CSM80001 Project Costing - Assignment #1 2016

Estimate Quantity Take-off:

Assignment #1 Bill of Quantity take off:


Your manager has asked you to measure the following quantities from the drawings supplied and
prepare them in a Bill of Quantities format. The purchasing department will then obtain material
prices for the items that you have measured.
The assignment requires measure of the works to lock up stage. Lock Up stage includes
earthworks, foundations, concrete slabs and carparks, steelwork, precast concrete walls, roof
cladding, external doors and windows. That is, works sufficient to make the building weathertight
and secure.
Your manager is preparing the requirements for the following tasks and they are not to be included
in your materials take-off. The items that he is measuring will be provided later with some listed as
Provisional Cost (PC) items.

Preliminaries, mobilisation, site establishment, survey and demobilisation


Utilities and Fitout - including internal stud walls, internal doors, Sanitary Plumbing (i.e.
above floor level), Electrical power and lighting, data and telephone (other than supply
conduit from underground cables in the street), Carpentry, Plastering, Tiling and Painting.
Landscaping

Site Visit Notes:


You have visited the site and made the following notes:

Site generally slopes from east to west with features shown on the existing conditions
drawing S16001. The site is covered by scrubby bushes and rubbish (estimated at about 5
m3). Topsoil (100mm deep).
Approx. 100 mm of topsoil a is to be excavated from the whole site, some to be retained on
site (Refer drawing A16001) and the remainder carted to the local Council depot.
Sections of the 1500 wide x 100 thick concrete footpaths are to be removed for the driveway
crossovers where indicated on the drawings. Breakout and cart concrete to recycle crusher.
The steel framed shed is to be dismantled and 5m x 8m reinforced concrete floor slab to be
broken out and carted to recycle crusher. Quote received from Mens Shed to dismantle
and remove the structure with salvage value $1,250. List as a line item in your estimate.
Roofing to both warehouse and office is Spandek zincalume roof sheeting. Client has
supplied a quotation from Hi-n-Dri Roofing to supply and install roofing, gutters, flashing
and downpipes for $ 82,650. List as a provisional cost item.
Electricity, Gas, Telecoms, Water supply, Sewerage, and Drainage:
o

o
o

Electricity: 415V Electrical cable supply available from underground cable on North
side of Kona Court adjacent to South property boundary. Supply to run to
distribution box on warehouse wall. Client has provided quote from Live Wire
Electrics for $28,750 for electric cabling. List this in BofQ as a provisional cost.
Gas: No gas supply required for this project.
Telecom and data cabling from street pit to distribution board in office. You have
obtained a quotation from DataStream for $7,500. List in BofQ as a subcontract
cost item.

2016_CSM80001 Assign #1 BofQ-Rev 2.xlsx.docx

Page 1 of 6

Australian Project Costing Society

CSM80001 Project Costing - Assignment #1 2016

Estimate Quantity Take-off:

Water: 150 dia. water main runs past the property on East side of Bilby Street. Client
has supplied quote from Pronto Plumbing for $21,500 to supply and install 100 dia
water supply and fireservice main. List as a provisional cost.
o Sewerage: Tap into 230 dia sewer in Bilby Street and install 150 dia sewer to office
with 100 dia branches to toilet, basin and sink wastes. You have obtained a quote
from Trevor Brown Plumbing for $8,750. Include as a subcontract line item in
BofQ.
o Stormwater Drainage: Existing 600 dia stormwater drain along North side of Kona
Court. Allow in estimate for pits with heavy duty pit covers to take truck traffic.
Client has provided a price from Able Drainage for $42,460 to supply and install.
List as provisional cost.
Site establishment will require temporary amenities (chemical toilets with regular pump out
etc.), a site office and change/crib room with temporary power and water connections.
Footpath protection at vehicle entry and temporary fencing to the street frontages. The site
office can be located near the west property boundary but will need to be relocated when
parking areas in front of the building are being concreted.
Construction traffic access and parking will require 75mm hardstanding during construction.
A separate vehicle crossover to the footpath, with timber plank protection for construction
traffic, will be required prior to the new driveway crossover being built. Allow an area of
15m x 15m on West boundary of Bilby Street for construction hard standing.

Specification for this work:


The scope of work that you are to measure for this assignment is for the construction of building
works to lockup stage for a precast concrete wall and steel framed warehouse and office building.
The works include earthworks and drainage (with sewer, stormwater and conduits for services),
reinforced concrete floor slab to warehouse and office, concrete apron and car park. Steel portal
frames, bracing and steel purlins, precast concrete walls to warehouse and office and electrically
operated roller shutter doors to warehouse. Metal roof decking including, flashings, gutters and
down pipes connected at floor level to storm water drains.
With the exception of the toilet amenities area, electrical power, telecom and data supply to
warehouse, the internal works and finishing trades to the office will be by others.
Specification Details:

Clear existing structures, foundations vegetation & rubbish from site and cart to tip.
Survey and set out the site works.
Excavate 100mm of topsoil from the whole site, store selected topsoil for landscaping as
required, and cart excess clean fill to Council depot.
Retain on site sufficient top soil to place and lightly consolidate it to 350 mm depth over
landscaped lawn area
Excavate natural ground (sandy clay) material on site uniformly under warehouse, office,
truck apron and carparks to underside of crushed rock base course.
Cart excavated material other than topsoil to spoil.
Compact exposed sandy clay subgrade to 95% modified ASSHO with smooth vibrating steel
rollers.
Supply and install water supply, sewer and underground electrical and stormwater to detail.

2016_CSM80001 Assign #1 BofQ-Rev 2.xlsx.docx

Page 2 of 6

Australian Project Costing Society

CSM80001 Project Costing - Assignment #1 2016

Estimate Quantity Take-off:

Supply, install and compact to 200mm thickness of size 20mm fine crushed rock (FCR) to the
underside of all concrete slabs.
Supply and install reinforcing mesh and holding down bolts.
Supply and install 30 Mpa concrete to footings and edge beams.
Supply and install steelwork for portal frames, associated bracing and purlins to warehouse.
Supply and install 150mm Precast Concrete wall panels to Warehouse and 125mm panels to
Office.
Supply and install steelwork for steel beams, purlins and associated bracing to office.
Supply and install roof sheeting, gutters, flashing and downpipes to warehouse and office.
Supply and install electrically powered roller shutter doors to warehouse.
Supply and install 30 Mpa concrete to floor slabs, car parks and driveway crossovers.
Supply and install external Aluminium framed windows and entrance door glazing to office.

The following are excluded from your take-off at this time:


o
o
o
o

Electrical power reticulation and lighting installation to warehouse and office.


Data and telephone cabling from distribution board to warehouse and office.
Office and amenities fitout including timber stud walls, internal doors and tiling to
toilets and passage areas.
Toilet cubicle partitions, WCs, urinals, basins, tapware, mirrors and all above floor
plumbing pipes and fittings.

Drawings:

Drawing No.
Survey
S 16001
Architectural
A 16001
A 16002
A 16003
Civil/Structural
C 16001
C 16002
C 16003
C 16004
C16005

Title
Existing Conditions - (Survey Plan)
Floor Plan & Car Parks - Warehouse/Office
Roof Plan - Warehouse/Office
Elevations - Warehouse/Office
Footing & Floor Slabs Warehouse /Office
Structural Steel Plan - Warehouse/Office
Drainage & Services Plan - Warehouse/Office
Sections - Warehouse/Office
Footing Details - Warehouse/Office

Purpose and Methodology of the Quantity Take-off


The purpose of this quantity take-off is to measure quantities for a Bill of Quantities (BofQ) that will
be suitable to obtain consistent subcontract prices for the various sections of the works. The BofQ
also enables progress payments to be made for listed work that has been completed.
The purpose of this assignment to:

Gain an understanding of the items to be measured and catalogue them in a systematic and
comprehensive manner, in accordance with AS1181-1982 Method of measurement of civil
engineering works and associated building works.

2016_CSM80001 Assign #1 BofQ-Rev 2.xlsx.docx

Page 3 of 6

Australian Project Costing Society

CSM80001 Project Costing - Assignment #1 2016

Estimate Quantity Take-off:

Ensure all aspects of the scope of works for the project are included in the take-off.
Gain an awareness of the level of detail required to accurately estimate the extent of works
to build the project

The following quantities will be aggregated for the purpose of obtaining subcontractor prices:

Concrete quantities will be assumed to include formwork, reinforcing steel (rebar). The
description you develop for the line item should make it clear that formwork and rebar are
included. You will not be required to measure these separately.
The calculated weight of each item of Structural steelwork will include all necessary
fabrications (structural profiles, plates, cleats etc.) that form part of the item being
measured
The area of roof plumbing to be measured shall cover the whole area of the roof and be
described to include roof sheeting, flashings, gutters and downpipes. You do not need to
measure gutters, flashings or downpipes separately for this assignment.

Hint: As a guide in the preparation of this quantity take-off you should expect to measure
approximately 30 various quantity items grouped under some 5 category sub headings. This may be
quite time consumming, so make sure you make an early start on this assignment.
ASSIGNMENT #1 SUBMISSION REQUIREMENTS
1. Presentation of your Assignment submission
This assignment is to be submitted with an assignment cover sheet followed by the BofQ and
supporting calculations, stapled at the top left hand corner. DO NOT bind the submission or put it in
a fancy cover or plastic sleeves. (Refer to Blackboard for form of assignment cover sheet).
2. Quantity Take-off and Australian Standard for Measurement of Civil Works
You are to measure the quantities for the items listed in the drawings and described in Assignment
#1 Bill of Quantity take-off
Your Bill of Quantities will have the following header on each page:Item

Description

Quantity Unit

Rate

Amount

Assignment #1 requires a quantity take-off which is a measure of quantities & units only (Except for
PC items and firm quotations as detailed above). The Rate and Amount columns will remain
blank, to be calculated at another time.
The description of each item in the Bill of Quantities list is required to be in the form of a brief
description that includes a clear explanation of the task in the form of noun and verb for the
measured items.
e.g. Supply and install 900 x 900 precast concrete stormwater pitetc.(with other
information identifiers such as location and/or details specific to that particular item etc.)
Refer to Australian Standard AS1181-1982 Method of measurement of civil engineering works and
associated building works for the rules about how to do a quantity take off. A sample extract from
the standard has been supplied for your reference.
Students will need to refer to the whole standard available from the Swinburne Library web page;
select Databases/Standards/Australian Standards/ and search on AS 1181.
2016_CSM80001 Assign #1 BofQ-Rev 2.xlsx.docx

Page 4 of 6

Australian Project Costing Society

CSM80001 Project Costing - Assignment #1 2016

Estimate Quantity Take-off:

Note: There is a limit of four users logged on at any one time to the Standards Australia
website. If you download the AS1181 .pdf file and save it to flash drive it will remain readable
for 48 hours. If you copy the .pdf file and paste it to a Word document the format will be poor
and you are required by Copyright Law to limit that content to a maximum of 10% of the
document. The best approachis to print out the Standard in notebook form (2 to a page and
double sided) for your ongoing reference.
You are to prepare the materials take-off measurement in the above BofQ format. The calculations
are to be in an Excel spreadsheet model with quantities referenced to the Quantity column for the
appropriate items in the Bill of Quantities.
Print out your Bill of Quantities results and calculations spread sheets and submit them in hard copy.
All calculations must be done on the spreadsheet. Hand sketches, if needed, can be scanned and
inserted as a JPEG picture in the Excel spread sheet.
Where an item is not fully detailed on the drawings you are expected to estimate by scaling off the
drawing and/or assuming a sensible value.
The spreadsheet file name that you create for this assignment is to have your student ID number
included in the file name.
3. Tips for setting up the Bill of Quantities:
The AS1181 standard gives you the sequence for listing the trades in the Bill of Quantities (BofQ), the
units and what goes where. It also indicates what should be measured and how to group various
types of work.
The standard is 53 pages and you will need to be selective about the degree of detail that you use. In
this instance, i.e. for this assignment you do not need different strengths of concrete, so find the
sections and part(s) that you need.
Set out your calculations in the quantities calculations spread sheets in the same sequence as you
intend the BofQ to appear. Setup your Excel spreadsheet targetting the calculation results (with
relative and absolute cell addresses) to the BofQ table so that if you change a quantity the result
automatically adjusts in the BofQ. This makes it less likely for you to make a mistake than transfering
the numbers manually.
As the first step, set out the headings, sub-headings and line descriptions of the BofQ using AS1181
(and information herein) as a guide and then use this as the template for your calculation sheet.
Group like tasks under suitable subheadings in the BofQ so that those sections of the BofQ can be
used to obtain subcontractor prices for their area of work e.g. all steelwork grouped under
Structural Steel.
Some general instructions from Section 1.3 of AS1181, page 5-7, General Principles
AS1181 Ref.
1.3.3 (a)
1.3.3 (b)
1.3.3 (i)
1.3.3 (ii)

Simplified description, paraphrased (Not complete; check AS1181 for yourself!)


Put minor items with major in the description e.g. Supply & Install door complete
with door furniture
Put similar items together i.e. where the cost (labour & material) are related and
the unit of measure is the same then include them in the same line item.
Fixed duration tasks or fixed cost items are always kept separate from quantity
based items.
Components built together should be grouped together. i.e. try to measure a task
(line item) the the way you would build it.

2016_CSM80001 Assign #1 BofQ-Rev 2.xlsx.docx

Page 5 of 6

Australian Project Costing Society

CSM80001 Project Costing - Assignment #1 2016


1.3.3 (iii)
1.3.4
1.3.3 (iv)
1.3.8
1.3.9
Table 1.1

Estimate Quantity Take-off:

Divide the project into its major subdivisions and then by trade or subcontract
within each subdivision, e.g. Excavation: Cut, Fill, Cartage to spoil etc.
Where location is significant group minor trades together under one heading.
Subtotal quantities that are built in different locations or stages of construction
Dimensions always Length x Width x Height.
Rounding UP rules for quantities <10 & >10 & units m, m2, m3, t
Significant figures in the BofQ line items and totals

4. Date, Time and Location for Assignment Submission


The assignment is to be submitted in both hard copy and electronic format by the due date.

Hard copy to be delivered to the CSM80001 mailbox located on Level 7 of the ATC building
Mailbox: CSM80001 Project Costing
Location: ATC building, Level 7 Mailboxes (bottom right)
Closing time: 10:30 am, Monday 22 August, 2016

Electronic copy to be submited via the Assignment section on Blackboard before the
closing time.

Note:
1. This assignment is to be all your own work. Refer to the Unit Outline for this subject and
student notices on Blackboard regarding plagiarism and unfair advantange. In particular, if
you copy another students work, or if you allow another student to copy your work, even
with modifications, then both of you risk being penalised by loosing some or all of your
marks in addition to other consequences that may be imposed upon you.
2. The quality of the work that you produce is important and setout and logical presentation of
this assignment will be marked.
3. The content of the electronic copy must be identical to the hard copy. You will be marked
on the hard copy. The electronic copy to be used, as necessary, for back up and verification
of spreadsheets.

Marking schedule for this assignment:

Attribute
Set out & presentation - incl. Headers, Footers
Grouping, Units & rounding to AS 1181
Group and item descriptions
Layout & Completeness
Quantity Take-off Values & detailed calcs
Concepts & Clear Logic
Total

%
6%
19%
19%
19%
31%
6%
100%

Score
1
3
3
3
5
1
16

2016_CSM80001 Assign #1 BofQ-Rev 2.xlsx.docx

Page 6 of 6

Australian Project Costing Society

100.60

100.00

20 m

52.00m 270'00"

Bore hole #2

15 m

100.20

KONA COURT

Existing 1500 wide x100 th


concrete footpath

0
100.4

Existing concrete kerb & channel

d
l frame
m stee
8m x 5 ted galv iron
a
corrug d on 150mm
e
clad sh base
te
concre .45
0
FFL 10

415V Underground Electrical Supply

prox)
ide (ap
2.5m w rock driveway
d
crushe condition)
r
(in poo

55.00m 90'00"

100.40

Existing 600 RCP stormwater drain

Bore hole #1

Lot 15 Bilby Street


Campbellfield VIC 3061

100.58

Natural Surface Levels: 100.00

R
L

25.00 m 0'00"

Constructed Feature Levels: RL 100.00

9500

Existing PC concrete wall to adjoining building

100.65

Drawing No. S16001


Revision: 0 Date: 29 June 2016
EXISTING CONDITIONS SURVEY PLAN

10
0.
00

RL 100.90 Finished Floor Level of adjoining building

2150

Existing 150 dia water main

Existing 230 dia sewer

Exist telephone cable


Telecom pit

Existing concrete kerb & channel

BILBY STREET

p
g
in ry
st ent
i
Ex ide
s

it

NORTH

R
L

99.30

4.

22.00m 180' 00"


Existing 1500 wide x 100 th conc footpath

3050

2010

4000

99
.2
5

99.50

24

45

99
.0
0

'0

99.60

Drawn LJP
Date 29 June 2016

0"

Bore hole #3

t
pi

5m

g y
tin tr
is en
x
E ide
s

Scale

10 m

99.80

Disabled WC

5400
3250

1000
2250
1000

RL
10
0

Car park:
11 spaces
+1 disabled

6400
3700
1350

.1
0

22.00m 180' 00"

BILBY STREET
Truck Parking Apron

Fall

Storage Area #2

150

5400

Driveway Crossover
to Local Council
Specification
(Refer dwg: C12001)

NORTH

KONA COURT

Loading Bay #1

20 m

FFL 100.10

R
L

10
0.
00

Drawing No. A16001


Revision: 0 Date: 29 June 2016
PLAN & CAR PARKS
WAREHOUSE/OFFICE
Lot 15 Bilby Street
Campbellfield VIC 3061

Driveway Crossover to Local Council Specification.


(Refer dwg No. C14001)

.9
5

15 m

3 car spaces @ 2.6m

99
.5
0

700

RL
10
0.
10

Scale

10 m

100

52.00m 270'00"

3600
typical

150

5000

25.00 m 0'00"

Reinstate existing 1500 wide x 100 thick


concrete footpath as necessary

1400
typical

5000

Truck Washdown Bay

Drawn LJP
Date 29 June 2016

950

Office

5m

FFL 100.10

2500

R
L

100 100
1200

150 x 350 high kerb

Loading Bay #2

99
.0
0

0"

Storage Area #1
5.4m

5000

Loading Bay #3

45
'0

2000

Fall

1000

900 x 900 heavy duty


galvanized steel grating

Fill area to top of concrete kerb


with topsoil sourced from site
and seed with grass to specn.

2100

2400

3700

5000

Fall

99

1500

5000

55.00m 90'00"

5000

150

RL

150 x 350 high kerb

125
925

2700

Fall

6 car spaces @ 2.6m

Fall

Disabled
3.2m

125
150 thick x 4500 high
precast concrete wall

4.
24

5 car spaces @ 2.6m

2700

100

99
.2
5

1600

30000

150

0.1
10
RL

R
L

7300

15000
Existing Factory building adjoining

10000

Car park:
3 parking spaces

5m

22.00m 180' 00"


3250

15 m

Fall

Fall

5000

5000

Drawing No. A16002


Revision: 0 Date: 29 June 2016
ROOF PLAN
WAREHOUSE/OFFICE
Lot 15 Bilby Street
Campbellfield VIC 3061

D/P

NORTH

20 m

52.00m 270'00"

Spandek zincalume
roofing sheeting

500 wide ridge flashing

600 wide box gutter

5000

25.00 m 0'00"

Scale

10 m

D/P

250 wide gutter

600 wide box gutter

5000

Existing Factory building adjoining

Drawn LJP
Date 29 June 2016

0"

Spandek zincalume
roofing sheeting

'0

Verandah Spandek
roofing sheeting

45

600 wide box gutter

24
m

D/P

4.

Fall

Fall

Fall

1200

5000

55.00m 90'00"

5000

30000

D/P

Fall

Fall

7300

15000
10000

Fall
D/P

D/P

Adjoining building
boundary wall

4500

6500

Off form finish 125 precast


concrete wall panels to office

4600 Ht Roller
Shutter Door (typical)

Off form finish 150 precast concrete


wall panels to warehouse

3000

1200

Off form finish


150 precast concrete
wall panels
Adjoining building
FFL 100.90

Natural Surface

FFL 100.10

Aluminium framed
windows to specification

SOUTH ELEVATION
Adjoining building
boundary wall

4500

Off form finish


150 precast concrete
wall panels

Adjoining building
FFL 100.90

Off form finish 125 precast


concrete wall panels to office

4500

6500

Off form finish 150 precast concrete


wall panels to warehouse

Natural Surface
Natural Surface

NORTH ELEVATION
3250

Verandah with pressed metal fascia

Off form finish 150 precast concrete


wall panels to warehouse
6500

3000

4500

800

Off form finish 125 precast


concrete wall panels to office

Natural Surface
Natural Surface
2100 x 950
Staff access door

Alum framed entrance door Aluminium framed


& glazing to specification
windows to specification

EAST ELEVATION

WEST ELEVATION
0

Drawn LJP
Date 29 June 2016

5m

10 m

Scale

15 m

20 m

Drawing No. A16003


Revision: 0 Date:29 June 2016
ELEVATIONS
WAREHOUSE/OFFICE
Lot 15 Bilby Street
Campbellfield VIC 3061

99
.2
5

Car park slab 150 mm thick with


SL72 mesh in top on 200mm layer
of compacted fine crushed rock.

22.00m 180' 00"

150mm Crossover
with SL72 in top
on 200mm layer
of 20mm FCR

NORTH

BILBY STREET

Scale

1350

15 m

20 m

A
99
.5
0

1000

R
L

10 m

3700

52.00m 270'00"

Fall

150

5000

KONA COURT

R
L

10
0.
00

Drawing No. C16001


Revision: 0 Date: 29 June 2016
FOOTING & FLOOR SLABS
WAREHOUSE/OFFICE
Lot 15 Bilby Street
Campbellfield VIC 3061

Driveway Crossover 200 thick concrete


reinforced with two layers SL92 mesh on
200 thick compacted 20mm fine crushed rock.

Fall

10000

Drawn LJP
Date 29 June 2016

5m

1000

25.00 m 0'00"

Reinstate existing 1500 wide x 100


thick concrete footpath as necesary

150

A
FFL 100.10

150 x 350 high kerb

2250

Truck Parking Apron 200 thick concrete


reinforced with two layers SL92 mesh on
200 thick compacted 20mm fine crushed rock.

Fall

99
.0
0

0"

3250
2100

FFL 100.10
Office floor slab 150 mm thick
with two layers SL72 mesh with
600 x 300 edge beam to detail.
.
3700

5000

2m x 2m x 1m deep pad footings


under each portal frame column

45
'0

950
1500

2000

5000

Fall

2500

Warehouse floor slab 200 mm thick


with two layers SL92 mesh with
600 x 300 edge beam to detail.

5000

Fall

4.
24

125
925

5000

55.00m 90'00"

5000

Truck washdown slab 200 mm thick with


SL92 mesh in top laid to falls on 200mm
layer of compacted fine crushed rock.

150 x 350 high kerb

Fall

125

10
0.
10
RL

10
0.
10
RL

R
L

30000

150
10
0.
10
RL

.9

2400
99

C
150
RL

7300

15000

150 x 350 high kerb

45

'0

5m

150 PFC cantilever


supports to verandah

22.00m 180' 00"

Scale

10 m

20 diam rod cross


bracing each bay

15 m

52.00m 270'00"

55.00m 90'00"

150 NB x 5 CHS

150 NB x 5 CHS

Drawing No. C16002


Revision: 0 Date 29 June 2016
STRUCTURAL STEEL PLAN
WAREHOUSE/OFFICE
Lot 15 Bilby Street
Campbellfield VIC 3061

250PFC bolted to precast panels

Drawn LJP
Date 29 June 2016

0"

150 NB x 5 CHS
200PFC bolted to
precast panels

Office Roof structural steel:


310UB32 raked beams bolted to
125 thick precast concrete walls.

4.
24

200PFC bolted to
precast panels

4 No. 460UB75 Portals @ 5000 centres

25.00 m 0'00"

20 diam rod
cross bracing
each bay

250PFC bolted to precast panels

0"

Tap into 150 dia water main


Existing telephone cable
Existing 230 dia sewer

BILBY STREET

5m

22.00m 180' 00"


Electrical conduit

900 x 600 PC Conc Pit

300 R
CP
Drain

Exist telecom pit

NORTH

15 m

FH

20 m

Drawing No. C16003


Revision: 0 Date: 29 June 2016
DRAINAGE & SERVICES PLAN
WAREHOUSE/OFFICE
Lot 15 Bilby Street
Campbellfield VIC 3061

Existing Kerb & Channel

200 PVC D/P

KONA COURT

Drain

900 x 900 PC Concrete Pit


to existing 600 RCP drain

900 x 900 PC
Concrete Pit
with HD Galv
grating

415V Underground Electrical Supply


Existing Kerb & Channel

5000

25.00 m 0'00"

Scale

10 m

100 PVC D/P


900 x 900 PC Concrete Pit
to existing 600 RCP drain

100 dia Water

52.00m 270'00"

5000

Existing Factory building adjoining

Drawn LJP
Date 29 June 2016

'0

5000

300 R
CP

45

200 PVC D/P


200 PVC Stormwater

200 PVC D/P

24
m

200 PVC D/P

100 PVC Stormwater

100 dia Water

5000

FH

4.

100 dia Water

100 dia Sewer

5000

55.00m 90'00"

5000

30000

200 PVC D/P

3050

duit

2010

n
ata co
one/D
Teleph
50 dia

4000

7300

15000
10000

Lysaght C20019 purlins


250PFC bolted to precast panels
150PFC beams
verandah supports
400 Wide gutter
Spandek zincalume roof
-

fall 1 in 20

310UB32 rafters with


Lysaght C15015 purlins
at 1800 centres

1200

Recessed
Entry Door

3000 Ceiling Ht

150 concrete slab with two layers


of SL72 mesh reinforcement.

200 concrete slab with two layers


of SL92 mesh reinforcement.

SECTION A-A

200 of 20mm compacted fine crushed rock under slabs

Spandek zincalume roof

- fall 1 in 20

15 m

4500

250 wide gutter

Drawing No. C16004


Revision: 0 Date: 29 June 2016
SECTIONS
WAREHOUSE/OFFICE
Lot 15 Bilby Street
Campbellfield VIC 3061

Spandek zincalume roof and flashings

20 dia rod cross bracing


150 NB x 5 CHS

Roller shutter door

200 concrete slab with two layers


of SL92 mesh reinforcement.
200 of 20mm compacted fine crushed rock under slab.

Scale

10 m

4600

6500

Lysaght C20019 purlins at 1800 centres

SECTION B-B
5m

460UB75 Portal Frame

150 NB x 5 CHS

200 concrete slab with two layers


of SL92 mesh reinforcement.

200 of 20mm compacted fine crushed rock under slab.

32mm Base Plate


675 x 400 (Typical)

Undisturbed nature ground


complying to Geotech Engr
Load bearing requirements

SECTION C-C

Undisturbed nature ground


complying to Geotech Engr
Load bearing requirements

Drawn LJP
Date 29 June 2016

5450

6500

20 dia rod cross bracing

125 thick PC Panels

150 thick PC Panels

460UB75 Portal Frame

150 thick PC Panels

4/30mm dia x 850 lg HD bolts


200 thick RC Slab

200 thick RC Slab

200 thick 20mm FCR

200 thick 20mm FCR

300

1000

2000
485 cts

270 cts

Tie slab rebar


into kerb

Topsoil to specification

Extend 200 thick


20mm FCR under kerb

WAREHOUSE

OFFICE
2000

OFFICE EDGE BEAM DETAIL


150 x 350 high kerb
with two 15 dia rebars

150 thick PC Panels

2000 x 2000 x 1000 deep footing


reinforced with 20mm deformed bar
cage at 250 centres both ways

6/20 deformed bars with 10 dia


ligatures at 500 centres

600

WAREHOUSE EDGE BEAM DETAIL

Undisturbed nature ground


complying to Geotech Engr
load bearing requirements

150 thick RC Slab


200 thick 20mm FCR

200 thick RC Slab


200 thick 20mm FCR

CAR PARK KERB


(Typical detail)

300

32mm Base Plate


400 x 675 (Typical)
600

100 cover (typical)

PLAN

5m

Scale

6/20 deformed bars with 10 dia


ligatures at 500 centres

FOOTING BEAM BETWEEN OFFICE & WAREHOUSE

PORTAL FRAME FOOTING DETAILS

Drawn LJP
Date 29 June 2016

200 thick 20mm FCR

300

6/20 deformed bars with 10 dia


ligatures at 500 centres

600

100 cover (typical)

150 thick RC Slab

Drawing No. C16005


Revision: 0 Date: 29 June 2016
FOOTING DETAILS
WAREHOUSE/OFFICE
Lot 15 Bilby Street
Campbellfield VIC 3061