GAME PLAN #1_ HH 83/5X_NAO_GPC

Field
Well
P.B

GG
GG 2/2
Vertical
2355

Spud Date

28/01/2016

Perforation
intervals

1805.5-1812.5
m

Operations
Current:
** Keep hole fill every time
** Drift all tubular while RIH
** PB 1931mt TD
1. HPJSM, flow check well static , POOH with milling assy. BHA #3
Forecast:
2. RIH with BHA #4; 8-1/2 open jet TCI bit (equipped with float valve) cleaning assy
to 1931 mt, POOH & R/B with same
o Keep hole fill
o Check proper installation for a float valve (drillers responsibilities)
3. RIH with BHA #5; 9-5/8 scrapper assy. To 1931 mt, circ. Till shaker clean, POOH
& R/B with same
Safety:
All work permits should be signed by a company man
Barge:
- Water maker quality is low
- Boat MD 11 (D/P, tubing)
- Boat misr gulf 15 (spooler machine, ESP, slick line unit & tools..Deisel 40,000
litre)
Material required:
- 9-5/8 scrapper, 1500 mt inspected 5 D/P
- High pressure hose from rig floor to platform

Safety always is safety first


Company Man
Mahmoud Abdelrazik

GAME PLAN #1_ HH 83/5X_NAO_GPC

Field
Well

NAO
Spud Date
20/04/2016
HH 83/5X Exploratory - Deviated Max I 28.07 @
614 m
2116.94 m
Last csg shoe 13-3/8 @ 710 m

TD

Operation: Cont. drlg 12-1/4 hole to 840 m to 950 or top of Belyim(wash & ream
twice once every stand , sweep hole with 10 bbl lo-vis followed 20 hi-vis) , POOH wiper
trip to csg shoe , Cont. drlg to 1250 m (TD)
** keep monitoring shaker screens cleaned , mud pits , mud parameters , overboard
ditch cleaned all time
After tomorrow >> Fill up tools , cold cutter (on location; please check) ,
MLH engineer ?? no answer
Plan for mud: dont add EMEC TEX , add
before kareem fm with 50 mt
Treatment only
If losses appeared please call me

Boats: Masr gulf: WA gharib >>


remaining csg and hlb floating eq. ,
food container
Capitano gee: 60 jt csg , IPJ 9-5/8 csg
handling equipment , BHI back up tools
Md 11 >> rig >> LCM non
conventional >> getty
Md 8 >> ad 6
Problems: no problems

Rig issues:
-

Two engine out of hours , 4th engine generator not in location


Air conditioning very bad , open internet full access
SWACO sup to check shaker conditions
Plan for hlb cmt replacement with slb one

GAME PLAN #1_ HH 83/5X_NAO_GPC

Safety first is safety always