You are on page 1of 37

Hadaieq Zenhom upgrading project in Cairo

UPL 611

Urban Upgrading of Informal Areas

Hadaieq Zenhom upgrading


project in Cairo
Prepared by:
Dr. Marwa A. Khalifa
ASU, Egypt
Cairo, 2012
Dr. Marwa A. Khalifa
ASU, Cairo Egypt

Guest Lecturer, 11th October 15th October 2010


ITT - CUAS, Cologne - Germany

Hadaieq Zenhom upgrading project in Cairo

Location
Hadaak Zeinhom is located
in El-Sayeda Zainab, Cairo
Governorate

Initially, this area was an


EMERGENCY SHELTER
housing area for the people
who lost their houses. It was
meant to be temporary
shelters until the government
provides house, however the
government didnt resettle the
inhabitants in any place

Hadaieq Zenhom upgrading project in Cairo

Hadaieq Zenhom upgrading project in Cairo

Location

Hadaieq Zenhom upgrading project in Cairo

The Start
February 1998

Hadaieq Zenhom upgrading project in Cairo

Initial Status
The settlement lies in Saieda
Zainab district.
The settlement is 54 state
owned feddans, hosting 20.000
persons.
The settlement has been divided
into three phases:

- The first phase: 12.8 feddans


-The second phase: 19.2 feddans
- The first phase: 22 feddans

Hadaieq Zenhom upgrading project in Cairo

Area Characteristics

Hadaieq Zenhom upgrading project in Cairo

Area Characteristics
Living and environmental deterioration
High population density
Lack of services, utilities, and open spaces

High pollution rate


Low income level (272
L.E./month)
High proportion of
unemployed headed
households (20%)
High illiteracy rata (31.6%
of total population)

Hadaieq Zenhom upgrading project in Cairo

Area Characteristics

Hadaieq Zenhom upgrading project in Cairo

General Development Plan


Integrated development plan not only seeking improvement
of physical conditions but rather promotion of the local
community in the different fields: social, economic, health,
educational and cultural

Work Flow
Demolition of existing construction and build new proper houses

Providing residents with provisional residence


In parallel a development program is working in their provisional place
After return to their permanent residence developmental activities will

be sustained

Hadaieq Zenhom upgrading project in Cairo

Project partners & their roles


Cairo Governorate
Red Crescent society ( NGO(
Businessmen ( Private Sector(

Inhabitants

Hadaieq Zenhom upgrading project in Cairo

Socio- Economic Survey


October 1998 to February 1999

Study Dimensions
Demographic & Social Features of the dwellers
Work structure & Interactions
Housing
Expenditures and sources of income

Hadaieq Zenhom upgrading project in Cairo

Socio- Economic Survey


October 1998 to February 1999

Study Findings

Hadaieq Zenhom upgrading project in Cairo

Socio- Economic Survey


October 1998 to February 1999

Study Findings

Hadaieq Zenhom upgrading project in Cairo

Socio- Economic Survey


October 1998 to February 1999

Study Findings

Hadaieq Zenhom upgrading project in Cairo

Socio- Economic Survey


October 1998 to February 1999

Study Findings

Hadaieq Zenhom upgrading project in Cairo

Socio- Economic Survey


October 1998 to February 1999

Study Findings

Hadaieq Zenhom upgrading project in Cairo

Recommendations
Programs to provide job opportunities with a special focus
on female supported households
Programs to eradicate illiteracy

Programs to link education with labor market


Programs to raise the environmental awareness

Hadaieq Zenhom upgrading project in Cairo

Master Plan

Hadaieq Zenhom upgrading project in Cairo

First Stage
Early 1999 to July 2000 (18 months)
29 blocks, 12 flats each - Total cost 30 million L.E.

Hadaieq Zenhom upgrading project in Cairo

First Stage
Early 1999 to July 2000 (18 months)
Design of units

Hadaieq Zenhom upgrading project in Cairo

First Stage
Household were transferred to provisional housing in:
- Mothallath Helwan
- Nahda city

- Mokattam area

Hadaieq Zenhom upgrading project in Cairo

First Stage
ERC undertook the following tasks:
- Establishment of ERC center before the arrival of households
- Establishment of Social Relation Network

- Conducting a comprehensive survey for new dwellers


Core Problems
- Lack of some services,
- Difficulty in students enrollments at schools,
- Lack of security, insufficient bakeries and
-Absence of public transportation

Hadaieq Zenhom upgrading project in Cairo

First Stage

Hadaieq Zenhom upgrading project in Cairo

Second Stage
January 2003 September 2005
49 blocks, 12 flats each
Total cost 81 million L.E.

(Cash donations & in-kind)

Hadaieq Zenhom upgrading project in Cairo

Project Area in Progress (2004)

Hadaieq Zenhom upgrading project in Cairo

Zeinhum Gardens 2005: A different life

Hadaieq Zenhom upgrading project in Cairo

Zeinhum Gardens 2005: A different life

Hadaieq Zenhom upgrading project in Cairo

Zeinhum Gardens 2005: A different life

Hadaieq Zenhom upgrading project in Cairo

Project Area after implementation of Phases 1&2

2005

Hadaieq Zenhom upgrading project in Cairo

Phase (3)

Hadaieq Zenhom upgrading project in Cairo

Before Upgrading

Hadaieq Zenhom upgrading project in Cairo

Upgrading in progress

Hadaieq Zenhom upgrading project in Cairo

After Upgrading

Hadaieq Zenhom upgrading project in Cairo

After Upgrading

Hadaieq Zenhom upgrading project in Cairo

Lessons Learned

To Be Discussed.

Hadaieq Zenhom upgrading project in Cairo

Thank you

You might also like