National Renewable Energy Program
(Under Republic Act 9513: Renewable Energy Act of 2008)
Increase RE-based capacity by 200% within the next 20 years (2011-2030)
Increase non-power contribution of RE to the energy mix by 10 MMBFOE in the
next ten years
Be the number one wind energy producer in Southeast Asia (up to 2,500
MW)
Biomass - 265 MW
Solar - at least 280 MW
Ocean energy at least 10 MW
Department of Energy
: 2,345 MW
: 5,398 MW
: 75 MW
: 284 MW*
: 1,495 MW
2030
20
AAGR = 6.44%
15,151 MW
15,236 MW
15
12,683 MW
5,369 MW
2010
10
7,526 MW
2015
2020
2025
2030
Note: The National Renewable Energy Program (NREP) is currently under review
2014
Biomass,
0.19%
Department of Energy
Biomass, 131,
0.73%
2014
Biomass
0.04%
Department of Energy
Biomass
0.25%
2010
2011
2012
2013
2014
2015
Total
BREOC
No. of Projects
Potential
11.2MWe
Installed
13
3.6MWe
16
59
94.07MWe,
96.4MWe 86.8MWe 150MT/day RDF
489.52MWe,
200MT/day RDF
81MWe,
5.6MWth,
300MT/day RDF
50MT/day RDF
241.81MWe,
5.6MWth,
50MT/day RDF
28
3.0MWe
0.624MWe
3.92MWe
12.5MWe
164.18MWe,
59MWth
Own-use
No. of Projects
12
Potential
Installed
Total
0.30MWe
45MWth
126.72MWe,
2MWth
14.8MWe, 264.93MWe,
45MWth
2MWth
Department of Energy
12MWe,
12MWth
0.56MWe
191MWe,
41.86MWe
12MWth
12.4MWe
189.8MWe,
107.194MWe,
5.6MWth, 89.8MWe
200MT/day RDF
300MT/day RDF
Department of Energy
HPCo
2MW Biogas-FiredSCBPI
Power Plant Project Asian Carbon Neutral Power
Corporation
10
Balance
Department of Energy
94.251 MW
250 MW
155.749 MW
11
94.251 MW
Capacity Addition
24.367 MW
Installation Target
250 MW
Balance
Department of Energy
131.382 MW
12
Department of Energy
13
Department of Energy
B2 to
B5
E20/E85
15
Department of Energy
Diesel Demand
Biodiesel Blends
(Target)
Supply Requirement
2016
7,176.41
5%
358.82
2020
7,923.37
10%
792.34
2025
8,693.73
20%
1,738.75
2030
9,030.68
20%
1,806.14
16
Department of Energy
Gasoline
Demand
Bioethanol Blends
(Target)
Supply Requirement
2015
3,818.61
10%
381.86
2020
4,328.87
20%
865.77
2025
4,712.28
20%
942.46
2030
5,084.05
20%/85%
1,016.81
17
Department of Energy
Biofuels Program
Biodiesel
11 Biodiesel Plants with a total capacity of 584.69ML/year
1 Pending project with a potential capacity of 150ML/year
Bioethanol
10 Bioethanol Plants with a total capacity of 282.4 ML/year
1 On-going project with a potential capacity of 40 ML/year
1 Pending project with a potential capacity of 45 ML/year
Department of Energy
18
Department of Energy
19
TEI
Department of Energy
20
CBPI
Department of Energy
21
Feed-in-Tariff (FIT)
Priority connection to the grid
Priority purchase and transmission of and payment for
by grid system operators
Fixed tariff for 20 years
To be applied for generation utilized in complying with
RPS
Department of Energy
22
Department of Energy
23
Department of Energy
24
Approved Rates
(PHP/kWh)
5.90
Biomass
6.63
250
Wind
8.53*
Solar
8.69 *
Run-of-River Hydro
250
* Feed in Tariff (FIT) rates for solar was revised in April 2015 (Resolution No. 6, Series of
2015) from Php 9.68 to 8.69/kWh covering additional target of 450 MW and the second FIT
rate for wind energy was issued by the ERC at Php 7.40/kWh covering additional target of
200MW under ERC Resolution No. 14, series of 2015.
** Amended targets for wind energy and solar power up to March 15, 2016.
Department of Energy
25
Resource
For Nomination
(2016)
With Certificate of
Confirmation of
Commerciality
With Certificate of
Endorsement to ERC
No. of
Projects
Capacity
(MW)
No. of
Projects
Capacity
(MW)
No. of
Projects
Capacity
(MW)
24.367
24.367
14
94.251
Biomass
Department of Energy
27
Department of Energy
Short Term
Medium Term
Long Term
2011-2015
2016-2020
2021-2030
Geothermal
220 MW
1,100 MW
175 MW
Hydropower
341.3 MW
3,161 MW
1,891.8 MW
5,394.1 MW
Biomass
276.7 MW
276.7 MW
Biofuels
DC on E10 in 2011
Mandatory E10 to
all Gasoline by 2012
PNS for B5 by 2014
DC on B5 by 2015
Mandatory B5 to all
Diesel by 2015
Wind
200 MW
700 MW
1,445 MW
Solar
50 MW
100 MW
200 MW
35.5
35
Ocean Power
Total
1,495 MW
DC on B20 and
E85 by 2025
2,345 MW
350 MW
(Aspirational
target 1,528
MW)
70.5
Note: RE Targets under review of NREB to reflect developments on RE sector and the DOEs issuances of new Installation targets
Total
Department of Energy
1,088 MW
5,096 MW
3,746.80 MW
9,931.3 MW
29
Challenges
Feedstock supply, sustainability and cost
Validation of emerging biomass/biofuels
feedstock and its related utilization
technologies
Insufficient local bioethanol supply
Implementation of B5 by 2016
Department of Energy
30
Department of Energy
31
Thank you ! ! !
www.doe.gov.ph
ruby.deguzman@doe.gov.ph
Department of Energy