You are on page 1of 4

Project: NAG LTFD PHASE 1 PROJECT TO

INSTALL 500MMSCFD GDU

LIQUID PENETRANT TEST PROCEDURE FOR HP


& LP FLARE STACK

DOCUMENT No.: MFJO629-LPT-0001


Rev

Date

Description

Prepared

Reviewed

Approved

16 May,16

Issued for Sqad Check

SF

AM

AM

19 May,16

Issued for Approval

SF

AM

AM

MFJO629-LPT-0001 rev 0

Page i

Liquid Penetrant Procedure

NAG LTFD PHASE 1 PROJECT TO INSTALL


500MMSCFD GDU
DISCLAIMER
This Procedure has been prepared on behalf of and for the exclusive use of METALFAB.
METALFAB accepts no liability or responsibility whatsoever for it in respect of any use of or
reliance upon this Procedure by any third party.
Copying this Procedure without the permission of METALFAB is not permitted.

MFJO629-LPT-0001 rev 0

Page ii

Liquid Penetrant Procedure

NAG LTFD PHASE 1 PROJECT TO INSTALL


500MMSCFD GDU
CONTENTS
1.

SCOPE........................................................................................................ 1

MFJO629-LPT-0001 rev 0

Page iii

Liquid Penetrant Procedure

NAG LTFD PHASE 1 PROJECT TO INSTALL


500MMSCFD GDU
1.

SCOPE
The purpose of this procedure is to control, execute and monitor all activities related to the
Penetrant test of HP & LP Flare stack to comply with Project Specifications and Technical
Standards.
Penetrant test performed by third party agency as per this procedure developed by third party
agency and is part of this document.