You are on page 1of 18

Flow of work:

dsgdfgdfg
MM adds a client

Client submits work

PM receives work

PM assign to TL

TL assigns to Programmer

Programmer submits
completed job to TL

QC
finds
bugs

Work submitted to PM

Delivery of work

USER INTERFACES:

1.

Header.html
Contains company logo

2.

Footer.html
Contains copyright text copyrights Technologies 2001.

3.

Login.html

Header .html
Username:
Password:
Submit

Forgot your Password

Footer.html

Clear

Marketing Manager
a)

M. Manager (Home interface)

Header.html
1.
2.
3.
4.
5.

View clients
Add new client
Edit client
Check status of a client
Delete client
Footer.html

b)

M. Manager (Add new client)

Header.html
Client code:
Client name:

user name :

Contact

phone

Street

fax

City

e-mail

State

remarks

Country

zip code

Add

Clear

Home

Footer.html
c) M. Manager

(view clients)

Exit

S.No

Client Name

Next

Header.html
Client code

Previous

date

status

Home

Search by name :

Exit

search

Search by date :

search
( Before/after

MM

DD

Footer.html

d)

M. Manager

(Edit clients)

Header.html
Client name

Edit

Search by name

Search

Search by status

Search

Footer.html

YY )

Header.html
S. No

Next

Client name

Prev

Home

Exit

Footer.html
(Client name is Hyper link)

On clicking the hyper link the next interface is presented


Header.html
Client code :
Client name :

user name :

Contact

phone

Street

fax

City

e-mail

State

remarks

Country

zip code

Footer.html

e) M. Manager

(Check Status)
Header.html
:

Check

Search by name :

Search

Search by status :

Search

Client name

Footer.html
Clicking check shows the following interface:

Client name

Header.html
Client code

status
1
2

(hyper links)
Home

Exit
Footer.html

Clicking on hyperlinks, status of the respective work is displayed in a new


Window as follows:

Client name

Work submission date

Work received date

Status

:
Cc

close

Search by name shows the following interface:


Header.html
Client code

Client name

Home

Status

Exit
Footer.html

NOTES:

Next/Prev buttons will be added if search results are more than 5

clients.
Clicking on hyperlinks status of the respective work is displayed in a new window.
Client name

Work submission date

Work received date

Status

:
Close

Search by status shows the following interface:

Header.html
Client name

Client code

home

Date

exit

Footer.html

NOTES :

f)

Client codes with active status are displayed along with corresponding
WORK IDs being hyperlinks.
On clicking these links status is displayed in a new window as in the
Previous case
M. Manager (Delete).

Header.html
Client name

Delete

Search by name

Search

Search by status

Search
(C/A/I)

Footer.html
NOTES :

The next few interfaces are same as that in M.Manager(check status)with


Only the final operation being delete instead of status being displayed.

The client is removed from the client table and also all corresponding
Work ids of that client from the worktable.

6.

Project Manager :
a) P. Manager(Home interface)
Header.html
1)
2)
3)
4)
5)

View jobs
Add works
View teamleader status
Check status of a job
Assign jobs
Footer.html

Client name

b) P. Manager (Add works)


Header.html
Client code
Date of submission No. of
Works

updated

Expected
date of
Delivery

NOTES :
On clicking update, number of rows =number of works are inserted in to
work table with different WORK IDS, same WORK SUBMISSION
DATE and WORK RECEIVED DATEand the status=3.

Before this task, the dummy row in works table of the above client should
be deleted. (This row is created when client submits work!).

c)

s.no

Project Manager(View jobs)

Client code

Header.html
Work id
Status

Date of delivery

Home

Footer.html

d)

Project Manager(Assign jobs)

S.no

Client code

Header.html
Work ID

assign

Paz

1
2
3
4
5

ABC

Next

Prev

Home

Exit

Footer.html

NOTES :

Only work Id's status 3 are displayed


On clicking assign the next interface is presented.

Assign

Header.html
Client code :

work ID :
Raster Image Name :

Assign

Type of Work

Time Estimation

Team Leader

Home

Exit

Back

Footer.html
Notes :
On Assign fields to be updated in works table :
Raster Image Name, Type Of Work, Time Estimation, TL,
AssignToTl on, Status=4.
Previous interface is presented to the user after database updating.

c) Project Manager

(view Team leader status)

Team Leader No of works

Header.html
Work IDs

Home

Performance/efficiency

Exit

Footer.html
Notes:

Client code with status >=3 and <=7 are displayed

TL status is>=4 and <7


f)

Project Manger (check status of a job)


Header.html
Client Code

S.no

Work IDs
(hyper links)

Next

Previous

Home

Footer.html
Notes :
Works with Status(>=3 and <7) are only displayed

Exit

On clicking the hyperlinks, relevant messages are displayed in a new


window as follows :
Header.html
Date of work Submissions

Date received by project manager

Date assigned to team leader

Team Leader

Time Estimation

Date assigned to operator

Operator

Date submitted to QC

No of times reverted

Bugs reported

Over all progress

Close

Footer.html

6) TEAM LEADER
a)

Team Leader(Home interface)


Header.html
1)
2)
3)
4)

View jobs
View operator status
Assign jobs to Operator
Assign to QC
Footer.html

b) Team Leader(View jobs)


S no.

Client Code

Next

Header.html
Work ID

Previous

Home

Footer.html
NOTES :
Only clients with Status >=4 are displayed

Status

Exit

c) Team Leader(view Operator Status)


S No

Header .html
No of Works Work IDs

Name of Operator

Next

Previous

Performance

Home

Exit

Footer.html
Notes:
d) Team Leader (Assign jobs to operator)
Header.html
S. No

Client code

Scale

Work ID

operator

assign

Footer.html
NOTES :

All clients with status 4 are displayed

On assign, status field = 5.

Select

home

exit

e)

Team Leader (Assign to QC)


Header.html

S. No

Client code

Scale

operator

Work ID

assign

Footer.html
NOTES :

All works with status=6 are displayed

On assign, status=7

Select

home

exit

6) OPERATOR
a)
S. No

Work ID

Update

Operator(View jobs)
Status

Next

Header.html
Select
Scale

Previous

Home

Expected format

Exit

Footer.html
NOTES:

All works with status = 5 are displayed

On update work status = 6

By clicking update, it is submitted to TL

b) Operator (Time log)


1.
2.

Time In
Time Out

1) Time In.
Header.html
Time in

File

Type of work

Submit

Clear

Exit

Home

Footer.html
2. Time Out
Header.html
Time in

File

Type of work

Submit

Clear

Exit

Home

Footer.html
7) QC MANAGER
a) QC Manager(View jobs)

S. No

Client code

Update

Header.html
Work ID Expected Format

Next

Prev

Scale

Clear

Footer.html
NOTES :

All clients with status 7 should be displayed.


On completion of QC on any work ID, it should be updated.
On clicking update the following window is presented.

Update

Exit

You might also like