BAM 421 Unit 4 Examination Answers

1.
2.
3.
4.
5.
6.

The aggregate plan gets input or feedback from which of the following areas?
engineering
finance, marketing and human resources
the master production schedule
procurement, production and general management
All of the above.

2.
3.
4.
5.
6.
7.

Which portion of the master production schedule is normally fixed, frozen or firm?
the entire schedule
only the aggregate schedule
only the middle of the schedule
only the near-term portion
only the far-term portion

3. In continuous (stock-to-forecast) operations, the master production schedule is usually


expressed in terms of _______________.
4. end items
5. modules
6. kits
7. customer orders
8. warehouse orders

4. In job shop (make-to-order) operations, the master production schedule is usually expressed
in
_______________.
1.
2.
3.
4.
5.

end items
modules
kits
customer orders
warehouse orders

5. A document calls for the production of 50 small garden tractors in week 1, 50 small garden
tractors and 100 riding mowers in week 2, 100 riding mowers and 200 garden utility carts in
week 3 and 100 riding mowers in week 4. This document is most likely a(n)
_______________.
6. net requirements document
7. resource requirements profile
8. aggregate plan
9. master production schedule
10. Wagner-Whitin finite capacity document

6. The _______________ is the input to material requirements planning which lists the
assemblies, subassemblies, parts and raw materials needed to produce one unit of finished
product.
7. bill of material
8. master production schedule
9. inventory records
10. assembly time chart
11. net requirements chart

7.
8.
9.
10.
11.
12.

A bill of material lists the _______________.


times needed to perform all phases of production
production schedules for all products
components, ingredients and materials required to produce an item
operations required to produce an item
components, ingredients, materials and assembly operations required to produce an item

8.
9.
10.
11.
12.

Forward scheduling _______________.


begins with a delivery date, then offsets each operation one at a time, in reverse order
is well suited where the supplier is usually able to meet precise delivery dates
tends to minimize work-in-process inventory
assumes that procurement of material and operations start as soon as requirements are
known
13. produces a schedule only if it meets the due date

9.
10.
11.
12.
13.
14.

Scheduling is rather straightforward in product-focused facilities because _______________.


kanban automates the scheduling of the assembly line
demand is reasonably stable and capacities, set-up times and run times are generally known
assembly line balancing assures the highest possible production efficiency
finite capacity scheduling has made MRP much more realistic
All of the above are true.

10. Which file contains important information regarding an items flow through the shop?

11.
12.
13.
14.
15.

item master file


work-center master file
control files
routing file
None of the above provides information regarding an items flow through the shop.

11.
12.
13.
14.
15.
16.

Which of these is not part of the planning files of a production planning and control system?
a progress file
a work-center master file
an item master file
a routing file
All of the above are all part of the planning files.

12.
13.
14.
15.
16.
17.

Which of the following files tracks work order progress?


work-center master files
routing files
item master files
control files
None of the above tracks work order progress.

13. The production database containing information about each of the components that a firm
produces or purchases is the _______________.
14. routing file
15. work-center master file
16. control file
17. item master file
18. None of the above.

14.
15.
16.
17.
18.
19.

Which of the following is not one of the Seven Wastes?


overproduction
transportation
assignment
defective product
motion

15.
16.
17.
18.
19.
20.

The 5Ss ________________.


have the flavor of a housekeeping list
are a checklist for lean operations
have become a list of seven items in American practice
can be used to assist with necessary changes in organizational culture
All of these are true.

16. The list of 5Ss, although it looks like a housekeeping directive, supports lean production by

________________.
1.
2.
3.
4.
5.

identifying non-value items and removing them in the sort/segregate item


reducing inventory in the standardize item
increasing variability through standardized procedures in the standardize item
eliminating wasted motion through ergonomic studies in the support item
building good safety practices in the shine/sweep item

17. Concerning relationships with suppliers, which of the following combinations is critical to the
success of JIT?
18. close relationships with trust
19. close relationships with skepticism
20. distant relationships with trust
21. distant relationships with skepticism
22. None of the above.

18.
19.
20.
21.
22.
23.

Which one of the following is not a benefit of the implementation of JIT?


cost reduction
variability increase
rapid throughput
quality improvement
rework reduction

19.
20.
21.
22.
23.
24.

If the goals of JIT partnerships are met, which of the following is a result?
For incoming goods, receiving activity and inspection are outsourced.
In-transit inventory falls as suppliers are located closer to facilities.
The number of suppliers increases.
In-plant inventory replaces in-transit inventory.
All of the above are consequences of meeting the JIT partnership goals.

20. Ten high-technology batteries are tested for 200 hours each. One failed at 20 hours; all others
completed the test. FR(%) is _______________ and MTBF is ________________.
21. 10%; 1/1820
22. 90%; 1/1820
23. 10%; 1820 hours
24. 10%; 1980 hours
25. cannot calculate from information provided

21. Ten high-technology batteries are tested for 200 hours each. One failed at 50 hours; all others
completed the test. FR(%) is _____________ and FR(N) is _______________.
22. 10%; 1/1850
23. 10%; 1/2000
24. 25%; 1850 hours
25. 90%; 1/2000
26. Indeterminate; no standard deviation is given.

22. Ten high-technology batteries are tested for 200 hours each. One failed at 20 hours, another
failed at 140 hours and all others completed the test. FR(%) is _______________ and MTBF
is ________________.
23. 20%; 880 hours
24. 10%; 1980 hours
25. 20%; 1760 hours
26. 80%; 920 hours
27. cannot calculate from information provided

23.
24.
25.
26.
27.
28.

MTBF measures the average _________________.


calendar time between failures
operating time between failures
number of failures per unit time
number of operations between failures
downtime per breakdown

24. A system is composed of four parts, J, K, L and M. All four must function for the system to
function. The four component reliabilities are .99, .98, .992 and .998. The designers are
considering putting a .80 reliable backup at K. This backup will change the system reliability
from ______________ to ________________.
25. 0.9762 to 0.9605
26. 0.9605 to 0.9762
27. 0.9605 to some smaller value
28. cannot be determined
29. None of the above.

25. Suppose that a process is comprised of multiple components, each having a 75% success
rate. What is the change in reliability going from a series layout to a parallel layout if the
process has 5 components?
26. 0%
27. 100%
28. 76.2%
29. -76.2 %
30. unable to determine