You are on page 1of 2

OIL AND NATURAL

N
GAS CORP
PORATION
N LIMITED

PAGE
1 of 2

MUMB
BAI HIGH SOUTH
S
RED
DEVELOPM
MENT
P
PHASE-III
P
PROJECT
(M
MHSRD-III))

DATE
12--May-2016

CONTRA
ACT NO. : MR/ES/MM/
M
/MHSRD-III/09/2014 (P
P851C14006
6)
DOC. NO
O. : RS21-G
GA-584-007
7A-04

REV.
R
04

GEN
NERAL
L ARRA
ANGE
EMENT
T DRA
AWING
G
FOR
R DRU
UM RA
ACK (R
RS21)
(P
PO NO
O.3300
000005
56)

Aker Engineering Malay


ysia Sdn Bhd
B

SAPURA
S
KENCAN
NA HL SD
DN BHD
(Formerly known as Ke
encana HL Sdn
n Bhd)

PREPAR
RED & SUBMITTED BY
Y-

p
04

12
2-05-2016

IFA

SSM

SSM

JG

03

05
5-05-2016

IFA

SSM

SSM

JG

02

23
3-04-2016

IFA

SSM

SSM

JG

01

09
9-03-2016

IFA

SSM

SSM

JG

00

30
0-01-2016

IFA

SSM

SSM

JG

REV.

DATE

REA
ASON FOR IS
SSUE

PREPD CHKD.
C
APPD
D.

1.
2.

This provision for hose (Hanger).


Overall Weight of the drum rack is
Approx.180 Kgs.
Painting as per ONGC specification FS 2005
Rev. 5.
COG Of drum rack from Elevation
(X1000,Y530,Z550).
The height of the Drum resting point is equal to
the Suction Line of the Skid to provide free flow
of liquid.
Interconnecting piping between drum rack and
skid (By Others) height is advised to be
maintained 680mm.

3.

600

856

4.
R29

5.

6.

Ref. Note 1

Plain CS

ISMC 100 x 50 x 6 mm

Plain CS

ISA 50 x 50 x 6 mm

Plain CS

Plate 75 x 75 x 6 mm

Plain CS

Plate radius 290 x 6 mm

Plain CS

Plate 100 x 130 x 8 mm

230

415

680

780

1050

Ref. Note 5

ELEVATION

SIDE VIEW

856

1000

CLIENT

880

240

880

CONTRACTOR

VENDOR

2000
PROJECT

PLAN
ISOMETRIC VIEW

TITLE

CONSULTANT

You might also like