ITP-2i - WBS w/ Durations

Instructions
Full details and requirements, plus grading criterai, are included in the ITP Maste
The purpose of this Individual project is to develop the Work Breakdown Structur
another way, the scope of the project as defined in the charter and other docum
In addition (an extension beyond typical WBSs), each work task in the WBS must
their durations will be automatically rolled up and calculated by MS Project.)
Since this is an Individual project you must do your own work.