Professional Documents
Culture Documents
10
8
6
<<<
<<<
Select
<<<
Select
<<<
Value
Select
<<<
Value
Select
>>>
<<<
Value
Select
>>>
<<<
Value
Select
>>>
<<<
Value
Select
>>>
<<<
Value
Select
>>>
<<<
Value
Select
>>>
<<<
Value
Select
>>>
<<<
Value
Select
>>>
<<<
Value
Select
>>>
<<<
Value
Select
>>>
<<<
Value
Select
>>>
<<<
Value
Select
>>>
<<<
Value
Select
>>>
<<<
Value
Select
>>>
<<<
Value
Select
>>>
<<<
Value
Select
>>>
<<<
Value
Select
>>>
<<<
Value
Select
>>>
<<<
Value
Select
>>>
Value
Select
>>>
<<<
Value
>>>
<<<
Value
Select
>>>
<<<
Select
>>>
<<<
Value
Select
<<<
Value
Select
>>>
<<<
Value
Select
>>>
<<<
Value
Select
>>>
Value
Select
>>>
Value
>>>
Value
>>>
>>>
Note: For
2.1.1.
2.2
Ayala
Submit
Architectural/ELECTRICAL/mechanical/fire
and
2.1
2.6
RDS
Budget
2.4
Request
Request
Drafting
-Exclusive
2.8
proposal
2.1.2.
for
T
for
ransmit
2.1.3.
and
quotation
2.3
2.5
contractor
the
Fire
,Provide
Printing
Submission
budget
Glass/
payment
Protection
approved
2.8.1
2.7
Reminders:
Tarpaulin
of
allocation
Stainless
for
Pre-Constuction
4floor
to
of
fire
of
blueprints
5
Security
perspective
sets
plans
protection
for
protection
and
sign
Store
blueprints
2.8.2
(with
deposit
Bill
3.1
and
(by
meeting
front,
(Sprinkler
of
3
email)
sign
Preparation
and
seal
materials
sets
2.8.2
,(Opens.
Cari,
blue
and
Architectural,
for
Project
with
to
R
3
2.8.4
eminders:
all
and
seal
prints
admin
Construction
sets
gov't
Admin
/of
initial
smoke
1
)
Specification
ordered
bill
and
Activity
(8-9
department
R
documents
eminders:
of
and
inventory
Electrical,
For
perspective.
materials
sets).
detector)
Provide
contractors.
in-house
bond
For
Logbook
Ayala
Contractor
SM
Wand
use
ith
Mechanical,
for
Always
malls
transmittal
Bill
4.1
with
provide
materials
Sign
with
building
transmittal
advance
of
Process
must
sign
provide
materials
verify
sign
and
bolt
and
return
permit
when
Fire
and
Seal
and
rentals.
of
schedule
on
industrial
seal
form
payments
Protection)
seal.
shall
type
provide
releasing
excess
5.1
R
Secure
purposes:
eminders:
or
R
Panel
be
of
equest
logbook
type
verified
materials
actual
or
for
to
board.
panel
cover
both
contractors
for
Submit
to
delivery
by
trucking
6.1
record
suppiers
board.
fragile
with
checklist.
contractors
Secure
minimum
return
and
file
materials
.services.
Verify
and
transfer
pull
work
Update
slip
.contractors
if
of
out
permit
permits.
3-5
and
.. Confirm
permits
days
fixed
is approved.
prior
assets.
every
on to
theactual
week.
actual
schedule
delivery date.
PROJECT CODE:
TARGET LAUNCH DATE:
PROJECT OVERALL LEAD:
STOREOP-<Store/Site>
<Month-Day-Year>
<Name of Overall Project Lead>
ACTIVITIES
1. DESIGN AND CONCEPTUALIZATION STAGE
1.1 RECEIVED Confirm/ verify lease commencement date and final space info.
1.2 Ocular inspection to verify measurement and area specification
1.3 Submit Preliminary designs for RIN and ECC's approval.
1.4 Submit final design concept for ECC's approval.
2. PRE-CONSTRUCTION STAGE
2.1 Request for quotation
2.1.1. Architectural/ELECTRICAL/mechanical/fire protection
2.1.2. Fire Protection
2.1.3. Glass/ Stainless
Note: For Ayala and RDS -Exclusive contractor for fire protection (Sprinkler and smoke detector)
2.2 Submit Budget proposal , budget allocation and Bill of materials / initial inventory
2.3
2.4
2.5
2.6
2.7
2.8
Reminders: sign and seal for all gov't documents use transmittal form or logbook to record file transfer.
3. CONSTRUCTION STAGE
1.1 Ocular inspection for progress monitoring.
1.2.Check actual design specs if followed
1.3. Check additional material requirements
1.4. Request for initial inspection from mail admin.
Reminders: for Ayala malls certificate for Architectural, electrical , mechanical, fire protection is needed.
Coordinators:
Assigned
Personnel
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
24 25 26 27 28 29 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
53 54 55 56 57 58 59 60
PROGRESS
STATUS
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>
>>
>>
>>
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>>
>>>
>>>
>>>
<<<
<<<
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Select
Select
Value
Value
Value
Value
Value
Value
>>
>>
>>
>>
>>
>>
<<<
<<<
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Select
Select
Value
Value
Value
Value
Value
Value
>>>
>>>
>>>
>>>
>>>
>>>
<<<
<<<
<<<
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Select
Select
Select
Value
Value
Value
Value
Value
Value
Value
>>
>>
>>
>>
>>
>>
>>
<<<
<<<
<<<
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Select
Select
Select
Value
Value
Value
Value
Value
Value
Value
>>>
>>>
>>>
>>>
>>>
>>>
>>>
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Value
Value
Value
Value
Value
Value
Value
Value
Value
Value
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Value
Value
Value
Value
Value
Value
Value
Value
Value
Value
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
<<<
<<<
<<<
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Select
Select
Select
Value
Value
Value
Value
Value
Value
Value
>>
>>
>>
>>
>>
>>
>>
<<<
<<<
<<<
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Select
Select
Select
Value
Value
Value
Value
Value
Value
Value
>>>
>>>
>>>
>>>
>>>
>>>
>>>
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>
>>
>>
>>
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>>
>>>
>>>
>>>
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>
>>
>>
>>
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>>
>>>
>>>
>>>
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Value
Value
Value
Value
Value
Value
Value
Value
Value
Value
Value
Value
Value
Value
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Value
Value
Value
Value
Value
Value
Value
Value
Value
Value
Value
Value
Value
Value
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
<<<
<<<
<<<
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Select
Select
Select
Value
Value
Value
Value
Value
Value
Value
>>
>>
>>
>>
>>
>>
>>
<<<
<<<
<<<
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Select
Select
Select
Value
Value
Value
Value
Value
Value
Value
>>>
>>>
>>>
>>>
>>>
>>>
>>>
REMARKS/ISSUES
t
t
t
t
Value
Value
Value
Value
>>>
>>>
>>>
>>>
t
t
t
t
t
t
Value
Value
Value
Value
Value
Value
>>>
>>>
>>>
>>>
>>>
>>>
t
t
t
t
t
t
t
Value
Value
Value
Value
Value
Value
Value
>>>
>>>
>>>
>>>
>>>
>>>
>>>
t
t
t
t
t
t
t
t
t
t
Value
Value
Value
Value
Value
Value
Value
Value
Value
Value
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
t
t
t
t
t
t
t
Value
Value
Value
Value
Value
Value
Value
>>>
>>>
>>>
>>>
>>>
>>>
>>>
MAJOR RISKS
RESPONSIBLE
t
t
t
t
Value
Value
Value
Value
>>>
>>>
>>>
>>>
t
t
t
t
Value
Value
Value
Value
>>>
>>>
>>>
>>>
t
t
t
t
t
t
t
t
t
t
t
t
t
t
Value
Value
Value
Value
Value
Value
Value
Value
Value
Value
Value
Value
Value
Value
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>>
t
t
t
t
t
t
t
Value
Value
Value
Value
Value
Value
Value
>>>
>>>
>>>
>>>
>>>
>>>
>>>
INFORMED
SB NO
Nov 9 - 12, 2015 / <Na
ACTIVITIES
1. STORE/SITE OFFER SHEET
-activity
list for each item to be specified in
1.1detailed
Store/Site
Negotiation
OFFER
SHEET
tab
1.2 Finalization and Acceptance of Offer Sheet
1.3 Store Op Project Mobilization
1.3.1 Notification of Store Op Project Coordinators
>>>
heads
to provide
e-mail recipient
1.3.2 Group
Store Op
Project
Coordinators'
Briefing list to IT; IT
to
create
distribution
list
(to
be
discussed
if
needed)
1.3.3 Store Op Project Status Update Scheduling
(Set to weekly/bi-weekly at start of the project; and,
weekly/daily,
if needed,
1 month to 2 months before the
2. PERMITS AND
CONTRACTS
target launch date)
2.1 Store Perspective Documentation and Approval
2.2 Construction Permits Processing
2.3 Certificate of Registration (COR) Processing
2.4 Insurance Processing
2.4.1 CARI
2.4.2 CGLI and Fire
2.5 POS Permit Processing
2.5.1 Submission of POS Serial No. to Admin
2.5.2 COR and Serial NO. submission to vendor
2.5.3A Submission of POS permit application (with COR,
Serial No.) to BIR
ASSIGNED GROUP
PROGRESS
BDG
BDG
Completed (100%)
Completed (100%)
BDG
BDG
BDG
Completed (100%)
Completed (100%)
Completed (100%)
SPDD
Admin
Admin
Completed (100%)
Completed (100%)
Completed (100%)
Admin
Admin
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
IT
Admin
Vendor
Admin
Admin
BIR
Admin
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
SPDD
Store Personnel
Creative and Store
Personnel
IT
Completed (100%)
Completed (100%)
Treasury
Completed (100%)
Treasury
Treasury
Completed (100%)
Completed (100%)
Treasury
Completed (100%)
Completed (100%)
Ongoing (80%)
Treasury
Completed (100%)
SOG
Logistics
Admin
Completed (100%)
Completed (100%)
Logistics, SPDD
Logistics
Completed (100%)
Completed (100%)
Completed (100%)
HR
HR
SOG, HR
HR
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
IT
Completed (100%)
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
To be started (0%)
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
<<< Select Value >>
IT
IT
Completed (100%)
Completed (100%)
Completed (100%)
IT
Completed (100%)
SB NORTH MALL
Nov 9 - 12, 2015 / <Name of Overall Project Lead>
STATUS
REMARKS/ISSUES
On Time
On Time
Completed (100%)
Completed (100%)
On Time
On Time
On Time
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
On Time
On Time
On Time
Completed (100%)
Completed (100%)
To be started (0%)
On Time
On Time
Nearing Delay
On Time
On Time
Completed (100%)
Completed (100%)
On Time
On Time
On Time
On Time
To be started (0%)
Ongoing (10%)
To be started (0%)
Nearing Delay
Nearing Delay
On Time
On Time
Nearing Delay
To be started (0%)
Nearing Delay
<<< Select Value >> <<< Select Value >>>
On Time
On Time
On Time
On Time
On Time
Completed (100%)
Completed (100%)
On Time
On Time
Completed (100%)
Ongoing (50%)
On Time
On Time
Nearing Delay
On Time
Completed (100%)
Nearing Delay
On Time
On Time
On Time
Completed (100%)
Completed (100%)
On Time
On Time
On Time
Completed (100%)
On Time
On Time
Completed (100%)
On Time
On Time
On Time
Completed (100%)
Completed (100%)
On Time
On Time
On Time
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
On Time
On Time
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
On Time
On Time
Ongoing (80%)
Nearing Delay
On Time
On Time
On Time
On Time
Nearing Delay
RP 2 unit
On Time
On Time
On Time
On Time
On Time
<<< Select Value >>>
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
To be started (0%)
To be started (0%)
To be started (0%)
To be started (0%)
<<< Select Value >>
<<< Select Value >>
<<< Select Value >>
On Time
On Time
On Time
On Time
Nearing Delay
Nearing Delay
Nearing Delay
Nearing Delay
<<< Select Value >>>
<<< Select Value >>>
<<< Select Value >>>
On Time
On Time
Completed (100%)
Completed (100%)
On Time
On Time
On Time
Completed (100%)
On Time
On Time
Completed (100%)
On Time
LAZARO (TRANSFER)
<Name of Overall Project Lead>
REMARKS/ISSUES
Same as 2.3
t Value >>>
t Value >>>
t Value >>>
SM SAN MATEO
<Launch Date> / <Name of Overall Project Lead>
PROGRESS
STATUS
Completed (100%)
Completed (100%)
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
Completed (100%)
Completed (100%)
On Time
On Time
Completed (100%)
Completed (100%)
Ongoing (50%)
On Time
On Time
Completed (100%)
On Time
On Time
Completed (100%)
On Time
<<< Select Value >> <<< Select Value >>>
<<< Select Value >> <<< Select Value >>>
Completed (100%)
Completed (100%)
On Time
On Time
Completed (100%)
Ongoing (50%)
On Time
Completed (100%)
Nearing Delay
On Time
Completed (100%)
Completed (100%)
On Time
On Time
Completed (100%)
On Time
Connectivity - intermittent
problem; for isolation with
Philcom >> June to send follow
up e-mail
t Value >>>
t Value >>>
t Value >>>
Completed (100%)
On Time
Completed (100%)
Completed (100%)
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
On Time
Ongoing (80%)
Nearing Delay
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
To be started (0%)
To be started (0%)
To be started (0%)
To be started (0%)
On Time
On Time
On Time
On Time
On Time
On Time
On Time
Nearing Delay
Nearing Delay
Nearing Delay
Nearing Delay
Completed (100%)
Completed (100%)
To be started (0%)
On Time
On Time
Nearing Delay
Completed (100%)
On Time
M SAN MATEO
<Name of Overall Project Lead>
REMARKS/ISSUES
SM CABANATUAN
Nov 16 - 20, 2015 / <Name of Overall Project Lead>
PROGRESS
STATUS
Completed (100%)
Completed (100%)
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
Completed (100%)
Completed (100%)
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
Completed (100%)
Completed (100%)
On Time
On Time
Completed (100%)
Ongoing (20%)
On Time
On Time
On Time
Same as 2.3
t Value >>>
t Value >>>
Completed (100%)
Nearing Delay
On Time
Completed (100%)
Completed (100%)
On Time
On Time
Completed (100%)
On Time
Same as 3.4
RP2 unit
Completed (100%)
On Time
Completed (100%)
Completed (100%)
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
On Time
Ongoing (80%)
Nearing Delay
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
To be started (0%)
To be started (0%)
To be started (0%)
To be started (0%)
On Time
On Time
On Time
On Time
On Time
On Time
On Time
Nearing Delay
Nearing Delay
Nearing Delay
Nearing Delay
Completed (100%)
On Time
Completed (100%)
On Time
<<< Select Value >>
On Time
<<< Select Value >>
On Time
M CABANATUAN
<Name of Overall Project Lead>
REMARKS/ISSUES
Same as 2.3
SB FESTIVAL
Dec 15 / Joan Almazan
STATUS
PROGRESS
Completed (100%)
Completed (100%)
On Time
Nearing Delay
Ongoing (10%)
To be started (0%)
To be started (0%)
Select
Select
Select
Select
Select
Select
Value
Value
Value
Value
Value
Value
>>
>>
>>
>>
>>
>>
<<<
<<<
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Select
Select
Value
Value
Value
Value
Value
Value
>>>
>>>
>>>
>>>
>>>
>>>
On Time
Started (5%)
<<< Select Value >> <<< Select Value >>>
<<< Select Value >> <<< Select Value >>>
Philcom connectivity pending
with Mall Admin
Completed (100%)
On Time
<<< Select Value >> <<< Select Value >>>
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>
>>
>>
>>
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>>
>>>
>>>
>>>
To be started (0%)
Nearing Delay
<<< Select Value >> <<< Select Value >>>
<<< Select Value >> <<< Select Value >>>
<<< Select Value >> <<< Select Value >>>
<<< Select Value >> <<< Select Value >>>
<<<
<<<
<<<
<<<
Same as 3.4
RP2 unit
Select
Select
Select
Select
Value
Value
Value
Value
>>
>>
>>
>>
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>>
>>>
>>>
>>>
On Time
On Time
On Time
On Time
Nearing Delay
<<< Select Value
<<< Select Value
<<< Select Value
<<< Select Value
<<< Select Value
<<< Select Value
<<< Select Value
>>>
>>>
>>>
>>>
>>>
>>>
>>>
Completed (100%)
On Time
<<< Select Value >> <<< Select Value >>>
<<< Select Value >> <<< Select Value >>>
SB FESTIVAL
15 / Joan Almazan
REMARKS/ISSUES
SM SEASIDE (Cebu)
Nov 26 - 27, 2015 / <Name of Overall Project Lead>
PROGRESS
STATUS
Completed (100%)
Pending Acceptance of Offer Sheet Completed (100%)
On Time
On Time
t Value >>>
t Value >>>
t Value >>>
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
t Value >>>
t Value >>>
t Value >>>
Completed (100%)
Completed (100%)
Ongoing (50%)
On Time
On Time
Nearing Delay
t
t
t
t
t
t
Completed (100%)
Completed (100%)
On Time
On Time
To be started (0%)
To be started (0%)
To be started (0%)
Nearing Delay
Nearing Delay
Value
Value
Value
Value
Value
Value
>>>
>>>
>>>
>>>
>>>
>>>
t Value >>>
t Value >>>
Nearing Delay
To be started (0%)
Nearing Delay
<<< Select Value >> <<< Select Value >>>
t Value >>>
t Value >>>
t Value >>>
t Value >>>
On Time
Ongoing (10%)
Ongoing (30%)
On Time
<<< Select Value >> <<< Select Value >>>
To be started (0%)
t Value >>>
Nearing Delay
<<< Select Value >> <<< Select Value >>>
t
t
t
t
To be started (0%)
<<< Select Value >>
<<< Select Value >>
To be started (0%)
Value
Value
Value
Value
>>>
>>>
>>>
>>>
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>>
>>>
>>>
>>>
t Value >>>
t Value >>>
t Value >>>
Completed (100%)
Ongoing (30%)
Ongoing (30%)
t Value >>>
t Value >>>
Ongoing (30%)
Ongoing (30%)
On Time
On Time
On Time
t
t
t
t
Completed (100%)
Completed (100%)
Completed (100%)
<<< Select Value >>
On Time
On Time
On Time
<<< Select Value >>>
Value
Value
Value
Value
>>>
>>>
>>>
>>>
Same as 3.4
On Time
On Time
On Time
On Time
On Time
On Time
Nearing Delay
<<< Select Value
<<< Select Value
<<< Select Value
<<< Select Value
<<< Select Value
<<< Select Value
<<< Select Value
To be started (0%)
To be started (0%)
Nearing Delay
<<< Select Value >>>
t Value >>>
Ongoing (90%)
t
t
t
t
t
t
t
Value
Value
Value
Value
Value
Value
Value
RP2 unit
>>>
>>>
>>>
>>>
>>>
>>>
>>>
On Time
>>>
>>>
>>>
>>>
>>>
>>>
>>>
M SEASIDE (Cebu)
/ <Name of Overall Project Lead>
REMARKS/ISSUES
PROGRESS
Completed (100%)
Completed (100%)
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
t Value >>>
Completed (100%)
Ahead of Time
Completed (100%)
Ahead of Time
<<< Select Value >> <<< Select Value >>>
t Value >>>
t Value >>>
Ongoing (90%)
Ongoing (30%)
Ongoing (30%)
On Time
On Time
On Time
Connectivity - application
submitted to Philcom (date?); for
follow up. New Biometrics unit to
be used.
To be started (0%)
t Value >>>
Nearing Delay
<<< Select Value >> <<< Select Value >>>
t
t
t
t
Completed (100%)
Ahead of Time
Completed (100%)
Ahead of Time
<<< Select Value >> <<< Select Value >>>
Completed (100%)
Ahead of Time
Value
Value
Value
Value
>>>
>>>
>>>
>>>
t Value >>>
Same as 3.2
t Value >>>
t
t
t
t
t
t
t
Same as 3.4
Value
Value
Value
Value
Value
Value
Value
RP2 unit
>>>
>>>
>>>
>>>
>>>
>>>
>>>
t Value >>>
Completed (100%)
Ahead of Time
Completed (100%)
Ongoing (90%)
Ongoing (90%)
On Time
On Time
Ongoing (90%)
Ongoing (90%)
On Time
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
Ahead of Time
Ahead of Time
Ahead of Time
Ahead of Time
To be started (0%)
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
To be started (0%)
<<< Select Value >>
<<< Select Value >>
<<< Select Value >>
<<< Select Value >>
<<< Select Value >>
<<< Select Value >>
<<< Select Value >>
On Time
On Time
On Time
On Time
Nearing Delay
<<< Select Value
<<< Select Value
<<< Select Value
<<< Select Value
<<< Select Value
<<< Select Value
<<< Select Value
>>>
>>>
>>>
>>>
>>>
>>>
>>>
To be started (0%)
Nearing Delay
<<< Select Value >> <<< Select Value >>>
<<< Select Value >> <<< Select Value >>>
t Value >>>
t Value >>>
t Value >>>
POS Serial No. to be submitted by
June to Accounting.
PROGRESS
Completed (100%)
Completed (100%)
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
t Value >>>
Nearing Delay
To be started (0%)
Nearing Delay
<<< Select Value >> <<< Select Value >>>
t Value >>>
t Value >>>
Completed (100%)
Ongoing (30%)
Ongoing (30%)
On Time
On Time
On Time
t Value >>>
t Value >>>
Nearing Delay
<<< Select Value >> <<< Select Value >>>
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>
>>
>>
>>
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>>
>>>
>>>
>>>
t
t
t
t
t
t
t
Completed (100%)
Ongoing (30%)
Ongoing (30%)
Same as 3.2
Value
Value
Value
Value
Value
Value
Value
PC from Accounting
>>>
>>>
>>>
>>>
>>>
>>>
>>>
On Time
On Time
On Time
Ongoing (30%)
Ongoing (30%)
<<<
<<<
<<<
<<<
On Time
On Time
Select
Select
Select
Select
Value
Value
Value
Value
>>
>>
>>
>>
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>>
>>>
>>>
>>>
On Time
On Time
On Time
On Time
Nearing Delay
<<< Select Value
<<< Select Value
<<< Select Value
<<< Select Value
<<< Select Value
<<< Select Value
<<< Select Value
>>>
>>>
>>>
>>>
>>>
>>>
>>>
Same as 3.4
t Value >>>
To be started (0%)
Nearing Delay
<<< Select Value >> <<< Select Value >>>
t Value >>>
t Value >>>
t Value >>>
t Value >>>
POS Serial No. to be finalized.
t Value >>>
t Value >>>
t Value >>>
t Value >>>
t
t
t
t
Value
Value
Value
Value
>>>
>>>
>>>
>>>
t Value >>>
t
t
t
t
t
t
t
t
t
t
t
Same as 3.2
Value
Value
Value
Value
>>>
>>>
>>>
>>>
Same as 3.4
Value
Value
Value
Value
Value
Value
Value
Same as 3.4
t Value >>>
t Value >>>
SB NO
Nov 9 - 12, 2015 / <Na
ACTIVITIES
1. STORE/SITE OFFER SHEET
-- detailed activity list for each item to be specified in
OFFER
SHEET
tabCONTRACTS
2. PERMITS
AND
2.1
2.2
2.3
2.4
2.5
ASSIGNED GROUP
PROGRESS
BDG
Completed (100%)
SPDD
Admin
Admin
Admin
Admin
Completed (100%)
Completed (100%)
Completed (100%)
SPDD
Store Personnel
Completed (100%)
Completed (100%)
Completed (100%)
Creative and Store Completed (100%)
Personnel
IT
Treasury
Ongoing (50%)
Completed (100%)
SOG
Logistics
Admin
Completed (100%)
Completed (100%)
Logistics, SPDD
Logistics
Completed (100%)
Completed (100%)
Completed (100%)
HR
HR
SOG, HR
HR
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
IT
Completed (100%)
IT
IT
Completed (100%)
Completed (100%)
IT
IT
Completed (100%)
Completed (100%)
SB NORTH MALL
Nov 9 - 12, 2015 / <Name of Overall Project Lead>
STATUS
REMARKS/ISSUES
On Time
On Time
On Time
On Time
Completed (100%)
Completed (100%)
To be started (0%)
On Time
On Time
Nearing Delay
On Time
Completed (100%)
On Time
On Time
On Time
Completed (100%)
Completed (100%)
On Time
On Time
Nearing Delay
On Time
Ongoing (50%)
Completed (100%)
Nearing Delay
On Time
On Time
On Time
Completed (100%)
Completed (100%)
On Time
On Time
On Time
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
On Time
On Time
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
On Time
On Time
Ongoing (80%)
Nearing Delay
On Time
On Time
Completed (100%)
Completed (100%)
On Time
On Time
On Time
Completed (100%)
On Time
On Time
Completed (100%)
On Time
LAZARO (TRANSFER)
<Name of Overall Project Lead>
REMARKS/ISSUES
Connectivity - intermittent
problem; for isolation with
Philcom >> June to send follow
up e-mail
SM SAN MATEO
<Launch Date> / <Name of Overall Project Lead>
PROGRESS
STATUS
Completed (100%) On Time
Completed (100%)
Completed (100%)
Ongoing (80%)
On Time
On Time
Nearing Delay
Completed (100%)
On Time
Completed (100%)
Completed (100%)
On Time
On Time
Ongoing (50%)
Completed (100%)
Nearing Delay
On Time
Completed (100%)
Completed (100%)
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
On Time
Ongoing (80%)
Nearing Delay
Completed (100%)
Completed (100%)
On Time
On Time
M SAN MATEO
<Name of Overall Project Lead>
REMARKS/ISSUES
SM CABANATUAN
Nov 16 - 20, 2015 / <Name of Overall Project Lead>
PROGRESS
STATUS
Completed (100%) On Time
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
On Time
Completed (100%)
Completed (100%)
On Time
On Time
Ongoing (20%)
Completed (100%)
Nearing Delay
On Time
Completed (100%)
Completed (100%)
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
Completed (100%)
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
On Time
Ongoing (80%)
Nearing Delay
Completed (100%)
Completed (100%)
On Time
On Time
Same as 3.4
M CABANATUAN
<Name of Overall Project Lead>
REMARKS/ISSUES
SB FESTIVAL
<Launch Date> / <Name of Overall Project Lead>
PROGRESS
STATUS
Completed (100%) On Time
Started (5%)
On Time
<<< Select Value >> <<< Select Value >>>
To be started (0%)
Nearing Delay
<<< Select Value >> <<< Select Value >>>
<<< Select Value >> <<< Select Value >>>
<<< Select Value >> <<< Select Value >>>
<<< Select Value >> <<< Select Value >>>
<<<
<<<
<<<
<<<
Same as 3.4
Select
Select
Select
Select
Value
Value
Value
Value
>>
>>
>>
>>
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>>
>>>
>>>
>>>
On Time
SB FESTIVAL
<Name of Overall Project Lead>
REMARKS/ISSUES
SM SEASIDE (Cebu)
Nov 26 - 27, 2015 / <Name of Overall Project Lead>
PROGRESS
STATUS
<<< Select Value > <<< Select Value >>>
t Value >>>
t Value >>>
t Value >>>
t Value >>>
Ongoing (90%)
On Time
t Value >>>
t Value >>>
Share existing Onesimus
connectivity
Ongoing (30%)
On Time
<<< Select Value >> <<< Select Value >>>
t Value >>>
Started (5%)
Nearing Delay
<<< Select Value >> <<< Select Value >>>
t Value >>>
Completed (100%)
Ongoing (30%)
On Time
On Time
t Value >>>
t Value >>>
Ongoing (30%)
Ongoing (30%)
Ongoing (30%)
On Time
On Time
On Time
t
t
t
t
<<<
<<<
<<<
<<<
t Value >>>
t Value >>>
Value
Value
Value
Value
>>>
>>>
>>>
>>>
Same as 3.4
t Value >>>
To share with existing Onesimus
facility
Select
Select
Select
Select
Value
Value
Value
Value
>>
>>
>>
>>
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>>
>>>
>>>
>>>
Nearing Delay
t Value >>>
t Value >>>
M SEASIDE (Cebu)
/ <Name of Overall Project Lead>
REMARKS/ISSUES
ct Value >>>
t Value >>>
t Value >>>
COR ongoing processing with BIR.
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
t Value >>>
Completed (100%)
On Time
Ongoing (30%)
t Value >>>
Ongoing (30%)
Connectivity - application
submitted to Philcom (date?). New
Biometrics unit to be used.
On Time
On Time
t Value >>>
To be started (0%)
Nearing Delay
<<< Select Value >> <<< Select Value >>>
t Value >>>
t
t
t
t
Same as 3.2
Value
Value
Value
Value
>>>
>>>
>>>
>>>
Same as 3.4
t Value >>>
Completed (100%)
Ongoing (30%)
On Time
On Time
Ongoing (30%)
Ongoing (30%)
Ongoing (30%)
On Time
On Time
On Time
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>
>>
>>
>>
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>>
>>>
>>>
>>>
Nearing Delay
t Value >>>
t Value >>>
t Value >>>
Completed (100%)
Completed (100%)
Completed (100%)
On Time
On Time
On Time
Completed (100%)
On Time
Ongoing (30%)
Ongoing (30%)
On Time
On Time
t Value >>>
To be started (0%)
Nearing Delay
<<< Select Value >> <<< Select Value >>>
t Value >>>
t
t
t
t
Same as 3.2
Value
Value
Value
Value
>>>
>>>
>>>
>>>
Same as 3.4
t Value >>>
Same as 3.4
Completed (100%)
Ongoing (30%)
On Time
On Time
Ongoing (30%)
Ongoing (30%)
Ongoing (30%)
On Time
On Time
On Time
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>
>>
>>
>>
<<<
<<<
<<<
<<<
Select
Select
Select
Select
Value
Value
Value
Value
>>>
>>>
>>>
>>>
Nearing Delay
t Value >>>
t Value >>>
t Value >>>
t Value >>>
t Value >>>
t
t
t
t
Same as 3.2
Value
Value
Value
Value
>>>
>>>
>>>
>>>
Same as 3.4
t Value >>>
Same as 3.4
t Value >>>
t Value >>>
SB NORTH MALL
SAN LAZARO
Nov 9 - 12
TASK
I. PERMITS AND CONTRACTS
BIR Permit for POS
II. STORE
III. MERCHANDISE
V. IT
STATUS
STATUS
RP2
Connectivity - ok
RP2
Connectivity - intermittent
problem; for isolation with
Philcom >> June to send follow
up e-mail
Merchandise - N/A
Merchandise - N/A
Biometrics - ok
Biometrics - ok
SAN MATEO
CABANATUAN
SB FESTIVAL
Nov 16 - 20
STATUS
STATUS
STATUS
RP2
Connectivity - pending with
Philcom >>> June to send
follow up e-mail
RP2
Connectivity - pending with
Philcom >>> June to send
follow up e-mail
Merchandise - N/A
Merchandise - N/A
Biometrics - ok
Biometrics - ok
Biometrics - ok
RP2
Connectivity - ok
SM Seaside (Cebu)
Nov 26 - 27
Dec 10
Dec 10
STATUS
STATUS
STATUS
RP2
Connectivity - application
submitted to Philcom date??
PC - from Accounting
Connectivity - ongoing Philcom
check of existing facility
Biometrics - new
Biometrics - new