You are on page 1of 2

3005E

159S

Team ID: 15-62058

first operating furnace :

second operating furnace :

- construction of the processing warehouse and the storage

third operating furnace :

- production of the materials needed in the settlement


- construction of the services related to the factory

phase 1 | production for the self-construction

phase 2 | production for the neighborhood

- distinction of the production


- construction of the training and testing building
- production of materials and craftsmanship for trading

20m

phase 3 | production and trading

Infrastructures and
Services

10

Public Washhouses;
Rainwater harvesting,
filtering and
distribution points.

Electricity Access
Points.

Public Toiltes; Biogas


Production Points.
Refuse Areas and Waste
Collection Systems.

Income Generating
Activities.
Recreational Spaces.

The Factory
1
2
3
4
5
6
7
8
9
10

Clay Factory.

slot
processing warehouse
cooking furnace
materials storage
office
waste deposit
retail space
toilets
canteen and rest
training and testing

Cooperative Offices
and Headquarters.
Cultivated Land.
Public Transport
Stop.
Canteen.

1
0

3m

Internet; Training
Rooms; Afterschool
Classrooms.

3005E
159S

Team ID: 15-62058


Abacus

Business

Bus stop

Water|Wash house

Electricity|Drinkable water

Mininum module

Terraces and filtering


Basic module

A system of terraces at different heights could resolve the


erosion phenomen by containing the ground and allow the passage
of people in a safer way. These could be made of metal gabions,
filled with bricks scraps, or of reclaimed tires filled with
soil and arranged in staggered positions.
In this lowest part of the valley all the canals carrying the
rainwater converge to tanks and pools gathered from
these terraces and made of masonry. Inside them occurs
the rainwater filtering processus. Subsequently to a
first step of prefiltering, the purification cycle is
interrupted and the water fills two open pools that
could be used as public washrooms.

Learning
+

Each building is independent


in the rainwater collection
system, in the exhaust system
of black and grey water, and
is assisted by a pergola
whose variable configuration
performs multiple functions:
to collect and convey
rainwater to the tanks, to
serve as a seat support or
shielding.

Double module

Toilet

The internal configuration of


the spaces is relatively free
as there are no fixed dividing
walls. In some modular
buildings only the vertical
load-bearing walls are
provided, leaving the users
the possibility to choose the
materials and the finishing.

Constructive system
Roof
Corrugated steel
Soundproofing soil layer
Euclyptus straw (double)
Box-shaped steel profiles
Steel beams
Wall
CEB (Compressed Earth Blocks)
Steel plates

External cladding
Box-shaped steel profiles
Eucalyptus straw
Floor
Eucalyptus wood plank
Foundation
Metal Gabions (filled with scraps of
bricks)

Internet point|Information

Triple module

2m

You might also like