Professional Documents
Culture Documents
AnalisaTeknis
Jembatan Ngrame Mojokerto
PC - I Girder L 16.6 m; H 90 cm; CTC 180 cm
No. Job: 08004
No. Rev: 00
HEAD OFFICES
Jl. D.I. Panjaitan Kav. 3-4
JAKARTA INDONESIA
Telp
: (+62-21) 8192808, 8508640, 8508650,
85905570 (Direct to Marketing)
Fax
: (+62-21) 85903872
Web
: www.wika-beton.co.id
Email : teknik@wika-beton.co.id
PROPOSAL TEKNIS
PC I GIRDER POSTENSION NONSEGMENTAL
AnalisaTeknis
Jembatan Ngrame Mojokerto
PC - I Girder L 16.6 m; H 90 cm; CTC 180 cm
No. Job: 08004
No. Rev: 00
MENYETUJUI
Ir. M. Zulkarnain,MM,.IPM
Manajer Teknik
DIPERIKSA :
TANGGAL :
Ir. Gambiro
Kabag Teknik
DIBUAT :
TANGGAL :
PROPOSAL TEKNIS
Strand
= K-300
= 27 cm (termasuk Pelat dek)
= K-350
= 7 cm
= 5 cm
= H-90cm.
= L=16.6m; Ctc balok 1,85m; K-500
= D-13 fy = 400 MPa (tulangan deform).
10 U-24 (tulangan polos)
= 12,7 mm (grade 270, low relaxation)
ANALISA TEKNIS
Analisa yang dilakukan adalah perhitungan teknis untuk perencanaan balok I girder
Pretension nonsegmental terhadap beban kerja rencana berdasarkan pembebanan Bridge
Management System (BMS).
Analisa teknis meliputi penentuan konfigurasi tendon dan jumlah strand yang
dibutuhkan balok, penulangan balok terhadap gaya dalam yang bekerja dan analisa lendutan
yang terjadi.
Penggunaan konfigurasi tendon dengan konfigurasi strand pada posisi tertentu yang
diberi jacking force akan mengakibatkan tegangan pada penampang balok, tegangan tersebut
di check terhadap tegangan yang diijinkan pada kondisi saat transfer dan saat service balok.
Pada analisa teknis juga dilakukan kontrol lendutan yang terjadi terhadap lendutan
yang diijinkan baik pada saat service.
KESIMPULAN
Kesimpulan analisa teknis adalah sebagai berikut :
PC I Girder Non Segmental Post tension L16,6m
Mutu Beton
: K-500
Dimensi Balok
: Standar Wika Beton H=90
Rancang Jembatan
: Panjang Balok 16.6m ctc185cm
Jumlah Segmen
: 1 Segmen (16.6m)
Skiew Jembatan
: 0
Strand
: 12,7 mm (grade 270, low relaxation)
Jacking Force
: 75% dari Ultimate Tensile Strength (UTS)
Kekuatan Beton saat jacking force : 80% dari fc
Konfigurasi tendon & Strand
Tendon
Jumlah Strand
1
2
10
12
=
=
=
=
=
=
Segment Arrangement
Beam Segment
1
Length (m)
5.00
Additional length at the end of beam
Total length of the beam
Total beam weight
2. STRESSING
Nos of PC Strand
=
Strand configuration
22
16.00
90.00
185.00
27.00
KK-
m (beam length =
cm
cm
cm (include RC Flat)
500
300
2
6.00
=
=
=
3
5.00
0.3
16.60
11.20
m
m
ton
strand
12.7
No.
number
Tendon
strand
edge
mid
10
50
20
12
25
10
total
22
36.36
14.55
4
0.00
Jacking Force
UTS of Strand
Total Losses
fc initial
5
0.00
16.60 m)
=
=
=
=
6
0.00
75%
7
0.00
UTS
19000.00 kg/cm2
23.12%
80.0%
fc'
3. LOADING
1. Dead Load
a. Precast Beam
=
0.64
t/m
b. Slab
=
1.20
t/m
Slab thickness =
27.0
cm (include RC Flat)
c. Asphalt
=
0.20
t/m
Asphalt thickness =
5.0
cm
d. Diaphragm
=
0.42
ton
for 1 diaphragm
No. Diaphragm
3
pcs
equivalent load
=
0.08
t/m
2. Live Load
Taken from "Bridge Management System (BMS)"
D load
a. Dynamic Load Allowance (DLA)
=
1.4
for span length <= 50m
b. Knife Edge Load (KEL)
=
4.40
ton/m'
c. Distribution Factor (DF)
=
1.00
d. Distribution Load
q=
0.80 t/m2
which :
q = 0,8 t/m'
For Span <= 30m
q = 0,8 x (0,5 + 15/span) t/m' For Span > 30m
e. Live Load
Distribution load :
q' = DF x q x s
=
1.48
ton/m'
Line Load
:
p' = DF x DLA x KEL x s
=
11.40 ton
CALCULATION RESUME
69.13
ton
2
13.47 kg/cm
2
171.84 kg/cm
required
required
>
<
2
-14.88 kg/cm
2
190.21 kg/cm
2
147.80 kg/cm
2
-8.58 kg/cm
required
required
<
>
2
172.92 kg/cm
2
-33.06 kg/cm
=
=
=
=
=
-1.58
-2.41
-2.26
0.78
-1.48
cm
cm
cm
cm, required < L/800 =
cm, required < L/360 =
2.00 cm
4.44 cm
CALCULATION RESUME
=
=
=
276.53 t.m
326.38 t.m
1.18
0.3
L=
Beam length
Beam spacing (s)
Concrete Slab thickness
Asphalt thickness
RC Flat thickness
16.00 M
16.60
185.00
27.00
5.00
7.00
=
=
=
=
=
0.3
m
( edge anchor to edge anchor :
16.3
cm
cm (include RC Flat)
cm
A
cm
m)
tfl-1
tfl-2
Cross Section
H
A
B
tweb
=
=
=
=
90
35
65
17
cm
cm
cm
cm
tfl-1
tfl-2
tfl-3
tfl-4
=
=
=
=
7.5
7.5
10
12.5
tweb
cm
cm
cm
cm
tfl-3
tfl-4
B
II. MATERIAL
2.1 Concrete
Beam
Slab
Compressive strength
500
300
at service
* fc' = (0.76+0.2*log(bk/150))*bk = 432.3
246.1
at initial
(
80%
), fc'i =
345.8
196.8
Allowable stress at initial ..(AASHTO 1992, Chapt. 9.15.2.1-Design)
Compressive
0.55 * fc'I = 190.2
108.3
0.80 * Sqrt(fc'I) =
Tensile
14.9
11.2
Allowable stress at service . (AASHTO 1992, Chapt. 9.15.2.2-Design)
Compressive
0.40 * fc' = 172.9
98.4
1.59 * Sqrt(fc') =
Tensile
33.1
24.9
Modulus of elasticity
Ec = 313952.2
236864.0
Eci = 280807.3
Modulus rupture
fr =
41.2
31.1
Note :
* Pedoman Beton 1988, Chapter 3
[kg/cm2]
[kg/cm2]
[kg/cm2]
[kg/cm2]
[kg/cm2]
[kg/cm2]
[kg/cm2]
[kg/cm2]
[kg/cm2]
[kg/cm2]
dia
Ast
Es
fy
:
13
[mm]
2
: 1.267 [cm ]
2
: 2.10E+06 [kg/cm ]
:
3900 [kg/cm2]
page 1 / 13
Remark :
Ep 1 = 313952
Ep 2 = 236864
kg/cm
kg/cm 2
[Girder]
[Slab]
4
Ya
n = Ep 1 / Ep 2
n=
1.33
Ya'
1
Yb
base line
Yb'
PRECAST BEAM
COMPOSITE BEAM
Zone Section
6
5
4
3
2
1
Total
Width
Area
Yb
cm
cm
cm
0.00
262.50
195.00
892.50
410.00
812.50
2572.50
90.0
82.5
75.0
22.5
12.5
0.0
90.0
86.3
79.2
48.8
16.5
6.3
36.3
0
22641
15441
43509
6775
5078
93444
0
1230
878
204996
3026
10579
220710
0
654306
358187
137805
160732
734867
2045897
Area
Level
Yb
Area*Yb
Io
Area*d
Bottom
Upper
cm
0.0
7.5
7.5
52.5
10.0
12.5
90.0
65.0
35.0
17.0
17.0
65.0
65.0
35.0
35.0
35.0
17.0
17.0
65.0
Area*Yb
Level
Height
Io
cm
Area*d
4
cm
Ix
cm
0
655537
359065
342801
163758
745446
2266607
2
1
Total
3.3
Width
cm
cm
97.0
90.0
0.0
107.0
93.5
36.3
73.4
298690
7078
93444
399212
Area (cm )
Ya (cm)
Yb (cm)
Ix (cm )
Wa (cm )
Wb (cm )
2572.50
5439.70
53.7
43.6
16.6
36.3
73.4
2266607
9078357
42228
208165
546515
62400
123702
Bottom
Upper
cm
20.0
7.0
90.0
117.0
185.0
19.0
65.0
185.0
19.0
35.0
2791.50
75.70
2572.50
5439.70
cm
cm
93050
410
2266607
2360067
Ix
cm4
cm
Section
3153620
30620
3534050
6718290
3246669
31030
5800657
9078357
Resume
[in cm ]
2
Description
Precast Beam
Composite Beam
[composite]
[precast]
IV. Loading
4.1 Dead Load
Design Carracteristics. Bridge Management System ( BMS ), Vol.1 Chapter 2.3.1
1. Specific Gravity of Precast Beam = 2.5 ton/m3 ( PB )
2. Specific Gravity of Slab = 2.4 ton/m3 ( S )
3. Specific Gravity of Asphalt = 2.2 t/m3 ( asp )
4. Specific gravity of Diaphragm = 2.4 ton/m3 ( diaph )
a. Precast Beam
q1 = Area x PB
x
2.5
0.6431
[t/m']
b. Slab
q1 =
0.2573
q2 = Hslab x s x s
q2 = 0.2700 x
1.85
q3 = tasp x s x asp
2.4
1.1988
[t/m']
c. Asphalt
q3 =
0.05
1.85
x
x
p = Volume of diaph. x diaph
2.2
0.2035
[t/m']
d. Diaphragm
0.15
2.4
x
q4 (q ek = p*n/span)
0.4234
0.0794
[ton]
[t/m']
p =
no. diaph.
1.68
3
x 0.7
pcs
page 2 / 13
DLA = 1 + 0,4
=
1.40
DLA = 1 + (0.0025*span+0.175)
DLA = 1 + 0,3
=
1.30
=
4.40
=
1.00
which :
q = 0,8 t/m'
q = 0,8 x (0,5 + 15/span) t/m'
e. Live load
- Distribution load q' = DF x q x s
x
=
1.00
0.80 x 1.85
- Line load p' = DF x DLA x KEL x s
1.00
1.400 x 4.400 x
x
1.85
Span <= 50 m
50 < Span < 90 m
Span >= 90 m
ton/m'
for
Span <= 30 m
Span > 30 m
1.48
ton/m'
11.40
ton
Sec 3-3
11.00
17.69
17.69
32.97
5.60
2.18
40.75
40.70
39.17
79.87
138.31
237.64
Sec 4-4
16.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sec 5-5
16.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sec 6-6
8.00
20.58
20.58
38.36
6.51
2.54
47.41
47.36
45.58
92.94
160.94
276.53
V. MOMENT ANALYSIS
[in ton-meter ]
Type
Description
DL
Precast beam
Subtotal
Slab
ADL Asphalt
Diaphragm
Subtotal
LL Distribution load
Line load
Subtotal
Total (DL + LL)
Ultimate total
Mid
span
20.58
20.58
38.36
6.51
2.54
47.41
47.36
45.58
92.94
160.94
276.53
Sec 1-1
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sec 2-2
5.00
17.69
17.69
32.97
5.60
2.18
40.75
40.70
39.17
79.87
138.31
237.64
(m)
Description
Precast beam
Subtotal
Slab
Asphalt
ADL
Diaphragm
Subtotal
Distribution load
LL
Line load
Subtotal
Total (DL + LL)
Ultimate total
DL
span
Sec 1-1
0.00
Sec 2-2
5.00
Sec 3-3
11.00
Sec 4-4
16.00
Sec 5-5
16.00
Sec 6-6
8.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.70
5.70
5.70
11.40
5.15
5.15
9.59
1.63
0.64
11.85
11.84
11.40
23.24
40.23
69.13
1.93
1.93
3.60
0.61
0.24
4.45
4.44
7.83
12.27
18.65
33.05
-1.93
-1.93
-3.60
-0.61
-0.24
-4.45
-4.44
-7.83
-12.27
-18.65
-33.05
-5.15
-5.15
-9.59
-1.63
-0.64
-11.85
-11.84
-11.40
-23.24
-40.23
-69.13
-5.15
-5.15
-9.59
-1.63
-0.64
-11.85
-11.84
-11.40
-23.24
-40.23
-69.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-5.70
-5.70
-5.70
-11.40
Mid
(m)
page 3 / 13
Nos
don
strand
edge
middle
cm
1
2
3
4
1
0
0
0
10
12
22
0.00
0.00
0.00
50.00
25.00
36.36
0.00
0.00
0.00
20.00
10.00
14.55
0.987
0.987
0.987
0.987
0.987
total
profile
Asp
2
fu
Jacking Force
75%
75%
75%
75%
75%
75%
0.00
0.00
0.00
140661.75
168794.10
309455.85
(kg)
kg/cm
19000
19000
19000
19000
19000
Parabolic curve :
Y = AX
Y=
A=
B=
C=
BX +
Average of Strand's position vertically from the bottom of beam ( Value for Y axis )
Constanta : ( (Ymiddle + Yedge)/(L/2)2)
Constanta : ( L x A )
Average of strand's position when the parabolic curve reach the Y axis
X +
0.3636364
A = 0.003285
Y
=
0.003285 X2 + -0.05354
B = -0.05354
tg o =
0.00657 X
+
-0.05354
Eccentricity [e] Yb - Ys =
21.78
cm
Note : Jacking Force = Nos x Asp x Fu x (Tension Persentation)
Nos = Number of Strand
Yb = Distance of Neutral Axis from the bottom of non composite beam ( Chapter 3.3 - Resume )
Ys = Distance of tendon from the bottom of the beam at the middle span ( Chapter 7.1,Cable Profile-middle)
Bottom Stress
Pi
<=
-14.88
500.82
190.21
302.53
kg/cm 2
ton
kg/cm 2
ton
>=
<=
<=
<=
302.53
ton
[3]
<=
>=
>=
<=
197.72
172.92
161.07
-33.06
197.72
ton
kg/cm 2
ton
kg/cm2
ton
[6]
-14.88
-33.06
[1]
[2]
[4]
[5]
Assumption :
Loss of Prestress assumption long term
23.117% (must be = 23.117% )
From eq. [3] and eq. [6], gradually stressing is
not needed
used prestressing cable
12.7"
Pi =
=
309456 kg
Pe = 76.9%
309455.85
=
237918 kg
Note :
Pi = Initial Prestress Force
Wa = Modulus Section for Top section of Precast Beam
Mbs = Moment due to Self Weight
e = eccentricity
Wb = Modulus Section for Bottom section of Precast Beam
Pe = Effective Prestress force
Wac = Modulus Section for Top section of composite Beam
Mbp = Moment due to concrete Weight (Precast Beam + Slab + Diapraghm)(Chapt. V-Moment Analysis)
Wbc = Modulus Section for Bottom section of composite Beam
Wap = Modulus Section for Top section of Precast Beam
Wbp = Modulus Section for Bottom section of Precast Beam
Mbp = Moment due to additional Load ( Asphalt + Live Load ) (Chapter 5-Moment Analysis)
page 4 / 13
( CR )
CR = Kcr*(Es/Ec)*(fcir-fcds)
Where :
Kcr =
fcir =
fcds =
fcds =
Msd =
Ig =
CR =
1.60
(for postensioned member)
stress at center point prestress force, initial condition
stress at center point prestress force, permanent dead load.
2
Msd (e) / Ig
fcds =
45.56 kg/cm
Moment due to all superimposed permanent dead loads applied after prestressing
Moment of inertia of gross concrete section at the cross section considered.
992.79
kg
page 5 / 13
c. Steel Relaxation ( RE )
RE = [ Kre - J*(SH+CR+ES) ] *C
where :
Kre =
J =
C =
5000
0.04
0.57
RE =
162.91
kg
GRAPHICS OF LOSS OF PRESTRESS STAGE
1. Due Friction
14066
13089
2. Due Slip (chek effect of prestress losses at mid span, wheather of not)
14066
13094
12122
12620
13578
16.22
8.30
13089
13089
12620
11672
12169
8.30
13578
12644
13127
12639
13089
12620
12169
11672
13578
12644
13127
10814
12639
11772
11284
10317
16.22 m
8.30 m
Stress force at X =
8
22
- Initial
=
22
- Service
=
22
Total losses for long term
- Jacking Force =
=
=
=
309455.9 kg
277633.3 kg
237918.2 kg
(
(
(
75.00% )
67.29% )
57.66% )
page 6 / 13
Condition
Tranfer
Service
Cable
stress
% tensile
[cm ]
[ton]
[kg/cm ]
21.72
21.72
277.63
237.92
12785
10956
67.3%
57.7%
5.00
6.00
5.00
0.30
Total Length =
16.60
Moment DL
Pi
e (eccentricity)
Pi.e
Moment Net.
Pi / A
M / Wa
M / Wb
Initial Stresses
[kg/cm2]
Middle
SEC 1-1
SEC 2-2
SEC 3-3
SEC 4-4
SEC 5-5
x - [m]
Span
0.00
5.00
11.00
16.00
16.00
8.00
[ton.m]
20.58
277.63
0.22
-60.46
-39.88
107.92
-94.45
63.92
13.47
171.84
0.00
277.63
0.01
-2.10
-2.10
107.92
-4.97
3.36
102.95
111.29
17.69
277.63
0.19
-52.26
-34.57
107.92
-81.87
55.40
26.05
163.33
17.69
277.63
0.19
-52.26
-34.57
107.92
-81.87
55.40
26.05
163.33
0.00
277.63
0.01
-2.10
-2.10
107.92
-4.97
3.36
102.95
111.29
0.00
277.63
0.01
-2.10
-2.10
107.92
-4.97
3.36
102.95
111.29
20.58
277.63
0.22
-60.46
-39.88
107.92
-94.45
63.92
13.47
171.84
[ton]
[m]
[ton.m]
[ton.m]
[kg/cm2]
2
[kg/cm ]
2
[kg/cm ]
top ( T )
bottom ( B )
Moment DL =
Moment Bal =
Moment Net =
Pi =
P=
M=
A=
Wa =
Wb =
Wa' =
Wb' =
SEC 3-3
11.00
58.43
237.92
-44.78
13.65
79.87
92.49
32.33
-21.88
14.62
-64.57
38.37
139.43
6.04
( = M1 )
( = M2 )
SEC 4-4 SEC 5-5
16.00
16.00
0.00
0.00
237.92
237.92
-1.80
-1.80
-1.80
-1.80
0.00
0.00
92.49
92.49
-4.26
-4.26
2.88
2.88
0.00
0.00
0.00
0.00
0.00
0.00
88.22
88.22
95.37
95.37
SEC 6-6
SEC 6-6
8.00
67.99
237.92
-51.82
16.18
92.94
92.49
38.31
-25.93
17.01
-75.14
44.65
147.80
-8.58
Allow.
stress
-14.9
190.2
Allow.
stress
98.4
172.9
-33.1
top =
13.47
kg/cm2
+
+
=
-
M/Wb =
63.92
kg/cm2
bottom =
171.84 kg/cm2
slab = 44.65
kg/cm
top = 147.80 kg/cm2
=
+
+
2
bottom =
-8.58 kg/cm2
8.3 Deflection
l
Note :
P = Prestress force
e' = Distance between c.g of strand at end and
e'
l/ 2
l/ 2
w=
8 . P . e'
l2
Reference :
PCI Design Handbook : Part 11.1.4 page no. 11-12
w
Condition
at initial
at aDL (total)
at service (total)
due to Live Load
q
(t/m)
p
(ton)
w
(t/m)
0.64
1.48
3.60
1.48
0.00
0.00
11.40
11.40
-1.82
-1.56
due load
1
2
prestress
wd
w ad
w LL
-2.85
0.44
-2.41
3 x (2)
-3.59
1.33
-2.26
0.78
2.00
-1.48
page 8 / 13
must <=
337
cm
= 0.9
T
C1
C2
C3
a
=
=
=
=
=
Aps * fps
=
371347 kg
0.85*fc'beam*tweb*(a-tslab-tflens)
0.85*fc'beam*A*tflens
=
96454 kg
0.85*fc'slab*bslab*tslab
=
1044717 kg
((T-C2-C3)/(0.85*fc'*tweb))+tslab+tflens
=
-88.7 cm
-- Check, if a < (tslab+tflens), so must analyse as T beam or square beam.
(tslab+tflens) =
34.5
cm
C1 = -769824 kg
d = (H+tslab-ed) =
102.45 cm
Mn = C1(d-(a-tslab-tflens)/2)+C2(d-tslab-tflens/2)+C3(d-tslab/2) =
-264.60 ton.m
Mn =
-238.14 ton.m
Analysed as T beam, for a < (tslab+tflens) or at flens of beam :
a = ((T-C3)/(0.85*fc'*A))+tslab
=
-25.4 cm
-- Check, if a < (tslab), so must analyse as square beam.
(tslab) =
27
cm
C2 = 0.85*fc'beam*A*(a-tslab)
=
-673370 kg
Mn = C2(d-tslab-((a-tslab)/2))+C3(d-tslab/2)
=
244.95 ton.m
Mn = 220.45 ton.m
Analysed as square beam, for a < tslab
a = Aps*fps/(0.85*fc'slab*bslab)
Mn = T*(d-a/2)
=
362.64 ton.m
Mn = 326.38 ton.m
9.6
=
=
cm
276.53
ton.m
1.18
( Fr + Peff / A + Peff * e / Wb ) * Wb
Mn > 1.2 * Mcr
1.2 * Mcr
Mn
180.9417
ton.m
<
191.8638
260.576
ton.m
<
326.3782
ton.m (Ok!)
ton.m (Ok!)
page 9 / 13
X. SHEAR ANALYSIS
10.1Shear calculation by rebar
=
WEB SHEAR
bw =
Description
Vu = 1.3[Vdl+5/3Vll]
Mu = 1.3[Mdl+5/3Mll]
dp
> 0.80 h
[Vu*dp]/>1
Vc min
Vc
Vc max
Vc taken
Vu/
Vs = Vu/ - Vc --STIRRU, nos stirrup
Dia.
fy
Av
S
Smax
Smax
Smax
S
using S
x - [m]
[ton]
[t-m]
[cm]
[kg]
[kg]
[kg]
[kg]
[kg]
[kg]
[mm]
[kg/cm2]
[cm2]
[mm]
[mm]
[mm]
[mm]
1565
[mm]
[mm]
0.85
17
Sec 4-4
16.00
69.13
0.00
54.43
bwu=
Mid
Sec 1-1 Sec 2-2 Sec 3-3
Sec 5-5
span
0.00
5.00
11.00
16.00
11.40
69.13
33.05
33.05
69.13
276.53
0.00
237.64
237.64
0.00
75.45
54.43
72.50
72.50
54.43
0.03 3.76E+100
0.10
0.10 3.76E+100 3.76E+100
14135.03 20993.5 13581.2 13581.2 10196.9
10196.9
199715.46 3.5E+107 6.1E+05 6.13E+05 1.7E+107 1.71E+107
35470.92 52681.9 34081.2 34081.2 25588.3
25588.3
35470.92 52681.9 34081.2 34081.2 25588.3
25588.3
13407.06 81331.3 38878.6 38878.6 81331.3
81331.3
0.000 28649.4
4797.4
4797.4 55742.9
55742.9
2
4
2
2
13
13
13
13
3900
3900
3900
3900
2.65
5.31
2.65
2.65
7.8E+16 393.4061 1564.547 1.6E+03
15816.62 38551.21 15503.7 15503.7
450.00
450.00
450.00
450.00
15816.62 1183.21 1218.01 1218.01
450.00
2
2
13
13
3900
3900
2.65
2.65
1.0E+02
101
13433.8 13433.79
450.00
450.00
1218.01 1218.01
393.41
450.00
450.00
101.10
150
200
300
Reference (ACI) :
Vc min = 0.53*sqrt(f'c)*bw*dp .. (1)
Vc =
(0.16*sqrt(f'c)+49*vu*dp/Mu)*bw*dp ..(2)
Vc max = 1.33*sqrt(f'c)*bw*dp .(3)
S
S min
=
=
=
=
101.10
35
Sec 6-6
8.00
11.40
276.53
75.45
0.03
14135.0
199715.5
35470.9
35470.9
13407.1
0.0
2
13
3900
2.65
7.8E+16
15816.62
450.00
15816.62
450.00
10*Av*fy*dp/Vs
10*Av*80*fy*dp/(Aps*fps*sqrt(dp/bw)
d/2 atau 24 in (=60.96 cm)
10*Av*fy/(50*bw) if only Vu/ > Vc/2
Note :
Formula (1),(2) and (3) are adapted from the ACI formula for Shear Design
Conversion Factor From Psi to Kg/cm 2 is
0.0703
( 1 Psi = 0.0703 kg/cm 2 )
ACI standard states :
Vc min = 2x(fc')^0.5 ( Psi )
Vc min = 2x(0.0703x fc')^0.5 .. ( kg/cm2 )
10.2Shear Connector
Slab K- 300
Distance ctc beam (be) =
Thickness of slab =
Height of compression stress (a) =
f'c =
246.06 kg/cm
1.85
m
27.00
cm
9.60
cm
(see moment capacity section)
Hu = 3.7E+05 kg
Avf total of 1/2 span = 112.02 cm2
Average stirrup space = 196.69 mm
Number of stirrup for 1/2 span =
43
pcs.
page 10 / 13
36.36
cm
12
0.9871
3/8 P (1 - a/b) =
3/8 P (1 - a/h) =
ton
3900 )
=
4
D13
19000
=
23.51 ton
25.00 ton
7.37 cm
168794.1 kg
200
100
Ya'[c]
Ya
225
Y'b[c]
36.3
Yb
73.4
100
275
27.00 cm
0.00 cm
Ya =
Yb =
Middle
Span
Vn = Vdl + Vll
[ton]
tg
Vp = P tg
[ton]
Vs = Vn - Vp
[ton]
SEC 1-1
0.00
33.68 cm
8.82 cm
SEC 2-2
5.00
Ya' =
Yb' =
SEC 3-3
11.00
SEC 4-4
16.00
-3.39 cm
45.89 cm
SEC 5-5
16.00
SEC 6-6
8.00
5.70
0.000
0.00
5.70
40.23
-0.053
12.50
27.73
18.65
-0.020
4.69
13.96
18.65
0.020
4.69
13.96
40.23
0.053
12.50
27.73
40.23
0.053
12.50
27.73
5.70
0.000
0.00
5.70
0.79
67.99
92.94
-51.82
116.18
81.49
3.84
0.00
0.00
-1.80
89.81
93.19
1.93
58.43
79.87
-44.78
112.47
83.13
1.93
58.43
79.87
-44.78
112.47
83.13
3.84
0.00
0.00
-1.80
89.81
93.19
3.84
0.00
0.00
-1.80
89.81
93.19
0.79
67.99
92.94
-51.82
116.18 Allow.
81.49 stress
116.18
-0.01
89.98
-0.16
112.50
-0.03
112.50
-0.03
89.98
-0.16
89.98
-0.16
116.18 172.9
-0.01 -33.1
81.50
-0.01
93.34
-0.16
83.18
-0.04
83.18
-0.04
93.34
-0.16
93.34
-0.16
81.50 172.9
-0.01 -33.1
[kg/cm ]
[t-m]
P.e
[t-m]
Top stress
[kg/cm2]
Bottom stress
[kg/cm2]
Top point
max
[kg/cm2]
min
[kg/cm2]
Bottom Point
max
[kg/cm2]
min
[kg/cm2]
Calculation :
Top stress = P/A + Mdl/Wa + Mll/Wa'
Bottom Stress = P/A + Mdl/Wb + Mll/Wb'
P max = Teg./2 + [ (teg./2)^2 + V^2 ]^(1/2)
P min = Teg./2 - [ (teg./2)^2 + V^2 ]^(1/2)
page 11 / 13
Note :
P=
A=
Mdl =
Mll =
Wa =
Wb =
teg. =
V=
Vn =
Vp =
s=
Ae
h'
AB
A'e
Av
Av'
H
(ton)
(mm)
(mm)
(mm)
(mm)
(kg/cm2)
(kg/cm2)
Sec 2-2
5.00
18.65
100
50
425
300
3900
1950
Sec 3-3
11.00
-18.65
100
50
425
300
3900
1950
Sec 4-4
16.00
-40.23
100
50
425
300
3900
1950
Sec 5-5
16.00
-40.23
100
50
425
300
3900
1950
( mm2 )
265.46
265.46
265.46
265.46
( mm2 )
140.64
-140.64
-303.43
-303.43
0.53
0.53
1.14
1.14
2
35.16
2
-35.16
2
-75.86
2
-75.86
0.13
0.13
0.29
0.29
478.18
-478.18
-1031.65
-1031.65
1.80
1.80
3.89
3.89
199.24
-199.24
-429.86
-429.86
0.75
2
49.81
0.19
2
478.18
0.75
2
-49.81
0.19
2
-478.18
1.62
2
-107.46
0.40
2
-1031.65
1.62
2
-107.46
0.40
2
-1031.65
1.80
1.80
3.89
3.89
Description
x [m]
S ( DL + LL )
H
a
h
h'
fy
sa
Steel of reinforcement 2D - 13
Area
Male Section
Ae
Number of stell Needed
Number of steel Used
AB
Av
( mm2 )
( mm )
Female section
A'e
( mm2 )
( mm2 )
( mm2 )
page 12 / 13
Ae =
AB =
Av =
Sxa
0.8 x h x sa
A'e =
Ae
4
S
2 x sa
Sxa
0.8 x h' x sa
AB =
A'e
4
Av' =
Av
Beam Segment
Length (m)
a
b
Precast beam weight
Segment beam weight
Dynamic load factor
Force at lifitng point
Safety Factor
No. legs for lifting point
MDL middle
Wx
botom
fr' conc.at stock yard
fr' conc.at instalation
Stress control
fc at lifting =
50% fc'
=
frupture = 0.8 sqrt(fc at lifting) =
fc at install =
80% fc'
=
frupture = 0.8 sqrt(fc at instal) =
2
3
5.30
6.00
5.30
1.10
1.24
1.10
3.11
3.52
3.11
0.6431
0.6431
0.6431
3.4
3.9
3.4
1.4
1.4
1.4
2.4
2.7
2.4
2
2
2
1
1
1
5.44E+04 6.97E+04 5.44E+04
6.24E+04 6.24E+04 6.24E+04
0.87
1.12
0.87
216.1439 [kg/cm ]
2
11.76147 [kg/cm ]
2
345.8303 [kg/cm ]
14.87721
11.76
14.88
OK
11.76
14.88
OK
0.00
0.00
0.00
0.00
m
m
t/m
ton
ton
leg
kg.cm
cm3
kg/cm2
kg/cm2
kg/cm2
11.76
14.88
OK
b
Unit
Lifting Point
12,7
0.987
19000
75%
14.06
mm
Beam Weight =
cm2
kg/cm2
UTS
ton for 1 leg of strand
12.2038 ton
1.4
8.54266 ton
2
3
legs
page 13 / 13