You are on page 1of 16

COMFACAUCA

GERENCIA INTEGRAL No. 144


DEPARTAMENTO DEL CAUCA
MUNICIPIO: MORALES
CONTRATO DE OBRA:

No. 046 DE 2015

VALOR DEL CONTRATO:

CONSTRUCCION DE TRESCIENTAS TRES (303) VIVIENDAS DE INTERES SOCIAL RURAL,EN EL MUNICIPIO DE MORALES (CAUCA
G.I. 144 CELEBRADO CON EL BANCO AGRARIO DE COLOMBIA S.A. Y COMFACAUCA
PROYECTO:
ANTICIPO PROYECTO:
CONTRATISTA:
CONTRATANTE:
INTERVENTOR:
GERENCIA INTEGRAL:
TEM

CEDULA

PROYECTO DE VIVIENDA LOS ANDES RESGUARDO AGUA NEGRA I


476,221,686.00
COOPERATIVA DE BENEFICIARIOS DE LA REFORMA AGRARIA DEL CAUCA "COOBRA"
COMFACAUCA
CONSORCIO INTERVENTORIA URRUTIA 1
COMFACAUCA

CONTRACT

BENEFICIARIOS
UNIDAD

CANTIDAD

PROYECTO VIVIENDA LOS ANDES RESGUARDO AGUA NEGRA I (30) FAMILIAS


1
2
3
4
5
6
7
8
9
10
11
12

1,059,598,026
4,722,306
1,059,601,062
4,718,653
1,002,846,462
1,059,595,166
1,010,072,796
4,721,609
1,059,600,527
4,719,454
4,718,674
25,552,039

QUIGUANAS COMETA OBEYMAR


COMETA VIVAS JAIR
ZAMBRANO RIVERA OSCAR FERNANDO
VIVAS PILLIMUE NOE
RIVERA PECHENE SARI RAQUEL
VELASCO RIVERA MARI MARLY
MOSQUERA POLANCO MARIA ALEYDA
ZAMBRANO GUACHETA SEN
CAMPO CAMAYO ROSA ELENA
FLOR LUBER LEY
MENESES VERGARA DIDIMO ALFONSO
MENESES MOSQUERA BLANCA RUBY

UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

4,718,999
25,545,843
25,546,322
4,719,107
25,546,889
4,719,156
76,190,320
1,002,846,876
1,059,595,207
4,722,275
34,614,446
25,544,971
4,718,961
25,545,298
1,059,595,139
25,546,269
4,722,307
1,059,594,744

MENESES MOSQUERA DORANSE


MOSQUERA POLANCO MERI
MENESES MARIA RUTH
CHOCUE CHOCUE DIONEL
QUIGUANAS COMETA ROSMIRA
PECHENE CUCUAME ISIDRO
OROZCO VALENCIA JOSE RIYER
SOMBONI CUCUAME ELSA LILIANA
CAMAYO OSNAS MATILDA
RIVERA ZAMBRANO JOSE JILDO
CAMPO BECOCHE MARIELA
CUCUAME ARANDA NOELVA
SAMBONI CUCUAME ALBEIRO
CAMPO GLADIS
CAMPO FLOR DEYSY ADRIANA
PECHENE CAMAYO PAULINA
UL LIPONCE JOSE ALBEIRO
ZAMBRANO CHOCUE JUAN BAUTISTA

UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND

TOTAL
VALOR CONTRATO
COSTOS DIRECTOS
AUI
ADMINISTRACION
IMPREVISTOS
UTILIDAD

1.02
2.00%
0.92%
0.50%
0.50%

IVA (16% DEL 0,5% DE LA UTILIDAD)

TOTAL

ESTADO DEL ANTICIPO


VALOR ANTICIPO RECIBIDO

30%

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
30

VALOR ANTICIPO AMORTIZADO ACTAS ANTERIORES


VALOR POR AMORTIZAR PRESENTE ACTA
SALDO POR AMORTIZAR
VALOR EJECUTADO ACUMULADO HASTA ACTA ANTERIOR
VALOR EJECUTADO ACUMULADO
VALOR PRESENTE ACTA

40.30%
59.70%
0.00%
40.30%
40.30%

VALOR A PAGAR PRESENTE ACTA

ZORAIDA CUELLAR VELASCO


REP. LEGAL COOBRA
CONTRATISTA

ING. EDUARDO RAMIREZ ALDANA


COORDINADOR VIVIENDA RURAL
COMFACAUCA

ING. JUAN PABLO URRUTIA


REP. LEGAL CONSORCIO INTERVENTOR
INTERVENTOR

ONTRATO:

4,809,839,030.00

PIO DE MORALES (CAUCA),GRUPO 2,SEGN CONTRATO

PLAZO ADICIONAL:
FECHA DE INICIO:
FECHA DE TERMINACIN:
FECHA DE ADICION:
NUEVA FECHA DE TERMINACION:

DEL CAUCA "COOBRA"

EJECUTADO

CONTRACTUAL
V. UNITARIO

15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056

PLAZO INICIAL:

PRESENTE ACTA
V. TOTAL

15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056

CANTIDAD

0.9220
0.8046
0.9220
0.8697
0.7465
0.9220
0.2668
0.8118
-

V. TOTAL

14,635,879.82
12,772,265.62
14,635,879.82
13,805,666.68
11,849,982.95
14,635,879.82
4,235,198.19
12,886,558.82
-

ACUMULADO
CANTIDAD

0.9220
0.8046
0.9220
0.8697
0.7465
0.9220
0.2668
0.8118
-

15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
476,221,686.00

15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
15,874,056
476,221,686

476,221,686.00

0.7292
0.2668
0.8065
0.4211
0.8626
0.2668
0.8202
0.7892
0.8626
12.0904

11,575,361.78
4,235,198.19
12,801,632.62
6,684,565.07
13,692,960.88
4,235,198.19
13,019,900.90
12,527,805.15
13,692,960.88
191,922,895.38

0.7292
0.2668
0.8065
0.4211
0.8626
0.2668
0.8202
0.7892
0.8626
12.0904

191,922,895.38
188,159,701.35
3,763,194.03

466,884,005.88
9,337,680.12
4,295,332.85
2,334,420.03
2,334,420.03
373,507.20
476,221,686.00

1,731,069.25

940,798.51
940,798.51
150,527.76
191,922,895.38
ESTADO DEL CONTRATO
142,866,505.80

VALOR BSICO CONTRATO PRINCIPAL

BLO URRUTIA
ONSORCIO INTERVENTORIA URRUTIA 1

57,576,868.61
85,289,637.19
191,922,895.38
191,922,895.38
134,346,026.76

VALOR EJECUTADO ACUMULADO HASTA ACTA ANTERIOR


VALOR EJECUTADO PRESENTE ACTA
VALOR TOTAL EJECUTADO ACUMULADO A LA FECHA
SALDO POR EJECUTAR PRESENTE ACTA
SALDO POR EJECUTAR DEL CONTRATO
SON:

CIENTO TREINTA Y CUATRO MILLONES TRESCIENTOS CUARENTA Y


76/100 M/CTE

ARQ. ANA CATALINA HERRERA S


SUPERVISORA PROYECTOS VISR
COMFACAUCA

ING. GUILLERMO HERNAN HORMAZA REY


JEFE DAPARTAMENTO VIVIENDA Y OBRAS
COMFACAUCA

ACTA DE OBRA

8 MESES

N 01

5 MESES
8/24/2015
4/23/2016
4/21/2016
9/24/2016

FECHA:

18 de JULIO de 2016
SALDO X EJECUTAR

ACUMULADO
V. TOTAL

14,635,879.82
12,772,265.62
14,635,879.82
13,805,666.68
11,849,982.95
14,635,879.82
4,235,198.19
12,886,558.82
-

CANTIDAD

0.0780
0.1954
0.0780
0.1303
0.2535
1.0000
1.0000
0.0780
0.7332
0.1882
1.0000
1.0000

V. TOTAL

1,238,176.38
3,101,790.58
1,238,176.38
2,068,389.52
4,024,073.25
15,874,056.20
15,874,056.20
1,238,176.38
11,638,858.01
2,987,497.38
15,874,056.20
15,874,056.20

FECHA RECIBIDO

% A PAGAR

11,575,361.78
4,235,198.19
12,801,632.62
6,684,565.07
13,692,960.88
4,235,198.19
13,019,900.90
12,527,805.15
13,692,960.88
191,922,895.38

1.0000
1.0000
1.0000
0.2708
0.7332
0.1936
0.5789
0.1374
1.0000
1.0000
1.0000
0.7332
0.1798
1.0000
1.0000
0.2108
1.0000
0.1374
17.9097

15,874,056.20
15,874,056.20
15,874,056.20
4,298,694.42
11,638,858.01
3,072,423.58
9,189,491.13
2,181,095.32
15,874,056.20
15,874,056.20
15,874,056.20
11,638,858.01
2,854,155.30
15,874,056.20
15,874,056.20
3,346,251.05
15,874,056.20
2,181,095.32
284,298,790.62

ESTADO DEL CONTRATO


476,221,686.00

0.000

TA ACTA ANTERIOR

191,922,895.38

O A LA FECHA
TA
O

191,922,895.38
284,298,790.62
284,298,790.62

MILLONES TRESCIENTOS CUARENTA Y SEIS MIL 0VEINTISEIS PESOS CON

EY

RECIBIDO BENEFICIARIO

AVANCE DE OBRA SEMANAL

Canal

Anden

ML

ML

M2

UND Trampa de grasas

UND Poso Sptico

UND Tanque Anaerobico

1
1
1
1
1

1
1
1
1
1

1
1
1
1
1

1
1
1
1
1

1
1
1
1
1

1
1
1
1
1

1
1
1
1
1

1
1

1
1

1
1

1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1
1
1

1
1
1
1
1

1
1
1
1
1

1
1
1
1
1

1
1
1
1
1

1
1
1
1
1

1
1
1

1
1
1

11

MENESES VERGARA DIDIMO ALFONSO

4,718,674

12

MENESES MOSQUERA BLANCA RUBY

25,552,039

13

MENESES MOSQUERA DORANSE

14

MOSQUERA POLANCO MERI

25,545,843

15

MENESES MARIA RUTH

25,546,322

16

CHOCUE CHOCUE DIONEL

17

QUIGUANAS COMETA ROSMIRA

18

PECHENE CUCUAME ISIDRO

19

OROZCO VALENCIA JOSE RIYER

20
21
22

RIVERA ZAMBRANO JOSE JILDO

23

CAMPO BECOCHE MARIELA

34,614,446

24

CUCUAME ARANDA NOELVA

25,544,971

25

SAMBONI CUCUAME ALBEIRO

4,718,961

1
1

1
1

1
1

1
1

1
1

1
1

1
1

26

CAMPO GLADIS

27

CAMPO FLOR DEYSY ADRIANA

28

PECHENE CAMAYO PAULINA

29

UL LIPONCE JOSE ALBEIRO

30

ZAMBRANO CHOCUE JUAN BAUTISTA

4,718,999

4,719,107

25,546,889

4,719,156

76,190,320

SOMBONI CUCUAME ELSA LILIANA

1,002,846,876

CAMAYO OSNAS MATILDA

1,059,595,207

Total con Materiales

CAPITULOS DEL PRESUPUESTO


OBRAS PRELIMINARES
CIMENTACIN
ESTRUCTURA EN CONCRETO
MAMPOSTERIA
CUBIERTA
INSTALACIONES HIDRAULICAS
INSTALACIONES ELECTRICAS
INSTALACIONES SANITARIAS
ACABADOS
CARPINTERIAS
OTROS
POZO SPTICO
No. A ENTREGAR
ENTREGA ACUMULADA

Campo Infiltracion

UND Puertarta 0,70 m.

Bajante Agias lluvias 3"

M2

1
1
1
1
1

M.L.

UND Puertas

1
1
1
1
1

UND Caja Inspenccin

UNID Grifo y Ducha

1
1
1
1
1

UNID Lvadero Prefabricado

UND Lavamanos

1
1
1
1
1

Ventanas

Enchape

1
1
1
1
1

Mesn

UND Sanitario y Accesorios

Paete

4,719,454

M2

M2

FLOR LUBER LEY

UND Polo a tierra

10

4,721,609
1,059,600,527

UND Punto elctrico

CAMPO CAMAYO ROSA ELENA

ML

ZAMBRANO GUACHETA SEN

UND Caja de circuitos

Cubierta

1,010,072,796

1
1
1
1

Cinta de Amarre

1,059,595,166

MOSQUERA POLANCO MARIA ALEYDA

1
1
1
1
1

M2

1,002,846,462

VELASCO RIVERA MARI MARLY

1
1
1
1
1

Dinteles

RIVERA PECHENE SARI RAQUEL

1
1
1
1
1

ML

1
1
1
1
1

ML

1
1
1
1
1

Viga Aerea

1
1
1
1
1

Columnetas

1
1
1
1
1

ML

4,718,653

1
1
1
1
1

Muros

1,059,601,062

1
1
1
1
1

ML

VIVAS PILLIMUE NOE

1
1
1
1
1

M2

ZAMBRANO RIVERA OSCAR FERNANDO

1
1
1
1
1

Losa Ciment.

30

1
1
1
1
1

M2

UNID Punto Hidraulico1/2"

4,722,306

UND Punto Sanitario 4

1,059,598,026

Excavacin

COMETA VIVAS JAIR

UND Punto Sanitario 2

QUIGUANAS COMETA OBEYMAR

Localizacin y Replant

M3

Nombre
Materiales

VEREDA

No. Viviendas

M2

No.

11. Jul. 2016

FECHA CORTE:
144

G.I. #:

UND Lavaplatos

MORALES

M2

PROYECTO VIVIENDA LOS ANDES AGUA NEGRA I

MUNICIPIO:

Red electrica

PROYECTO:

4,722,275

25,545,298
1,059,595,139
25,546,269
4,722,307
1,059,594,744

17

TOTALES

COSTO POR VIVIENDA


167,868.72
3,465,384.73
2,758,907.41
1,649,632.38
2,030,494.40
535,027.67
1,118,811.16
932,049.60
384,300.00
1,307,263.00
165,289.72
1,047,771.44
15,562,800.23

##
##
##

Este valor no incluye el AIU

VR. TOTAL

% AVANCE

$
13,773,997.27
12,655,186.11
13,773,997.27
13,773,997.27
12,543,789.11
0.00
0.00
13,773,997.27
6,509,910.43
13,773,997.27
0.00
0.00
0.00
0.00
0.00
13,662,600.27
4,108,979.05
13,773,997.27
6,509,910.43
15,071,165.07
0.00
0.00
0.00
5,560,975.73
15,071,165.07
0.00
0.00
14,661,258.27
0.00
15,071,165.07
204,070,088.24

88.51%
81.32%
88.51%
88.51%
80.60%
0.00%
0.00%
88.51%
41.83%
88.51%
0.00%
0.00%
0.00%
0.00%
0.00%
87.79%
26.40%
88.51%
41.83%
96.84%
0.00%
0.00%
0.00%
35.73%
96.84%
0.00%
0.00%
94.21%
0.00%
96.84%
43.71%

RANGOS / No. VIVIENDAS

SIN INICIAR

1%-25%

25%-50%

50%-75%

75%-90%

90%-99.8%

100%

0
0
0
0
0
1
1
0
0
0
1
1
1
1
1
0
0
0
0
0
1
1
1
0
0
1
1
0
1
0
13

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
1
0
1
0
0
0
0
1
0
0
0
0
0
0
4

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

1
1
1
1
1
0
0
1
0
1
0
0
0
0
0
1
0
1
0
0
0
0
0
0
0
0
0
0
0
0
9

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
1
0
0
1
0
1
4

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

RUTINA PARA COLOCAR EL VALOR DEL NUMERO EN LETRAS


134,346,026.76

NUMERO:
VALOR:

CIENTO TREINTA Y CUATRO MILLONES TRESCIENTOS CUARENTA Y SEIS MIL 0VEINTISEIS PES
134,346,026.00

134346026

0.76

CON 76/100 M/CTE

8.00

8.00

0.00

6.00

SEIS

1.00

2.00

VEINTI

2.00

0.00

3.00

6.00

SEIS

4.00

4.00

CUARENTA Y

5.00

3.00

TRESCIENTOS

6.00

4.00

CUATRO

7.00

3.00

TREINTA Y

8.00

1.00

CIENTO

9.00

0.00

0.00
1.00

UN

DIEZ

CIENTO

2.00

DOS

VEINTE

DOSCIENTOS

3.00

TRES

TREINTA

TRESCIENTOS

4.00

CUATRO

CUARENTA

CUATROCIENTOS

5.00

CINCO

CINCUENTA

QUINIENTOS

6.00

SEIS

SESENTA

SEISCIENTOS

7.00

SIETE

SETENTA

SETECIENTOS

8.00

OCHO

OCHENTA

OCHOCIENTOS

9.00

NUEVE

NOVENTA

NOVECIENTOS

NUMERO EN LETRAS

ARENTA Y SEIS MIL 0VEINTISEIS PESOS CON 76/100 M/CTE

0VEINTISEIS
MIL
TRESCIENTOS CUARENTA Y SEIS MIL
MILLONES
CIENTO TREINTA Y CUATRO MILLONES

DIEZ
ONCE
DOCE

VEINTI

TRECE

TREINTA Y

CATORCE

CUARENTA Y

QUINCE

CINCUENTA Y

DIECISEIS

SESENTA Y

DIECISIETE

SETENTA Y

DIECIOCHO

OCHENTA Y

DIECINUEVE

NOVENTA Y

You might also like