Result:
1. Visual inspection & dimensional was performed with satisfactory result.
2. NDT was performed with satisfactory result.
No
Description
Item Number
Asset Number
Hose Basket
HB 002
7831208035
2
3
Sling 4 Legs
Shackle
SL 01 HB 002
SC 01 up to 04 HB 002
Conclusion:
Based on
with Safe
This certificate reflects our findings at time and place of inspection only and is issued without prejudice.
Balikpapan, May 31, 2010
PT. GERBANG KRENINDO SAKTI
SUMARDI
Representative Manager
No. BPN.2144
d without prejudice.
RENINDO SAKTI
ARDI
ive Manager
Color Code
: Yellow
Acc
Struc.
Rejected
PE
Rejected
Acc
Rejected
Acc
Not done
Done
General Condition
Painting
Dim.
SC
Joint
Good
Heavy
Part of Inspection
Light
No
Medium
Corrotion
Date of Insp.
Location of Insp.
Acc
Hose Basket
HB 002
Repair
Medium
:
:
:
Poor
Client
Name of Equip.
Item Number
Structure Straightness
Structure Type
Top Plate
Base Plate
Wall Plate
Frame
P
P
P
P
P
Joint
-
Weld Soundness
Weld Completeness
P
P
Pad Eye ( PE )
-
Weld Soundness
Dimensional
P
P
P
L : 688Cm x W :122Cm x H :122Cm
Accepted
Conclusion ;
Based on Visual Inspection The Above Equipment can be used for operation with safe working load stated above
* Note:
Corrotion
Light
Medium
Heavy
2
:
:
:
Painting
Good
Medium
Poor
:
:
:
PADEYES: 4 EA
THICKNESS: 20 mm
mm
Inspected by
MUKTI SEKTIADI
PT. Gerbang Krenindo Sakti
NG KRENINDO SAKTI
Remark
:
:
:
:
Tare Weight
Safe Working Load
Max Gross Weight
Load Test 2,5xMGW
1200 Kgs
4000 Kgs
5200 Kgs
Kgs
28mm
67mm
28mm
107mm
:
:
:
:
INSPECTION ITEM
Location of Inspection
Refference
Color Code
:
:
Solic Yellow
RESULT
1. Shackle Data
- Manufacturer
- Type
- Safe Working Load
2 Inspection
- Shackle
- Pin Shackle
3 Dimensional
- Dimensional Nominal
REMARK
Crosby,
Bolt Type Anchor Shackle
Tones
Good
Good
- Dimensional Actual
Item No.
: SC 01
: SC 02
: SC 03
: SC 04
4 Nondestructive Examination
- Dye Penetrant Inspection
- Magnetic Partical Inspection
Open
mm
Open
Pin
Pin to Top
mm
Pin to Top
Shackle
mm
Pin
mm
mm
mm
mm
mm
mm
mm
mm
mm
Shackle
mm
mm
mm
mm
mm
mm
mm
mm
Good
Good
:
:
:
:
RESULT
DIAMETER
LENGTH
SAFE WORKING LOAD (SWL)
ROPE CONDITION
Good
A-A'
C-C'
B-B'
Inspected By
Location of Inspection
Refference
Color Code
:
:
MASTER LINK
A= Diameter
B= Length
C= Width
Link Condition
Good
SUB LINK
A= Diameter
B= Length
C= Width
Link Condition
Good
KRENINDO SAKTI
ND DIMENSIONAL REPORT
Solic Yellow
REMARK
D DIMENSIONAL REPORT
REMARK
BS6,
Crosby,
GRS,
OMS
Good
Rejected
-
mm
tones
kg
mtr
MPI-GKS
Report No
Description
Item Number
Date of Test
Illumination
:
:
:
:
:
Procedure No
Acc. Criteria
Welding Process
Client
: IP - 55
: AWS D1.1
:
: PT. M-I INDONESIA
No.
1
2
3
4
/ ###
Hose Basket
HB 002
May 27, 2010
- Sun Light
Part of.
Inspector
Method
Equipment
Type
Chemical
Observetion
No indication of defect
No indication of defect
No indication of defect
No indication of defect
:
:
:
:
:
Location
MUKTI SEKTIADI
CONTINUOUS METHOD
YOKE
YOKE PERMANENT
- WCP 2
WHITE CON
- 7HF
PREPARED
- SKC - S
CLEANER
: W/H. PT. M-I Indonesia, Tanju
Sheet
: 1 of 1
Result
Accepted
Rejected
Type of Discontinut
INSPECT
Name
Balikpapan Representative Office:
Sign
Ruko Balikpapan Baru, Sentra Eropa, AB.4, No.24, Balikpapan 76125, Kalimantan Timur
MUKT
Sign
MT &
MUKTI SEKTIADI
DI
METHOD
NENT
WHITE CONTRAST PAINT
PREPARED BATH
CLEANER
of Discontinuties
RUSDIANSYAH
BENNY SETYA NUGROHO
ANDI BASRI
WISNU HATTA
AGUS WAHYUDI
SMAW
GMAW
GTAW
After Repair
Before Repair
After Load Test
Before Load Test
Before & After Load Test
I
MPI-GKS YOKE ELECTRIC
II
PT-GKS YOKE PERMANENT
IP - 55
SURFACE CLEANING
III
IP
56
APPLY WHITE CONTRAST
IV
AWS D1.1
MAGNETIZATION
V
ASME V
APPLY MAGNETIC INK
VI
INSPECTION
VII
CLEANING
VIII
APPLY RED PENETRANT
IX
APPLY DEVELOPER
X
INSPECTION
XI
XII
Remaks
INSPECTED BY
MUKTI SEKTIADI
Balikpapan Representative Office:
Ruko Balikpapan Baru, Sentra Eropa, AB.4, No.24, Balikpapan 76125, Kalimantan Timur
MT & PT Level II
No indication of defect
Indication of defect
SOLVENT REMOVABLE
MAGNETIC PARTICLE INSPECTION REPORT
SKC - S
CLEANER
SKL - SP1
SKD - S2
PENETRANT
DEVELOPER
WCP - 2
7HF
PREPARED BATH
NETRANT
RAST PAINT