You are on page 1of 228

R

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

SUBJECT:

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

PROJECT:

BY

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

ASK

DESIGN OF PILE FOUNDATION FOR


FIXED PIER P26
1

INTRODUCTION:
Aim of this note is to present the design of substructure for fix Pier of the elevated corridor near BKC.
Pier P26 supporting
m simply supported spans over Harbour Railway.
60
P26 supports 60.0m span on BKC side &
31
m on EEH side.
Design of Substructure is covered in this note.
The superstructure ROB is a steel plate girder structure resting on 6 bearings on Pier P26.
Pier P26 also supports 30.75m concrete flyover with two fix bearings.
Length of span c/c of piers at
left side
Length of span c/c of piers at
Right side
Width of the carriageway
Total width

60

Span C/C of bearings

58

30.8

Span C/C of bearings

28.8

=
=

15
17.2

m
m

Exp JT

(7.5m + 7.5m)

Exp JT

58.00 m

28.75 m

Fixed
P25

P26

P27

Span Arrangement
Reference Drawings
1
2
3
4

1.1

SC/835/GA-11
SC/835/GA-12
SC/835/GA-17
SC/835/RC-653

General Arrangement : Layout


General Arrangement : Elevations
General Arrangement : Section Details
RC Details of Pile and Pile Cap.

Reference document:Reference from tender


1 Volume II -Section 2
2 Volume II -Section 6
Reference Codes1 IRC 6:2014
2 IRC 112:2011

Design criteria
Design data

Loads and stress


Code of Practic for Concrete Road Bridges:
Limit State Design

3 IRC 78:2014
Latest geotechnical report

Loading on the structure:


The Pier substructure and foundation shall be designed for the following loads:
a) Sizes of different structural elements
(length)
(width)
- Reactangular Pile cap(PC1) &(PC2)
4.6
4.6
x
-

Pedestal size

Bearing c/c in trans direction to left of P26 =


Bearing c/c in trans direction to right of P26 =

Pier Cap Size

4.0

(height)
1.8

0.85

0.85

0.3

3.0
4.5
23.3

m
m
x

Nos.
Nos.
1.5

=
=

6
2

4 piles

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

SUBJECT:

BY

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
-

No of Piers
Pier size
Pile dia

=
=

2
2
1.2

x
m

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

PROJECT:

1.50

ASK

8.0905

b)
1
2
3

Superimposed dead load


Crash Barriers and medians as indicated in the departmental drawing.
Loading of sound barrier & Services
2
Wearing coat
90

c)

Live loads : Class A upto 4 lanes OR Class 70R wheeled and tracked upto 2 lanes.

d)

Bearing Rigidity force

e)

Wind load as per IRC 6

f)

Seismic load for zone III with


Zone factor
=
Importance factor
=

KN/m at each k..( As per tender Cl.2.0 table)


mm thk
..(As per tender Cl.)

..(As per tender Cl. 5.3.1 )

g)

h)

i)

..(As per cl. 211.5 of IRC:6-2014.)

Obstructed wind

..( As per "Design data")

0.16
1.2

..(As per Table 8 of IRC:6-2014.)

Centrifugal forces as per the radius of curvatures.


Minimum radius of curvature for pier group
covered in this note
superelevation
Speed on curves
Unit Weights

..(As per cl. 209.3 of IRC:6-2014.)

PSC
RCC
wearing coat
soil sat

=
=

2.5%
80

=
=
=
=

26
26
22
18

Maxm Pile capacity is


including socketing
Capacity considered

600

t/m2. Maxm. Limited by recommendations

481

socketing in rock

5.7

kmph
kN/m3
kN/m3

..(As per tender


provision )

kN/m3
kN/m3

..(As per tender Cl. 3.7.3 )

As per Geo tech reco.


..(As per bore log detail )

in soft rock

TYPICAL CROSS SECTION OF ROB SUPERSTRUCTURE :

8.2

and recommendations of Geotech

STRUCTCON DESIGNS P. L.

NOTE No.

835/N-454
DATE

PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT:

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

SHEET

31-May-16
BY

CHKD

ANK

ASK

VIEW SHOWING GENERAL ARRANGEMENT OF PIER -P26 :

1.2

SUBSTRUCTURE DESIGN DATA:


R.L. at
0
Remarks
Top of road
16.70
Top of pier cap
12.524
0.375
Ht of pedestal.+bearing
Ground level
5.123
Top of pile cap
4.433
690
8.3
3.533
cutoff level
2.708
depth of pile cap
Height of Pier
Bore Hole Nos
point of fixity

-5.257

point of fixity
Founding LVL

-5.257
-17.577

Below GL

1.800
8.091
P26

Pier height
8.091
The R.L. at the top of pier cap is found as follows:
=
R.L. at top of road - thickness of wearing coat - Thk of Deck slab-depth of girder - bearing & pedestal
=
16.700 0.09 0.24
3.264
0.345
- 0.1875 -

Design loads:
Class A
:
Seismic zone:
Zone factor
Importance factor

( As per Design Data given in Tender )


Class 70R :
III
=
=

0.16
1.2

0.05

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

SUBJECT:

BY

As per IRC 112:2011


Fe 500
M45

Chara. Compressive Strength

45

kN/m2

fcd

...
Fc

Fc

as per annexure A-2

xlim

=
=

1
0.8

0.4561

fcd

20.1

N/mm2

fyd

435

N/mm2

Fyk

=
=
=

500
3.3
0.365

=
d

6.000

fctm
x
Fs

fc
z lim
z lim

For grade of Concrete

M45
Fc
for Pile Cap
Grade of steel
Grade of concrete
Chara. Compressive Strength

= 0.365
x
20.1
= (1-0.36488/2) x d

x
=

(1-0.365/2)

=
=

=
=

0.818
6.00

xlim

=
=
=

1
0.8
0.4561

fcd

20.1

N/mm2

fyd

=
=
=
=

435
500
3.3
0.365

N/mm2

=
d
d

Fe 500
M45

45

kN/m2

fcd

...
Fc

Fc

0.818

Fyk
fctm
x
Fs

fc
z lim
z lim

For grade of Concrete

M45

Fc

ASK

3.3

Design constants:
for Pile
Grade of steel
Grade of concrete

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
Response reduction factor

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

PROJECT:

= 0.36488 x
20.1
= (1-0.36488/2) x d
=
=

x
=
=
=

(1-0.365/2)

0.818
0.818
6.00

Pile Geometry
The fixity length of the pile is calculated as follows:
The top of the pile cap lies at 0.690m below GL .
FIXITY CALCULATION
For Stiff normal Clay / Sand
k1
T
E

=
0.146
kg/cm3
= ( E * I / k1 ) 1/5
= 5000 * sqrt( fck )
=
33541.0
N/mm2
=
335410
kg/cm2
Diameter of pile =
1200 mm
I
=
1.02E+11 mm4
=
1.02E+07 cm4
Hence
T
L1
Lf / T

=
=
=

471.8
cm
0m
2.2 _ For fixed headed pile

Hence the depth of fixity


Lf

where

1038.0 cm

Therefore as per cl. C - 1.2,IS 2911


Part 1/sec 2

Fig.2.IS2911-App-C

STRUCTCON DESIGNS P. L.

NOTE No.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
Point of fixity of =
pile:
L1 +
Lf

10.38 m Below GL
10.38 m

Length of the pile = GL - center of pile embed lvl - 0.75 - thickness of the pilecap / 2

SHEET

31-May-16
BY

CHKD

ANK

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

BY

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
Hence the length of the pile for analysis upto point of fixity
= 10.38
0.69
1.8
=
8.8
m

8.8
m

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

CHKD

ANK

ASK

G.L

Ground LVL
0.69 m
Pile cap top
1.8 m
Pile cap bottom

5.123
4.433
2.633

10.4 m
8.80 m

Fixity

-5.257

Founding LV

-17.577

Tilt and shift in pile:


Tilt and shift is to be considered in the pile as per IRC78:2014 .
As per cl. 709.1.5.2 max allowable tilt in the pile is 1 in 150 and the maximum allowable shift is 75 mm.
Total shift
=
75
mm
Shift in each direction
=
53.03 mm
Total tilt
= 8.8*1000/150
=
58.7 mm
Adopt shift in each direction
=
53.03 mm

Analysis and design philosophy:The superstructure has been supported on the piercap through bearings.
A portal consisting of two piers has been provided to support the piercap. A two separate pilecaps under
each pier with four piles has been proposed to this portal.
The analysis ans design philosophy for this structure is as below:2.1 Geometrical model
1 The structural system consisting of piercap, 2 piers supported on two separate pilecap. Each pilecap is
supporting four piles of 1.2m dia.
2 Piercap,piers are modelled as line elements with material propoerty as concrete.
and 19K15 cables are also modelled and stressesd at appropriate pressure.
3 The pilecap has been modelled as plate elements of thickness 1.8m.
4 Piles of length upto point of fixity are modelled as line elements of circular shape of dia 1.2m
5 The supports to piles has been defined as fixed.

STRUCTCON DESIGNS P. L.

NOTE No.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

SHEET

31-May-16
BY

CHKD

ANK

ASK

STRUCTCON DESIGNS P. L.

NOTE No.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

SHEET

31-May-16
BY

CHKD

ANK

2.2 Evaluation of Loads:1 Selfweight of modelled elements are defined in Midas by "Selfweight" command.
2 The superstructure dead loads(weight of structure+SIDL+SSDL) are available from
superstructure analysis. These loads are applied on the piercap at bearing locations.
The bearing of left span and right span are spaced at 1m in the longitudinal direction on either side of joint.
Hence the longitudinal moment due to load eccentricity is also applied alongwith
verical loads.
3 The pilecap top is 690 mm below the ground level, hence soil load of 0.69x18=12.42kN/sqm is applied
on pilecap.
4 Subsurface water is not encountered to these borehole locations as per Geotechnical reports.
Hence buoyancy is not considered.
5 The Live loads cases which will give maximum veritical loads and maximum longitudinal moments are
considered in the analysis. The position of a set of load i.e one 70R or one Class-A is
determined for these cases and extrapolated for multilanes. The loads on the bearings are
then determined by applying these loadson the superstructure line model.
6 Casewise these bearing reactions are applied on the piercap.For maximum piercap beam span moment,
the LL are applied towards center of beam.And for maximum shear in beam, LL are applied near to
the pier.
6 A bearing rigidity force is determined as per IRC guidelines and applied on the piercap
7 Wind load in longitudinal and transverse direction is also determined and applied on the pier top as point
loads in Midas.
8 Time period of the system has been evaluated as per IRC:6:2014. A Midasmodel with piles modelled
upto point of fixity has been used to determined the time period.The Seismic loads has been
evaluated in two orthogonal directions with these period and other relevant pararmeters.
These loads are also applied at pier top as point loads in appropriate directions.
9 The above defined loads are then combined in relevant load combinations as per IRC guidelines.
10 The structure is then analysed for these loads and load-combinations.
11 The analysis results are extracted and then further used for checking piles,design of piles,design
of pilecap and design of piers.

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

SUBJECT:

BY

2.3 VERTICAL LOADS

Self weight of superstructure:


a) DL from superstructure-Reactions on P26

8.5
8.5.1

The flyover(RC structure) and ROB(Steel structure) has been analysed separately for the
applicable loads and load combinations. The analysis results for respective load cases are used
for analysis and design of substructure-piles, pilecap, pier and piercap.

(6 Bearings)

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

Table showing loads on Piercap from superstructure


DL
SIDL
SSIDL
1
984
368
120
From 60m span

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

PROJECT:

Total
1472

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

BY

899

120

153

1172

918

142

167

1227

918

142

167

1227

899

120

153

1172

984
5602

368
1260

120
880

1472
7742

2194

324

228

2746

2194
4388

324
648

228
456

2746
5492

-1214

-612

-424

-2250

From 30.75m span 1


(2 Bearings)

2
Total
Longitudinal
moment due to
eccentricity

Sample calculation
DL from 30.75m span
DL from 60m span

4388 kN

5602 kN

Distance between Center of =


Bearings and Pier

Longitudinal moment developed

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

Total

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

R3
7742

R3=
7742
R4=
5492

1m
=
=

(4388x -1)+(5602x1)
1214 kNm

Longitudinal moment developed for each case is evaluated and applied in respective load case on
the pier cap beam in Midasmodel as shown below.

View showing Dead load applied on Piercap

ASK

kN

kN
kN

STRUCTCON DESIGNS P. L.

NOTE No.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

SHEET

31-May-16
BY

CHKD

ANK

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

BY

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

ASK

VEHICULAR LIVE LOAD:

(As per cl. 204 of IRC:6-2014.)


Longitudinal analysis
Live load on superstructure.
Trains of 70R and Class-A(single train over the whole width)are run over both spans of 60m and 30.75m
to get maximum load on pier as well as max longitudinal bending moment on the pier. Loading including
impact and longitudinal distance between two successive trains are as per IRC:6:2014.

3.1

70R Vehicle
Two successive trains of 70R vehicles moved over three spans such as to get
maximum vertical reaction on Pier P26.The Midasfile shows the reactions of each load case.
Studying the analysis results, a case with max total reaction on P26 piercap and max longitudinal
moments are identified.

Case with maximum reaction.

Case with Maximum vertical reaction


R2
R3
R4
Max reaction
884
1031
356
Load on P26=R3+R4
= 1031+356 =
1387
Per Wheel load =

kN

say

695 kN

Longitudinal moment =

1031
=

2
337.5 kNm

356

X1
Per wheel

Case with maximum Longitudinal moment

Case with maximum Longitudinal moment

1390

kN

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

BY

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
R2
R3
Reaction
1032
1276
Load on P26=R3+R4
= 1276+0
Hence Per wheel load=r/2
LA-Bearing center to piercap center
Hence Longitudinal moment

=
=
=
=

R4
0
1276
638
1
638 x 1

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

kN
kN
m
=

CHKD

ANK

Used for Transverse analysis


638
kNm
Per wheel

3.2 One class-A vehicle

Case with maximum reaction.


Similarly three consecutive Class-A vehicles are moved over these spans to get maximum vertical
reaction on P26.
8.5.2

Case with Maximum vertical reaction


R2
R3
R4
Max reaction
561
639
108
Load on P26=R3+R4
= 639+108 =
747
Hence Per wheel load=r/2
=
373.5
Let's apply
=
388
Longitudinal moment =

639
=

2
265.5 kNm

kN
kN
kN

108

X1
Per wheel

Case with maximum Longitudinal moment


Max difference in reactions on pier which will produce maximum longitudinal moment.

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

SUBJECT:

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

PROJECT:

BY

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

ASK

Case with maximum Longitudinal moment


R2
R3
Reaction
623
656
Load on P26=R3+R4
= 656+0
Hence Per wheel load=r/2

R4
0
656
328

=
=

kN
kN

LA-Bearing center to piercap center


Hence Longitudinal moment

328 x 1

328 kNm
per wheel

3.3 Transverse Analysis


Max live load reaction on pier are mainly due to LL on ROB.Moreover Live load applied on
ROB bearings will generate worse effect than applied on flyover bearings which
are near center.
Thus max LL on pier as calculated above are applied to get reactions on six bearings which are
in turn applied on substructure portal to get maximum transverse moments for corresponding loads.

3.4 Following load cases are considered:


Wheel loads are arranged so as to produce max. eccentricity w.r.t.CG of structure
LL-1 Class 70RW-One train
LL-2 Class 70RW-Two trains
LL-3 2-Class A+Class 70R
LL-4 Class 70RW+class A

LL-5 Class A
LL-6 Class A

2 lane
1 lane

LL-7 Class A

4 lane

Reactions at each bearing location are thus obtained and further applied over pier cap at
respective locations for each case.

Cases with Max Reactions


LL 1-Class 70RW 1 lane:

R= 413

1038

-73

12
Total

-2
=

0
1388 kN on P26

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

SUBJECT:

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

PROJECT:

BY

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

ASK

LL 2-Class 70RW 2 lane:

R= 411

1053

-158

697

830

-54

Total

2779 kN on P26

Total

840
=

-55
2942 kN on P26

Total

155
=

-21
2166 kN on P26

LL 3 -Class A2+70R lane:

R=

530

758

227

642

LL4 -Class 70RW 1 lane + class A one lane

414

1033

LL 5 -Class A2 lane:

-52

637

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

BY

743

313

-42
Total

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

532

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

7
=

ASK

-1
1552 kN on P26

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

BY

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

ASK

LL 6 -Class A 1lane:
9

564

248

-43

8
Total

-1
=

0
776 kN on P26

773

181

LL 7 -Class A4 lane:

533

736

341

540
Total

3104 kN on P26

Thus reactions from above analysis has been applied on piercap at bearing locations in load cases-7 to 13.
Similarly loads per wheel for maximum longitudinal moment are also applied
and the reactions from those are applied on the piercap in primary loadcases(LC-14 to 20)

The piercap beam for P26 is a single beam of 18m length whereas bridge deck is placed off-center.
The live load applied as definced above in LC-7 to LC20 will produce maximum span moment
in the piercap beam.
Another set of live load reactions is applied on the bearing locations near to pier support. These
load cases are LC21 to LC27-with maximum reactions and LC28 to LC34 with maximum longitudinal
moment. These loadcases will produce max shear and max pier and pile loads.
Thus following various load cases are considered:Loads on bearing which are near to center of piercap
LC7 to LC13
With max reaction
LC14 to LC20

With max longitudinal moment

Loads on bearing which are near to pier


LC21 to LC 27
With max reaction
LC28 to LC34

HORIZONTAL LOADS

4.1

Seismic Forces
Transverse Seismic load :

4.1.1

Horizontal seismic force

With max longitudinal moment

(As per cl. 219.5.1 of IRC:6-2014.)

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

SUBJECT:

BY

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
Feq

Ah

= Horizontal seismic coefficient


=
( Z / 2 ) . ( Sa / g )
(R/I)
= Zone factor
=
0.16 for zone III
= Importance factor
=
1.2
= Response reduction factor
=
3
. For Portal columns without ductile detailing (Table-9)
= Average response acceleration coefficient for 5% damping depending upon
fundamental period of vibration T.
For rocky or hard soil sites,
=
2.5
0.0 < T < 0.4
=
1/T
0.4 < T < 4.0
=
2.5
considered on conservative side
=
2
x
D
1000 F

Z
I
R
Sa / g

Sa / g

Ah

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

PROJECT:

x ( Dead load + appropriate live load )

= Dead load + live load


= 13234.0 + 554.0
= 13344.8 KN

0.2

Minm live load considered on conservative side

= Horizontal force required to be applied at the centre of the mass of


superstructure for 1mm horizontal deflection at the top of the pier
along the considered direction of horizontal force.

=
=

Hence

7.31
F
971.00

34000
36000
T
Therefore
Sa / g

Ref Staad analysis in annexure A

KN

for pile
for pier

N/mm

0.234

2.500

Hence
Ah

0.75E

FOR PSC BEAM


Ah
=

0.080

25500 N/mm2

0.240

The seismic mass for transverse seismic force at P26 is sum of reactions from left side span
of 60.0m and right side span of 32m. Refering to clause:219.8 of IRC:6:2014, the seismic loads has
been increased by 25% for foundation design only.
The total transverse seismic forces are given in the following table
Sr.
No.

1
2
3

Item

D.L.
S.I.D.L
S.S.DL

LL
LL-1
LL-2
LL-3

Reaction
through
right
span(R4)

4388.0
648.0
456.0
5492.0

ASK

Reaction
from
Left
span(R3)

5602.0
1260.0
880.0
7742.0

20% load considered


884.0
1031
1768.0
2062
2006.0
2309

R3+R4

13234.0

1915.0
3830.0
4315.0

*(R3+R4)*
1.25

Transverse
Load
=Ah*(R3+R4)
*W

For
Foundation
Design

For Pier Design

Transverse
Load =Ah

1323.4

1058.7

38.3
76.6
86.3

30.6
61.3
69.0

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

SUBJECT:

BY

1445.0
1670
3115.0
1122.0
1278
2400.0
561.0
639
1200.0
2244.0
2556
4800.0
Considered max value
Applied total transverse Seismic Force
Horizontal load per column of pier frame applied as
=

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
LL-4
LL-5
LL-6
LL-7

4.1.2

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

PROJECT:

62.3
48.0
24.0
96.0
96.0
1419.4
709.7

49.8
38.4
19.2
76.8
76.8
1135.5
kN 567.8 kN

Longitudinal Seismic load :


T

=
=

Hence

7.31
F
388.00

34000
36000
T
Therefore
Sa / g

Ref staad analysis in annexure A

KN

for pile
for pier

N/mm2

0.371

2.500

0.75E

25500 N/mm2

Hence

FOR PSC BEAM


Ah
= 0.080
= 0.240
The seismic mass for longitudinal seismic force at P25 is reaction from 52.67m span
transferred to P25 & P19.Refering to clause:219.8 of IRC:6:2014, the seismic loads has
been increased by 25% for foundation design only.Seismic mass due to Live load has been considered
for two full successive trains on the span which is slightly on conservative side.
Max
70R
2302
Class A
1278
Reaction
Reaction
Longi. Load
from
Longi. Load
Sr.
from
=Ah
=Ah*(R2+R3)
Item
right
R2+R3
*(R2+R3)*
No.
right
*W
span
1.25
span(R2)
(R3)
Ah

For
Foundation
Design

1
2
3

4.2

D.L.
S.I.D.L
S.S.DL

For Pier Design

5602
5602.0
1260
1260.0
880
880.0
7742.0
7742.0
15484.0
1548.4
1238.7
4 LL
20% load considered
LL-1
1031.0
356.0
1387.0
27.7
22.2
LL-2
2062.0
712.0
2774.0
55.5
44.4
LL-3
2309.0
572.0
2881.0
57.6
46.1
LL-4
1670.0
464.0
2134.0
42.7
34.1
LL-5
1278.0
216.0
1494.0
29.9
23.9
LL-6
639.0
108.0
747.0
14.9
12.0
LL-7
2556.0
432.0
2988.0
59.8
47.8
Considered max value
0.0
0.0
Applied at Pier top
1548
1239
Per pier load applied as
=
774.2 kN 619.4
The longitudinal seismic force from ROB between P25-P26 will be transferred to
Fixed pier P26.
Wind loads
(As per cl. 209 of IRC:6-2014.)
As per table 5 of Cl. 209 of IRC:6, for 10m height of structure, and for basic wind speed of 44 m/s,
the vz
=
29.2 m/s
for
33
m/sec
In mumbai region the basic wind speed
=
44
m/sec
Hence vz
=
38.93 m/s
Hence the horizontal wind pressure
= 0.6 * vz2
=

909.5

N/m2

0.909

kN/m2

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

DATE
PROJECT:
SUBJECT:

835/N-454
SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

BY

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

ASK

Obstructed area:Height of Solid barrier above Roadway


Height of Superstructure(Girder+Slab etc)
Total exposed height

=
=

2.50
3.45
5.95

m
m
m
(As per clause 209.3.6)

Wind in Transverse direction:Contributory Length=(34.5/2)+(60/2)


Projected area
=
5.95
Total transverse force

245.54

KN

45.38

=
=

45.4
270.0

for
=

33
36

0.609

m2

Without Live Load

Live load case : wind speed 36 m/s


Refering IRC:6:2014-Cl.209.3.6, Live load on a height of 3.0m above the roadway shall be considered.
10
45.4
x
0.50
=
22.7
Obstructed Area by vehicle
=
Total Obstructed Area
=
270.0 +
22.7 =
292.7
the vz
=
29.2 m/s
In mumbai region the basic wind speed
Hence vz
=
31.85 m/s

m2
m2

m/sec
m/sec

Hence the horizontal wind pressure


= 0.6 * vz2
=

608.8

N/m2
Force

kN/m2

= Pz x A x G x Cd
=
0.609

292.7

Gust factor

Total transverse force


Applied per pier =
374.2

=
kN

748.4

2.1
Drag coeff.

With Live Load

KN

Wind in Longitudinal direction:Referign to IRC:6:2014:Cl 209.3.4,Longitudinal wind on bridge superstructure shall be take as 25% of
the transverse wind for plate girder bridges.
Hence Longitudinal wind =
=
Applied per pier =

Wind on Pier:Wind on Pier=

d
=
2.0
b
=
1.5
d/b
= 1.333333 &
Drag Coe CD
=

Wind on Pier-Transverse direction


Wind on Pier- longitudinal direction

4.3

0.25 X
187.1 kN
93.6
kN

=
=
=
=

748.4

Height
H/b

8.091

5.4

1.4
1.4
5.09
1.4
3.82

(Table:6-Cl:209.4-IRC:6:2014)
x

0.91

2.0 x

0.91

1.5 x

KN/m

KN/m

Bearing rigidity forces:


(As per cl. 211 of IRC:6-2014.)
Pier considered in this note has fixed bearings for ROB(60.0m Span) & free bearings for RCC flyover.
Hence the bearing rigidity forces are calculated as per the cl. 211.5.1 of IRC:6-2014.

For Teflon on stainless steel

=
=

0.03
0.05

Min
Max

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

BY

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
58.00 m

ASK

28.75 m

Free

Free

Fixed

R1
=

R2
=
7742

R3
=
7742

(DL+/SIDL)

Max bearing rigidity force due to DL+SIDL+SSDL-P26-Two bearings =

Free
R4

5492
R4min
5492X0.03
164.76

164.76 kN
82.4 kN

Bearing rigidity force on fixed bearing on 60m span of ROB on Pier P26 due to LL

Max Reaction For one Class-A


Hence for 4-Class-A

=
=

387.0
387.0

kN
x

4=

1548

kN

Max Reaction For one 70R(W)


Hence for 2-70R(W)

=
=

857
857

kN
x

2=

1714

kN

Hence total Reaction R1 = DL+LL

=
7742
+
=
9456.00
Hence Bearing Rigidity Force at P26 on free bearing
= R1xmax
= 9456X0.05
=
472.80
Hence applied at locations of two bearings =
472.80
=
236.40

1714

kN
/2
kN

NOTE No.

STRUCTCON DESIGNS P. L.

DATE

SUBJECT:

4.4

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

PROJECT:

835/N-454

BY

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

ASK

Braking effect
Two full trains are accomodated over 60m span.
Hence two full trains are assumed for braking load calculations.
(As per IRC 6-2014, cl. 211.2)

For 70R (LL-2)


20% of First train and 10% of succeeding train
1st two Lanes

Other two Lanes

Load of one 70R

70RW
20%

70RW
10%

70RW
5%

70RW

1000
2000.0

kN
kN

0.2X1000=
0.1X1000=

200
100

3rd
4th

0.05X1000=
0.05X1000=
Total=

50
50
400

kN

554

kN

110.8
55.4
0
0
27.7
27.7
27.7
27.7
277

kN

5%

Reaction R3:For one 70R


For Two 70R

1000

1st Train
2nd

R3
(P26)

R2
(P25)

kN
kN

For Class A (LL-7)


Load of one Class-A
Class-A

1st two Lanes

Other two Lanes

1st Train
2nd
3rd
4th
5th
6th
7th
8th

Class-A

Class-A

Class-A
20%

Class-A

Class-A

Class-A

Class-A 5%

R2
(P25)

R3
(P26)
Reaction R3:For one Class-A
For 4-Class-A

554
2216.0

0.2X554=
0.1X554=
0X554=
0X554=
0.05X554=
0.05X554=
0.05X554=
0.05X554=
Total=

kN
kN

For one 70R & 2Class A( LL-3)

70RW

1st two Lanes

Other two Lanes

Load of one 70R


=
Load of one Class-A
=
1st Train
0.2X1000=
2nd
0.1X1000=
3rd
0X554=
4th
0X554=
5th
0.05X554=
6th
0.05X554=
7th
0.05X554=
8th
0.05X554=
Total=

70RW

Class-A

Class-A

Class-A

Class-A 5%
R3
(P26)

R2
(P25)
Reaction R3:For one 70R
=
For 2-Class-A
=
Total
=

1000
1108.0
2108

1000
554
200
100
0
0
27.7
27.7
27.7
27.7
410.8

kN
kN
kN

Evaluation of braking force for Non-Seismic case over fixed brearing on P-26

Fh

R3
Reaction
(LL)

R3=
DL+LL

R3* min

Fh-(R3*
min)

R3*
max

Fh/2+
(R3*
max)

kN
kN

kN

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

SUBJECT:

BY

300
400
410.8
355.4
166.2
166.2
277

1000
2000
2108
1554
2000
554
2216

8742
9742
9850
9296
9742
8296
9958

262.3
292.3
295.5
278.9
292.3
248.9
298.7

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
LL-1
LL-2
LL-3
LL-4
LL-5
LL-6
LL-7

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

PROJECT:

ASK

37.7
107.7
115.3
76.5
-126.1
-82.7
-21.7

437.1
487.1
492.5
464.8
487.1
414.8
497.9

587.1
687.1
697.9
642.5
570.2
497.9
636.4

Fh-(R3*
min)
-178.3
-164.3
-162.7
-170.5
-211.0
-202.3
-190.2

R3*
max
397.1
407.1
408.2
402.6
407.1
392.6
409.3

Fh/2+
(R3*
max)
427.1
447.1
449.3
438.2
423.7
409.3
437.0

Thus maximum longitudinal braking force on fixed bearing over P-26


Max force at bearing
= 697.9 kN
Applied at
1.2
m above Road Level
Evaluation of braking force for Seismic case

LL-1
LL-2
LL-3
LL-4
LL-5
LL-6
LL-7

Fh
60
80
82
71
33
33
55

R3
Reaction
(0.2LL)

200
400
422
311
400
111
443

Max force at bearing


Applied at
1.2

R3=
DL+
0.2LL
7942
8142
8164
8053
8142
7853
8185

R3* min
238.3
244.3
244.9
241.6
244.3
235.6
245.6

= 449.3 kN
m above Road Level

One Span dislodged condition


The Piles, pilecap and piers are checked foronly one span loading condition. Two Primary
load cases are defined- Case-98-when only ROB is erected and Case 99-when only flyover is
constructed.For these cases only dead load,SIDL and SSDL on the span are considered.
In these cases due to loading only one side of center of P26, the longitudinal moment on Pile and pilecap
will be maximum and hence the structural elements-piles,pilecap and piers have also been checked
for these cases.

5
5.1

INDIVIDUAL LOAD CASES AND THEIR COMBINATIONS


The following load cases are considered.
PRIMARY LOAD CASES:
1
2

3
4
5
6
7

SEISMIC LOADS IN LOGITUDINAL


SEISMIC LOADS IN TRANSVERSE

SL
TS

SELFWEIGHT
SUPERSTRUCTURE DEAD LOAD
SIDL

Selfweight
DL

SSIDL
PRESTRESS

SSDL
PT

SIDL

LL applied towards the center of piercap


Live load cases with maximum verical reaction

8
9
10
11
12
13
14

ONLY ONE 70R NEAR CRASH BARRIER


ONE 70R NEAR CRASH BARRIER AND OTHER 70R NEAR CENTRAL MEDIAN

LL1
LL2

2CLASSA NEAR CRASH BARRIER AND ONE 70R NEAR CENTRAL MEDIAN
ONE 70R NEAR CRASH BARRIER AND ONE CLASSA NEAR CENTRAL MEDIAN

LL3
LL4

TWO CLASS-A NEAR CRASH PARAPET


ONE CLASS-A NEAR CRASH PARAPET

LL5
LL6

TWO CLASS-A NEAR CRASH PARAPET AND ANOTHER SET OF TWO AT CENTRAL MEDIAN
Live load cases with maximum Longitudinal moment

LL7

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

SUBJECT:

BY

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
15
16
17
18
19
20
21

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

PROJECT:

ASK

ONLY ONE 70R NEAR CRASH BARRIER


ONE 70R NEAR CRASH BARRIER AND OTHER 70R NEAR CENTRAL MEDIAN

LL1
LL2

2CLASSA NEAR CRASH BARRIER AND ONE 70R NEAR CENTRAL MEDIAN
ONE 70R NEAR CRASH BARRIER AND ONE CLASSA NEAR CENTRAL MEDIAN
TWO CLASS-A NEAR CRASH PARAPET

LL3
LL4
LL5

ONE CLASS-A NEAR CRASH PARAPET


TWO CLASS-A NEAR CRASH PARAPET AND ANOTHER SET OF TWO AT CENTRAL MEDIAN

LL6
LL7

LL applied near to the pier location


22
23
24
25
26
27
28
29
30
31
32
33
34
35

36
37
38
39
40
41
42
43
44
45

Live load cases with maximum verical reaction


ONLY ONE 70R NEAR CRASH BARRIER

LL1A

ONE 70R NEAR CRASH BARRIER AND OTHER 70R NEAR CENTRAL MEDIAN
2CLASSA NEAR CRASH BARRIER AND ONE 70R NEAR CENTRAL MEDIAN

LL2A
LL3A

ONE 70R NEAR CRASH BARRIER AND ONE CLASSA NEAR CENTRAL MEDIAN
TWO CLASS-A NEAR CRASH PARAPET

LL4A
LL5A

ONE CLASS-A NEAR CRASH PARAPET


TWO CLASS-A NEAR CRASH PARAPET AND ANOTHER SET OF TWO AT CENTRAL MEDIAN

LL6A
LL7A

Live load cases with maximum Longitudinal moment


ONLY ONE 70R NEAR CRASH BARRIER
ONE 70R NEAR CRASH BARRIER AND OTHER 70R NEAR CENTRAL MEDIAN

LL1A
LL2A

2CLASSA NEAR CRASH BARRIER AND ONE 70R NEAR CENTRAL MEDIAN
ONE 70R NEAR CRASH BARRIER AND ONE CLASSA NEAR CENTRAL MEDIAN

LL3A
LL4A

TWO CLASS-A NEAR CRASH PARAPET


ONE CLASS-A NEAR CRASH PARAPET

LL5A
LL6A

TWO CLASS-A NEAR CRASH PARAPET AND ANOTHER SET OF TWO AT CENTRAL MEDIAN

LL7A

WIND IN LONGITUDINAL
WIND IN TRANVERSE

WL
WT

BRAKING FORCE/BEARING RIGIDITY FORCE-Non-seismic case


BRAKING FORCE/BEARING RIGIDITY FORCE-Seismic case

BR
BRS

SUPERSTRUCTURE DEAD LOAD


SIDL-ONLY FLYOVER SIDE
SSIDL-ONLY FLYOVER SIDE
SUPERSTRUCTURE DEAD LOAD(ONLY ROB)
SIDL(ONLY ROB)
SSIDL(ONLY ROB)

6 LOAD COMBINATIONS
6.1 Load Factors
DL,SIDL

SSDL

LL

SESIMIC

1
1
1
1
1

1
1
1
1
1

1
0.2
1

Permissible
stress

1
1.5
1.25
1.33
1.33

(As per . Amendment no. 2 IRC:6-2014/ august 2014.)

DL,SIDL

SSDL

LL

Leading
1

1.2

accompany

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

BY

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
1

1.2

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

ASK

0.75
(As per . Amendment no. 2 IRC:6-2014/ august 2014.)

DL,SIDL

SSDL

LL

backfill

WIND

SEISMIC

Leading

accompany

Leading

accompany

1.35

1.75

1.5

1.15

1.5

0.9

1.35

1.75

0.2

0.75

1.5

6.2 LOAD COMBINATIONS FOR PILE CAPACITY CHECK:

DL + SIDL + SSDL(ONLY ROB)


DL + SIDL + SSDL(ONLY FLYOVER)
NORMAL COMBINATION

Maximum Reaction Case

Maximum Longitudinal Moment Case

Towards ccenter of piercap

809
810
811
812
813
814
815

DL + SIDL + SSDL
DL + SIDL + SSDL + LL 1+BR
DL + SIDL + SSDL + LL 2+BR
DL + SIDL + SSDL + LL 3+BR
DL + SIDL + SSDL + LL 4+BR
DL + SIDL + SSDL + LL 5+BR
DL + SIDL + SSDL + LL 6+BR
DL + SIDL + SSDL + LL 7+BR

816
817
818
819
820
821
822

DL + SIDL + SSDL + LL 1A+BR


DL + SIDL + SSDL + LL 2A+BR
DL + SIDL + SSDL + LL 3A+BR
DL + SIDL + SSDL + LL 4A+BR
DL + SIDL + SSDL + LL 5A+BR
DL + SIDL + SSDL + LL 6A+BR
DL + SIDL + SSDL + LL 7A+BR

837
838
839
840
841
842
843

DL + SIDL + SSDL +TS


DL + SIDL + SSDL + LL 1(0.2)+TS+BRS
DL + SIDL + SSDL + LL 2 (0.2)+TS+BRS
DL + SIDL + SSDL + LL 3 (0.2)+TS+BRS
DL + SIDL + SSDL + LL 4(0.2)+TS+BRS
DL + SIDL + SSDL + LL 5 (0.2)+TS+BRS
DL + SIDL + SSDL + LL 6 (0.2)+TS+BRS
DL + SIDL + SSDL + LL 7 (0.2)+TS+BRS

851
852
853
854
855
856
857

844
845
846
847
848
849
850

DL + SIDL + SSDL + LL 1A(0.2)+TS+BRS


DL + SIDL + SSDL + LL 2A (0.2)+TS+BRS
DL + SIDL + SSDL + LL 3A (0.2)+TS+BRS
DL + SIDL + SSDL + LL 4A(0.2)+TS+BRS
DL + SIDL + SSDL + LL 5 A(0.2)+TS+BRS
DL + SIDL + SSDL + LL 6A (0.2)+TS+BRS
DL + SIDL + SSDL + LL 7A (0.2)+TS+BRS

858
859
860
861
862
863
864

823
824
825
826
827
828
829

Near piercap support

830
831
832
833
834
835
836

TRANS SEISMIC COMBINATION

LONG SEISMIC COMBINATION

DL + SIDL + SSDL +LS


865 DL + SIDL + SSDL + LL 1(0.2)+LS+BRS
866 DL + SIDL + SSDL + LL 2 (0.2)+LS+BRS

879
880

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

BY

867
868
869
870
871

DL + SIDL + SSDL + LL 3 (0.2)+LS+BRS


DL + SIDL + SSDL + LL 4(0.2)+LS+BRS
DL + SIDL + SSDL + LL 5 (0.2)+LS+BRS
DL + SIDL + SSDL + LL 6 (0.2)+LS+BRS
DL + SIDL + SSDL + LL 7 (0.2)+LS+BRS

881
82
883
884
885

872
873
874
875
876
877
878

DL + SIDL + SSDL + LL 1A(0.2)+LS+BRS


DL + SIDL + SSDL + LL 2A (0.2)+LS+BRS
DL + SIDL + SSDL + LL 3A (0.2)+LS+BRS
DL + SIDL + SSDL + LL 4A(0.2)+LS+BRS
DL + SIDL + SSDL + LL 5 A(0.2)+LS+BRS
DL + SIDL + SSDL + LL 6A (0.2)+LS+BRS
DL + SIDL + SSDL + LL 7A (0.2)+LS+BRS

886
887
888
889
890
891
892

Maximum Reaction Case

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

WIND COMBINATION

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

ASK

Maximum Longitudinal Moment Case


Transverse wind

893
894
895
896
897
898
899

DL + SIDL + SSDL + WT
DL + SIDL + SSDL + LL 1+WT+BR
DL + SIDL + SSDL + LL 2 +WT+BR
DL + SIDL + SSDL + LL 3+WT+BR
DL + SIDL + SSDL + LL 4+WT+BR
DL + SIDL + SSDL + LL 5+WT+BR
DL + SIDL + SSDL + LL 6+WT+BR
DL + SIDL + SSDL + LL 7+WT+BR

907
908
909
910
911
912
913

900
901
902
903
904
905
906

DL + SIDL + SSDL + WT
DL + SIDL + SSDL + LL 1A+WT+BR
DL + SIDL + SSDL + LL 2A +WT+BR
DL + SIDL + SSDL + LL 3A+WT+BR
DL + SIDL + SSDL + LL 4A+WT+BR
DL + SIDL + SSDL + LL 5A+WT+BR
DL + SIDL + SSDL + LL 6A+WT+BR
DL + SIDL + SSDL + LL 7A+WT+BR

914
915
916
917
918
919
920

921
922
923
924
925
926
927

With longitudinal wind


DL + SIDL + SSDL + WT
DL + SIDL + SSDL + LL 1+WT+BR
DL + SIDL + SSDL + LL 2 +WT+BR
DL + SIDL + SSDL + LL 3+WT+BR
DL + SIDL + SSDL + LL 4+WT+BR
DL + SIDL + SSDL + LL 5+WT+BR
DL + SIDL + SSDL + LL 6+WT+BR
DL + SIDL + SSDL + LL 7+WT+BR

936
937
938
939
940
941
942

928
929
930
931
932
933
934
935

DL + SIDL + SSDL + WL
DL + SIDL + SSDL + LL 1A+WL+BR
DL + SIDL + SSDL + LL 2A +WL+BR
DL + SIDL + SSDL + LL 3A+WL+BR
DL + SIDL + SSDL + LL 4A+WL+BR
DL + SIDL + SSDL + LL 5A+WL+BR
DL + SIDL + SSDL + LL 6A+WL+BR
DL + SIDL + SSDL + LL 7A+WL+BR

943
944
945
946
947
948
949

Combinations for ULS case


BASIC COMBINATION

1.35DL + 1.35SIDL + 1.75SSDL

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

BY

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

Towards ccenter of piercap

1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 1 +1.5WT + 1.15BR


1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 2 +1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 3 +1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 4 +1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 5 +1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 6 +1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 7 +1.5WT + 1.15BR

515
516
517
518
519
520
521

Near piercap support

508
509
510
511
512
513
514

1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 1A +1.5WT + 1.15BR


1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 2A +1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 3A +1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 4A +1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 5A +1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 6A+1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 7A +1.5WT + 1.15BR

522
523
524
525
526
527
528

Live load Leading, WL Accompanying


Towards ccenter of piercap

529
530
531
532
533
534
535

1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 1 +1.5WL + 1.15BR


1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 2 +1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 3 +1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 4 +1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 5 +1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 6 +1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 7 +1.5WL + 1.15BR

543
544
545
546
547
548
549

Near piercap support

536
537
538
539
540
541
542

1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 1A +1.5WL + 1.15BR


1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 2A +1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 3A +1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 4A +1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 5A +1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 6A+1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 7A +1.5WL + 1.15BR

550
551
552
553
554
555
556

WT load Leading, Live Load Accompanying


Towards ccenter of piercap

557
558
559
560
561
562
563

1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 1 +1.5WT + 1.15BR


1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 2 +1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 3 +1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 4 +1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 5 +1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 6 +1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 7 +1.5WT + 1.15BR

571
572
573
574
575
576
577

Near piercap support

564
565
566
567
568
569

1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 1A +1.5WT + 1.15BR


1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 2A +1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 3A +1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 4A +1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 5A +1.5WT + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 6A+1.5WT + 1.15BR

CHKD

ANK

Live load Leading, WT Accompanying

501
502
503
504
505
506
507

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

578
579
580
581
582
583

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

BY

584

WL load Leading, Live Load Accompanying


Towards ccenter of piercap

585
586
587
588
589
590
591

1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 1 +1.5WL + 1.15BR


1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 2 +1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 3 +1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 4 +1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 5 +1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 6 +1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 7 +1.5WL + 1.15BR

599
600
601
602
603
604
605

Near piercap support

592
593
594
595
596
597
598

1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 1A +1.5WL + 1.15BR


1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 2A +1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 3A +1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 4A +1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 5A +1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 6A+1.5WL + 1.15BR
1.35DL + 1.35SIDL + 1.75SSDL + 1.5LL 7A +1.5WL + 1.15BR

606
607
608
609
610
611
612

SEISMIC COMBINATION
Transverse Seismic combinations
1.35DL + 1.35SIDL + 1.75SSDL
Towards ccenter of piercap

613
614
615
616
617
618
619

1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 1 +1.5TSL + 0.45LS + BRS


1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 2 +1.5TSL + 0.45LS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 3 +1.5TSL + 0.45LS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 4 +1.5TSL + 0.45LS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 5 +1.5TSL + 0.45LS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 6 +1.5TSL + 0.45LS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 7 +1.5TSL + 0.45LS + BRS

627
628
629
630
631
632
633

Near piercap support

620
621
622
623
624
625
626

1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 1A +1.5TSL + 0.45LS + BRS


1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 2A +1.5TSL + 0.45LS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 3A +1.5TSL + 0.45LS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 4A+1.5TSL + 0.45LS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 5A +1.5TSL + 0.45LS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 6A +1.5TSL + 0.45LS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 7A +1.5TSL + 0.45LS + BRS

634
635
636
637
638
639
640

Longitudinal Seismic combinations


1.35DL + 1.35SIDL + 1.75SSDL
Towards ccenter of piercap

641
642
643
644
645
646
647

1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 1 +1.5LS + 0.45TS + BRS


1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 2 +1.5LS + 0.45TS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 3 +1.5LS + 0.45TS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 4 +1.5LS + 0.45TS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 5 +1.5LS + 0.45TS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 6 +1.5LS + 0.45TS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 7 +1.5LS + 0.45TS + BRS

655
656
657
658
659
660
661

Near piercap support

648 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 1A +1.5LS + 0.45TS + BRS

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

570 1.35DL + 1.35SIDL + 1.75SSDL + 1.5LL 7A +1.5WT + 1.15BR

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

662

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

649
650
651
652
653
654

BY

663
664
665
666
667
668

RARE COMBINATION

Live load Leading, WT Accompanying


Towards ccenter of piercap

669
670
671
672
673
674
675

DL + SIDL + 1.2SSDL + LL 1(1)+0.6WT +BR


DL + SIDL + SSDL + LL 2(1)+0.6WT+BR
DL + SIDL + SSDL +LL 3(1)+0.6WT+BR
DL + SIDL + SSDL + LL 4(1)+0.6WT+BR
DL + SIDL + SSDL + LL 5(1)+0.6WT+BR
DL + SIDL + SSDL + LL 6(1)+0.6WT+BR
DL + SIDL + SSDL +LL 7(1)+0.6WT+BR

683
684
685
686
687
688
689

Near piercap support

676
677
678
679
680
681
682

DL + SIDL + 1.2SSDL + LL 1A(1)+0.6WT +BR


DL + SIDL + SSDL + LL 2A(1)+0.6WT+BR
DL + SIDL + SSDL +LL 3A(1)+0.6WT+BR
DL + SIDL + SSDL + LL 4A(1)+0.6WT+BR
DL + SIDL + SSDL + LL 5A(1)+0.6WT+BR
DL + SIDL + SSDL + LL 6A(1)+0.6WT+BR
DL + SIDL + SSDL +LL 7A(1)+0.6WT+BR

690
691
692
693
694
695
696

Live load Leading, WL Accompanying


Towards ccenter of piercap

697
698
699
700
701
702
703

DL + SIDL + 1.2SSDL + LL 1(1)+0.6WL +BR


DL + SIDL + SSDL + LL 2(1)+0.6WL+BR
DL + SIDL + SSDL +LL 3(1)+0.6WL+BR
DL + SIDL + SSDL + LL 4(1)+0.6WL+BR
DL + SIDL + SSDL + LL 5(1)+0.6WL+BR
DL + SIDL + SSDL + LL 6(1)+0.6WL+BR
DL + SIDL + SSDL +LL 7(1)+0.6WL+BR

711
712
713
714
715
716
717

Near piercap support

704
705
706
707
708
709
710

DL + SIDL + 1.2SSDL + LL 1A(1)+0.6WL +BR


DL + SIDL + SSDL + LL 2A(1)+0.6WL+BR
DL + SIDL + SSDL +LL 3A(1)+0.6WL+BR
DL + SIDL + SSDL + LL 4A(1)+0.6WL+BR
DL + SIDL + SSDL + LL 5A(1)+0.6WL+BR
DL + SIDL + SSDL + LL 6A(1)+0.6WL+BR
DL + SIDL + SSDL +LL 7A(1)+0.6WL+BR

WT load Leading, Live Load Accompanying


Towards ccenter of piercap

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 2A +1.5LS + 0.45TS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 3A +1.5LS + 0.45TS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 4A+1.5LS + 0.45TS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 5A +1.5LS + 0.45TS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 6A +1.5LS + 0.45TS + BRS
1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 7A +1.5LS + 0.45TS + BRS

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

718
719
720
721
722
723
724

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

725
726
727
728
729
730
731

BY

739
740
741
742
743
744
745

Near piercap support

732
733
734
735
736
737
738

DL + SIDL + 1.2SSDL + LL 1A(0.75)+WT +0.75BR


DL + SIDL + SSDL + LL 2A(0.75)+WT+0.75BR
DL + SIDL + SSDL +LL 3A(0.75)+WT+0.75BR
DL + SIDL + SSDL + LL 4A(0.75)+WT+0.75BR
DL + SIDL + SSDL + LL 5A(0.75)+WT+0.75BR
DL + SIDL + SSDL + LL 6A(0.75)+WT+0.75BR
DL + SIDL + SSDL +LL 7A(0.75)+WT+0.75BR

746
747
748
749
750
751
752

WL load Leading, Live Load Accompanying


Towards ccenter of piercap

753
754
755
756
757
758
759

DL + SIDL + 1.2SSDL + LL 1(0.75)+WL +0.75BR


DL + SIDL + SSDL + LL 2(0.75)+WL+0.75BR
DL + SIDL + SSDL +LL 3(0.75)+WL+0.75BR
DL + SIDL + SSDL + LL 4(0.75)+WL+0.75BR
DL + SIDL + SSDL + LL 5(0.75)+WL+0.75BR
DL + SIDL + SSDL + LL 6(0.75)+WL+0.75BR
DL + SIDL + SSDL +LL 7(0.75)+WL+0.75BR

767
768
769
770
771
772
773

Near piercap support

760
761
762
763

DL + SIDL + 1.2SSDL + LL 1A(0.75)+WL +0.75BR


DL + SIDL + SSDL + LL 2A(0.75)+WL+0.75BR
DL + SIDL + SSDL +LL 3A(0.75)+WL+0.75BR
DL + SIDL + SSDL + LL 4A(0.75)+WL+0.75BR

CHKD

ANK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
DL + SIDL + 1.2SSDL + LL 1(0.75)+WT +0.75BR
DL + SIDL + SSDL + LL 2(0.75)+WT+0.75BR
DL + SIDL + SSDL +LL 3(0.75)+WT+0.75BR
DL + SIDL + SSDL + LL 4(0.75)+WT+0.75BR
DL + SIDL + SSDL + LL 5(0.75)+WT+0.75BR
DL + SIDL + SSDL + LL 6(0.75)+WT+0.75BR
DL + SIDL + SSDL +LL 7(0.75)+WT+0.75BR

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

774
775
776
777

764 DL + SIDL + SSDL + LL 5A(0.75)+WL+0.75BR

778

765 DL + SIDL + SSDL + LL 6A(0.75)+WL+0.75BR


766 DL + SIDL + SSDL +LL 7A(0.75)+WL+0.75BR

779
780

ASK

GRADE

Page 64

GRADE

Page 65

GRADE

Page 66

GRADE

Page 67

GRADE

Page 68

GRADE

Page 69

GRADE

Page 70

GRADE

Page 71

GRADE

Page 72

GRADE

Page 73

GRADE

Page 74

GRADE

Page 75

GRADE

Page 76

GRADE

Page 77

GRADE

Page 78

GRADE

Page 79

GRADE

Page 80

GRADE

Page 81

GRADE

Page 82

GRADE

Page 83

GRADE

Page 84

GRADE

Page 85

GRADE

Page 86

GRADE

Page 87

GRADE

300

Page 88

NOTE No.

STRUCTCON DESIGNS P. L.

34
835/N-454

DATE
PROJECT:

BETWEEN BKC AND EEH


SUBJECT:

BY

7.0

Number of cable and their stressing stage is given in table below.


Construction stage analsis is carried out in Midas civil

Steps for construction stage analysis taken listed as following,

CS1
CS2
CS3
CS4
CS5
CS6
CS7
CS8
CS9
CS10

Days

0
15
22
52
59
89
96
126
156
20156

Case

Cables

Both column of portal cast


Piercap of portal cast on staging
1st stage prestress of piercap done

CHKD

ANK ASK

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

Construction Stage

SHEET

31-May-16

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR

3,7,14,15,16,17,18

Girders from 60m span placed


2nd stage prestressing

2,8,13,19

Girders from 32m span placed


3rd stage prestressing

1,5,9,10,11,12,20

SIDL reaction is applied


Full live load reaction applied
Long term creep and shrinkage

Total 18 cables + 2 dummy

NOTE No.

STRUCTCON DESIGNS Pvt Ltd.

835/N-455
DATE

BETWEEN BKC AND EEH

BY

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

1.0
1.1

SHEET

2-Jun-16

PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR

ASK

ANK

Post Tensioned Pier Cap Analysis & Design


Piercap, piers and pile caps are modelled in Midas as line elements.
Pilecap has been modelled with four noded plates supported on piles. Piles of 1.2m dia are modelled
upto point of fixity and defined as fixed supports at that level.
All loads are applied on Piercap and piers appropriately.
Reference Note: 835/N-454

1.1.1

General Data
Pier cap size=

4.00

Post tensioned cables data


Cables
Duct Dia
Span length c/c between two piers
Left side cantilever Length
Right side cantilever length
Depth of Pier Cap
Width of pier cap
Grade of concrete (fck)

=
=
=
=
=
=
=
=

18
107.00
18.02
3.5
1.8
1.5
4
M 55

1.50

No.s
mm
m
m
m
m
m

2 No.s Dummy

Fig. showing general arrangement

Fig. showing general arrangement location of bearings

Permissible stresses in concrete Stage

IRC-112, 12.2.1
Minimum (MPa)

Maximum (MPa)

Construction

2.5

-26.40

Service

3.5

-26.40

Cable profile
Cable no. 1 to 9
e1

e2

e3

e4

e5

-180 mm

-365 mm

-610 mm

-260 mm

-180 mm

Eccentricities

Cable No. 10 to 20
e1

e2

e3

e4

e5

180 mm

115 mm

-380 mm

0 mm

115 mm

Eccentricities

Cable arrangement

at Mid Section
at Left Support Aection
Input Parameters
Concrete:
Fck, Characterstic Compressive strength =
Ec, Modulus of Elasticity of concrete =
Reinforcement Steel
Grade
=
Fy
=
Es
=

Mpa
55
36000.00 MPa

Table 6.5, IRC-112

Fe500
Mpa
500
2.00E+05 Mpa

Prestresing Steel:
Type of Prestressing cables used i.e
Area of 1 strand (Astrand) =
Area of one cable

19 strands of
19 T 15
140 mm2

15.2 dia. Each


type anchorage
IS 14268-1995
2660
=

mm^2

UTS of strand
Jacking force
Force per cable

=
=

Es
Fu (Ultimate Strength)
Fy (Yield Strength)

=
=
=

Sheathing Type Duct Diameter


As per, IRC-112, Table 7.1
Coefficient of friction (meu)
Coefficient of wobble (k)
Anchorage Slip
Stressing Type

0.765
1422.90

x
x

1860
2.660

=
=

1860
1423
3784.91

1.95E+05 Mpa
1860 Mpa
1570 Mpa
Corugated HDPE
=
=
=
=
=

Minimum strength of concrete at the time of stressing =


Age of concrete at the time of stressing =

107 mm
0.17
0.002 per meter
mm
6
One end stressing
MPa
45
days
7
(assumed minimum age, actual may be more)

Creep & Shrinkage Inputs


Relative Humidity
Notional size of member

=
=
=
Compressive stregnth of concrete at the age of 28 days
=
Days considered for long term creep and shrinkage
=

70
2*Ac/ u
1
55

Mpa

20,000 Days

Graph of time vs Creep Coefficient (Generated through Midas Civil)

Mpa
Mpa
KN

Graph of time vs Shrinkage Strain (Generated through Midas Civil)

8.1.2

Construction Stages Data


Number of cable and their stressing stage is given in table below.
Construction stage analsis is carried out in Midas civil
Steps for construction stage analysis taken listed as following,

Construction Stage

Days

0
15
22
32
40
50
60
90
100
20100

CS1
CS2
CS3
CS4
CS5
CS6
CS7
CS8
CS9
CS10

Case

Cables

Both column of portal cast


Piercap of portal cast on staging

0
15
4,6,12,13,14,15,16
7
10
3,7,11,17
8
10
1,2,5,8,9,10,18
10
30
10
20000
Total 18 cables + 2 dummy

1st stage prestress of piercap done


Girders from 60m span placed
2nd stage prestressing
Girders from 32m span placed
3rd stage prestressing
SIDL reaction is applied
Full live load reaction applied
Long term creep and shrinkage

* Cables should be stressed symmetricially in all the stages. i.e 4/6, 13/15, 14, 12/16
8.2

Summary of Stresses at each Stages


Results are Extracted from the midas model.
Sign convention
Negative = Compression
Positive = Tension

Element numbers in Midas


STAGE 2

Elem
659
LEFT
CANTIL
EVER

Pier cap cast on staging

Load
Summation

Stage
CS 2

Part
J[14]

Axial
(N/mm^2)

Bend(+z)
(N/mm^2)

Bend(-z)
(N/mm^2)

0.00

0.05

-0.05

TOP
BOTTOM
(N/mm^2) (N/mm^2)
0.05

-0.05

LEFT
CANTIL
EVER

PIER
CAP

RIGHT
CANTIL
EVER

659
660
660
661
661
665
665
668
668
671
671
672
672
673
673

Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation

CS 2
CS 2
CS 2
CS 2
CS 2
CS 2
CS 2
CS 2
CS 2
CS 2
CS 2
CS 2
CS 2
CS 2
CS 2

I[8]
I[14]
J[5]
J[378]
I[5]
J[6]
I[9]
J[11]
I[15]
J[747]
I[12]
J[379]
I[747]
I[379]
J[380]

0.00
0.00
0.00
0.00
0.00
-0.03
-0.03
-0.03
-0.03
-0.03
-0.03
-0.03
-0.03
0.00
0.00

0.00
0.05
0.32
0.63
0.32
-1.65
-0.89
-2.53
-2.30
-1.55
-1.94
1.47
-1.55
0.16
0.00

0.00
-0.05
-0.32
-0.63
-0.32
1.72
0.93
2.63
2.40
1.60
2.01
-1.48
1.60
-0.16
0.00

* At this stage pier will be supported on staging, hence stress check is not required

STAGE 3

LEFT
CANTIL
EVER

PIER
CAP

RIGHT
CANTIL
EVER

659
659
660
660
661
661
665
665
668
668
671
671
672
672
673
673

LEFT
CANTIL
EVER

PIER
CAP

RIGHT
CANTIL
EVER

659
659
660
660
661
661
665
665
668
668
671
671
672
672
673
673

0.00
-0.05
-0.32
-0.63
-0.32
1.69
0.90
2.60
2.37
1.57
1.98
-1.51
1.57
-0.16
0.00
2.60
-1.51

MAX
MIN

-7.42
-7.03
-6.16
-7.03
-5.05
-6.16
-1.25
-2.10
-1.54
-1.95
-2.81
-3.23
-5.77
-3.23
-7.71
-4.60
-1.25
-7.71

0.14
-0.28
-1.20
-0.28
-2.38
-1.20
-6.42
-5.43
-6.17
-5.74
-4.83
-4.39
-1.70
-4.39
0.24
-2.97
0.24
-6.42

MAX
MIN

-7.30
-6.92
-5.11
-6.92
-3.36
-5.11
-4.20
-3.84
-6.64
-5.77
-6.24
-5.57
-3.18
-5.57
-4.52
-7.58
-3.18
-7.58

0.13
-0.27
-2.17
-0.27
-3.99
-2.17
-3.47
-3.68
-1.08
-1.96
-1.41
-2.05
-4.31
-2.05
-2.93
0.23
0.23
-4.31

First stage prestress


Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation

CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3

Max Allowable Compression


Mx Allowable Tension
STAGE 4

MAX
MIN

0.00
0.05
0.32
0.63
0.32
-1.68
-0.92
-2.56
-2.33
-1.58
-1.97
1.44
-1.58
0.16
0.00
1.44
-2.56

I[8]
J[14]
J[5]
I[14]
J[378]
I[5]
J[6]
I[9]
I[15]
J[11]
I[12]
J[747]
J[379]
I[747]
J[380]
I[379]
=
=

-26.40
2.50

-3.66
-3.67
-3.70
-3.67
-3.73
-3.70
-3.84
-3.76
-3.88
-3.87
-3.84
-3.82
-3.75
-3.82
-3.76
-3.79

-3.76
-3.36
-2.46
-3.36
-1.32
-2.46
2.60
1.67
2.34
1.92
1.03
0.60
-2.02
0.60
-3.96
-0.81

Mpa
Mpa

OK
OK

-3.60
-3.62
-3.65
-3.62
-3.68
-3.65
-3.86
-3.77
-3.92
-3.92
-3.86
-3.83
-3.74
-3.83
-3.73
-3.69

-3.70
-3.30
-1.46
-3.30
0.32
-1.46
-0.34
-0.07
-2.72
-1.86
-2.38
-1.73
0.56
-1.73
-0.79
-3.88

Mpa
Mpa

OK
OK

3.80
3.40
2.50
3.40
1.35
2.50
-2.57
-1.67
-2.29
-1.87
-0.99
-0.57
2.05
-0.57
4.00
0.82

ROB placed
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation

CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4

Max Allowable Compression


Mx Allowable Tension

I[8]
J[14]
J[5]
I[14]
J[378]
I[5]
J[6]
I[9]
J[11]
I[15]
I[12]
J[747]
J[379]
I[747]
I[379]
J[380]
=
=

-26.40
2.50

3.73
3.34
1.48
3.34
-0.31
1.48
0.39
0.09
2.83
1.95
2.45
1.79
-0.56
1.79
0.80
3.92

STAGE 5

LEFT
CANTIL
EVER

PIER
CAP

RIGHT
CANTIL
EVER

659
659
660
660
661
661
665
665
668
668
671
671
672
672
673
673

Second stage prestressing


Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation

CS 5
CS 5
CS 5
CS 5
CS 5
CS 5
CS 5
CS 5
CS 5
CS 5
CS 5
CS 5
CS 5
CS 5
CS 5
CS 5

Max Allowable Compression


Mx Allowable Tension

STAGE 6
659
LEFT
CANTIL
EVER

PIER
CAP

RIGHT
CANTIL
EVER

659
660
660
661
661
665
665
668
668
671
671
672
672
673
673

LEFT
CANTIL
EVER

PIER
CAP

RIGHT
CANTIL
EVER

659
659
660
660
661
661
665
665
668
668
671
671
672
672

=
=

-26.40
2.50

-5.64
-5.66
-5.72
-5.66
-5.76
-5.72
-5.94
-5.82
-6.00
-6.01
-5.94
-5.91
-5.91
-5.79
-5.82
-5.77

-4.65
-3.90
-1.53
-3.90
0.72
-1.53
2.09
1.69
-0.22
0.73
-0.56
-0.31
-0.31
-0.73
-0.39
-4.91

Mpa
Mpa

OK
OK

-5.59

-3.86

-5.57
-5.59
-5.65
-5.65
-5.69
-5.86
-6.01
-6.10
-6.07
-5.91
-5.95
-5.78
-5.91
-5.69
-5.75

-4.59
-3.86
-1.51
-1.51
0.73
-2.06
-2.62
-5.28
-4.68
-1.70
-2.73
1.50
-1.70
-4.84
-0.38

Mpa
Mpa

OK
OK

-9.11
-9.07
-9.19
-9.11
-9.19
-9.25
-9.33
-9.49
-9.56
-9.60
-9.40
-9.45
-9.40
-9.25

-2.78
-4.34
0.76
-2.78
0.76
3.83
1.50
1.67
-0.35
-0.82
1.13
0.65
1.13
0.42

4.70
3.95
1.56
3.95
-0.72
1.56
-2.03
-1.66
0.35
-0.62
0.65
0.37
0.37
0.74
0.39
4.96
MAX
MIN

-10.30
-9.57
-7.25
-9.57
-5.04
-7.25
-3.84
-4.14
-6.22
-5.27
-6.50
-6.22
-6.22
-6.52
-6.21
-10.70
-3.84
-10.70

-0.94
-1.71
-4.16
-1.71
-6.48
-4.16
-7.96
-7.48
-5.65
-6.62
-5.29
-5.54
-5.54
-5.06
-5.43
-0.81
-0.81
-7.96

3.91

-9.45

-1.68

4.64
3.91
1.53
1.53
-0.73
2.08
2.66
5.35
4.78
1.75
2.81
-1.51
1.75
4.89
0.39
MAX
MIN

-10.20
-9.45
-7.15
-7.15
-4.96
-7.92
-8.63
-11.40
-10.80
-7.61
-8.69
-4.28
-7.61
-10.50
-6.13
-4.28
-11.40

-0.93
-1.68
-4.12
-4.12
-6.42
-3.79
-3.34
-0.75
-1.28
-4.16
-3.15
-7.29
-4.16
-0.80
-5.36
-0.75
-7.29

-11.90
-13.40
-8.43
-11.90
-8.43
-5.42
-7.83
-7.82
-9.91
-10.40
-8.27
-8.80
-8.27
-8.83

-6.30
-4.68
-9.94
-6.30
-9.94
-13.10
-10.70
-11.00
-8.95
-8.54
-10.40
-9.91
-10.40
-9.69

Other span placed


Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation

CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6

Max Allowable Compression


Mx Allowable Tension

STAGE 7

I[8]
J[14]
J[5]
I[14]
J[378]
I[5]
J[6]
I[9]
J[11]
I[15]
I[12]
J[747]
I[747]
J[379]
I[379]
J[380]

J[14]
I[8]
I[14]
J[5]
I[5]
J[378]
I[9]
J[6]
I[15]
J[11]
J[747]
I[12]
J[379]
I[747]
J[380]
I[379]
=
=

-26.40
2.50

Third stage prestressing


Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation

CS 7
CS 7
CS 7
CS 7
CS 7
CS 7
CS 7
CS 7
CS 7
CS 7
CS 7
CS 7
CS 7
CS 7

J[14]
I[8]
J[5]
I[14]
I[5]
J[378]
I[9]
J[6]
J[11]
I[15]
J[747]
I[12]
I[747]
J[379]

2.81
4.39
-0.74
2.81
-0.74
-3.83
-1.37
-1.47
0.61
1.07
-1.00
-0.47
-1.00
-0.43

RIGHT
CANTIL
EVER

673
673

Summation
Summation

CS 7
CS 7

Max Allowable Compression


Mx Allowable Tension
STAGE 8

LEFT
CANTIL
EVER

PIER
CAP

RIGHT
CANTIL
EVER

659
659
660
660
661
661
665
665
668
668
671
671
672
672
673
673

LEFT
CANTIL
EVER

PIER
CAP

RIGHT
CANTIL
EVER

659
659
660
660
661
661
665
665
668
668
671
671
672
672
673
673

Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation

CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8

Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation

STAGE 10

LEFT
CANTIL
EVER

PIER
CAP

-26.40
2.50

-4.67
1.91

Mpa
Mpa

OK
OK

-8.97
-9.01
-9.01
-9.09
-9.14
-9.09
-9.28
-9.46
-9.55
-9.59
-9.35
-9.41
-9.17
-9.35
-9.13
-9.20

-4.30
-2.76
-2.76
1.19
4.53
1.19
0.04
-0.47
-3.11
-3.73
-0.24
-1.31
1.86
-0.24
-4.62
1.88

Mpa
Mpa

OK
OK

-8.89
-8.93
-9.01
-8.93
-9.01
-9.06
-9.27
-9.46
-9.59
-9.62
-9.41
-9.33
-9.12
-9.33
-9.05
-9.12

-4.28
-2.75
1.12
-2.75
1.12
4.41
-1.58
-2.55
-6.14
-6.35
-3.45
-1.73
3.44
-1.73
-4.58
1.85

Mpa
Mpa

OK
OK

-8.19
-8.23
-8.30
-8.23
-8.30
-8.33
-8.53
-8.70
-8.83
-8.86
-8.65

-3.95
-2.56
1.09
-2.56
1.09
4.17
-2.29
-3.52
-7.11
-7.35
-4.18

4.72
-1.90
MAX
MIN

-13.90
-7.40
-5.42
-13.90

-4.52
-11.20
-4.52
-13.10

I[8]
J[14]
I[14]
J[5]
J[378]
I[5]
I[9]
J[6]
J[11]
I[15]
J[747]
I[12]
J[379]
I[747]
J[380]
I[379]

MAX
MIN

-13.30
-11.80
-11.80
-7.90
-4.61
-7.90
-9.24
-9.92
-12.70
-13.30
-9.59
-10.70
-7.31
-9.59
-13.70
-7.32
-4.61
-13.70

-4.62
-6.21
-6.21
-10.30
-13.70
-10.30
-9.24
-8.86
-6.28
-5.73
-9.01
-7.97
-11.00
-9.01
-4.46
-11.10
-4.46
-13.70

=
=

-26.40
2.50

MAX
MIN

-13.20
-11.70
-7.89
-11.70
-7.89
-4.65
-10.80
-12.00
-15.70
-16.00
-12.90
-11.10
-5.68
-11.10
-13.60
-7.26
-4.65
-16.00

-4.57
-6.15
-10.10
-6.15
-10.10
-13.50
-7.66
-6.87
-3.40
-3.24
-5.91
-7.55
-12.60
-7.55
-4.42
-11.00
-3.24
-13.50

-12.10
-10.80
-7.21
-10.80
-7.21
-4.16
-10.80
-12.20
-15.90
-16.20
-12.80

-4.20
-5.64
-9.37
-5.64
-9.37
-12.50
-6.22
-5.16
-1.71
-1.50
-4.44

4.35
2.80
2.80
-1.18
-4.54
-1.18
0.04
0.59
3.27
3.87
0.33
1.43
-1.87
0.33
4.67
-1.87

LL
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9

Max Allowable Compression


Mx Allowable Tension

659
659
660
660
661
661
665
665
668
668
671

=
=

-9.24
-9.31

SIDL

Max Allowable Compression


Mx Allowable Tension
STAGE 9

J[380]
I[379]

I[8]
J[14]
J[5]
I[14]
I[5]
J[378]
I[9]
J[6]
J[11]
I[15]
I[12]
J[747]
J[379]
I[747]
J[380]
I[379]
=
=

-26.40
2.50

4.32
2.79
-1.11
2.79
-1.11
-4.41
1.61
2.60
6.18
6.38
3.50
1.78
-3.44
1.78
4.63
-1.84

LONG TERM CREEP & SHRINKAGE


Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation

CS 10
CS 10
CS 10
CS 10
CS 10
CS 10
CS 10
CS 10
CS 10
CS 10
CS 10

I[8]
J[14]
J[5]
I[14]
I[5]
J[378]
I[9]
J[6]
J[11]
I[15]
I[12]

4.00
2.59
-1.08
2.59
-1.08
-4.18
2.31
3.54
7.12
7.35
4.21

PIER
CAP

RIGHT
CANTIL
EVER

671
672
672
673
673

Summation
Summation
Summation
Summation
Summation

CS 10
CS 10
CS 10
CS 10
CS 10

Max Allowable Compression


Mx Allowable Tension
8.3

J[747]
J[379]
I[747]
I[379]
J[380]
=
=

-26.40
2.50

-2.35
3.79
-2.35
1.69
-4.18

Mpa
Mpa

OK
OK

2.38
-3.79
2.38
-1.69
4.22
MAX
MIN

Ultimate Limit State


Load Factors - Ultimate Limit State for Strength
Basic combination
Dead Load
1.35
SIDL
1.35
SIDL surfacing
1.75
Live load (Leading)
1.5
Live load (Accompanying)
1.15
Prestressing
1
Wind (Leading)
1.5
Wind (Accompanying)
0.9

8.3.1

-8.56
-8.38
-8.56
-8.37
-8.30

Seismic Combination
1.35
1.35
1.75
0.2
1
-

Summary of forces at center of pier cap for ULS load cases

BMD Under selft weight

44
46
46
45
43

Shear-z
(kN)
-2438
-2261
-1911
-2239
-2088

Torsion
(kN*m)
-611
-922
-874
-917
-562

Moment-y
(kN*m)
18947
20072
20810
20152
19686

Moment-z
(kN*m)
-1772
-1767
-1768
-1768
-1773

-58564
-59029

44
49

-1937
-1876

-643
-1102

17113
20925

-1771
-1762

-58763
-58930
-58946

43
49
49

-2357
-2190
-1840

-141
-724
-1054

18689
19718
20197

-1774
-1762
-1761

-58906
-58779

45
43

-2183
-2006

-485
-470

19731
19168

-1770
-1773

-58528
-58894
-58584

44
50
47

-1878
-1846
-2331

-620
-1079
-810

16943
20103
18003

-1771
-1760
-1765

-58998
-58978

46
47

-2261
-2182

-922
-948

20072
20470

-1767
-1765

-58789
-58563

47
51

-2210
-1952

-991
-1256

19356
18477

-1765
-1757

Elem

Load

Axial (kN)

Shear-y (kN)

668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668

501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519

-58812
-58998
-59044
-58979
-58857

-10.90
-4.59
-10.90
-6.67
-12.50
-4.16
-16.20

-6.18
-12.20
-6.18
-10.10
-4.08
-1.50
-12.50

668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668

520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582

-58255

50

-1793

-1053

15827

-1759

-58968
-58558

48
45

-2093
-2262

-995
-399

20623
17826

-1763
-1769

-58925
-58899
-58731

46
47
49

-2462
-2095
-2153

-425
-817
-759

19643
19947
18993

-1767
-1764
-1762

-58529
-58260

49
50

-1893
-1753

-953
-1057

18127
15830

-1761
-1759

-58872
-58701
-58844

49
32
34

-2009
-2125
-1990

-954
-778
-1017

19977
18408
19270

-1761
-1360
-1356

-58878
-58828

34
34

-1721
-1973

-980
-1013

19836
19332

-1358
-1358

-58735
-58511
-58867

32
33
36

-1857
-1741
-1695

-741
-803
-1155

18974
17002
19925

-1362
-1360
-1353

-58526
-58844

35
34

-2043
-1990

-931
-1017

17684
19270

-1355
-1356

-58828
-58683
-58510
-58273
-58820
-58663
-58791
-58803
-58773
-58675
-58483
-58764
-58506
-58787
-58767
-58639
-58484
-58277
-58747
-58682
-58825
-58860
-58810
-58717
-58492

35
35
38
37
36
31
36
36
33
32
33
37
33
34
35
36
37
37
36
39
41
40
40
38
39

-1929
-1950
-1753
-1631
-1861
-2063
-1935
-1667
-1930
-1795
-1696
-1672
-1990
-2143
-1863
-1907
-1708
-1600
-1796
-2361
-2225
-1956
-2208
-2092
-1977

-1036
-1069
-1273
-1117
-1073
-418
-865
-1118
-681
-670
-785
-1137
-616
-636
-936
-892
-1041
-1120
-1041
-861
-1100
-1062
-1096
-824
-886

19576
18721
18048
16016
19693
18210
18999
19366
19009
18578
16872
19294
17548
18941
19175
18443
17779
16019
19198
18001
18864
19430
18926
18568
16596

-1355
-1355
-1349
-1351
-1354
-1362
-1353
-1352
-1359
-1362
-1360
-1351
-1358
-1357
-1355
-1353
-1352
-1350
-1352
-1347
-1343
-1344
-1344
-1348
-1346

-58849
-58507

43
42

-1930
-2279

-1237
-1014

19518
17278

-1340
-1342

-58825
-58809
-58665

41
42
42

-2225
-2164
-2186

-1100
-1119
-1152

18864
19169
18315

-1343
-1342
-1341

-58491
-58255

45
44

-1988
-1866

-1355
-1200

17641
15610

-1336
-1337

-58802
-58645

42
38

-2096
-2298

-1156
-500

19286
17804

-1340
-1349

-58772
-58785
-58754

43
43
40

-2171
-1902
-2165

-948
-1201
-764

18593
18960
18603

-1340
-1339
-1345

-58657
-58465

38
39

-2030
-1931

-753
-868

18171
16466

-1348
-1346

-58745
-58487
-58769

44
40
41

-1907
-2225
-2379

-1220
-698
-719

18888
17142
18535

-1338
-1345
-1343

-58749
-58620

42
43

-2098
-2142

-1019
-974

18768
18037

-1341
-1339

-58465

43

-1943

-1123

17373

-1339

668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668

583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645

-58259

44

-1836

-1203

15612

-1337

-58728
-58701

43
32

-2031
-2125

-1124
-778

18791
18408

-1339
-1360

-58844
-58878
-58828

34
34
34

-1990
-1721
-1973

-1017
-980
-1013

19270
19836
19332

-1356
-1358
-1358

-58735
-58511

32
33

-1857
-1741

-741
-803

18974
17002

-1362
-1360

-58867
-58526
-58844

36
35
34

-1695
-2043
-1990

-1155
-931
-1017

19925
17684
19270

-1353
-1355
-1356

-58828
-58683

35
35

-1929
-1950

-1036
-1069

19576
18721

-1355
-1355

-58510
-58273
-58820

38
37
36

-1753
-1631
-1861

-1273
-1117
-1073

18048
16016
19693

-1349
-1351
-1354

-58663
-58791

31
36

-2063
-1935

-418
-865

18210
18999

-1362
-1353

-58803
-58773
-58675
-58483
-58764
-58506
-58787
-58767
-58639
-58277
-58277
-58747
-58331
-58356
-58362
-58354
-58337
-58298
-58360
-58301
-58356
-58353
-58831
-58298
-58257

36
33
32
33
37
33
34
35
36
37
37
36
27
27
27
27
26
27
27
27
27
27
28
28
27

-1667
-1930
-1795
-1696
-1672
-1990
-2143
-1863
-1907
-1600
-1600
-1796
-1748
-1724
-1678
-1721
-1701
-1681
-1673
-1734
-1724
-1714
-2447
-1683
-1662

-1118
-681
-670
-785
-1137
-616
-636
-936
-892
-1120
-1120
-1041
-1194
-1235
-1229
-1235
-1187
-1198
-1259
-1221
-1235
-1239
-1237
-1280
-1253

19366
19009
18578
16872
19294
17548
18941
19175
18443
16019
16019
19198
16101
16251
16349
16262
16199
15856
16365
15975
16251
16304
19769
16038
15685

-1352
-1359
-1362
-1360
-1351
-1358
-1357
-1355
-1353
-1350
-1350
-1352
-727
-727
-727
-727
-728
-727
-726
-726
-727
-726
-725
-725
-726

-58352
-58325

27
26

-1702
-1737

-1245
-1131

16324
16066

-726
-728

-58347
-58349
-58344

27
27
27

-1715
-1668
-1714

-1209
-1253
-1177

16204
16268
16205

-726
-726
-727

-58327
-58294

26
27

-1690
-1673

-1175
-1195

16130
15834

-728
-727

-58342
-58298

27
27

-1669
-1724

-1256
-1166

16255
15951

-726
-727

-58346
-58343
-58321

27
27
27

-1751
-1702
-1710

-1169
-1221
-1214

16194
16234
16107

-727
-726
-726

-58294
-58258

27
27

-1675
-1657

-1240
-1253

15992
15685

-726
-726

-58339
-58334
-58358

27
28
29

-1691
-1754
-1730

-1240
-1198
-1240

16238
16090
16240

-726
-735
-734

-58364
-58356

29
29

-1684
-1728

-1233
-1239

16338
16251

-734
-735

-58340

28

-1707

-1192

16188

-735

668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668

8.3.1.1

646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668

-58301

28

-1687

-1203

15845

-735

-58362
-58303

29
29

-1679
-1740

-1264
-1225

16354
15964

-734
-734

-58358
-58356
-58331

29
29
29

-1730
-1720
-1724

-1240
-1243
-1249

16240
16293
16144

-734
-734
-734

-58300
-58259

29
29

-1689
-1668

-1284
-1257

16027
15674

-733
-733

-58354
-58300
-58349

29
28
29

-1708
-1731
-1757

-1250
-1170
-1174

16313
15940
16183

-734
-735
-734

-58345
-58323

29
29

-1708
-1716

-1226
-1218

16223
16096

-734
-734

-58296
-58260
-58342

29
29
29

-1681
-1663
-1697

-1244
-1258
-1244

15981
15674
16227

-733
-733
-734

-58327
-58349

28
29

-1743
-1721

-1136
-1213

16056
16193

-735
-734

-58351
-58346
-58329
-58296
-58344

29
28
28
28
29

-1674
-1720
-1697
-1679
-1675

-1257
-1182
-1180
-1200
-1261

16257
16195
16119
15823
16244

-734
-735
-735
-735
-733

MAX
MIN

-58255

51

-1600

-141

20925

-725

-59044

26

-2462

-1355

15610

-1774

Moment capacity of a section at mid span


Moment Capacity of Prestressed Section

Area of layer 1 cables


Area of layer 2 cables

=
=

23940
23940

mm^2
mm^2

Total Force in layer 1 cable after losses


Total Force in layer 2 cable after losses

=
=

23845
23845

KN
KN

ES

1.95E+05

Mpa

Prestrain in Layer 1 cables


Prestrain in Layer 2 cables

=
=

Fs / Es =
Fs / Es =

0.0051
0.0051

Ultimate stress in cable (Fpk)


Stress at 0.1 % Proof force = 0.87 * Fpk

=
=

1860
1618.2

Mpa
Mpa

1618.2
1.15

1407.13

Mpa

Fpd
ES

0.0072

Fpd

Yield Strain, pd
pd

Fig. A2-4 , IRC-112-2011


CG Of cables from top at mid sec
1245
mm
485
CG Of cables from top at Left support sec
872.5
mm
385
230
140

Left Support

Mid Section

Neutral Axis Location at

821.18

mm

.After iterations

Final Steel Strain = Prestrain + Bending Strain


Final Strain in Layer 1 cables

=
=

0.0051
0.0074

+
>

0.00230
pd

Final Strain in Layer 2 cables

=
=

0.0051
0.0064

+
~

0.001316
pd

As the strain values are greater than pd , hence stresses in cables are=Fpd=
Thus Total force in steel , Tu

=
=

1407.13

Mpa

*Es*A
64555.55 KN

Total Compressive force in concrete


fcd =

Fck
m

*x

Cu

Tu

Fcd

0.8

for Fck < 60 Mpa

Fck

IRC-112, A2.9
IRC-112, 6.4.2.8

m
m

=
=

1.5
0.67

for basic and seismic combination

Fcd

=
=

24.57

Mpa

for Fck < 60 Mpa

IRC-112, 6.4.2.8

IRC-112, A2.9

*Fcd

24.57

Compressive Force, Cu

*Fcd**x*b

=
Tu = Cu

8.3.1.2

i.e

64555.55 KN

Tu - Cu =

0.00

Ultimate Moment Capacity

=
=

Ultimate Moment

Goal Seek this to 0 by Changing cell E775


(Fs*As*(d-0.4*x))
59693 KN-M
20925

OR

KN-M

<

*Fcd**x*b*Z

Ultimate Moment Capacity


OK

Torsional Moment
TED

=
=

Design torsion
KN-M
1355

Tt

shear stress due to torsion


TED

2*Ak*tef
VED

t * tef * Z

Torsional Inertia ofr section


b
d
b/d
torsional constant

Torsional Inertia ofr section

=
=
=

4000
1500
2.67
0.254

mm
mm

*b*d^3
3.429E+012 mm^4

tef
=
A/W
545.4545455
this thickness should not b les than twice the distance between edge and centre of longitudinal reinforcement
effective cover
=
as
2 * effective cover
tef

=
=

VED

137

502.89

=
=

Ast
St

68.5
545.5

mm

Side length of wall I defined by the distance between intersection points with adjecent walls
m
3.91

Ak

50 + 12.5 + 6
>

KN

X
(4000-137)
5265269 mm^2

(1500-137)

45
TED
* cot
(2 * Ak * Fyd )
0.390

mm^/mm

The required torsional reinforcement should be 2 legged only.


Longitudinal Reinforcement
Asl
uk

TED
(2 * Ak * Fyd )

* Cot

=
Asl

0.390 mm^/mm

4293

mm^2

Spacing between longitudinal bars should not be more than 350mm


Take sapcing as 300mm
Provide additional 22 no.s 25 mm dia. Bars, with main reinforcement

IRC-112, 16.5.3

Torsional Resisting Capacity


Trdmax
=
2 * * cw * fcd * Ak * tef * sin * cos
=

6485.56

KN-M

>

1355.26

0.718

<

KN-M

Safe in torsional resistance


As per Cl. 10.5.2.1, (4), IRC-112
TED

TRd MAX
8.3.1.3

VED

VRd MAX

Shear Capacity
Equivalent Shear Due to torsion
Total Design shear

=
=

502.89
2964

KN
KN

Flexural Tensile stress

5.360

Mpa

Allowable tensile stress

2.33

Mpa

The Section is Cracked


Elements not requiring shear reinforcement
K
=
1+ (200/d)^0.5
=
1.01

IRC-112, 10.3.2

Fcd

24.57

Mpa

cp

Min of

NED/AC

&

0.2 * Fcd

7.948

&

4.91

Asl/(b*d)

&
&

cp

4.913

Min of

0.001
t

VRdc

5490

vmin

0.234

VRdc (MIN)

5828

KN

VRdc

5828

KN

0.02
0.02

0.001

VRdc
>
As,
Provide minimum Reinforcement

KN

IRC-112,Cl. 10.3.2
Eq. 10.1
Eq. 10.3

Design shear

Eq. 10.1

Asw
S* bw

0.072*(Fck)^0.5
Fyk
0.00129

The maximum spacing


Slmax
=
0.75d*(1+cota)
=
1125.00 mm
lets assume spacing as, 200 mm
Asw
S

IRC-112, 16.5.2, Eq. 16.6

5.15 mm^2/mm

Provide 12mm dia, 8 legged stirrups at 160 mm c-c.


8.3.2

Summary opf forces at Letf support of pier cap for ULS load cases

580
581
581
581
580
580
581
580
581
581
581
580
580
581
581
581
581
581
581
581
581
581
581
581

Shear-z
(kN)
-9585
-11549
-11709
-10585
-9745
-9123
-11593
-9512
-11315
-11411
-10377
-9608
-9072
-11232
-9482
-11549
-10643
-10295
-9598
-8982
-10925
-9421
-10372
-10437

Torsion
(kN*m)
2820
3453
3853
3361
3220
2803
4108
3297
4550
4617
3921
3364
2828
4389
2613
3453
3222
3098
3315
2371
3687
3040
3795
3797

Moment-y
(kN*m)
-17607
-18320
-18542
-18343
-17829
-16559
-18740
-17425
-18071
-18159
-18060
-17512
-16416
-18655
-18132
-18320
-20248
-19085
-18512
-17279
-20237
-17914
-19486
-19688

Moment-z
(kN*m)
409
414
415
413
409
409
419
409
419
420
414
410
409
420
411
414
414
414
417
413
417
410
415
416

-57877
-57783
-57658
-57943
-57860

581
581
581
581
445

-10121
-9484
-8949
-10629
-9278

3414
2851
2363
3907
2556

-18732
-18111
-17040
-19593
-16083

416
414
413
418
315

-57923
-57940

445
445

-10784
-10907

3041
3348

-16630
-16800

319
319

-57918
-57877
-57773

445
445
445

-10045
-9401
-8924

2971
2862
2543

-16647
-16253
-15280

318
315
315

-57936
-57779

446
445

-10818
-9200

3543
2397

-16952
-16486

322
317

-57923
-57919
-57852

445
445
445

-10784
-10089
-9822

3041
2864
2769

-16630
-18108
-17216

319
319
319

-57774
-57663

446
445

-9288
-8816

2935
2212

-16777
-15831

322
318

-57916
-57844

446
445

-10306
-9222

3220
2921

-18100
-15944

321
315

Elem

Load

Axial (kN)

Shear-y (kN)

662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662

501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543

-57912
-57994
-58016
-57987
-57934
-57798
-58011
-57892
-57967
-57974
-57957
-57899
-57782
-57951
-57807
-57994
-57989
-57901
-57799
-57656
-57986
-57796
-57968
-57956

662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662

544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606

-57902

446

-10604

3882

-16439

323

-57907
-57894

446
445

-10678
-9886

3934
3400

-16506
-16430

324
319

-57850
-57760
-57890

445
445
446

-9296
-8885
-10541

2973
2562
3759

-16011
-15170
-16887

316
315
324

-57771
-57903

445
445

-9152
-9882

2724
3303

-16319
-17524

316
320

-57894
-57833
-57761

445
446
445

-9932
-9689
-9201

3305
3011
2580

-17678
-16946
-16470

321
320
319

-57665
-57884

445
446

-8791
-10078

2205
3389

-15648
-17606

318
322

-57854
-57917
-57934

445
446
446

-9578
-11084
-11206

2527
3013
3320

-18705
-19252
-19422

319
323
323

-57912
-57871

446
445

-10345
-9700

2942
2834

-19270
-18876

322
319

-57767
-57930
-57773
-57917
-57913
-57845
-57768
-57657
-57910
-57838
-57896
-57901
-57888
-57844
-57754
-57884
-57765
-57897
-57888
-57827
-57755
-57659
-57878
-57860
-57923

445
446
446
446
446
446
446
446
446
445
446
446
446
445
445
446
445
446
446
446
446
446
446
445
445

-9224
-11118
-9499
-11084
-10389
-10122
-9588
-9116
-10605
-9522
-10904
-10978
-10185
-9595
-9184
-10841
-9452
-10181
-10231
-9989
-9501
-9090
-10378
-9278
-10784

2514
3515
2368
3013
2836
2741
2907
2183
3192
2893
3854
3905
3371
2945
2533
3731
2696
3275
3277
2982
2551
2177
3361
2556
3041

-17902
-19574
-19108
-19252
-20730
-19839
-19399
-18454
-20722
-18566
-19061
-19128
-19053
-18633
-17793
-19509
-18941
-20146
-20301
-19568
-19092
-18270
-20228
-16083
-16630

318
326
320
323
323
322
325
321
325
319
327
327
322
319
318
327
319
323
324
324
323
322
325
315
319

-57940
-57918

445
445

-10907
-10045

3348
2971

-16800
-16647

319
318

-57877
-57773
-57936

445
445
446

-9401
-8924
-10818

2862
2543
3543

-16253
-15280
-16952

315
315
322

-57779
-57923

445
445

-9200
-10784

2397
3041

-16486
-16630

317
319

-57919
-57852

445
445

-10089
-9822

2864
2769

-18108
-17216

319
319

-57774
-57663
-57916

446
445
446

-9288
-8816
-10306

2935
2212
3220

-16777
-15831
-18100

322
318
321

-57844
-57902

445
446

-9222
-10604

2921
3882

-15944
-16439

315
323

-57907
-57894
-57850

446
445
445

-10678
-9886
-9296

3934
3400
2973

-16506
-16430
-16011

324
319
316

-57760
-57890

445
446

-8885
-10541

2562
3759

-15170
-16887

315
324

-57771

445

-9152

2724

-16319

316

662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662

607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668

-57903

445

-9882

3303

-17524

320

-57894
-57833

445
446

-9932
-9689

3305
3011

-17678
-16946

321
320

-57665
-57665
-57884

445
445
446

-8791
-8791
-10078

2205
2205
3389

-15648
-15648
-17606

318
318
322

-57697
-57708

176
176

-9039
-9301

2084
2168

-17232
-17327

182
183

-57711
-57707
-57700

176
176
176

-9322
-9173
-9061

2222
2156
2137

-17357
-17330
-17262

183
183
182

-57682
-57710

176
176

-8978
-9307

2082
2256

-17093
-17383

182
184

-57683
-57708
-57707

176
176
176

-9026
-9301
-9180

2056
2168
2138

-17302
-17327
-17584

183
183
183

-57928
-57682

177
176

-10737
-9041

2793
2150

-21122
-17353

187
184

-57663
-57707
-57694
-57704
-57705
-57703
-57695
-57680
-57702
-57681
-57704
-57703
-57692
-57680
-57663
-57701
-57698
-57709
-57712
-57708
-57701
-57683
-57712
-57684
-57709

176
176
176
176
176
176
176
176
176
176
176
176
176
176
176
176
177
178
178
177
177
177
178
177
178

-8959
-9218
-9030
-9270
-9283
-9145
-9042
-8971
-9259
-9017
-9144
-9153
-9111
-9026
-8954
-9178
-9050
-9312
-9333
-9183
-9071
-8988
-9317
-9036
-9312

2024
2199
2147
2315
2324
2231
2157
2085
2293
2113
2214
2214
2163
2088
2023
2229
2083
2167
2221
2155
2136
2080
2255
2055
2167

-17189
-17583
-17208
-17294
-17306
-17293
-17220
-17074
-17372
-17273
-17483
-17510
-17382
-17300
-17157
-17497
-17320
-17415
-17445
-17418
-17350
-17181
-17471
-17390
-17415

183
183
182
184
184
183
183
182
184
183
183
183
183
183
183
184
183
183
183
183
183
183
184
183
183

-57709
-57697

178
178

-9191
-9144

2136
2120

-17672
-17517

183
183

-57683
-57664
-57708

178
178
178

-9051
-8969
-9228

2149
2023
2198

-17441
-17277
-17671

184
183
184

-57683
-57706

177
178

-9028
-9155

2112
2213

-17361
-17571

183
183

-57704
-57694

178
178

-9163
-9121

2213
2162

-17598
-17470

184
184

-57681
-57664
-57702

178
178
178

-9036
-8965
-9189

2087
2022
2228

-17388
-17245
-17585

183
183
184

-57696
-57706

177
178

-9040
-9280

2146
2313

-17296
-17382

183
184

-57707
-57704
-57697

178
177
177

-9293
-9155
-9053

2322
2230
2155

-17394
-17381
-17308

184
183
183

-57681
-57704

177
178

-8981
-9269

2084
2292

-17162
-17460

183
184

MAX
MIN

8.3.2.1

-57656

581

-8791

4617

-15170

420

-58016

176

-11709

2022

-21122

182

Moment capacity of a section at left support


Moment Capacity of Prestressed Section

Area of layer 1 cables


Area of layer 2 cables

=
=

23940
23940

mm^2
mm^2

Total Force in layer 1 cable after losses


Total Force in layer 2 cable after losses

23845

KN

23845

KN

ES

1.95E+05

Mpa

Prestrain in Layer 1 cables


Prestrain in Layer 2 cables

Fs / Es =

0.0051

Fs / Es =

0.0051

Ultimate stress in cable (Fpk)


Stress at 0.1 % Proof force = 0.87 * Fpk

=
=

1860
1618.2

Mpa
Mpa

1618.2
1.15

1407.13

Mpa

Fpd
ES

0.0072

Fpd

Yield Strain, pd
pd

Fig. A2-4 , IRC-112-2011


CG Of cables from top at mid sec
1245

mm

485
CG Of cables from top at Left support sec
872.5
385
230
140

Left Support

Neutral Axis Location at

Mid Section

779.15

mm

.After iterations

mm

Final Steel Strain = Prestrain + Bending Strain

Final Strain in Layer 1 cables

Final Strain in Layer 2 cables

=
=

0.0051
0.0066

0.0051

0.0044

+
~

+
~

0.00151
pd

-0.000670
pd

As the strain values are greater than or almost equal to pd , hence stresses in ca 1407.13
Thus Total force in steel , Tu

*Es*A

Mpa

47880

51605.13 KN

Total Compressive force in concrete


Fck

fcd =

*x

Cu

Tu

Fcd

0.8

for Fck < 60 Mpa

IRC-112, A2.9

Fck

IRC-112, 6.4.2.8

m
m

=
=

1.5
0.67

for basic and seismic combination

IRC-112, 6.4.2.8

Fcd

=
=

24.57
1

Mpa
for Fck < 60 Mpa

IRC-112, A2.9

*Fcd

24.57

Compressive Force, Cu

*Fcd**x*b

=
Tu = Cu

8.3.2.2

i.e

Tu - Cu =

61251.50 KN
-9646.37

Ultimate Moment Capacity

=
=

Ultimate Moment

Torsional Moment
TED

=
=

Design torsion
KN-M
4617

Tt

shear stress due to torsion


TED

2*Ak*tef

Goal Seek this to 0 by Changing cell E775


(Fs*As*(d-0.4*x))
49335 KN-M
21122

KN-M

OR

<

*Fcd**x*b*Z

Ultimate Moment Capacity


OK

VED

t * tef * Z

Torsional Inertia ofr section


b
d
b/d
torsional constant

Torsional Inertia ofr section

4000
1500
2.67
0.254

=
=
=

mm
mm

*b*d^3
3.429E+012 mm^4

tef
=
A/W
545.4545455
this thickness should not b les than twice the distance between edge and centre of longitudinal reinforcement
effective cover
=
as
2 * effective cover
tef

=
=

VED

137

1713.28

=
=

Ast

St

68.5
545.5

mm

Side length of wall I defined by the distance between intersection points with adjecent walls
m
3.91

Ak

50 + 12.5 + 6
>

KN

X
(4000-137)
5265269 mm^2

(1500-137)

45
TED
* cot
(2 * Ak * Fyd )
1.330

mm^/mm

The required torsional reinforcement should be 2 legged only.


Longitudinal Reinforcement
Asl

TED

=
Asl

* Cot

(2 * Ak * Fyd )

uk

1.330 mm^/mm
10638

mm^2

Spacing between longitudinal bars should not be more than 350mm


Take sapcing as 300mm
Provide additional 22 no.s 25 mm dia. Bars, with main reinforcement

IRC-112, 16.5.3

Torsional Resisting Capacity


Trdmax
=
2 * * cw * fcd * Ak * tef * sin * cos
=

6485.56

KN-M

>

4617.22

3.013

<

KN-M

Safe in torsional resistance


As per Cl. 10.5.2.1, (4), IRC-112
TED
TRd MAX

VED
VRd MAX

8.3.2.3

Shear Capacity
* Equivalent Shear Due to torsion
Total Design shear

=
=

* Flexural Tensile stress

5.360

Mpa

2.33

Mpa

Allowable tensile stress

1713.28 KN
13422 KN

The Section is Cracked


* Elements not requiring shear reinforcement
K
=
1+ (200/d)^0.5
=
1.02

IRC-112, 10.3.2

Fcd

24.57

Mpa

cp

Min of

NED/AC

&

0.2 * Fcd

7.948

&

4.91

Asl/(b*d)

&
&

cp

4.913

Min of

0.001
t

VRdc

5493

vmin

0.235

VRdc (MIN)

5833

KN

VRdc

5833

KN

0.02
0.02

0.001

VRdc
As,
Design the shear reinforcement
* Applied shear stress

KN

IRC-112,Cl. 10.3.2
Eq. 10.1
Eq. 10.3
Eq. 10.1

<

Design shear

vED

VED

Mpa

b*z

Maximum allowable shear stress


where v1 =

cw * 0.225* v1 * Fck

0.6*(1-fck/310)
0.49
=
1.2

cw
Hence,
Maximum allowable shear stress

7.33

Applied shear stress is less than allowable shear stress


* Is allowable shear stress less than =
=

* Shear Reinforcement

cw * 0.155* v1 * Fck
5.05
YES, Take theta as 21.8

Asw
S

Shear stress * bw
Fywd * cot(theta)

Fywd

=
=

0.87*Fyk
435

Mpa

14.15

mm^/mm

* Minimum shear Reinforcement


Asw
s

0.072*(Fck)^0.5 * bw
Fyk
5.15

* The maximum spacing


Slmax
=
0.75d*(1+cota)
=
1125.00 mm
lets assume spacing as, 200 mm
Asw
S

5.65

IRC-112, Eq. 16.5

mm^/mm

IRC-112, 16.5.2, Eq. 16.6

mm^2/mm

Provide 12mm dia, 8 legged stirrups at 160 mm c-c.

8.3.3

Summary opf forces at Right support of pier cap for ULS load cases

-307
-305
-305
-306
-308
-307
-302
-308
-302
-302
-306
-308
-307
-301
-304
-305
-304

Shear-z
(kN)
4868
5064
5149
5059
4953
4409
5155
4774
4958
4962
4941
4777
4305
4930
4351
5064
5343

Torsion
(kN*m)
-1632
-1944
-2318
-1938
-2006
-1555
-2545
-2085
-2668
-2693
-2428
-2110
-1560
-2718
-1499
-1944
-2304

Moment-y
(kN*m)
4826
4715
4770
4772
4882
4253
4789
4591
4459
4410
4537
4542
4013
4472
3811
4715
5727

Moment-z
(kN*m)
-1176
-1187
-1183
-1183
-1172
-1178
-1196
-1170
-1196
-1197
-1179
-1171
-1178
-1201
-1191
-1187
-1190

-57313
-57088
-56781
-57491
-57083

-304
-300
-301
-303
-306

4699
4301
3705
5300
4295

-1870
-2050
-1316
-2600
-1700

4175
3581
2878
5532
3684

-1192
-1208
-1205
-1194
-1182

-57448
-57422

-305
-304

5265
5177

-2810
-2801

5569
5347

-1185
-1190

-57255
-57054
-56786

-302
-302
-301

4600
4209
3695

-2279
-1854
-1353

3973
3445
2822

-1197
-1200
-1207

-57396
-57225

-302
-237

5080
4679

-2779
-1561

5089
3836

-1197
-895

-57367
-57402
-57352

-235
-235
-235

4830
4895
4826

-1800
-2087
-1796

3751
3793
3795

-904
-900
-901

-57259
-57036

-237
-236

4744
4327

-1848
-1502

3879
3396

-892
-897

-57391
-57051

-233
-234

4899
4283

-2261
-1459

3808
3058

-910
-907

Elem

Load

Axial (kN)

Shear-y (kN)

672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672

501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536

-57336
-57522
-57567
-57502
-57381
-57089
-57552
-57287
-57453
-57469
-57430
-57303
-57053
-57418
-57109
-57522
-57501

672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672

537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599

-57367

-235

4830

-1800

3751

-904

-57351
-57208

-234
-234

5044
4550

-2076
-1744

4527
3337

-906
-907

-57034
-56799
-57344

-231
-232
-233

4244
3787
5010

-1882
-1319
-2304

2882
2342
4377

-919
-917
-909

-57187
-57315

-238
-233

4607
4748

-1908
-2355

3656
3555

-890
-910

-57327
-57297
-57200

-233
-236
-237

4751
4735
4610

-2374
-2172
-1927

3517
3614
3618

-911
-897
-891

-57008
-57288

-236
-232

4247
4727

-1506
-2394

3213
3564

-897
-914

-57031
-57311
-57291

-236
-235
-234

4240
4983
4916

-1613
-2464
-2457

2961
4406
4235

-899
-902
-906

-57163
-57009

-233
-233

4474
4174

-2057
-1731

3182
2777

-911
-914

-56803
-57271
-57207
-57349
-57384
-57334
-57241
-57017
-57373
-57033
-57349
-57333
-57190
-57016
-56781
-57325
-57169
-57297
-57309
-57279
-57182
-56990
-57270
-57013
-57293

-232
-233
-230
-228
-229
-229
-231
-230
-226
-228
-228
-228
-227
-225
-225
-227
-231
-226
-226
-229
-231
-230
-226
-229
-228

3780
4842
4444
4595
4660
4591
4509
4092
4664
4048
4595
4809
4315
4009
3552
4775
4372
4513
4516
4500
4375
4012
4491
4005
4748

-1347
-2440
-1644
-1883
-2169
-1879
-1931
-1585
-2344
-1541
-1883
-2159
-1827
-1965
-1402
-2386
-1991
-2438
-2457
-2254
-2010
-1589
-2477
-1696
-2547

2300
4038
4958
4873
4915
4917
5001
4518
4930
4180
4873
5649
4459
4004
3464
5499
4778
4677
4639
4736
4740
4335
4686
4083
5528

-918
-911
-925
-934
-930
-930
-922
-926
-940
-937
-934
-936
-937
-949
-947
-939
-920
-940
-941
-927
-921
-927
-944
-929
-931

-57273
-57145

-227
-226

4681
4239

-2540
-2140

5357
4304

-936
-941

-56991
-56785
-57253

-226
-225
-226

3939
3545
4606

-1814
-1430
-2523

3899
3422
5160

-944
-948
-941

-57225
-57367

-237
-235

4679
4830

-1561
-1800

3836
3751

-895
-904

-57402
-57352

-235
-235

4895
4826

-2087
-1796

3793
3795

-900
-901

-57259
-57036
-57391

-237
-236
-233

4744
4327
4899

-1848
-1502
-2261

3879
3396
3808

-892
-897
-910

-57051
-57367

-234
-235

4283
4830

-1459
-1800

3058
3751

-907
-904

-57351
-57208
-57034

-234
-234
-231

5044
4550
4244

-2076
-1744
-1882

4527
3337
2882

-906
-907
-919

-56799
-57344

-232
-233

3787
5010

-1319
-2304

2342
4377

-917
-909

-57187

-238

4607

-1908

3656

-890

672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672

600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662

-57315

-233

4748

-2355

3555

-910

-57327
-57297

-233
-236

4751
4735

-2374
-2172

3517
3614

-911
-897

-57200
-57008
-57288

-237
-236
-232

4610
4247
4727

-1927
-1506
-2394

3618
3213
3564

-891
-897
-914

-57031
-57311

-236
-235

4240
4983

-1613
-2464

2961
4406

-899
-902

-57291
-57163
-56803

-234
-233
-232

4916
4474
3780

-2457
-2057
-1347

4235
3182
2300

-906
-911
-918

-56803
-57271

-232
-233

3780
4842

-1347
-2440

2300
4038

-918
-911

-56860
-56885
-56891

-124
-124
-124

3686
3712
3723

-1339
-1381
-1431

3392
3377
3385

-518
-519
-519

-56883
-56866

-124
-125

3711
3697

-1380
-1389

3385
3400

-519
-517

-56828
-56889
-56830
-56885
-56882
-57358
-56827
-56786
-56881
-56854
-56876
-56878
-56873
-56856
-56823
-56871
-56827
-56875
-56872
-56850
-56823
-56787
-56868
-56860
-56885

-124
-124
-124
-124
-124
-123
-123
-124
-124
-125
-124
-124
-124
-125
-124
-124
-124
-124
-124
-124
-124
-124
-124
-125
-125

3624
3724
3617
3712
3749
4775
3610
3531
3743
3673
3698
3698
3695
3674
3611
3694
3609
3739
3727
3650
3598
3529
3714
3679
3706

-1329
-1461
-1321
-1381
-1429
-2244
-1395
-1297
-1468
-1399
-1477
-1481
-1445
-1403
-1330
-1484
-1348
-1496
-1495
-1425
-1369
-1302
-1492
-1344
-1385

3316
3387
3257
3377
3512
5017
3226
3132
3486
3361
3343
3337
3354
3354
3284
3345
3240
3491
3462
3278
3208
3125
3427
3422
3407

-518
-520
-520
-519
-520
-521
-522
-522
-520
-517
-520
-521
-518
-517
-518
-521
-518
-519
-520
-520
-521
-522
-520
-524
-526

-56891
-56882

-125
-125

3717
3705

-1435
-1384

3414
3414

-525
-525

-56866
-56827
-56889

-125
-125
-124

3691
3618
3718

-1393
-1333
-1465

3429
3345
3417

-523
-524
-527

-56830
-56885

-125
-125

3611
3706

-1326
-1385

3286
3407

-526
-526

-56882
-56857

-125
-125

3743
3657

-1433
-1375

3542
3335

-526
-526

-56827
-56786
-56881

-124
-124
-124

3604
3524
3737

-1399
-1301
-1473

3256
3162
3516

-528
-528
-526

-56827
-56875

-125
-125

3603
3732

-1353
-1501

3269
3521

-525
-525

-56872
-56850
-56823

-125
-124
-124

3721
3644
3592

-1499
-1430
-1373

3491
3308
3238

-526
-527
-527

-56787
-56868

-124
-124

3523
3708

-1306
-1496

3154
3457

-528
-527

-56854

-125

3667

-1404

3390

-523

672
672
672
672
672
672

8.3.3.1

663
664
665
666
667
668

-56876

-124

3692

-1482

3373

-527

-56878
-56873

-124
-125

3692
3689

-1485
-1450

3366
3383

-527
-524

-56856
-56823
-56871

-125
-125
-124

3667
3604
3688

-1407
-1334
-1488

3384
3313
3374

-523
-524
-527

MAX
MIN

-56781

-123

5343

-1297

5727

-517

-57567

-308

3523

-2810

2300

-1208

Moment capacity of a section at right support


Moment Capacity of Prestressed Section

Area of layer 1 cables


Area of layer 2 cables

=
=

23940
23940

mm^2
mm^2

Total Force in layer 1 cable after losses


Total Force in layer 2 cable after losses

=
=

23845
23845

KN
KN

ES

1.95E+05

Mpa

Prestrain in Layer 1 cables


Prestrain in Layer 2 cables

=
=

Fs / Es =
Fs / Es =

0.0051
0.0051

Ultimate stress in cable (Fpk)


Stress at 0.1 % Proof force = 0.87 * Fpk

=
=

1860
1618.2

Mpa
Mpa

1618.2
1.15

1407.13

Mpa

Fpd
ES

0.0072

Fpd

Yield Strain, pd
pd

Fig. A2-4 , IRC-112-2011


CG Of cables from top at mid sec
1245
mm
115
CG Of cables from top at Right support sec
872.5
570
230

mm

140

Right Support

Mid Section

Neutral Axis Location at

705.23

mm

.After iterations

0.0051

0.0062

=
=

0.0051
0.0057

Final Steel Strain = Prestrain + Bending Strain

Final Strain in Layer 1 cables

Final Strain in Layer 2 cables

0.00112
~

pd

0.000545
pd

As the strain values are greater than or almost equal to pd , hence stresses in
cables are=Fpd=
Thus Total force in steel , Tu

=
=

*Es*A

1407.13

Mpa

47880

55440.59 KN

Total Compressive force in concrete


Fck

fcd =

*x

Cu

Tu

Fcd

0.8

for Fck < 60 Mpa

IRC-112, A2.9

Fck

IRC-112, 6.4.2.8

m
m

=
=

1.5

Fcd

=
=

24.57
1

*Fcd

24.57

for basic and seismic combination

IRC-112, 6.4.2.8

Mpa
for Fck < 60 Mpa

IRC-112, A2.9

0.67

Compressive Force, Cu

*Fcd**x*b

=
Tu = Cu

8.3.2.2

i.e

Tu - Cu =

0.00

Ultimate Moment Capacity

=
=

Ultimate Moment

Torsional Moment

55440.59 KN
Goal Seek this to 0 by Changing cell E775
(Fs*As*(d-0.4*x))
32886 KN-M
5727

KN-M

OR

<

*Fcd**x*b*Z

Ultimate Moment Capacity


OK

TED

Design torsion
KN-M
2810

=
=

Tt

shear stress due to torsion


TED
2*Ak*tef

t * tef * Z

VED

Torsional Inertia ofr section


b
d
b/d
torsional constant

Torsional Inertia ofr section

4000
1500
2.67
0.254

=
=
=

mm
mm

*b*d^3
3.429E+012 mm^4

tef
=
A/W
545.4545455
this thickness should not b les than twice the distance between edge and centre of longitudinal reinforcement
effective cover
=
as
2 * effective cover
tef

=
=

VED

137

1042.82

=
=

Ast

St

68.5
545.5

mm

Side length of wall I defined by the distance between intersection points with adjecent walls
m
3.91

Ak

50 + 12.5 + 6
>

KN

X
(4000-137)
5265269 mm^2

(1500-137)

45
TED
* cot
(2 * Ak * Fyd )
0.809

mm^/mm

The required torsional reinforcement should be 2 legged only.


Longitudinal Reinforcement
Asl

uk
=
Asl

TED

* Cot

(2 * Ak * Fyd )
0.809 mm^/mm

6475

mm^2

Spacing between longitudinal bars should not be more than 350mm


Take sapcing as 300mm
Provide additional 22 no.s 25 mm dia. Bars, with main reinforcement

IRC-112, 16.5.3

Torsional Resisting Capacity


Trdmax
=
2 * * cw * fcd * Ak * tef * sin * cos
=

6485.56

KN-M

>

2810.36

KN-M

Safe in torsional resistance


As per Cl. 10.5.2.1, (4), IRC-112
TED
TRd MAX
8.3.2.3

VED
VRd MAX

1.528

<

Shear Capacity
* Equivalent Shear Due to torsion
Total Design shear

=
=

* Flexural Tensile stress

5.360

Mpa

2.33

Mpa

Allowable tensile stress

1042.82 KN
KN
6386

The Section is Cracked


* Elements not requiring shear reinforcement
K
=
1+ (200/d)^0.5
=
1.01

IRC-112, 10.3.2

Fcd

24.57

Mpa

cp

Min of

NED/AC
7.948

cp

4.913

Min of

Asl/(b*d)
0.001

VRdc

5492

vmin

0.235

VRdc (MIN)

5833

KN

VRdc

5833

KN

&
&

0.2 * Fcd

&
&

0.02
0.02

4.91

0.001

VRdc
As,
Design the shear reinforcement
* Applied shear stress

IRC-112,Cl. 10.3.2
Eq. 10.1
Eq. 10.3
Eq. 10.1

<

Design shear

vED

Maximum allowable shear stress


where v1 =

KN

VED
b*z

cw * 0.225* v1 * Fck

0.6*(1-fck/310)
0.60
=
1.2

cw
Hence,
Maximum allowable shear stress

8.91

Applied shear stress is less than allowable shear stress


* Is allowable shear stress less than =

cw * 0.155* v1 * Fck

Mpa

Mpa

6.14
YES, Take theta as 21.8

Asw

* Shear Reinforcement

S
=

Shear stress * bw
Fywd * cot(theta)
6.59

Fywd

=
=

mm^/mm

* Minimum shear Reinforcement


Asw
s

0.072*(Fck)^0.5 * bw
Fyk
5.15

* The maximum spacing


Slmax
=
0.75d*(1+cota)
=
0.00 mm
lets assume spacing as, 200 mm
Asw
S

5.65

IRC-112, Eq. 16.5

mm^/mm

IRC-112, 16.5.2, Eq. 16.6

mm^2/mm

Provide 12mm dia, 8 legged stirrups at 160 mm c-c.

8.4

Minimum Untensioned Reinforcement


Surface Reinforcemnt
As.sur
=
0.01*Act.ext
23739.13 mm^2
A.ct.ext
=
area of the cover portion outside stirrups.

As.sur

433600

mm^2

4336

mm^2

IRC-112, Cl. 16.5.4

Provide 25 dia. Bars 30 no.s, including torsional steel

8.5
8.5.1

Servicabiliy Limit State


Stress check at pier cap center-servicability rare combionation

Elem

Load

Axial
(N/mm^2)

Bend(+z)
(N/mm^2)

Bend(-z)
(N/mm^2)

TOP
(N/mm^2)

BOTTOM
(N/mm^2)

668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668

669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687

-9.33
-9.34
-9.34
-9.34
-9.34
-9.32
-9.34
-9.32
-9.34
-9.34
-9.33
-9.32
-9.31
-9.34
-9.32
-9.34
-9.34
-9.33
-9.32

-6.95
-7.55
-7.90
-7.58
-7.30
-5.99
-7.94
-6.39
-7.55
-7.71
-7.11
-6.59
-5.24
-7.77
-6.30
-7.32
-7.43
-6.92
-6.41

6.68
7.26
7.60
7.28
7.01
5.76
7.64
6.15
7.26
7.41
6.84
6.33
5.04
7.47
6.06
7.03
7.15
6.65
6.17

-16.60
-17.20
-17.50
-17.20
-16.90
-15.60
-17.60
-16.00
-17.20
-17.30
-16.70
-16.20
-14.80
-17.40
-15.90
-16.90
-17.10
-16.50
-16.00

-2.95
-2.37
-2.04
-2.35
-2.62
-3.85
-2.00
-3.47
-2.37
-2.22
-2.79
-3.28
-4.56
-2.16
-3.56
-2.60
-2.49
-2.97
-3.45

0.87*Fyk
435

Mpa

668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668

688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750

-9.31
-9.34
-9.33
-9.34
-9.34
-9.34
-9.33
-9.32
-9.34
-9.33
-9.34
-9.34
-9.34
-9.34
-9.32
-9.34
-9.32
-9.34
-9.34
-9.33
-9.32
-9.31
-9.34
-9.33
-9.34
-9.34
-9.34
-9.33
-9.32
-9.34
-9.32
-9.34
-9.34
-9.33
-9.32
-9.31
-9.34
-9.33
-9.33
-9.34
-9.33
-9.33
-9.32
-9.34
-9.32
-9.33
-9.33
-9.33
-9.32
-9.31
-9.33
-9.32
-9.33
-9.33
-9.32
-9.32
-9.31
-9.33
-9.33
-9.33
-9.33
-9.33
-9.33

-5.25
-7.43
-6.80
-7.35
-7.57
-7.35
-7.02
-5.90
-7.50
-6.81
-7.42
-7.77
-7.44
-7.16
-5.86
-7.80
-6.26
-7.42
-7.57
-6.97
-6.45
-5.11
-7.63
-6.67
-7.22
-7.44
-7.21
-6.88
-5.76
-7.36
-6.16
-7.18
-7.30
-6.78
-6.28
-5.11
-7.29
-6.63
-7.09
-7.35
-7.10
-6.89
-5.92
-7.38
-6.22
-7.09
-7.20
-6.75
-6.36
-5.35
-7.25
-6.15
-6.91
-7.00
-6.61
-6.23
-5.36
-6.99
-6.52
-6.94
-7.10
-6.93
-6.69

5.05
7.14
6.54
7.07
7.28
7.06
6.75
5.67
7.21
6.55
7.13
7.47
7.15
6.88
5.63
7.50
6.02
7.13
7.28
6.70
6.20
4.91
7.34
6.41
6.94
7.15
6.93
6.62
5.54
7.08
5.93
6.90
7.01
6.52
6.03
4.91
7.01
6.37
6.81
7.06
6.83
6.63
5.69
7.09
5.98
6.81
6.93
6.49
6.12
5.15
6.97
5.91
6.64
6.73
6.35
5.99
5.15
6.72
6.27
6.67
6.83
6.66
6.43

-14.80
-17.10
-16.40
-17.00
-17.20
-17.00
-16.60
-15.50
-17.10
-16.40
-17.10
-17.40
-17.10
-16.80
-15.50
-17.40
-15.90
-17.10
-17.20
-16.60
-16.10
-14.70
-17.30
-16.30
-16.90
-17.10
-16.80
-16.50
-15.40
-17.00
-15.80
-16.80
-16.90
-16.40
-15.90
-14.70
-16.90
-16.20
-16.60
-16.90
-16.70
-16.40
-15.50
-16.90
-15.80
-16.60
-16.80
-16.30
-15.90
-14.90
-16.80
-15.70
-16.50
-16.50
-16.20
-15.80
-14.90
-16.50
-16.10
-16.50
-16.70
-16.50
-16.20

-4.55
-2.49
-3.08
-2.56
-2.35
-2.57
-2.87
-3.94
-2.42
-3.08
-2.51
-2.17
-2.48
-2.75
-3.98
-2.13
-3.60
-2.51
-2.35
-2.92
-3.41
-4.69
-2.30
-3.22
-2.69
-2.48
-2.70
-3.01
-4.07
-2.55
-3.69
-2.73
-2.62
-3.11
-3.58
-4.69
-2.62
-3.17
-2.74
-2.49
-2.73
-2.92
-3.85
-2.46
-3.56
-2.74
-2.63
-3.05
-3.42
-4.38
-2.58
-3.63
-2.91
-2.83
-3.19
-3.55
-4.38
-2.83
-3.27
-2.88
-2.73
-2.89
-3.12

668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668

751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780

-9.32
-9.33
-9.33
-9.33
-9.34
-9.33
-9.33
-9.32
-9.33
-9.32
-9.33
-9.33
-9.33
-9.32
-9.31
-9.33
-9.32
-9.33
-9.33
-9.32
-9.32
-9.31
-9.33
-9.32
-9.31
-9.32
-9.33
-9.33
-9.33
-9.33

Max Allowable Compression


Mx Allowable Tension
8.5.2

-5.84
-7.05
-6.40
-6.86
-7.12
-6.87
-6.66
-5.69
-7.15
-5.99
-6.86
-6.97
-6.52
-6.13
-5.12
-7.02
-5.92
-6.68
-6.77
-6.38
-6.00
-5.13
-6.76
-5.62
-5.16
-6.29
-6.71
-6.87
-6.70
-6.46

=
=

5.62
6.77
6.15
6.59
6.84
6.61
6.41
5.47
6.87
5.76
6.59
6.71
6.27
5.90
4.93
6.75
5.69
6.42
6.51
6.13
5.77
4.93
6.50
5.40
4.96
6.05
6.45
6.61
6.44
6.21
max
min

-15.40
-16.60
-15.90
-16.40
-16.70
-16.40
-16.20
-15.20
-16.70
-15.50
-16.40
-16.50
-16.10
-15.70
-14.70
-16.60
-15.50
-16.20
-16.30
-15.90
-15.50
-14.70
-16.30
-15.20
-14.70
-15.80
-16.30
-16.40
-16.30
-16.00
-14.70
-17.60
OK

-3.92
-2.78
-3.39
-2.96
-2.71
-2.94
-3.14
-4.07
-2.68
-3.78
-2.96
-2.85
-3.27
-3.64
-4.60
-2.80
-3.85
-3.13
-3.04
-3.41
-3.77
-4.60
-3.05
-4.14
-4.57
-3.49
-3.10
-2.94
-3.11
-3.34
-2.00
-4.69
OK

-26.40
3.50

Mpa
Mpa

OK
OK

Stress check at pier cap left support-servicability rare combionation

Elem

Load

Axial
(N/mm^2)

Bend(+z)
(N/mm^2)

Bend(-z)
(N/mm^2)

TOP
(N/mm^2)

BOTTOM
(N/mm^2)

662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662

669.00
670.00
671.00
672.00
673.00
674.00
675.00
676.00
677.00
678.00
679.00
680.00
681.00
682.00
683.00
684.00
685.00
686.00
687.00
688.00
689.00

-9.28
-9.28
-9.29
-9.28
-9.28
-9.26
-9.29
-9.26
-9.28
-9.28
-9.27
-9.26
-9.25
-9.28
-9.26
-9.28
-9.28
-9.27
-9.26
-9.25
-9.28

7.93
8.24
8.34
8.25
8.03
7.47
8.43
8.16
8.24
9.10
8.58
8.33
7.79
9.09
8.07
8.76
8.85
8.43
8.15
7.68
8.81

-7.85
-8.16
-8.26
-8.17
-7.95
-7.39
-8.34
-8.08
-8.16
-9.00
-8.49
-8.24
-7.71
-9.00
-7.98
-8.67
-8.76
-8.34
-8.07
-7.60
-8.72

-1.28
-0.97
-0.88
-0.96
-1.18
-1.73
-0.79
-1.03
-0.97
-0.12
-0.62
-0.87
-1.39
-0.12
-1.13
-0.45
-0.36
-0.78
-1.04
-1.50
-0.40

-17.10
-17.40
-17.50
-17.40
-17.20
-16.60
-17.60
-17.30
-17.40
-18.20
-17.70
-17.40
-16.90
-18.20
-17.20
-17.90
-18.00
-17.50
-17.30
-16.80
-17.90

662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662

690.00
691.00
692.00
693.00
694.00
695.00
696.00
697.00
698.00
699.00
700.00
701.00
702.00
703.00
704.00
705.00
706.00
707.00
708.00
709.00
710.00
711.00
712.00
713.00
714.00
715.00
716.00
717.00
718.00
719.00
720.00
721.00
722.00
723.00
724.00
725.00
726.00
727.00
728.00
729.00
730.00
731.00
732.00
733.00
734.00
735.00
736.00
737.00
738.00
739.00
740.00
741.00
742.00
743.00
744.00
745.00
746.00
747.00
748.00
749.00
750.00
751.00
752.00

-9.27
-9.28
-9.28
-9.28
-9.27
-9.26
-9.28
-9.27
-9.28
-9.29
-9.28
-9.28
-9.26
-9.29
-9.26
-9.28
-9.28
-9.27
-9.26
-9.25
-9.28
-9.27
-9.28
-9.28
-9.28
-9.27
-9.26
-9.28
-9.26
-9.28
-9.28
-9.27
-9.26
-9.25
-9.28
-9.27
-9.28
-9.28
-9.28
-9.27
-9.26
-9.28
-9.26
-9.28
-9.28
-9.27
-9.26
-9.25
-9.28
-9.26
-9.27
-9.27
-9.27
-9.26
-9.25
-9.27
-9.27
-9.27
-9.27
-9.27
-9.27
-9.26
-9.27

7.85
8.14
8.17
8.13
7.89
7.40
8.39
8.62
8.94
9.04
8.95
8.72
8.16
9.12
8.86
8.94
9.79
9.28
9.02
8.48
9.79
8.54
8.83
8.87
8.82
8.58
8.10
9.09
8.76
9.45
9.54
9.12
8.85
8.37
9.50
7.24
7.48
7.55
7.49
7.32
6.90
7.62
7.42
7.48
8.12
7.73
7.54
7.13
8.11
7.34
7.86
7.93
7.61
7.41
7.05
7.90
7.18
7.40
7.43
7.39
7.21
6.85
7.59

-7.77
-8.05
-8.09
-8.05
-7.81
-7.33
-8.31
-8.54
-8.85
-8.94
-8.86
-8.63
-8.08
-9.03
-8.77
-8.85
-9.69
-9.18
-8.93
-8.39
-9.68
-8.46
-8.74
-8.78
-8.73
-8.49
-8.02
-8.99
-8.67
-9.36
-9.44
-9.03
-8.76
-8.29
-9.40
-7.17
-7.40
-7.47
-7.41
-7.24
-6.83
-7.54
-7.34
-7.40
-8.03
-7.65
-7.46
-7.06
-8.03
-7.27
-7.78
-7.85
-7.54
-7.33
-6.98
-7.82
-7.11
-7.32
-7.35
-7.32
-7.14
-6.78
-7.51

-1.36
-1.08
-1.04
-1.08
-1.32
-1.79
-0.82
-0.58
-0.28
-0.18
-0.27
-0.49
-1.03
-0.09
-0.34
-0.28
0.58
0.07
-0.17
-0.70
0.57
-0.66
-0.38
-0.35
-0.39
-0.62
-1.09
-0.12
-0.44
0.24
0.33
-0.08
-0.35
-0.81
0.29
-1.98
-1.75
-1.67
-1.74
-1.90
-2.31
-1.61
-1.79
-1.75
-1.11
-1.49
-1.67
-2.06
-1.11
-1.86
-1.36
-1.29
-1.60
-1.80
-2.14
-1.32
-2.03
-1.83
-1.80
-1.83
-2.01
-2.36
-1.63

-17.00
-17.30
-17.30
-17.30
-17.00
-16.50
-17.50
-17.70
-18.10
-18.20
-18.10
-17.80
-17.30
-18.20
-18.00
-18.10
-18.90
-18.40
-18.10
-17.60
-18.90
-17.70
-18.00
-18.00
-17.90
-17.70
-17.20
-18.20
-17.90
-18.60
-18.70
-18.20
-17.90
-17.50
-18.60
-16.40
-16.60
-16.70
-16.60
-16.50
-16.00
-16.80
-16.60
-16.60
-17.30
-16.90
-16.70
-16.30
-17.30
-16.50
-17.00
-17.10
-16.80
-16.50
-16.20
-17.00
-16.30
-16.50
-16.60
-16.50
-16.40
-16.00
-16.70

662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662

753.00
754.00
755.00
756.00
757.00
758.00
759.00
760.00
761.00
762.00
763.00
764.00
765.00
766.00
767.00
768.00
769.00
770.00
771.00
772.00
773.00
774.00
775.00
776.00
777.00
778.00
779.00
780.00

-9.27
-9.28
-9.28
-9.27
-9.27
-9.26
-9.28
-9.26
-9.28
-9.27
-9.27
-9.26
-9.25
-9.27
-9.26
-9.27
-9.27
-9.27
-9.26
-9.25
-9.27
-9.26
-9.25
-9.27
-9.27
-9.27
-9.27
-9.27

Max Allowable Compression


Mx Allowable Tension
8.5.3

8.40
8.64
8.71
8.64
8.47
8.05
8.77
8.57
8.64
9.27
8.89
8.70
8.29
9.27
8.50
9.02
9.09
8.77
8.57
8.21
9.06
8.01
7.71
8.34
8.55
8.58
8.55
8.37

=
=

-8.31
-8.55
-8.62
-8.55
-8.39
-7.97
-8.68
-8.49
-8.55
-9.18
-8.80
-8.61
-8.21
-9.18
-8.41
-8.93
-9.00
-8.68
-8.48
-8.13
-8.96
-7.92
-7.63
-8.25
-8.47
-8.49
-8.46
-8.28
max
min

-0.82
-0.59
-0.52
-0.58
-0.75
-1.16
-0.45
-0.64
-0.59
0.05
-0.33
-0.51
-0.91
0.05
-0.71
-0.20
-0.13
-0.44
-0.64
-0.99
-0.16
-1.20
-1.49
-0.88
-0.67
-0.64
-0.67
-0.85
0.58
-2.36
OK

-17.50
-17.80
-17.80
-17.80
-17.60
-17.20
-17.90
-17.70
-17.80
-18.40
-18.00
-17.80
-17.40
-18.40
-17.60
-18.20
-18.20
-17.90
-17.70
-17.30
-18.20
-17.10
-16.80
-17.50
-17.70
-17.70
-17.70
-17.50
-16.00
-18.90
OK

-26.40
3.50

Mpa
Mpa

OK
OK

Stress check at pier cap right support-servicability rare combionation

Elem

Load

Axial
(N/mm^2)

Bend(+z)
(N/mm^2)

Bend(-z)
(N/mm^2)

TOP
(N/mm^2)

BOTTOM
(N/mm^2)

672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672

669.00
670.00
671.00
672.00
673.00
674.00
675.00
676.00
677.00
678.00
679.00
680.00
681.00
682.00
683.00
684.00
685.00
686.00
687.00
688.00
689.00
690.00
691.00

-9.10
-9.10
-9.11
-9.10
-9.10
-9.08
-9.11
-9.08
-9.10
-9.10
-9.09
-9.08
-9.07
-9.10
-9.08
-9.10
-9.10
-9.09
-9.08
-9.07
-9.10
-9.09
-9.10

-1.14
-1.20
-1.25
-1.21
-1.19
-0.74
-1.25
-0.56
-1.20
-1.64
-0.84
-0.44
0.05
-1.55
-0.49
-1.54
-1.43
-0.71
-0.36
0.08
-1.29
-1.01
-1.04

1.11
1.16
1.21
1.18
1.16
0.72
1.21
0.54
1.16
1.59
0.81
0.43
-0.05
1.50
0.47
1.49
1.38
0.69
0.35
-0.07
1.25
0.98
1.01

-10.40
-10.50
-10.60
-10.50
-10.50
-10.00
-10.60
-9.85
-10.50
-11.00
-10.10
-9.73
-9.22
-10.90
-9.78
-10.90
-10.70
-10.00
-9.65
-9.20
-10.60
-10.30
-10.40

-8.20
-8.16
-8.11
-8.14
-8.15
-8.57
-8.11
-8.75
-8.16
-7.72
-8.49
-8.86
-9.33
-7.81
-8.82
-7.82
-7.93
-8.61
-8.94
-9.35
-8.05
-8.32
-8.30

672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672

692.00
693.00
694.00
695.00
696.00
697.00
698.00
699.00
700.00
701.00
702.00
703.00
704.00
705.00
706.00
707.00
708.00
709.00
710.00
711.00
712.00
713.00
714.00
715.00
716.00
717.00
718.00
719.00
720.00

-9.10
-9.10
-9.09
-9.08
-9.10
-9.09
-9.10
-9.11
-9.10
-9.10
-9.08
-9.11
-9.08
-9.10
-9.10
-9.09
-9.08
-9.07
-9.10
-9.09
-9.10
-9.10
-9.10
-9.09
-9.08
-9.10
-9.08
-9.10
-9.10

-1.03
-1.07
-1.00
-0.61
-1.03
-1.52
-1.57
-1.62
-1.59
-1.57
-1.12
-1.62
-0.93
-1.57
-2.01
-1.21
-0.82
-0.32
-1.92
-1.39
-1.42
-1.41
-1.44
-1.37
-0.99
-1.40
-0.86
-1.92
-1.80

1.00
1.03
0.97
0.59
1.00
1.47
1.52
1.57
1.54
1.52
1.08
1.57
0.90
1.52
1.95
1.17
0.79
0.31
1.86
1.34
1.37
1.36
1.40
1.33
0.96
1.36
0.83
1.86
1.74

-10.30
-10.40
-10.30
-9.90
-10.30
-10.80
-10.90
-10.90
-10.90
-10.90
-10.40
-10.90
-10.20
-10.90
-11.30
-10.50
-10.10
-9.60
-11.20
-10.70
-10.70
-10.70
-10.80
-10.70
-10.30
-10.70
-10.20
-11.20
-11.10

-8.31
-8.27
-8.34
-8.70
-8.31
-7.83
-7.79
-7.74
-7.77
-7.79
-8.21
-7.74
-8.39
-7.79
-7.36
-8.13
-8.50
-8.97
-7.45
-7.96
-7.94
-7.95
-7.91
-7.97
-8.33
-7.95
-8.46
-7.45
-7.56

672

721.00

-9.09

-1.09

1.06

-10.40

-8.25

672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672

722.00
723.00
724.00
725.00
726.00
727.00
728.00
729.00
730.00
731.00
732.00
733.00
734.00
735.00
736.00
737.00
738.00
739.00
740.00
741.00
742.00
743.00
744.00
745.00
746.00
747.00
748.00
749.00
750.00
751.00
752.00

-9.08
-9.07
-9.10
-9.09
-9.10
-9.10
-9.10
-9.09
-9.08
-9.10
-9.08
-9.10
-9.10
-9.09
-9.08
-9.07
-9.10
-9.08
-9.09
-9.09
-9.09
-9.08
-9.07
-9.09
-9.09
-9.09
-9.09
-9.09
-9.09
-9.08
-9.09

-0.74
-0.30
-1.67
-0.56
-0.60
-0.63
-0.61
-0.59
-0.25
-0.63
-0.12
-0.60
-0.93
-0.33
-0.03
0.34
-0.86
-0.06
-0.85
-0.77
-0.23
0.03
0.36
-0.67
-0.46
-0.48
-0.47
-0.50
-0.45
-0.16
-0.47

0.71
0.29
1.62
0.54
0.58
0.61
0.59
0.58
0.25
0.62
0.11
0.58
0.90
0.32
0.03
-0.33
0.83
0.06
0.83
0.74
0.23
-0.03
-0.35
0.65
0.44
0.47
0.46
0.48
0.43
0.15
0.46

-10.00
-9.58
-11.00
-9.80
-9.85
-9.89
-9.86
-9.84
-9.49
-9.89
-9.35
-9.85
-10.20
-9.57
-9.27
-8.88
-10.10
-9.30
-10.10
-10.00
-9.48
-9.20
-8.87
-9.92
-9.70
-9.73
-9.72
-9.75
-9.69
-9.39
-9.72

-8.58
-8.99
-7.69
-8.71
-8.68
-8.64
-8.66
-8.67
-8.99
-8.64
-9.13
-8.68
-8.35
-8.93
-9.21
-9.56
-8.42
-9.18
-8.42
-8.51
-9.02
-9.27
-9.57
-8.60
-8.80
-8.78
-8.80
-8.77
-8.81
-9.08
-8.79

672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672

753.00
754.00
755.00
756.00
757.00
758.00
759.00
760.00
761.00
762.00
763.00
764.00
765.00
766.00
767.00
768.00
769.00
770.00
771.00
772.00
773.00
774.00
775.00
776.00
777.00
778.00
779.00
780.00

Max Allowable Compression


Mx Allowable Tension
8.6

End Block Design

-9.09
-9.10
-9.10
-9.09
-9.09
-9.08
-9.10
-9.08
-9.10
-9.10
-9.09
-9.08
-9.07
-9.09
-9.08
-9.09
-9.09
-9.09
-9.08
-9.07
-9.09
-9.08
-9.07
-9.09
-9.09
-9.09
-9.09
-9.09

-1.18
-1.22
-1.26
-1.23
-1.22
-0.88
-1.26
-0.74
-1.22
-1.55
-0.95
-0.66
-0.28
-1.48
-0.69
-1.48
-1.39
-0.86
-0.59
-0.27
-1.29
-0.78
-0.18
-1.08
-1.11
-1.10
-1.12
-1.07

=
=

1.14
1.18
1.22
1.19
1.18
0.85
1.22
0.72
1.18
1.50
0.92
0.64
0.27
1.44
0.67
1.43
1.35
0.83
0.58
0.26
1.25
0.76
0.18
1.05
1.07
1.06
1.09
1.04
max
min

-10.40
-10.50
-10.50
-10.50
-10.50
-10.10
-10.50
-9.98
-10.50
-10.80
-10.20
-9.89
-9.51
-10.70
-9.92
-10.70
-10.60
-10.10
-9.83
-9.49
-10.50
-10.00
-9.41
-10.30
-10.40
-10.30
-10.40
-10.30
-8.87
-11.30
OK

-8.10
-8.07
-8.03
-8.06
-8.07
-8.39
-8.03
-8.52
-8.07
-7.75
-8.32
-8.60
-8.95
-7.81
-8.57
-7.82
-7.90
-8.41
-8.66
-8.97
-7.99
-8.48
-9.05
-8.20
-8.18
-8.19
-8.16
-8.21
-7.36
-9.57
OK

-26.40
3.50

Mpa
Mpa

OK
OK

8.6.1

Calculation of stress behind anchorage as per annex J of EC2-2


Pmax
C*C'
Fck(t)

Fck(t)

=
=
=
=

C & C'

Pmax
C*C'
8.6.2

< or =

Concrete strength at the time of tensioning (Cylinder strength)


36.00 Mpa
Dimensions of thr associated rectangle
396 X 396

24.14
OK

Mpa

<

Mpa

36.00

Calculation of Bursting Reinforcement


2 Ypo
2 Yo
For

=
=
=
=
Ypo
Yo

width of Bearing plate


mm.
292.5
width of End Block
720.0 mm.
=
146.3
360.0

Fbst
Pk

Pk

=
=

Fbst

0.23

=
=

0.230

0.4063

0.2300

IRC-112, Table 13.1

Max. prestressing force at anchorage end


3784.91 KN

3784.914
Fbst

3784.914

870.53 KN

Permissible stress for Fe - 415 steel

=
=
Fyd is restricted to 250 to avoid crack width check.
Area of steel required
=

0.87
x
361.05 Mpa

415

870530.22

3482.12 mm^2

250
Provided SPIRAL

Area of steel provided

16

=
=
<

rounds

201.062

2 no

3216.99 cm2.
3482.12 cm2.

x
...

2
UNSAFE

Provided in the region 0.2Yo to 2Yo, i.e 0.072m to 0.72m


OR

Reinforcement to prevemt bursting should not be less than,


Ast
=
0.15*Pmax/Fyd *
=
2725.14 mm^2

EC2-2, Annex J
IRC SP: 105-2015

Fyd is restricted to 250 to avoid crack width check.


Spiral reinforcement provided,

2 X 16 Dia. -8 legs

3216.99
OK

mm^2

>

2725.14

8.6.3

Calculation of spalling reinforcement


0.03*Pmax/Fyd*
Min Ast in Each direction =
=
545.03 mm^2
Provide 16 dia. 4 no.s in each direction

EC2-2, Annex J
IRC SP: 105-2015

NOTE No.

STRUCTCON DESIGNS Pvt Ltd.

835/N-455
DATE

BETWEEN BKC AND EEH

BY

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

1.0
1.1

SHEET

2-Jun-16

PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR

ASK

ANK

Post Tensioned Pier Cap Analysis & Design


Piercap, piers and pile caps are modelled in Midas as line elements.
Pilecap has been modelled with four noded plates supported on piles. Piles of 1.2m dia are modelled
upto point of fixity and defined as fixed supports at that level.
All loads are applied on Piercap and piers appropriately.
Reference Note: 835/N-454

1.1.1

General Data
Pier cap size=

4.00

Post tensioned cables data


Cables
Duct Dia
Span length c/c between two piers
Left side cantilever Length
Right side cantilever length
Depth of Pier Cap
Width of pier cap
Grade of concrete (fck)

=
=
=
=
=
=
=
=

18
107.00
18.02
3.5
1.8
1.5
4
M 55

1.50

No.s
mm
m
m
m
m
m

2 No.s Dummy

Fig. showing general arrangement


Permissible stresses in concrete Stage

IRC-112, 12.2.1
Minimum (MPa)

Maximum (MPa)

Construction

-2.5

26.40

Service

-3.5

26.40

Cable profile
Cable no. 1 to 9
Eccentricities

Cable No. 10 to 20

e1

e2

e3

e4

e5

-180 mm

-365 mm

-610 mm

-260 mm

-180 mm

e1

e2

e3

e4

e5

180 mm

115 mm

-380 mm

0 mm

115 mm

Eccentricities

Cable arrangement

at Mid Section
at Left Support Aection
Input Parameters
Concrete:
Fck, Characterstic Compressive strength =
Ec, Modulus of Elasticity of concrete =
Reinforcement Steel
Grade
=
Fy
=
Es
=

Mpa
55
36000.00 MPa

Table 6.5, IRC-112

Fe500
Mpa
500
2.00E+05 Mpa

Prestresing Steel:
19 strands of
19 T 15
140 mm2

Type of Prestressing cables used i.e


Area of 1 strand (Astrand) =
Area of one cable
UTS of strand
Jacking force
=
Force per cable
=
Es
Fu (Ultimate Strength)
Fy (Yield Strength)
Sheathing Type Ducty Diameter
As per, IRC-112, Table 7.1
Coefficient of friction (meu)
Coefficient of wobble (k)

15.2 dia. Each


type anchorage
=
=

0.765
1422.90

=
=
=

x
x

1860
2.660

1.95E+05 Mpa
1860 Mpa
1570 Mpa
Corugated HDPE
=
=
=

107 mm
0.17
0.002 per meter

=
=

2660
1860
1423
3784.91

mm^2
Mpa
Mpa
KN

Anchorage Slip
Stressing Type

=
=

Minimum strength of concrete at the time of stressing =


Age of concrete at the time of stressing =

mm
6
One end stressing
MPa
40
days
7
(assumed minimum age, actual may be more)

Creep & Shrinkage Inputs


Relative Humidity
Notional size of member

=
=
=
Compressive stregnth of concrete at the age of 28 days
=
Days considered for long term creep and shrinkage
=

70
2*Ac/ u
1
55

Mpa

20,000 Days

Graph of time vs Creep Coefficient (Generated through Midas Civil)

Graph of time vs Shrinkage Strain (Generated through Midas Civil)

8.1.2

Construction Stages Data


Number of cable and their stressing stage is given in table below.
Construction stage analsis is carried out in Midas civil
Steps for construction stage analysis taken listed as following,

Construction Stage

Days

0
15
22
52
59
89
96
126
156
20156

CS1
CS2
CS3
CS4
CS5
CS6
CS7
CS8
CS9
CS10

Case

Cables

Both column of portal cast


Piercap of portal cast on staging

0
15
4,6,12,13,14,15,16
7
30
3,7,11,17
7
30
1,2,5,8,9,10,18
7
30
30
20000
Total 18 cables + 2 dummy

1st stage prestress of piercap done


Girders from 60m span placed
2nd stage prestressing
Girders from 32m span placed
3rd stage prestressing
SIDL reaction is applied
Full live load reaction applied
Long term creep and shrinkage

* Cables should be stressed symmetricially in all the stages. i.e 4/6, 13/15, 14, 12/16
8.2

Summary of Stresses at each Stages


Results are Extracted from the midas model.
Sign convention
Negative = Compression
Positive = Tension

Element numbers in Midas


STAGE 2 Pier cap cast on staging

Elem

LEFT
CANTIL
EVER

PIER
CAP

659
659
660
660
661
661
665
665
668
668
671

Load
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation

Stage
CS 2
CS 2
CS 2
CS 2
CS 2
CS 2
CS 2
CS 2
CS 2
CS 2
CS 2

Part
J[14]
I[8]
I[14]
J[5]
J[378]
I[5]
J[6]
I[9]
J[11]
I[15]
J[747]

Axial
(N/mm^2)

Bend(+z)
(N/mm^2)

Bend(-z)
(N/mm^2)

0.00
0.00
0.00
0.00
0.00
0.00
-0.03
-0.03
-0.03
-0.03
-0.03

0.05
0.00
0.05
0.32
0.63
0.32
-1.65
-0.89
-2.53
-2.30
-1.55

-0.05
0.00
-0.05
-0.32
-0.63
-0.32
1.72
0.93
2.63
2.40
1.60

TOP
BOTTOM
(N/mm^2) (N/mm^2)
0.05
0.00
0.05
0.32
0.63
0.32
-1.68
-0.92
-2.56
-2.33
-1.58

-0.05
0.00
-0.05
-0.32
-0.63
-0.32
1.69
0.90
2.60
2.37
1.57

PIER
CAP

RIGHT
CANTIL
EVER

671
672
672
673
673

Summation
Summation
Summation
Summation
Summation

CS 2
CS 2
CS 2
CS 2
CS 2

I[12]
J[379]
I[747]
I[379]
J[380]

-0.03
-0.03
-0.03
0.00
0.00

-1.94
1.47
-1.55
0.16
0.00

2.01
-1.48
1.60
-0.16
0.00

* At this stage pier will be supported on staging, hence stress check is not required

MAX
MIN

-1.97
1.44
-1.58
0.16
0.00
1.44
-2.56

1.98
-1.51
1.57
-0.16
0.00
2.60
-1.51

MAX
MIN

-7.42
-7.03
-6.16
-7.03
-5.05
-6.16
-1.25
-2.10
-1.54
-1.95
-2.81
-3.23
-5.77
-3.23
-7.71
-4.60
-1.25
-7.71

0.14
-0.28
-1.20
-0.28
-2.38
-1.20
-6.42
-5.43
-6.17
-5.74
-4.83
-4.39
-1.70
-4.39
0.24
-2.97
0.24
-6.42

MAX
MIN

-7.30
-6.92
-6.06
-6.92
-4.96
-6.06
-6.06
-5.89
-6.51
-7.70
-4.99
-4.60
-3.50
-4.60
-4.52
-7.58
-3.50
-7.70

0.13
-0.27
-1.19
-0.27
-2.36
-1.19
-1.67
-1.67
-1.23
-0.10
-2.66
-3.02
-4.00
-3.02
-2.93
0.23
0.23
-4.00

-10.30
-9.57
-8.20
-9.57
-6.64
-8.20

-0.94
-1.71
-3.18
-1.71
-4.84
-3.18

STAGE 3 First stage prestress

LEFT
CANTIL
EVER

PIER
CAP

RIGHT
CANTIL
EVER

659
659
660
660
661
661
665
665
668
668
671
671
672
672
673
673

Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation

CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3
CS 3

Max Allowable Compression


Mx Allowable Tension

I[8]
J[14]
J[5]
I[14]
J[378]
I[5]
J[6]
I[9]
I[15]
J[11]
I[12]
J[747]
J[379]
I[747]
J[380]
I[379]
=
=

26.40
-2.50

-3.66
-3.67
-3.70
-3.67
-3.73
-3.70
-3.84
-3.76
-3.88
-3.87
-3.84
-3.82
-3.75
-3.82
-3.76
-3.79

-3.76
-3.36
-2.46
-3.36
-1.32
-2.46
2.60
1.67
2.34
1.92
1.03
0.60
-2.02
0.60
-3.96
-0.81

Mpa
Mpa

OK
REVISE

-3.60
-3.62
-3.65
-3.62
-3.67
-3.65
-3.90
-3.80
-3.93
-3.96
-3.86
-3.83
-3.76
-3.83
-3.73
-3.69

-3.70
-3.30
-2.41
-3.30
-1.29
-2.41
-2.16
-2.08
-2.58
-3.74
-1.13
-0.77
0.25
-0.77
-0.79
-3.88

Mpa
Mpa

OK
REVISE

-5.64
-5.66
-5.71
-5.66
-5.75
-5.71

-4.65
-3.90
-2.49
-3.90
-0.89
-2.49

3.80
3.40
2.50
3.40
1.35
2.50
-2.57
-1.67
-2.29
-1.87
-0.99
-0.57
2.05
-0.57
4.00
0.82

STAGE 4 ROB placed

LEFT
CANTIL
EVER

PIER
CAP

RIGHT
CANTIL
EVER

659
659
660
660
661
661
665
665
668
668
671
671
672
672
673
673

Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation

CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4
CS 4

Max Allowable Compression


Mx Allowable Tension

I[8]
J[14]
J[5]
I[14]
J[378]
I[5]
J[6]
I[9]
J[11]
I[15]
I[12]
J[747]
J[379]
I[747]
I[379]
J[380]
=
=

26.40
-2.50

3.73
3.34
2.45
3.34
1.32
2.45
2.24
2.13
2.69
3.86
1.19
0.81
-0.25
0.81
0.80
3.92

STAGE 5 Second stage prestressing

LEFT
CANTIL
EVER

PIER
CAP

659
659
660
660
661
661

Summation
Summation
Summation
Summation
Summation
Summation

CS 5
CS 5
CS 5
CS 5
CS 5
CS 5

I[8]
J[14]
J[5]
I[14]
J[378]
I[5]

4.70
3.95
2.53
3.95
0.91
2.53

PIER
CAP

RIGHT
CANTIL
EVER

665
665
668
668
671
671
672
672
673
673

Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation

CS 5
CS 5
CS 5
CS 5
CS 5
CS 5
CS 5
CS 5
CS 5
CS 5

Max Allowable Compression


Mx Allowable Tension

J[6]
I[9]
J[11]
I[15]
I[12]
J[747]
I[747]
J[379]
I[379]
J[380]
=
=

26.40
-2.50

-5.98
-5.86
-6.01
-6.05
-5.94
-5.91
-5.91
-5.80
-5.82
-5.77

0.27
-0.33
-0.08
-1.15
0.68
0.65
0.65
-1.04
-0.39
-4.91

Mpa
Mpa

OK
REVISE

-5.59

-3.86

-5.57
-5.59
-5.65
-5.65
-5.69
-5.86
-6.00
-6.09
-6.07
-5.91
-5.96
-5.78
-5.91
-5.69
-5.75

-4.59
-3.86
-1.52
-1.52
0.70
-2.07
-2.64
-5.30
-4.68
-1.69
-2.72
1.50
-1.69
-4.84
-0.38

Mpa
Mpa

OK
REVISE

-9.11
-9.07
-9.19
-9.11
-9.19
-9.25
-9.33
-9.48
-9.56
-9.60
-9.41
-9.45
-9.41
-9.25
-9.24
-9.31

-2.78
-4.34
0.74
-2.78
0.74
3.80
1.48
1.65
-0.34
-0.85
1.14
0.67
1.14
0.42
-4.67
1.91

Mpa
Mpa

OK
OK

-0.18
0.38
0.21
1.28
-0.61
-0.61
-0.61
1.05
0.39
4.96
MAX
MIN

-5.70
-6.19
-6.09
-7.20
-5.26
-5.26
-5.26
-6.84
-6.21
-10.70
-5.26
-10.70

-6.16
-5.48
-5.81
-4.76
-6.55
-6.52
-6.52
-4.75
-5.43
-0.81
-0.81
-6.55

3.91

-9.45

-1.68

4.64
3.91
1.55
1.55
-0.70
2.12
2.72
5.41
4.78
1.73
2.77
-1.50
1.73
4.89
0.39
MAX
MIN

-10.20
-9.45
-7.17
-7.17
-4.99
-7.93
-8.64
-11.40
-10.70
-7.60
-8.67
-4.29
-7.60
-10.50
-6.13
-4.29
-11.40

-0.93
-1.68
-4.10
-4.10
-6.39
-3.74
-3.28
-0.68
-1.29
-4.18
-3.19
-7.29
-4.18
-0.80
-5.36
-0.68
-7.29

MAX
MIN

-11.90
-13.40
-8.45
-11.90
-8.45
-5.45
-7.84
-7.84
-9.91
-10.40
-8.26
-8.79
-8.26
-8.84
-13.90
-7.40
-5.45
-13.90

-6.30
-4.68
-9.92
-6.30
-9.92
-13.00
-10.70
-10.90
-8.96
-8.47
-10.40
-9.95
-10.40
-9.68
-4.52
-11.20
-4.52
-13.00

STAGE 6 Other span placed


659
LEFT
CANTIL
EVER

PIER
CAP

RIGHT
CANTIL
EVER

659
660
660
661
661
665
665
668
668
671
671
672
672
673
673

Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation

CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6
CS 6

Max Allowable Compression


Mx Allowable Tension

J[14]
I[8]
I[14]
J[5]
I[5]
J[378]
I[9]
J[6]
I[15]
J[11]
J[747]
I[12]
J[379]
I[747]
J[380]
I[379]
=
=

26.40
-2.50

STAGE 7 Third stage prestressing

LEFT
CANTIL
EVER

PIER
CAP

RIGHT
CANTIL
EVER

659
659
660
660
661
661
665
665
668
668
671
671
672
672
673
673

Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation

CS 7
CS 7
CS 7
CS 7
CS 7
CS 7
CS 7
CS 7
CS 7
CS 7
CS 7
CS 7
CS 7
CS 7
CS 7
CS 7

Max Allowable Compression


Mx Allowable Tension
STAGE 8 SIDL

J[14]
I[8]
J[5]
I[14]
I[5]
J[378]
I[9]
J[6]
J[11]
I[15]
J[747]
I[12]
I[747]
J[379]
J[380]
I[379]
=
=

26.40
-2.50

2.81
4.39
-0.73
2.81
-0.73
-3.80
-1.33
-1.41
0.60
1.13
-1.03
-0.50
-1.03
-0.43
4.72
-1.90

LEFT
CANTIL
EVER

PIER
CAP

RIGHT
CANTIL
EVER

659
659
660
660
661
661
665
665
668
668
671
671
672
672
673
673

Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation

CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8
CS 8

Max Allowable Compression


Mx Allowable Tension

I[8]
J[14]
I[14]
J[5]
J[378]
I[5]
I[9]
J[6]
J[11]
I[15]
J[747]
I[12]
J[379]
I[747]
J[380]
I[379]
=
=

26.40
-2.50

-8.97
-9.01
-9.01
-9.09
-9.13
-9.09
-9.28
-9.45
-9.55
-9.59
-9.35
-9.41
-9.17
-9.35
-9.13
-9.20

-4.30
-2.76
-2.76
1.17
4.50
1.17
0.02
-0.49
-3.10
-3.76
-0.23
-1.29
1.86
-0.23
-4.62
1.88

Mpa
Mpa

OK
OK

-8.89
-8.93
-9.01
-8.93
-9.01
-9.06
-9.27
-9.46
-9.59
-9.61
-9.41
-9.33
-9.12
-9.33
-9.05
-9.12

-4.28
-2.75
1.11
-2.75
1.11
4.38
-1.59
-2.57
-6.13
-6.37
-3.43
-1.72
3.44
-1.72
-4.58
1.85

Mpa
Mpa

OK
OK

-8.19
-8.23
-8.30
-8.23
-8.30
-8.33
-8.53
-8.69
-8.83
-8.85
-8.65
-8.57
-8.38
-8.57
-8.37
-8.30

-3.95
-2.56
1.07
-2.56
1.07
4.14
-2.31
-3.54
-7.10
-7.38
-4.17
-2.34
3.78
-2.34
1.69
-4.18

4.35
2.80
2.80
-1.16
-4.51
-1.16
0.09
0.64
3.26
3.93
0.31
1.39
-1.87
0.31
4.67
-1.87
MAX
MIN

-13.30
-11.80
-11.80
-7.91
-4.63
-7.91
-9.25
-9.94
-12.60
-13.30
-9.58
-10.70
-7.31
-9.58
-13.70
-7.32
-4.63
-13.70

-4.62
-6.21
-6.21
-10.20
-13.60
-10.20
-9.19
-8.81
-6.29
-5.66
-9.04
-8.02
-11.00
-9.04
-4.46
-11.10
-4.46
-13.60

MAX
MIN

-13.20
-11.70
-7.90
-11.70
-7.90
-4.68
-10.90
-12.00
-15.70
-16.00
-12.80
-11.10
-5.69
-11.10
-13.60
-7.26
-4.68
-16.00

-4.57
-6.15
-10.10
-6.15
-10.10
-13.40
-7.61
-6.81
-3.41
-3.17
-5.95
-7.57
-12.60
-7.57
-4.42
-11.00
-3.17
-13.40

-12.10
-10.80
-7.22
-10.80
-7.22
-4.18
-10.80
-12.20
-15.90
-16.20
-12.80
-10.90
-4.60
-10.90
-6.67
-12.50

-4.20
-5.64
-9.36
-5.64
-9.36
-12.50
-6.17
-5.10
-1.71
-1.44
-4.47
-6.21
-12.20
-6.21
-10.10
-4.08

STAGE 9 LL

LEFT
CANTIL
EVER

PIER
CAP

RIGHT
CANTIL
EVER

659
659
660
660
661
661
665
665
668
668
671
671
672
672
673
673

Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation

CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9
CS 9

Max Allowable Compression


Mx Allowable Tension
STAGE 10

LEFT
CANTIL
EVER

PIER
CAP

RIGHT
CANTIL
EVER

659
659
660
660
661
661
665
665
668
668
671
671
672
672
673
673

I[8]
J[14]
J[5]
I[14]
I[5]
J[378]
I[9]
J[6]
J[11]
I[15]
I[12]
J[747]
J[379]
I[747]
J[380]
I[379]
=
=

26.40
-2.50

4.32
2.79
-1.09
2.79
-1.09
-4.38
1.66
2.65
6.17
6.44
3.46
1.76
-3.44
1.76
4.63
-1.84

LONG TERM CREEP & SHRINKAGE


Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation
Summation

CS 10
CS 10
CS 10
CS 10
CS 10
CS 10
CS 10
CS 10
CS 10
CS 10
CS 10
CS 10
CS 10
CS 10
CS 10
CS 10

I[8]
J[14]
J[5]
I[14]
I[5]
J[378]
I[9]
J[6]
J[11]
I[15]
I[12]
J[747]
J[379]
I[747]
I[379]
J[380]

4.00
2.59
-1.06
2.59
-1.06
-4.15
2.35
3.59
7.11
7.41
4.18
2.36
-3.79
2.36
-1.69
4.22

Max Allowable Compression


Mx Allowable Tension
8.3

=
=

26.40
-2.50

MAX
MIN

OK
OK

Ultimate Limit State


Load Factors - Ultimate Limit State for Strength
Basic combination
Dead Load
1.35
SIDL
1.35
SIDL surfacing
1.75
Live load (Leading)
1.5
Live load (Accompanying)
1.15
Prestressing
1
Wind (Leading)
1.5
Wind (Accompanying)
0.9

8.3.1

Mpa
Mpa

Seismic Combination
1.35
1.35
1.75
0.2
1
-

Summary of forces at center of pier cap for ULS load cases

BMD Under selft weight

Elem

Load

Axial (kN)

Shear-y (kN)

668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668

501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522

-58812
-58998
-59044
-58979
-58857
-58564
-59029
-58763
-58930
-58946
-58906
-58779
-58528
-58894
-58584
-58998
-58978
-58789
-58563
-58255
-58968
-58558

44
46
46
45
43
44
49
43
49
49
45
43
44
50
47
46
47
47
51
50
48
45

Shear-z
(kN)
-2438
-2261
-1911
-2239
-2088
-1937
-1876
-2357
-2190
-1840
-2183
-2006
-1878
-1846
-2331
-2261
-2182
-2210
-1952
-1793
-2093
-2262

Torsion
(kN*m)
-611
-922
-874
-917
-562
-643
-1102
-141
-724
-1054
-485
-470
-620
-1079
-810
-922
-948
-991
-1256
-1053
-995
-399

Moment-y
(kN*m)
18947
20072
20810
20152
19686
17113
20925
18689
19718
20197
19731
19168
16943
20103
18003
20072
20470
19356
18477
15827
20623
17826

Moment-z
(kN*m)
-1772
-1767
-1768
-1768
-1773
-1771
-1762
-1774
-1762
-1761
-1770
-1773
-1771
-1760
-1765
-1767
-1765
-1765
-1757
-1759
-1763
-1769

-4.18
-16.20

-1.44
-12.50

668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668

523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583

-58925

46

-2462

-425

19643

-1767

-58899

47

-2095

-817

19947

-1764

-58731
-58529

49
49

-2153
-1893

-759
-953

18993
18127

-1762
-1761

-58260

50

-1753

-1057

15830

-1759

-58872

49

-2009

-954

19977

-1761

-58701

32

-2125

-778

18408

-1360

-58844
-58878

34
34

-1990
-1721

-1017
-980

19270
19836

-1356
-1358

-58828

34

-1973

-1013

19332

-1358

-58735

32

-1857

-741

18974

-1362

-58511

33

-1741

-803

17002

-1360

-58867
-58526

36
35

-1695
-2043

-1155
-931

19925
17684

-1353
-1355

-58844

34

-1990

-1017

19270

-1356

-58828

35

-1929

-1036

19576

-1355

-58683

35

-1950

-1069

18721

-1355

-58510
-58273
-58820
-58663
-58791
-58803
-58773
-58675
-58483
-58764
-58506
-58787
-58767
-58639
-58484
-58277
-58747
-58682
-58825
-58860
-58810
-58717
-58492
-58849
-58507
-58825
-58809
-58665
-58491
-58255
-58802
-58645
-58772
-58785
-58754
-58657
-58465
-58745
-58487
-58769
-58749
-58620
-58465
-58259

38
37
36
31
36
36
33
32
33
37
33
34
35
36
37
37
36
39
41
40
40
38
39
43
42
41
42
42
45
44
42
38
43
43
40
38
39
44
40
41
42
43
43
44

-1753
-1631
-1861
-2063
-1935
-1667
-1930
-1795
-1696
-1672
-1990
-2143
-1863
-1907
-1708
-1600
-1796
-2361
-2225
-1956
-2208
-2092
-1977
-1930
-2279
-2225
-2164
-2186
-1988
-1866
-2096
-2298
-2171
-1902
-2165
-2030
-1931
-1907
-2225
-2379
-2098
-2142
-1943
-1836

-1273
-1117
-1073
-418
-865
-1118
-681
-670
-785
-1137
-616
-636
-936
-892
-1041
-1120
-1041
-861
-1100
-1062
-1096
-824
-886
-1237
-1014
-1100
-1119
-1152
-1355
-1200
-1156
-500
-948
-1201
-764
-753
-868
-1220
-698
-719
-1019
-974
-1123
-1203

18048
16016
19693
18210
18999
19366
19009
18578
16872
19294
17548
18941
19175
18443
17779
16019
19198
18001
18864
19430
18926
18568
16596
19518
17278
18864
19169
18315
17641
15610
19286
17804
18593
18960
18603
18171
16466
18888
17142
18535
18768
18037
17373
15612

-1349
-1351
-1354
-1362
-1353
-1352
-1359
-1362
-1360
-1351
-1358
-1357
-1355
-1353
-1352
-1350
-1352
-1347
-1343
-1344
-1344
-1348
-1346
-1340
-1342
-1343
-1342
-1341
-1336
-1337
-1340
-1349
-1340
-1339
-1345
-1348
-1346
-1338
-1345
-1343
-1341
-1339
-1339
-1337

668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668

584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644

-58728

43

-2031

-1124

18791

-1339

-58701

32

-2125

-778

18408

-1360

-58844
-58878

34
34

-1990
-1721

-1017
-980

19270
19836

-1356
-1358

-58828

34

-1973

-1013

19332

-1358

-58735

32

-1857

-741

18974

-1362

-58511

33

-1741

-803

17002

-1360

-58867
-58526

36
35

-1695
-2043

-1155
-931

19925
17684

-1353
-1355

-58844

34

-1990

-1017

19270

-1356

-58828

35

-1929

-1036

19576

-1355

-58683

35

-1950

-1069

18721

-1355

-58510
-58273

38
37

-1753
-1631

-1273
-1117

18048
16016

-1349
-1351

-58820

36

-1861

-1073

19693

-1354

-58663

31

-2063

-418

18210

-1362

-58791

36

-1935

-865

18999

-1353

-58803
-58773
-58675
-58483
-58764
-58506
-58787
-58767
-58639
-58277
-58277
-58747
-58331
-58356
-58362
-58354
-58337
-58298
-58360
-58301
-58356
-58353
-58831
-58298
-58257
-58352
-58325
-58347
-58349
-58344
-58327
-58294
-58342
-58298
-58346
-58343
-58321
-58294
-58258
-58339
-58334
-58358
-58364
-58356

36
33
32
33
37
33
34
35
36
37
37
36
27
27
27
27
26
27
27
27
27
27
28
28
27
27
26
27
27
27
26
27
27
27
27
27
27
27
27
27
28
29
29
29

-1667
-1930
-1795
-1696
-1672
-1990
-2143
-1863
-1907
-1600
-1600
-1796
-1748
-1724
-1678
-1721
-1701
-1681
-1673
-1734
-1724
-1714
-2447
-1683
-1662
-1702
-1737
-1715
-1668
-1714
-1690
-1673
-1669
-1724
-1751
-1702
-1710
-1675
-1657
-1691
-1754
-1730
-1684
-1728

-1118
-681
-670
-785
-1137
-616
-636
-936
-892
-1120
-1120
-1041
-1194
-1235
-1229
-1235
-1187
-1198
-1259
-1221
-1235
-1239
-1237
-1280
-1253
-1245
-1131
-1209
-1253
-1177
-1175
-1195
-1256
-1166
-1169
-1221
-1214
-1240
-1253
-1240
-1198
-1240
-1233
-1239

19366
19009
18578
16872
19294
17548
18941
19175
18443
16019
16019
19198
16101
16251
16349
16262
16199
15856
16365
15975
16251
16304
19769
16038
15685
16324
16066
16204
16268
16205
16130
15834
16255
15951
16194
16234
16107
15992
15685
16238
16090
16240
16338
16251

-1352
-1359
-1362
-1360
-1351
-1358
-1357
-1355
-1353
-1350
-1350
-1352
-727
-727
-727
-727
-728
-727
-726
-726
-727
-726
-725
-725
-726
-726
-728
-726
-726
-727
-728
-727
-726
-727
-727
-726
-726
-726
-726
-726
-735
-734
-734
-735

668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668

8.3.1.1

645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668

-58340

28

-1707

-1192

16188

-735

-58301

28

-1687

-1203

15845

-735

-58362
-58303

29
29

-1679
-1740

-1264
-1225

16354
15964

-734
-734

-58358

29

-1730

-1240

16240

-734

-58356

29

-1720

-1243

16293

-734

-58331

29

-1724

-1249

16144

-734

-58300
-58259

29
29

-1689
-1668

-1284
-1257

16027
15674

-733
-733

-58354

29

-1708

-1250

16313

-734

-58300

28

-1731

-1170

15940

-735

-58349

29

-1757

-1174

16183

-734

-58345
-58323

29
29

-1708
-1716

-1226
-1218

16223
16096

-734
-734

-58296

29

-1681

-1244

15981

-733

-58260

29

-1663

-1258

15674

-733

-58342

29

-1697

-1244

16227

-734

-58327
-58349
-58351
-58346
-58329
-58296
-58344

28
29
29
28
28
28
29

-1743
-1721
-1674
-1720
-1697
-1679
-1675

-1136
-1213
-1257
-1182
-1180
-1200
-1261

16056
16193
16257
16195
16119
15823
16244

-735
-734
-734
-735
-735
-735
-733

MAX
MIN

-58255

51

-1600

-141

20925

-725

-59044

26

-2462

-1355

15610

-1774

Moment capacity of a section at mid span


Moment Capacity of Prestressed Section

Area of layer 1 cables


Area of layer 2 cables

=
=

23940
23940

mm^2
mm^2

Total Force in layer 1 cable after losses


Total Force in layer 2 cable after losses

=
=

23845
23845

KN
KN

ES

1.95E+05

Mpa

Prestrain in Layer 1 cables


Prestrain in Layer 2 cables

=
=

Fs / Es =
Fs / Es =

0.0051
0.0051

Ultimate stress in cable (Fpk)


Stress at 0.1 % Proof force = 0.87 * Fpk

=
=

1860
1618.2

Mpa
Mpa

1618.2
1.15

1407.13

Mpa

Fpd
ES

0.0072

Fpd

Yield Strain, pd
pd

Fig. A2-4 , IRC-112-2011


CG Of cables from top at mid sec
1245
mm
115
CG Of cables from top at Left support sec
1102.5

mm

340
230
140

Left Support

Mid Section

Neutral Axis Location at

821.18

mm

.After iterations

Final Steel Strain = Prestrain + Bending Strain


Final Strain in Layer 1 cables

=
=

0.0051
0.0074

+
>

0.00230
pd

Final Strain in Layer 2 cables

=
=

0.0051
0.0064

+
~

0.001316
pd

As the strain values are greater than pd , hence stresses in cables are=Fpd=
Thus Total force in steel , Tu

=
=

1407.13

Mpa

*Es*A
64555.55 KN

Total Compressive force in concrete


fcd =

Fck
m

*x

Cu

Tu

Fcd

0.8

for Fck < 60 Mpa

Fck

IRC-112, A2.9
IRC-112, 6.4.2.8

m
m

=
=

1.5
0.67

for basic and seismic combination

IRC-112, 6.4.2.8

Fcd

=
=

24.57

Mpa

for Fck < 60 Mpa

*Fcd

24.57

Compressive Force, Cu

*Fcd**x*b

=
Tu = Cu

8.3.1.2

i.e

IRC-112, A2.9

64555.55 KN

Tu - Cu =

0.00

Goal Seek this to 0 by Changing cell E775

Ultimate Moment Capacity

=
=

(Fs*As*(d-0.4*x))
59693 KN-M

Ultimate Moment

20925

KN-M

Design shear

2462

KN

Flexural Tensile stress

5.360

Mpa

Allowable tensile stress

2.33

Mpa

OR

<

*Fcd**x*b*Z

Ultimate Moment Capacity


OK

Shear Capacity

The Section is Cracked


Elements not requiring shear reinforcement
K
=
1+ (200/d)^0.5
=
1.01

IRC-112, 10.3.2

Fcd

24.57

Mpa

cp

Min of

NED/AC

&

0.2 * Fcd

7.948

&

4.91

Asl/(b*d)

&
&

cp

4.913

Min of

0.004
t

0.004

VRdc

3148
KN
(Considering b as 2m, i.e supported width)

vmin

0.235

VRdc (MIN)

5829

KN

VRdc

3148

KN

VRdc
>
As,
Provide minimum Reinforcement
Asw
S* bw

0.02
0.02

IRC-112,Cl. 10.3.2
Eq. 10.1
Eq. 10.3

Design shear

0.072*(Fck)^0.5
Fyk

Eq. 10.1

0.00129

The maximum spacing


Slmax
=
0.75d*(1+cota)
=
1125.00 mm
lets assume spacing as, 200 mm
Asw
S
8.3.1.3

IRC-112, 16.5.2, Eq. 16.6

5.15 mm^2/m

Torsional Moment
TED

Design torsion
KN-M
1355

=
=

Tt

shear stress due to torsion


TED

=
=

2*Ak*tef
VED

t * tef * Z

Torsional Inertia ofr section


b
d
b/d
torsional constant

Torsional Inertia ofr section

=
=
=

4000
1500
2.67
0.254

mm
mm

*b*d^3
3.429E+012 mm^4

tef
=
A/W
545.4545455
this thickness should not b les than twice the distance between edge and centre of longitudinal reinforcement
effective cover
=
as
2 * effective cover
tef

Ak

=
=

Ast

St

50 + 12.5 + 6
>
137

68.5
545.5

mm

X
(4000-137)
5265269 mm^2

(1500-137)

45
TED
* cot
(2 * Ak * Fyd )
0.390

mm^/m

Total shear reinforcemenrt required including for shear


=
5.15
+
=
mm^2/m
5.54
Provide 16mm dia. 8 legged stirrups at 200 mm c-c
Astprovided

8.04

mm^2/mm

St
Longitudinal Reinforcement
Asl
uk

TED
(2 * Ak * Fyd )

* Cot

0.390

Asl

0.390 mm^/m

35348 mm^2

Spacing between longitudinal bars should not be more than 350mm


Take sapcing as 300mm
Provide additional 22 no.s 25 mm dia. Bars, with main reinforcement

IRC-112, 16.5.3

Torsional Resisting Capacity


Trdmax
=
2 * * cw * fcd * Ak * tef * sin * cos
=

6485.56

KN-M

>

1355.26

KN-M

Safe in torsional resistance

8.3.2

Summary opf forces at Letf support of pier cap for ULS load cases

Elem

Load

Axial (kN)

Shear-y (kN)

662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662

501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540

-57912
-58002
-57994
-58084
-58016
-58106
-57987
-58077
-57934
-58024
-57798
-57888
-58011
-58101
-57892
-57981
-57967
-58056
-57974
-58063
-57957
-58047
-57899
-57989
-57782
-57872
-57951
-58041
-57807
-57897
-57994
-58084
-57989
-58079
-57901
-57991
-57799
-57889
-57656
-57745

580
580
581
581
581
581
581
581
580
580
580
580
581
581
580
580
581
581
581
581
581
581
580
580
580
580
581
581
581
581
581
581
581
581
581
581
581
581
581
581

Shear-z
(kN)
-9585
-9607
-11549
-11571
-11709
-11731
-10585
-10607
-9745
-9766
-9123
-9145
-11593
-11615
-9512
-9534
-11315
-11336
-11411
-11432
-10377
-10399
-9608
-9630
-9072
-9093
-11232
-11254
-9482
-9504
-11549
-11571
-10643
-10665
-10295
-10316
-9598
-9620
-8982
-9004

Torsion
(kN*m)
2820
2820
3453
3453
3853
3853
3361
3361
3220
3220
2803
2803
4108
4108
3297
3297
4550
4550
4617
4617
3921
3921
3364
3364
2828
2828
4389
4389
2613
2613
3453
3453
3222
3222
3098
3098
3315
3315
2371
2371

Moment-y
(kN*m)
-17607
-12756
-18320
-12486
-18542
-12628
-18343
-12991
-17829
-12898
-16559
-11938
-18740
-12885
-17425
-12610
-18071
-12355
-18159
-12394
-18060
-12812
-17512
-12649
-16416
-11822
-18655
-12980
-18132
-13332
-18320
-12486
-20248
-14867
-19085
-13879
-18512
-13654
-17279
-12729

Moment-z
(kN*m)
409
119
414
124
415
124
413
122
409
119
409
118
419
128
409
119
419
129
420
129
414
123
410
119
409
118
420
129
411
121
414
124
414
124
414
123
417
127
413
122

662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662

541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601

-57986

581

-10925

3687

-20237

417

-58075

581

-10947

3687

-14716

126

-57796
-57886

581
581

-9421
-9442

3040
3040

-17914
-13145

410
120

-57968

581

-10372

3795

-19486

415

-58058

581

-10394

3795

-14241

124

-57956

581

-10437

3797

-19688

416

-58046
-57877

581
581

-10459
-10121

3797
3414

-14410
-18732

126
416

-57966

581

-10143

3414

-13613

125

-57783

581

-9484

2851

-18111

414

-57873

581

-9506

2851

-13310

124

-57658
-57748

581
581

-8949
-8971

2363
2363

-17040
-12506

413
123

-57943

581

-10629

3907

-19593

418

-58033

581

-10650

3907

-14220

127

-57860

445

-9278

2556

-16083

315

-57950
-57923
-58013
-57940
-58030
-57918
-58008
-57877
-57967
-57773
-57863
-57936
-58026
-57779
-57869
-57923
-58013
-57919
-58009
-57852
-57941
-57774
-57864
-57663
-57753
-57916
-58006
-57844
-57934
-57902
-57992
-57907
-57997
-57894
-57984
-57850
-57940
-57760
-57850
-57890
-57980
-57771
-57861
-57903

445
445
445
445
445
445
445
445
445
445
445
446
446
445
445
445
445
445
445
445
445
446
446
445
445
446
446
445
445
446
446
446
446
445
445
445
445
445
445
446
446
445
445
445

-9300
-10784
-10806
-10907
-10928
-10045
-10067
-9401
-9422
-8924
-8946
-10818
-10840
-9200
-9221
-10784
-10806
-10089
-10111
-9822
-9844
-9288
-9310
-8816
-8838
-10306
-10328
-9222
-9244
-10604
-10626
-10678
-10700
-9886
-9907
-9296
-9318
-8885
-8906
-10541
-10563
-9152
-9174
-9882

2556
3041
3041
3348
3348
2971
2971
2862
2862
2543
2543
3543
3543
2397
2397
3041
3041
2864
2864
2769
2769
2935
2935
2212
2212
3220
3220
2921
2921
3882
3882
3934
3934
3400
3400
2973
2973
2562
2562
3759
3759
2724
2724
3303

-11385
-16630
-11179
-16800
-11288
-16647
-11566
-16253
-11494
-15280
-10759
-16952
-11484
-16486
-11827
-16630
-11179
-18108
-13004
-17216
-12246
-16777
-12074
-15831
-11365
-18100
-12888
-15944
-11274
-16439
-11078
-16506
-11108
-16430
-11429
-16011
-11304
-15170
-10669
-16887
-11557
-16319
-11684
-17524

93
319
96
319
97
318
95
315
93
315
92
322
100
317
94
319
96
319
96
319
96
322
99
318
95
321
98
315
93
323
100
324
101
319
96
316
93
315
92
324
101
316
93
320

662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662

602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662

-57993

445

-9903

3303

-12524

97

-57894

445

-9932

3305

-17678

321

-57984
-57833

445
446

-9954
-9689

3305
3011

-12654
-16946

98
320

-57923

446

-9711

3011

-12042

98

-57761

445

-9201

2580

-16470

319

-57851

445

-9223

2580

-11811

96

-57665
-57755

445
445

-8791
-8813

2205
2205

-15648
-11194

318
96

-57884

446

-10078

3389

-17606

322

-57974

446

-10100

3389

-12508

99

-57854

445

-9578

2527

-18705

319

-57943
-57917

445
446

-9599
-11084

2527
3013

-13858
-19252

96
323

-58007

446

-11106

3013

-13651

100

-57934

446

-11206

3320

-19422

323

-58024

446

-11228

3320

-13760

100

-57912
-58001
-57871
-57960
-57767
-57857
-57930
-58020
-57773
-57863
-57917
-58007
-57913
-58003
-57845
-57935
-57768
-57857
-57657
-57747
-57910
-58000
-57838
-57928
-57896
-57985
-57901
-57991
-57888
-57978
-57844
-57933
-57754
-57844
-57884
-57973
-57765
-57854
-57897
-57987
-57888
-57977
-57827
-57916

446
446
445
445
445
445
446
446
446
446
446
446
446
446
446
446
446
446
446
446
446
446
445
445
446
446
446
446
446
446
445
445
445
445
446
446
445
445
446
446
446
446
446
446

-10345
-10366
-9700
-9722
-9224
-9246
-11118
-11139
-9499
-9521
-11084
-11106
-10389
-10411
-10122
-10144
-9588
-9610
-9116
-9137
-10605
-10627
-9522
-9544
-10904
-10926
-10978
-10999
-10185
-10207
-9595
-9617
-9184
-9206
-10841
-10863
-9452
-9474
-10181
-10203
-10231
-10253
-9989
-10010

2942
2942
2834
2834
2514
2514
3515
3515
2368
2368
3013
3013
2836
2836
2741
2741
2907
2907
2183
2183
3192
3192
2893
2893
3854
3854
3905
3905
3371
3371
2945
2945
2533
2533
3731
3731
2696
2696
3275
3275
3277
3277
2982
2982

-19270
-14038
-18876
-13967
-17902
-13231
-19574
-13957
-19108
-14299
-19252
-13651
-20730
-15477
-19839
-14719
-19399
-14546
-18454
-13837
-20722
-15360
-18566
-13746
-19061
-13551
-19128
-13581
-19053
-13901
-18633
-13776
-17793
-13142
-19509
-14030
-18941
-14156
-20146
-14996
-20301
-15126
-19568
-14515

322
99
319
96
318
96
326
103
320
97
323
100
323
100
322
99
325
102
321
99
325
102
319
96
327
104
327
104
322
99
319
96
318
96
327
104
319
97
323
100
324
101
324
101

662
662
662
662
662
662

8.3.2.1

663
664
665
666
667
668

-57755

446

-9501

2551

-19092

323

-57845

446

-9522

2551

-14283

100

-57659
-57749

446
446

-9090
-9112

2177
2177

-18270
-13666

322
99

-57878

446

-10378

3361

-20228

325

-57967

446

-10400

3361

-14980

103

MAX
MIN

-57656

581

-8791

4617

-10669

420

-58106

445

-11731

2177

-20730

92

Moment capacity of a section at left support


Moment Capacity of Prestressed Section

Area of layer 1 cables


Area of layer 2 cables

23940

mm^2

23940

mm^2

Total Force in layer 1 cable after losses


Total Force in layer 2 cable after losses

=
=

23845
23845

KN
KN

ES

1.95E+05

Mpa

Prestrain in Layer 1 cables


Prestrain in Layer 2 cables

=
=

Fs / Es =
Fs / Es =

0.0051
0.0051

Ultimate stress in cable (Fpk)


Stress at 0.1 % Proof force = 0.87 * Fpk

=
=

1860
1618.2

Mpa
Mpa

1618.2
1.15

1407.13

Mpa

Fpd
ES

0.0072

Fpd

Yield Strain, pd
pd

Fig. A2-4 , IRC-112-2011


CG Of cables from top at mid sec
1245
mm
115
CG Of cables from top at Left support sec
1102.5
mm
340

230
140

Left Support

Mid Section

Neutral Axis Location at

779.15

mm

.After iterations

Final Steel Strain = Prestrain + Bending Strain

Final Strain in Layer 1 cables

=
=

0.0051
0.0068

Final Strain in Layer 2 cables

=
=

+
~

0.00171
pd

0.0051

0.001194

0.0063

pd

As the strain values are greater than or almost equal to pd , hence stresses in ca 1407.13
Thus Total force in steel , Tu

=
=

*Es*A

Mpa

47880

61251.50 KN

Total Compressive force in concrete


Fck

fcd =

*x

Cu

Tu

Fcd

0.8

for Fck < 60 Mpa

IRC-112, A2.9

Fck

IRC-112, 6.4.2.8

m
m

=
=

1.5
0.67

for basic and seismic combination

IRC-112, 6.4.2.8

Fcd

=
=

24.57
1

Mpa
for Fck < 60 Mpa

IRC-112, A2.9

*Fcd

24.57

Compressive Force, Cu

*Fcd**x*b

=
Tu = Cu

i.e

Tu - Cu =

61251.50 KN
0.00

Ultimate Moment Capacity

=
=

Ultimate Moment

Goal Seek this to 0 by Changing cell E775


(Fs*As*(d-0.4*x))
57446 KN-M
20730

KN-M

OR

<

*Fcd**x*b*Z

Ultimate Moment Capacity


OK

8.3.2.2

Shear Capacity
Design shear

11730.84 KN

Flexural Tensile stress

4.670

Mpa

Allowable tensile stress

2.33

Mpa

Section is Cracked.
Elements not requiring shear reinforcement
K
=
1+ (200/d)^0.5
=
1+(200/0.8)^0.5
=
16.81
Fcd

24.57

cp

Min of

cp

0.011

Min of

IRC-112, 10.3.2

NED/AC

&

0.2 * Fcd

0.011

&

4.91

Asl/(b*d)

&
&

0.008
t

VRdc

18930

vmin

15

VRdc(min)

18930

KN

VRdc

18930

KN

0.008

VRdc
<
As,
Provide minimum Reinforcement
Asw
S* bw

KN

Eq. 10.3

Design shear

0.75d*(1+cota)
826.88 mm

lets assume spacing as, 200 mm


=

5.15

mm^2/m

Torsional Moment
TED

Tt

Design torsion
KN-M
4617

shear stress due to torsion

Eq. 10.1

0.00129

The maximum spacing


Slmax
=
=

8.3.2.3

IRC-112,Cl. 10.3.2
Eq. 10.1

0.072*(Fck)^0.5
Fyk

Asw
S

0.02
0.02

IRC-112, 16.5.2, Eq. 16.6

TED

2*Ak*tef
VED

t * tef * Z

Torsional Inertia ofr section


b
d
b/d
torsional constant

Torsional Inertia ofr section

4000
1500
2.67
0.254

=
=
=

mm
mm

*b*d^3
3.429E+012 mm^4

tef
=
454545
this thickness should not b les than twice the distance between edge and centre of longitudinal reinforcement
effective cover
=
as
2 * effective cover
tef

Ak

137

Ast

St

68.5
545.5

mm

X
(4000-137)
5265269 mm^2

50 + 12.5 + 6
>

(1500-137)

45
TED
(2 * Ak * Fyd * cot)
1.328 mm^/m

Total shear reinforcemenrt required including for shear


=
5.15
+
=
mm^2/m
6.47
Provide 16mm dia. 8 legged stirrups at 200 mm c-c
Astprovided

8.04

1.328

mm^2/mm

St
Longitudinal Reinforcement
Asl

Asl

TED

* Cot

(2 * Ak * Fyd )

uk
=

1.330 mm^/m

8018 mm^2

Spacing between longitudinal bars should not be more than 350mm


Take sapcing as 300mm
Provide additional 22 no.s 25 mm dia. Bars, with main reinforcement
Torsional Resisting Capacity
Trdmax
=
2 * * cw * fcd * Ak * tef * sin * cos
=
Safe in torsional resistance

6485.56

>

4617.22

IRC-112, 16.5.3

8.3.3

Summary opf forces at Right support of pier cap for ULS load cases

-307

Shear-z
(kN)
4868

Torsion
(kN*m)
-1632

Moment-y
(kN*m)
4826

Moment-z
(kN*m)
-1176

-305

5064

-1944

4715

-1187

-305

5149

-2318

4770

-1183

-57502
-57381

-306
-308

5059
4953

-1938
-2006

4772
4882

-1183
-1172

-57089

-307

4409

-1555

4253

-1178

-57552

-302

5155

-2545

4789

-1196

-57287

-308

4774

-2085

4591

-1170

-57453
-57469

-302
-302

4958
4962

-2668
-2693

4459
4410

-1196
-1197

-57430
-57303
-57053
-57418
-57109
-57522
-57501
-57313
-57088
-56781
-57491
-57083
-57448
-57422
-57255
-57054
-56786
-57396
-57225
-57367
-57402
-57352
-57259
-57036
-57391
-57051
-57367
-57351
-57208
-57034
-56799
-57344
-57187
-57315
-57327
-57297
-57200
-57008
-57288
-57031
-57311
-57291
-57163
-57009

-306
-308
-307
-301
-304
-305
-304
-304
-300
-301
-303
-306
-305
-304
-302
-302
-301
-302
-237
-235
-235
-235
-237
-236
-233
-234
-235
-234
-234
-231
-232
-233
-238
-233
-233
-236
-237
-236
-232
-236
-235
-234
-233
-233

4941
4777
4305
4930
4351
5064
5343
4699
4301
3705
5300
4295
5265
5177
4600
4209
3695
5080
4679
4830
4895
4826
4744
4327
4899
4283
4830
5044
4550
4244
3787
5010
4607
4748
4751
4735
4610
4247
4727
4240
4983
4916
4474
4174

-2428
-2110
-1560
-2718
-1499
-1944
-2304
-1870
-2050
-1316
-2600
-1700
-2810
-2801
-2279
-1854
-1353
-2779
-1561
-1800
-2087
-1796
-1848
-1502
-2261
-1459
-1800
-2076
-1744
-1882
-1319
-2304
-1908
-2355
-2374
-2172
-1927
-1506
-2394
-1613
-2464
-2457
-2057
-1731

4537
4542
4013
4472
3811
4715
5727
4175
3581
2878
5532
3684
5569
5347
3973
3445
2822
5089
3836
3751
3793
3795
3879
3396
3808
3058
3751
4527
3337
2882
2342
4377
3656
3555
3517
3614
3618
3213
3564
2961
4406
4235
3182
2777

-1179
-1171
-1178
-1201
-1191
-1187
-1190
-1192
-1208
-1205
-1194
-1182
-1185
-1190
-1197
-1200
-1207
-1197
-895
-904
-900
-901
-892
-897
-910
-907
-904
-906
-907
-919
-917
-909
-890
-910
-911
-897
-891
-897
-914
-899
-902
-906
-911
-914

Elem

Load

Axial (kN)

Shear-y (kN)

672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672

501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554

-57336
-57522
-57567

672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672

555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615

-56803

-232

3780

-1347

2300

-57271

-233

4842

-2440

4038

-918
-911

-57207
-57349

-230
-228

4444
4595

-1644
-1883

4958
4873

-925
-934

-57384

-229

4660

-2169

4915

-930

-57334

-229

4591

-1879

4917

-930

-57241

-231

4509

-1931

5001

-922

-57017
-57373

-230
-226

4092
4664

-1585
-2344

4518
4930

-926
-940

-57033

-228

4048

-1541

4180

-937

-57349

-228

4595

-1883

4873

-934

-57333

-228

4809

-2159

5649

-936

-57190
-57016

-227
-225

4315
4009

-1827
-1965

4459
4004

-937
-949

-56781

-225

3552

-1402

3464

-947

-57325

-227

4775

-2386

5499

-939

-57169

-231

4372

-1991

4778

-920

-57297
-57309
-57279
-57182
-56990
-57270
-57013
-57293
-57273
-57145
-56991
-56785
-57253
-57225
-57367
-57402
-57352
-57259
-57036
-57391
-57051
-57367
-57351
-57208
-57034
-56799
-57344
-57187
-57315
-57327
-57297
-57200
-57008
-57288
-57031
-57311
-57291
-57163
-56803
-56803
-57271
-56860
-56885
-56891

-226
-226
-229
-231
-230
-226
-229
-228
-227
-226
-226
-225
-226
-237
-235
-235
-235
-237
-236
-233
-234
-235
-234
-234
-231
-232
-233
-238
-233
-233
-236
-237
-236
-232
-236
-235
-234
-233
-232
-232
-233
-124
-124
-124

4513
4516
4500
4375
4012
4491
4005
4748
4681
4239
3939
3545
4606
4679
4830
4895
4826
4744
4327
4899
4283
4830
5044
4550
4244
3787
5010
4607
4748
4751
4735
4610
4247
4727
4240
4983
4916
4474
3780
3780
4842
3686
3712
3723

-2438
-2457
-2254
-2010
-1589
-2477
-1696
-2547
-2540
-2140
-1814
-1430
-2523
-1561
-1800
-2087
-1796
-1848
-1502
-2261
-1459
-1800
-2076
-1744
-1882
-1319
-2304
-1908
-2355
-2374
-2172
-1927
-1506
-2394
-1613
-2464
-2457
-2057
-1347
-1347
-2440
-1339
-1381
-1431

4677
4639
4736
4740
4335
4686
4083
5528
5357
4304
3899
3422
5160
3836
3751
3793
3795
3879
3396
3808
3058
3751
4527
3337
2882
2342
4377
3656
3555
3517
3614
3618
3213
3564
2961
4406
4235
3182
2300
2300
4038
3392
3377
3385

-940
-941
-927
-921
-927
-944
-929
-931
-936
-941
-944
-948
-941
-895
-904
-900
-901
-892
-897
-910
-907
-904
-906
-907
-919
-917
-909
-890
-910
-911
-897
-891
-897
-914
-899
-902
-906
-911
-918
-918
-911
-518
-519
-519

672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672

8.3.3.1

616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668

-56883

-124

3711

-1380

3385

-519

-56866

-125

3697

-1389

3400

-517

-56828
-56889

-124
-124

3624
3724

-1329
-1461

3316
3387

-518
-520

-56830

-124

3617

-1321

3257

-520

-56885

-124

3712

-1381

3377

-519

-56882

-124

3749

-1429

3512

-520

-57358
-56827

-123
-123

4775
3610

-2244
-1395

5017
3226

-521
-522

-56786

-124

3531

-1297

3132

-522

-56881

-124

3743

-1468

3486

-520

-56854

-125

3673

-1399

3361

-517

-56876
-56878

-124
-124

3698
3698

-1477
-1481

3343
3337

-520
-521

-56873

-124

3695

-1445

3354

-518

-56856

-125

3674

-1403

3354

-517

-56823

-124

3611

-1330

3284

-518

-56871
-56827
-56875
-56872
-56850
-56823
-56787
-56868
-56860
-56885
-56891
-56882
-56866
-56827
-56889
-56830
-56885
-56882
-56857
-56827
-56786
-56881
-56827
-56875
-56872
-56850
-56823
-56787
-56868
-56854
-56876
-56878
-56873
-56856
-56823
-56871

-124
-124
-124
-124
-124
-124
-124
-124
-125
-125
-125
-125
-125
-125
-124
-125
-125
-125
-125
-124
-124
-124
-125
-125
-125
-124
-124
-124
-124
-125
-124
-124
-125
-125
-125
-124

3694
3609
3739
3727
3650
3598
3529
3714
3679
3706
3717
3705
3691
3618
3718
3611
3706
3743
3657
3604
3524
3737
3603
3732
3721
3644
3592
3523
3708
3667
3692
3692
3689
3667
3604
3688

-1484
-1348
-1496
-1495
-1425
-1369
-1302
-1492
-1344
-1385
-1435
-1384
-1393
-1333
-1465
-1326
-1385
-1433
-1375
-1399
-1301
-1473
-1353
-1501
-1499
-1430
-1373
-1306
-1496
-1404
-1482
-1485
-1450
-1407
-1334
-1488

3345
3240
3491
3462
3278
3208
3125
3427
3422
3407
3414
3414
3429
3345
3417
3286
3407
3542
3335
3256
3162
3516
3269
3521
3491
3308
3238
3154
3457
3390
3373
3366
3383
3384
3313
3374

-521
-518
-519
-520
-520
-521
-522
-520
-524
-526
-525
-525
-523
-524
-527
-526
-526
-526
-526
-528
-528
-526
-525
-525
-526
-527
-527
-528
-527
-523
-527
-527
-524
-523
-524
-527

MAX
MIN

-56781

-123

5343

-1297

5727

-517

-57567

-308

3523

-2810

2300

-1208

Moment capacity of a section at right support


Moment Capacity of Prestressed Section

Area of layer 1 cables


Area of layer 2 cables

=
=

23940
23940

mm^2
mm^2

Total Force in layer 1 cable after losses


Total Force in layer 2 cable after losses

23845

KN

23845

KN

ES

1.95E+05

Mpa

Prestrain in Layer 1 cables


Prestrain in Layer 2 cables

Fs / Es =

0.0051

Fs / Es =

0.0051

Ultimate stress in cable (Fpk)


Stress at 0.1 % Proof force = 0.87 * Fpk

1860

Mpa

1618.2

Mpa

1618.2
1.15

1407.13

Mpa

Fpd
ES

0.0072

Fpd

Yield Strain, pd
pd

Fig. A2-4 , IRC-112-2011


CG Of cables from top at mid sec
1245
mm
115
CG Of cables from top at Right support sec
872.5
mm
570
230
140

Right Support

Neutral Axis Location at

Mid Section

705.23

mm

.After iterations

0.0051
0.0062

Final Steel Strain = Prestrain + Bending Strain

Final Strain in Layer 1 cables

=
=

0.00112
pd

Final Strain in Layer 2 cables

0.0051

0.0057

0.000545
~

As the strain values are greater than or almost equal to pd , hence stresses in
cables are=Fpd=
Thus Total force in steel , Tu

*Es*A

pd

1407.13

Mpa

47880

55440.59 KN

Total Compressive force in concrete


Fck

fcd =

*x

Cu

Tu

Fcd

0.8

for Fck < 60 Mpa

IRC-112, A2.9

Fck

IRC-112, 6.4.2.8

m
m

=
=

1.5
0.67

for basic and seismic combination

IRC-112, 6.4.2.8

Fcd

=
=

24.57
1

Mpa
for Fck < 60 Mpa

IRC-112, A2.9

*Fcd

24.57

Compressive Force, Cu

*Fcd**x*b

=
Tu = Cu

8.3.3.2

i.e

Tu - Cu =

55440.59 KN
0.00

Goal Seek this to 0 by Changing cell E775

Ultimate Moment Capacity

=
=

(Fs*As*(d-0.4*x))
32886 KN-M

Ultimate Moment

5727

Design shear

5343.37 KN

Flexural Tensile stress

5.500

Mpa

Allowable tensile stress

2.15

Mpa

KN-M

OR

<

*Fcd**x*b*Z

Ultimate Moment Capacity


OK

Shear Capacity

Section is Cracked.
Elements not requiring shear reinforcement

IRC-112, 10.3.2

=
=
=

1+ (200/d)^0.5
1+(200/0.8)^0.5
16.81

Fcd

24.57

cp

Min of

cp

0.011

Min of

NED/AC

&

0.2 * Fcd

0.011

&

4.91

Asl/(b*d)

&
&

0.004
t

VRdc

15542

vmin

15

VRdc(min)

45334

KN

VRdc

15542

KN

0.004

VRdc
As,
>
Provide minimum Reinforcement
Asw
S* bw

0.02
0.02

KN

IRC-112,Cl. 10.3.2
Eq. 10.1
Eq. 10.3
Eq. 10.1

Design shear

0.072*(Fck)^0.5
Fyk

0.00129

The maximum spacing


Slmax
=
=

0.75d*(1+cota)
654.38 mm

IRC-112, 16.5.2, Eq. 16.6

lets assume spacing as, 200 mm


Asw
S
8.3.3.3

6.03

mm^2/mm

Torsional Moment
TED

=
=

Design torsion
KN-M
2810

Tt

shear stress due to torsion


TED

2*Ak*tef
VED

Torsional Inertia of section


b
d
b/d
torsional constant

t * tef * Z

=
=
=

4000
1500
2.67
0.254

mm
mm

Torsional Inertia ofr section

*b*d^3
3.429E+012 mm^4

tef
=
454545
this thickness should not b les than twice the distance between edge and centre of longitudinal reinforcement
effective cover
=
as
2 * effective cover
tef

Ak

137

Ast

St

68.5
545.5

mm

X
(4000-137)
5265269 mm^2

50 + 12.5 + 6
>

(1500-137)

45
TED
(2 * Ak * Fyd * cot)
0.808 mm^/mm

Total shear reinforcemenrt required including for shear


=
6.03
+
=
mm^2/m
6.84
Provide 16mm dia. 8 legged stirrups at 200 mm c-c
Astprovided

8.04

mm^2/mm

2.26

mm^2/mm

0.808

St
Astprovided

Longitudinal Reinforcement
Asl
uk

=
Asl

TED
(2 * Ak * Fyd )

* Cot

0.809

0.000

2.99197 mm^2

Spacing between longitudinal bars should not be more than 350mm


Take sapcing as 300mm
Provide additional 22 no.s 25 mm dia. Bars, with main reinforcement

IRC-112, 16.5.3

Torsional Resisting Capacity


Trdmax
2 * * cw * fcd * Ak * tef * sin * cos
=
=
8.4

6485.56

>

2810

Minimum Untensioned Reinforcement


Asmin

Asmin

0.26*(Fctm/Fyk)* bt*d
or
0.0013bt*d
23739.13

23739.13
or
7540

mm^2

Provide 25 dia. Bars 70 no.s, including torsional steel


8.5
8.5.1

Servicabiliy Limit State


Stress check at pier cap center-servicability rare combionation

mm^2
mm^2

IRC-112,cl. 16.5.1.1

Elem

Load

Axial
(N/mm^2)

Bend(+z)
(N/mm^2)

Bend(-z)
(N/mm^2)

TOP
(N/mm^2)

BOTTOM
(N/mm^2)

668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668

669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723

-9.33
-9.34
-9.34
-9.34
-9.34
-9.32
-9.34
-9.32
-9.34
-9.34
-9.33
-9.32
-9.31
-9.34
-9.32
-9.34
-9.34
-9.33
-9.32
-9.31
-9.34
-9.33
-9.34
-9.34
-9.34
-9.33
-9.32
-9.34
-9.33
-9.34
-9.34
-9.34
-9.34
-9.32
-9.34
-9.32
-9.34
-9.34
-9.33
-9.32
-9.31
-9.34
-9.33
-9.34
-9.34
-9.34
-9.33
-9.32
-9.34
-9.32
-9.34
-9.34
-9.33
-9.32
-9.31

-6.95
-7.55
-7.90
-7.58
-7.30
-5.99
-7.94
-6.39
-7.55
-7.71
-7.11
-6.59
-5.24
-7.77
-6.30
-7.32
-7.43
-6.92
-6.41
-5.25
-7.43
-6.80
-7.35
-7.57
-7.35
-7.02
-5.90
-7.50
-6.81
-7.42
-7.77
-7.44
-7.16
-5.86
-7.80
-6.26
-7.42
-7.57
-6.97
-6.45
-5.11
-7.63
-6.67
-7.22
-7.44
-7.21
-6.88
-5.76
-7.36
-6.16
-7.18
-7.30
-6.78
-6.28
-5.11

6.68
7.26
7.60
7.28
7.01
5.76
7.64
6.15
7.26
7.41
6.84
6.33
5.04
7.47
6.06
7.03
7.15
6.65
6.17
5.05
7.14
6.54
7.07
7.28
7.06
6.75
5.67
7.21
6.55
7.13
7.47
7.15
6.88
5.63
7.50
6.02
7.13
7.28
6.70
6.20
4.91
7.34
6.41
6.94
7.15
6.93
6.62
5.54
7.08
5.93
6.90
7.01
6.52
6.03
4.91

-16.60
-17.20
-17.50
-17.20
-16.90
-15.60
-17.60
-16.00
-17.20
-17.30
-16.70
-16.20
-14.80
-17.40
-15.90
-16.90
-17.10
-16.50
-16.00
-14.80
-17.10
-16.40
-17.00
-17.20
-17.00
-16.60
-15.50
-17.10
-16.40
-17.10
-17.40
-17.10
-16.80
-15.50
-17.40
-15.90
-17.10
-17.20
-16.60
-16.10
-14.70
-17.30
-16.30
-16.90
-17.10
-16.80
-16.50
-15.40
-17.00
-15.80
-16.80
-16.90
-16.40
-15.90
-14.70

-2.95
-2.37
-2.04
-2.35
-2.62
-3.85
-2.00
-3.47
-2.37
-2.22
-2.79
-3.28
-4.56
-2.16
-3.56
-2.60
-2.49
-2.97
-3.45
-4.55
-2.49
-3.08
-2.56
-2.35
-2.57
-2.87
-3.94
-2.42
-3.08
-2.51
-2.17
-2.48
-2.75
-3.98
-2.13
-3.60
-2.51
-2.35
-2.92
-3.41
-4.69
-2.30
-3.22
-2.69
-2.48
-2.70
-3.01
-4.07
-2.55
-3.69
-2.73
-2.62
-3.11
-3.58
-4.69

668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668
668

724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780

-9.34
-9.33
-9.33
-9.34
-9.33
-9.33
-9.32
-9.34
-9.32
-9.33
-9.33
-9.33
-9.32
-9.31
-9.33
-9.32
-9.33
-9.33
-9.32
-9.32
-9.31
-9.33
-9.33
-9.33
-9.33
-9.33
-9.33
-9.32
-9.33
-9.33
-9.33
-9.34
-9.33
-9.33
-9.32
-9.33
-9.32
-9.33
-9.33
-9.33
-9.32
-9.31
-9.33
-9.32
-9.33
-9.33
-9.32
-9.32
-9.31
-9.33
-9.32
-9.31
-9.32
-9.33
-9.33
-9.33
-9.33

-7.29
-6.63
-7.09
-7.35
-7.10
-6.89
-5.92
-7.38
-6.22
-7.09
-7.20
-6.75
-6.36
-5.35
-7.25
-6.15
-6.91
-7.00
-6.61
-6.23
-5.36
-6.99
-6.52
-6.94
-7.10
-6.93
-6.69
-5.84
-7.05
-6.40
-6.86
-7.12
-6.87
-6.66
-5.69
-7.15
-5.99
-6.86
-6.97
-6.52
-6.13
-5.12
-7.02
-5.92
-6.68
-6.77
-6.38
-6.00
-5.13
-6.76
-5.62
-5.16
-6.29
-6.71
-6.87
-6.70
-6.46

7.01
6.37
6.81
7.06
6.83
6.63
5.69
7.09
5.98
6.81
6.93
6.49
6.12
5.15
6.97
5.91
6.64
6.73
6.35
5.99
5.15
6.72
6.27
6.67
6.83
6.66
6.43
5.62
6.77
6.15
6.59
6.84
6.61
6.41
5.47
6.87
5.76
6.59
6.71
6.27
5.90
4.93
6.75
5.69
6.42
6.51
6.13
5.77
4.93
6.50
5.40
4.96
6.05
6.45
6.61
6.44
6.21
max
min

-16.90
-16.20
-16.60
-16.90
-16.70
-16.40
-15.50
-16.90
-15.80
-16.60
-16.80
-16.30
-15.90
-14.90
-16.80
-15.70
-16.50
-16.50
-16.20
-15.80
-14.90
-16.50
-16.10
-16.50
-16.70
-16.50
-16.20
-15.40
-16.60
-15.90
-16.40
-16.70
-16.40
-16.20
-15.20
-16.70
-15.50
-16.40
-16.50
-16.10
-15.70
-14.70
-16.60
-15.50
-16.20
-16.30
-15.90
-15.50
-14.70
-16.30
-15.20
-14.70
-15.80
-16.30
-16.40
-16.30
-16.00
-14.70
-17.60
OK

-2.62
-3.17
-2.74
-2.49
-2.73
-2.92
-3.85
-2.46
-3.56
-2.74
-2.63
-3.05
-3.42
-4.38
-2.58
-3.63
-2.91
-2.83
-3.19
-3.55
-4.38
-2.83
-3.27
-2.88
-2.73
-2.89
-3.12
-3.92
-2.78
-3.39
-2.96
-2.71
-2.94
-3.14
-4.07
-2.68
-3.78
-2.96
-2.85
-3.27
-3.64
-4.60
-2.80
-3.85
-3.13
-3.04
-3.41
-3.77
-4.60
-3.05
-4.14
-4.57
-3.49
-3.10
-2.94
-3.11
-3.34
-2.00
-4.69
OK

Max Allowable Compression


Mx Allowable Tension
8.5.2

=
=

26.40
-3.50

Mpa
Mpa

OK
OK

Stress check at pier cap left support-servicability rare combionation

Elem

Load

Axial
(N/mm^2)

Bend(+z)
(N/mm^2)

Bend(-z)
(N/mm^2)

TOP
(N/mm^2)

BOTTOM
(N/mm^2)

662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662

669.00
670.00
671.00
672.00
673.00
674.00
675.00
676.00
677.00
678.00
679.00
680.00
681.00
682.00
683.00
684.00
685.00
686.00
687.00
688.00
689.00
690.00
691.00
692.00
693.00
694.00
695.00
696.00
697.00
698.00
699.00
700.00
701.00
702.00
703.00
704.00
705.00
706.00
707.00
708.00
709.00
710.00
711.00
712.00
713.00
714.00
715.00
716.00
717.00
718.00
719.00
720.00

-9.28
-9.28
-9.29
-9.28
-9.28
-9.26
-9.29
-9.26
-9.28
-9.28
-9.27
-9.26
-9.25
-9.28
-9.26
-9.28
-9.28
-9.27
-9.26
-9.25
-9.28
-9.27
-9.28
-9.28
-9.28
-9.27
-9.26
-9.28
-9.27
-9.28
-9.29
-9.28
-9.28
-9.26
-9.29
-9.26
-9.28
-9.28
-9.27
-9.26
-9.25
-9.28
-9.27
-9.28
-9.28
-9.28
-9.27
-9.26
-9.28
-9.26
-9.28
-9.28

7.93
8.24
8.34
8.25
8.03
7.47
8.43
8.16
8.24
9.10
8.58
8.33
7.79
9.09
8.07
8.76
8.85
8.43
8.15
7.68
8.81
7.85
8.14
8.17
8.13
7.89
7.40
8.39
8.62
8.94
9.04
8.95
8.72
8.16
9.12
8.86
8.94
9.79
9.28
9.02
8.48
9.79
8.54
8.83
8.87
8.82
8.58
8.10
9.09
8.76
9.45
9.54

-7.85
-8.16
-8.26
-8.17
-7.95
-7.39
-8.34
-8.08
-8.16
-9.00
-8.49
-8.24
-7.71
-9.00
-7.98
-8.67
-8.76
-8.34
-8.07
-7.60
-8.72
-7.77
-8.05
-8.09
-8.05
-7.81
-7.33
-8.31
-8.54
-8.85
-8.94
-8.86
-8.63
-8.08
-9.03
-8.77
-8.85
-9.69
-9.18
-8.93
-8.39
-9.68
-8.46
-8.74
-8.78
-8.73
-8.49
-8.02
-8.99
-8.67
-9.36
-9.44

-1.28
-0.97
-0.88
-0.96
-1.18
-1.73
-0.79
-1.03
-0.97
-0.12
-0.62
-0.87
-1.39
-0.12
-1.13
-0.45
-0.36
-0.78
-1.04
-1.50
-0.40
-1.36
-1.08
-1.04
-1.08
-1.32
-1.79
-0.82
-0.58
-0.28
-0.18
-0.27
-0.49
-1.03
-0.09
-0.34
-0.28
0.58
0.07
-0.17
-0.70
0.57
-0.66
-0.38
-0.35
-0.39
-0.62
-1.09
-0.12
-0.44
0.24
0.33

-17.10
-17.40
-17.50
-17.40
-17.20
-16.60
-17.60
-17.30
-17.40
-18.20
-17.70
-17.40
-16.90
-18.20
-17.20
-17.90
-18.00
-17.50
-17.30
-16.80
-17.90
-17.00
-17.30
-17.30
-17.30
-17.00
-16.50
-17.50
-17.70
-18.10
-18.20
-18.10
-17.80
-17.30
-18.20
-18.00
-18.10
-18.90
-18.40
-18.10
-17.60
-18.90
-17.70
-18.00
-18.00
-17.90
-17.70
-17.20
-18.20
-17.90
-18.60
-18.70

662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662
662

721.00
722.00
723.00
724.00
725.00
726.00
727.00
728.00
729.00
730.00
731.00
732.00
733.00
734.00
735.00
736.00
737.00
738.00
739.00
740.00
741.00
742.00
743.00
744.00
745.00
746.00
747.00
748.00
749.00
750.00
751.00
752.00
753.00
754.00
755.00
756.00
757.00
758.00
759.00
760.00
761.00
762.00
763.00
764.00
765.00
766.00
767.00
768.00
769.00
770.00
771.00
772.00
773.00
774.00
775.00
776.00
777.00
778.00
779.00
780.00

-9.27
-9.26
-9.25
-9.28
-9.27
-9.28
-9.28
-9.28
-9.27
-9.26
-9.28
-9.26
-9.28
-9.28
-9.27
-9.26
-9.25
-9.28
-9.26
-9.27
-9.27
-9.27
-9.26
-9.25
-9.27
-9.27
-9.27
-9.27
-9.27
-9.27
-9.26
-9.27
-9.27
-9.28
-9.28
-9.27
-9.27
-9.26
-9.28
-9.26
-9.28
-9.27
-9.27
-9.26
-9.25
-9.27
-9.26
-9.27
-9.27
-9.27
-9.26
-9.25
-9.27
-9.26
-9.25
-9.27
-9.27
-9.27
-9.27
-9.27

9.12
8.85
8.37
9.50
7.24
7.48
7.55
7.49
7.32
6.90
7.62
7.42
7.48
8.12
7.73
7.54
7.13
8.11
7.34
7.86
7.93
7.61
7.41
7.05
7.90
7.18
7.40
7.43
7.39
7.21
6.85
7.59
8.40
8.64
8.71
8.64
8.47
8.05
8.77
8.57
8.64
9.27
8.89
8.70
8.29
9.27
8.50
9.02
9.09
8.77
8.57
8.21
9.06
8.01
7.71
8.34
8.55
8.58
8.55
8.37

-9.03
-8.76
-8.29
-9.40
-7.17
-7.40
-7.47
-7.41
-7.24
-6.83
-7.54
-7.34
-7.40
-8.03
-7.65
-7.46
-7.06
-8.03
-7.27
-7.78
-7.85
-7.54
-7.33
-6.98
-7.82
-7.11
-7.32
-7.35
-7.32
-7.14
-6.78
-7.51
-8.31
-8.55
-8.62
-8.55
-8.39
-7.97
-8.68
-8.49
-8.55
-9.18
-8.80
-8.61
-8.21
-9.18
-8.41
-8.93
-9.00
-8.68
-8.48
-8.13
-8.96
-7.92
-7.63
-8.25
-8.47
-8.49
-8.46
-8.28
max

-0.08
-0.35
-0.81
0.29
-1.98
-1.75
-1.67
-1.74
-1.90
-2.31
-1.61
-1.79
-1.75
-1.11
-1.49
-1.67
-2.06
-1.11
-1.86
-1.36
-1.29
-1.60
-1.80
-2.14
-1.32
-2.03
-1.83
-1.80
-1.83
-2.01
-2.36
-1.63
-0.82
-0.59
-0.52
-0.58
-0.75
-1.16
-0.45
-0.64
-0.59
0.05
-0.33
-0.51
-0.91
0.05
-0.71
-0.20
-0.13
-0.44
-0.64
-0.99
-0.16
-1.20
-1.49
-0.88
-0.67
-0.64
-0.67
-0.85
0.58

-18.20
-17.90
-17.50
-18.60
-16.40
-16.60
-16.70
-16.60
-16.50
-16.00
-16.80
-16.60
-16.60
-17.30
-16.90
-16.70
-16.30
-17.30
-16.50
-17.00
-17.10
-16.80
-16.50
-16.20
-17.00
-16.30
-16.50
-16.60
-16.50
-16.40
-16.00
-16.70
-17.50
-17.80
-17.80
-17.80
-17.60
-17.20
-17.90
-17.70
-17.80
-18.40
-18.00
-17.80
-17.40
-18.40
-17.60
-18.20
-18.20
-17.90
-17.70
-17.30
-18.20
-17.10
-16.80
-17.50
-17.70
-17.70
-17.70
-17.50
-16.00

Max Allowable Compression


Mx Allowable Tension
8.5.3

=
=

min

-2.36
OK

-18.90
OK

26.40
-3.50

Mpa
Mpa

OK
OK

Stress check at pier cap right support-servicability rare combionation

Elem

Load

Axial
(N/mm^2)

Bend(+z)
(N/mm^2)

Bend(-z)
(N/mm^2)

TOP
(N/mm^2)

BOTTOM
(N/mm^2)

672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672

669.00
670.00
671.00
672.00
673.00
674.00
675.00
676.00
677.00
678.00
679.00
680.00
681.00
682.00
683.00
684.00
685.00
686.00
687.00
688.00
689.00
690.00
691.00
692.00
693.00
694.00
695.00
696.00
697.00
698.00
699.00
700.00
701.00
702.00
703.00
704.00
705.00
706.00
707.00
708.00
709.00
710.00
711.00
712.00
713.00
714.00
715.00
716.00
717.00
718.00

-9.10
-9.10
-9.11
-9.10
-9.10
-9.08
-9.11
-9.08
-9.10
-9.10
-9.09
-9.08
-9.07
-9.10
-9.08
-9.10
-9.10
-9.09
-9.08
-9.07
-9.10
-9.09
-9.10
-9.10
-9.10
-9.09
-9.08
-9.10
-9.09
-9.10
-9.11
-9.10
-9.10
-9.08
-9.11
-9.08
-9.10
-9.10
-9.09
-9.08
-9.07
-9.10
-9.09
-9.10
-9.10
-9.10
-9.09
-9.08
-9.10
-9.08

-1.14
-1.20
-1.25
-1.21
-1.19
-0.74
-1.25
-0.56
-1.20
-1.64
-0.84
-0.44
0.05
-1.55
-0.49
-1.54
-1.43
-0.71
-0.36
0.08
-1.29
-1.01
-1.04
-1.03
-1.07
-1.00
-0.61
-1.03
-1.52
-1.57
-1.62
-1.59
-1.57
-1.12
-1.62
-0.93
-1.57
-2.01
-1.21
-0.82
-0.32
-1.92
-1.39
-1.42
-1.41
-1.44
-1.37
-0.99
-1.40
-0.86

1.11
1.16
1.21
1.18
1.16
0.72
1.21
0.54
1.16
1.59
0.81
0.43
-0.05
1.50
0.47
1.49
1.38
0.69
0.35
-0.07
1.25
0.98
1.01
1.00
1.03
0.97
0.59
1.00
1.47
1.52
1.57
1.54
1.52
1.08
1.57
0.90
1.52
1.95
1.17
0.79
0.31
1.86
1.34
1.37
1.36
1.40
1.33
0.96
1.36
0.83

-10.40
-10.50
-10.60
-10.50
-10.50
-10.00
-10.60
-9.85
-10.50
-11.00
-10.10
-9.73
-9.22
-10.90
-9.78
-10.90
-10.70
-10.00
-9.65
-9.20
-10.60
-10.30
-10.40
-10.30
-10.40
-10.30
-9.90
-10.30
-10.80
-10.90
-10.90
-10.90
-10.90
-10.40
-10.90
-10.20
-10.90
-11.30
-10.50
-10.10
-9.60
-11.20
-10.70
-10.70
-10.70
-10.80
-10.70
-10.30
-10.70
-10.20

-8.20
-8.16
-8.11
-8.14
-8.15
-8.57
-8.11
-8.75
-8.16
-7.72
-8.49
-8.86
-9.33
-7.81
-8.82
-7.82
-7.93
-8.61
-8.94
-9.35
-8.05
-8.32
-8.30
-8.31
-8.27
-8.34
-8.70
-8.31
-7.83
-7.79
-7.74
-7.77
-7.79
-8.21
-7.74
-8.39
-7.79
-7.36
-8.13
-8.50
-8.97
-7.45
-7.96
-7.94
-7.95
-7.91
-7.97
-8.33
-7.95
-8.46

672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672
672

719.00
720.00
721.00
722.00
723.00
724.00
725.00
726.00
727.00
728.00
729.00
730.00
731.00
732.00
733.00
734.00
735.00
736.00
737.00
738.00
739.00
740.00
741.00
742.00
743.00
744.00
745.00
746.00
747.00
748.00
749.00
750.00
751.00
752.00
753.00
754.00
755.00
756.00
757.00
758.00
759.00
760.00
761.00
762.00
763.00
764.00
765.00
766.00
767.00
768.00
769.00
770.00
771.00
772.00
773.00
774.00
775.00
776.00
777.00
778.00
779.00

-9.10
-9.10
-9.09
-9.08
-9.07
-9.10
-9.09
-9.10
-9.10
-9.10
-9.09
-9.08
-9.10
-9.08
-9.10
-9.10
-9.09
-9.08
-9.07
-9.10
-9.08
-9.09
-9.09
-9.09
-9.08
-9.07
-9.09
-9.09
-9.09
-9.09
-9.09
-9.09
-9.08
-9.09
-9.09
-9.10
-9.10
-9.09
-9.09
-9.08
-9.10
-9.08
-9.10
-9.10
-9.09
-9.08
-9.07
-9.09
-9.08
-9.09
-9.09
-9.09
-9.08
-9.07
-9.09
-9.08
-9.07
-9.09
-9.09
-9.09
-9.09

-1.92
-1.80
-1.09
-0.74
-0.30
-1.67
-0.56
-0.60
-0.63
-0.61
-0.59
-0.25
-0.63
-0.12
-0.60
-0.93
-0.33
-0.03
0.34
-0.86
-0.06
-0.85
-0.77
-0.23
0.03
0.36
-0.67
-0.46
-0.48
-0.47
-0.50
-0.45
-0.16
-0.47
-1.18
-1.22
-1.26
-1.23
-1.22
-0.88
-1.26
-0.74
-1.22
-1.55
-0.95
-0.66
-0.28
-1.48
-0.69
-1.48
-1.39
-0.86
-0.59
-0.27
-1.29
-0.78
-0.18
-1.08
-1.11
-1.10
-1.12

1.86
1.74
1.06
0.71
0.29
1.62
0.54
0.58
0.61
0.59
0.58
0.25
0.62
0.11
0.58
0.90
0.32
0.03
-0.33
0.83
0.06
0.83
0.74
0.23
-0.03
-0.35
0.65
0.44
0.47
0.46
0.48
0.43
0.15
0.46
1.14
1.18
1.22
1.19
1.18
0.85
1.22
0.72
1.18
1.50
0.92
0.64
0.27
1.44
0.67
1.43
1.35
0.83
0.58
0.26
1.25
0.76
0.18
1.05
1.07
1.06
1.09

-11.20
-11.10
-10.40
-10.00
-9.58
-11.00
-9.80
-9.85
-9.89
-9.86
-9.84
-9.49
-9.89
-9.35
-9.85
-10.20
-9.57
-9.27
-8.88
-10.10
-9.30
-10.10
-10.00
-9.48
-9.20
-8.87
-9.92
-9.70
-9.73
-9.72
-9.75
-9.69
-9.39
-9.72
-10.40
-10.50
-10.50
-10.50
-10.50
-10.10
-10.50
-9.98
-10.50
-10.80
-10.20
-9.89
-9.51
-10.70
-9.92
-10.70
-10.60
-10.10
-9.83
-9.49
-10.50
-10.00
-9.41
-10.30
-10.40
-10.30
-10.40

-7.45
-7.56
-8.25
-8.58
-8.99
-7.69
-8.71
-8.68
-8.64
-8.66
-8.67
-8.99
-8.64
-9.13
-8.68
-8.35
-8.93
-9.21
-9.56
-8.42
-9.18
-8.42
-8.51
-9.02
-9.27
-9.57
-8.60
-8.80
-8.78
-8.80
-8.77
-8.81
-9.08
-8.79
-8.10
-8.07
-8.03
-8.06
-8.07
-8.39
-8.03
-8.52
-8.07
-7.75
-8.32
-8.60
-8.95
-7.81
-8.57
-7.82
-7.90
-8.41
-8.66
-8.97
-7.99
-8.48
-9.05
-8.20
-8.18
-8.19
-8.16

672

780.00

-9.09

Max Allowable Compression


Mx Allowable Tension
8.6
8.6.1

=
=

1.04
max
min

-10.30
-8.87
-11.30
OK

-8.21
-7.36
-9.57
OK

26.40
-3.50

Mpa
Mpa

OK
OK

End Block Design


Calculation of stress behind anchorage as per annex J of EC2-2
Pmax
C*C'
Fck(t)

< or =

Fck(t)

=
=
=
=

C & C'

Pmax
C*C'
8.6.2

-1.07

Concrete strength at the time of tensioning (Cylinder strength)


32.00 Mpa
Dimensions of thr associated rectangle
396 X 396

24.14
OK

Mpa

<

Mpa

32.00

Calculation of Bursting Reinforcement


2 Ypo
2 Yo
For

=
=
=
=
Ypo
Yo

width of Bearing plate


292.5 mm.
width of End Block
4000.0 mm.
=
146.3
2000.0

Fbst
Pk

Pk

=
=

Fbst

0.26

=
=

0.260

0.0731

0.2600

IRC-112, Table 13.1

Max. prestressing force at anchorage end


3784.91 KN

3784.914
Fbst

3784.914

984.08 KN

Permissible stress for Fe - 415 steel

=
=

Area of steel required

0.87
x
361.05 Mpa
984077.64

415

2725.60 mm^2

361.05
Provided SPIRAL

Area of steel provided

20

=
=
>

10

rounds

314.159

6283.19 cm2.
2725.60 cm2.

Provided in the region 0.2Yo to 2Yo, i.e 0.4m to 4m


OR

2 no

10

x
...

2
SAFE

Reinforcement to prevemt bursting should not be less than,


Ast
=
0.15*Pmax/Fyd *
=
2725.14 mm^2

EC2-2, Annex J

Fyd is restricted to 250 to avoid crack width check.


Spiral reinforcement provided,

2 X 20 Dia. -10 legs

6283.19
OK

8.6.3

Calculation of spalling reinforcement


0.03*Pmax/Fyd*
Min Ast in Each direction =
=
545.03 mm^2
Provide 16 dia. 4 no.s in each direction

EC2-2, Annex J

mm^2

>

2725.14

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

Forces in pile during construction stages

SHEET

31-May-16
BY

CHKD

ASK

ANK

Pile No. 1 to 8

Part

Axial
(kN)

CS 1

I[308]

-392

CS 2 I[308]

-952

208

CS 1

J[381]

-656

-4

-3

CS 2 J[381] -1217

-219

-1

CS 1

I[160]

-392

-7

CS 2 I[160]

-747

182

14

CS 1

J[356]

-656

-3

CS 2 J[356] -1011

-217

CS 1

I[294]

-392

-7

CS 2 I[294]

-986

208

-13

CS 1

J[382]

-656

-4

CS 2 J[382] -1250

-220

CS 1

I[146]

-392

-7

-7

CS 2 I[146]

-780

181

-12

CS 1

J[357]

-656

CS 2 J[357] -1045

-217

CS 1

I[676]

-392

CS 2 I[676]

-753

-187

10

CS 1

J[743]

-656

-4

-3

CS 2 J[743] -1018

214

-1

CS 1

I[525]

-392

-7

CS 2 I[525]

-864

-209

10

CS 1

J[745]

-656

-3

CS 2 J[745] -1128

215

-1

CS 1

I[662]

-392

-7

CS 2 I[662]

-720

-187

-12

CS 1

J[744]

-656

-4

CS 2 J[744]

-985

215

-1

CS 1

I[511]

-392

-7

-7

CS 2 I[511]

-831

-209

-12

CS 1

J[746]

-656

CS 2 J[746] -1095

215

-1

CS 3

I[308]

-622

-307

10

CS 4 I[308] -2358

91

CS 3

J[381]

-887

367

-1

CS 4 J[381] -2623

-58

-45

CS 3

I[160]

-1153

-333

13

CS 4 I[160] -2441

-6

CS 3

J[356]

-1417

368

-2

CS 4 J[356] -2706

-24

-46

CS 3

I[294]

-592

-308

-12

CS 4 I[294] -1300

76

-76

CS 3

J[382]

-856

367

-1

CS 4 J[382] -1565

-51

-19

CS 3

I[146]

-1123

-333

-15

CS 4 I[146] -1383

10

-78

CS 3

J[357]

-1387

368

CS 4 J[357] -1648

-32

-18

CS 3

I[676]

-1013

331

12

CS 4 I[676] -1730

-27

CS 3

J[743]

-1277

-365

CS 4 J[743] -1994

27

-29

CS 3

I[525]

-529

312

10

CS 4 I[525] -1380

-76

-4

CS 3

J[745]

-793

-367

CS 4 J[745] -1644

38

-27

CS 3

I[662]

-1043

332

-10

CS 4 I[662]

-37

-44

CS 3

J[744]

-1307

-366

CS 4 J[744] -1261

32

-21

CS 3

I[511]

-559

311

-8

CS 4 I[511]

-646

-66

-40

CS 3

J[746]

-823

-367

CS 4 J[746]

-911

32

-23

CS 5

I[308]

-2160

-236

CS 6 I[308] -2713

234

58

CS 5

J[381]

-2425

314

-46

CS 6 J[381] -2977

-194

-29

CS 5

I[160]

-2685

-334

CS 6 I[160] -2831

101

62

CS 5

J[356]

-2950

347

-47

CS 6 J[356] -3095

-144

-30

CS 5

I[294]

-1062

-252

-76

CS 6 I[294] -2519

229

-70

CS 5

J[382]

-1326

321

-21

CS 6 J[382] -2783

-192

18

CS 5

I[146]

-1587

-318

-80

CS 6 I[146] -2637

105

-73

CS 5

J[357]

-1851

339

-19

CS 6 J[357] -2902

-147

20

Elem

Stage

1
1

Moment-y Moment-z
(kN*m)
(kN*m)

Elem

Stage

Part

Axial
(kN)

-996

Moment-y Moment-z
(kN*m)
(kN*m)

15

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

SHEET

31-May-16
BY

CHKD

ASK

ANK

CS 5

I[676]

-1894

303

CS 6 I[676] -1638

-138

24

CS 5

J[743]

-2159

-341

-28

CS 6 J[743] -1903

163

-13

CS 5

I[525]

-1169

254

-4

CS 6 I[525] -1519

-196

21

CS 5

J[745]

-1434

-332

-25

CS 6 J[745] -1784

175

-11

CS 5

I[662]

-1201

293

-43

CS 6 I[662] -1443

-142

-35

CS 5

J[744]

-1465

-337

-20

CS 6 J[744] -1707

165

CS 5

I[511]

-476

264

-37

CS 6 I[511] -1323

-193

-32

CS 5

J[746]

-741

-337

-23

CS 6 J[746] -1588

174

-1

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

SHEET

31-May-16
BY

CHKD

ASK

ANK

CS 7

I[308]

-2351

-392

54

CS 8 I[308] -3217

-132

67

CS 7

J[381]

-2616

514

-30

CS 8 J[381] -3481

234

-44

CS 7

I[160]

-3278

-526

61

CS 8 I[160] -3870

-304

73

CS 7

J[356]

-3542

563

-34

CS 8 J[356] -4134

301

-47

CS 7

I[294]

-2080

-397

-71

CS 8 I[294] -2781

-139

-95

CS 7

J[382]

-2345

516

15

CS 8 J[382] -3045

237

18

CS 7

I[146]

-3007

-521

-78

CS 8 I[146] -3434

-296

-101

CS 7

J[357]

-3271

561

19

CS 8 J[357] -3698

297

22

CS 7

I[676]

-1951

490

27

CS 8 I[676] -2237

253

29

CS 7

J[743]

-2216

-541

-11

CS 8 J[743] -2502

-276

-19

CS 7

I[525]

-1121

434

22

CS 8 I[525] -1588

181

23

CS 7

J[745]

-1385

-530

-8

CS 8 J[745] -1852

-258

-16

CS 7

I[662]

-1833

488

-33

CS 8 I[662] -1952

249

-45

CS 7

J[744]

-2097

-540

CS 8 J[744] -2217

-274

CS 7

I[511]

-1002

437

-28

CS 8 I[511] -1303

186

-40

CS 7

J[746]

-1267

-531

CS 8 J[746] -1567

-261

-3

CS 9

I[308]

-3988

147

72

CS 10 I[308] -3998

211

52

CS 9

J[381]

-4253

-67

-60

CS 10 J[381] -4262

-136

-37

CS 9

I[160]

-4357

-58

77

CS 10 I[160] -4331

45

59

CS 9

J[356]

-4622

15

-62

CS 10 J[356] -4596

-96

-40

CS 9

I[294]

-3254

135

-120

CS 10 I[294] -3278

197

-97

CS 9

J[382]

-3518

-61

16

CS 10 J[382] -3543

-130

-5

CS 9

I[146]

-3623

-46

-125

CS 10 I[146] -3612

59

-104

CS 9

J[357]

-3887

10

19

CS 10 J[357] -3876

-104

-1

CS 9

I[676]

-2541

-3

27

CS 10 I[676] -2542

-106

CS 9

J[743]

-2805

10

-32

CS 10 J[743] -2806

122

-10

CS 9

I[525]

-2085

-93

21

CS 10 I[525] -2103

-157

-1

CS 9

J[745]

-2350

36

-29

CS 10 J[745] -2367

105

-6

CS 9

I[662]

-1965

-11

-62

CS 10 I[662] -1949

-117

-42

CS 9

J[744]

-2229

14

-6

CS 10 J[744] -2213

127

-28

CS 9

I[511]

-1509

-84

-56

CS 10 I[511] -1510

-146

-34

CS 9

J[746]

-1774

32

-9

CS 10 J[746] -1775

99

-31

Max compressive force

-4622

KN

ML

15

MT

-62.48

Max tensile force

-476

KN

ML

264

MT

-37

Max MT

563

KN-M

-3542

MT

-34

Min MT

-541

KN-M

-2216

MT

-11

Max ML

77

KN-M

-4357

ML

-58

Min ML

-125

KN-M

-3623

ML

-46

8.2
Piles,Piercap and piers are modelled in Midas as line elements.
Pilecap has been modelled with four noded plates supported on piles. Piles of 1.2m dia are modelled
upto point of fixity and defined as fixed supports at that level.
All loads are applied on Piercap and piers appropriately.Support reactions are further used for design of piles

STRUCTCON DESIGNS P. L.

NOTE No.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

SHEET

31-May-16
BY

CHKD

ANK

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

Thickness of soil layer on pilecap


Hence soil load on pilecap applied in Midas model=

690

BY

CHKD

ANK

The following table shows vertical support reactions from Midas


Combination for pile capacity check
357
356

ASK

mm
0.69

744

746

18 =
12.42 kN/sqm
Vertically downwards

The support reactions from Midas analysis results are further used

8.3

SHEET

31-May-16

Pile Capacity Check

743

745

L/C

Pile-1

Pile-2

Pile-3

Pile-4

Pile-5

Pile-6

Pile-7

Pile-8 *All Loads are in kN

809

2882

4311

4561

3133

2111

2656

2359

1814

810

3286

4581

4785

3490

2148

2614

2390

1923

811

3362

4571

4762

3552

2199

2586

2366

1980

812

3122

4436

4644

3330

2150

2620

2386

1915

813

2958

4301

4538

3195

2163

2627

2336

1871

814

2756

4188

4533

3101

2059

2624

2257

1693

815

3416

4516

4706

3606

2237

2569

2330

1999

816

2912

4239

4507

3180

2157

2607

2282

1832

817

3353

4416

4642

3580

2234

2540

2268

1961

818

3376

4425

4650

3602

2233

2533

2270

1970

819

3136

4331

4562

3368

2201

2569

2294

1926

820

2935

4248

4515

3203

2156

2599

2284

1840

821

2742

4169

4530

3103

2047

2610

2236

1672

822

3404

4437

4667

3634

2247

2541

2245

1951

823

2945

4347

4671

3269

2051

2621

2247

1676

825

3286

4581

4785

3490

2148

2614

2390

1923

826

3343

4549

4717

3511

2265

2655

2363

1973

827

3163

4463

4723

3424

2120

2605

2295

1810

828

3098

4285

4616

3428

2119

2562

2161

1718

829

2846

4233

4679

3291

1972

2581

2110

1501

830

3438

4546

4718

3610

2297

2621

2317

1993

831

2930

4312

4648

3266

2067

2598

2212

1681

832

3311

4396

4584

3498

2321

2604

2281

1998

833

3346

4411

4611

3546

2309

2592

2264

1981

834

3182

4349

4630

3463

2164

2559

2217

1822

835

3013

4279

4627

3361

2080

2569

2171

1681

836

2829

4199

4647

3277

1972

2572

2107

1507

837

3384

4426

4638

3596

2295

2580

2246

1961

838

2915

3765

4303

3454

2052

2394

2096

1754

839

2996

3819

4348

3525

2060

2385

2102

1776

840

3011

3817

4343

3537

2070

2380

2097

1787

841

2963

3790

4319

3493

2060

2387

2101

1774

842

2931

3763

4298

3466

2063

2388

2091

1766

843

2890

3740

4297

3447

2042

2387

2075

1730

844

3022

3806

4332

3548

2078

2376

2090

1791

845

2921

3750

4292

3463

2062

2384

2080

1758

846

3010

3786

4319

3543

2077

2371

2077

1784

847

3014

3787

4321

3547

2077

2369

2078

1785

848

2966

3769

4303

3501

2071

2376

2083

1777

849

2926

3752

4294

3468

2062

2383

2081

1760

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

SHEET

31-May-16
BY

CHKD

ANK

850

2887

3736

4297

3448

2040

2385

2071

1726

851

3020

3790

4324

3554

2080

2371

2073

1782

852

2928

3772

4325

3481

2040

2387

2073

1727

853

2996

3819

4348

3525

2060

2385

2102

1776

854

3008

3812

4334

3529

2083

2394

2096

1786

855

2972

3795

4335

3512

2054

2384

2083

1753

856

2959

3760

4314

3513

2054

2375

2056

1735

857

2908

3749

4326

3485

2025

2379

2046

1692

858

3027

3812

4334

3549

2090

2387

2087

1790

859

2925

3765

4320

3480

2044

2382

2066

1728

860

3001

3782

4307

3527

2094

2383

2080

1791

861

3008

3785

4313

3536

2092

2381

2077

1788

862

2975

3772

4317

3520

2063

2374

2067

1756

863

2942

3758

4316

3499

2046

2376

2058

1728

864

2905

3742

4320

3482

2025

2377

2045

1693

865

3016

3788

4318

3546

2089

2379

2073

1784

866

2904

3860

4318

3361

2036

2484

2109

1661

867

2984

3914

4363

3433

2043

2475

2115

1683

868

2999

3913

4358

3445

2053

2470

2110

1694

869

2951

3886

4335

3401

2044

2476

2114

1681

870

2919

3859

4313

3374

2046

2478

2104

1672

871

2878

3836

4313

3355

2025

2477

2088

1637

872

3010

3901

4347

3456

2061

2466

2103

1698

873

2909

3846

4307

3371

2045

2474

2093

1665

874

2998

3881

4334

3451

2060

2460

2091

1690

875

3002

3883

4336

3455

2060

2459

2091

1692

876

2954

3864

4318

3408

2054

2466

2096

1683

877

2914

3848

4309

3375

2045

2472

2094

1666

878

2876

3832

4312

3355

2023

2474

2084

1633

879

3008

3886

4339

3462

2063

2461

2086

1688

880

2916

3868

4340

3388

2024

2477

2086

1634

881

2984

3914

4363

3433

2043

2475

2115

1683

882

2996

3908

4349

3437

2067

2483

2110

1693

883

2960

3891

4351

3419

2038

2473

2096

1660

884

2947

3855

4329

3420

2037

2465

2069

1642

885

2896

3845

4342

3393

2008

2468

2059

1598

886

3015

3907

4350

3457

2073

2477

2100

1697

887

2913

3861

4336

3388

2027

2472

2079

1634

888

2989

3878

4323

3434

2078

2473

2093

1698

889

2996

3880

4328

3444

2075

2471

2090

1694

890

2963

3868

4332

3427

2046

2464

2080

1663

891

2930

3854

4331

3407

2030

2466

2071

1634

892

2893

3838

4335

3390

2008

2467

2058

1600

893

3004

3883

4333

3454

2073

2468

2086

1690

894

2281

3712

5065

3634

1592

2134

2976

2434

895

2685

3982

5289

3991

1629

2093

3007

2543

896

2761

3973

5265

4053

1680

2064

2983

2600

897

2521

3838

5148

3831

1630

2098

3002

2534

898

2357

3703

5041

3696

1643

2105

2953

2491

ASK

*All Loads are in kN

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

SHEET

31-May-16
BY

CHKD

ANK

899

2155

3590

5037

3602

1540

2102

2874

2313

900

2815

3917

5209

4107

1718

2047

2947

2618

901

2311

3640

5010

3681

1638

2085

2898

2451

902

2752

3817

5145

4080

1715

2019

2885

2581

903

2775

3826

5154

4103

1714

2011

2887

2590

904

2535

3732

5066

3868

1682

2047

2911

2546

905

2334

3649

5019

3704

1637

2078

2901

2460

906

2141

3570

5033

3604

1527

2088

2853

2292

907

2803

3838

5170

4135

1727

2019

2862

2570

908

2343

3748

5175

3770

1532

2099

2864

2296

909

2685

3982

5289

3991

1629

2093

3007

2543

910

2742

3951

5221

4012

1746

2134

2980

2593

911

2562

3864

5227

3925

1601

2083

2912

2429

912

2497

3687

5119

3929

1600

2041

2778

2338

913

2245

3634

5182

3792

1452

2059

2727

2121

914

2837

3947

5222

4111

1778

2099

2934

2613

915

2329

3713

5152

3767

1547

2076

2829

2300

916

2710

3798

5087

3999

1802

2082

2898

2617

917

2745

3812

5114

4047

1790

2070

2881

2600

918

2581

3751

5134

3964

1645

2037

2834

2442

919

2412

3680

5131

3862

1561

2048

2788

2301

920

2228

3600

5150

3778

1453

2050

2724

2126

921

2783

3827

5141

4097

1775

2058

2863

2581

922

2641

4561

4805

2884

1858

2875

2610

1593

923

3044

4831

5029

3242

1895

2834

2641

1702

924

3120

4822

5005

3304

1946

2805

2617

1758

925

2881

4687

4888

3082

1897

2840

2637

1693

926

2717

4552

4781

2946

1910

2847

2587

1650

927

2515

4439

4777

2853

1806

2843

2508

1472

928

3175

4767

4949

3357

1984

2788

2581

1777

929

2671

4489

4751

2932

1904

2826

2533

1610

930

3112

4666

4886

3331

1981

2760

2519

1740

931

3135

4675

4894

3353

1980

2752

2521

1748

932

2895

4581

4806

3119

1948

2788

2545

1705

933

2694

4498

4759

2954

1903

2819

2535

1619

934

2501

4420

4773

2855

1793

2829

2487

1451

935

3163

4687

4910

3386

1994

2760

2496

1729

936

2703

4597

4915

3021

1798

2841

2498

1455

937

3044

4831

5029

3242

1895

2834

2641

1702

938

3102

4800

4961

3263

2012

2875

2614

1752

939

2922

4713

4967

3176

1867

2824

2546

1588

940

2857

4536

4859

3180

1866

2782

2412

1497

941

2605

4484

4922

3043

1719

2800

2361

1280

942

3197

4796

4962

3362

2044

2840

2568

1772

943

2689

4563

4892

3018

1814

2818

2463

1459

944

3069

4647

4827

3250

2068

2824

2532

1776

945

3105

4661

4854

3297

2056

2811

2515

1759

946

2941

4600

4874

3215

1911

2779

2468

1601

947

2771

4529

4871

3113

1827

2789

2422

1460

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

BY

2587

4449

4890

3029

1719

2791

2358

1285

949

3143

4676

4881

3347

2042

2799

2497

1740

Max Load

3438

4831

5289

4135

2321

2875

3007

2618

Min Load

2141

3570

4292

2853

1452

2011

2045

1280

Normal

Case

PC2

Seismic/Wind
3007
kN

Seismic/Wind
5289
kN

Min Pile load

2141

PC1

kN

4785

kn

2742

kn

CHKD

ASK

ANK

948

Max Pile load

SHEET

31-May-16

1280

Normal case
2656 kn

kN

1501 kn

9.4 Evaluation of Pile capacity


For PC1
Pile dia

1.2 m

Socketing considered

4.5 m

Refereing to Geo-technical report, recommended design parameters are


Safe end bearing
=
200 T/m2
Safe Friction
=
15 T/m3
Hence pile capacity
/4
x
d2
x
200
0.7855
x
x
200
1.44
226.224
255
+
480.73
t
( For
4.5
Recommended pile capacity
as per soil report
i.e. in nonseismic cases the permissible pile load
=
4807
kN

+
+

and in seismic/Wind cases permissible pile load


=
4807.3
x
=
6009.1
kN

x
x

socketing
481

x
x

d
1.2

4.5
4.5

x
x

15
15

)
t

Limiting 600

t/m

(As per tender)

t/m

(As per tender)

1.25

Check for pile max and min loads


Normal case

Max Pile loads


4785

Capacity
4807

Check
OK

4638

6009

OK

5289

6009

OK

809 to 836

Seismic cases
(837 to 892)

Wind cases
(893 to 849)

2141.3 KN
Minimum pile loads are greater than zero, hence No tension in Pile
Minimum pile load =

For PC2
Pile dia

1.2 m

Socketing considered

3.6 m

Refereing to Geo-technical report, recommended design parameters are


Safe end bearing
=
200 T/m2
Safe Friction
=
15 T/m3
Hence pile capacity
/4
x
d2
x
200
0.7855
x
x
200
1.44
226.224
204
+
429.83
t
( For
3.6
Recommended pile capacity
as per soil report
i.e. in nonseismic cases the permissible pile load
=
4298
kN
and in seismic/Wind cases permissible pile load
=
4298.3
x
=
5372.8
kN

+
+
m

socketing
430

1.25

d
1.2

x
x

3.6
3.6

x
x

15
15

)
t

Limiting 600

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

BY

CHKD

ANK

Check for pile max and min loads


Normal case

Max Pile loads


2656

Capacity
4298

Check
OK

2580

5373

OK

3007

5373

OK

809 to 836

Seismic cases
(837 to 892)

Wind cases
(893 to 849)

1279.7 KN
Minimum pile loads are greater than zero, hence No tension in Pile
Minimum pile load =

8.5
8.5.1

SHEET

31-May-16

Forces for pile design


Pile loads

ULS CASE
Table showing Pile reactions at point of fixity of Pile for ULS load cases:
*All Loads are in kN

L/C

Pile-1

Pile-2

Pile-3

Pile-4

L/C

Pile-5 Pile-6 Pile-7 Pile-8

501

3661

5902

6523

4282

501

2136

2908

4130

3358

502

4266

5902

6860

4819

502

2191

2846

4176

3521

503

4380

5902

6825

4912

503

2268

2803

4141

3606

504

4021

5902

6648

4578

504

2194

2855

4170

3509

505

3775

5902

6488

4375

505

2213

2865

4095

3444

506

3472

5902

6481

4235

506

2059

2860

3978

3176

507

4462

5902

6740

4992

507

2325

2778

4087

3634

508

3706

5902

6442

4354

508

2205

2835

4014

3384

509

4367

5902

6645

4952

509

2320

2735

3993

3578

510

4402

5902

6657

4986

510

2319

2724

3996

3591

511

4042

5902

6525

4634

511

2271

2778

4032

3526

512

3741

5902

6454

4387

512

2204

2824

4017

3397

513

3451

5902

6477

4238

513

2039

2839

3945

3145

514

4443

5902

6682

5034

514

2339

2736

3959

3563

515

3754

5902

6689

4487

515

2045

2856

3962

3151

516

4266

5902

6860

4819

516

2191

2846

4176

3521

517

4353

5902

6758

4850

517

2367

2907

4136

3596

518

4083

5902

6767

4719

518

2149

2832

4034

3351

519

3984

5902

6605

4726

519

2149

2768

3834

3214

520

3606

5902

6700

4520

520

1927

2795

3757

2888

521

4495

5902

6759

4999

521

2415

2856

4067

3626

522

3733

5902

6654

4483

522

2069

2821

3910

3158

523

4304

5902

6557

4831

523

2451

2831

4013

3633

524

4357

5902

6598

4902

524

2433

2812

3987

3608

525

4111

5902

6627

4778

525

2215

2763

3917

3370

526

3857

5902

6623

4625

526

2089

2778

3847

3158

527

3581

5902

6652

4499

527

1927

2782

3752

2897

528

4414

5902

6638

4977

528

2411

2794

3960

3578

529

3540

5902

6493

4900

529

1935

2413

4250

3772

530

4004

5902

6751

5312

530

1977

2365

4286

3897

531

4091

5902

6724

5383

531

2036

2333

4259

3962

532

3816

5902

6588

5127

532

1979

2372

4281

3888

533

3627

5902

6466

4971

533

1994

2380

4224

3837

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

SHEET

31-May-16
BY

CHKD

ANK

534

3395

5902

6461

4864

534

1875

2376

4133

3632

535

4154

5902

6659

5444

535

2080

2313

4217

3984

536

3611

5902

6620

5057

536

1865

2373

4121

3613

537

4004

5902

6751

5312

537

1977

2365

4286

3897

538

4070

5902

6673

5336

538

2112

2412

4255

3955

539

3863

5902

6680

5235

539

1945

2355

4176

3766

540

3788

5902

6556

5240

540

1944

2306

4023

3661

541

3498

5902

6628

5083

541

1774

2327

3964

3412

542

4179

5902

6674

5450

542

2148

2373

4202

3978

543

3574

5902

6431

4955

543

1987

2357

4161

3792

544

4081

5902

6586

5414

544

2076

2280

4145

3941

545

4108

5902

6595

5440

545

2075

2272

4148

3951

546

3832

5902

6494

5170

546

2038

2313

4175

3901

547

3601

5902

6440

4981

547

1986

2348

4164

3802

548

3379

5902

6457

4867

548

1860

2360

4108

3608

549

4140

5902

6615

5477

549

2090

2281

4119

3929

550

3595

5902

6593

5054

550

1883

2347

4082

3618

551

4033

5902

6519

5321

551

2176

2354

4161

3983

552

4073

5902

6550

5375

552

2162

2340

4141

3963

553

3884

5902

6572

5280

553

1995

2302

4087

3781

554

3690

5902

6569

5163

554

1898

2314

4034

3619

555

3478

5902

6592

5066

555

1774

2316

3960

3418

556

4117

5902

6581

5433

556

2146

2325

4120

3941

557

4079

5902

6103

3776

557

2334

3525

3701

2510

558

4543

5902

6361

4188

558

2376

3477

3737

2635

559

4631

5902

6334

4259

559

2435

3444

3710

2701

560

4355

5902

6199

4003

560

2378

3484

3732

2626

561

4167

5902

6076

3847

561

2393

3492

3675

2576

562

3935

5902

6071

3740

562

2274

3488

3585

2371

563

4693

5902

6269

4320

563

2479

3425

3668

2722

564

4151

5902

6230

3933

564

2264

3485

3572

2352

565

4543

5902

6361

4188

565

2376

3477

3737

2635

566

4610

5902

6283

4212

566

2511

3524

3706

2693

567

4403

5902

6290

4111

567

2344

3466

3627

2505

568

4327

5902

6166

4116

568

2343

3418

3474

2400

569

4038

5902

6238

3959

569

2173

3438

3415

2150

570

4719

5902

6284

4326

570

2548

3485

3653

2716

571

4114

5902

6041

3831

571

2386

3469

3612

2530

572

4621

5902

6196

4290

572

2475

3392

3596

2679

573

4648

5902

6205

4316

573

2474

3384

3599

2689

574

4371

5902

6105

4046

574

2437

3425

3626

2639

575

4141

5902

6050

3857

575

2386

3460

3615

2540

576

3919

5902

6067

3743

576

2259

3472

3559

2347

577

4679

5902

6225

4353

577

2490

3393

3570

2667

578

4135

5902

6203

3930

578

2283

3458

3533

2357

579

4572

5902

6129

4197

579

2575

3466

3612

2721

580

4613

5902

6160

4251

580

2561

3452

3592

2702

581

4424

5902

6183

4156

581

2395

3414

3538

2519

582

4229

5902

6179

4039

582

2298

3425

3485

2357

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

SHEET

31-May-16
BY

CHKD

ANK

583

4018

5902

6202

3942

583

2173

3428

3411

2157

584

4656

5902

6191

4309

584

2545

3437

3571

2679

585

3540

5902

6493

4900

585

1935

2413

4250

3772

586

4004

5902

6751

5312

586

1977

2365

4286

3897

587

4091

5902

6724

5383

587

2036

2333

4259

3962

588

3816

5902

6588

5127

588

1979

2372

4281

3888

589

3627

5902

6466

4971

589

1994

2380

4224

3837

590

3395

5902

6461

4864

590

1875

2376

4133

3632

591

4154

5902

6659

5444

591

2080

2313

4217

3984

592

3611

5902

6620

5057

592

1865

2373

4121

3613

593

4004

5902

6751

5312

593

1977

2365

4286

3897

594

4070

5902

6673

5336

594

2112

2412

4255

3955

595

3863

5902

6680

5235

595

1945

2355

4176

3766

596

3788

5902

6556

5240

596

1944

2306

4023

3661

597

3498

5902

6628

5083

597

1774

2327

3964

3412

598

4179

5902

6674

5450

598

2148

2373

4202

3978

599

3574

5902

6431

4955

599

1987

2357

4161

3792

600

4081

5902

6586

5414

600

2076

2280

4145

3941

601

4108

5902

6595

5440

601

2075

2272

4148

3951

602

3832

5902

6494

5170

602

2038

2313

4175

3901

603

3601

5902

6440

4981

603

1986

2348

4164

3802

604

3379

5902

6457

4867

604

1860

2360

4108

3608

605

4140

5902

6615

5477

605

2090

2281

4119

3929

606

3595

5902

6593

5054

606

1883

2347

4082

3618

607

4033

5902

6519

5321

607

2176

2354

4161

3983

608

4073

5902

6550

5375

608

2162

2340

4141

3963

609

3884

5902

6572

5280

609

1995

2302

4087

3781

610

3478

5902

6592

5066

610

1774

2316

3960

3418

611

3478

5902

6592

5066

611

1774

2316

3960

3418

612

4117

5902

6581

5433

612

2146

2325

4120

3941

613

4536

5902

5376

4621

613

2663

2839

2996

2820

614

4617

5902

5421

4693

614

2670

2831

3002

2841

615

4632

5902

5416

4705

615

2681

2825

2997

2853

616

4584

5902

5392

4661

616

2671

2832

3001

2840

617

4551

5902

5371

4633

617

2673

2833

2991

2831

618

4511

5902

5370

4615

618

2653

2833

2975

2795

619

4643

5902

5405

4716

619

2688

2822

2990

2856

620

4549

5902

5398

4648

620

2651

2832

2973

2792

621

4617

5902

5421

4693

621

2670

2831

3002

2841

622

4628

5902

5407

4697

622

2694

2839

2997

2851

623

5473

5902

5650

5244

623

3018

2886

3186

3318

624

4579

5902

5387

4680

624

2665

2820

2956

2800

625

4529

5902

5399

4653

625

2635

2824

2946

2757

626

4647

5902

5407

4717

626

2700

2832

2987

2855

627

4542

5902

5365

4631

627

2672

2829

2980

2823

628

4630

5902

5392

4710

628

2687

2816

2977

2849

629

4635

5902

5394

4715

629

2687

2814

2978

2851

630

4587

5902

5376

4668

630

2681

2822

2983

2842

631

4547

5902

5367

4635

631

2672

2828

2981

2825

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

CHKD

ANK

4508

5902

5370

4615

632

2650

2830

2971

2791

633

4640

5902

5397

4721

633

2690

2816

2973

2847

634

4546

5902

5393

4648

634

2654

2827

2966

2793

635

4622

5902

5380

4694

635

2705

2829

2980

2856

636

4629

5902

5386

4704

636

2702

2826

2977

2853

637

4596

5902

5390

4687

637

2673

2820

2967

2821

638

4562

5902

5389

4667

638

2657

2822

2958

2793

639

4525

5902

5393

4650

639

2635

2822

2945

2758

640

4636

5902

5391

4714

640

2700

2824

2973

2849

641

4518

5902

5399

4483

641

2638

2974

3015

2680

642

4599

5902

5444

4554

642

2645

2965

3022

2702

643

4614

5902

5439

4566

643

2656

2960

3017

2713

644

4566

5902

5415

4522

644

2646

2966

3021

2700

645

4533

5902

5394

4495

645

2648

2968

3011

2691

646

4493

5902

5393

4476

646

2628

2967

2995

2656

647

4625

5902

5428

4577

647

2663

2956

3010

2717

648

4531

5902

5421

4510

648

2626

2967

2993

2652

649

4599

5902

5444

4554

649

2645

2965

3022

2702

650

4610

5902

5430

4558

650

2669

2973

3016

2712

651

4574

5902

5431

4541

651

2640

2963

3003

2679

652

4561

5902

5410

4542

652

2640

2955

2976

2661

653

4511

5902

5422

4514

653

2610

2959

2966

2617

654

4629

5902

5430

4578

654

2675

2967

3007

2716

655

4528

5902

5416

4509

655

2629

2962

2986

2653

656

4604

5902

5403

4556

656

2680

2963

3000

2716

657

4611

5902

5409

4565

657

2677

2961

2996

2713

658

4578

5902

5413

4549

658

2648

2954

2987

2681

659

4544

5902

5412

4528

659

2632

2956

2978

2653

660

4508

5902

5416

4511

660

2610

2957

2965

2618

661

4619

5902

5414

4575

661

2675

2958

2993

2709

662

4524

5902

5388

4492

662

2647

2964

3000

2683

663

4612

5902

5415

4572

663

2662

2950

2997

2709

664

4617

5902

5417

4576

664

2662

2949

2998

2711

665

4569

5902

5399

4530

665

2656

2956

3002

2702

666

4529

5902

5390

4497

666

2647

2962

3000

2685

667

4490

5902

5393

4477

667

2625

2964

2991

2651

668

4623

5902

5420

4583

668

2665

2951

2993

2707

5473
1774

5902
2272

6860
2945

5477
2150

Support moments Mx & Mz

8.5.2
L/C

BY

632

Max
Min

SHEET

31-May-16

Table showing moments at bottom of pile in two orthoginal directions


Pile-1
Pile-2
Mx

Mz

R=sqrt(M
x2+Mz2)

501

912.1

242

502

898.6

503

893.6

504

902.9

Pile-3

Pile-4
R=sqrt(
Mx2+M
z2)

Mx

Mz

R=sqrt(
Mx2+
Mz2)

107

1054 908

117

915

1075 1049

206

1069 894.6

215

920 *All Loads are in kN

1075 1046

233

1071 889.7

242

922

1075 1047

199

1065 899

208

923

R=sqrt(Mx
2+Mz2)

Mx

Mz

Mx

944

1045

250

1075 1048

355

966

1045

250

384

972

1045

250

341

965

1045

250

Mz

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

SHEET

31-May-16
BY

CHKD

ANK

505

907.2

270

947

1045

250

1075 1045

134

1053 903.1

143

914

506

914.2

99

920

1045

250

1075 1047

-33

1047 909.7

-23

910

507

888.5

377

965

1045

250

1075 1040

227

1065 884.7

235

915

508

907.2

217

933

1045

250

1075 1043

82

1046 903

91

908

509

888.1

320

944

1045

250

1075 1037

173

1051 884.1

180

902

510

887.1

330

946

1045

250

1075 1037

182

1053 883.1

189

903

511

897.7

302

947

1045

250

1075 1040

162

1052 893.6

170

910

512

906.2

226

934

1045

250

1075 1042

91

1046 902

100

907

513

914.2

78

917

1045

250

1075 1046

-53

1048 909.6

-43

911

514

885.9

302

936

1045

250

1075 1037

153

1048 881.9

160

896

515

909.3

114

916

1045

250

1075 1049

-24

1050 905

-15

905

516

898.6

355

966

1045

250

1075 1049

206

1069 894.6

215

920

517

894.2

349

960

1045

250

1075 1045

200

1064 890.5

209

915

518

901

236

931

1045

250

1075 1047

91

1051 896.9

100

902

519

897.9

107

904

1045

250

1075 1040

-34

1041 893.6

-25

894

520

910.1

-75

913

1045

250

1075 1048

-212

1069 905.3

-202

928

521

888.3

347

953

1045

250

1075 1041

196

1059 884.6

203

908

522

908.5

100

914

1045

250

1075 1048

-38

1048 904.1

-28

905

523

890

321

946

1045

250

1075 1037

175

1051 886.2

183

905

524

888.4

306

940

1045

250

1075 1036

160

1049 884.6

167

900

525

895.5

205

919

1045

250

1075 1040

61

1042 891.3

69

894

526

902.5

85

907

1045

250

1075 1043

-54

1045 898.1

-45

899

527

909.8

-73

913

1045

250

1075 1047

-208

1067 905.1

-199

927

528

886.7

292

933

1045

250

1075 1036

144

1046 882.9

151

896

529

682.1

-145

697

1045

250

1075 816

-278

862.1 675.4

-271

728

530

671.7

-59

674

1045

250

1075 817

-202

841.38 665.1

-196

693

531

667.9

-37

669

1045

250

1075 814

-181

833.8 661.3

-175

684

532

675

-70

679

1045

250

1075 815

-208

840.78 668.4

-201

698

533

678.3

-124

689

1045

250

1075 813

-257

852.84 671.6

-251

717

534

683.7

-255

730

1045

250

1075 815

-385

901.32 676.7

-378

775

535

664

-41

665

1045

250

1075 810

-186

831 657.5

-180

682

536

679.9

-243

722

1045

250

1075 817

-379

900.43 673

-372

769

537

671.7

-59

674

1045

250

1075 817

-202

841.38 665.1

-196

693

538

668.3

-63

671

1045

250

1075 813

-206

839 661.9

-201

692

539

673.6

-150

690

1045

250

1075 815

-290

865.6 666.9

-284

725

540

671.2

-248

716

1045

250

1075 810

-386

897.08 664.3

-380

765

541

680.5

-388

783

1045

250

1075 816

-522

968.65 673.3

-515

848

542

663.8

-65

667

1045

250

1075 810

-210

837.19 657.4

-205

689

543

678.3

-165

698

1045

250

1075 812

-297

864.4 671.5

-290

732

544

663.7

-85

669

1045

250

1075 807

-227

838.83 657.1

-222

694

545

662.9

-78

667

1045

250

1075 807

-221

836.88 656.3

-216

691

546

671

-99

678

1045

250

1075 810

-236

843.21 664.3

-230

703

547

677.5

-158

696

1045

250

1075 812

-290

862 670.7

-284

728

548

683.7

-271

736

1045

250

1075 815

-401

907.89 676.6

-394

783

549

661.9

-99

669

1045

250

1075 807

-242

842.72 655.4

-238

697

550

679.3

-254

725

1045

250

1075 816

-389

903.63 672.3

-382

773

551

665.1

-85

670

1045

250

1075 807

-225

837.94 658.7

-220

695

552

663.9

-96

671

1045

250

1075 807

-237

841.14 657.4

-232

697

553

669.3

-174

692

1045

250

1075 810

-313

868.19 662.6

-307

730

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

SHEET

31-May-16
BY

CHKD

ANK

554

674.7

-265

725

1045

250

1075 812

-401

905.85 667.8

-395

776

555

680.3

-386

782

1045

250

1075 815

-519

966.37 673.1

-513

846

556

662.6

-107

671

1045

250

1075 807

-250

844.59 656.1

-245

700

557

929.4

653

1136

1045

250

1075 1066

518

1185 929.1

528

1069

558

919

740

1180

1045

250

1075 1066

594

1221 918.8

603

1099

559

915.2

761

1190

1045

250

1075 1064

615

1229 915

624

1107

560

922.3

728

1175

1045

250

1075 1064

588

1216 922.1

598

1099

561

925.6

674

1145

1045

250

1075 1063

539

1192 925.3

548

1076

562

931

543

1078

1045

250

1075 1065

411

1141 930.4

421

1021

563

911.2

757

1184

1045

250

1075 1060

610

1223 911.1

618

1101

564

927.2

555

1081

1045

250

1075 1067

417

1145 926.7

427

1020

565

919

740

1180

1045

250

1075 1066

594

1221 918.8

603

1099

566

915.6

735

1174

1045

250

1075 1063

590

1215 915.6

598

1094

567

920.9

648

1126

1045

250

1075 1065

505

1179 920.6

515

1055

568

918.4

550

1070

1045

250

1075 1060

410

1136 918

419

1009

569

927.8

410

1014

1045

250

1075 1066

274

1100 927

284

969

570

911.1

733

1169

1045

250

1075 1060

586

1211 911.1

594

1088

571

925.6

633

1121

1045

250

1075 1061

499

1173 925.2

509

1056

572

911

713

1157

1045

250

1075 1057

569

1200 910.8

577

1078

573

910.2

720

1161

1045

250

1075 1057

575

1203 910

583

1081

574

918.3

699

1154

1045

250

1075 1059

560

1198 918

569

1080

575

924.8

640

1125

1045

250

1075 1061

506

1176 924.4

515

1058

576

931

527

1070

1045

250

1075 1064

395

1135 930.3

405

1015

577

909.2

699

1147

1045

250

1075 1057

553

1193 909.1

561

1068

578

926.5

544

1074

1045

250

1075 1065

407

1140 926

417

1015

579

912.4

713

1158

1045

250

1075 1057

571

1201 912.3

579

1080

580

911.2

702

1150

1045

250

1075 1057

559

1195 911.1

567

1073

581

916.6

624

1109

1045

250

1075 1060

483

1164 916.3

492

1040

582

922

533

1065

1045

250

1075 1062

395

1133 921.5

404

1006

583

927.6

412

1015

1045

250

1075 1065

276

1100 926.8

286

970

584

909.9

691

1142

1045

250

1075 1057

546

1189 909.8

554

1065

585

682.1

-145

697

1045

250

1075 816

-278

862.1 675.4

-271

728

586

671.7

-59

674

1045

250

1075 817

-202

841.38 665.1

-196

693

587

667.9

-37

669

1045

250

1075 814

-181

833.8 661.3

-175

684

588

675

-70

679

1045

250

1075 815

-208

840.78 668.4

-201

698

589

678.3

-124

689

1045

250

1075 813

-257

852.84 671.6

-251

717

590

683.7

-255

730

1045

250

1075 815

-385

901.32 676.7

-378

775

591

664

-41

665

1045

250

1075 810

-186

831 657.5

-180

682

592

679.9

-243

722

1045

250

1075 817

-379

900.43 673

-372

769 *All Loads are in kN

593

671.7

-59

674

1045

250

1075 817

-202

841.38 665.1

-196

693

594

668.3

-63

671

1045

250

1075 813

-206

839 661.9

-201

692

595

673.6

-150

690

1045

250

1075 815

-290

865.6 666.9

-284

725

596

671.2

-248

716

1045

250

1075 810

-386

897.08 664.3

-380

765

597

680.5

-388

783

1045

250

1075 816

-522

968.65 673.3

-515

848

598

663.8

-65

667

1045

250

1075 810

-210

837.19 657.4

-205

689

599

678.3

-165

698

1045

250

1075 812

-297

864.4 671.5

-290

732

600

663.7

-85

669

1045

250

1075 807

-227

838.83 657.1

-222

694

601

662.9

-78

667

1045

250

1075 807

-221

836.88 656.3

-216

691

602

671

-99

678

1045

250

1075 810

-236

843.21 664.3

-230

703

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

SHEET

31-May-16
BY

CHKD

ANK

603

677.5

-158

696

1045

250

1075 812

-290

862 670.7

-284

728

604

683.7

-271

736

1045

250

1075 815

-401

907.89 676.6

-394

783

605

661.9

-99

669

1045

250

1075 807

-242

842.72 655.4

-238

697

606

679.3

-254

725

1045

250

1075 816

-389

903.63 672.3

-382

773

607

665.1

-85

670

1045

250

1075 807

-225

837.94 658.7

-220

695

608

663.9

-96

671

1045

250

1075 807

-237

841.14 657.4

-232

697

609

669.3

-174

692

1045

250

1075 810

-313

868.19 662.6

-307

730

610

680.3

-386

782

1045

250

1075 815

-519

966.37 673.1

-513

846

611

680.3

-386

782

1045

250

1075 815

-519

966.37 673.1

-513

846

612

662.6

-107

671

1045

250

1075 807

-250

844.59 656.1

-245

700

613

377.7

366

526

1045

250

1075 510

235

561.74 376.3

238

446

614

375.8

381

535

1045

250

1075 510

249

567.54 374.6

252

451

615

375.2

385

537

1045

250

1075 510

252

568.69 373.9

255

453

616

376.4

379

534

1045

250

1075 510

248

566.77 375.1

251

451

617

377

370

528

1045

250

1075 510

239

562.82 375.7

242

447

618

377.9

347

513

1045

250

1075 510

217

554 376.6

220

436

619

374.5

384

536

1045

250

1075 509

251

567.72 373.2

254

452

620

377.3

349

514

1045

250

1075 510

218

554.78 375.9

221

436

621

375.8

381

535

1045

250

1075 510

249

567.54 374.6

252

451

622

375.3

380

534

1045

250

1075 510

248

566.64 374

251

450

623

356.6

667

756

1045

250

1075 508

518

725.5 356.2

520

630

624

375.8

348

512

1045

250

1075 509

217

553.2 374.4

220

434

625

377.4

324

497

1045

250

1075 510

193

545.31 376

196

424

626

374.5

380

533

1045

250

1075 509

247

565.93 373.2

250

449

627

377

362

523

1045

250

1075 509

232

559.71 375.7

235

443

628

374.5

376

531

1045

250

1075 509

244

564.16 373.2

247

447

629

374.3

377

532

1045

250

1075 509

245

564.62 373

248

448

630

375.7

374

530

1045

250

1075 509

243

563.81 374.4

246

448

631

376.9

364

524

1045

250

1075 509

233

560.15 375.5

236

444

632

377.9

344

511

1045

250

1075 510

214

552.9 376.6

217

435

633

374.2

374

529

1045

250

1075 509

242

563 372.9

244

446

634

377.2

347

512

1045

250

1075 510

216

553.87 375.8

219

435

635

374.7

376

531

1045

250

1075 509

245

564.23 373.4

247

448

636

374.5

374

530

1045

250

1075 508

242

563.32 373.2

245

447

637

375.4

361

521

1045

250

1075 509

229

558.25 374.1

232

440

638

376.4

345

511

1045

250

1075 509

214

552.5 375

217

433

639

377.3

324

497

1045

250

1075 510

193

545.3 375.9

196

424

640

374.3

372

528

1045

250

1075 508

240

243

445

641

450.3

432

624

1045

250

1075 583

301

656 449.4

305

543

642

448.5

447

633

1045

250

1075 583

314

662.29 447.6

318

549

643

447.8

451

635

1045

250

1075 582

318

663.58 447

322

551

644

449.1

445

632

1045

250

1075 583

313

661.5 448.2

317

549

645

449.6

435

626

1045

250

1075 582

305

657.22 448.8

309

545

646

450.6

413

611

1045

250

1075 583

283

647.48 449.6

286

533

647

447.1

450

634

1045

250

1075 582

317

662.6 446.3

321

550

648

449.9

415

612

1045

250

1075 583

284

648.28 449

287

533

649

448.5

447

633

1045

250

1075 583

314

662.29 447.6

318

549

650

447.9

446

632

1045

250

1075 582

314

661.38 447.1

317

548

651

448.8

431

622

1045

250

1075 583

299

654.91 447.9

303

541

562.38 373

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

BY

448.4

414

610

1045

250

1075 582

282

646.67 447.5

286

531

653

450

389

595

1045

250

1075 583

259

637.61 449.1

262

520

654

447.1

446

631

1045

250

1075 582

313

660.65 446.3

316

547

655

449.8

413

610

1045

250

1075 583

282

647.29 448.9

286

532

656

447.3

442

629

1045

250

1075 581

310

658.87 446.5

314

546

657

447.1

440

627

1045

250

1075 581

308

657.88 446.3

312

544

658

448.1

427

619

1045

250

1075 582

295

652.27 447.2

299

538

659

449

411

609

1045

250

1075 582

280

645.84 448.1

283

530

660

450

390

595

1045

250

1075 583

259

637.63 449

263

520

661

446.9

438

626

1045

250

1075 581

306

656.86 446.1

310

543

662

449.6

428

621

1045

250

1075 582

298

653.84 448.7

302

541

663

447.1

442

629

1045

250

1075 581

310

658.78 446.2

313

545

664

447

443

630

1045

250

1075 581

311

659.29 446.1

315

546

665

448.4

440

628

1045

250

1075 582

308

658.37 447.5

312

546

666

449.5

430

622

1045

250

1075 582

299

654.32 448.6

303

541

667

450.6

410

609

1045

250

1075 583

280

646.24 449.6

284

532

668

446.8

440

627

1045

250

1075 581

307

657.48 445.9

311

544

1190.43

CHKD

ASK

ANK

652

Max=

SHEET

31-May-16

1075.019

1229

Max Moment at Pile Bottom =

1107

1228.5

9.0 Pile Reinforcement design:

ULS

condition

8.1 Pile has been designed for vertical loads on piles (including its self weight) and moments.
Pile is considered to be fixed at depth of fixity. The shear force in horizontal directions at the pile top will
cause moments in pile. Additional moment due to shift or tilt in piles is also considered.
The pile has been designed for vertical loads and the total moment.
L

=
=

centreline of pile cap to


centreline of socketing
8.80

pile cap thk

t1

socketing thk

le = 0.7l0

8.80

Shift to be considered

8.2
L/C

6.16

1.8

(conservative side)
=

58.7

mm

Sample Calculations:-

559
Pile -P3
Bending moments

Mx =
Mz=
R2=
R=

Verical Load =

1064
615
1063.5847 ^2 +
1228.5

614.881 ^2
kNm

Pile reaction at bottom of Pile in ULS case


6334 kN

Shift considered Hence Moment due to shift =

75 mm
6334 x

Hence Total Moment =


=

1228.5
1703.6

+
kNm

75 /1000

475 kNm

475

8.3 Table showing design forces for Pile design at bottom of Pile -3
Load
M Pile bottom
Comb.
Mmt
Due to
P
Tilt
( P*tilt dist)

Total
moment

*All Loads are in kN


& Moments in kNm

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
Mmt
Tilt

Due to
( P*tilt dist)

SHEET

31-May-16
BY

CHKD

ANK

M Pile bottom

Total
moment

S.No

501

6523

382.7

1053.7

1436.4

502

6860

402.4

1069.3

1471.8

503

6825

400.4

1071.2

1471.6

504

6648

390.0

1065.2

1455.3

505

6488

380.6

1053.1

1433.7

506

6481

380.2

1047.3

1427.6

507

6740

395.4

1065.0

1460.4

508

6442

377.9

1046.0

1424.0

509

6645

389.8

1051.5

1441.3

510

6657

390.5

1052.6

1443.2

511

6525

382.8

1052.2

1435.0

512

6454

378.7

1046.4

1425.1

513

6477

380.0

1047.8

1427.7

514

6682

392.0

1047.9

1439.9

515

6689

392.4

1049.8

1442.2

516

6860

402.4

1069.3

1471.8

517

6758

396.5

1063.7

1460.1

518

6767

397.0

1051.4

1448.4

519

6605

387.5

1040.9

1428.4

520

6700

393.0

1069.3

1462.4

521

6759

396.5

1059.2

1455.7

522

6654

390.4

1048.4

1438.8

523

6557

384.7

1051.3

1436.0

524

6598

387.1

1048.7

1435.8

525

6627

388.8

1042.0

1430.8

526

6623

388.5

1044.7

1433.2

527

6652

390.3

1067.3

1457.6

528

6638

389.5

1046.2

1435.7

529

6493

380.9

862.1

1243.0

530

6751

396.0

841.4

1237.4

531

6724

394.5

833.8

1228.3

532

6588

386.5

840.8

1227.3

533

6466

379.3

852.8

1232.2

534

6461

379.0

901.3

1280.4

535

6659

390.7

831.0

1221.7

536

6620

388.4

900.4

1288.8

537

6751

396.0

841.4

1237.4

538

6673

391.5

839.0

1230.5

539

6680

391.9

865.6

1257.5

540

6556

384.6

897.1

1281.7

541

6628

388.9

968.7

1357.5

542

6674

391.5

837.2

1228.7

543

6431

377.3

864.4

1241.7

544

6586

386.4

838.8

1225.2

545

6595

386.9

836.9

1223.8

546

6494

381.0

843.2

1224.2

547

6440

377.8

862.0

1239.8

548

6457

378.8

907.9

1286.7

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

SHEET

31-May-16
BY

CHKD

ANK

549

6615

388.1

842.7

1230.8

550

6593

386.8

903.6

1290.4

551

6519

382.5

837.9

1220.4

552

6550

384.3

841.1

1225.4

553

6572

385.6

868.2

1253.8

554

6569

385.4

905.9

1291.2

555

6592

386.7

966.4

1353.1

556

6581

386.1

844.6

1230.7

557

6103

358.0

1184.8

1542.9

558

6361

373.2

1220.7

1593.9

559

6334

371.6

1228.5

1600.1

560

6199

363.6

1216.1

1579.8

561

6076

356.5

1191.6

1548.0

562

6071

356.2

1141.1

1497.3

563

6269

367.8

1222.8

1590.6

564

6230

365.5

1145.3

1510.8

565

6361

373.2

1220.7

1593.9

566

6283

368.6

1215.5

1584.1

567

6290

369.0

1179.0

1548.0

568

6166

361.7

1136.3

1498.0

569

6238

366.0

1100.2

1466.2

570

6284

368.6

1211.3

1579.9

571

6041

354.4

1172.9

1527.3

572

6196

363.5

1200.4

1563.9

573

6205

364.1

1203.3

1567.4

574

6105

358.1

1198.0

1556.2

575

6050

354.9

1175.5

1530.5

576

6067

355.9

1135.2

1491.1

577

6225

365.2

1192.9

1558.1

578

6203

363.9

1140.3

1504.3

579

6129

359.6

1200.9

1560.5

580

6160

361.4

1195.2

1556.6

581

6183

362.7

1164.4

1527.1

582

6179

362.5

1132.9

1495.4

583

6202

363.8

1099.9

1463.7

584

6191

363.2

1189.4

1552.6

585

6493

380.9

862.1

1243.0

586

6751

396.0

841.4

1237.4

587

6724

394.5

833.8

1228.3

588

6588

386.5

840.8

1227.3

589

6466

379.3

852.8

1232.2

590

6461

379.0

901.3

1280.4

591

6659

390.7

831.0

1221.7

592

6620

388.4

900.4

1288.8

593

6751

396.0

841.4

1237.4

594

6673

391.5

839.0

1230.5

595

6680

391.9

865.6

1257.5

596

6556

384.6

897.1

1281.7

597

6628

388.9

968.7

1357.5

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

SHEET

31-May-16
BY

CHKD

ANK

598

6674

391.5

837.2

1228.7

599

6431

377.3

864.4

1241.7

600

6586

386.4

838.8

1225.2

601

6595

386.9

836.9

1223.8

602

6494

381.0

843.2

1224.2

603

6440

377.8

862.0

1239.8

604

6457

378.8

907.9

1286.7

605

6615

388.1

842.7

1230.8

606

6593

386.8

903.6

1290.4

607

6519

382.5

837.9

1220.4

608

6550

384.3

841.1

1225.4

609

6572

385.6

868.2

1253.8

610

6592

386.7

966.4

1353.1

611

6592

386.7

966.4

1353.1

612

6581

386.1

844.6

1230.7

613

5376

315.4

561.7

877.1

614

5421

318.0

567.5

885.5

615

5416

317.7

568.7

886.4

616

5392

316.4

566.8

883.1

617

5371

315.1

562.8

877.9

618

5370

315.1

554.0

869.1

619

5405

317.1

567.7

884.8

620

5398

316.7

554.8

871.5

621

5421

318.0

567.5

885.5

622

5407

317.2

566.6

883.9

623

5650

331.4

725.5

1056.9

624

5387

316.0

553.2

869.2

625

5399

316.8

545.3

862.1

626

5407

317.2

565.9

883.2

627

5365

314.7

559.7

874.5

628

5392

316.3

564.2

880.5

629

5394

316.4

564.6

881.0

630

5376

315.4

563.8

879.2

631

5367

314.8

560.1

875.0

632

5370

315.0

552.9

867.9

633

5397

316.6

563.0

879.6

634

5393

316.4

553.9

870.3

635

5380

315.6

564.2

879.9

636

5386

316.0

563.3

879.3

637

5390

316.2

558.2

874.4

638

5389

316.2

552.5

868.7

639

5393

316.4

545.3

861.7

640

5391

316.3

562.4

878.7

641

5399

316.7

656.0

972.7

642

5444

319.4

662.3

981.7

643

5439

319.1

663.6

982.7

644

5415

317.7

661.5

979.2

645

5394

316.5

657.2

973.7

646

5393

316.4

647.5

963.9

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

BY

5428

318.4

662.6

981.0

648

5421

318.0

648.3

966.3

649

5444

319.4

662.3

981.7

650

5430

318.6

661.4

979.9

651

5431

318.6

654.9

973.5

652

5410

317.4

646.7

964.0

653

5422

318.1

637.6

955.7

654

5430

318.6

660.7

979.2

655

5416

317.8

647.3

965.0

656

5403

317.0

658.9

975.9

657

5409

317.3

657.9

975.2

658

5413

317.5

652.3

969.8

659

5412

317.5

645.8

963.3

660

5416

317.7

637.6

955.4

661

5414

317.6

656.9

974.5

662

5388

316.1

653.8

969.9

663

5415

317.7

658.8

976.5

664

5417

317.8

659.3

977.1

665

5399

316.7

658.4

975.1

666

5390

316.2

654.3

970.5

667

5393

316.4

646.2

962.6

668

5420

318.0

657.5

975.5

Max Moment

10

LC
LC
LC

6860
1774
1600

Min P

502
610
559

PILE STRESS CHECK

SLS Rare combination results

PILE 1

PILE 2

Load

FZ
(kN)

MX
(kN*m)

MY
FZ (kN)
(kN*m)

669

2587

602

-219

PILE 3

PILE 4

MY
MX
MY
FZ
MX
(kN*
(kN*m) (kN*m) (kN) (kN*m)
m)

MX
(kN*m)

MY
(kN*m)

FZ
(kN)

4004

698

-214

4893

702

-318 3477 598 -312

670

2991

593

-143

4274

699

-139

5118

702

-252 3835 589 -246

Leading 671

3067

589

-125

4265

697

-120

5094

700

-234 3897 585 -228

672

2827

596

-153

4129

697

-148

4977

701

-257 3674 592 -251

673

2663

598

-200

3995

696

-195

4870

699

-300 3539 594 -294

674

2462

603

-314

3882

697

-309

4866

701

-411 3446 599 -405

675

3121

586

-129

4209

693

-125

5038

696

-238 3950 582 -233

676

2650

600

-304

4040

699

-299

5004

703

-406 3613 596 -399

677

2991

593

-143

4274

699

-139

5118

702

-252 3835 589 -246

678

3049

590

-147

4243

696

-143

5050

699

-256 3856 586 -251

679

2869

594

-223

4156

698

-218

5056

701

-329 3768 590 -323

680

2803

592

-309

3978

693

-304

4948

696

-412 3773 588 -407

681

2551

600

-430

3926

698

-425

5011

702

-530 3636 596 -524

682

3143

586

-149

4239

694

-145

5051

697

-259 3955 582 -254

683

2636

599

-314

4005

698

-308

4981

701

-415 3611 595 -408

684

3016

587

-167

4090

691

-163

4916

694

-272 3843 583 -268

LL

CHKD

ANK

647

Max P

SHEET

31-May-16
ASK

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

NOTE No.

STRUCTCON DESIGNS P. L.

SHEET

31-May-16
BY

CHKD

ASK

ANK

685

3051

586

-176

4104

691

-172

4943

694

-283 3890 582 -278

686

2887

591

-244

4042

693

-240

4963

696

-348 3807 586 -343

687

2718

595

-323

3972

695

-319

4960

698

-425 3706 591 -420

688

2534

600

-429

3892

697

-423

4979

701

-528 3621 596 -522

689

3089

585

-186

4119

690

-182

4970

694

-293 3940 581 -289

690

2617

598

-236

3932

695

-231

4839

698

-334 3525 594 -329

691

3058

586

-167

4109

691

-163

4974

694

-274 3924 582 -269

692

3082

585

-160

4118

691

-157

4983

694

-268 3946 581 -264

693

2841

592

-179

4024

693

-174

4895

696

-281 3712 588 -276

694

2641

598

-230

3941

694

-225

4847

698

-329 3547 594 -323

ML

MT

695

2448

603

-328

3862

697

-323

4862

700

-425 3448 599 -419

2448

603

-328

696

3109

584

-179

4130

691

-175

4999

694

-287 3979 580 -283

3862

697

-323

697

2803

701

100

4513

801

107

4737

802

3027 699

4683

798

-16

698

3207

692

176

4783

801

182

4962

802

67

3385 690

73

2996

700

-85

699

3283

688

195

4774

799

200

4938

800

85

3447 687

91

700

3043

695

166

4639

800

172

4821

800

62

3225 693

68

701

2879

697

119

4504

798

125

4714

799

18

3089 696

26

702

2678

702

4391

800

11

4710

801

-93

2996 700

-85

703

3337

685

191

4719

796

196

4882

796

81

3500 683

87

704

2866

699

15

4550

801

22

4848

802

-87

3164 697

-80

705

3207

692

176

4783

801

182

4962

802

67

3385 690

73

706

3264

689

172

4752

799

177

4894

799

63

3406 687

69

707

3084

693

96

4666

800

102

4900

801

-10

3319 692

-4

708

3019

691

11

4488

795

16

4792

796

-93

3323 689

-87

709

2767

699

-111

4436

800

-104

4855

802

-212 3186 697 -205

710

3359

685

170

4749

796

175

4895

797

60

3505 683

65

711

2833

697

83

4442

797

90

4683

798

-16

3075 696

-9

712

3274

685

153

4618

793

158

4818

794

45

3474 683

50

713

3297

684

159

4627

793

164

4827

794

50

3497 682

56

714

3057

691

140

4534

795

146

4739

796

37

3262 689

43

715

2856

697

90

4451

797

96

4692

798

-10

3097 695

-3

716

2663

702

-9

4372

799

-3

4706

800

-107 2998 700

-99

717

3325

683

140

4639

793

145

4843

794

31

3529 682

37

718

2851

698

4515

800

12

4825

801

-96

3161 696

-89

719

3232

686

153

4599

793

158

4760

794

46

3393 685

52

720

3267

685

143

4614

793

148

4787

794

36

3441 683

41

721

3103

690

75

4552

795

81

4807

796

-30

3358 688

-24

722

2934

694

-4

4482

797

4804

798

-107 3256 692 -100

723

2750

699

-109

4401

799

-103

4823

801

-210 3172 697 -202

724

3305

684

133

4629

793

138

4814

794

725

2518

437

-481

3471

531

-477

4857

536

-578 3904 431 -574

Leading 726

2821

431

-424

3674

531

-421

5026

536

-528 4173 425 -524

727

2878

428

-410

3667

529

-407

5008

534

-514 4219 422 -511

728

2698

433

-431

3565

530

-428

4920

535

-532 4052 427 -528

729

2575

435

-466

3464

529

-463

4840

534

-564 3951 429 -560

730

2424

438

-552

3379

530

-548

4836

535

-648 3881 432 -643

731

2918

426

-413

3625

527

-410

4966

532

-517 4259 420 -515

ML

732

2565

436

-544

3498

531

-541

4940

536

-643 4006 430 -639

2413

438

733

2821

431

-424

3674

531

-421

5026

536

-528 4173 425 -524

wind

25

3491 682

31

MT
-563

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

BY

CHKD

ASK

ANK

2864

428

-427

3650

529

-424

4975

534

-531 4188 423 -528

735

2729

432

-484

3585

530

-480

4979

535

-586 4123 426 -582

736

2680

430

-548

3452

526

-545

4898

532

-648 4126 424 -645

737

2491

436

-639

3413

530

-635

4946

536

-737 4023 430 -733

738

2935

425

-428

3648

527

-426

4975

532

-533 4262 420 -530

739

2554

436

-551

3472

530

-548

4923

536

-650 4005 429 -646

740

2839

426

-441

3535

525

-439

4874

530

-543 4178 421 -541

741

2866

425

-448

3546

525

-446

4895

530

-551 4214 420 -548

742

2743

429

-499

3500

526

-496

4909

532

-600 4152 423 -597

743

2616

433

-559

3447

528

-556

4907

533

-658 4076 427 -655

744

2478

436

-638

3387

529

-634

4922

535

-735 4012 430 -731

745

2894

425

-456

3558

525

-453

4915

530

-559 4252 419 -557

746

2540

435

-493

3417

528

-490

4817

533

-590 3940 429 -586

747

2871

425

-441

3550

525

-439

4918

530

-545 4239 420 -542

748

2889

425

-437

3557

525

-434

4924

530

-540 4256 419 -538

749

2708

430

-450

3486

526

-448

4858

532

-550 4080 424 -547

750

2558

434

-488

3424

528

-485

4823

533

-586 3957 428 -582

751

2413

438

-563

3365

529

-559

4834

535

-658 3882 432 -654

752

2909

424

-450

3566

525

-448

4937

530

-555 4280 418 -552

753

2878

602

51

4320

701

57

4597

702

-47

3155 601

754

3180

595

108

4523

702

113

4766

703

3423 594

755

3237

593

122

4516

700

127

4748

701

16

3470 591

21

756

3058

598

101

4415

700

106

4660

701

-1

3303 596

757

2935

600

66

4313

699

71

4580

700

-34

3201 598

-28

758

2783

603

-20

4229

700

-14

4577

702

-117 3131 601 -111

759

3278

590

119

4474

697

124

4706

698

760

2924

601

-12

4348

702

-7

4680

703

761

3180

595

108

4523

702

113

4766

703

3423 594

762

3224

593

105

4499

699

110

4715

700

3439 592

763

3089

597

48

4435

701

54

4719

702

-55

3373 595

-50

764

3040

595

-16

4301

697

-11

4638

698

-117 3377 593 -112

765

2851

601

-107

4262

701

-101

4686

702

-206 3274 599 -200

766

3295

590

104

4497

698

109

4715

699

767

2914

600

-19

4321

701

-14

4663

702

-120 3255 599 -114

768

3199

591

91

4385

695

95

4615

696

-13

3429 590

-8

769

3226

590

84

4396

695

88

4635

696

-21

3465 589

-16

770

3103

594

33

4349

697

38

4649

698

-70

3403 592

-65

771

2976

597

-27

4297

698

-21

4647

700

-127 3326 596 -122

772

2838

601

-106

4236

700

-100

4662

702

-205 3263 599 -199

773

3254

590

76

4407

695

81

4655

696

-29

774

2773

603

-31

4214

700

-25

4574

701

-127 3133 601 -121

775

2662

606

-98

4165

701

-92

4602

703

-193 3100 604 -187

776

2900

600

39

4266

698

44

4557

699

-60

3191 598

-54

777

3231

590

91

4399

695

95

4658

697

-14

3490 589

-9

778

3248

590

95

4406

695

100

4664

697

-10

3507 588

-5

779

3068

595

82

4336

697

87

4598

698

-20

3331 593

-14

780

2918

599

44

4273

698

49

4563

699

-55

3207 598

-49

PILE 6

SHEET

31-May-16

734

PILE 5

NOTE No.

STRUCTCON DESIGNS P. L.

PILE 7

13

3510 589

-41

18

-113 3257 599 -107

-3

3513 589

3502 588

PILE 8

-24

4523

702

113

5026

536

-528

4280

418

-552

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

LL

Load

FZ
(kN)

MX
(kN*m)

MY
FZ (kN)
(kN*m)

MX
(kN*m)

MY
(kN*m)

FZ
(kN)

NOTE No.

STRUCTCON DESIGNS P. L.

SHEET

31-May-16
BY

CHKD

ASK

ANK

MY
MX
MY
FZ
MX
(kN*
(kN*m) (kN*m) (kN) (kN*m)
m)
282
-406 2221
226
-403

669

1816

227

-351

2346

282

-349

2750

Leading 670

1853

224

-422

2304

279

-420

2781

280

-478

2329

222

-475

671

1904

221

-439

2276

277

-438

2758

277

-496

2386

219

-494

672

1855

224

-414

2310

279

-413

2777

280

-470

2321

222

-468

673

1868

224

-368

2317

279

-367

2727

280

-424

2278

223

-422

674

1765

229

-259

2314

281

-257

2648

282

-311

2099

228

-309

ML

675

1942

219

-434

2259

275

-433

2721

275

-491

2405

217

-489

1677

232

-143

676

1756

229

-266

2311

281

-264

2638

282

-318

2083

228

-315

2223

281

-257

677

1853

224

-422

2304

279

-420

2781

280

-478

2329

222

-475

2278

379

130

678

1970

220

-413

2345

277

-412

2754

278

-471

2380

219

-469

1403

332

136

679

1825

225

-343

2295

279

-342

2686

279

-397

2216

224

-395

680

1824

224

-259

2252

276

-258

2552

277

-311

2125

223

-309

681

1677

232

-143

2271

281

-141

2501

281

-192

1907

231

-189

682

2002

218

-410

2311

275

-409

2708

275

-467

2400

217

-466

683

1772

228

-256

2288

280

-255

2603

280

-309

2087

227

-306

684

2026

217

-394

2294

274

-394

2672

274

-452

2404

216

-450

685

2014

217

-385

2282

273

-385

2655

274

-442

2387

216

-440

686

1869

222

-322

2249

276

-321

2608

276

-376

2228

221

-374

687

1785

226

-246

2259

278

-245

2562

278

-298

2087

225

-296

688

1677

231

-145

2262

280

-143

2498

281

-194

1913

230

-191

689

2000

217

-375

2269

273

-375

2637

273

-431

2367

216

-430

690

1862

224

-334

2297

278

-332

2673

279

-388

2238

223

-386

691

1939

218

-397

2230

273

-397

2659

274

-453

2367

217

-452

692

1938

218

-404

2223

273

-403

2661

274

-459

2376

217

-458

693

1906

221

-388

2259

276

-387

2685

276

-444

2332

219

-442

694

1861

224

-340

2289

278

-339

2675

279

-394

2247

223

-392

695

1752

229

-245

2300

281

-243

2627

281

-298

2078

228

-295

696

1952

218

-384

2231

273

-384

2636

273

-439

2357

216

-438

697

1976

326

-27

2790

382

-24

2530

381

-81

1716

327

-78

698

2013

323

-98

2749

380

-95

2561

378

-153

1825

324

-150

699

2064

320

-116

2720

377

-113

2538

376

-171

1882

321

-168

700

2014

323

-90

2755

380

-88

2557

378

-146

1817

324

-142

701

2027

324

-45

2762

380

-42

2507

378

-100

1773

324

-96

702

1924

328

65

2758

382

68

2429

380

13

1595

329

17

703

2102

318

-110

2704

375

-109

2502

374

-166

1900

319

-163

704

1915

328

58

2756

382

61

2418

380

1578

329

10

705

2013

323

-98

2749

380

-95

2561

378

-153

1825

324

-150

706

2130

320

-89

2790

378

-87

2535

376

-146

1875

321

-143

707

1985

324

-20

2740

380

-17

2466

378

-73

1711

325

-69

708

1984

324

65

2697

377

67

2333

375

13

1620

325

17

709

1836

331

181

2715

381

184

2282

379

132

1403

332

136

710

2162

317

-86

2755

376

-85

2489

374

-143

1895

318

-140

711

2022

324

-10

2741

379

-8

2453

377

-64

1733

325

-60

712

2099

318

-74

2675

374

-72

2439

372

-128

1863

319

-126

713

2098

317

-80

2668

374

-78

2441

372

-135

1872

318

-132

714

2066

320

-64

2703

376

-62

2465

375

-119

1828

321

-116

715

2021

323

-16

2734

379

-14

2455

377

-70

1742

324

-67

MT

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

SHEET

31-May-16
BY

CHKD

ANK

716

1911

328

78

2745

382

81

2407

380

27

1574

330

31

717

2111

317

-60

2675

374

-59

2417

372

-115

1852

318

-112

718

1931

327

67

2733

381

70

2384

378

16

1582

328

20

719

2185

316

-71

2739

374

-69

2453

372

-127

1899

317

-125

720

2174

316

-61

2727

374

-60

2435

372

-117

1882

317

-115

721

2029

321

2694

376

2389

374

-52

1724

323

-49

722

1944

326

77

2704

379

80

2342

376

27

1583

327

30

723

1837

331

179

2706

381

182

2278

379

130

1408

332

134

724

2159

316

-52

2714

374

-50

2417

372

-107

1863

318

-104

725

1687

162

-519

2007

214

-518

2818

216

-573

2499

159

-572

Wind

726

1715

160

-572

1976

212

-572

2841

215

-627

2580

156

-626

Leadng

727

1753

158

-585

1954

210

-585

2824

213

-641

2623

154

-640

728

1716

160

-567

1980

212

-566

2838

215

-622

2574

157

-620

729

1726

160

-532

1985

212

-532

2801

215

-587

2541

157

-586

730

1648

164

-450

1983

214

-449

2742

216

-502

2408

161

-501

731

1782

156

-582

1942

209

-581

2797

211

-637

2637

153

-636

732

1642

164

-455

1981

214

-454

2734

216

-508

2395

161

-506

733

1715

160

-572

1976

212

-572

2841

215

-627

2580

156

-626

734

1803

157

-566

2007

211

-566

2822

213

-622

2618

154

-621

735

1694

161

-513

1969

212

-513

2770

214

-567

2495

158

-566

736

1693

160

-450

1937

210

-450

2670

212

-502

2427

157

-501

737

1583

166

-363

1951

213

-362

2632

215

-413

2264

163

-411

738

1827

155

-564

1981

209

-564

2787

211

-619

2633

152

-619

739

1654

163

-448

1964

213

-448

2708

215

-500

2398

160

-499

740

1844

155

-552

1968

208

-552

2760

210

-608

2636

152

-607

741

1835

155

-545

1959

208

-545

2747

210

-600

2623

152

-599

742

1727

159

-498

1934

210

-498

2712

212

-551

2504

156

-550

743

1664

162

-441

1942

211

-440

2677

213

-492

2399

159

-491

744

1583

165

-365

1944

213

-364

2629

215

-415

2268

163

-413

745

1825

155

-537

1950

208

-537

2734

210

-592

2609

152

-592

746

1721

160

-506

1970

212

-506

2760

214

-560

2511

157

-559

747

1779

156

-554

1920

208

-554

2750

210

-609

2609

153

-608

748

1779

155

-559

1915

208

-559

2751

210

-613

2615

152

-613

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

BY

1755

157

-547

1942

210

-547

2769

212

-602

2582

154

-601

750

1721

160

-511

1965

211

-510

2762

214

-565

2518

157

-563

751

1639

164

-440

1973

214

-439

2726

216

-492

2392

161

-490

752

1789

155

-544

1921

207

-544

2733

210

-598

2601

152

-598

753

1953

328

20

2748

382

23

2452

380

-32

1657

329

-29

754

1981

325

-33

2717

380

-30

2475

379

-86

1739

326

-83

755

2019

323

-46

2696

378

-44

2458

377

-100

1782

324

-97

756

1982

325

-27

2721

380

-25

2472

379

-81

1733

326

-77

757

1992

325

2727

380

10

2435

378

-46

1700

327

-43

758

1914

329

89

2724

382

92

2376

380

38

1567

330

42

759

2048

321

-42

2683

377

-40

2431

375

-96

1796

322

-93

760

1908

329

84

2722

382

87

2368

380

33

1554

330

37

761

1981

325

-33

2717

380

-30

2475

379

-86

1739

326

-83

762

2069

322

-27

2748

379

-24

2456

377

-81

1777

324

-78

763

1960

326

26

2710

380

29

2404

378

-26

1654

327

-23

764

1959

325

89

2678

378

92

2304

376

39

1585

327

42

765

1849

331

176

2692

381

179

2266

379

128

1423

332

132

766

2093

321

-24

2722

377

-22

2421

375

-79

1792

322

-76

767

1920

328

91

2705

381

94

2342

379

40

1557

329

44

768

2110

320

-13

2710

376

-11

2394

374

-67

1795

321

-64

769

2102

320

-6

2700

376

-3

2381

374

-59

1782

321

-57

770

1993

324

41

2676

377

44

2346

376

-10

1663

325

-7

771

1930

327

99

2683

379

101

2311

377

48

1557

328

52

772

1849

331

174

2685

381

178

2263

379

126

1427

332

130

773

2091

320

2691

376

2368

374

-52

1767

321

-49

774

1905

329

99

2714

382

102

2360

380

49

1551

330

53

775

1789

333

162

2683

383

166

2306

381

114

1412

334

119

776

1987

325

33

2711

380

36

2394

378

-19

1670

327

-16

777

2045

321

-15

2662

376

-13

2384

374

-68

1768

322

-65

778

2045

321

-19

2656

376

-17

2386

374

-72

1774

322

-70

779

2021

323

-8

2683

378

-6

2403

376

-61

1741

324

-58

780

1987

325

28

2706

379

31

2396

378

-24

1677

326

-21

Crack Width check

Load Combination 5000

Node

356
357
381
382
743
744
745
746

FX (kN) FZ (kN)

-44
-43
-12
-13
36
36
20
21

4084
3642
3632
3190
2442
2139
1969
1666

Quasi Permanent Comb


MX
(kN*m)

MY
(kN*m)

-64
35
-62
34
-36
14
-34
12

-198
-196
-101
-103
175
173
126
127

CHKD

ANK

749

10.2

SHEET

31-May-16
ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

Quasi Permanent combination


LC 5000

Governing case
crack width

ML

4084

-198

Bar spacing
Bar dia
fy
=
C min
=
a cr
=
d
=
a'
=
x
=
st
=

=
s
=
m
=
=
crack width

st

Refer BT annexure
Spacing of bar

Case

0.2

<

0.0

120.0

hence OK

mm

12.4

Crack width less than

Design of pile

P
6860
3379
6717

Mx
1049
685
1067

Mz
206
495
749

ASK

on safe side without stiffening effect


mm
mm
n/mm2
mm clear cover
mm
mm over all depth
mm depth upto location under consideration
mm depth of NA
N/mm2

Pile Loads - PC1-

Pmax
Pmin
Mmax

CHKD

ANK

-64

Refer IRC 112 Table

10.3

BY

MT

2000
3*acr* em
94.26
16
500
75
96.3
1200
1200
643.0
0.0
0.000E+00
0.000E+00
0.000E+00
0.0000

SHEET

31-May-16

R= Mx2+Mz2

1069.3
845.1
1303.6

Mmt due to
tilt/shift
402.4
198.2
394.1

Total Moment
1471.8
1043.4
1697.7

LC
502
548
558

0.2

mm

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

BY

CHKD

ANK

Pile loads - PC2-

Pmax
Pmin
Mmax

P
4286
1774
4260

Grade

45

Case

L/C

Mx
1295
900
1540

Mz
397.0
260.0
323

Mmt due to
tilt/shift
251.4
104.1
249.9

R= Mx2+Mz2

1354.5
936.8
1573.5

D=
1200
Ac=
PI()/4*1200*1200
=
1130973.4
Reinforcement required is checked using charts of Design Aids to IS 456.
d'/ D
=
0.1
chart 60
d'/ D
=
0.05
chart 59
M
P
Mu/ Fck D
PC1
0.019
6859.55
1471.8
0.013
3378.83
1043.4
0.022
6717.00
1697.7
PC2

mpa

0.021
0.013
0.023

1605.9
1040.9
1823.4

As min

Total Moment
1605.9
1040.9
1823.4

435

0.106
0.052
0.104

fck
0.005
0.003
0.005

____Pmax
____Pmin
_____Max Moment

0.066
0.027
0.066

0.0185
0.015
0.0185

____Pmax
____Pmin
_____Max Moment

Pu/fck D

4285.51
1774.20
4260.00

LC
530
541
531

fyd=

mm

max(0.1 x NED / fyd, or 0.002Ac)

As per IRC 112:2011

N ed
0.1 x NED / fyd

(0.1 x6859.551532x1000)/435=

1576.9

sqmm

0.002Ac

0.002x1130973.4=

2261.9

sqmm

2261.95

sqmm

Hence As min =

0.019
Ast =
0.833 x
provide
Ast provided
10.4

max of above two


x
45
=
1130973.4
/100
20 dia bar with
=

CL.16.2.2

design axial compressive force

0.833 %
=

10053

9415
32 nos.

mm2

mm2

DUCTILE DETAILING IN PILES

Ductile detailing has been carried out in piles as the structure is in seismic zone-III. IRC:112Section 17.3.2 has been refered.

i)

Check for Confinement reinforment requirement:nk = NED / AC fck > 0.08


NED

=
=

AC

=
=

fck
fyd
nk =

=
=
=

ii)

Design value of applied axial force


8189 kN
Max axial force extracted from Midas analysis results
0.7854 x
1130976
45 Mpa
435 Mpa
8189
1130976
0.161

1200 ^2

sqmm
sqmm

fcd=
x
x

20.1

1000
45

>0.08, Hence,Confinement in Pile is required

Spacing SL required :i)


5 x Min Longitudianl Bar Dia
100 mm
ii)
1/5 X core dia
Core Domensions
b=

Clause 17.2.1.3

1200

SHEET

31-May-16

100

1100

mm

ASK

STRUCTCON DESIGNS P. L.

NOTE No.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
= (1 / 5) x 1100

SHEET

31-May-16
BY

CHKD

ANK

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

=
Therefore SL =
Provide
iii)

BY

CHKD

ANK

220 mm

Min of I & II
90 mm C/C

100

For Circular hoops the minimum design confining R/F


wd = Max(1.4w req; 0.18)
w req =
Ac

0.37

Ac
Acc

nk

1130976

sqmm

0.7854x1100^2=

950334

sqmm

Confined core Area =

L=

R/F ratio of longitudinal Reinofrcement=


1130976
950334

0.37

0.1609

0.833
+0.13 x

435
20.1

0.0083 -0.01

0.06614
wd = Max(w req; 0.18)

Hence

=
iv)

Acc =

w req =

L-0.01)

+0.13 x fyd
fcd

Gross area of conrete section

0.18

Evaluation of Area of link required


Refer 17.2.1.1-(4)
Dsp=Diameter of spiral or hoop bar
=
1100 mm
wd = wx fyd/fc
0.18

4*Asp
SL x Dsp

0.18 =

0.18 =
Asp=

4*Asw
90 x

1100

0.0002186039

435
20.1

x
X 4 X Asp

205.85172 sqmm

Dia of hoop reqd

16.189 mm

Hence, Provide links

v)

fyd
fcd

16

Hence provide

dia

at

90

16
c/c

Extent of confinenment

Refer Clause 17.2.1.4


nk =

0.1609

Extent of confinement

nk<0.3
= 3 X Dia
mm from pile head
3600

11.0 Pilecap design:PC1

The pilecap has been designed for the pile loads which are extracted from
Midas analysis results.The mometns at the face of pier has been determined in longitudinal and
Transverse direction.For these moment pilecap reinforcement has been designed.
X
0.80

3.00

0.80

Pilecap thk=

1.8 m

0.80

Dist between CL of piles


& face of pier

0.3

1.95

4.60
2.4

SHEET

31-May-16

3.00

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

BY

4
0.80

0.525

4.60
Dist between CL of piles
& face of pier

CHKD

ANK

Y
Longitudinal
direction
3

SHEET

31-May-16
ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

Longitudinal Design:
Load
Comb.
1+3
S.No
KN

Load on pile
2+4
KN

NORMAL

SHEET

31-May-16
BY

CHKD

ANK

Load
Comb.
S.No
Seismic

Load on pile
1+3

2+4

KN

KN

501

9563

10806

613

10438

9997

502

10168

11678

614

10519

10113

503

10282

11736

615

10534

10121

504

9923

11226

616

10486

10053

505

9677

10863

617

10453

10005

506

9374

10716

618

10413

9985

507

10364

11732

619

10545

10120

508

9608

10796

620

10451

10046

509

10269

11597

621

10519

10113

510

10304

11643

622

10530

10104

511

9944

11160

623

11375

10893

512

9643

10842

624

10481

10067

513

9353

10715

625

10431

10052

514

10345

11716

626

10549

10124

515

9656

11175

627

10444

9996

516

10168

11678

628

10532

10102

517

10255

11608

629

10537

10109

518

9985

11486

630

10489

10044

519

9886

11331

631

10449

10002

520

9508

11220

632

10410

9985

521

10397

11758

633

10542

10118

522

9635

11137

634

10448

10041

523

10206

11388

635

10524

10075

524

10259

11499

636

10531

10089

525

10013

11405

637

10498

10077

526

9759

11247

638

10464

10056

527

9483

11151

639

10427

10043

528

10316

11615

640

10538

10105

529

9442

11393

641

10420

9881

530

9906

12062

642

10501

9998

531

9993

12107

643

10516

10005

532

9718

11716

644

10468

9937

533

9529

11438

645

10435

9889

534

9297

11325

646

10395

9869

535

10056

12103

647

10527

10005

536

9513

11677

648

10433

9931

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

SHEET

31-May-16
BY

CHKD

ANK

537

9906

12062

649

10501

9998

538

9972

12008

650

10512

9988

539

9765

11915

651

10476

9972

540

9690

11796

652

10463

9951

541

9400

11711

653

10413

9937

542

10081

12123

654

10531

10008

543

9476

11386

655

10430

9926

544

9983

12000

656

10506

9959

545

10010

12035

657

10513

9974

546

9734

11665

658

10480

9961

547

9503

11421

659

10446

9940

548

9281

11324

660

10410

9927

549

10042

12092

661

10521

9989

550

9497

11647

662

10426

9880

551

9935

11840

663

10514

9987

552

9975

11925

664

10519

9993

553

9786

11853

665

10471

9929

554

9592

11732

666

10431

9886

555

9380

11658

667

10392

9869

556

10019

12014

668

10525

10003

557

9981

9879

558

10445

10549

559

10533

10593

560

10257

10202

561

10069

9924

562

9837

9811

563

10595

10589

564

10053

10163

565

10445

10549

566

10512

10495

567

10305

10401

568

10229

10282

569

9940

10197

570

10621

10609

571

10016

9872

572

10523

10486

573

10550

10521

574

10273

10151

575

10043

9907

576

9821

9810

577

10581

10578

578

10037

10133

579

10474

10326

580

10515

10411

581

10326

10339

582

10131

10218

583

9920

10144

584

10558

10500

585

9442

11393

ASK

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

586

9906

12062

587

9993

12107

588

9718

11716

589

9529

11438

590

9297

11325

591

10056

12103

592

9513

11677

593

9906

12062

594

9972

12008

595

9765

11915

596

9690

11796

597

9400

11711

598

10081

12123

599

9476

11386

600

9983

12000

601

10010

12035

602

9734

11665

603

9503

11421

604

9281

11324

605

10042

12092

606

9497

11647

607

9935

11840

608

9975

11925

609

9786

11853

610

9380

11658

611

9380

11658

612

10019

12014

Case

598

NOTE No.

STRUCTCON DESIGNS P. L.

SHEET

31-May-16
BY

CHKD

ASK

ANK

governs

Moment @ the face of the pier due to pile 1+3 or 2+4

=
=

12123

6365
6121

0.525

4.60

1.325

4.6

1.325

26

1.8

18

243.48763
45
500
6130
4600
1800
50
25
0
1738

=
=
=
=
=
=
=
=
=

N/mm
N/mm
KN-m
mm
mm
mm
mm
mm
mm

=(

M
fc x b

)0.5

=(

6130
6.000

x
x

1000000
4600

)0.5=

471.3

1800
1738

50

Mlim
K
K

=
=
=
=
=

z
z

=
=

dprov

2
2
2
2

KN-m

Characteristic strength of concrete


Characteristic strength of reinforcement
Design Bending Moment
Length of pile cap in trans direction
Gross Depth of pile Cap
Clear Cover
Dia of bars in trans direction
Stirrups
Effective depth (def)

dreqd

mm

0-

>

6130

12.5

mm

R b d
Neutral axis constant
Mu/bdfck
lever arm
d(1+
(1- 4.41 K) )
2
0.9891
d

83321.8
=

KN-m

0.0098

0.95 d

0.95 d

fcd
Fc

Fc
z
Fs

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

Ast reqd

6130
435
=
8537
=
1856
Minimum reinforcement Req.
Ast min
=
0.26
x
=
=
25

BY

2981.55
2981.55

x
x

1000000
0.950
x
for total width

mm2
mm2

ASK

1738

PER METER

fctm

x
500

1000

mm2 per metre

Required spacing

150
31

OR

1738

0.0013
10390.25
2258.75

OR
164.64 mm c/c

mm2 per metre

mm dia bar @

No of bars provided
Ast pro
=

mm c/c spacing

31

3310.6

mm2 per metre

15228.75

mm2

(For entire width)

Check For shear:


Critical section for shear lies at deff from the face of the pier
deff
=
1738
mm
This is beyond pile centreline.
Hence No shear in Longitudinal direction

11.2 Transverse design


Along Transverse direction of pilecap, bending moments are evaluated. The reinforcement has been
designed for the those forces.

Load
Comb.
S.No

CHKD

ANK

M
fyd x z x d

Provided
Total no of bars

SHEET

31-May-16

Load on pile
1+2

3+4

KN

KN

501

12425

7943

502

12762

503

12727

504

Load
Comb.
S.No
Seismic

Load on pile
1+2

3+4

KN

KN

613

10168

11678

9085

614

10255

11608

9292

615

9985

11486

12550

8599

616

9886

11331

505

12390

8150

617

9508

11220

506

12383

7707

618

10397

11758

507

12642

9453

619

9635

11137

508

12344

8059

620

10206

11388

509

12547

9319

621

10259

11499

510

12559

9388

622

10013

11405

511

12427

8676

623

9759

11247

512

12356

8128

624

9483

11151

513

12379

7689

625

10316

11615

514

12584

9478

626

9442

11393

515

12591

8241

627

9906

12062

516

12762

9085

628

4342

8182

517

12660

9203

629

4524

8210

518

12669

8802

630

9476

11386

519

12507

8710

631

9983

12000

NORMAL

x bt
mm2
mm2 per metre

xd

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

SHEET

31-May-16
BY

CHKD

ANK

520

12602

8127

632

10010

12035

521

12661

9493

633

9734

11665

522

12556

8216

634

9503

11421

523

12459

9134

635

9281

11324

524

12500

9259

636

10042

12092

525

12529

8888

637

9497

11647

526

12525

8482

638

9935

11840

527

12554

8079

639

9975

11925

528

12540

9390

640

9786

11853

529

12395

8440

641

9592

11732

530

12653

9315

531

12626

9474

532

12490

8943

533

12368

8598

534

12363

8259

535

12561

9598

536

12522

8668

537

12653

9315

538

12575

9406

539

12582

9098

540

12458

9028

541

12530

8581

542

12576

9629

543

12333

8529

Load

544

12488

9495

Comb.

1+2

3+4

545

12497

9548

S.No

KN

KN

546

12396

9002

547

12342

8582

613

11278

9157

548

12359

8245

614

11323

9309

549

12517

9617

615

11318

9337

550

12495

8649

616

11294

9245

551

12421

9353

617

11273

9185

552

12452

9448

618

11272

9126

553

12474

9164

619

11307

9358

554

12471

8853

620

11300

9197

555

12494

8544

621

11323

9309

556

12483

9550

622

11309

9325

557

12005

7856

623

11552

10717

558

12263

8731

624

11289

9259

559

12236

8890

625

11301

9182

560

12101

8358

626

11309

9364

561

11978

8014

627

11267

9173

562

11973

7675

628

11294

9341

563

12171

9013

629

11296

9350

564

12132

8084

630

11278

9255

565

12263

8731

631

11269

9182

566

12185

8821

632

11272

9123

567

12192

8514

633

11299

9362

568

12068

8444

634

11295

9194

Load on pile

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

BY

12140

7996

635

11282

9316

570

12186

9044

636

11288

9333

571

11943

7945

637

11292

9283

572

12098

8911

638

11291

9229

573

12107

8963

639

11295

9175

574

12007

8418

640

11293

9350

575

11952

7997

641

11301

9001

576

11969

7661

642

11346

9153

577

12127

9032

643

11341

9181

578

12105

8065

644

11317

9088

579

12031

8769

645

11296

9028

580

12062

8864

646

11295

8969

581

12085

8580

647

11330

9202

582

12081

8269

648

11323

9040

583

12104

7960

649

11346

9153

584

12093

8965

650

11332

9169

585

12395

8440

651

11333

9115

586

12653

9315

652

11312

9103

587

12626

9474

653

11324

9025

588

12490

8943

654

11332

9207

589

12368

8598

655

11318

9037

590

12363

8259

656

11305

9160

591

12561

9598

657

11311

9176

592

12522

8668

658

11315

9127

593

12653

9315

659

11314

9073

594

12575

9406

660

11318

9019

595

12582

9098

661

11316

9194

596

12458

9028

662

11290

9016

597

12530

8581

663

11317

9184

598

12576

9629

664

11319

9193

599

12333

8529

665

11301

9098

600

12488

9495

666

11292

9025

601

12497

9548

667

11295

8967

602

12396

9002

668

11322

9205

603

12342

8582

604

12359

8245

605

12517

9617

606

12495

8649

607

12421

9353

608

12452

9448

609

12474

9164

610

12494

8544

611

12494

8544

612

12483

9550

12762

0.300

CHKD

ANK

569

Moment @ the face of the pier due to pile 1+2 or 3+4

SHEET

31-May-16
ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

3828

dprov

)0.5

=(

3828
6.000
1800
1713

x
x
-

R b d

K
K
z
z

=
=
=
=

Neutral axis constant


Mu/bdfck

z
Ast reqd

1000000
4600
50

N/mm
N/mm
KN-m
mm
mm
mm
mm
mm
mm

)0.5=

372.4

mm

12.5

>

3828

80941.3

KN-m

lever arm
d(1+
(1- 4.41 K) )
2
0.9930
d

25

0.0063

0.95 d

0.95 d

M
fyd x z x d
3828.5
435

=
5410
=
1176
Minimum reinforcement Req.
Ast min
=
0.26
x
500
=
2938.65
=
2938.65
Reinforcement Required
=
2938.7
provide
25
mm dia bar @
No of bars provided
Ast pro
=

ASK

mm

Mlim

45
500
3828
4600
1800
50
25
0
1713

=
=
=
=
=
=
=

M
fc x b

CHKD

ANK

=
=

=(

=
=

BY

kNm

Characteristic strength of concrete


Characteristic strength of reinforcement
Design Bending Moment
Width of pile cap in long direction
Gross Depth of pile Cap
Clear Cover
Dia of bars in long direction
Stirrups
Effective depth (def)

dreqd

SHEET

31-May-16

x
x

1000000
0.950

1712.5

for total width

mm2

PER METER

fctm

1000

1713

OR
OR

mm2 per metre

0.0013

x bt
10240.75
2226.25

mm2 per metre

spacing

mm2 per metre

150
30

3203.9

mm2

mm c/c spacing
spacing

154.31

mm2 per metre

Check For shear:


Critical section for shear lies at deff from the face of the pier
deff
=
1713
mm
This is beyond pile centreline.
Hence No shear in transverse direction
11.3 Pilecap design:PC2
Design moments in pilecap PC2 has been evaluated from the pile loads in ULS cases.
The mometns at the face of pier has been determined. Then the resultant moment @ the two orthogonal
directions of pilecap has been evaluated.For these moment pilecap reinforcement has been designed.

167 mm c/c

xd
mm2
mm2 per metre

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

BY

2.4
6
1.14632

0.9213

Dist between
CL of Pile and
face of pier
along b-b axis

Dist between CL of Pile


and face of pier along a-a
axis

2.1213203

3
8

Pile loads

ULS CASE
b
Table showing Pile reactions at point of fixity of Pile for ULS load cases:

a
*All Loads are in kN

L/C

Pile-5

L/C

Pile-5

501
502

2136 2907.862 4129.93 3358.11

585

2191 2845.925 4175.9

586

503

2268

4141.17 3606.46

504

Pile-6

Pile-7

Pile-8

1935 2412.9

4250

3772

1977 2365.4

4286

3897

587

2036 2332.5

4259

3962

2194 2854.661 4169.73 3508.88

588

1979 2372.1

4281

3888

505

2213 2864.988 4095.23 3443.56

589

1994

4224

3837

506

2059 2859.991 3977.57 3176.11

590

1875 2376.2

4133

3632

507

2325 2777.795 4086.52 3634.15

591

2080 2313.1

4217

3984

508

2205 2834.67 4013.74 3383.76

592

1865 2373.2

4121

3613

509

2320 2734.83 3992.88 3578.18

593

1977 2365.4

4286

3897

510

2319 2723.803 3996.13 3591.47

594

2112 2412.5

4255

3955

511

2271 2777.554 4031.94 3525.8

595

1945 2354.5

4176

3766

512

2204 2823.602 4016.93 3397.09

596

1944 2305.7

4023

3661

513

2039 2839.421 3944.82 3144.55

597

1774 2326.6

3964

3412

514

2339 2735.677 3959.09 3562.72

598

2148 2372.8

4202

3978

515

2045 2856.174 3961.8 3151.06

599

1987 2356.7

4161

3792

516

2191 2845.925 4175.9

600

2076 2280.2

4145

3941

517

2367 2907.378 4136.49 3596.43

601

2075 2271.7

4148

3951

518

2149 2831.77 4033.57 3350.92

602

2038

4175

3901

519

2149 2768.081 3833.6

603

1986 2348.3

4164

3802

520

1927 2795.333 3756.81 2888.36

604

1860 2360.4

4108

3608

521

2415 2855.563

3626.46

605

2090 2280.9

4119

3929

522

2069 2821.466 3909.84 3157.7

606

1883 2346.6

4082

3618

523

2451 2830.695 4013.08 3632.9

607

2176 2353.7

4161

3983

524

2433 2812.406 3987.19 3607.5

608

2162 2339.7

4141

3963

525

2215 2763.048 3917.12 3369.56

609

1995 2301.8

4087

3781

526

2089 2778.35 3847.46 3158.11

610

1774 2316.4

3960

3418

527

1927 2782.107 3751.78 2896.73

611

1774 2316.4

3960

3418

528

2411 2793.678 3960.45 3578.09

612

2146 2325.3

4120

3941

529

1935 2412.859 4250.26

613

2663 2838.9

2996

2820

530

1977 2365.374 4285.51 3896.88

614

2670 2830.6

3002

2841

531

2036 2332.507 4258.88 3962.36

615

2681 2824.9

2997

2853

532

1979 2372.071 4280.78 3887.56

616

2671 2831.8

3001

2840

2803

Pile-7

4067

Pile-8

3521

3521

3214

3772

CHKD

ANK

1.95

SHEET

31-May-16

Pile-6

2380

2313

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

BY

1994 2379.989 4223.66 3837.47

617

2673 2833.2

2991

2831

534

1875 2376.158 4133.46 3632.43

618

2653 2832.5

2975

2795

535

2080 2313.141

3983.59

619

2688 2821.6

2990

2856

536

1865 2373.231 4121.36 3613.23

620

2651

2973

2792

537

1977 2365.374 4285.51 3896.88

621

2670 2830.6

3002

2841

538

2112 2412.488 4255.3 3954.67

622

2694 2838.8

2997

2851

539

1945 2354.522 4176.39 3766.45

623

3018 2885.6

3186

3318

540

1944 2305.693 4023.08 3661.5

624

2665 2820.3

2956

2800

541

1774 2326.587 3964.21 3411.82

625

2635 2823.9

2946

2757

542

2148 2372.763

3977.69

626

2700 2831.9

2987

2855

543

1987 2356.745 4161.19 3791.62

627

2672 2829.1

2980

2823

544

2076 2280.201 4145.2 3940.68

628

2687 2815.8

2977

2849

545

2075 2271.747 4147.69 3950.87

629

2687 2814.4

2978

2851

546

2038 2312.956 4175.14 3900.53

630

2681 2821.5

2983

2842

547

1986 2348.259 4163.63 3801.85

631

2672 2827.7

2981

2825

548

1860 2360.387 4108.35 3608.23

632

2650 2829.8

2971

2791

549

2090 2280.851 4119.29 3928.83

633

2690 2815.9

2973

2847

550

1883 2346.622 4081.53 3618.32

634

2654 2827.4

2966

2793

551

2176 2353.697 4160.68 3982.64

635

2705 2828.6

2980

2856

552

2162 2339.676 4140.83 3963.16

636

2702 2826.2

2977

2853

553

1995 2301.835 4087.11 3780.74

637

2673 2819.6

2967

2821

554

1898 2313.567 4033.71 3618.63

638

2657 2821.6

2958

2793

555

1774 2316.447 3960.35 3418.24

639

2635 2822.1

2945

2758

556

2146 2325.318 4120.33 3940.62

640

2700 2823.7

2973

2849

557

2334 3524.684 3701.35 2510.35

641

2638 2973.5

3015

2680

558

2376

642

2645 2965.3

3022

2702

559

2435 3444.333

2700.76

643

2656 2959.6

3017

2713

560

2378 3483.897 3731.87

2626

644

2646 2966.5

3021

2700

561

2393 3491.815 3674.75 2575.87

645

2648 2967.8

3011

2691

562

2274 3487.984 3584.55 2370.83

646

2628 2967.2

2995

2656

563

2479 3424.967 3668.07

647

2663 2956.2

3010

2717

564

2264 3485.057 3572.45 2351.62

648

2626 2966.7

2993

2652

565

2376

3736.6 2635.28

649

2645 2965.3

3022

2702

566

2511 3524.314 3706.39 2693.07

650

2669 2973.5

3016

2712

567

2344 3466.347 3627.48 2504.85

651

2640 2963.4

3003

2679

568

2343 3417.519 3474.17 2399.89

652

2640 2954.9

2976

2661

569

2173 3438.413 3415.3 2150.21

653

2610 2958.5

2966

2617

570

2548 3484.589 3653.11 2716.09

654

2675 2966.6

3007

2716

571

2386 3468.571 3612.28

655

2629

2986

2653

572

2475 3392.027 3596.29 2679.08

656

2680 2963.3

3000

2716

573

2474 3383.573 3598.78 2689.27

657

2677 2960.8

2996

2713

574

2437 3424.782 3626.23 2638.92

658

2648 2954.2

2987

2681

575

2386 3460.085 3614.72 2540.24

659

2632 2956.3

2978

2653

576

2259 3472.213 3559.44 2346.63

660

2610 2956.8

2965

2618

3477.2

3477.2

4202

3736.6 2635.28
3710

2722

2530

CHKD

ANK

533

4217

SHEET

31-May-16

2832

2962

ASK

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

PROJECT:
SUBJECT:

BY

2490 3392.676 3570.38 2667.23

661

2675 2958.3

2993

2709

578

2283 3458.448 3532.62 2356.71

662

2647 2963.8

3000

2683

579

2575 3465.523 3611.77

663

2662 2950.5

2997

2709

580

2561 3451.502 3591.92 2701.56

664

2662

2998

2711

581

2395 3413.661 3538.2 2519.13

665

2656 2956.2

3002

2702

582

2298 3425.392 3484.8

666

2647 2962.3

3000

2685

583

2173 3428.272 3411.44 2156.64

667

2625 2964.4

2991

2651

584

2545 3437.144 3571.42

668

2665 2950.6

2993

2707

2357

2679

CHKD

ASK

ANK

577

2721

SHEET

31-May-16

2949

3018 3524.684 4285.51 3983.59


1774 2271.747 2945.24 2150.21

Longitudinal & Transverse Design:

11.4

Moment @ the face of the pier due to pile 6 or 7 @ a-a axis

=
=

4286
4912.6

1.146

=
=

4176
4787.0

0.921

3521

3244.1

kNm

x
kNm

1.146

0.921

Moment @ the face of the pier due to pile 5 or 8 @ b-b axis

3984

3670.2

x
kNm

kNm

Resultant moment @ x-x & y-y axis


= sqrt( 4912.6^2 + 3670.2^2)
= 6132 kNm

= sqrt( 4787^2 + 3244.1^2)


= 5782.7 kNm

Lets design the reinforcement in two orthogonal directions i.e in x-x and y-y. for max moment =
=
6132.21
kNm

dreqd

dprov

=
=
=
=
=
=
=

=(

M
fc x b

)0.5

=(

6132
6.000
1800
1713

x
x
-

Mlim
K
K

=
=
=
=
=

z
z

=
=

Ast reqd

=
=

45
500
6132
4600
1800
75
25
0
1713

=
=

Characteristic strength of concrete


Characteristic strength of reinforcement
Design Bending Moment
Length of pile cap in trans direction
Gross Depth of pile Cap
Clear Cover
Dia of bars in trans direction
Stirrups
Effective depth (def)

1000000
4600
75

N/mm
N/mm
KN-m
mm
mm
mm
mm
mm
mm

)0.5=

471.4

0-

>

6132

12.5

mm

R b d
Neutral axis constant
Mu/bdfck

80941.3
=

lever arm
d(1+
(1- 4.41 K) )
2
0.9887
d

KN-m

fcd

0.0101

0.95 d

0.95 d

Fc

x
x

1000000
0.950

Fc
z
Fs

M
fyd x z x d
6132
435

mm

1713

NOTE No.

STRUCTCON DESIGNS P. L.

835/N-454
DATE

PROJECT:
SUBJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
=
8665
=
1884
Minimum reinforcement Req.
Ast min
=
0.26
x
=
=

Provided
25
Total no of bars
No of bars provided
Ast pro
=

2938.65
2938.65

for total width


PER METER

x
500

1000

mm2 per metre


mm2 per metre

Required spacing

150
31
31
mm2 per metre

Check For shear:


Critical section for shear lies at deff from the face of the pier
deff
=
1713
This is beyond pile centreline.
Hence No shear in Longitudinal direction

CHKD

ASK

ANK

mm2

mm dia bar @

3310.6

BY

mm2

fctm

SHEET

31-May-16

1713

OR
167 mm c/c

OR

0.0013
10240.75
2226.25

mm c/c spacing

15228.75

mm2

(For entire width)

x bt
mm2
mm2 per metre

xd

STRUCTCON DESIGNS P. L.
PROJECT :

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR

Note No.

835/N-454
Date

Sheet

BETWEEN BKC AND EEH

34

31-May-16

SUBJECT : Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

By

Check
ANK

12.0

ASK

Crack Width checks

The previous section show the reinforcement design of pilecap. The area of steel
provided for both of the pilecaps are governed by the Ast min criteria.
As can be seen, pilecap PC1 the design meoments are higher than PC2, hence crackwidth
only for PC1 has been presented.
Hence the loads on the piles are as follows.
Load
Load on pile
Comb.
1
2
3
4
5
6
7
8
S.No

KN

KN

KN

KN

KN

KN

KN

KN

5000

3632

4083

3191

3642

2442

1969

2134

1667

Load
Comb.
S.No

Load on pile
1+3
2+4

202

KN

KN

6823

7725

For Longitudinal Design


Load
Load on pile
Comb. Max (1+3),(5+7) Max(2+4),(6+8)
S.No
kN
KN
6823
7725
5000

Longitudinal Direction:

Case

5000

Moment @ the face of the pier due to pile 1+3+5+7 or 2+4+6+8


= 7725 x
0.30
=

2318

KN-m

Crack width calculation:


Crack width
= Sr.max ( sm - cm )
Where,
Sr.max
= maximum crack spacing
sm
= mean strain in reinforcement under loading
cm
= mean strain in concrete between crack
Characteristic strength of concrete
Characteristic strength of reinforcement
Design Bending Moment
Width of pile cap
Gross Depth of pile Cap
Clear Cover

fck

cover for crack width


Dia of bars in trans direction
Effective depth

Cr

Modulus of elasticity of reinforcement


Modulus of elasticity of concrete

fy
M
b
h

deff
Es
Ecm

=
=
=
=
=
=

45
500
2318
4600
1800
50

N/mm

=
=
=

60
16
1738

mm

=
=

200000
13600

N/mm
KN-m
mm
mm

mm
mm
N/mm
N/mm

(Refer IRC:112-2011,Clause12.3.4)

STRUCTCON DESIGNS P. L.
PROJECT :

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR

Note No.

835/N-454
Date

Sheet

BETWEEN BKC AND EEH

By

Check
ANK

Area of reinforcement provided


Spacing provided to main bar
Ratio of reinforcement provided
Calculation of depth of neutral axis

b x
2

= 15228.75 mm
=
150
mm
= 0.1905
= m Ast ( d -

31-May-16

SUBJECT : Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

Ast

35

ASK

STRUCTCON DESIGNS P. L.
PROJECT :

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR

Note No.

835/N-454
Date

Sheet

BETWEEN BKC AND EEH

36

31-May-16

SUBJECT : Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

By

Check
ANK

4600
2

* x

2300

* x2

2300 x2 +
OR

-372.3

= 10 x 15229 (

= 2.6E+008

### - ###
x =
306.1
x
= 306.1 mm

1738

ASK

### x

by trial and error

Design constants:
Grade of steel
Grade of concrete
j

... st =
... cb =

Fe500
M45

240

N/mm2

15.00

N/mm2

... m = 10
n
= 0.941
3

<= 0.95

Stress in reinforcement provided


st

M
Ast j d
=
2318
x 1000000
15229 x 0.941 x 1738
= 93.05 N/mm2

IRC 112 eqn 12.6

hc.eff

= lesser of

Es

i. 2.5(h-d)
ii. (h-x)/3
iii. h/2
200000
=
=
13600

p.eff

kt

As
Ac.eff

=
=
=

0.5
3.3 N/mm2
-0.00005 <= 0.00028

fct.eff
sm - cm

Ecm

15228.75
=
718750

= 0.00028
Maximum crack spacing
bar spacing =
170
5(C+/2) =
465 >= 170
Sr.max = 3.4C+
0.425k1k2
eff
3.4
= 204 +
0.021
=
364.5
Crack width Wk
= Sr.max ( sm - cm )

=
=
=

156.3 mm
498 mm
900 mm

14.7

IRC 112 eqn 12.7

0.0212

IRC 112 eqn 12.8

k1
k2

=
=

1
0.5

for epoxy coated

STRUCTCON DESIGNS P. L.
PROJECT :

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

Note No.

835/N-454
Date

Sheet

By

Check
ANK

0.000279
mm
<

0.2

31-May-16

SUBJECT : Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

= 364.5 x
=
0.102

37

mm

Hence Safe
2

ASK

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

13.1 Forces during construction stages

*
*

Part

Axial (kN)

Moment-y
(kN*m)

Moment-z
(kN*m)

CS 1

I[17]

-636

CS 1

J[378]

657

CS 2

I[17]

-2533

162

-104

657

CS 2

J[378]

-1898

1660

-104

657

CS 3

I[17]

-2558

311

94

657

CS 3

J[378]

-1922

-2184

95

657

CS 4

I[17]

-6551

420

3314

657

CS 4

J[378]

-5915

724

3326

657

CS 5

I[17]

-6563

435

3441

657

CS 5

J[378]

-5927

-1798

3453

657

CS 6

I[17]

-9768

1024

605

657

CS 6

J[378]

-9132

2244

608

657

CS 7

I[17]

-9785

944

847

657

CS 7

J[378]

-9149

-2675

851

657

CS 8

I[17]

-12112

1089

1365

657

CS 8

J[378]

-11477

-670

1371

657

CS 9

I[17]

-14034

1286

2299

657

CS 9

J[378]

-13398

1542

2306

657

CS 10

I[17]

-14031

1512

2249

657

CS 10

J[378]

-13395

2399

2255

MT

ML

Max P

-14034

1286

2299

Miin P

-1922

-2184

95

MaxMT

-13395

2399

2255

MaxML

-5927

-1798

3453

Elem

Stage

657
657

Construction stage 2 is not considered critical as the pier cap will be supporterd on staging during pretsressing,
which is not simulated in Midas model.
ULS Partial Safety factor for DL is taken as 1.35 or 1 depending on it's effect i.e adding or relieving to the effect of variable load.
Max P Case
Elem

Load

657 Dead Load

Stage

Axial
(kN)

Moment-y
(kN*m)

Moment-z
(kN*m)

ULS Factors

Axial (kN)

Moment-y Moment-z
(kN*m)
(kN*m)

CS 9

-13982

1105

1743

1.35

-18875

1492

2353

657

Tendon
Primary

CS 9

0.9

657

Tendon
Secondary

CS 9

-51

-21

554

1.1

-57

-23

610

SHEET

CHKD
ASK

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

0
Creep
657
Secondary

CS 9

-1

-70

-1

-70

Shrinkage
Secondary

CS 9

272

-4

272

-4

CS 9

-14034

1286

2299

-18933

1671

2964

657

657 Summation

SHEET

CHKD
ASK

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

NED
NRD

Pu/fck bd

0.115

0.22

Mu T

MuL

Fck bd2

Fck bd2

MuT cap

1.10

Interaction Ratio

MuLcap
MuT cap

15840

0.141

MuLcap

0.048

0.048

11880

0.187

0.275

Stage

Axial
(kN)

Moment-y
(kN*m)

Moment-z
(kN*m)

ULS Factors

Axial (kN)

657 Dead Load

CS 3

-1898

1719

-103

-1898

1719

-103

Tendon
657
Primary

CS 3

0.9

-25

-3821

199

1.1

-27

-4203

219

13

13

-95

-2

-95

-2

-1922

-2184

95

-1925

-2566

115

Min P Case

Elem

Load

657

Tendon
Secondary

CS 3

657

Creep
Secondary

CS 3

657

Shrinkage
Secondary

CS 3
657 Summation CS 3

NED
NRD

Pu/fck bd

0.012

0.02

Mu T

MuL

Fck bd2

Fck bd2

MuT cap

Interaction Ratio

MuLcap
MuT cap

6600

Moment-y Moment-z
(kN*m)
(kN*m)

0.518

MuLcap

0.020

0.020

4950

0.017

0.536

Axial
(kN)

Moment-y
(kN*m)

Moment-z
(kN*m)

ULS Factors

Axial (kN)

-13346

12663

1747

1.35

-18017

17095

2358

0.9

-48

-10011

508

1.1

-53

-11012

559

-2

244

-2

244

-497

-9

-497

-9

-13395

2399

2255

-18071

5831

2918

Max MT Case

Elem

Load

657 Dead Load

Stage
CS 10

657

Tendon
Primary

CS 10

657

Tendon
Secondary

CS 10

657

Creep
Secondary

CS 10

657

Shrinkage
Secondary

CS 10

657 Summation CS 10

NED

0.21

1.09

Moment-y Moment-z
(kN*m)
(kN*m)

SHEET

CHKD
ASK

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

R
SHEET

CHKD
ASK

0
NRD

Pu/fck bd

Mu T

MuL

Fck bd2

Fck bd2

0.110

MuT cap

Interaction Ratio

MuLcap
MuT cap

0.050

0.050

12375

Axial
(kN)
-5891

Moment-y
(kN*m)
4596

Moment-z
(kN*m)
3127

16500

0.471

MuLcap

0.177

0.592

Max ML Case
Elem

Load

657 Dead Load


Tendon
657
Primary
Tendon
657
Secondary
Creep
657
Secondary
Shrinkage
657
Secondary
657 Summation

NED

Stage
CS 5

ULS Factors

Axial (kN)

1.35

-7953

Moment-y Moment-z
(kN*m)
(kN*m)
6205
4221

CS 5

0.9

CS 5

-36

-6295

324

1.1

-40

-6924

357

CS 5

38

38

CS 5

-138

-3

-138

-3

CS 5

-5927

-1798

3453

-7992

-818

4580

0.42

1.26

NRD

Pu/fck bd

Mu T

MuL

Fck bd2

Fck bd2

0.048

0.038

0.038

13.2 Design constants:

grade

Fc

Interaction Ratio

MuLcap
MuT cap

9405

12540

As per IRC 112:2011


Fe 500

Grade of steel
fcd

MuT cap

55

0.087

MuLcap

0.365

as per annexure A-2

kN/m2

Fc

=
=

1
0.8

x
fcd
fyd

=
=
=
=
=
=

0.4561
24.566667
435
500
3.7
0.36488

fyk

fctm
Fs

0.326

N/mm2
N/mm2

z
fc
z

For grade of Concrete


z
=
Fc
=
Height of Pier

=
=

0.36488

(1-0.36488/2) x d

24.6
=

x
(1-0.36488/2)
0.818 d

55

cover

=
=
=
=

0.82
d
7.33
8.0905 m
40
mm

13.3 Section Properties

Transverse Direction

7.33

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

SHEET

CHKD
ASK

0
h = 1.5
Longitudinal
Direction

b= 2

It

1.5

1500 x

Il

rt =sqrt (It/A)

r l =sqrt (Il/A)
Clear cover

dl /h

40

2000

3.00E+06

mm2

^3/12

x 10^12

1.00E+12

mm4

x
1.5
^3/12
= sqrt(1000000000000/3000000)
= sqrt(562500000000/3000000)

x 10^12

5.6250E+11
577
433

mm4

dt /b

0.02625

Minimum Steel
25 dia
25 dia

nos
nos

=
=
=
=

mm2

0.524%
0.524%
0.0095
0.0095

for transverse mom


for long mom

As min
6000 mm2
( As Per IRC : 112-2011 Cl 11.2.2 Table 11.1)
lel
8.0905*1.3*1000
10517.65
y =
24.3
<
32.42
( As Per IRC : 112-2011 Cl 11.2.1)

>

13.4 Effective Length Calculation


8.0905*2*1000

16181
28.0
<
32.42
Check For Second Order moment
z =

Where

lim =
A=
B=
C=

As min = max(0.1 x NED / fyd,0.002Ac)


0.1 x NED / fyd
=
4477
0.002Ac
=
6000
As min =
6000

each for long

31440

let=

20. ABC / n
1 / (1 + 0.2 ef )
( 1 + 2
1.7 - rm

( ,t 0)
ef=
( ,t 0) = 2.9
n=
NED / (Ac / fcd)
n=
0.26
ef=
lim =
32.42
since
lim
>
Second order factor

A=
B=
C=

=
=
Interaction Ratio

consider r m =

0.6 on conservative side

1.930
z/ y
long direction
transverse dir

Hence

Second Order Moment to be be ignored

0
0
( As Per IRC : 112-2011 Cl 8.3.2.4)

Ac.fcd + As fyd
87376.4

MEDy

0.721
1.05 based on minm 0.5% reinf
1.1

M0 EQP/M0ED
Table 6.9 IRC 112

13.5 Biaxial Bending Interaction Ratio

NRD
NRD

(IRC 112:2011 cl 16.2.2)

for transverse mom

31440

t/fck
l/fck

mm

mm

0.035

Provide
32
32

mm

MEDz

mm2

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

0
MRDy

For Rectangular cross section


NED/NRD

MRDz

0.1
1.0

13.6 Pier design forces


Pier design forces are extraced form Midas for ULS cases.

0.7
1.5

1
2

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

SHEET

CHKD
ASK

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

0
Table showing design froces from Midas for Pier-1:case
N ED
MT
ML

ML

MT
second ord

NED
NRD

MT

Total
ML

501

17335

2711

3571

3571

2711

0.198

1.082

502

19218

2892

2941

2941

2892

0.220

1.100

503

19376

2929

2541

2541

2929

0.222

1.101

504

18304

2866

3033

3033

2866

0.209

1.091

505

17493

2748

3171

3171

2748

0.200

1.084

506

16874

2632

3588

3588

2632

0.193

1.078

507

19370

2899

2024

2024

2899

0.222

1.101

508

17263

2702

3094

3094

2702

0.198

1.081

509

18991

2866

1848

1848

2866

0.217

1.098

510

19085

2895

1781

1781

2895

0.218

1.099

511

18101

2836

2472

2472

2836

0.207

1.089

512

17357

2731

3026

3026

2731

0.199

1.082

513

16822

2632

3563

3563

2632

0.193

1.077

514

19217

2812

1707

1707

2812

0.220

1.100

515

17853

2578

3448

3448

2578

0.204

1.087

516

19218

2892

2941

2941

2892

0.220

1.100

517

19188

2689

2524

2524

2689

0.220

1.100

518

18666

2716

2964

2964

2716

0.214

1.095

519

18146

2574

2434

2434

2574

0.208

1.090

520

17579

2451

3375

3375

2451

0.201

1.084

521

19474

2694

2061

2061

2694

0.223

1.102

522

17741

2581

3351

3351

2581

0.203

1.086

523

18689

2680

1957

1957

2680

0.214

1.095

524

18876

2683

1859

1859

2683

0.216

1.097

525

18442

2699

2341

2341

2699

0.211

1.093

526

17925

2583

2805

2805

2583

0.205

1.088

527

17433

2475

3294

3294

2475

0.200

1.083

528

19071

2683

1751

1751

2683

0.218

1.099

529

17032

3642

2344

2344

3642

0.195

1.079

530

18476

3781

1862

1862

3781

0.211

1.093

531

18597

3809

1555

1555

3809

0.213

1.094

532

17775

3761

1931

1931

3761

0.203

1.086

533

17153

3670

2038

2038

3670

0.196

1.080

534

16679

3582

2357

2357

3582

0.191

1.076

535

18592

3786

1158

1158

3786

0.213

1.094

536

17429

3540

2250

2250

3540

0.199

1.083

537

18476

3781

1862

1862

3781

0.211

1.093

538

18452

3625

1541

1541

3625

0.211

1.093

539

18052

3646

1879

1879

3646

0.207

1.089

SHEET

CHKD
ASK

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

540

17654

3537

1472

1472

3537

0.202

1.085

541

17219

3443

2194

2194

3443

0.197

1.081

542

18672

3629

1187

1187

3629

0.214

1.095

543

16976

3635

1978

1978

3635

0.194

1.079

544

18301

3761

1023

1023

3761

0.209

1.091

545

18373

3783

972

972

3783

0.210

1.092

546

17619

3737

1502

1502

3737

0.202

1.085

547

17049

3657

1927

1927

3657

0.195

1.079

548

16639

3581

2338

2338

3581

0.190

1.075

549

18475

3719

915

915

3719

0.211

1.093

550

17343

3542

2176

2176

3542

0.198

1.082

551

18070

3618

1107

1107

3618

0.207

1.089

552

18213

3620

1032

1032

3620

0.208

1.090

553

17881

3632

1401

1401

3632

0.205

1.087

554

17485

3543

1757

1757

3543

0.200

1.083

555

17107

3461

2132

2132

3461

0.196

1.080

556

18363

3621

949

949

3621

0.210

1.092

557

17332

1268

3777

3777

1268

0.198

1.082

558

18775

1407

3295

3295

1407

0.215

1.096

559

18897

1435

2988

2988

1435

0.216

1.097

560

18075

1387

3364

3364

1387

0.207

1.089

561

17453

1296

3471

3471

1296

0.200

1.083

562

16978

1207

3790

3790

1207

0.194

1.079

563

18892

1412

2591

2591

1412

0.216

1.097

564

17729

1166

3683

3683

1166

0.203

1.086

565

18775

1407

3295

3295

1407

0.215

1.096

566

18752

1250

2974

2974

1250

0.215

1.096

567

18352

1272

3312

3312

1272

0.210

1.092

568

17953

1163

2905

2905

1163

0.205

1.088

569

17519

1069

3627

3627

1069

0.200

1.084

570

18972

1255

2620

2620

1255

0.217

1.098

571

17276

1260

3411

3411

1260

0.198

1.081

572

18601

1387

2456

2456

1387

0.213

1.094

573

18673

1409

2405

2405

1409

0.214

1.095

574

17919

1363

2935

2935

1363

0.205

1.088

575

17348

1283

3360

3360

1283

0.199

1.082

576

16939

1207

3771

3771

1207

0.194

1.078

577

18775

1345

2348

2348

1345

0.215

1.096

578

17643

1168

3609

3609

1168

0.202

1.085

579

18370

1244

2540

2540

1244

0.210

1.092

580

18513

1246

2465

2465

1246

0.212

1.093

581

18180

1258

2834

2834

1258

0.208

1.090

SHEET

CHKD
ASK

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

582

17784

1169

3190

3190

1169

0.204

1.086

583

17406

1087

3565

3565

1087

0.199

1.083

584

18662

1246

2382

2382

1246

0.214

1.095

585

17032

3642

2344

2344

3642

0.195

1.079

586

18476

3781

1862

1862

3781

0.211

1.093

587

18597

3809

1555

1555

3809

0.213

1.094

588

17775

3761

1931

1931

3761

0.203

1.086

589

17153

3670

2038

2038

3670

0.196

1.080

590

16679

3582

2357

2357

3582

0.191

1.076

591

18592

3786

1158

1158

3786

0.213

1.094

592

17429

3540

2250

2250

3540

0.199

1.083

593

18476

3781

1862

1862

3781

0.211

1.093

594

18452

3625

1541

1541

3625

0.211

1.093

595

18052

3646

1879

1879

3646

0.207

1.089

596

17654

3537

1472

1472

3537

0.202

1.085

597

17219

3443

2194

2194

3443

0.197

1.081

598

18672

3629

1187

1187

3629

0.214

1.095

599

16976

3635

1978

1978

3635

0.194

1.079

600

18301

3761

1023

1023

3761

0.209

1.091

601

18373

3783

972

972

3783

0.210

1.092

602

17619

3737

1502

1502

3737

0.202

1.085

603

17049

3657

1927

1927

3657

0.195

1.079

604

16639

3581

2338

2338

3581

0.190

1.075

605

18475

3719

915

915

3719

0.211

1.093

606

17343

3542

2176

2176

3542

0.198

1.082

607

18070

3618

1107

1107

3618

0.207

1.089

608

18213

3620

1032

1032

3620

0.208

1.090

609

17881

3632

1401

1401

3632

0.205

1.087

610

17107

3461

2132

2132

3461

0.196

1.080

611

17107

3461

2132

2132

3461

0.196

1.080

612

18363

3621

949

949

3621

0.210

1.092

613

16791

1432

768

768

1432

0.192

1.077

614

17042

1456

684

684

1456

0.195

1.079

615

17063

1461

630

630

1461

0.195

1.079

616

16920

1453

696

696

1453

0.194

1.078

617

16812

1437

714

714

1437

0.192

1.077

618

16729

1422

770

770

1422

0.191

1.076

619

17062

1457

561

561

1457

0.195

1.079

620

16860

1415

751

751

1415

0.193

1.077

621

17042

1456

684

684

1456

0.195

1.079

622

17038

1429

628

628

1429

0.195

1.079

623

19213

1520

327

327

1520

0.220

1.100

SHEET

CHKD
ASK

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

624

16899

1414

616

616

1414

0.193

1.078

625

16823

1398

741

741

1398

0.193

1.077

626

17076

1430

566

566

1430

0.195

1.080

627

16781

1431

704

704

1431

0.192

1.077

628

17011

1453

538

538

1453

0.195

1.079

629

17024

1457

529

529

1457

0.195

1.079

630

16893

1449

621

621

1449

0.193

1.078

631

16794

1435

695

695

1435

0.192

1.077

632

16722

1422

767

767

1422

0.191

1.076

633

17042

1446

519

519

1446

0.195

1.079

634

16845

1415

738

738

1415

0.193

1.077

635

16971

1428

552

552

1428

0.194

1.079

636

16996

1429

539

539

1429

0.195

1.079

637

16938

1431

604

604

1431

0.194

1.078

638

16869

1415

665

665

1415

0.193

1.078

639

16804

1401

731

731

1401

0.192

1.077

640

17022

1429

525

525

1429

0.195

1.079

641

16801

1292

1016

1016

1292

0.192

1.077

642

17052

1316

932

932

1316

0.195

1.079

643

17073

1321

879

879

1321

0.195

1.079

644

16930

1312

944

944

1312

0.194

1.078

645

16822

1297

963

963

1297

0.193

1.077

646

16740

1281

1018

1018

1281

0.192

1.076

647

17072

1317

810

810

1317

0.195

1.079

648

16870

1274

999

999

1274

0.193

1.078

649

17052

1316

932

932

1316

0.195

1.079

650

17048

1289

876

876

1289

0.195

1.079

651

16978

1292

935

935

1292

0.194

1.079

652

16909

1273

864

864

1273

0.194

1.078

653

16834

1257

990

990

1257

0.193

1.077

654

17086

1289

815

815

1289

0.196

1.080

655

16855

1274

987

987

1274

0.193

1.077

656

16982

1288

801

801

1288

0.194

1.079

657

17006

1288

788

788

1288

0.195

1.079

658

16949

1290

852

852

1290

0.194

1.078

659

16880

1275

914

914

1275

0.193

1.078

660

16814

1260

979

979

1260

0.192

1.077

661

17032

1288

773

773

1288

0.195

1.079

662

16791

1290

952

952

1290

0.192

1.077

663

17022

1312

786

786

1312

0.195

1.079

664

17034

1316

777

777

1316

0.195

1.079

665

16903

1308

869

869

1308

0.193

1.078

SHEET

CHKD
ASK

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

R
SHEET

CHKD
ASK

666

16804

1294

943

943

1294

0.192

1.077

667

16733

1281

1015

1015

1281

0.192

1.076

668

17052

1305

767

767

1305

0.195

1.079

13.7 Design check for Pier


Table showing moment capacities and interaction ratios :case
Pu/fck bd
Mu l
Fck bd2

Mut

MuL cap

MuTcap

Fck bd2

ML
MuL cap

MT
MuTcap

Interaction Ratio

501

0.105

0.039

0.039

9653

12870

0.370

0.211

0.526

502

0.116

0.041

0.041

10148

13530

0.290

0.214

0.439

503

0.117

0.041

0.041

10148

13530

0.250

0.216

0.403

504

0.111

0.040

0.040

9900

13200

0.306

0.217

0.464

505

0.106

0.039

0.039

9653

12870

0.329

0.214

0.487

506

0.102

0.039

0.039

9653

12870

0.372

0.205

0.525

507

0.117

0.041

0.041

10148

13530

0.199

0.214

0.353

508

0.105

0.039

0.039

9653

12870

0.321

0.210

0.477

509

0.115

0.041

0.041

10148

13530

0.182

0.212

0.336

510

0.116

0.041

0.041

10148

13530

0.175

0.214

0.332

511

0.110

0.040

0.040

9900

13200

0.250

0.215

0.408

512

0.105

0.039

0.039

9653

12870

0.314

0.212

0.472

513

0.102

0.039

0.039

9653

12870

0.369

0.204

0.523

514

0.116

0.041

0.041

10148

13530

0.168

0.208

0.318

515

0.108

0.039

0.039

9653

12870

0.357

0.200

0.501

516

0.116

0.041

0.041

10148

13530

0.290

0.214

0.439

517

0.116

0.041

0.041

10148

13530

0.249

0.199

0.386

518

0.113

0.040

0.040

9900

13200

0.299

0.206

0.444

519

0.110

0.040

0.040

9900

13200

0.246

0.195

0.385

520

0.107

0.039

0.039

9653

12870

0.350

0.190

0.486

521

0.118

0.041

0.041

10148

13530

0.203

0.199

0.341

522

0.108

0.039

0.039

9653

12870

0.347

0.201

0.492

523

0.113

0.040

0.040

9900

13200

0.198

0.203

0.344

524

0.114

0.040

0.040

9900

13200

0.188

0.203

0.334

525

0.112

0.040

0.040

9900

13200

0.236

0.204

0.383

526

0.109

0.040

0.040

9900

13200

0.283

0.196

0.423

527

0.106

0.039

0.039

9653

12870

0.341

0.192

0.480

528

0.116

0.041

0.041

10148

13530

0.173

0.198

0.314

529

0.103

0.039

0.039

9653

12870

0.243

0.283

0.473

530

0.112

0.040

0.040

9900

13200

0.188

0.286

0.416

531

0.113

0.040

0.040

9900

13200

0.157

0.289

0.389

532

0.108

0.039

0.039

9653

12870

0.200

0.292

0.437

533

0.104

0.039

0.039

9653

12870

0.211

0.285

0.444

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

R
SHEET

CHKD
ASK

534

0.101

0.038

0.038

9405

12540

0.251

0.286

0.485

535

0.113

0.040

0.040

9900

13200

0.117

0.287

0.351

536

0.106

0.039

0.039

9653

12870

0.233

0.275

0.454

537

0.112

0.040

0.040

9900

13200

0.188

0.286

0.416

538

0.112

0.040

0.040

9900

13200

0.156

0.275

0.375

539

0.109

0.040

0.040

9900

13200

0.190

0.276

0.410

540

0.107

0.039

0.039

9653

12870

0.153

0.275

0.376
contunued..

Table showing moment capacities and interaction ratios :case


Pu/fck bd
Mu l
Fck bd2

Mut

MuL cap

MuTcap

Fck bd2

ML
MuL cap

MT
MuTcap

Interaction Ratio

541

0.104

0.039

0.039

9653

12870

0.227

0.268

0.442

542

0.113

0.040

0.040

9900

13200

0.120

0.275

0.341

543

0.103

0.039

0.039

9653

12870

0.205

0.282

0.437

544

0.111

0.040

0.040

9900

13200

0.103

0.285

0.338

545

0.111

0.040

0.040

9900

13200

0.098

0.287

0.335

546

0.107

0.039

0.039

9653

12870

0.156

0.290

0.394

547

0.103

0.039

0.039

9653

12870

0.200

0.284

0.433

548

0.101

0.038

0.038

9405

12540

0.249

0.286

0.484

549

0.112

0.040

0.040

9900

13200

0.092

0.282

0.325

550

0.105

0.039

0.039

9653

12870

0.225

0.275

0.447

551

0.110

0.040

0.040

9900

13200

0.112

0.274

0.336

552

0.110

0.040

0.040

9900

13200

0.104

0.274

0.329

553

0.108

0.040

0.040

9900

13200

0.142

0.275

0.365

554

0.106

0.039

0.039

9653

12870

0.182

0.275

0.405

555

0.104

0.039

0.039

9653

12870

0.221

0.269

0.438

556

0.111

0.040

0.040

9900

13200

0.096

0.274

0.321

557

0.105

0.039

0.039

9653

12870

0.391

0.099

0.444

558

0.114

0.040

0.040

9900

13200

0.333

0.107

0.386

559

0.115

0.040

0.040

9900

13200

0.302

0.109

0.356

560

0.110

0.040

0.040

9900

13200

0.340

0.105

0.395

561

0.106

0.039

0.039

9653

12870

0.360

0.101

0.413

562

0.103

0.039

0.039

9653

12870

0.393

0.094

0.443

563

0.114

0.040

0.040

9900

13200

0.262

0.107

0.316

564

0.107

0.039

0.039

9653

12870

0.382

0.091

0.425

565

0.114

0.040

0.040

9900

13200

0.333

0.107

0.386

566

0.114

0.040

0.040

9900

13200

0.300

0.095

0.343

567

0.111

0.040

0.040

9900

13200

0.335

0.096

0.380

568

0.109

0.040

0.040

9900

13200

0.293

0.088

0.335

569

0.106

0.039

0.039

9653

12870

0.376

0.083

0.414

570

0.115

0.041

0.041

10148

13530

0.258

0.093

0.300

571

0.105

0.039

0.039

9653

12870

0.353

0.098

0.406

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

R
SHEET

CHKD
ASK

572

0.113

0.040

0.040

9900

13200

0.248

0.105

0.303

573

0.113

0.040

0.040

9900

13200

0.243

0.107

0.299

574

0.109

0.040

0.040

9900

13200

0.296

0.103

0.351

575

0.105

0.039

0.039

9653

12870

0.348

0.100

0.402

576

0.103

0.039

0.039

9653

12870

0.391

0.094

0.441

577

0.114

0.040

0.040

9900

13200

0.237

0.102

0.289

578

0.107

0.039

0.039

9653

12870

0.374

0.091

0.418

579

0.111

0.040

0.040

9900

13200

0.257

0.094

0.302

580

0.112

0.040

0.040

9900

13200

0.249

0.094

0.294

case

Pu/fck bd

Mu l

Mut

Fck bd2

Fck bd2

MuL cap

MuTcap

ML
MuL cap

MT
MuTcap

Interaction Ratio

581

0.110

0.040

0.040

9900

13200

0.286

0.095

0.333

582

0.108

0.039

0.039

9653

12870

0.331

0.091

0.374

583

0.105

0.039

0.039

9653

12870

0.369

0.084

0.409

584

0.113

0.040

0.040

9900

13200

0.241

0.094

0.286

585

0.103

0.039

0.039

9653

12870

0.243

0.283

0.473

586

0.112

0.040

0.040

9900

13200

0.188

0.286

0.416

587

0.113

0.040

0.040

9900

13200

0.157

0.289

0.389

588

0.108

0.039

0.039

9653

12870

0.200

0.292

0.437

589

0.104

0.039

0.039

9653

12870

0.211

0.285

0.444

590

0.101

0.038

0.038

9405

12540

0.251

0.286

0.485

591

0.113

0.040

0.040

9900

13200

0.117

0.287

0.351

592

0.106

0.039

0.039

9653

12870

0.233

0.275

0.454

593

0.112

0.040

0.040

9900

13200

0.188

0.286

0.416

594

0.112

0.040

0.040

9900

13200

0.156

0.275

0.375

595

0.109

0.040

0.040

9900

13200

0.190

0.276

0.410

596

0.107

0.039

0.039

9653

12870

0.153

0.275

0.376

597

0.104

0.039

0.039

9653

12870

0.227

0.268

0.442

598

0.113

0.040

0.040

9900

13200

0.120

0.275

0.341

599

0.103

0.039

0.039

9653

12870

0.205

0.282

0.437

600

0.111

0.040

0.040

9900

13200

0.103

0.285

0.338

601

0.111

0.040

0.040

9900

13200

0.098

0.287

0.335

602

0.107

0.039

0.039

9653

12870

0.156

0.290

0.394

603

0.103

0.039

0.039

9653

12870

0.200

0.284

0.433

604

0.101

0.038

0.038

9405

12540

0.249

0.286

0.484

605

0.112

0.040

0.040

9900

13200

0.092

0.282

0.325

606

0.105

0.039

0.039

9653

12870

0.225

0.275

0.447

607

0.110

0.040

0.040

9900

13200

0.112

0.274

0.336

608

0.110

0.040

0.040

9900

13200

0.104

0.274

0.329

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

SHEET

CHKD
ASK

609

0.108

0.040

0.040

9900

13200

0.142

0.275

0.365

610

0.104

0.039

0.039

9653

12870

0.221

0.269

0.438

611

0.104

0.039

0.039

9653

12870

0.221

0.269

0.438

612

0.111

0.040

0.040

9900

13200

0.096

0.274

0.321

613

0.102

0.039

0.039

9653

12870

0.080

0.111

0.159

614

0.103

0.039

0.039

9653

12870

0.071

0.113

0.153

615

0.103

0.039

0.039

9653

12870

0.065

0.114

0.148

616

0.103

0.039

0.039

9653

12870

0.072

0.113

0.154

617

0.102

0.039

0.039

9653

12870

0.074

0.112

0.155

618

0.101

0.038

0.038

9405

12540

0.082

0.113

0.164

619

0.103

0.039

0.039

9653

12870

0.058

0.113

0.142

620

0.102

0.039

0.039

9653

12870

0.078

0.110

0.156

621

0.103

0.039

0.039

9653

12870

0.071

0.113

0.153

622

0.103

0.039

0.039

9653

12870

0.065

0.111

0.146

623

0.116

0.041

0.041

10148

13530

0.032

0.112

0.113

624

0.102

0.039

0.039

9653

12870

0.064

0.110

0.144

625

0.102

0.039

0.039

9653

12870

0.077

0.109

0.155

626

0.103

0.039

0.039

9653

12870

0.059

0.111

0.140

627

0.102

0.038

0.038

9405

12540

0.075

0.114

0.158

628

0.103

0.039

0.039

9653

12870

0.056

0.113

0.139

629

0.103

0.039

0.039

9653

12870

0.055

0.113

0.139

630

0.102

0.039

0.039

9653

12870

0.064

0.113

0.147

631

0.102

0.039

0.039

9653

12870

0.072

0.111

0.153

632

0.101

0.038

0.038

9405

12540

0.082

0.113

0.163

633

0.103

0.039

0.039

9653

12870

0.054

0.112

0.137

634

0.102

0.039

0.039

9653

12870

0.076

0.110

0.155

635

0.103

0.039

0.039

9653

12870

0.057

0.111

0.139

636

0.103

0.039

0.039

9653

12870

0.056

0.111

0.138

637

0.103

0.039

0.039

9653

12870

0.063

0.111

0.144

638

0.102

0.039

0.039

9653

12870

0.069

0.110

0.149

639

0.102

0.039

0.039

9653

12870

0.076

0.109

0.154

640

0.103

0.039

0.039

9653

12870

0.054

0.111

0.137

641

0.102

0.039

0.039

9653

12870

0.105

0.100

0.173

642

0.103

0.039

0.039

9653

12870

0.097

0.102

0.166

643

0.103

0.039

0.039

9653

12870

0.091

0.103

0.161

644

0.103

0.039

0.039

9653

12870

0.098

0.102

0.167

645

0.102

0.039

0.039

9653

12870

0.100

0.101

0.168

646

0.101

0.038

0.038

9405

12540

0.108

0.102

0.177

647

0.103

0.039

0.039

9653

12870

0.084

0.102

0.154

648

0.102

0.039

0.039

9653

12870

0.104

0.099

0.170

649

0.103

0.039

0.039

9653

12870

0.097

0.102

0.166

650

0.103

0.039

0.039

9653

12870

0.091

0.100

0.158

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

R
SHEET

CHKD
ASK

651

0.103

0.039

0.039

9653

12870

0.097

0.100

0.164

652

0.102

0.039

0.039

9653

12870

0.090

0.099

0.157

653

0.102

0.039

0.039

9653

12870

0.103

0.098

0.168

654

0.104

0.039

0.039

9653

12870

0.084

0.100

0.153

655

0.102

0.039

0.039

9653

12870

0.102

0.099

0.168

656

0.103

0.039

0.039

9653

12870

0.083

0.100

0.152

657

0.103

0.039

0.039

9653

12870

0.082

0.100

0.150

658

0.103

0.039

0.039

9653

12870

0.088

0.100

0.157

659

0.102

0.039

0.039

9653

12870

0.095

0.099

0.162

660

0.102

0.039

0.039

9653

12870

0.101

0.098

0.167

661

0.103

0.039

0.039

9653

12870

0.080

0.100

0.149

662

0.102

0.039

0.039

9653

12870

0.099

0.100

0.167

663

0.103

0.039

0.039

9653

12870

0.081

0.102

0.152

664

0.103

0.039

0.039

9653

12870

0.081

0.102

0.151

665

0.102

0.039

0.039

9653

12870

0.090

0.102

0.160

666

0.102

0.039

0.039

9653

12870

0.098

0.101

0.166

667

0.101

0.038

0.038

9405

12540

0.108

0.102

0.177

668

0.103

0.039

0.039

9653

12870

0.079

0.101

0.150

Max Interaction ratio=

0.526 < 1.00

Hence OK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

0
13.8 SLS Rare Combination Results
ELEMENT 657 =
P-1

Elem

Load

Axial
(kN)

Moment-y
(kN*m)

Moment-z
(kN*m)

657

669

-12715

1887

-2137

657

670

-13971

2007

-1717

657

671

-14076

2032

-1450

657

672

-13361

1990

-1778

657

673

-12820

1911

-1870

657

674

-12408

1834

-2148

657

675

-14072

2012

-1105

657

676

-13060

1798

-2054

657

677

-13971

2007

-1717

657

678

-13950

1872

-1438

657

679

-13602

1890

-1732

657

680

-13256

1795

-1378

657

681

-12878

1714

-2006

657

682

-14141

1875

-1130

657

683

-12986

1800

-1990

657

684

-13618

1866

-1061

657

685

-13742

1868

-995

657

686

-13453

1878

-1316

657

687

-13109

1801

-1626

657

688

-12780

1729

-1952

657

689

-13872

1868

-923

657

690

-12667

1880

-1818

657

691

-13819

1990

-988

657

692

-13881

2009

-943

657

693

-13225

1970

-1404

657

694

-12730

1900

-1773

657

695

-12373

1834

-2131

657

696

-13970

1954

-894

657

697

-12835

937

-2710

657

698

-14090

1058

-2290

657

699

-14196

1082

-2023

657

700

-13481

1041

-2351

657

701

-12940

961

-2443

657

702

-12527

884

-2721

657

703

-14192

1062

-1678

657

704

-13180

849

-2628

657

705

-14090

1058

-2290

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

SHEET

CHKD
ASK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

0
657

706

-14070

922

-2012

657

707

-13722

940

-2305

657

708

-13375

846

-1952

657

709

-12997

764

-2579

657

710

-14261

926

-1703

657

711

-12786

931

-2392

657

712

-13938

1040

-1561

657

713

-14001

1060

-1516

657

714

-13345

1020

-1977

657

715

-12849

950

-2347

657

716

-12493

884

-2705

657

717

-14090

1004

-1467

657

718

-13105

850

-2563

657

719

-13738

916

-1634

657

720

-13862

918

-1569

657

721

-13573

929

-1890

657

722

-13228

851

-2199

657

723

-12900

780

-2525

657

724

-13992

918

-1497

657

725

-12504

2506

-1260

657

726

-13446

2597

-945

657

727

-13525

2615

-745

657

728

-12989

2584

-991

657

729

-12583

2525

-1060

657

730

-12274

2467

-1269

657

731

-13522

2600

-486

657

732

-12763

2440

-1199

657

733

-13446

2597

-945

657

734

-13430

2495

-737

657

735

-13169

2509

-956

657

736

-12910

2438

-692

657

737

-12626

2377

-1162

657

738

-13574

2498

-505

657

739

-12707

2442

-1150

657

740

-13181

2491

-453

657

741

-13274

2492

-404

657

742

-13058

2500

-645

657

743

-12799

2442

-877

657

744

-12553

2388

-1122

657

745

-13372

2493

-350

657

746

-12468

2502

-1021

657

747

-13332

2584

-398

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

SHEET

CHKD
ASK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

0
657

748

-13379

2598

-365

657

749

-12887

2569

-711

657

750

-12515

2516

-988

657

751

-12248

2467

-1256

657

752

-13445

2557

-328

657

753

-12704

924

-2216

657

754

-13645

1014

-1901

657

755

-13724

1033

-1701

657

756

-13188

1001

-1946

657

757

-12783

942

-2015

657

758

-12473

884

-2224

657

759

-13721

1018

-1442

657

760

-12963

857

-2154

657

761

-13645

1014

-1901

657

762

-13630

912

-1692

657

763

-13369

926

-1912

657

764

-13109

855

-1647

657

765

-12826

794

-2118

657

766

-13773

915

-1461

657

767

-12907

859

-2106

657

768

-13381

908

-1409

657

769

-13474

910

-1360

657

770

-13257

918

-1600

657

771

-12999

859

-1833

657

772

-12753

806

-2077

657

773

-13572

910

-1305

657

774

-12447

884

-2212

657

775

-12283

884

-2402

657

776

-12668

919

-1977

657

777

-13531

1001

-1354

657

778

-13579

1016

-1320

657

779

-13087

986

-1666

657

780

-12715

934

-1943

14.0 DUCTILE DETAILING IN PIERS


Ductile detailing has been carried out in pier as the structure is in seismic zone-III. IRC:112Section 17.2 has been refered.
14.1 Check for Confinement reinforment requirement:nk = NED / AC fck > 0.08
NED

=
=

Design value of applied axial force


19474.37 kN
Max axial force extracted from MIDAS analysis results

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

SHEET

CHKD
ASK

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

SHEET

CHKD
ASK

0
AC

=
=

2.00
3

fck

55 Mpa

nk =

19474.37
3000000

1.5

0.12

Let provide

sqm
sqm

x
x

1000
55

>0.08, Hence,Confinement in Pier is required

6 legged

12 dia links

Area of links Asw =

14.2 Spacing SL required :i)


5 x Min Longitudianl Bar Dia

678.6 sqmm

Cluase 17.2.1.3
100 mm

ii)

1/5 X smallest core dimensions


Core Domensions

b=
d=

1500
2000

= (1 / 5) x 1420
=
284 mm
Min of i & ii
=
100 mm C/C

Therefore SL =
Provide

80
80

=
=

w =

Asw
SL x b

678.6

100 x
0.0047789

For rectangular stirrups the minimum design confining R/F


wd = Max(w req; 0.12)
w req =
Ac

0.37

Ac
Acc

nk

Confined core Area =

L=

R/F ratio of longitudinal Reinofrcement=

0.37

0.03793796

L-0.01)

fyd
fcd
=

Acc =

1420x1920=

+0.13 x
3.0E+06
0.1180265
2.7E+06

3.00E+06

sqmm

2726400

sqmm

0.524%

435.0
24.5667

0.524% -0.01

wd = Max(w req; 0.12)

Hence

=
14.5

+0.13 x

Gross area of conrete section

w req =

0.12

Evaluation of Area of link required about tranverse direction


Refer 17.2.1.1-(4)
b=Dimension of concrete core perpendicuar to the confiment direction under considerarion
=
1420 mm
wd = wx fyd/fc
0.12
0.12 =

Asw
SL x b

mm
mm

100

14.3 Volumetric ratio of transverse reinforment

14.4

1420
1920

x
Asw

fyd
fc
x

435.0

1420

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix

0
100 x
0.12 =

0.0001246966

Asw=

24.567

X Asw

962.34 sqmm

No. of legs required =

8.509 provide
Dia =
12
dia

Hence, Provide links

14.5.1

1420

8
12
legged

mm
100

c/c

Extent of confinenment

Refer Clause 17.2.1.4


nk =

0.118026

nk<0.3

Extent of coninement is the larger of below two:1)


2)

14.6

Depth of pier section within the plane of bend=


1420 mm
(Perpendicular to the axis of rotation of hinge)
Dist from the point of max design to the point where design moment is 80% of the max moment
Provide confining reinforcement for the whole height of column

Evaluation of Area of link required about Longitudinal direction


Refer 17.2.1.1-(4)
b=Dimension of concrete core perpendicuar to the confiment direction under considerarion
=
1920 mm
wd = wx fyd/fc
0.12
0.12

Asw
SL x b

fyd
fcd

Asw
100 x

0.12

Asw=
No. of legs required =
Hence, Provide links

1920

435
24.567

9.729076893256E-005 X Asw
1233 sqmm
10.9 provide
12

dia

10
10

legged

100

c/c

SHEET

CHKD
ASK

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT:

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

R
SHEET

CHKD

Forces during construction stages

*
*

Moment- Moment-z
y (kN*m) (kN*m)

Elem

Stage

Part

Axial (kN)

658

CS 1

I[377]

-636

658

CS 1

J[379]

658

CS 2

I[377]

-2236

-390

-265

658

CS 2

J[379]

-1601

-1411

-1360

658

CS 3

I[377]

-2212

-44

-185

658

CS 3

J[379]

-1576

1658

1639

658

CS 4

I[377]

-3821

-2529

642

658

CS 4

J[379]

-3185

-2728

412

658

CS 5

I[377]

-3809

-2303

699

658

CS 5

J[379]

-3173

-771

2323

658

CS 6

I[377]

-4992

-1146

-335

658

CS 6

J[379]

-4356

-1977

-1229

658

CS 7

I[377]

-4975

-708

-220

658

CS 7

J[379]

-4339

1763

2424

658

CS 8

I[377]

-5891

-1384

-184

658

CS 8

J[379]

-5255

-180

1099

658

CS 9

I[377]

-6912

-2377

86

658

CS 9

J[379]

-6276

-2547

-106

658

CS 10

I[377]

-6915

-2608

-88

658

CS 10

J[379]

-6279

-3208

-741

MT

ML

Max P

-6915

-2608

-88

Miin P

-1576

1658

1639

MaxMT

-6279

-3208

-88

MaxML

-4339

1763

2424

Construction stage 2 is not considered critical as the pier cap will be supporterd on staging during pretsressing,
which is not simulated in Midas model.
ULS Partial Safety factor for DL is taken as 1.35 or 1 depending on it's effect i.e adding or relieving to the effect of variable load.

Max P Case
Elem

Load

Stage

Axial
(kN)

Moment-y Moment-z
(kN*m)
(kN*m)

ULS
Factors

Axial
(kN)

Moment-y Moment-z
(kN*m)
(kN*m)

ASK

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT:

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

R
SHEET

CHKD
ASK

658

Dead Load

CS 10

-6964

-3302

-91

1.35

-9401

-4457

-123

658

Tendon
Primary

CS 10

0.9

658

Tendon
Secondary

CS 10

48

967

295

1.1

53

1063

325

658

Creep
Secondary

CS 10

211

212

211

212

658

Shrinkage
Secondary

CS 10

-1

-483

-504

-1

-483

-504

658

Summation

CS 10

-6915

-2608

-88

-9348

-3667

-90

NED
NRD

0.11

Pu/fck bd

0.057

Mut

Mu l

Fck bd2

Fck bd2

0.040

0.040

MuTcap

1.01

Interaction Ratio

MuL cap
MuTcap

9900

13200

0.370

MuL cap

0.007

0.375

Min P Case

Elem

Load

Stage

Axial
(kN)

Moment-y Moment-z
(kN*m)
(kN*m)

ULS
Factors

Axial
(kN)

Moment-y Moment-z
(kN*m)
(kN*m)

658

Dead Load

CS 3

-1600

-1449

-1402

-1600

-1449

-1402

658

Tendon
Primary

CS 3

0.9

658

Tendon
Secondary

CS 3

25

3054

2983

1.1

27

3359

3281

658

Creep
Secondary

CS 3

-7

-9

-7

-9

658

Shrinkage
Secondary

CS 3

61

68

61

68

658

Summation

CS 3

-1576

1658

1639

-1573

1964

1938

NED
NRD

Pu/fck bd

0.010

0.02

Mut

Mu l

Fck bd2

Fck bd2

0.020

0.020

MuTcap

Interaction Ratio

MuL cap
MuTcap

4950

6600

0.397

MuL cap

0.294

0.690

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT:

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

R
SHEET

CHKD
ASK

Max MT Case

Elem

Load

Stage

Axial
(kN)

Moment-y Moment-z
(kN*m)
(kN*m)

ULS
Factors

Axial
(kN)

Moment-y Moment-z
(kN*m)
(kN*m)

658

Dead Load

CS 10

-6328

-11181

-8546

1.35

-8543

-15095

-11538

658

Tendon
Primary

CS 10

0.9

658

Tendon
Secondary

CS 10

48

7789

7607

1.1

53

8568

8368

658

Creep
Secondary

CS 10

-135

-159

-135

-159

658

Shrinkage
Secondary

CS 10

-1

320

357

-1

320

357

658

Summation

CS 10

-6279

-3208

-741

-8489

-6342

-2971

0.10

NED
NRD

Pu/fck bd

0.051

Mut

Mu l

Fck bd2

Fck bd2

0.038

0.038

MuTcap

1.00

Interaction Ratio

MuL cap
MuTcap

9405

12540

0.674

MuL cap

0.237

0.912

Max ML Case

Elem

Load

Stage

Axial
(kN)

Moment-y Moment-z
(kN*m)
(kN*m)

ULS
Factors

Axial
(kN)

Moment-y Moment-z
(kN*m)
(kN*m)

658

Dead Load

CS 7

-4392

-6991

-6134

-4392

-6991

-6134

658

Tendon
Primary

CS 7

0.9

658

Tendon
Secondary

CS 7

52

8672

8470

1.1

57

9539

9317

658

Creep
Secondary

CS 7

-23

-30

-23

-30

658

Shrinkage
Secondary

CS 7

105

118

105

118

658

Summation

CS 7

-4339

1763

2424

-4334

2630

3271

0.05

NED
NRD

Pu/fck bd

Mut

Mu l

Fck bd2

Fck bd2

Interaction Ratio
MuTcap

MuL cap
MuTcap

MuL cap

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT:

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

0.026

0.028

0.028

15.2 Design constants:

grade

Fc

9240

0.380

0.354

As per IRC 112:2011 as per annexure A-2


Fe 500

55
x
N/mm2
fcd
fyd

Grade of steel
fcd

6930

Fc

fyk

fctm
x

Fs

SHEET

CHKD
ASK

0.734

=
=
=

1
0.8
0.4561

=
=

24.566667
435

=
=
=

500
3.7
0.36488

N/mm2
N/mm2

z
fc
z

=
=

0.36488

24.6
=

(1-0.36488/2) x d

For grade of Concrete


z
=
Fc
=
Height of Pier

x
(1-0.36488/2)
0.818 d

7.33

55
=
=
=
=

cover

0.82
d
7.33
8.0905 m
40 mm

15.3 Section Properties

Transverse Direction

h= 2
Longitudinal
Direction

b = 1.5

2000 x

It

Il

1.5

r t =sqrt (It/A)

rl =sqrt (Il/A)
Clear cover

dl /h

1500

3.00E+06

mm2

x 10^12

5.63E+11

mm4

x
2
^3/12
x 10^12
= sqrt(562500000000/3000000)
= sqrt(1000000000000/3000000)

1.0000E+12
433
577

mm4
mm
mm

40

1.5

^3/12

mm

0.026

dt /b

25 dia
25 dia

for transverse mom

Provide
32
32

nos
nos

=
=

0.035

Minimum Steel

As min = max(0.1 x NED / fyd,0.002Ac)


0.1 x NED / fyd =
2294
0.002Ac
=
6000
As min =
6000

each for long

31440

mm2

0.524%
0.524%
0.0095
0.0095

t/fck
=
l/fck
=
Additional reinforcement at top =
Total reinforcment=

for transverse mom


for long mom

31440+0

(IRC 112:2011 cl 16.2.2)

0 tor
=

0=
31440 =

0
1.048

mm2

mm2

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT:

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

8.0905*1.5*1000

12135.75
28.0
<
52.65
Check For Second Order moment
z =

Where

lim =
A=
B=
C=

20. ABC / n
1 / (1 + 0.2 ef )
( 1 + 2
1.7 - rm

A=
B=
C=

( ,t 0)
ef=
M0 EQP/M0ED
( ,t 0) = 2.9
Table 6.3 IRC 112
n=
NED / (Ac / fcd)
n=
0.14
ef=
0.963
lim =
52.65
since
lim
>
z/ y
Second order factor
long direction
transverse dir

Hence

0.6 on conservative side

Second Order Moment to be be ignored

0
0

1.0 Biaxial Bending Interaction Ratio


NRD

( As Per IRC : 112-2011 Cl 8.3.2.4)

Ac.fcd + As fyd
72927.6
86604.0

NRD

=
Interaction Ratio

CHKD

0.838
1.05 based on minm 0.5% reinf
1.1

consider r m =

+
kN

13676.4

MEDy
MRDy

MEDz
MRDz

For Rectangular cross section


NED/NRD

0.1
1.0

0.7
1.5

1
2

15.6 Pier design forces


Pier design forces are extraced form STAAD for ULS cases.
Table showing design froces from STAAD for Pier-2 :N ED
MT
ML
case
My
Mz

ML

MT

NED
NRD

ML

MT
second ord

Total

NORMAL

501

9498.93

523

997

997

523

0.110

1.008

502

9700.95

217

790

790

217

0.112

1.010

503

9786.03

111

590

590

111

0.113

1.011

504

9694.08

226

807

807

226

0.112

1.010

505

9584.08

195

796

796

195

0.111

1.009

506

9039.2

724

918

918

724

0.104

1.004

507

9790.89

345

464

464

345

0.113

1.011

508

9403.85

169

724

724

169

0.109

1.007

509

9593.01

399

349

349

399

0.111

1.009

SHEET

/fck
0.019
( As Per IRC : 112-2011 Cl 11.2.2 Table 11.1)
lel
8.0905*1.3*1000
10518
y =
18.2
<
52.65
( As Per IRC : 112-2011 Cl 11.2.1)

15.4 Effective Length Calculation

let=

ASK

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT:

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

510

9597.54

414

319

319

414

0.111

1.009

511

9573.71

162

512

512

162

0.111

1.009

512

9408.38

153

694

694

153

0.109

1.007

513

8934.93

747

887

887

747

0.103

1.003

514

9563.79

465

336

336

465

0.110

1.009

515

8981.47

692

996

996

692

0.104

1.003

516

9700.95

217

790

790

217

0.112

1.010

517

9974.6

241

754

754

241

0.115

1.013

518

9332.38

306

823

823

306

0.108

1.006

519

8931.21

192

658

658

192

0.103

1.003

520

8334.37

992

942

942

992

0.096

1.000

521

9931.03

496

572

572

496

0.115

1.012

522

8925.33

555

872

872

555

0.103

1.003

523

9894.19

639

446

446

639

0.114

1.012

524

9806.81

619

422

422

619

0.113

1.011

525

9232.2

28

561

561

28

0.107

1.006

526

8839.91

411

742

742

411

0.102

1.002

527

8324.68

971

903

903

971

0.096

1.000

528

9710.54

590

406

406

590

0.112

1.010

529

9336.63

779

163

163

779

0.108

1.007

530

9491.51

544

321

321

544

0.110

1.008

531

9556.74

293

475

475

293

0.110

1.009

532

9486.25

552

308

308

552

0.110

1.008

533

9401.92

528

316

316

528

0.109

1.007

534

8984.17

933

223

223

933

0.104

1.003

535

9560.46

114

571

571

114

0.110

1.009

536

8939.91

909

163

163

909

0.103

1.003

537

9491.51

544

321

321

544

0.110

1.008

538

9701.31

194

349

349

194

0.112

1.010

539

9208.94

613

296

296

613

0.106

1.005

540

8901.38

525

423

423

525

0.103

1.002

541

8443.81

1139

205

205

1139

0.097

1.000

542

9667.91

489

489

0.112

1.010

543

9263.73

508

372

372

508

0.107

1.006

544

9408.76

73

659

659

73

0.109

1.007

545

9412.23

61

682

682

61

0.109

1.007

546

9393.96

254

535

535

254

0.108

1.007

547

9267.21

496

395

395

496

0.107

1.006

548

8904.23

951

247

247

951

0.103

1.002

549

9386.36

22

669

669

22

0.108

1.007

550

8896.88

804

258

258

804

0.103

1.002

SHEET

CHKD
ASK

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT:

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

551

9639.66

112

585

585

552
553

9572.68

96

603

603

9132.14

357

497

497

554

8831.38

693

358

358

555

8436.37

1123

235

556

9498.86

74

616

557

9037.07

203

2464

558

9191.95

32

559

9257.18

284

560

9186.69

561

112

0.111

1.009

96

0.111

1.009

357

0.105

1.005

693

0.102

1.002

235

1123

0.097

1.000

616

74

0.110

1.008

2464

203

0.104

1.004

2306

2306

32

0.106

1.005

2152

2152

284

0.107

1.006

25

2319

2319

25

0.106

1.005

9102.35

49

2310

2310

49

0.105

1.004

562

8684.61

356

2403

2403

356

0.100

1.000

563

9260.9

463

2056

2056

463

0.107

1.006

564

8640.35

332

2464

2464

332

0.100

1.000

565

9191.95

32

2306

2306

32

0.106

1.005

566

9401.75

383

2278

2278

383

0.109

1.007

567

8909.38

36

2331

2331

36

0.103

1.002

568

8601.82

51

2204

2204

51

0.099

1.000

569

8144.24

562

2422

2422

562

0.094

1.000

570

9368.35

579

2138

2138

579

0.108

1.007

571

8964.17

69

2255

2255

69

0.104

1.003

572

9109.2

504

1967

1967

504

0.105

1.004

573

9112.67

516

1945

1945

516

0.105

1.004

574

9094.4

323

2092

2092

323

0.105

1.004

575

8967.65

81

2232

2232

81

0.104

1.003

576

8604.67

374

2380

2380

374

0.099

1.000

577

9086.8

555

1958

1958

555

0.105

1.004

578

8597.31

227

2369

2369

227

0.099

1.000

579

9340.1

688

2042

2042

688

0.108

1.007

580

9273.11

673

2024

2024

673

0.107

1.006

581

8832.58

220

2130

2130

220

0.102

1.002

582

8531.82

116

2269

2269

116

0.099

1.000

583

8136.81

546

2392

2392

546

0.094

1.000

584

9199.3

651

2011

2011

651

0.106

1.005

585

9336.63

779

163

163

779

0.108

1.007

586

9491.51

544

321

321

544

0.110

1.008

587

9556.74

293

475

475

293

0.110

1.009

588

9486.25

552

308

308

552

0.110

1.008

589

9401.92

528

316

316

528

0.109

1.007

590

8984.17

933

223

223

933

0.104

1.003

591

9560.46

114

571

571

114

0.110

1.009

SHEET

CHKD
ASK

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT:

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

592

8939.91

909

163

163

909

0.103

1.003

593

9491.51

544

321

321

544

0.110

1.008

594

9701.31

194

349

349

194

0.112

1.010

595

9208.94

613

296

296

613

0.106

1.005

596

8901.38

525

423

423

525

0.103

1.002

597

8443.81

1139

205

205

1139

0.097

1.000

598

9667.91

489

489

0.112

1.010

599

9263.73

508

372

372

508

0.107

1.006

600

9408.76

73

659

659

73

0.109

1.007

601

9412.23

61

682

682

61

0.109

1.007

602

9393.96

254

535

535

254

0.108

1.007

603

9267.21

496

395

395

496

0.107

1.006

604

8904.23

951

247

247

951

0.103

1.002

605

9386.36

22

669

669

22

0.108

1.007

606

8896.88

804

258

258

804

0.103

1.002

607

9639.66

112

585

585

112

0.111

1.009

608

9572.68

96

603

603

96

0.111

1.009

609

9132.14

357

497

497

357

0.105

1.005

610

8436.37

1123

235

235

1123

0.097

1.000

611

8436.37

1123

235

235

1123

0.097

1.000

612

9498.86

74

616

616

74

0.110

1.008

613

8284.06

1013

901

901

1013

0.096

1.000

614

8311

1054

873

873

1054

0.096

1.000

615

8322.34

1098

847

847

1098

0.096

1.000

616

8310.08

1053

876

876

1053

0.096

1.000

617

8295.42

1057

874

874

1057

0.096

1.000

618

8222.76

986

890

890

986

0.095

1.000

619

8322.99

1129

830

830

1129

0.096

1.000

620

8215.07

990

901

901

990

0.095

1.000

621

8311

1054

873

873

1054

0.096

1.000

622

8347.48

1115

868

868

1115

0.096

1.000

623

9374.51

2144

699

699

2144

0.108

1.007

624

8208.37

1057

856

856

1057

0.095

1.000

625

8128.79

950

893

893

950

0.094

1.000

626

8341.68

1149

844

844

1149

0.096

1.000

627

8271.38

1060

864

864

1060

0.096

1.000

628

8296.61

1136

814

814

1136

0.096

1.000

629

8297.21

1138

810

810

1138

0.096

1.000

630

8294.03

1104

836

836

1104

0.096

1.000

631

8271.99

1062

860

860

1062

0.096

1.000

632

8208.86

983

886

886

983

0.095

1.000

SHEET

CHKD
ASK

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT:

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

633

8292.71

1145

813

813

1145

0.096

1.000

634

8207.58

1009

884

884

1009

0.095

1.000

635

8336.76

1168

827

827

1168

0.096

1.000

636

8325.11

1165

824

824

1165

0.096

1.000

637

8248.5

1086

843

843

1086

0.095

1.000

638

8196.19

1028

867

867

1028

0.095

1.000

639

8127.49

953

888

888

953

0.094

1.000

640

8312.28

1161

822

822

1161

0.096

1.000

641

8273.7

920

1158

1158

920

0.096

1.000

642

8300.63

961

1131

1131

961

0.096

1.000

643

8311.97

1005

1104

1104

1005

0.096

1.000

644

8299.72

960

1133

1133

960

0.096

1.000

645

8285.05

964

1132

1132

964

0.096

1.000

646

8212.4

893

1148

1148

893

0.095

1.000

647

8312.62

1036

1087

1087

1036

0.096

1.000

648

8204.7

897

1158

1158

897

0.095

1.000

649

8300.63

961

1131

1131

961

0.096

1.000

650

8337.12

1022

1126

1126

1022

0.096

1.000

651

8251.49

949

1135

1135

949

0.095

1.000

652

8198

964

1113

1113

964

0.095

1.000

653

8118.42

857

1151

1151

857

0.094

1.000

654

8331.31

1056

1102

1102

1056

0.096

1.000

655

8197.22

916

1142

1142

916

0.095

1.000

656

8326.4

1075

1085

1085

1075

0.096

1.000

657

8314.75

1072

1082

1082

1072

0.096

1.000

658

8238.13

993

1100

1100

993

0.095

1.000

659

8185.83

935

1124

1124

935

0.095

1.000

660

8117.13

860

1146

1146

860

0.094

1.000

661

8301.91

1068

1080

1080

1068

0.096

1.000

662

8261.02

967

1122

1122

967

0.095

1.000

663

8286.24

1043

1072

1072

1043

0.096

1.000

664

8286.84

1045

1068

1068

1045

0.096

1.000

665

8283.67

1011

1094

1094

1011

0.096

1.000

666

8261.62

969

1118

1118

969

0.095

1.000

667

8198.5

890

1144

1144

890

0.095

1.000

668

8282.34

1051.7

1070.32

1070 1051.7

0.096

1.000

15.7 Design check for Pier


Table showing moment capacities and interaction ratios :case
Pu/fck bd
Mu l
Mut

MuL cap

Fck bd2

Fck bd2

MuTcap

ML
MuL cap

R
SHEET

CHKD

MT
MuTcap

Interaction Ratio

ASK

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT:

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

R
SHEET

CHKD
ASK

501

0.058

0.044

0.044

14520

10890 0.069

0.048

0.114

502

0.059

0.044

0.044

14520

10890 0.054

0.020

0.072

503

0.059

0.045

0.045

14850

11138 0.040

0.010

0.048

504

0.059

0.044

0.044

14520

10890 0.056

0.021

0.074

505

0.058

0.044

0.044

14520

10890 0.055

0.018

0.071

506

0.055

0.042

0.042

13860

10395 0.066

0.070

0.134

507

0.059

0.045

0.045

14850

11138 0.031

0.031

0.060

508

0.057

0.043

0.043

14190

10643 0.051

0.016

0.065

509

0.058

0.044

0.044

14520

10890 0.024

0.037

0.059

510

0.058

0.044

0.044

14520

10890 0.022

0.038

0.058

511

0.058

0.044

0.044

14520

10890 0.035

0.015

0.049

512

0.057

0.043

0.043

14190

10643 0.049

0.014

0.062

513

0.054

0.042

0.042

13860

10395 0.064

0.072

0.135

514

0.058

0.044

0.044

14520

10890 0.023

0.043

0.064

515

0.054

0.042

0.042

13860

10395 0.072

0.067

0.137

516

0.059

0.044

0.044

14520

10890 0.054

0.020

0.072

517

0.060

0.045

0.045

14850

11138 0.051

0.022

0.069

518

0.057

0.043

0.043

14190

10643 0.058

0.029

0.085

519

0.054

0.042

0.042

13860

10395 0.047

0.018

0.065

520

0.051

0.039

0.039

12870

9653

0.073

0.103

0.176

521

0.060

0.045

0.045

14850

11138 0.038

0.045

0.080

522

0.054

0.042

0.042

13860

10395 0.063

0.053

0.116

523

0.060

0.045

0.045

14850

11138 0.030

0.057

0.084

524

0.059

0.045

0.045

14850

11138 0.028

0.056

0.081

525

0.056

0.043

0.043

14190

10643 0.040

0.003

0.041

526

0.054

0.041

0.041

13530

10148 0.055

0.040

0.095

527

0.050

0.039

0.039

12870

9653

0.070

0.101

0.171

528

0.059

0.044

0.044

14520

10890 0.028

0.054

0.080

529

0.057

0.043

0.043

14190

10643 0.011

0.073

0.083

530

0.058

0.044

0.044

14520

10890 0.022

0.050

0.070

531

0.058

0.044

0.044

14520

10890 0.033

0.027

0.058

532

0.057

0.044

0.044

14520

10890 0.021

0.051

0.070

533

0.057

0.043

0.043

14190

10643 0.022

0.050

0.070

534

0.054

0.042

0.042

13860

10395 0.016

0.090

0.105

535

0.058

0.044

0.044

14520

10890 0.039

0.010

0.048

536

0.054

0.042

0.042

13860

10395 0.012

0.087

0.098

537

0.058

0.044

0.044

14520

10890 0.022

0.050

0.070

538

0.059

0.044

0.044

14520

10890 0.024

0.018

0.040

539

0.056

0.043

0.043

14190

10643 0.021

0.058

0.077

540

0.054

0.041

0.041

13530

10148 0.031

0.052

0.082

541

0.051

0.040

0.040

13200

9900

0.115

0.131

0.016

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT:

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

R
SHEET

CHKD
ASK

542

0.059

0.044

0.044

14520

10890 0.034

0.000

0.033

543

0.056

0.043

0.043

14190

10643 0.026

0.048

0.073

544

0.057

0.043

0.043

14190

10643 0.046

0.007

0.052

545

0.057

0.043

0.043

14190

10643 0.048

0.006

0.053

546

0.057

0.043

0.043

14190

10643 0.038

0.024

0.060

547

0.056

0.043

0.043

14190

10643 0.028

0.047

0.073

548

0.054

0.041

0.041

13530

10148 0.018

0.094

0.111

549

0.057

0.043

0.043

14190

10643 0.047

0.002

0.048

550

0.054

0.041

0.041

13530

10148 0.019

0.079

0.098

551

0.058

0.044

0.044

14520

10890 0.040

0.010

0.049

552

0.058

0.044

0.044

14520

10890 0.042

0.009

0.049

553

0.055

0.042

0.042

13860

10395 0.036

0.034

0.069

554

0.054

0.041

0.041

13530

10148 0.026

0.068

0.094

555

0.051

0.040

0.040

13200

9900

0.018

0.113

0.131

556

0.058

0.044

0.044

14520

10890 0.042

0.007

0.048

557

0.055

0.042

0.042

13860

10395 0.178

0.019

0.196

558

0.056

0.042

0.042

13860

10395 0.166

0.003

0.168

559

0.056

0.043

0.043

14190

10643 0.152

0.027

0.176

560

0.056

0.042

0.042

13860

10395 0.167

0.002

0.168

561

0.055

0.042

0.042

13860

10395 0.167

0.005

0.170

562

0.053

0.041

0.041

13530

10148 0.178

0.035

0.213

563

0.056

0.043

0.043

14190

10643 0.145

0.043

0.186

564

0.052

0.041

0.041

13530

10148 0.182

0.033

0.215

565

0.056

0.042

0.042

13860

10395 0.166

0.003

0.168

566

0.057

0.043

0.043

14190

10643 0.161

0.036

0.194

567

0.054

0.041

0.041

13530

10148 0.172

0.004

0.175

568

0.052

0.040

0.040

13200

9900

0.167

0.005

0.172

569

0.049

0.039

0.039

12870

9653

0.188

0.058

0.246

570

0.057

0.043

0.043

14190

10643 0.151

0.054

0.202

571

0.054

0.042

0.042

13860

10395 0.163

0.007

0.168

572

0.055

0.042

0.042

13860

10395 0.142

0.048

0.189

573

0.055

0.042

0.042

13860

10395 0.140

0.050

0.188

574

0.055

0.042

0.042

13860

10395 0.151

0.031

0.180

575

0.054

0.042

0.042

13860

10395 0.161

0.008

0.168

576

0.052

0.040

0.040

13200

9900

0.180

0.038

0.218

577

0.055

0.042

0.042

13860

10395 0.141

0.053

0.193

578

0.052

0.040

0.040

13200

9900

0.179

0.023

0.202

579

0.057

0.043

0.043

14190

10643 0.144

0.065

0.206

580

0.056

0.043

0.043

14190

10643 0.143

0.063

0.203

581

0.054

0.041

0.041

13530

10148 0.157

0.022

0.179

582

0.052

0.040

0.040

13200

9900

0.012

0.184

0.172

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT:

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

SHEET

CHKD
ASK

583

0.049

0.039

0.039

12870

9653

0.186

0.057

0.242

584

0.056

0.043

0.043

14190

10643 0.142

0.061

0.201

585

0.057

0.043

0.043

14190

10643 0.011

0.073

0.083

586

0.058

0.044

0.044

14520

10890 0.022

0.050

0.070

587

0.058

0.044

0.044

14520

10890 0.033

0.027

0.058

588

0.057

0.044

0.044

14520

10890 0.021

0.051

0.070

589

0.057

0.043

0.043

14190

10643 0.022

0.050

0.070

590

0.054

0.042

0.042

13860

10395 0.016

0.090

0.105

591

0.058

0.044

0.044

14520

10890 0.039

0.010

0.048

592

0.054

0.042

0.042

13860

10395 0.012

0.087

0.098

593

0.058

0.044

0.044

14520

10890 0.022

0.050

0.070

594

0.059

0.044

0.044

14520

10890 0.024

0.018

0.040

595

0.056

0.043

0.043

14190

10643 0.021

0.058

0.077

596

0.054

0.041

0.041

13530

10148 0.031

0.052

0.082

597

0.051

0.040

0.040

13200

9900

0.016

0.115

0.131

598

0.059

0.044

0.044

14520

10890 0.034

0.000

0.033

599

0.056

0.043

0.043

14190

10643 0.026

0.048

0.073

600

0.057

0.043

0.043

14190

10643 0.046

0.007

0.052

601

0.057

0.043

0.043

14190

10643 0.048

0.006

0.053

602

0.057

0.043

0.043

14190

10643 0.038

0.024

0.060

603

0.056

0.043

0.043

14190

10643 0.028

0.047

0.073

604

0.054

0.041

0.041

13530

10148 0.018

0.094

0.111

605

0.057

0.043

0.043

14190

10643 0.047

0.002

0.048

606

0.054

0.041

0.041

13530

10148 0.019

0.079

0.098

607

0.058

0.044

0.044

14520

10890 0.040

0.010

0.049

608

0.058

0.044

0.044

14520

10890 0.042

0.009

0.049

609

0.055

0.042

0.042

13860

10395 0.036

0.034

0.069

610

0.051

0.040

0.040

13200

9900

0.018

0.113

0.131

611

0.051

0.040

0.040

13200

9900

0.018

0.113

0.131

612

0.058

0.044

0.044

14520

10890 0.042

0.007

0.048

613

0.050

0.039

0.039

12870

9653

0.070

0.105

0.175

614

0.050

0.039

0.039

12870

9653

0.068

0.109

0.177

615

0.050

0.039

0.039

12870

9653

0.066

0.114

0.179

616

0.050

0.039

0.039

12870

9653

0.068

0.109

0.177

617

0.050

0.039

0.039

12870

9653

0.068

0.109

0.177

618

0.050

0.039

0.039

12870

9653

0.069

0.102

0.171

619

0.050

0.039

0.039

12870

9653

0.064

0.117

0.181

620

0.050

0.039

0.039

12870

9653

0.070

0.103

0.173

621

0.050

0.039

0.039

12870

9653

0.068

0.109

0.177

622

0.051

0.040

0.040

13200

9900

0.066

0.113

0.178

623

0.057

0.043

0.043

14190

10643 0.049

0.201

0.248

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT:

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

SHEET

CHKD
ASK

624

0.050

0.039

0.039

12870

9653

0.066

0.110

0.176

625

0.049

0.039

0.039

12870

9653

0.069

0.098

0.168

626

0.051

0.039

0.039

12870

9653

0.066

0.119

0.185

627

0.050

0.039

0.039

12870

9653

0.067

0.110

0.177

628

0.050

0.039

0.039

12870

9653

0.063

0.118

0.181

629

0.050

0.039

0.039

12870

9653

0.063

0.118

0.181

630

0.050

0.039

0.039

12870

9653

0.065

0.114

0.179

631

0.050

0.039

0.039

12870

9653

0.067

0.110

0.177

632

0.050

0.039

0.039

12870

9653

0.069

0.102

0.171

633

0.050

0.039

0.039

12870

9653

0.063

0.119

0.182

634

0.050

0.039

0.039

12870

9653

0.069

0.105

0.173

635

0.051

0.039

0.039

12870

9653

0.064

0.121

0.185

636

0.050

0.039

0.039

12870

9653

0.064

0.121

0.185

637

0.050

0.039

0.039

12870

9653

0.065

0.113

0.178

638

0.050

0.039

0.039

12870

9653

0.067

0.106

0.174

639

0.049

0.039

0.039

12870

9653

0.069

0.099

0.168

640

0.050

0.039

0.039

12870

9653

0.064

0.120

0.184

641

0.050

0.039

0.039

12870

9653

0.090

0.095

0.185

642

0.050

0.039

0.039

12870

9653

0.088

0.100

0.187

643

0.050

0.039

0.039

12870

9653

0.086

0.104

0.190

644

0.050

0.039

0.039

12870

9653

0.088

0.099

0.187

645

0.050

0.039

0.039

12870

9653

0.088

0.100

0.188

646

0.050

0.039

0.039

12870

9653

0.089

0.093

0.182

647

0.050

0.039

0.039

12870

9653

0.084

0.107

0.192

648

0.050

0.039

0.039

12870

9653

0.090

0.093

0.183

649

0.050

0.039

0.039

12870

9653

0.088

0.100

0.187

650

0.051

0.039

0.039

12870

9653

0.087

0.106

0.193

651

0.050

0.039

0.039

12870

9653

0.088

0.098

0.187

652

0.050

0.039

0.039

12870

9653

0.086

0.100

0.186

653

0.049

0.039

0.039

12870

9653

0.089

0.089

0.178

654

0.050

0.039

0.039

12870

9653

0.086

0.109

0.195

655

0.050

0.039

0.039

12870

9653

0.089

0.095

0.184

656

0.050

0.039

0.039

12870

9653

0.084

0.111

0.196

657

0.050

0.039

0.039

12870

9653

0.084

0.111

0.195

658

0.050

0.039

0.039

12870

9653

0.085

0.103

0.188

659

0.050

0.039

0.039

12870

9653

0.087

0.097

0.184

660

0.049

0.039

0.039

12870

9653

0.089

0.089

0.178

661

0.050

0.039

0.039

12870

9653

0.084

0.111

0.195

662

0.050

0.039

0.039

12870

9653

0.087

0.100

0.187

663

0.050

0.039

0.039

12870

9653

0.083

0.108

0.191

664

0.050

0.039

0.039

12870

9653

0.083

0.108

0.191

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT:

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

CHKD
ASK

0.050

0.039

0.039

12870

9653

0.085

0.105

0.190

666

0.050

0.039

0.039

12870

9653

0.087

0.100

0.187

667

0.050

0.039

0.039

12870

9653

0.089

0.092

0.181

668

0.050

0.039

0.039

12870

9653

0.083

0.109

0.192

0.248 < 1.00

SLS Rare Combination Results


ELEMENT 658 =
P-2

Elem

Load

Axial
(kN)

Moment-y Moment-z
(kN*m)
(kN*m)

658

669

-6886

468

-605

658

670

-7020

264

-468

658

671

-7077

46

-334

658

672

-7016

271

-479

658

673

-6943

250

-471

658

674

-6579

602

-552

658

675

-7080

-110

-250

658

676

-6541

581

-605

658

677

-7020

264

-468

658

678

-7203

-41

-443

658

679

-6775

324

-489

658

680

-6507

248

-379

658

681

-6109

781

-568

658

682

-7174

-211

-322

658

683

-6503

490

-522

658

684

-7149

-306

-238

658

685

-7091

-293

-222

658

686

-6708

101

-315

658

687

-6446

394

-435

658

688

-6103

767

-542

658

689

-7027

-274

-211

658

690

-6822

233

-423

658

691

-6948

-146

-173

658

692

-6951

-156

-153

658

693

-6936

12

-282

658

694

-6825

222

-403

658

695

-6510

618

-532

658

696

-6929

-190

-165

658

697

-6766

238

-1656

658

698

-6901

34

-1518

Hence OK

SHEET

665

Max Interaction ratio=

15.8

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT:

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

658

699

-6957

-185

-1384

658

700

-6896

40

-1529

658

701

-6823

19

-1522

658

702

-6459

372

-1603

658

703

-6961

-341

-1301

658

704

-6421

351

-1655

658

705

-6901

34

-1518

658

706

-7083

-271

-1494

658

707

-6655

93

-1540

658

708

-6387

17

-1430

658

709

-5990

550

-1619

658

710

-7054

-442

-1372

658

711

-6703

-1474

658

712

-6829

-377

-1224

658

713

-6832

-387

-1204

658

714

-6816

-219

-1332

658

715

-6706

-9

-1454

658

716

-6390

387

-1583

658

717

-6809

-421

-1215

658

718

-6384

259

-1573

658

719

-7029

-537

-1288

658

720

-6971

-523

-1273

658

721

-6588

-130

-1365

658

722

-6327

163

-1486

658

723

-5983

537

-1593

658

724

-6907

-504

-1262

658

725

-6764

620

189

658

726

-6865

467

292

658

727

-6908

303

392

658

728

-6862

472

284

658

729

-6807

456

289

658

730

-6534

720

229

658

731

-6910

186

455

658

732

-6505

705

189

658

733

-6865

467

292

658

734

-7002

238

310

658

735

-6681

511

276

658

736

-6480

454

359

658

737

-6182

854

216

658

738

-6980

110

402

658

739

-6477

636

251

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

SHEET

CHKD
ASK

STRUCTCON DESIGNS P. L.
PROJECT:

DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR


BETWEEN BKC AND EEH

SUBJECT:

Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

658

740

-6962

39

464

658

741

658

742

-6918

49

476

-6631

344

407

658

743

-6435

564

316

658

744

-6177

844

236

658

745

-6870

63

485

658

746

-6717

443

325

658

747

-6811

159

513

658

748

-6814

151

528

658

749

-6802

278

431

658

750

-6719

435

340

658

751

-6482

732

244

658

752

-6797

126

519

658

753

-6565

236

-1562

658

754

-6666

82

-1459

658

755

-6708

-82

-1359

658

756

-6662

87

-1467

658

757

-6607

71

-1462

658

758

-6335

336

-1523

658

759

-6710

-198

-1296

658

760

-6306

320

-1562

658

761

-6666

82

-1459

658

762

-6802

-146

-1441

658

763

-6481

127

-1475

658

764

-6281

70

-1393

658

765

-5982

470

-1535

658

766

-6781

-274

-1350

658

767

-6278

252

-1500

658

768

-6762

-346

-1287

658

769

-6718

-335

-1275

658

770

-6431

-40

-1344

658

771

-6235

179

-1435

658

772

-5977

460

-1515

658

773

-6670

-321

-1267

658

774

-6283

348

-1507

658

775

-5943

660

-1562

658

776

-6517

59

-1426

658

777

-6612

-225

-1238

658

778

-6614

-233

-1224

658

779

-6602

-107

-1320

658

780

-6519

51

-1411

NOTE No.
835/N-454
DATE
31-May-16
BY
ANK

SHEET

CHKD
ASK

ANNEXURE PILE BT

34

pile
~~~~
Analysis of Section under Bending + Thrust
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

~~~~~~~~~~

~~~~~~~~~~~~~~~~~

Concrete :Inst.Modulus,Ei = 3.1E+07 kn/m


Shrk.Strain,shr = 0

Deferred Modulus = 3.1E+07 kn/m


Allow.Tensile stress,ft = 0 kn/m

Rebars : Total nr = 30

Mod.of Elasticity,Er = 2.17E+08 kn/m

As/Ac = .89 %

Node coordinates :
Ac = 1.13 m
~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Node#
X(m)
Y(m)
Node#
X(m)
Y(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
1
0
.6
7
.043
.823
13
.166
1.014
19
.351
1.146
25
.571
1.199
31
.796
1.167
37
.993
1.053
43
1.133
.875
49
1.197
.657
55
1.176
.431
61
1.072
.229
67
.9
.08
73
.685
.006
79
.459
.017
85
.252
.111
91
.095
.276
97
.011
.486
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

35

Reinforcement Details :

~~~~~~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Bar#

X(m)

Y(m)

Area(m)

Bar#

X(m)

Y(m)

Area(m)

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
R 1
.09
.6
.000335
R 5
.259
.979
.000335
R 9
R 17

.653
1.099

1.107
.494

.000335
.000335

R 13
R 21

1.013
.855

.9
.158

.000335
.000335

R 25

.442

.115

.000335

R 29

.134

.393

.000335

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Characteristics of Total Section :
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
At = 1.1905 m

Xc = .6 m

Yc = .6 m

Ix = .10949 m4

Iy = .10949 m4

Ixy = 0 m4

Load case : 1 PC1


~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn)
Mx(knm)
My(knm)
f0(kn/m)
Xn(m)
Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL
2138
608
-745
14312.75
1.042
1.277
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 9982.312 kn/m at Node# 89
Max.Tensile stress = 67764.13 kn/m in Rebar# 13
Max.Compressive stress = 58614.47 kn/m in Rebar# 28
Load case : 2
~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn)
Mx(knm)
My(knm)
f0(kn/m)
Xn(m)
Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL
3699
702
-739
12055.87
1.513
1.592
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 9326.728 kn/m at Node# 88
Max.Tensile stress = 20013.31 kn/m in Rebar# 12
Max.Compressive stress = 58241.87 kn/m in Rebar# 27

Load case : 3
~~~~~~~~~~~~~

36

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn)
Mx(knm)
My(knm)
f0(kn/m)
Xn(m)
Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL
2018
443
-1082
18375.43
.707
1.728
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete =

13248.9 kn/m at Node# 94

Max.Tensile stress = 125337.8 kn/m in Rebar# 14


Max.Compressive stress = 75013.7 kn/m in Rebar# 29

Load case : 4
~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn)
Mx(knm)
My(knm)
f0(kn/m)
Xn(m)
Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL
4624
680
-151
8437.728
6.118
1.359
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 7700.324 kn/m at Node# 79
Max.Compressive stress = 49795.66 kn/m in Rebar# 25

Load case : 5 PC2


~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn)
Mx(knm)
My(knm)
f0(kn/m)
Xn(m)
Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL
1645
246
-285
4454.175
1.596
1.849
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 3545.853 kn/m at Node# 89
Max.Tensile stress = 3785.429 kn/m in Rebar# 13
Max.Compressive stress = 22453.03 kn/m in Rebar# 28

37

Load case : 6

~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn)

Mx(knm)

My(knm)

f0(kn/m)

Xn(m)

Yn(m)

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL
2474
290
-20
3776.823
20.677
1.426
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 3670.644 kn/m at Node# 76
Max.Compressive stress = 24018.37 kn/m in Rebar# 24

Load case : 7
~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn)
Mx(knm)
My(knm)
f0(kn/m)
Xn(m)
Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL
2305
366
-391
6337.22
1.644
1.757
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete =

5027.481 kn/m at Node# 88

Max.Tensile stress = 5757.927 kn/m in Rebar# 12


Max.Compressive stress = 31798.73 kn/m in Rebar# 27

Load case : 8
~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn)
Mx(knm)
My(knm)
f0(kn/m)
Xn(m)
Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL
1277
317
-394
6408.391
1.139
1.416
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 4648.81 kn/m at Node# 89
Max.Tensile stress = 23517.46 kn/m in Rebar# 13
Max.Compressive stress = 27968.6 kn/m in Rebar# 28

38

Load case : 9 CONSTRUCTION CASE

~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn)

Mx(knm)

My(knm)

f0(kn/m)

Xn(m)

Yn(m)

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL
-242
1021
-240
21647.16
1.681
.395
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 14817.43 kn/m at Node# 79
Max.Tensile stress = 332781.1 kn/m in Rebar# 10
Max.Compressive stress = 67582.05 kn/m in Rebar# 25

Load case : 5000 QUASI PERMANENT CASE


~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn)
Mx(knm)
My(knm)
f0(kn/m)
Xn(m)
Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL
4208
461
-64
6411.488
10.969
1.523
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress

CROSS SECTIONAL PROPERTIES


PIER CAP
A
6.0 M^2
I
0.1 M^4
Z
0.1 M^3

PIER LEFT
4.7 M^2
2.2 M^4
1.9 M^3

PIER RIGHT
4.7 M^2
1.5 M^4
1.5 M^3

BENDING MOMENTS

659.0
660.0
661.0
665.0
668.0
671.0
672.0
673.0
673.0

STAGE 2
Pier cap cast on staging
PIER CAP
BM
DL
PT
PT SEC
0M
-69.7
0.0
0.0
2M
-435.5
0.0
0.0
3.5M
-3130.0
0.0
0.0
8M
1601.9
0.0
0.0
12.5M
2884.2
0.0
0.0
17M
1655.8
0.0
0.0
21.5M
-2414.2
0.0
0.0
22.4M
-225.0
0.0
0.0
23.3M
0.0
0.0
0.0

SUM
-69.7
-435.5
-3130.0
1601.9
2884.2
1655.8
-2414.2
-225.0
0.0

P
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

P (SEC)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

STRESS
TOP
BOTTOM
-0.5
0.5
-3.3
3.3
-23.8
23.8
12.2
-12.2
21.9
-21.9
12.6
-12.6
-18.3
18.3
-1.7
1.7
0.0
0.0

DL
139.4
348.4
487.7
-598.3
28.5
585.7
1215.4
0.0
0.0

SF
PT
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

PT SEC
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

PIER

PIER LEFT

PIER RIGHT

TOP
BOTTOM

DL
2009.5
503.1

TOP
BOTTOM

DL
-2480.0
-973.7

BM
PT

BM
PT

PT SEC
0.0
0.0
0.0
0.0

SUM
2009.5
503.1

STRESS
TOP
BOTTOM
1.1
-1.1
0.3
-0.3

DL
-177.7
-177.7

PT SEC
0.0
0.0
0.0
0.0

SUM
-2480.0
-973.7

STRESS
TOP
BOTTOM
1.6
-1.6
0.6
-0.6

DL
177.7
177.7

AXIAL FORCE
PIER LEFT
DL
-1752.0
PT
0.0
PT SEC
0.0

659.0
660.0
661.0
665.0
668.0
671.0
672.0
673.0
673.0

SF
PT
0.0
0.0

PT SEC
0.0
0.0

0.0
0.0

PT SEC
0.0
0.0

SF
PT

PIER RIGHT
-1497.7
0.0
0.0

STAGE 3
First stage prestress
PIER CAP
BM
DL
PT
0M
-69.9
1344.7
2M
-436.8
2668.7
3.5M
-3140.0
3155.0
8M
1606.6
-1904.1
12.5M
2892.7
-3608.5
17M
1660.6
-2568.5
21.5M
-2421.3
1252.9
22.4M
-225.0
3154.5
23.3M
0.0
3154.5

PT SEC
0.0
0.0
947.0
1051.3
1154.7
1246.6
1349.9
0.0
0.0

SUM
1274.8
2232.0
962.0
753.8
439.0
338.7
181.5
2929.5
3154.5

P
-5394.1
-5648.8
-6014.2
-6643.8
-6657.5
-6534.2
-6323.4
-6253.8
-6253.8

P (SEC)
0.0
0.0
0.0
109.1
109.1
109.1
109.1
0.0
0.0

STRESS
TOP
BOTTOM
10.6
-8.8
17.9
-16.0
8.3
-6.3
6.8
-4.6
4.4
-2.2
3.6
-1.5
2.4
-0.3
23.3
-21.2
25.0
-22.9

DL
139.8
349.4
489.2
-600.0
28.6
587.4
1218.9
0.0
0.0

SF
PT
-1228.1
-969.4
720.6
708.6
45.7
-535.3
-1056.1
-1060.5
-1060.5

PT SEC
0.0
0.0
0.0
-23.1
-23.0
-23.0
-22.9
0.0
0.0

PIER

PIER LEFT

TOP

DL
2292.1

BM
PT

PT SEC
0.0
-1834.9

SUM
457.3

STRESS
TOP
BOTTOM
0.2
-0.2

DL
-179.2

SF
PT
0.0

PT SEC
213.6

PIER RIGHT

BOTTOM

773.2

TOP
BOTTOM

DL
-2201.8
-682.8

0.0
BM
PT

0.0

773.2

PT SEC
0.0
2641.2
0.0
830.2

SUM
439.5
147.4

AXIAL FORCE
PIER LEFT
DL
-1793.6
PT
0.0
PT SEC
-44.8

0.4

-0.4

STRESS
TOP
BOTTOM
0.3
-0.3
0.1
-0.1

-179.2

DL
179.2
179.2

0.0

213.6

0.0
0.0

PT SEC
-213.6
-213.6

SF
PT

PIER RIGHT
-1475.2
0.0
44.8

STAGE 4
ROB placed
PIER CAP

659.0
660.0
661.0
665.0
668.0
671.0
672.0
673.0
673.0

0M
2M
3.5M
8M
12.5M
17M
21.5M
22.4M
23.3M

DL
-69.9
-1912.8
-3130.0
4825.9
8986.5
4505.5
-6581.8
-225.0
0.0

BM
PT
1326.7
2645.2
3139.5
-1883.8
-3662.7
-2548.6
1240.1
3078.1
3078.1

PT SEC
0.0
0.0
0.0
1053.3
1156.8
1248.8
1352.1
0.0
0.0

SUM
1256.9
732.4
9.5
3995.5
6480.6
3205.6
-3989.6
2853.1
3078.1

P
-5322.3
-5599.0
-5984.6
-6572.9
-6757.6
-6483.5
-6258.8
-6102.4
-6102.4

P (SEC)
0.0
0.0
0.0
109.2
109.2
109.2
109.2
0.0
0.0

STRESS
TOP
BOTTOM
10.4
-8.7
6.5
-4.6
1.1
0.9
31.4
-29.3
50.3
-48.1
25.4
-23.3
-29.3
31.3
22.7
-20.6
24.4
-22.4

DL
139.8
1333.4
1473.2
-1850.4
-304.2
2137.6
2768.8
0.0
0.0

SF
PT
-1211.7
-960.9
717.1
701.1
46.4
-531.1
-1045.4
-1034.8
-1034.8

PT SEC
0.0
0.0
0.0
-23.1
-23.0
-23.0
-22.9
0.0
0.0

PIER

PIER LEFT

PIER RIGHT

TOP
BOTTOM

DL
6517.6
2168.1

TOP
BOTTOM

DL
-6349.7
-2000.3

BM
PT

BM
PT

AXIAL FORCE
PIER LEFT
DL
-5845.5
PT
0.0
PT SEC
-44.4

659.0
660.0
661.0
665.0
668.0
671.0
672.0
673.0
673.0

PT SEC
0.0
-1825.5
0.0
0.0

SUM
4692.0
2168.1

STRESS
TOP
BOTTOM
2.5
-2.5
1.2
-1.2

DL
-513.0
-513.0

PT SEC
0.0
2624.9
0.0
825.9

SUM
-3724.8
-1174.4

STRESS
TOP
BOTTOM
2.4
-2.4
0.8
-0.8

DL
513.0
513.0

SF
PT
0.0
0.0

PT SEC
212.2
212.2

0.0
0.0

PT SEC
-212.2
-212.2

SF
PT

PIER RIGHT
-3025.3
0.0
44.4

STAGE 5
Second stage prestressing
PIER CAP
BM
DL
PT
PT SEC
0M
-70.1
5202.8
0.0
2M
-1914.0
10195.4
0.0
3.5M
-9875.0
12014.1
3198.0
8M
4815.3
-7374.5
4048.0
12.5M
8978.0
-13899.8 4442.6
17M
4493.1
-9923.8
4793.0
21.5M
-6605.1
4837.9
5188.2
22.4M
-225.0
11962.6
0.0
23.3M
0.0
11962.6
0.0

SUM
5132.7
8281.4
5337.1
1488.8
-479.2
-637.7
3421.0
11737.6
11962.6

P
-21062.1
-21776.1
-23108.6
-25966.7
-25874.9
-25475.4
-24639.9
-23931.8
-23931.8

P (SEC)
0.0
0.0
0.0
419.9
419.9
420.0
420.0
0.0
0.0

STRESS
TOP
BOTTOM
42.5
-35.5
66.5
-59.3
44.4
-36.7
15.6
-7.0
0.6
7.9
-0.7
9.0
30.0
-21.9
93.1
-85.1
94.8
-86.9

DL
140.2
1334.4
1474.6
-1851.7
-304.0
2139.1
2772.1
0.0
0.0

SF
PT
-4763.4
-3763.2
2766.4
2769.6
177.7
-2087.0
-4115.4
-4058.2
-4058.2

PT SEC
0.0
0.0
0.0
-87.8
-87.6
-87.5
-87.4
0.0
0.0

PIER

PIER LEFT

TOP
BOTTOM

DL
6527.5
2171.5

BM
PT

PT SEC
0.0
-3145.3
0.0
0.0

SUM
3382.2
2171.5

STRESS
TOP
BOTTOM
1.8
-1.8
1.2
-1.2

DL
-513.8
-513.8

SF
PT
0.0
0.0

PT SEC
365.6
365.6

PIER RIGHT

TOP
BOTTOM

DL
-6359.2
-2003.2

BM
PT

PT SEC
0.0
4518.2
0.0
1418.7

AXIAL FORCE
PIER LEFT
DL
-5853.3
PT
0.0
PT SEC
-76.2

659.0
660.0
661.0
665.0
668.0
671.0
672.0
673.0
673.0

STRESS
TOP
BOTTOM
1.2
-1.2
0.4
-0.4

SUM
-1841.0
-584.5

DL
513.8
513.8

SF
PT
0.0
0.0

PT SEC
-365.6
-365.6

PIER RIGHT
-3031.7
0.0
76.2

STAGE 6
Other span placed
PIER CAP
BM
DL
PT
0M
-70.4
4479.5
2M
-3392.0
8811.7
3.5M
-3130.0
10422.9
8M
13517.0
-6471.2
12.5M
20499.7 -12636.1
17M
8317.9
-8626.6
21.5M
-14826.7
4212.7
22.4M
-225.0
10193.6
23.3M
0.0
10193.6

PT SEC
0.0
0.0
0.0
3610.2
3953.1
4257.8
4602.9
0.0
0.0

SUM
4409.1
5419.8
7292.9
10655.9
11816.6
3949.1
-6011.0
9968.6
10193.6

P
-18181.1
-18870.1
-20101.0
-22847.4
-23590.1
-22204.2
-21513.0
-20444.9
-20444.9

P (SEC)
0.0
0.0
0.0
372.9
373.0
373.0
372.9
0.0
0.0

STRESS
TOP
BOTTOM
36.5
-30.5
44.3
-38.0
58.7
-52.0
84.7
-77.2
93.6
-85.9
33.6
-26.4
-42.1
49.2
79.1
-72.3
80.8
-74.0

DL
140.8
2320.0
2460.7
-4188.9
473.9
4802.9
5438.6
0.0
0.0

SF
PT
-4113.1
-3259.9
2406.4
2436.9
162.0
-1819.0
-3593.1
-3466.9
-3466.9

PT SEC
0.0
0.0
0.0
-76.3
-76.2
-76.2
-76.4
0.0
0.0

PIER

PIER LEFT

PIER RIGHT

TOP
BOTTOM

DL
16755.2
6214.1

TOP
BOTTOM

DL
-14585.5
-4044.3

BM
PT

BM
PT

PT SEC
0.0
-3223.4
0.0
0.0

SUM
13531.8
6214.0

STRESS
TOP
BOTTOM
7.2
-7.2
3.3
-3.3

DL
-1243.4
-1243.4

PT SEC
0.0
4591.3
0.0
1437.4

SUM
-9994.2
-2607.0

STRESS
TOP
BOTTOM
6.6
-6.6
1.7
-1.7

DL
1243.4
1243.4

AXIAL FORCE
PIER LEFT
DL
-13182.4
PT
0.0
PT SEC
-75.9

659.0
660.0
661.0
665.0
668.0
671.0
672.0
673.0
673.0

SF
PT
0.0
0.0

PT SEC
372.0
372.0

0.0
0.0

PT SEC
-372.0
-372.0

SF
PT

PIER RIGHT
-5692.7
0.0
75.9

STAGE 7
Third stage prestressing
PIER CAP
BM
DL
PT
0M
-70.8
9354.2
2M
-3394.5
18111.7
3.5M
-3130.0
21282.8
8M
20486.9 -13476.0
12.5M
26935.1 -25518.2
17M
14265.4 -17930.8
21.5M
-9445.4
8725.9
22.4M
-225.0
21065.5
23.3M
0.0
21065.5

PT SEC
0.0
0.0
6047.0
4636.8
4929.5
5191.7
5490.8
0.0
0.0

SUM
9283.4
14717.2
24199.8
11647.7
6346.4
1526.2
4771.2
20840.5
21065.5

P
-38348.9
-39169.9
-41447.8
-48045.6
-48082.8
-46606.3
-45006.3
-42672.6
-42672.6

P (SEC)
0.0
0.0
0.0
669.0
669.0
668.9
668.9
0.0
0.0

STRESS
TOP
BOTTOM
76.9
-64.1
118.3
-105.2
190.7
-176.9
96.3
-80.6
56.1
-40.3
19.2
-3.9
43.6
-28.8
165.4
-151.1
167.1
-152.9

DL
141.6
2322.0
2463.6
-4071.8
594.4
4926.2
5565.8
0.0
0.0

SF
PT
-8664.0
-6776.4
4961.1
5124.6
330.3
-3818.0
-7516.9
-7236.1
-7236.1

PT SEC
0.0
0.0
0.0
-64.5
-65.3
-65.8
-66.2
0.0
0.0

PIER

PIER LEFT

TOP

DL
16768.4

BM
PT

PT SEC
0.0
-4915.7

SUM
11852.7

STRESS
TOP
BOTTOM
6.3
-6.3

DL
-1244.4

SF
PT
0.0

PT SEC
568.3

PIER RIGHT

BOTTOM

6218.5

TOP
BOTTOM

DL
-14598.1
-4048.3

0.0
BM
PT

0.0

6218.5

PT SEC
0.0
7011.9
0.0
2193.5

SUM
-7586.2
-1854.7

AXIAL FORCE
PIER LEFT
DL
-13192.8
PT
0.0
PT SEC
-116.3

3.3

-3.3

-1244.4

STRESS
TOP
BOTTOM
5.0
-5.0
1.2
-1.2

DL
1244.4
1244.4

STRESS
TOP
BOTTOM
121.9
-111.5
121.9
-111.5
98.1
-87.7
121.9
-111.5
121.9
-111.5
121.9
-111.5
121.9
-111.5
120.1
-109.8
121.9
-111.5

DL
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0

568.3

0.0
0.0

PT SEC
-568.3
-568.3

SF
PT

PIER RIGHT
-5701.3
0.0
116.3

STAGE 8
Service stage
PIER CAP

659.0
660.0
661.0
665.0
668.0
671.0
672.0
673.0
673.0

0M
2M
3.5M
8M
12.5M
17M
21.5M
22.4M
23.3M

DL
0.0
0.0
-3130.0
0.0
0.0
0.0
0.0
-225.0
0.0

BM
PT
15365.7
15365.7
15365.7
15365.7
15365.7
15365.7
15365.7
15365.7
15365.7

PT SEC
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

SUM
15365.7
15365.7
12235.7
15365.7
15365.7
15365.7
15365.7
15140.7
15365.7

P
-31004.7
-31004.7
-31004.7
-31004.7
-31004.7
-31004.7
-31004.7
-31004.7
-31004.7

P (SEC)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

SF
PT
-5257.6
-5257.6
-5257.6
-5257.6
-5257.6
-5257.6
-5257.6
-5257.6
-5257.6

PT SEC
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

PIER

PIER LEFT

PIER RIGHT

TOP
BOTTOM

DL
19618.2
7267.1

TOP
BOTTOM

DL
-17107.0
-4755.9

AXIAL FORCE
PIER LEFT
DL
-15555.7
PT
0.0
PT SEC
-114.8

BM
PT

BM
PT

PT SEC
0.0
-4891.1
0.0
0.0

SUM
14727.2
7267.1

STRESS
TOP
BOTTOM
7.9
-7.9
3.9
-3.9

DL
-1456.8
-1456.8

PT SEC
0.0
6960.7
0.0
2175.9

SUM
-10146.3
-2580.0

STRESS
TOP
BOTTOM
6.7
-6.7
1.7
-1.7

DL
1456.8
1456.8

PIER RIGHT
-6582.5
0.0
114.8

SF
PT
0.0
0.0

PT SEC
564.4
564.4

0.0
0.0

PT SEC
-564.4
-564.4

SF
PT

661 to 672 =

pier cap

negative= compression
positive= tension

STAGE 2 Pier cap cast on staging


Elem
659.00
659.00
660.00
660.00
661.00
661.00
665.00
665.00
668.00
668.00
671.00
671.00
672.00
672.00
673.00
673.00

Load

Stage

SummationCS 2
SummationCS 2
SummationCS 2
SummationCS 2
SummationCS 2
SummationCS 2
SummationCS 2
SummationCS 2
SummationCS 2
SummationCS 2
SummationCS 2
SummationCS 2
SummationCS 2
SummationCS 2
SummationCS 2
SummationCS 2

Step

Part

Axial
Bend(+z) Bend(-z)
(N/mm^2) (N/mm^2) (N/mm^2)

Cb(min/m
Cb1(-y+z) Cb3(+y-z)
ax)
(N/mm^2) (N/mm^2)
(N/mm^2)

002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)

J[14]
I[8]
I[14]
J[5]
J[378]
I[5]
J[6]
I[9]
J[11]
I[15]
J[747]
I[12]
J[379]
I[747]
I[379]
J[380]

0.00
0.00
0.00
0.00
0.00
0.00
-0.07
-0.07
-0.07
-0.07
-0.07
-0.07
-0.07
-0.07
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.03
0.00
0.03
0.09
0.12
0.09
-0.15
-0.20
0.01
-0.08
0.15
0.11
0.30
0.15
-0.06
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.05
0.00
0.05
0.29
0.56
0.29
-0.53
0.17
-1.39
-1.14
-0.55
-0.90
2.11
-0.55
0.15
0.00
2.11
-1.39

002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)

I[8]
J[14]
J[5]
I[14]
J[378]
I[5]
J[6]
I[9]
I[15]
J[11]
I[12]
J[747]
J[379]
I[747]
J[380]
I[379]

-4.87
-4.89
-4.93
-4.89
-4.94
-4.93
-4.83
-4.85
-4.77
-4.72
-4.71
-4.71
-4.70
-4.71
-4.80
-4.80

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

-0.04
0.08
0.55
0.08
0.68
0.55
0.17
0.21
0.09
-0.03
-0.14
-0.16
-0.12
-0.16
-0.44
-0.49

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

-0.31
-0.29
0.88
-0.29
2.55
0.88
1.12
0.41
1.71
1.82
1.05
0.65
-1.22
0.65
0.34
2.58
2.58
-1.22

STAGE 3 First stage prestress


659.00
659.00
660.00
660.00
661.00
661.00
665.00
665.00
668.00
668.00
671.00
671.00
672.00
672.00
673.00
673.00

SummationCS 3
SummationCS 3
SummationCS 3
SummationCS 3
SummationCS 3
SummationCS 3
SummationCS 3
SummationCS 3
SummationCS 3
SummationCS 3
SummationCS 3
SummationCS 3
SummationCS 3
SummationCS 3
SummationCS 3
SummationCS 3

STAGE 4 ROB placed


659.00
659.00
660.00
660.00
661.00
661.00
665.00
665.00
668.00
668.00
671.00
671.00
672.00
672.00
673.00
673.00

SummationCS 4
SummationCS 4
SummationCS 4
SummationCS 4
SummationCS 4
SummationCS 4
SummationCS 4
SummationCS 4
SummationCS 4
SummationCS 4
SummationCS 4
SummationCS 4
SummationCS 4
SummationCS 4
SummationCS 4
SummationCS 4

002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)

I[8]
J[14]
J[5]
I[14]
J[378]
I[5]
J[6]
I[9]
J[11]
I[15]
I[12]
J[747]
J[379]
I[747]
I[379]
J[380]

-4.70
-4.71
-4.75
-4.71
-4.74
-4.75
-4.69
-4.68
-4.67
-4.69
-4.61
-4.58
-4.51
-4.58
-4.63
-4.63

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

-0.04
0.08
0.78
0.33
0.91
0.78
-0.16
-0.12
-0.12
0.00
0.26
0.24
0.29
0.24
-0.48
-0.42

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

-0.30
-0.28
1.81
-0.28
4.07
1.81
-2.05
-1.51
-3.16
-2.76
-2.84
-2.23
0.66
-2.23
2.48
0.32
4.07
-3.16

002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)

I[8]
J[14]
J[5]
I[14]
J[378]
I[5]
J[6]
I[9]
J[11]
I[15]
I[12]
J[747]
I[747]
J[379]
I[379]
J[380]

-6.75
-6.77
-6.83
-6.77
-6.81
-6.83
-6.90
-6.91
-6.82
-6.86
-6.77
-6.75
-6.75
-6.69
-6.65
-6.65

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

-0.03
0.12
0.97
0.36
1.14
0.97
-0.03
0.04
-0.14
0.07
0.15
0.12
0.12
0.11
-0.66
-0.61

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

-0.26
-0.20
2.30
-0.20
5.12
2.30
2.14
2.13
1.58
1.87
1.40
1.72
1.72
2.72
3.63
0.60
5.12
-0.26

002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)

J[14]
I[8]
I[14]
J[5]
I[5]
J[378]
I[9]
J[6]
I[15]
J[11]
J[747]
I[12]
J[379]
I[747]

-6.61
-6.59
-6.61
-6.66
-6.66
-6.64
-6.94
-6.98
-7.03
-6.93
-6.73
-6.78
-6.62
-6.73

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.12
-0.03
0.36
0.95
0.95
1.12
-0.24
-0.31
-0.20
0.14
0.40
0.43
0.41
0.40

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

-0.20
-0.25
-0.20
2.26
2.26
5.03
0.65
-0.36
-1.92
-0.86
2.01
0.99
6.43
2.01

STAGE 5 Second stage prestressing


659.00
659.00
660.00
660.00
661.00
661.00
665.00
665.00
668.00
668.00
671.00
671.00
672.00
672.00
673.00
673.00

SummationCS 5
SummationCS 5
SummationCS 5
SummationCS 5
SummationCS 5
SummationCS 5
SummationCS 5
SummationCS 5
SummationCS 5
SummationCS 5
SummationCS 5
SummationCS 5
SummationCS 5
SummationCS 5
SummationCS 5
SummationCS 5

STAGE 6 Other span placed


659.00
659.00
660.00
660.00
661.00
661.00
665.00
665.00
668.00
668.00
671.00
671.00
672.00
672.00

SummationCS 6
SummationCS 6
SummationCS 6
SummationCS 6
SummationCS 6
SummationCS 6
SummationCS 6
SummationCS 6
SummationCS 6
SummationCS 6
SummationCS 6
SummationCS 6
SummationCS 6
SummationCS 6

673.00 SummationCS 6
673.00 SummationCS 6

002(last)
002(last)

J[380]
I[379]

-6.50
-6.49

0.00
0.00

-0.60
-0.65

0.00
0.00

0.00
0.00
0.00
0.00

0.59
3.54
6.43
-1.92

STAGE 7 Third stage prestressing


659.00
659.00
660.00
660.00
661.00
661.00
665.00
665.00
668.00
668.00
671.00
671.00
672.00
672.00
673.00
673.00

SummationCS 7
SummationCS 7
SummationCS 7
SummationCS 7
SummationCS 7
SummationCS 7
SummationCS 7
SummationCS 7
SummationCS 7
SummationCS 7
SummationCS 7
SummationCS 7
SummationCS 7
SummationCS 7
SummationCS 7
SummationCS 7

002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)

J[14]
I[8]
J[5]
I[14]
I[5]
J[378]
I[9]
J[6]
J[11]
I[15]
J[747]
I[12]
I[747]
J[379]
J[380]
I[379]

-10.10
-10.00
-10.10
-10.10
-10.10
-10.10
-10.10
-10.10
-9.93
-10.10
-9.77
-9.81
-9.77
-9.71
-9.89
-9.85

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.28
0.10
1.26
0.53
1.26
1.45
0.01
-0.11
0.11
-0.10
0.21
0.28
0.21
0.13
-0.90
-0.95

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.37
0.95
4.68
1.37
4.68
8.26
-2.31
-2.53
-2.17
-3.42
-0.45
-1.03
-0.45
1.12
1.97
6.33
8.26
-3.42

002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)

I[8]
J[14]
I[14]
J[5]
J[378]
I[5]
I[9]
J[6]
J[11]
I[15]
J[747]
I[12]
J[379]
I[747]
J[380]
I[379]

-9.81
-9.84
-9.84
-9.88
-9.81
-9.88
-9.87
-9.91
-9.82
-9.97
-9.57
-9.64
-9.44
-9.57
-9.66
-9.61

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.10
0.27
0.64
1.36
1.54
1.36
-0.18
-0.30
0.14
-0.21
0.44
0.50
0.37
0.44
-0.88
-0.92

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.91
1.32
1.32
5.02
8.83
5.02
-4.21
-5.12
-5.42
-6.76
-2.46
-3.59
1.87
-2.46
1.92
6.17
8.83
-6.76

002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)
002(last)

I[8]
J[14]
J[5]
I[14]
I[5]
J[378]
I[9]
J[6]
J[11]
I[15]
I[12]
J[747]
J[379]
I[747]
J[380]
I[379]

-9.67
-9.69
-9.73
-9.69
-9.73
-9.65
-9.77
-9.85
-9.85
-9.96
-9.60
-9.49
-9.28
-9.49
-9.52
-9.46

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.10
0.27
1.33
0.62
1.33
1.51
-0.32
-0.44
0.07
-0.28
0.74
0.68
0.63
0.68
-0.87
-0.91

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.89
1.29
4.90
1.29
4.90
8.62
-6.00
-7.38
-8.63
-9.54
-6.07
-4.37
2.89
-4.37
1.89
6.07

STAGE 8 SIDL
659.00
659.00
660.00
660.00
661.00
661.00
665.00
665.00
668.00
668.00
671.00
671.00
672.00
672.00
673.00
673.00

SummationCS 8
SummationCS 8
SummationCS 8
SummationCS 8
SummationCS 8
SummationCS 8
SummationCS 8
SummationCS 8
SummationCS 8
SummationCS 8
SummationCS 8
SummationCS 8
SummationCS 8
SummationCS 8
SummationCS 8
SummationCS 8

STAGE 9 LL
659.00
659.00
660.00
660.00
661.00
661.00
665.00
665.00
668.00
668.00
671.00
671.00
672.00
672.00
673.00
673.00

SummationCS 9
SummationCS 9
SummationCS 9
SummationCS 9
SummationCS 9
SummationCS 9
SummationCS 9
SummationCS 9
SummationCS 9
SummationCS 9
SummationCS 9
SummationCS 9
SummationCS 9
SummationCS 9
SummationCS 9
SummationCS 9

0.00
0.00

8.62
-9.54

Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID

4.4942 Y =

-1.2027 Z =

4.9942 Y =

-1.0893 Z =

5.2 Y =

-1.0506 Z =

5.4942 Y =

-0.998 Z =

5.9942 Y =

-0.9162 Z =

6.4942 Y =

-0.8436 Z =

6.9942 Y =

-0.7803 Z =

7.4942 Y =

-0.7261 Z =

7.9942 Y =

-0.681 Z =

8.4942 Y =

-0.645 Z =

8.9942 Y =

-0.6181 Z =

9.4942 Y =

-0.6001 Z =

9.9942 Y =

-0.5911 Z =

10.2442 Y =

-0.59 Z =

10.4942 Y =

-0.5911 Z =

10.9942 Y =

-0.6001 Z =

11.4942 Y =

-0.6181 Z =

11.9942 Y =

-0.645 Z =

12.4942 Y =

-0.681 Z =

12.9942 Y =

-0.7261 Z =

13.4942 Y =

-0.7803 Z =

13.9942 Y =

-0.8436 Z =

Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX
Command: ID
Specify poiX

14.4942 Y =

-0.9162 Z =

14.9942 Y =

-0.998 Z =

15.3 Y =

-1.0527 Z =

15.4942 Y =

-1.0893 Z =

15.9942 Y =

-1.19 Z =

4.4942
4.9942
5.2
5.4942
5.9942
6.4942
6.9942
7.4942
7.9942
8.4942
8.9942
9.4942
9.9942
10.2442
10.4942
10.9942
11.4942
11.9942
12.4942
12.9942
13.4942
13.9942
14.4942
14.9942
15.3
15.4942
15.9942

-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375
-0.375

-1.2027
-1.0893
-1.0506
-0.998
-0.9162
-0.8436
-0.7803
-0.7261
-0.681
-0.645
-0.6181
-0.6001
-0.5911
-0.59
-0.5911
-0.6001
-0.6181
-0.645
-0.681
-0.7261
-0.7803
-0.8436
-0.9162
-0.998
-1.0527
-1.0893
-1.19

4.4942
4.9942
5.2
5.4942
5.9942
6.4942
6.9942
7.4942
7.9942
8.4942
8.9942
9.4942
9.9942
10.2442
10.4942
10.9942
11.4942
11.9942
12.4942
12.9942
13.4942
13.9942
14.4942
14.9942
15.3
15.4942
15.9942

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

-1.2027
-1.0893
-1.0506
-0.998
-0.9162
-0.8436
-0.7803
-0.7261
-0.681
-0.645
-0.6181
-0.6001
-0.5911
-0.59
-0.5911
-0.6001
-0.6181
-0.645
-0.681
-0.7261
-0.7803
-0.8436
-0.9162
-0.998
-1.0527
-1.0893
-1.19

4.4942
4.9942
5.2
5.4942
5.9942
6.4942
6.9942
7.4942
7.9942
8.4942
8.9942
9.4942
9.9942
10.2442
10.4942
10.9942
11.4942
11.9942
12.4942
12.9942
13.4942
13.9942
14.4942
14.9942
15.3
15.4942
15.9942

0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375

-1.2027
-1.0893
-1.0506
-0.998
-0.9162
-0.8436
-0.7803
-0.7261
-0.681
-0.645
-0.6181
-0.6001
-0.5911
-0.59
-0.5911
-0.6001
-0.6181
-0.645
-0.681
-0.7261
-0.7803
-0.8436
-0.9162
-0.998
-1.0527
-1.0893
-1.19

You might also like