Activity
Building project
Site Preperation
Foundation and Stump Column

Duration
96 days

Survey and mark location


Footing Exscavation and leveling of footing
Crustone 4x6 compaction and lean concrete
Rebar cutting
Rebar and formwork installation of footing
concrete casting of footing
rebar stump column and wormwork installation
concrete casting of stump column
Remove formwork of footing and stump column
Soil backfill and compaction

1 day
1 day
2 day
1 day
2 days
2 days
2 days
2 days
4 days
1 day

Ground floor work

10 days

Soil backfill for beam and slab


Wast water pipe conection
Crustone compaction and lean concrete
Rebar cutting
Rebar and formwork installation of beam and slab
Concrete casting for ground floor
Column rebar and formwork installation
Concrete casting for Column ground floor
Remove formwork of column ground floor

1 day
1day
1 day
1 day
3 days
1 day
2 days
2 days
3 days

Septic tank work

6 days

Soil excavation and crustone compaction


Concrete casting
Brick work and wall plastering of Septic tank
Wast water pipe conection to septic tank

1
1
3
2

Mezzenine work

9 days

Rebar cutting for beam, slab and stair


Formwork of beam, slab and stair installation
Rebar installation
Waste water pipe conection
Concrete casting
Column rebar and formwork installation
Column concrete casting
Remove formwork of column mezzenine floor

1
3
2
1
1
2
2
2

First floor work

9 days

Rebar cutting for beam, slab and stair


Formwork of beam, slab and stair installation
Rebar installation

1 day
3 days
2 days

1 day

9 days

day
day
days
days
day
days
days
day
day
days
days
days

VII

VIII

IX

wast water pipe conection


Concrete casting
Column rebar and formwork installation
Remove formwork of columns first floor
Remove formwork of beam, slab and stair mezznine floor

1
1
2
2
3

Terazz work

10 days

Rebar cutting
Formwork of beam, slab and stair installation
Rebar installation
Concrete casting
Remove formwork of beam, slab and stair of first floor
Remove formwork of terazz floor

1
3
2
1
3
3

Finishing work

48 days

Brick work, Door and window fram installation


Cutting wall for lighting, socket and AC
Flexible pipe for lighting, socket and AC in wall
Clean water pipe conection
Drain for AC
Wall plastering
Ventilation, Copper pipe and Electrice cable conection
Ceiling fram and board installation
Ceiling painting
Wall coating
Wall painting
Doors, windows and handrial installation
Bathroom and floor tiling with skirting
Sanitary ware and bathroom fitting

15 days
3 days
4 days
4 days
3 days
10 days
5 days
8 days
6 days
10 days
7 days
5 days
16 days
5 days

Clean up of site work

3 days

5
4
5

day
day
days
days
days
day
days
days
day
days
days

Per day
48000
30000
24000
21000
1140
3562.5
2280
2493.75
9476.25

Start

Finish

5/27/2016

9/2/2016

9 10 11 12

Riel
4560000
2850000
2280000
1995000

Dollar
1140
712.5
570
498.75

13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

Date
38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62

63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87

88 89 90 91 92 93 94 95