Measurement Book
Name of Project :- VRC Slaughter House construction work

Fiscal Year:- 2072/073


Date:- 2073.03.16

Final Bill
Mechanical & Electrical Equipments

Location:- Dharan 11, Sunsari (Nepal)

S.N.
1
2
3
4
5
6
7
8

Valuation
Particular
40 kva Ganeratior
Meat Chilling Machine
Weighting Kata
Solar Water Heater
Solar Inverter
Meat Cuttung Machine
Vacuum packing Machine
Khukuri / Chhuri

Unit Quantity
Rate
1.00
###
nos
2.00
###
nos
2.00
15368.00
nos
1.00
###
nos
1.00
###
nos
1.00
###
nos
1.00
###
nos
12.00
762.50
nos

Total Amount With 13 % VAT

User/ Clint

Users

Amount
Remarks
900000.00
300000.00
30736.00
130000.00
207666.00
150000.00
150000.00
9150.00
1877552.00

Consultant

Consultant

Approved By

Approved By:

HOME OLANS CONSULTING FIRM


DHARAN, SUNSHARI, NEPAL

Fiscal Year:- 2072/073

Work Complete Certificate


1

Name of Project & Address:- VRC Slaughter House construction worked. Dharan

Estimate Cost:-

Date of Commencement :- 2073.02.26

Date of Completion :- 2073.03.15

S.N.
1

Work Particular

2059409.19

Date:- 2073.03.16

Worked Complete Date:- 2073.03.14

Bill Amount:-

Estimate cost above or below:-

2057933.36

Unit

As per Estimate
Quantity
Rate
Amount
l/s

Site Clearance & Preparation Work

25000.00

In Percentage
As per Field
Quantity
Rate
Amount
l/s

25000.00

Quantity

below
Page:Difference
Rate
Amount

l/s

0.00

Foundation Work
2

Earth Work in Excavation

Cum

Filling

Cum

Stone Soling Works

Cum

PCC Work in 1:2:4 Cement ratio

Cum

RCC Work in 1:1.5:3 C/M ratio

Cum

1st class Brick Work(1:4)

Cum

Reinforcement work all complete

Form Works

10

1st class Brick Work(1:4)

Cum

11

Sal Wood work ( for frame)

Cum

12

0.5" thick plaster work (1:4) in walls

Sq.M.

13

0.5" thick plaster work (1:4) in walls

Sq.M.

14

Door panel

Sq.M.

15

Two coat water proof cement painting work

Sq.M.

16

Enamel Painting work

Sq.M.

17

Acid or Alkali Resistant tiling on floor

Sq.M.

18

Sal wood for roof work

Cum

19

3mm thick plywood for roofing

Sq.M.

20

26 gage CGI sheet Roofing

Sq.M.

21

Water-supply and sanitary work

5%

22

Electrical Installation work

8%

kg
Sq.M.

44.96
9.25
15.54
9.34
1.84
30.86
193.09
13.43

576.23
1734.17
3191.25
11861.75
12031.45
12723.72
105.42
683.14

25904.42
16041.07
49592.03
110788.75
22089.74
392615.83
20355.76
9171.84

59.52
15.84
14.46
9.54
1.95
24.09
191.61
13.88

576.23
1734.17
3191.25
11861.75
12031.45
12723.72
105.42
683.14

34299.40
27462.88
46132.02
113170.78
23493.38
306552.21
20199.02
9485.23

14.56
6.59
-1.08
0.20
0.11
-6.77
-1.48
0.45

576.23
1734.17
3191.25
11861.75
12031.45
12723.72
105.42
683.14

7.24
0.04

12723.72
239493.03

92056.11
9100.74

10.89
0.09

12723.72
239493.03

138505.05
22177.54

3.65
0.05

12723.72
239493.03

107.36
65.08
4.18
107.36
51.58
51.54
1.30
62.74
79.47

274.53
274.53
6515.39
109.92
246.91
2499.64
239493.03
6515.39
1285.74

29472.72
17865.59
27247.35
11801.01
12735.36
128828.95
310861.95
408775.44
102181.36
1822486.01
91124.30
145798.88

55.76
81.55
3.90
106.88
64.95
65.06
1.30
55.76
98.31

274.53
274.53
6515.39
109.92
246.91
2499.64
239493.03
6515.39
1285.74

15308.36
22388.99
25431.82
11747.96
16036.53
162615.99
311292.06
363311.71
126399.24

-51.60
16.47
-0.28
-0.48
13.37
13.52
0.00
-6.98
18.84

274.53
274.53
6515.39
109.92
246.91
2499.64
239493.03
6515.39
1285.74

SUPER STRUCTURE WORK

FINISHING WORK

Civil Work
Civil Work

2059409.19
Total Amount
Total Amount in words:Reason for deviation on in estimation (+) for above estimate (-) for below estimate.
Verification of works as per design & specification.

..
Consultancy

l/s
l/s

91124.30
145798.88
2057933.36

l/s
l/s

8394.98
11421.81
-3460.01
2382.03
1403.64
-86063.62
-156.74
313.39
0.00
46448.94
13076.80
0.00
-14164.36
4523.40
-1815.53
-53.05
3301.17
33787.04
430.11
-45463.73
24217.88
0.00
0.00
-1475.84

..
Approved By

1
Remarks

HOME PLANS CONSULTING FIRM


DHARAN, SUNSARI, NEPAL
Name of Project:- VRC Slaughter House construction work
Estimate Cost:- 2059409.19
Users:Work Order Date:- 2073.02.26
Work Complete Period:- 2073.03.15
Worked Complete Date:- 2073.03.15
S.N.
1
1

Work Particular
2
Site Clearance & Preparation Work
Foundation Work
2
Earth Work in Excavation
3
Filling
4
Stone Soling Works
5
PCC Work in 1:2:4 Cement ratio
6
RCC Work in 1:1.5:3 C/M ratio
7
1st class Brick Work(1:4)
8
Reinforcement work all complete
9
Form Works
SUPER STRUCTURE WORK
10
1st class Brick Work(1:4)
11
Sal Wood work ( for frame)
FINISHING WORK
12
0.5" thick plaster work (1:4) in walls
13
0.5" thick plaster work (1:4) in walls
14
Door panel
Two coat water proof cement painting
15
work
16
Enamel Painting work
17
Acid or Alkali Resistant tiling on floor
18
Sal wood for roof work
19
3mm thick plywood for roofing
20
26 gage CGI sheet Roofing
21
Water-supply and sanitary work
22
Electrical Installation work
Total Amount
This Bill Amount :Be four Bill Payment :Payment:
Users/ Clint
Total Rs.:This is certify sing

Users/ Courtesan / Contract


Bill

Maximum work
Rate
Amount
5
6
25000.00

Bill no:Final Bill


Payment Bill no:Payment Slip no:Measurement Book No:Page No:one
Old Bill Work
Quantity Amount
7
8

1/1/Bld/2072/073
Fiscal Year:- 2072/073
Date:- 2073.03.16
Net Work
Quantity
Amount
Remarks
9
10
11
l/s
25000.00

Unit
3

Quantity
4
l/s

Cum
Cum
Cum
Cum
Cum
Cum
kg
Sq.M.

59.52
15.84
14.46
9.54
1.95
24.09
191.61
13.88

576.23
1,734.17
3,191.25
11,861.75
12,031.45
12,723.72
105.42
683.14

34299.40
27462.88
46132.02
113170.78
23493.38
306552.21
20199.02
9485.23

59.52
15.84
14.46
9.54
1.95
24.09
191.61
13.88

34299.40
27462.88
46132.02
113170.78
23493.38
306552.21
20199.02
9485.23

Cum
Cum

10.89
0.09

12,723.72
###

138505.05
22177.54

10.89
0.09

138505.05
22177.54

Sq.M.
Sq.M.
Sq.M.
Sq.M.
Sq.M.
Sq.M.
Cum
Sq.M.
Sq.M.

55.76
81.55
3.90
106.88
64.95
65.06
1.30
55.76
98.31
l/s
l/s

274.53
274.53
6,515.39
109.92
246.91
2,499.64
###
6,515.39
1,285.74

15308.36
22388.99
25431.82
11747.96
16036.53
162615.99
311292.06
363311.71
126399.24
91124.30
145798.88
2057933.36

55.76
81.55
3.90
106.88
64.95
65.06
1.30
55.76
98.31
l/s
l/s

15308.36
22388.99
25431.82
11747.96
16036.53
162615.99
311292.06
363311.71
126399.24
91124.30
145798.88
###

Consultant
In Figure:-

Deduct Amount:a) Advance:b) Contractor Tax:c) Deposit :Net Payment :-

for Cheque No:-

..
Approved By
Receiver sing:-

HOME PLANS CONSULTING FIRM


DHARAN SUNSARI, NEPAL

Measurement Book

Fiscal Year:- 2072/073

Name of Project :- VRC Slaughter House construction work


Location:- Dharan 11, Sunsari (Nepal)
S.No
Details of Works
NO
1
2

Date:- 2073.03.16

Final Bill
Measurement
Length Breadth High/Dep.

Site Clearance & Preparation Work


FOUNDATION WORK (UP TO PLINTH)
Earth Work in Excavation
Long wall
2
30.00
3.00
5.00
Short wall
4
20.00
3.00
5.00
Total
Filling
Floor Room

Total
Stone Soling Works
Long wall
Short wall
Floor Room

2
4
1

Total
PCC Work in 1:2:4 Cement ratio
Long wall
Short wall
Floor Room
Total
RCC Work in 1:1.5:3 C/M ratio
Tie Beam

2
4
1

29.16

30.00
20.00
30.00

30.00
20.00
30.00

100.00

19.16

3.00
3.00
20.00

3.00
3.00
20.00

0.83

1.00

0.50
0.50
0.50

0.33
0.33
0.33

0.83

Net RCC work

8
9

1st class Brick Work(1:4)


Foundation
Long wall
Short wall
Total brick work

3
4

Reinforcement work all complete


Form Works
Tie Beam

30.00
20.00

1.25
1.25

1.95
2

1.25

90.00

4.00
4.00

78.50
0.83

Quantity

Remarks

l/s

900.00
1200.00
2100.00
59.52

Cft
Cum

558.71
558.71
15.84

Cft
Cum

90.00
120.00
300.00
510.00
14.46

Cum

59.40
79.20
198.00
336.60
9.54

Cft
Cum

68.89
68.89
68.89
1.95

Cft
Cft
Cum

450.00
400.00
850.00
24.09
191.61

Cft
Cum
Kg

149.40
149.40
13.88

Sft
Sq.M.

196.75
122.95
99.20
418.90

Cft

SUPER STRUCTURE WORK (GROUND FLOOR)


10

Users

1st class Brick Work(1:4)


Long wall
Short wall
Pillar
Total brick work

2
2
12

26.66
16.66
0.83

0.41
0.41
0.83

Consultant
Er. Mishal Limbu
Eng Council No:- 10319 'A' C

9.00
9.00
12.00

Approved By:

HOME PLANS CONSULTING FIRM


DHARAN SUNSARI, NEPAL

Measurement Book

Fiscal Year:- 2072/073

Name of Project :- VRC Slaughter House construction work


Location:- Dharan 11, Sunsari (Nepal)
S.No
Details of Works
NO

Deduction
Door D2
Total deduction

Date:- 2073.03.16

Final Bill
Measurement
Length Breadth High/Dep.

3.0

0.83

7.0

Net Brick Work


11

Sal Wood work ( for frame)


Door D2

15.0

0.33

0.33

Quantity

Remarks

11.87

Cum

34.86
34.86
0.99
10.89

Cft
Cum
Cum

3.27
3.27
0.09

Cft
Cum

360.00
240.00
600.00
55.76

Sq.ft.
Sq.M.

480.00
320.00
119.52
919.52

Sq.ft.

42.00
42.00
877.52
81.55

Sq.ft.
Sq.ft.
Sq.M.

FINISHING WORK
12

13

0.5" thick plaster work (1:4) in walls


Inner portion
Long wall
Short wall

0.5" thick plaster work (1:4) in walls


Inner portion
Long wall
Short wall
Pillar
Deduction
Door D2

4
4

2
2
12

14

Door panel

15

Two coat water proof cement painting work


Long Wall
2
Short Wall
2
out side wall below
1

16

17

Users

Enamel Painting work


Door Khapa
Door Panel
Calling

3
4
1

Acid or Alkali Resistant tiling on floor


of size 300x300 mm with 10mm
thickness in 1:4 cement mortar joint

30.00
20.00

3.00
3.00

30.00
20.00
0.83

8.00
8.00
12.00

3.0

7.00

3.0

7.00

42.00
3.90

Sq.ft.
Sq.M.

30.0
20.0
100.0

9.00
9.00
2.50

540.00
360.00
250.00
1150.00
106.88

Sq.ft.
Sq.M.

14.85
84.00
600.00
698.85
64.95

Sq.ft.
Sq.M.

15.0
3.0
30.0

0.33
7.00
20.00

100.0

Consultant
Er. Mishal Limbu
Eng Council No:- 10319 'A' C

1.00

100.00

Approved By:

HOME PLANS CONSULTING FIRM


DHARAN SUNSARI, NEPAL

Measurement Book

Fiscal Year:- 2072/073

Name of Project :- VRC Slaughter House construction work


Location:- Dharan 11, Sunsari (Nepal)
S.No
Details of Works
NO
Calling

18

19

Supplying & Fixing of sal wood for


roof work all complete work
Rafter
Purling

Supplying & fixing of 3mm thick


plywood for roofing

20

26 gage CGI sheet Roofing

21
22

Water-supply and sanitary work


Electrical Installation work

S.N.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

8
12

1
1

Final Bill
Measurement
Length Breadth High/Dep.
30.0
20.00

12.0
30.0

30.00
43.00

0.33
0.33

0.51
0.250

20.00
24.60

Valuation
Particular
Unit Quantity
Rate
Site Clearance & Preparation Work
l/s
FOUNDATION WORK (UP TO PLINTH)
Earth Work in Excavation
59.52
576.23
Cum
Filling
15.84
1734.17
Cum
Stone Soling Works
14.46
3191.25
Cum
PCC Work in 1:2:4 Cement ratio
9.54
11861.75
Cum
RCC Work in 1:1.5:3 C/M ratio
1.95
12031.45
Cum
1st class Brick Work(1:4)
24.09
12723.72
Cum
Reinforcement work all complete kg
191.61
105.42
Form Works
13.88
683.14
Sq.M.
SUPER STRUCTURE WORK (GROUND FLOOR)
1st class Brick Work(1:4)
10.89
12723.72
Cum
Sal Wood work ( for frame)
0.09
###
Cum
FINISHING WORK
0.5" thick plaster work (1:4) in wa Sq.M.
55.76
274.53
0.5" thick plaster work (1:4) in wa Sq.M.
81.55
274.53
Door panel
3.90
6515.39
Sq.M.
Two coat water proof cement pain Sq.M.
106.88
109.92
Enamel Painting work
64.95
246.91
Sq.M.
Acid or Alkali Resistant tiling on f Sq.M.
65.06
2499.64
Sal wood for roof work
1.30
###
Cum
3mm thick plywood for roofing Sq.M.
55.76
6515.39
26 gage CGI sheet Roofing
98.31
1285.74
Sq.M.
Water-supply and sanitary work
l/s
Electrical Installation work
l/s
Total

Users

Date:- 2073.03.16

Quantity

Remarks

600.00
700.00
65.06

Sq.ft.
Sq.M.

16.16
29.70
45.86
1.30

Cft
Cum

600.00
55.76
1057.80
98.31
l/s
l/s

Sq.ft.
Sq.M.
Sft
Sq.M.

Amount
Remarks
25000.00
34299.40
27462.88
46132.02
113170.78
23493.38
306552.21
20199.02
9485.23
138505.05
22177.54
15308.36
22388.99
25431.82
11747.96
16036.53
162615.99
311292.06
363311.71
126399.24
91124.30
145798.88
2057933.36

Consultant
Er. Mishal Limbu
Eng Council No:- 10319 'A' C

Approved By:

DHARAN MUNICIPALITY OFFICE

INTERGRATED URBAN DEVELOPMENT PROJECT (IUDP)


PROJECT IMPLEMENTATION UNIT (PIU)
QUANTITY ESTIMATED SHEET
Name of the Project: Community Building Construction Works

Page:- 1

Place:-Dharan -17, Saune Basti

Date:-2066/09/12
Estimate of the proposed Ground Floor of building

S.No.
1

Particulars

No. Length (ft.)Breadth (ft)


Height (ft) Quantity

Long wall

39.16

2.00

3.00

704.88

Short wall

20.66

2.00

3.00

619.80

Septic tank

5.00

6.00

5.00

Amount

Remarks

150.00
1474.68

Cft

41.80

Cum

346.08

14,465.91

Filling
Floor Room

37.00

13.00

3.00

Floor verandah

20.66

6.00

3.00

1443.00
371.88
1814.88

Cft

51.44

Cum

400.00

20,576.87

Cum

4886.28

66,904.50

8994.40

40,469.70

7205.20

90,179.37

12290.45

235,654.05

Total
3

Rate

Earth Work in Excavation

Total
2

Unit

Stone Soling Works


Long wall

39.16

1.50

0.50

88.11

Short wall

20.66

1.50

0.50

77.48

Septic tank

5.00

6.00

0.50

15.00

Floor Room

37.00

13.00

0.50

240.50

Floor verandah

20.66

6.00

0.50

61.98
483.07

Total
4

13.69

PCC Work in 1:2:4 Cement ratio


Septic tank

5.00

6.00

0.25

7.50

Floor Room

37.00

13.00

0.25

120.25

Floor verandah

20.66

6.00

0.25

30.99
158.74

Cft

4.50

Cum

Total
5

Stone Masonry wall in 1:6 CM


Long wall

39.16

1.00

2.00

234.96

Short wall

20.66

1.00

2.00

206.60
441.56

Cft

12.52

Cum

Total
6

1st class Brick Work(1:4)


For the super structure work up to second floor slab
10" wall room

119.00

0.83

8.00

Total brick work

790.16
790.16

Cft

22.40

Cum

Deduction

Door D1

3.0

0.83

7.0

34.86

Door D2

2.5

0.83

6.0

12.45

Window W4

4.0

0.83

4.0

66.40

Total deduction

113.71

Cft

3.22

Cum

Net Brick Work

19.17

Cum

RCC Work in 1:2:4 C/M ratio


Tie Beam

171.00

0.83

0.33

46.84

Seal beam

133.00

0.83

0.25

55.20

Prepare By

Checked By

Approved By

DHARAN MUNICIPALITY OFFICE

INTERGRATED URBAN DEVELOPMENT PROJECT (IUDP)


PROJECT IMPLEMENTATION UNIT (PIU)
QUANTITY ESTIMATED SHEET
Name of the Project: Community Building Construction Works

Page:- 1

Place:-Dharan -17, Saune Basti

Date:-2066/09/12
Estimate of the proposed Ground Floor of building

S.No.

Particulars

No. Length (ft.)Breadth (ft)


Height (ft) Quantity

RCC Slab tank

6.00

6.00

0.33

11.88

RCC Slab toilet

8.00

5.00

0.33

13.20
127.11

Net RCC work


8

Reinforcement work all complete

3.60

0.5" thick plaster work (1:4) in walls

0.75

Unit

Rate

Amount

Remarks

Cft

127.11

Cft

3.60

Cum

8994.40

32,406.33

78.50

212.12

Kg

91.21

19,347.77

Inner portion
10" wall room

140.30

9.00

1262.70

Toilet wall

24.50

8.00

196.00

Septic tank wall

22.00

6.60

1262.7

0.00
1458.70

Sq.ft.

Deduction

10

Door D1

3.0

7.00

42.00

Door D2

2.5

6.00

15.00

Window W4

4.0

4.00

80.00
137.00

Sq.ft.

1321.70

Sq.ft.

122.83

Sq.M.

241.83

29,705.08

Cum

176400

41,718.75

Sal Wood work ( for frame)


Door D1

15.0

0.25

0.25

1.88

Door D2

13.5

0.25

0.25

0.84

Window W4

18.0

0.25

0.25

5.63
8.34
0.24

11

Glazed Window and Shutter


Window W4

12

13

14

2.50

2.50

31.25
31.25

Sq.ft.

2.90

Sq.M.

15984.70

46,411.89

Water proof ply door


Door D1 3x 7 size

2.00

Nos

10500.00

21,000.00

Door D2 2.5x 6.5 size

1.00

Nos

8500.00

8,500.00

308.15

9,360.77

2152.00

211,560.00

Form Works
Tie Beam

171.00

Seal beam

133.00

RCC Slab tank

6.00

6.00

RCC Slab toilet

9.00

5.00

26 gage CGI sheet Roofing &


Truss fitting

43.00

0.66

112.86

0.25

133.00
36.00
45.00

24.60

326.86

Sft

30.38

Sq.M.

1057.80

Sft

98.31

Sq.M.

Total Civil Work of Ground floor


Total of civil work

913,261.00
913,261.000

Electrical Installation (3% of the civil work)

Prepare By

25,000.00

27,397.83

Checked By

Approved By

DHARAN MUNICIPALITY OFFICE

INTERGRATED URBAN DEVELOPMENT PROJECT (IUDP)


PROJECT IMPLEMENTATION UNIT (PIU)
QUANTITY ESTIMATED SHEET
Name of the Project: Community Building Construction Works

Page:- 1

Place:-Dharan -17, Saune Basti

Date:-2066/09/12
Estimate of the proposed Ground Floor of building

S.No.

Particulars

No. Length (ft.)Breadth (ft)


Height (ft) Quantity

Unit

Rate

Amount

Water-supply and sanitary Installation (5% of the civil work)

45,663.05

Add 3% for miscellaneous works

27,397.83

Total of estimated cost of the building

Prepare By

Remarks

1,013,719.71