Major improvement job planned for FGD major Shutdown with full kit on March'16

Sl.n
o

Job planned
Area

Boiler

Type
UOM Scope Resp
of job

Durat
Tools and Tackles (A)
ion Engg.
Appro
days val
Status
T.date

Material (B)
Status

T.date

12.02.16
Contracts (C)
Status

Total
pts

Comp
status
Pts

T.date

Shutdown Preparedness (%)

53

Complete
d

Draft WO Ok,
12.02.16
Under Sign

Pre-S/D Job List:

FGD

Winch Machine Installation

SET

BSC

12

----

----

Available

----

NA

Major Job List:

FGD

Coating Repair of RCC Tank And Scrubber Area

M2

70

BSC

10

Vendor
Scope

01.03.16

LOI released

01.03.16

FGD

Coating on FRP lining for chemical Handling Area.

M2

150

BSC

Vendor
Scope

01.03.16

LOI released

01.03.16

To be
released

15.02.16

23

FGD

RVDG internal header replaced with GRP line

SET

16

RS

Vendor
Scope

01.03.16

LOI will be
released today

01.03.16

To be
released

15.10.15

FGD

Mist Eleminator Spray Nozzle inspection /


cleaning /Replacement

JJ

Available-210

------

Available

----

NA

----

FGD

Slurry Spray Nozzle inspection, removal and


cleaning

JJ

Available-7

------

Available

----

NA

----

FGD

Air Diffuser headers & coating inspection and


cleaning.

JJ

Available1599

------

Available

----

NA

----

FGD

Root Blower Radiator water line replacement

AK

Available

------

Available

----

NA

----

FGD

Root blower radiator by pass water line with


isolation valve provision 2.5" size (Improvement)

EA

AK

Available

------

Available

----

NA

----

FGD

Root blower cooling water inlet and


discharge header modification

Mtr

30

AK

Available

------

Available

----

NA

----

10

FGD

Common header drain valve replacement of


Recirculation pump

EA

AK

Available

------

Available

----

NA

----

11

FGD

GT Pump#3 gland cooling line connection


Rerouting of gypsm transfer Pump

Mtrs

AK

Available

------

Available

----

NA

----

12

FGD

Vacuume pump Body leakage attending

MT

RS

Available

------

Not Available

02.03.16

NA

----

13

FGD

General inspection and checking


related points

EA

16

JJ

Available

------

Available

----

NA

----

16

After
EA inspect
ion
After
EA inspect
ion
After
EA inspect
ion

1.89

Major improvement job planned for FGD major Shutdown with full kit on March'16
Sl.n
o

Job planned
Area

Boiler

Type
UOM
of job

Scope

Durat
Tools and Tackles
ion Engg.
(A)
Resp
Appro
days val
Status
T.date

Material (B)
Status

T.date

05.03.16
Contracts (C)
Status

Total
pts

Comp
status
Pts

T.date

Shutdown Preparedness (%)

53

1.89

Pre-S/D Job List:

FGD

Winch Machine Installation

SET

BSC

12

----

----

Available

----

NA

Comple
ted

Major Job List:

FGD

Coating Repair of RCC Tank And Scrubber Area

M2

70

BSC

10

Vendor
Scope

FGD

Coating on FRP lining for chemical Handling Area.

M2

150

BSC

Vendor
Scope

FGD

RVDG internal header replaced with GRP line

SET

16

After
inspecti
on

FGD

Mist Eleminator Spray Nozzle inspection /


cleaning /Replacement

EA

FGD

Slurry Spray Nozzle inspection, removal and


cleaning

EA

FGD

Air Diffuser headers & coating inspection and


cleaning.

EA

FGD

Root Blower Radiator water line replacement

After
inspecti
on
After
inspecti
on
6

RS

Vendor
Scope

----

On the Way
Expected
receive at
site
06.03.2016

06.03.16

WO
released

----

----

Material
Received at
Site.

----

WO
released

----

23

----

Under
manufacturin
g, expected
to dispatch
from rajkot
on 08.03.16

09.03.16

WO
released

----

JJ

Available210

------

Additional
09.03.16
Qty--200 Nos,

JJ

Available-7

------

Available

JJ

Available1599

------

AK

Available

------

NA

----

----

NA

----

Available

----

NA

----

Available

----

NA

----

Order Placed to M/S Composite


tank,Pune, (Contact Person Mr.
Bhaskar Bhattacharya-9967637836)--Material
expected reach at site on
06.03.16, manpower
deloyment at site on
09.03.2016
Order Placed to M/S Creasent
Composits, Bhopal, (Contact
Person Mr. Papria-9425009688)--Material received
at site. In case of manpower
deloyment Mr. Alok Pathak
-9425605267) confirmed on
date 08.03.2016
Order Placed to M/S EPP
Composite, Rajkot (Contact
Person Mr.Mehul Solanki
--9099072535)--Material
expected reach at site on
10.03.16, In case of manpower
deloyment Mr. Vinod batra
(9099072507) will confirm
today around 2:00 PM
Order Placed to M/S Jai Laxmi
engineering, Mumbai (Contact
Person Mr.Mukesh
--09820447740)--Material
expected reach at site on
09.03.16,

Major improvement job planned for FGD major Shutdown with full kit on March'16
Sl.n
o

Job planned
Area

Boiler

Type
UOM
of job

Scope

Durat
Tools and Tackles
ion Engg.
(A)
Resp
Appro
days val
Status
T.date

Material (B)
Status

T.date

05.03.16
Contracts (C)
Status

Total
pts

Comp
status
Pts

T.date

Shutdown Preparedness (%)

53

FGD

Root blower radiator by pass water line with


isolation valve provision 2.5" size (Improvement)

EA

AK

Available

------

Available

----

NA

----

FGD

Root blower cooling water inlet and


discharge header modification

Mtr

30

AK

Available

------

Available

----

NA

----

10

FGD

Common header drain valve replacement of


Recirculation pump

EA

AK

Available

------

Available

----

NA

----

11

FGD

GT Pump#3 gland cooling line connection


Rerouting of gypsm transfer Pump

Mtrs

AK

Available

------

Available

----

NA

----

12

FGD

Vacuume pump Body leakage attending

MT

RS

Available

------

Dispatched
from mumbai
(LR No sent
to vendor)

07.03.16

NA

----

13

FGD

General inspection and checking


related points

EA

16

JJ

Available

------

Available

----

NA

----

16

1.89

Order Placed to M/S Prime


engineering, Mumbai --Material
expected reach at site on
07.03.16,