirton) APTRANSCO. Vidyut Soudha, Hyderabad DIRECTOR(PROIECTS) Fa APTRANSCO SSR2014-15, LAYING OF 132KV UG CABLE (DOUBLE CIRCUIT) item [St pt : SSR ee Description of Material/Work UNIT | oonats 1_|CABLE ROUTE SURVEY UIDT | a) [Conducting reconnoitery and preliminary survey along shortest route with best] Mis] 250.00 proposed route and furnishing report for selecting the best proposal for approval including cost and conveyance of all materials, hire charges of equipment, tools land plant, preparation of drawings and reports, labour charges, complete for finished item of work as per the directions of Engineer-in-charge at site as pe ISSR 2013-14. (a) With GPS equipment (As per clause 4.9 of survey) (b) With] [otal station equipment [Conducting Detailed Survey of cable route including evaluation of thermal] Mts} 1000.00 ity of the soil along the cable route, excavation of tral pits as per field requirements, preparation of cable route profile, drawings for cable laying, final route alignment, marking lines & grades, and preparing bill of materials/ lengths} lof the cable for the project incl. preparation of PTCC questionnare and marking| lof proposed cable route in topo sheet, tower/SS sketch, Single line diagram| letc(30 copies/sets). (NOTE: For survey of small lengths of UG Cable, if the length is ess than 0.5KM, then 0.SKM is considered in preparation of estimate), UID? | 8) 2 [CAVING OF CABLE 2.1 Laying of 132 kv 630 sq. mm. XLPE U/G copper cable (6 Nos. for double |Cireuit) including road cutting, pulling and laying of cable including excavation| in the following soils and back filling, sand filling dewatering, including cost o IRCC protective tiles, cost of route markers, warning tapes ete. Across and along| CC, BT & earth road, Nala crossings, bridge crossings, providing HDPE| thickness 10 mm)pipes, Bell mouths, end caps after laying cable, labour charges land all incidental items of work for finished item of work. This includes loading, luntoading and transportation ofall materials to work spot. (flat formation) UID3 | a)[Fard gravel soils, BC soils, red earth, stone and earth mixed with fair size! Rm] 12000.00| boulders ete UID 4 | “b)|Hard Rock with soils Rrnil —16000.00] UID S| _o)|CC oF BT road surface ee, Rmt| 1000.00] UID 6 | a)lHard Rock ‘Rint! 1250.00] UID T | e)|CC or BT road with Hard rock ‘Rmt] 2400.00) UID 8 |” H]Actoss the road In HDPE pipes (thickness 10mm) to eross CC or BT road andl Rm} —15000.00] lother service lines including cost of concrete cost of HDPE pipes of 250 mm dia etc. complete UID 9 | @)]Across the road in HDPE pipes (hickness TOmm) to eross CC or BT road with] Rimi] 1957600] Ihard rock and other service lines including cost of concrete cost of HDPE pipes| lof 250 mm dia etc. complete UID TO] W][Cable laying in built up wrenches, cable ways and supports ete. complete! Rmt} 15000.00| including cost of trays and support etc, complete vii [Cable laying across the culverts and over bridges ete, complete in PVC pipes off Ril 1500000] 1250 mm dia in complete UID 12] j|Cable laying by clamping on special pe tower including earthing cable from] mi} 16000.00| termination to Link box including cost of Aluminum clamps UID 13] W|Cable laying while clamping bare on the walls ceiling and structures including] Rt! 600,00 cost of clamps in complete shape [TID 14] D|Cable laying across the railway wacks Rimi) 3500000] [UID 15] m[Cable laying by clamping on Sub-station siuctures like CPL ete, including] Rm] — 3000.00] earthing cable from termination to Link box including cost of Aluminum clamps, 8 APTRANSCO SSR2014-15, Tem [St No._{No. 2.2 [Including excavation and excluding backfilling without cable laying [UID 16|a)|Hard Gravel soils, BC Soils, Red Earth, stone & Earth mixed with fair size] Rmil —17000.00] boulders ete. [UID 17] 6)|Hard rock with CC or BT Road surfaces et, Ri] 600,00 2.3 [Excluding excavation and including backfilling UID 18] a)[Hard Gravel soils, BC Soils, Red Earth, stone & Earth mixed with fair size] Rimi] 2500.00] ‘SSR Description of Material Work 2014-15 boulders ete. [UID 19] 6)|Hard rock with CC or BY Road surfaces ete Rimi) 6000.0] [UID 20] 2.4 [Only excavation and backfilling of sol without laying oF cable. Rt 3000.00] [UID 21] 2.8]Excavation and backfilling of suitable thermal backfill for maintainings soil] — Cum] 8000.00] thermal resistance value of 120 degrees [UID 22 2.6 [Laying of cable excluding excavation and backfilling Ril 800,00] 2.7]Laying of eable by Horizontal Directional Drilling (HDD) incl, cost of 250] lmm HDPE Pipe [UID 23| a) Soil/Morrem,soft rock (upio 5000 PSI) per each pipe Rini| 9800.00] [UID 24] "b)]Soil/Hard rock (S000 PSI upto 9000 PSI) per each pipe ‘Rent] 16000.00| 3 [LAYING OF CO-AXIAL CABLE UID 25] }[300sq.mm, co-axial copper eable conductor PVC insulated @SKV grade across] Rm] 25.00 the cable. UID 26] b)]300s9.mmsingle core copper cable conductor PVC insulated GOKV grade across} Rm 25.00 the cable. [UID 27] —6)]300sq.mm. co-axial copper cable conductor PVC insulated 6.6RW grade on polel Rn] 25.00] mounted termination tower including cost of cleats [UID 28 d)]300sq.mm.single core copper cable conductor PVC insulated 6GKV grade on] Rimi] 25.00] pole mounted termination tower including cost of cleats 4 |For pulling optical fiber cable the following items shall be done while lexcavation of trenches as per specifications [Supply of HDPE duct pipe of OD/ID 40/33 mm dia and assoclated material off — RM] 100,00] standard make as per the specification of the contracvtender and laying jointing, bedding of above HDPE duct pipe in the already excavated XLPE cable treneh| including sealing the section ends_as per the specification ofthe contracttender. UiD 30] b]Supply of RCC joint chambers (1200/760/50 mm) WILIT with base and top] Each} 7000.00 plates as per the specification of the contracttender and erection of RCC joint Jchambers for every IKM in HDPE duct enroot as per the specification of the| lcontracvtender. 3 [CABLE JOINTING. Jointing of cable excluding cost of pre-moulded straight through joints] Protection box, 3-phase solid bond link box without SVL / 3-phase cross bond| link box with SVL, including excavation of pit for double circuit cable, providing! |cement concrete base and walls etc. including cost of cement, steel etc, labour [charges and all incidental items of work for finished item of work including] Idesign of pit providing joint bay identification mark including providing Inecessary T&P for jointing viz, tarpaullin tent, DG Set, Air Conditioner ete,| [complete wherever necessary for complete item of work. This includes loading | ‘unloading and transportation of all materials to work spot as per drawing and] preparation of joint bay [UID 31] a] With excavation of joint bay size (SmX4m) and laying of CC(1:2:4) bed and] Nos] 450000.00] sand bed and back filing UID 32| by] ointing charges for cross bonding joins/normal joints Nes] 130000:00 6 [TERMINATION CHARGES Termination of cable excluding cost of out door type cable terminations and] single phase link boxes without SVL complete and all incidental item of work] finished item of work including providing necessary T&P viz, tarpaullin tent IDG set, air conditioner, scaffolding ete complete wherever necessary for Jcomplete item of work iD 29) 0 APTRANSCO SSR20%4-15, Trem No. st nal Description of Material/Work SR UNIT | 2014-15 UIDs 2)|132 KV tower mounted type cable end terminations including erection on tower] all respects Each] 350000.00 UID 34 By]132 KV Outdoor type cable end terminations with silicon materials Complete all respect. Each] 300000.00 UID 35) ©)|132 KV SF6 pe cable end terminations complete in all respect, Each] 300000.00| UID 36} 7a [Providing earthing of joint bays with copper flat of cross section equivalent to the| learthing cable and run all around the joint bay, providing earth electrodes of steel rods coated with copper as per standards and treated with suitable earth lenhancing compound to get an effective diameter and welding the copper fat t| the electrodes by exothermic weldng. The earthing scheme drawing shall be got approved with all cath resistance calculations considerting the fault currents learth leads from link box to earth pit and connecing lug fixtures, fasteners shall be supplied. Length ofthe earth lead will be as per site condition! connivance, Each] 40000.00| vib 37) 7b [Excavation of earth pit at CTT Tower, putting cast iron pipe with flange on one] lend (as per 1S87181/86) of nominal dia 125 mm and 2.75 metres long inside the| pit including supply and fixing of RCC Collars 0.75 mtr, dia (OD) SOmm thick land 0,60 mtrs. long inside the pit, backfill the pit in the 25mm size granules of BH coke for full depth of the pit with altemate layers of BH Coke and salt [300mm thick around the earth pipe of 1S0mm on all the sides of the pipe| including cost and conveyance of BH Coke,sal.clamps,Cl pipes and RCC| collars, labour charges for all operational and incidental itemis of work ete. |complete.(as per SSR 2013-14) Fach) 10650,09 iD 3s 82) Provision for RCC (1-24) for any unforeseen requirement whenever necessary al culverts, drains, nalas,bridges.(rate to be taken as per CSSR) Cum| (rate be taken as per CSSR) UID 39) 8b|Supplying. —fiting and placing of HYSD, TMT bar reinforcement |(FISCOVSAILIVSP) in foundtions, colums , beams slabs wherever necessiated.for the work as per the drawings furnished by the field engineer] including cutting , bending, cranking, tying grill in position including cost binding wire scaffolding ete (rate to be taken as per CSSR) Mi{rate to be haken as Iper CSSR) 9, [CONNECTION OF LINK BOXES uiD 40) a) [Erection of single phase link boxes, providing sultable supporting arrangements| Isheath bonding cable, connecting earth leads, with all lugs, fixtures, clamps| bolts and nuts etc., complete including excavation, providing concrete box with] walls of 75mm thick RCC for inserting link boxes, and refilling, et. including [earthing as per the directions of site engineer Each} 3000.00] vib at ‘)[Erection of 3 phase link boxes making connections with earth Teads with Tugs] fixtures, fasteners sheath bonding cable etc. including excavation, providing RCC concrete wall box of 75mm thick for inserting link boxes , and refilling, etc including earthing as per the directions of site engineer. 4000.00) Ui 43} 10 [Erection of Lightning Arrestors on special type tower including cost of hardware] jiumpering with suitable conductor between line conductor and the pole mounted| terminations including labour charges and insurance for all incidental and) loperational items of work. Each] 5000.00] UIDs TT JRoad cutting charges and charges for way leaves to be paid for various |Government and other agencies Mis] 10600.00) ibaa] 2 [Site testing and commissioning (including phase sequence tes, megger test Jcontinuity test, HV test etc.) KM} 300000.09] Sa SUBRAHMANYAM DIRECTOR(PROJECTS) 2 yorwnso BY ORDER DIVISONAL ENGINEER-3 O'o Chief Engineer(Constuction) ‘APTRANSCO Vidyut Soudha, Hyderabad 40 APTRANSCO SSR2014-15 LAYING OF 220 KV UG CABLE (SINGLE CIRCUIT) Tem | Sh No._|No. Description of MateriaVWork UNIT ‘SSR 2014-15 [CABLE ROUTE SURVEY T2871 | a) [Conducting reconnoitery and preliminary survey along shortest route with lbest proposed route and furnishing report for selecting the best proposal Yor approval including cost and conveyance of all materials, hire charges| Jof equipment, tools and plant, preparation of drawings and reports, labour Jcharges, complete for finished item of work as per the directions of lEngineer-in-charge at site as per SSR 2013-14. (a) With GPS equipment (As per clause 4.9 of survey) (b) With total station equipment. Mss. 250,00] 282 | 6) [Conducting Detailed Survey of cable route including evaluation o thermal resistivity of the soil along the cable route, excavation of trial pits as per field requirements, preparation of cable route profile, drawings for cable laying, final route alignment, marking lines & grades, and preparing| bill of materials’ lengths of the cable for the project incl. preparation of PTC questionnare and marking of proposed cable route in topo sheet, tower'SS sketch, Single line diagram etc.(30 copies/sets) (NOTE: For| Isurvey of small lengths of UG Cable, if the length of UG cable is less Ithan 0.5KM, then 0.5KM is considered for survey of small length of UG| [cable in the preparation of estimate) " Mis, 750.00] LAYING OF CABLE 24 JLaying of 220 kv 1000 sq. mm. XLPE UIG copper cable (3 Nos. for Single Circuit) including road cuting, pulling and laying of cable jincluding excavation in the following soils and back filling, sand filling |dewatering, including cost of RCC protective tiles, cost of route markers, Jwamning tapes etc. Across and along CC, BT & earth road, Nala| lcrossings, bridge crossings, providing HDPE (thickness 10 mm)pipes, Bell mouths, end caps after laying cable, labour charges and all incidental items of work for finished item of work. This includes loading, unloading} land transportation of all materials to work spot. (flat formation) w2s3| a] Hard gravel soils, BC soils, red earth, stone and earth mixed with fair size| boulders ete Rm] 7962.00) was4] 6) [Hard Rock with soils 10938.00) w2ss| | ICC or BT road surface ete Rm 7096.20 w2s6| a] Hard Rock Rm 8183.40 ws7] 2) ICC or BT road with Hard rock Rm 1520160 use] A] [Across the road In HDPE pipes (thickness 10mm) to cross CC or BT road| land other service lines including cost of concrete cost of HDPE pipes of 1250 mm dia etc. complete Rm 9978.00] v2s9 1 @) [Cable laying in built up trenches, cable trays and supports ete. complete| lincluding cost of trays and support etc, complete. Rim 9978.00} U2s 10] hy] [Cable laying across the culverts and over bridges etc., complete in PVC| pipes of 250 mm dia in complete 9978.00] wastiy i [Cable laying by clamping on special ype tower including earthing cable from termination to Link box including cost of aluminum clamps 9000.09} vista] D [Cable laying by clamping on Sub-station structures like CPL etc.| including earthing cable from termination to Link box including cost of aluminum clamps. 2000.09} 28 13) [Cable laying while clamping bare on the walls , ceiling and structures] including cost of clamps in complete shape Rm 4000.09] pea sl a i ak Al hi | RN a APTRANSCO SSR2014-15, ] SSR _Peseription of Materia Work UNIT | sores | Cabie laying across the railway tracks ini] 2500.00] Including excavation and excluding backfilling without cable laying top plates as per the specification of the contractitender and erection of IRC joint chambers for every IKM in HDPE duct enroot as per the specification of the contracttendee, a Sad sare inl aso U2S 16] by] Hard Gravel soils BC Soils. Red Earth, sone & Bath mixed wilt Tak] Rent) 3000-00 ize boulder ete. Excluding excavation and including backing Hard Gravel soils, WC Soils, Red Eamh, tone & Earth mined with fa] Ri] 158000 | ulders et. TGS IE] bard rock wih CC or BF Road surest we inal — So (35 19] 2.4 [Only excavation and back filling of soil without Tying oF eable Rinsf 1500.00 13570 vation and backing oF suitable thermal backfl Tor malataniags] Cm] 1060, 0 soil ermal resistance valu of 120 dere . [UESZT [26 [Laying of cable esching excavation and backing al sont] ing of cable by Horizontal Directional Drilling (HDD) incl costo mm HDPE Pipe - : : T5535 [_a)| Sot Monrem.soft rock tapte 5000 PSI per pipe itl — own 3S 25 [by f Soi Har rock (3000 PST upto 9000 FSI) per pipe Fan] 160.00 [3 JLAVING OF CO-AXIAL CABLE UIST] a]240sq.mm. co-anial copper cable conductor PVC insulated 6@KW grade! Remi 500] j__facross the cable. Bf25q mm sine” core copper cable conductor PVG Insulated 6@KV] Ri] 15.00 rade ners te cable THS36]cjfBatisqnn. co-anial copper cable conductor PVC Tnulated © ORV grade} Rani] TS _ Jon pote niounted termination tower including cost of eleats : DfeWsqummsingle core copper cable conkivctor PVC insulated GOV] em} 1S radeon pole mounted temmination tower including cost of eats, T ]For pulling optical her eable te following items shall be done wi excavation of trenches as per specifications : TISZ8]aifSuppls of HOPE uct pipe of ODD 4055 mm dia and associated] fii] Tan09 material of standard make as per the specification ofthe contracende land laying jointing. bedding of above HDPE duct pipe in the already lescavated XLPE cable tench including seating the seetion ends as pr | fine specication or tne contact ender (Per Pipe) _ T3S35] HyfSupply oF RCC joint chambers (1260-76050 many WILT with base and] Baca] 7m CABLE JOINTING Hointing oF cable excluding cost of pre-moulded straight through joints, Protection box, 3-phase solid bond link box without SVL / 3-phase cross bond link box with SVL, including excavation of pit for single circuit cable. providing cement concrete base and walls etc. including cost of Jcement, steel etc., labour charyes and all incidental items of work for] Finished item of work including design of pit providing joint bay] identification mark including providing necessary T&P for jointing viz., ltarpaullin tent, DG Set, Air Conditioner ete, complete wherever Inecessary for complete item of work. ‘This includes loading, un-loading land transportation of all materials to work spot as per drawing and| preparation of joint hay. es an 2 APTRANSCO SSR2014-15 Tem No. sh. No. Description of Mat iavWork UNIT SSR 2014-15 U2 30 ay With excavation of joint bay size (I3mX4m) and laying of CC(I:2:4) bed] land sand bed and back filling Each 350000.00] WaS31 [Jointing charges for cross bonding joints for each phase Each 250000.00] [TERMINATION CHARGES. : [Termination of cable excluding cost of out door type cable terminations| land single phase link boxes without SVL. complete and all incidental item| lof work finished item of work including. providing necessary T&P viz. tarpaultin tent, DG set, air conditioner, scaffolding etc complete wherever| Inecessary for complete item of work. 2s 32 ay [220 KV tower mounted type cable end terminations including erection on| tower in al respects per phase including scaffolding charges. Each 420000.00| as 33 By 1220 KV Outdoor type cable end terminations with silicon material| complete in all respect. 350000.00] U2s34) [220 kV SF6 type cable end terminations compiete in all respect Each 35000000] [u28 35 7a Providing earthing of joint bays with copper flat of cross section| lequivalent to the earthing cable and run all around the joint bay, providing earth electrodes of steel rods coated with copper as per| standards and treated with suitable earth enhancing compound to get an| effective diameter and welding the copper flat to the electrodes by| lexothermic weldng. The earthing scheme drawing shall be got approved| with all eath resistance calculations considerting the fault currents earth] leads from link box to earth pit and connecing lug fixtures, fasteners shal lbe supplied. Length of the earth lead will be as per site condition/| Each 5000.00 02836 7b [Excavation of earth pit at CTT Tower, putting cast iron pipe with Flange] lon one end (as per 1SS7181/86) of nominal dia 125 mm and 2.75 metres long inside the pit including supply and fixing of RCC Collars 0.75 mt. dia (OD) SOmm thick and 0.60 mits. long inside the pit, backfill the pit in the 25mm size granules of BH coke for full depth of the pit with alternate layers of BH Coke and salt of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH| [Coke,salt.clamps.Cl pipes and RCC collars, labour charges for all loperational and incidental items of work etc., complete (as per SSR 2013-| Each 10650.00 2837 8a Provision for RCC (1:2:4) for any unforeseen requirement whenever Inecessary at culverts, drains, nalas, bridges.(rate to be taken as per CSSR)| Cum (ate to be| taken as per CSSR)| 2838 8 [Supplying, fitting and placing of HYSD, TMT bar reinforcement] |(TISCO/SAIL/VSP) in foundtions, colums , beams slabs wherever Inccessiated.for the work as per the drawings furnished by the field| lengineer including cutting , bending, cranking, tying grill in position| including cost of binding wire scaffolding etc.(rate 10 be taken as per| MT (rate to be| taken as per CSSR)} [CONNECTION OF LINK BOXES 02839 [Erection of single phase link boxes, providing suitable supporting| larrangements, sheath bonding cable, connecting earth leads, with all lugs, fixtures, clamps, bolts and nuts etc., complete including excavation, Iproviding concrete box with walls of 75mm thick RCC for inserting link lboxes, and refilling, ete. including earthing as per the directions of site lengineer including connecting to the earthing cable from link box to learthpit, Each 3000.00] _ sae esses et SE SE EES Gas aI ry APTRANSCO SSR2014-15, Item | SI SSR’ No. [Nos Description of Material/Work UNIT] ores U2S 40] b)[Erection of 3 phase link boxes making connections with earth leads with] Each| 40000 001 lugs, fixtures, fasteners sheath bonding cable ete., including excavation, providing RCC concrete wall box of 75mm thick for inserting link boxes | land refilling, etc. including earthing as per the directions of site eninee including connecting to the earthing cable from link box to earthpit. 'U28 41] 10 [Erection of Lightning Arrestors on special type tower including cost off Each] 3000.00] /hardware, jumpering with suitable conductor between line conductor and] the pole mounted terminations including labour charges and insurance for all incidental and operational items of work. 'U2S 42] 11 JRoad cutting charges and charges for way leaves to be paid for various| Mis] 6000.00] JGovernment and other agencies. The cost is for estimate purpose however, the amount will be reimbursed as per actuals against ldocumentary evidence. U2S 43] 12 [Site testing and commissioning (including phase sequence test, megger] KM] 200000.00| test, continuity test, HV test ete.) Sd/-S SUBRAHMANYAM DIRECTOR(PROIECTS) 1 FORWARD BY ORDER / DIVISONAL ENGINEERS (fo Chief Engineer(Construction) APTRANSCO. Vidyut Soudha, Hyderabad “ [APTRANSCO SSR2014-15 LAYING OF 220 KV UG CABLE (DOUBLE CIRCUIT) Tem SR tem | suno. Description of Material Work Unit 1_|CABLE ROUTE SURVEY aaa TID T] a) [Conducting reconnoitery and preliminary survey along shortest route with bes] Mis] 250.00 lproposed route and furnishing report for selecting the best proposal for approval including cost and conveyance ofall materials, hire charges of equipment, tools land plant, preparation of drawings and report, labour charges, complete for] finished item of work as per the directions of Engineer-in-charge at site as per] [SSR 2013-14. (a) With GPS equipment (As per clause 4.9 of survey) (b) With total station equipment. UaDZ |b) [Conducting Detailed Survey of cable route Including evaluation of thermal] Mis] 1000.00 resistivity ofthe soil along the cable route, excavation of tral pits as per field Jequirements, preparation of cable route profile, drawings for cable laying, final route alignment, marking lines & grades, and preparing bill of materials! lengths lof the cable for the project incl. preparation of PTCC questionnare and marking lot proposed cable route in topo sheet, ower/SS sketch, Single line diagram] let-(30 copiesisets) (NOTE: For survey of small lengths of UG Cable, if the length of UG cable is less than 0.SKM, then 0.SKM is considered for survey o small length of UG cable in the preparation of estimate) 2 [LAYING OF CABLE BA |Laying of 220 kv 1000 sq, ram. XLPE UG copper cable (6 Nos. for double [Cireut) including road cutting, pulling and laying of eable including excavation in the following soils and back filling, sand filling dewatering, including cost of IRCC protective tiles, cost of route markers, warning tapes etc. Across and along| ICC, BT & earth road, Nala crossings, bridge crossings, providing HDPE| thickness 10 mm)pipes, Bell mouths, end caps afer laying cable, labour charges land all incidental items of work for finished item of work. Ths includes loading luntoading and transportation of all materials to work spot. (Mat formation) U2D3 | __a)|Hlard gravel soils, BC soils, red earth, stone and earth mixed with fair size] Rmi) 15270.0] boulders ete W2D4| —_b)[Hard Rock with soils ‘Rm _18230.00] U2D S| e)|CC oF BT road surface et, ‘mt 11827.04] W2D6| __ d)]tiard Rock Rent] 13639.00] U2D 7] e)|CC or BT road with Hard rock ‘t) —25336,00] U2D 8] D]Across the road In HDPE pipes Chickness 10mm) to cross CC or BT road and] Rmt] 16630.00] lother service lines including cost of concrete cost of HDPE pipes of 250 mm dia] etc. complete TAD 9] —_g)]Cable laying in built up wrenches, cable trays and Supports ei, complete! Rmi] —16630.00 including cost of trays and suppor etc, complete. [Ua TO] F|Cable laying across the culverts and over bridges eic., complete in PVC pipes off Rint} —16630.00| [250 mm dia in complete UAD IT] [Cable laying by clamping on special ‘ype tower including earthing cable from] Rm] 1800000] termination o Link box including cast of aluminum clamps [UID 12] [Cable Taying by clamping on Sub-station structures like CPL etc, including) — Rent) 4000.00 earthing cable from termination to Link box including cost of aluminum clamps. TaD 13] fo] Cable laying while clamping bare on the walls, ceiling and structures including] Rm] 8000.00) cost of clamps in complete shape [aD 14] Hable laying across the railway racks Rint| «0000.00 22 [Including excavation and excluding backfilling without cable laying [aD 1S] Hard rock with CC or BT Road surfaces et. inl _17000,00 [2D 16] _b)[Hard Gravel soils, BC Soils, Red Earth, stone & Earth mixed with fair size} — Rent} — 6000.09 boulders ete. 45 APTRANSCO SSR201445 Tem a SR Description of Material/Wor nl iption of Mate ke unit | oon: [Excluding excavation and including backfilling U2DI7|——a)]Fiard Gravel soils, BC Soils, Red Earth, stone & Earth mixed with fair size] Rt} 2500.00 boulders ete. (U2 18] Hard rock with CC or BT Road surfaces ee Renal 7000.09 [U2 19| 24 [Only excavation and back filling of sol without laying of cable : Rnt{ 3000.00 U2D 20/28 |Excavation and backfilling of suitable thermal backfill for maintainings soll] Cum] — 8000.09 thermal resistance value of 120 degrees U2DF1| 2.6 [Laying of cable excluding excavation and backtiling Renil 1000.00) 2.7 [Laying of eable by Horizontal Directional Drilling (HDD) incl, cost of 280] Imm HDPE Pipe U2 22|__a)|Soil7Morrem,soft rock (upto 5000 PSN per pipe Rinil 9800.00) {U2 23[ b)]Soi/Hard rock (5000 PSI upto 9000 PS!) per pipe Rant! —16000.00) ‘3_[LAYING OF CO-AXIAL CABLE U2D 24] _a]240sq.mm. co-axial copper cable conductor PVG insulated 6KV grade across] mil 25.00] the cable. U2D 25] __b)[240sq.mmsingle core copper cable conductor PVC Insulated GAKV grade] Rei} 25.00] lacross the cable. U2D 26] ©)[240sq.mm. co-axial Copper cable conductor PVC insulated GOKW grade on pole] Rimi] 25.00 mounted termination tower including cost of cleats U2D Z| d]240sq.mm single core copper eable conductor PVC insulated 6GKV grade on] Rt] 25,00 Je mounted termination tower including cost of cleats. |For pulling optical fiber cable the following items shall be done while excavation of trenches as per specifications [Supply of HDPE duct pipe of ODAD 40/33 mm dia and associated material o RM] 100.00 standard make as per the specification ofthe contracVtender and laying jointing bedding of above HDPE duct pipe in the already excavated XLPE cable trench inciuding sealing the section ends as per the specification ofthe contracvtender| (Per Pipe), U2D 29. —_by|Supply of RCC joint chambers (1200/760i50 mm) WILT with base and top] Each] — 7000.00] plates a per the specification of the contracttender and erection of RCC join Jchambers for every IKM in HDPE duct enroot as per the specification of the Jcontracvtender. 3_|CABLE JOINTING Hointing of cable excluding cost of pre-moulded straight through joins] [Protection box, 3-phase solid bond link box without SVL / 3-phase eross bond link box with SVL, including excavation of pit for double circuit cable lproviding cement concrete base and walls etc. including cost of cement, see etc. labour charges and all incidental items of work for finished item of work lincluding design of pit providing joint bay identification mark including lproviding necessary T&P for jointing viz. tarpaullin tent, DG Set, Air] [Conditioner etc., complete wherever necessary for complete item of work. Ths includes loading, un-loading and transportation of all materials to work spot as lper drawing and preparation of joint bay. 2D 28, a) U2D 30] __a)] With excavation of joint bay size (13mX4m) and laying of CC(I:2:8) bed and] — Nos} 510000.00| sand bed and back filling U2D 31] bp[lointing charges for cross bonding Joints foreach phase ‘Nos 230000:00 6 [TERMINATION CHARGES [Termination of cable excluding cost of out door Wype eable terminations and] single phase link boxes without SVL complete and all incidental item of work finished item of work including providing necessary TP viz. tarpaulin tent DG set, air conditioner, scaffolding ete complete wherever necessary for lcomplete item of work [U2D 32] a) [220 KV tower mounted type eable end terminations including erection on tower] — Each] 420000,00 in all respects per phase including scaffolding charges. [U2D 33] _6)]220 KV Outdoor type eable end terminations with silicon materials complete in| — Each] 330000.00| all respect. [U2D 34] 0220 kV SFE type cable end terminations complete in all respect Each 350000:00 “6 -APTRANSCO SSR201415 Tem SSR SLNo. U2D 35] 7a [Providing earthing of joint bays with copper flat of etoss section equivalent to] Nos |” 40000.00 the earthing cable and run all around the joint bay, providing earth electrodes of steel rods coated with copper as per standards and treated with suitable eath lenhancing compound to get an effective diameter and welding the copper fatto] lhe electrodes by exothermic weldng. The earthing scheme drawing shall be got lapproved with all eath resistance calculations considering the fault currents| learth leads from link box t earth pit and connecing lug fixtures, fasteners shall be supplied. Length ofthe earth lead will be as per site condition’ connivance. [U2D 36[ 75 Excavation of earth pit at CTT Tower, puting cast iro pipe with flange on one) Nos] 1050.09 lend (as per ISS7181/86) of nominal dia 125 mm and 2.75 metres long inside te] pit including supply and fixing of RCC Collars 0.75 mit. dia (OD) 0mm thick [and 0.60 mirs. long inside te pit, backfill the pit in the 25mm size granules of [BH coke for full depth ofthe pit with alternate layers of BH Coke and salt of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH Coke,sal.clamps,Cl pipes and RCC| collars, labour charges for all operational and incidental items of work et. complete (as per SSR 2013-14) jon of Material/Work Unit [U2D 37] Ba [Provision for RCC (1:2:4) for any unforeseen requirement whenever necesary ail Cum|(rate to be culverts, drains, nlas, bridges (rate to be taken as per CSSR) taken as lper CSSR) [UaD 388 Supplying, fiting and placing of HYSD, TMT bar reinforcement] MiT(rate to be (TISCO/SAIL/VSP) in foundtions, colums , beams slabs _ wherever taken as lnecessited.for the work as per the drawings furnished by the field engineer lper CssR) including cutting , bending, cranking, tying grill in position including cost of binding wire scaffolding ete (rte to be taken as per CSSR) 9 |CONNECTION OF LINK BOXES [02039] a) Erection of single phase link boxes, providing suitable supporting arrangements) Each} 3000.00 sheath bonding cable, connecting earth leads, with all lugs, fixtures, clamps| bolts and nuts et., complete including excavation, providing concrete box with lwalls of 75mm thick RCC for inserting link boxes, and refilling, etc. including Jearthing as per the directions of site engineer including connecting to the lerthing cable from link box to earthpit, (U2D40| __b)]Ereetion of 3 phase Tink boxes making connections with earth leads with Tugs Back] —40000.00| Fixtures, fasteners sheath bonding cable etc., including excavation, proviing| IRCC concrete wall box of 75mm thick for inserting link boxes , and refiling| Jet. including earthing as per the directions of site engineer including} |connecting tothe earthing cable from link box to earthpit. TURD 410 [Erection of Lightning Arrestors on special type tower including cost off Nos] 5000.00 hardware, jumpering with suitable conductor between line conductor and the pole mounted terminations including labour charges and insurance for all incidental and operational items of work, [UAB #2] IT Road cutting charges and charges for way Teaves to be pald Tor various] Mis] —10000.00| |Government and other agencies. The cost is for estimate purpose however, the amount will be reimbursed as per actuals aguinst documentary evidence, [02D 43] —12 [site testing and commissioning (including phase sequence test, megger test| _ KM] 300000.09 continuity tes, HV test ete.) ‘Sd-S SUBRAHMANYAM DIRECTOR(PROJECTS) 1, FORWARD BY ORDER /! IVISONXL ENGINEER: (Oo Chet Engineer(Construction) ‘APTRANSCO| Vidyut Sudha, Hyderabad

You might also like