You are on page 1of 10

Address:

Phone:
Cell:
Web:
Email:

No. 70 Glenara Avenue


Hillside
Harare
04-780 581 / 04-748 529
+263 772 816 905 / +263 774 860 037
www.creativeconstruction.co.zw
mcharuma@creativeconstruction.co.zw
tmatiza@creativeconstruction.co.zw

Creative Construction (Pvt) Ltd


No. 70 Glenara Avenue
Hillside
Harare
Email: creativeconstruction8@gmail.com
Cell Number: +263 772 816 905 / +263 774 860 037
Customer:
Rainbow Tourism Group
Kadoma Hotel and Conference Center
Cnr Bulawayo Rd/ Eiffel Flats Rd
Kadoma
Zimbabwe
Phone: +263 4 757 090
Email: reservations@rainbowkadomahotel.com
Item

Description

Linen Store Room

1.1 Painting to Interior Walls and Varnshing to Skirting


1.2
2
2.1

Qty

Painting to External Corridor Walls, Door Frames


and Doors
Villa Units and Rooms
Painting to Villa 21

98.40
376.76

Painting to External Walls, Doors, Door Frames,


2.1.1 Windows and Metal Screens on Villa Number 21
Aventurine
Painting Fascia Boards, Gutters and Downpipes on
2.1.2
Villa Number 21 Aventurine

2.2

2.2.1

Painting to Exterior Walls,Doors and Vanishing to


Skirting (56.27 m x 60 Rooms)

2.2.3 Painting to Ceilings (24.4 m x 60 Rooms)


2.3

Painting to Veranda Walls and Metal Bars of 5


Villas (Villa 18, 19, 20, 21 and 23)

2.3.1

Painting to Interior Walls and Metal Bars (34.8 m x


5 Villas)

2.3.2 Painting to Veranda Ceilings (7.6 m x 5 Villas)

2.4

Painting to Fascia Boards, Gutters and


Downpipes of 7 Villas (18, 19, 20, 21, 22, 23,
24)

2.4.1

Painting to Fascia Boards, Gutters and Downpipes


(4.3 m x 7 Villas)

3,376.20
307.80
1,464.00

174.00
38.00

30.10

Casita Rooms (28 Rooms)

3.1

Painting to Interior Walls, Doors and Varnishing to


Skirting (46.63 m x 28 Rooms)

3.2

Painting to Ceilings (16.2 m x 28 Rooms)

4.30

Painting to Exterior Walls, Doors, Ceilings,


Cupboards Doors and Vanishing to Skirting of
60 Villa Rooms

2.2.2 Painting to Cupboard Doors (5.13 m x 60 Rooms)

512.00

Switchboard Rooms

1,305.64
453.60

4.1

Painting to Exterior Walls, Windows, Doors and Door


Frames of Switchboard Room, Generator Room and
Durawall (to be painted on both sides)

4.2

Painting to Fascia Boards, Gutters and Downpipes

5
5.1
6
6.1
7

Painting to Durawall and Resting Units

Painting to Durawall

243.00

Offices (near Receiving Bay)

7.2

Painting to Fascia Boards, Gutters and Downpipes

324.00
6.35

Kitchen Area

8.1

Painting to External Walls

8.2

Painting to Fascia Boards

9.1

993.00

Receiving Bay

Painting to External Walls, Door Frames, Doors,


Windows and Metal Screens

10.50

Dandaro

7.1

863.80

180.00
5.65

Offices (Close to Main Entrance)


Painting to External Walls, Windows and Doors of 2
Individual Offices

Banking Details:
Creative Construction and Maintenance (Pvt) Ltd
Bank: ZB Bank
Branch: Borrowdale, Harare
Acc Number: 4129-709337-200

132.00

Creative Construction (Pvt) Ltd

nue

8 529
/ +263 774 860 037
uction.co.zw
econstruction.co.zw
construction.co.zw

Structural and Civil Contractors

QUOTATION
Date:

24-Jun-16

Page:

1 of 2

Document Number:

GC 01/06/16

Deliver to :
Kadoma Hotel and Conference Center
Cnr Bulawayo Rd/ Eiffel Flats Rd
Kadoma
Zimbabwe

Unit

Unit Price

Tax

Net Price

per m

US $

2.30

15%

226.32

2.30

15%

866.55

2.30

15%

1,177.60

2.30

15%

9.89

2.30

15%

7,765.26

2.30

15%

707.94

2.30

15%

3,367.20

2.30

15%

400.20

2.30

15%

87.40

2.30

15%

69.23

2.30

15%

3,002.97

2.30

15%

1,043.28

2.30

15%

1,986.74

2.30

15%

24.15

2.30

15%

2,283.90

2.30

15%

558.90

2.30

15%

745.20

2.30

15%

14.61

2.30

15%

414.00

2.30

15%

13.00

2.30

15%

303.60

Sub-Total
Add V.A.T @ 15%
Total Painting Cost

25,067.94
3,760.19
28,828.13

Less 80% Deposit

23,062.50

BALANCE AT COMPLETION

5,765.63

"Building the future. Restoring the past."

30+ Days

60+ Days

90+ Days

120+ Days
25,067.94

Current
25,067.94

Total Due
25,067.94

You might also like