1.1.1.1
19.4 Providing and fixing square-mouth S.W. gully trap class SP-1 complete with C.I. grating brick
masonry chamber with water tight Precast RCC cover with Frame 300 x300 mm size (inside) as
per standard design:
19.4.1 100x100 mm size P type
19.4.1.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
Code Description
Details of cost of one gully tarp
Rate
Unit
Qty
90.00
each
each
35.00
150.00
each
each
1
1
each
each
0.00
L.S.
4.5
L.S.
3349.30
cum
0.09
cum
4470.10
cum
0.13
cum
5377.25
cum
0.008
cum
200.65
sqm
0.29
sqm
22.7 Providing and laying integral cement based water proofing treatment including preparation of
as required
for treatment
roofs,
balconies,
terraces
consisting
of following
22.7.1 surface
With average
thickness
of 120 mmofand
minimum
thickness
at etc
khurra
as 65 mm.
Code Description
Rate
Unit
Qty
Detail of cost for 10 sqm
i) Cement slury
0367 Portland Cement
5400.00
tonne
0.0275 tonne
ii) Cement mortar 1:5 (1 cement: 5
coarsesand)
3.10 Rate as per Item No.3.10 of SH:Mortars
2921.55
cum
0.224
cum
650.00
cum
0.94
cum
0.00
cum
0.94
cum
2921.55
cum
0.5
cum
0114 Beldar
0101 Bhisti
0123 Mason (brick layer) 1st class
0124 Mason (brick layer) 2nd class
0128 Mate
Extra labour for ramming
0114 Beldar
9999 Sundries
iv) Cement slury
0367 Portland Cement
0114 Beldar
v) 20 mm cement plaster 1:4 (1 cement :
4 coarse sand)
13.6.1 Rate as per item no 13.6.1 of SH :
Finishing
290.00
328.00
480.00
450.00
328.00
Day
Day
Day
Day
Day
1.75
0.28
0.05
0.05
0.04
Day
Day
Day
Day
Day
290.00
1.09
Day
L.S.
0.25
13.65
Day
L.S.
5400.00
290.00
tonne
Day
212.85
sqm
0.0275 tonne
0.2 Day
10
sqm
40.00
kilogram
5ilogram
0.00
sqm
10.5
sqm
450.00
290.00
1.09
Day
Day
L.S.
0.36
0.36
13.65
Day
Day
L.S.
450.00
290.00
328.00
Day
Day
Day
0.54
0.54
0.45
Day
Day
Day
TOTAL
Add 15 % for contractor's profit and
overheads on all except (A) i.e. on
(7033.09 - 2128.50) = 4904.59
Cost for 10 sqm
Cost for one sqm
Say
3.10 Cement mortar 1:5 (1 cement : 5 coarse sand).
Code Description
Rate
Details of cost for 1 cum
MATERIAL
(0.214 cum. of cement = 0.31 tonne)
Cement required for cement mortar is
21.40%
Unit
Qty
0.31 tonne
0.31 tonne
1.07 cum
1.07 cum
5400.00
0.00
900.00
0.00
tonne
tonne
cum
cum
0114 Beldar
0101 Bhisti
9999 Hire and running charges of mechanical
mixer
290.00
328.00
1.09
Day
Day
L.S.
0.75
0.07
26.91
Day
Day
L.S.
1.09
L.S.
13.52
L.S.
9999 Sundries
TOTAL
Say
4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering
shuttering
- All
up to: 10
plinth
levelstone
: aggregate 40 mm nominal size)
4.1.11 and
1:5:10
(1 cement
: 5 work
fine sand
graded
Code Description
Rate
Unit
Qty
Details of cost for 1 cum.
MATERIAL
0293 Stone Aggregate (Single size) : 40 mm
950.00
cum
0.65 cum
nominal size
(0.70 cum - 7.5% for voids i.e. 0.05 =
0.65_x000D_
cum)
0295 Stone Aggregate (Single size) : 20 mm
nominal size
1050.00
cum
0.24
cum
0.00
cum
0.65
cum
0.00
cum
0.24
cum
950.00
0.00
cum
cum
0.47
0.47
cum
cum
5400.00
tonne
0.13 tonne
0.00
tonne
0.13 tonne
LABOUR
0155 Mason (average)
0114 Beldar
0101 Bhisti
0002 Hire charges of Concrete Mixer 0.25 to
0.40 cum with hooper
0012 Vibrator(Needle type 40mm)
9999 Sundries
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit and
overheads
450.00
290.00
328.00
1200.00
Day
Day
Day
Day
0.1
1.63
0.7
0.07
Day
Day
Day
Day
350.00
1.09
Day
L.S.
0.07
8.97
Day
L.S.
Cost of 1 cum.
Say
6.1 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in
and plinth
in:
6.1.1 foundation
Cement mortar
1:4 (1 cement
: 4 coarse sand)
Code Description
Rate
Unit
Qty
Details of cost for 1 cum.
MATERIAL
2602 Common burnt clay F.P.S. (non modular)
4500.00 1000 Nos
494 Nos
bricks class designation 7.5
2201 Carriage of Bricks
Cement mortar 1 : 4 (1 cement : 4 coarse
sand)
3.9 Rate as per item No 3.9 of SH: Mortar
9999 Sundries
LABOUR
0123 Mason (brick layer) 1st class
0124 Mason (brick layer) 2nd class
0115 Coolie
0101 Bhisti
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit and
overheads
0.00
1000 Nos
494
Nos
3299.55
cum
0.25
cum
1.09
L.S.
2.73
L.S.
480.00
450.00
290.00
328.00
Day
Day
Day
Day
0.36
0.36
1.37
0.2
Day
Day
Day
Day
Rate
Unit
Qty
Cost of 1 Cum.
Say
13.6 20 mm cement plaster of mix :
13.6.1 1:4 (1 cement: 4 coarse sand)
Code Description
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 4 (1 cement : 4 coarse
sand)
3.9 Rate as per Item Number 3.9 of SH:
Mortars
LABOUR
0155 Mason (average)
0115 Coolie
0101 Bhisti
9999 Scaffolding and sundries
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit and
overheads
3299.55
cum
0.224
cum
450.00
290.00
328.00
1.09
Day
Day
Day
L.S.
0.94
1.02
1.1
12.61
Day
Day
Day
L.S.
4001.55
cum
0.144
450.00
290.00
328.00
1.09
5400.00
0.00
450.00
290.00
1.09
Day
Day
Day
L.S.
tonne
tonne
Day
Day
L.S.
0.67 Day
0.75 Day
0.92 Day
12.61 L.S.
0.02 tonne
0.02 tonne
0.27 Day
0.27 Day
8.06 L.S.
cum
Code Description
Details of cost for 1 cum
MATERIAL
(0.357 cum. of cement = 0.51 tonne)
Cement required for cement mortar is
35.70%
Rate
Unit
Qty
5400.00
0.00
900.00
0.00
tonne
tonne
cum
cum
0.51 tonne
0.51 tonne
1.07 cum
1.07 cum
290.00
328.00
1.09
Day
Day
L.S.
0.75
0.07
26.91
Day
Day
L.S.
1.09
L.S.
13.52
L.S.
Unit
Qty
0.38 tonne
0.38 tonne
1.07 cum
1.07 cum
5400.00
0.00
900.00
0.00
tonne
tonne
cum
cum
0114 Beldar
0101 Bhisti
9999 Hire and running charges of mechanical
mixer
290.00
328.00
1.09
Day
Day
L.S.
0.75
0.07
26.91
Day
Day
L.S.
1.09
L.S.
13.52
L.S.
9999 Sundries
Cost of 1.00 cum
Say
4.2 Providing and laying cement concrete in retaining walls, return walls, walls (any thickness)
attached
columns,
piers,stone
abutments,
pillars,
posts,
struts,
buttresses, string or
4.2.3 including
1:2:4 (1 Cement
: 2pilasters,
coarse sand
: 4 graded
aggregate
20 mm
nominal
size)
Code Description
Rate
Unit
Qty
Details of cost for 1 cum.
MATERIAL
1050.00
cum
0.67
cum
1050.00
cum
0.22
cum
0.00
cum
0.89
cum
900.00
0.00
5400.00
cum
cum
tonne
0.445 cum
0.445 cum
0.32 tonne
0.00
tonne
0.32 tonne
290.00
290.00
328.00
480.00
450.00
1200.00
Day
Day
Day
Day
Day
Day
0.9
0.78
0.7
0.06
0.06
0.07
Day
Day
Day
Day
Day
Day
350.00
1.09
1.09
290.00
Day
L.S.
L.S.
Day
0.07
114.4
14.3
1.88
Day
L.S.
L.S.
Day
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit and
overheads
Cost of 1 cum.
Say
5
Total
90
15
150
0
301.44
581.11
43.02
58.19
1238.76
2.55
1241.31
38.63
1279.94
1279.95
ding preparation of
of following
mm.
Total
148.5
654.43
611
0
1460.78
507.5
91.84
24
22.5
13.12
72.5
14.88
148.5
58
2128.5
200
162
104.4
14.88
243
156.6
147.6
6984.53
48.56
7033.09
735.69
7768.78
776.88
776.9
Total
1674
0
963
0
217.5
22.96
29.33
14.74
2921.53
2921.55
617.5
252
0
0
446.5
0
702
0
45
472.7
229.6
84
24.5
9.78
2883.58
28.84
2912.42
436.86
3349.28
3349.3
signation 7.5 in
Total
2223
824.89
2.98
172.8
162
397.3
65.6
3848.57
38.49
3887.06
583.06
4470.12
4470.1
Total
739.1
423
295.8
360.8
13.74
1832.44
18.32
1850.76
277.61
2128.37
212.84
212.85
neat cement.
Total
576.22
301.5
217.5
301.76
13.74
108
0
121.5
78.3
8.79
1727.31
17.27
1744.58
261.69
2006.27
200.63
200.65
Total
2754
0
963
0
217.5
22.96
29.33
14.74
4001.53
4001.55
Total
2052
0
963
0
217.5
22.96
29.33
14.74
3299.53
3299.55
(any thickness)
,ize)
buttresses, string or
Total
703.5
231
0
400.5
0
1728
0
261
226.2
229.6
28.8
27
84
24.5
124.7
15.59
545.2
4629.59
46.3
4675.89
701.38
5377.27
5377.25