Professional Documents
Culture Documents
VISUAL CHECK OF AC
FEEDER SEATH CONDITION
AT CONNECTIONS
CHK 10010-001
1
APR05
ZONING DATA
___________
ZONE
ACCESS
: 114
210
212
231
232
511
611
: 114BR 114CR
212KF 212TZ 231XZ 232XZ
511
611
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
AH
___
MEN
_________
MAN-HOURS
24-00-00
CHK 10010-001
2-400 PAGE
1
APR 01/05
24-00-00
VISUAL CHECK OF AC
FEEDER SEATH CONDITION
AT CONNECTIONS
001
CHK 10010-001
2
APR05
___________
PREPARATION
REF. FIG. 240000-RAI-00100
1. MAKE CERTAIN THAT ELECTRICAL GROUND POWER
UNIT IS NOT CONNECTED TO AC AND DC GROUND
POWER RECEPTACLES (ON PANELS 5002VU AND
5000VU) AND THAT ACCESS DOORS 114BR AND
114CR ARE CLOSED.
2. ON PANEL 29VU, MAKE CERTAIN THAT BAT SWITCH
IS IN OFF POSITION.
3. DISPLAY WARNING NOTICE ON PANELS 29VU AND
26VU PROHIBITING ENERGIZATION OF SYSTEM.
NOTE: ALL PANELS OR ACCESS DOOR MENTIONED IN
THIS PROCEDURE MUST BE OPENED.
002
003
24-00-00
CHK 10010-001
2-400 PAGE
2
APR 01/05
24-00-00
VISUAL CHECK OF AC
FEEDER SEATH CONDITION
AT CONNECTIONS
004
CHK 10010-001
3
APR05
_____________________________________________
CHECK
OF CONNECTIONS IN PASSENGER COMPARTMENT
REF. FIG. 245000-CHK-00111
A. REAR OF ACCESS DOOR 232XZ (231XZ) :
- TERMINAL STRIP 430VT (431VT) TERMINALS
1, 2 AND 3
005
____________________________
CHECK
OF CONNECTIONS IN WING
REF. FIG. 245000-CHK-00111
A.REAR OF LEADING EDGES 511 (611) NEARNESS
ENGINE NACELLES :
- TERMINAL STRIPS 501VT (600VT) TERMINALS
1, 2 AND 3
006
________________________________
CHECK
OF CONNECTIONS UNDER FLOOR
REF. FIG. 245000-CHK-00111
A.REAR OF ACCESS DOOR 212KF :
- AC EXTERNAL POWER RECEPTACLE 1XG TERMINALS A, B, C AND N
- GROUNDING POINT 127VN
007
________
CLOSE-UP
1. REMOVE WARNING NOTICES ON 29VU AND 26VU.
2. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OR
EQUIPMENT.
NOTE: ALL PANELS OR ACCES DOOR OPENED DURING
THIS PROCEDURE MUST BE CLOSED.
*****
AH
E N D
O F
T E X T
*****
24-00-00
CHK 10010-001
2-400 PAGE
3
APR 01/05
24-00-00
4
AH
CHK 10010-001
APR05
24-00-00
CHK 10010-001
2-400
PAGE
4
APR 01/05
24-00-00
5
AH
CHK 10010-001
APR05
24-00-00
CHK 10010-001
2-400
PAGE
5
APR 01/05
24-00-00
VISUAL CHECK OF DC
FEEDER SHEATH CONDITION
AT CONNECTIONS
CHK 10020-001
1
APR05
ZONING DATA
___________
ZONE
ACCESS
: 114
210
232
511
611
: 114BR
211JF
222KF
475AT
511
611
211
251
221
222
231
114CR
211TZ 212UZ 212VZ 213AZ 221AZ 221FF 222CW 222FZ
231XZ 232XZ 251BW
485AT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
AH
___
MEN
_________
MAN-HOURS
24-00-00
CHK 10020-001
2-400 PAGE
1
APR 01/05
24-00-00
VISUAL CHECK OF DC
FEEDER SHEATH CONDITION
AT CONNECTIONS
001
CHK 10020-001
2
APR05
___________
PREPARATION
REF. FIG. 240000-RAI-00100
1. MAKE CERTAIN THAT ELECTRICAL GROUND POWER
UNIT IS NOT CONNECTED TO AC AND DC GROUND
POWER RECEPTACLES (ON PANELS 5002VU AND
5000VU) AND THAT ACCESS DOORS 114BR AND
114CR ARE CLOSED.
2. ON PANEL 29VU, MAKE CERTAIN THAT BAT SWITCH
IS IN OFF POSITION.
3. DISPLAY WARNING NOTICE ON PANELS 29VU AND
26VU PROHIBITING ENERGIZATION OF SYSTEM.
NOTE: ALL PANELS OR ACCESS DOOR MENTIONED IN
THIS PROCEDURE MUST BE OPENED.
002
003
24-00-00
CHK 10020-001
2-400 PAGE
2
APR 01/05
24-00-00
VISUAL CHECK OF DC
FEEDER SHEATH CONDITION
AT CONNECTIONS
CHK 10020-001
3
APR05
_____________________________________________
CHECK
OF CONNECTIONS IN PASSENGER COMPARTMENT
REF. FIG. 245000-CHK-00122
A. REAR OF ACCESS DOORS 232XZ (231XZ) :
- TERMINAL STRIPS 430VT (431VT) TERMINAL
4
B. REAR OF ACCESS DOOR 251BW :
- TERMINAL STRIP 434VT TERMINAL 1
*** CONTINUED ***
AH
24-00-00
CHK 10020-001
2-400 PAGE
3
APR 01/05
24-00-00
VISUAL CHECK OF DC
FEEDER SHEATH CONDITION
AT CONNECTIONS
CHK 10020-001
4
APR05
____________________________
CHECK
OF CONNECTIONS IN WING
REF. FIG. 245000-CHK-00122
A. REAR OF LEADING EDGES 511 (611) NEARNESS
ENGINE NACELLES :
- TERMINAL STRIPS 501VT (600VT) TERMINAL
4
B. REAR OF ACCESS DOORS 475AT (485AT) :
- TERMINAL STRIPS 503VT (602VT) TERMINAL
1
006
________________________________
CHECK
OF CONNECTIONS UNDER FLOOR
REF. FIG. 245000-CHK-00121, 245000-CHK-00122
1. IN FLIGHT COMPARTMENT :
A. REAR OF ACCESS DOOR 211JF :
- GROUNDING POINT 930VN
2. IN PASSENGER COMPARTMENT :
A. REAR OF ACCESS DOOR 221FF :
- FAN 7HR TERMINALS (+) AND (-)
- GROUNDING POINT 108VN
007
________
CLOSE-UP
1. REMOVE WARNING NOTICES ON 29VU AND 26VU.
2. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OR
EQUIPMENT.
NOTE: ALL PANELS OR ACCES DOOR OPENED DURING
THIS PROCEDURE MUST BE CLOSED.
*****
AH
E N D
O F
T E X T
*****
24-00-00
CHK 10020-001
2-400 PAGE
4
APR 01/05
24-00-00
5
AH
CHK 10020-001
APR05
24-00-00
CHK 10020-001
2-400
PAGE
5
APR 01/05
24-00-00
6
AH
CHK 10020-001
APR05
24-00-00
CHK 10020-001
2-400
PAGE
6
APR 01/05
24-00-00
7
AH
CHK 10020-001
APR05
24-00-00
CHK 10020-001
2-400
PAGE
7
APR 01/05
24-00-00
RAI 10000-002
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 212
220
: 212TZ 212VZ 214BZ 214PZ 222CZ 222QZ 222RZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
SPARE
: 02 CT: 3XU-4XU
01 CT: 2XG
AH
___
MEN
_________
MAN-HOURS
01
24-22-80-01-040
24-41-80-01-040
24-00-00
RAI 10000-002
2-400 PAGE
1
MAR 01/15
24-00-00
001
RAI 10000-002
2
MAR15
_______
CAUTION
VU ASSEMBLIES ARE NOT EQUIPMENT,
INTERCHANGEABILITY BETWEEN AIRCRAFT IS NOT
AUTHORIZED.
002
___________
PREPARATION
REF. FIG. 240000-RAI-00100 (FIG.1)
REF. FIG. 240000-RAI-00103 (FIG.2)
1. MAKE CERTAIN THAT THE GROUND POWER UNIT IS
NOT CONNECTED TO THE DC AND AC EXTERNAL POWER RECEPTACLES (ON PANELS 5002VU AND 5000VU
-FIG.1-F AND D) AND THE ACCESS DOORS 114BR
AND 114CR (FIG.1-E AND C) ARE CLOSED
2. ON PANEL 29VU (FIG.1-A) MAKE CERTAIN THAT:
BAT SELECTOR SWITCH 7PA IS IN OFF POSITION
3. DISPLAY A WARNING NOTICE ON PANELS 29VU AND
26VU (FIG.1-B) PROHIBITING POWER SUPPLY TO
SYSTEM
4. ON DC/AC POWER CENTER 120VU OR ON ELECTRONICS RACK 90VU (FIG.2 A AND B AND THE CORRESPONDING FIGURE OF EACH RAI)
120VU: REMOVE ACCESS PANEL 212TZ OR 212VZ
(123VU) OR CIRCUIT BREAKER PANEL 121V
U OR 122VU OR 124VU OR 125VU OR 126VU
OR 127VU OR 128VU OR 129VU OR 130VU
90VU - SIDE SHELF: REMOVE ACCESS PANEL 222RZ
(SHELF 91VU) OR 222QZ (SHELF 91VU OR
92VU OR 93VU) OR 222PZ (SHELF 94VU OR
95VU)
- FRONT SHELF: REMOVE ACCESS PANEL 214
CZ(SHELF 91VU OR 92VU) OR 214BZ(SHELF
93VU OR 94VU OR 95VU)
24-00-00
RAI 10000-002
2-400 PAGE
2
MAR 01/15
24-00-00
003
RAI 10000-002
3
MAR15
_______
REMOVAL
REF.FIG.240000-RAI-00101
1. UNPLUG ELECTRICAL CONNECTOR (5)
2. PUT BLANKING CAP ON ELECTRICAL CONNECTOR
3. REMOVE SCREWS (7) AND WASHERS (6) SECURING
COVER (8)
4. REMOVE COVER
5. REMOVE NUTS (9) AND WASHERS (10) TO DISCONNECT TERMINAL LUGS (11)
6. REMOVE TERMINAL LUGS
7. REMOVE SCREWS (4) AND WASHERS (3) SECURING
CURRENT TRANSFORMER (2)
8. REMOVE CURRENT TRANSFORMER
004
____________
INSTALLATION
REF.FIG.240000-RAI-00101
01. CLEAN AND INSPECT COMPONENT INTERFACE AND/
OR COMPONENT ADJACENT AREA. CHECK FOR CORRECT CONDITION OF ELECTRICAL CONNECTOR
02. INSTALL CURRENT TRANSFORMER (2)
03. INSTALL WASHERS (3) AND SCREWS (4). TIGHTEN
SCREWS
04. INSERT WIRES THROUGH CURRENT TRANSFORMER
05. INSTALL TERMINAL LUGS (11)
06. INSTALL WASHERS (10) AND NUTS (9). TIGHTEN
*** CONTINUED ***
AH
24-00-00
RAI 10000-002
2-400 PAGE
3
MAR 01/15
24-00-00
RAI 10000-002
4
MAR15
NUTS
NOTE: MARK NUTS (9) WITH RED VARNISH
07. INSTALL COVER (8)
08. INSTALL WASHERS (6) AND SCREWS (7). TIGHTEN
SCREWS
09. REMOVE BLANKING CAP FROM ELECTRICAL CONNECTOR (5)
10. PLUG IN ELECTRICAL CONNECTOR
005
________
CLOSE
UP
REF. FIG. 240000-RAI-00100 (FIG.1)
REF. FIG. 240000-RAI-00103 (FIG.2)
1. ON DC/AC POWER CENTER 12OVU OR ON ELECTRONICS RACK 90VU (FIG.2 A OR B AND THE CORRESPONDING FIGURE OF EACH RAI)
120VU: CLOSE ACCESS PANEL 212TZ OR 212VZ OR
CIRCUIT BREAKER PANEL 121VU OR 122VU
OR 124VU OR 125VU OR 127VU OR 128VU
OR 129VU OR 130VU
90VU - SIDE SHELF: CLOSE ACCESS PANEL 222RZ
OR 222QZ OR 222PZ
- FRONT SHELF: CLOSE ACCESS PANEL 214CZ
OR 214BZ
2. REMOVE THE WARNING NOTICE FROM PANELS 29VU
AND 26VU (FIG.1-A AND B)
006
________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****
AH
E N D
O F
T E X T
*****
24-00-00
RAI 10000-002
2-400 PAGE
4
MAR 01/15
24-00-00
5
AH
RAI 10000-002
MAR15
24-00-00
RAI 10000-002
2-400
PAGE
5
MAR 01/15
24-00-00
6
AH
REM/INS OF CURRENT
TRANSFORMER
RAI 10000-002
MAR15
24-00-00
RAI 10000-002
2-400
PAGE
6
MAR 01/15
24-00-00
7
AH
RAI 10000-002
MAR15
24-00-00
RAI 10000-002
2-400
PAGE
7
MAR 01/15
24-00-00
RAI 10010-002
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 212
214
220
: 120VU 121VU 122VU 123VU 124VU 125VU 126VU
212TZ 212VZ 214BZ 214PZ 222CZ 222QZ 222RZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
SPARE
: 04
01
02
02
07
01
02
04
02
02
02
02
02
02
02
01
01
01
01
01
01
02
01
01
AH
___
MEN
_________
MAN-HOURS
01
CNTOR: 5XU-6XU-7XU-8XU
CNTOR:11XG
CNTOR: 2XX-8XX
CNTOR: 7GX - 8GX
CNTOR: 1PA- 2PA- 3PA-58PA
95PA-96PA-97PA
CNTOR: 4PD-13PD
CNTOR: 1DH- 3DH-16DH-18DH
CNTOR: 23PA-42PA
CNTOR: 28HB-29HB
CNTOR: 11HR-17HR
CNTOR: 15KF-16KF
CNTOR: 29PU-30PU
CNTOR: 8PX-10PX
CNTOR: 3GF-8GF
CNTOR: 16PU
CNTOR: 3KG
BAR 9PP FROM 3KG
BAR 8PP FROM 3KG
BAR 7PP FROM 16PU
BAR 2PP FROM 16PU
CNTOR: 1KG-2KG
BAR: 6PP FROM 2KG
BAR: 8PP FROM 2KG
24-22-80-01
24-41-80-01
24-42-80-01
29-24-80-01
24-31-80-01
24-65-80-01
30-61-80-02
24-31-80-01
21-51-80-01
21-23-80-01
61-22-80-02
24-32-80-01
24-47-80-01
29-25-80-01
24-32-80-01
80-11-80-01
24-69-80-03
24-69-80-03
24-69-80-03
24-69-80-03
80-11-80-01
24-69-80-03
24-69-80-03
24-00-00
RAI 10010-002
2-400 PAGE
1
MAR 01/15
SPARE
: 01
01
02
01
02
01
02
01
01
01
01
AH
24-00-00
RAI 10010-002
2
MAR15
24-69-80-03
24-69-80-03
24-32-80-01
24-32-80-01
24-31-80-01
24-32-80-01
24-32-80-01-030
24-46-80-04-050
24-69-80-03-210
24-69-80-03-200
24-69-80-03-280
24-00-00
RAI 10010-002
2-400 PAGE
2
MAR 01/15
24-00-00
001
RAI 10010-002
3
MAR15
_______
CAUTION
VU ASSEMBLIES ARE NOT EQUIPMENT,
INTERCHANGEABILITY BETWEEN AIRCRAFT IS NOT
AUTHORIZED.
002
_______
REMOVAL
THIS REMOVAL/INSTALLATION PROCEDURE IS APPLICABLE TO THE FOLLOWING ITEMS:
-------ITEM------------------ZONE--ACCESS--FINCONTACTOR-ACW GEN1
- 214
120VU
5XU
CONTACTOR-ACW GEN2
- 214
120VU
6XU
CONTACTOR-BUS TIE 1,ACW
- 214
120VU
7XU
CONTACTOR-BUS TIE 2,ACW
- 214
120VU
8XU
CONTACTOR-EXT PWR,AC
- 214
120VU 11XG
REF.FIG.240000-RAI-00111
1. UNPLUG THE ELECTRICAL CONNECTOR(3)
2. PUT BLANKING CAP ON THE ELECTRICAL CONNECTOR
3. REMOVE SCREWS(6) AND WASHERS(5) RETAINING
COVER(4)
4. REMOVE COVER
5. REMOVE NUTS(7) AND WASHERS(8) TO DISCONNECT
TERMINAL LUGS(9)
6. MARK AND DISCONNECT TERMINAL LUGS(10)
7. REMOVE SCREWS(2) AND WASHERS(1) RETAINING
CONTACTOR(11)
8. REMOVE CONTACTOR
24-00-00
RAI 10010-002
2-400 PAGE
3
MAR 01/15
24-00-00
003
RAI 10010-002
4
MAR15
___________
PREPARATION
REF. FIG. 240000-RAI-00100 (FIG.1)
REF. FIG. 240000-RAI-00103 (FIG.2)
1. MAKE CERTAIN THAT THE GROUND POWER UNIT IS
NOT CONNECTED TO THE DC AND AC EXTERNAL POWER RECEPTACLES (ON PANELS 5002VU AND 5000VU
-FIG.1-F AND D) AND THE ACCESS DOORS 114BR
AND 114CR (FIG.1-E AND C) ARE CLOSED
2. ON PANEL 29VU (FIG.1-A) MAKE CERTAIN THAT:
BAT SELECTOR SWITCH 7PA IS IN OFF POSITION
3. DISPLAY A WARNING NOTICE ON PANELS 29VU AND
26VU (FIG.1-B) PROHIBITING POWER SUPPLY TO
SYSTEM
4. ON DC/AC POWER CENTER 120VU OR ON ELECTRONICS RACK 90VU (FIG.2 A AND B AND THE CORRESPONDING FIGURE OF EACH RAI)
120VU: REMOVE ACCESS PANEL 212TZ OR 212VZ
(123VU) OR CIRCUIT BREAKER PANEL 121V
U OR 122VU OR 124VU OR 125VU OR 126VU
OR 127VU OR 128VU OR 129VU OR 130VU
90VU - SIDE SHELF: REMOVE ACCESS PANEL 222RZ
(SHELF 91VU) OR 222QZ (SHELF 91VU OR
92VU OR 93VU) OR 222PZ (SHELF 94VU OR
95VU)
- FRONT SHELF: REMOVE ACCESS PANEL 214
CZ(SHELF 91VU OR 92VU) OR 214BZ(SHELF
93VU OR 94VU OR 95VU)
004
_______
REMOVAL
THIS REMOVAL/INSTALLATION PROCEDURE IS APPLICABLE TO THE FOLLOWING ITEMS:
---------ITEM----------------ZONE--ACCESS--FINCNTR-SVCE BUS XFR, ACW
- 212
121VU
2XX
CNTR-SVCE BUS, ACW
- 212
121VU
8XX
*** CONTINUED ***
AH
24-00-00
RAI 10010-002
2-400 PAGE
4
MAR 01/15
24-00-00
RAI 10010-002
5
MAR15
REF.FIG.240000-RAI-00112
01. REMOVE SCREWS (7) RETAINING COVERS (6 AND
5)
02. REMOVE COVER (6)
03. REMOVE NUTS (11) AND WASHERS (12) TO DISCONNECT TERMINAL LUGS (13)
04. MARK AND DISCONNECT TERMINAL LUGS (13)
05. REMOVE COVER (5)
06. REMOVE NUTS (4) AND WASHERS (3) TO DISCONNECT TERMINAL LUGS (2)
07. MARK AND DISCONNECT TERMINAL LUGS (2)
08. REMOVE SCREWS(8) AND WASHERS (9) TO DISCONNECT TERMINAL LUGS (10)
09. MARK AND DISCONNECT TERMINAL LUGS (10)
10. REMOVE SCREWS (14) AND WASHERS (15) RETAINING CONTACTOR (1)
11. REMOVE CONTACTOR
005
_______
REMOVAL
THIS REMOVAL/INSTALLATION PROCEDURE IS APPLICABLE TO THE FOLLOWING ITEMS:
---------ITEM----------------ZONE--ACCESS--FINCONTACTOR-PUMP, BLUE HYD
SYS
- 212
126VU
7GX
CONTACTOR-PUMP, GREEN HYD
SYS
- 212
126VU
8GX
REF.FIG.240000-RAI-00113
*** CONTINUED ***
AH
24-00-00
RAI 10010-002
2-400 PAGE
5
MAR 01/15
24-00-00
RAI 10010-002
6
MAR15
_______
REMOVAL
THIS REMOVAL/INSTALLATION PROCEDURE IS APPLICABLE TO THE FOLLOWING ITEMS:
------ITEM-------------------ZONE--ACCESS--FINCONTACTOR-MAIN BUSES TRANSFER, DC
- 212
123VU
1PA
CONTACTOR-BUS1/HOT MAIN
BAT BUS TRANSFER - 212
123VU
2PA
CONTACTOR-MAIN BUSES/HOT
MAIN BAT BUS
TRANSFER
- 212
123VU
3PA
CONTACTOR-MAIN BUSES/HOT
EMER BAT BUS
*** CONTINUED ***
AH
24-00-00
RAI 10010-002
2-400 PAGE
6
MAR 01/15
24-00-00
RAI 10010-002
7
TRANSFER
- 212
CONTACTOR -EMER BUS
TRANSFER/HOT
EMER BAT
BUS-TRU
- 212
CONTACTOR -ESS/STBY BUSES
TRANSFER/HOT
MAIN BAT
BUS-TRU
- 212
CONTACTOR -INV 1 TRANSFER/
BUS 1-TRU
- 212
CONTACTOR-STBY BUS, DC
- 212
CONTACTOR-STAT INV OVRD XFR- 212
123VU
MAR15
58PA
123VU
95PA
123VU
96PA
123VU 97PA
123VU
4PD
123VU 13PD
REF.FIG.240000-RAI-00121
1. REMOVE CAPTIVE SCREWS (6) SECURING CONTACTOR
(7)
2. REMOVE CONTACTOR WITH CARE NOT TO DAMAGE THE
ELECTRICAL CONNECTOR (5)
3. REMOVE NUTS (8) AND WASHERS (9) TO DISCONNECT TERMINAL LUGS (10)
4. MARK AND DISCONNECT TERMINAL LUGS
5. REMOVE SCREW (2) RETAINING PROTECTIVE COVER
(1)
6. REMOVE PROTECTIVE COVER
7. REMOVE NUTS (13) AND WASHERS (12) TO DISCONNECT TERMINAL LUGS (11)
8. MARK AND DISCONNECT TERMINAL LUGS
9. REMOVE BUSBAR (14) (RE-USED).
NOTE: PROTECT COMPONENT INTERFACE AND/OR
COMPONENT ADJACENT AREA
*** CONTINUED ***
AH
24-00-00
RAI 10010-002
2-400 PAGE
7
MAR 01/15
24-00-00
007
RAI 10010-002
8
MAR15
_______
REMOVAL
THIS REMOVAL/INSTALLATION PROCEDURE IS APPLICABLE TO THE FOLLOWING ITEMS :
--------ITEM-----------------ZONE--ACCESS--FINCONTACTOR-MAIN BAT CHARGE - 214
123VU 23PA
CONTACTOR-EMER BAT CHARGE - 214
123VU 42PA
CONTACTOR-BLADES 1, 3 AND 5
DEICING, PROP 1 - 214
120VU
3DH
CONTACTOR-BLADES 2, 4 AND 6
DEICING, PROP 1 - 214
120VU
1DH
CONTACTOR-BLADES 1, 3 AND 5
DEICING, PROP 2 - 214
120VU 18DH
CONTACTOR-BLADES 2, 4 AND 6
DEICING, PROP 2 - 214
120VU 16DH
REF.FIG.240000-RAI-00122
1. REMOVE SCREWS (4) AND WASHERS (3) TO DISCONNECT TERMINAL LUGS (2)
2. MARK AND DISCONNECT TERMINAL LUGS
3. REMOVE NUTS (8) AND WASHERS (7) TO DISCONNECT TERMINAL LUGS (6)
4. MARK AND DISCONNECT TERMINAL LUGS
5. REMOVE CLAMP (5) RETAINING CONTACTOR (1)
6. REMOVE CONTACTOR
008
_______
REMOVAL
THIS REMOVAL PROCEDURE IS APPLICABLE TO THE
FOLLOWING ITEMS:
----ITEM---------------------ZONE--ACCESS--FINCONTACTOR-RECIRCULATION FAN,
SYS2
- 212
122VU 28HB
CONTACTOR-RECIRCULATION FAN,
SYS1
- 212
122VU 29HB
*** CONTINUED ***
AH
24-00-00
RAI 10010-002
2-400 PAGE
8
MAR 01/15
24-00-00
CONTACTOR-ELECTRONICS RACK
EXTRACTION FAN
BUS 2 PWR
CONTACTOR-ELECTRONICS RACK
EXTRACTION FAN
BUS 1 PWR
RELAY-FEATH PUMP PWR, PROP
(ENG1)
RELAY-FEATH PUMP PWR, PROP
(ENG2)
CONTACTOR-UTILITY BUS1
CONTACTOR-UTILITY BUS2
CONTACTOR-DC SERVICE BUS
TRANSFER
CONTACTOR-DC SERVICE BUS
RAI 10010-002
9
212
122VU
11HR
1
2
-
212
122VU
17HR
212
122VU
15KF
212
212
212
122VU
122VU
122VU
16KF
29PU
30PU
212
212
121VU
121VU
8PX
10PX
MAR15
REF.FIG.240000-RAI-00130
1. UNPLUG ELECTRICAL CONNECTOR (8)
2. PUT BLANKING CAP ON ELECTRICAL CONNECTOR
3. REMOVE NUTS (4),(5) AND WASHERS (3),(6) TO
DISCONNECT TERMINAL LUGS (2),(7)
4. MARK AND DISCONNECT TERMINAL LUGS (2),(7)
5. REMOVE SCREWS (9) AND WASHERS (10) RETAINING
CONTACTOR
6. REMOVE CONTACTOR (1)
NOTE: PROTECT COMPONENT INTERFACE AND/OR COMPONENT ADJACENT AREA
009
_______
REMOVAL
THIS REMOVAL/INSTALLATION PROCEDURE IS APPLICABLE TO THE FOLLOWING ITEMS:
------ITEMS------------------ZONE--ACCESS--FINCONTACTOR-PUMP GND PWR,
*** CONTINUED ***
AH
24-00-00
RAI 10010-002
2-400 PAGE
9
MAR 01/15
24-00-00
AUXILIARY SYS
CONTACTOR-PUMP MAIN PWR,
AUXILIARY SYS
RAI 10010-002
10
212
122VU
3GF
212
122VU
8GF
MAR15
REF.FIG.240000-RAI-00131
1. REMOVE NUTS (12) AND WASHERS (11) TO DISCONNECT TERMINAL LUGS (10)
2. MARK AND DISCONNECT TERMINAL LUGS (10)
3. REMOVE NUTS (1) AND WASHERS (2) TO DISCONNECT TERMINAL LUGS (3)
4. MARK AND DISCONNECT TERMINAL LUGS (3)
5. REMOVE SCREWS (4) AND WASHERS (5) TO DISCONNECT TERMINAL LUGS (6)
6. MARK AND DISCONNECT TERMINAL LUGS (6)
7. REMOVE SCREWS (9) AND WASHERS (8) RETAINING
CONTACTOR
8. REMOVE CONTACTOR (7)
NOTE: PROTECT COMPONENT INTERFACE AND/OR COMPONENT ADJACENT AREA
010
_______
REMOVAL
THIS REMOVAL/INSTALLATION PROCEDURE IS APPLICABLE TO THE FOLLOWING ITEMS:
--------ITEM-----------------ZONE--ACCESS--FINCONTACTOR-BUS TIE 2, DC
- 212
123VU 16PU
CONTACTOR-MAIN BAT START
ENG 1 & 2
- 212
123VU
3KG
REF.FIG.240000-RAI-00132
1. REMOVE NUTS (4) SECURING TERMINAL STRIPS (1
*** CONTINUED ***
AH
24-00-00
RAI 10010-002
2-400 PAGE
10
MAR 01/15
24-00-00
RAI 10010-002
11
MAR15
AND 3)
2. REMOVE CAPTIVE SCREWS (2) RETAINING CONTACTOR (5)
3. REMOVE CONTACTOR WITH CARE TO NOT DAMAGE THE
ELECTRICAL CONNECTOR (6)
011
_______
REMOVAL
THIS REMOVAL/INSTALLATION PROCEDURE IS APPLICABLE TO THE FOLLOWING ITEMS:
--------ITEM-----------------ZONE--ACCESS--FINCONTACTOR-START, ENG 1
- 212
123VU
1KG
CONTACTOR-START, ENG 2
- 212
123VU
2KG
REF.FIG.240000-RAI-00133
1. REMOVE NUTS (4) SECURING TERMINAL STRIPS (1
AND 3)
2. REMOVE CAPTIVE SCREWS (2) RETAINING CONTACTOR (5)
3. REMOVE CONTACTOR WITH CARE TO NOT DAMAGE THE
ELECTRICAL CONNECTOR (6)
012
_______
REMOVAL
THIS REMOVAL/INSTALLATION PROCEDURE IS
APPLICABLE TO THE FOLLOWING ITEMS:
------ITEMS-------------------ZONE--ACCESS--FIN
CONTACTOR-GENERATOR,DC
212 123VU 11PU
CONTACTOR-GENERATOR,DC
212 123VU 12PU
REF. FIG. : 240000-RAI-00135
1. REMOVE NUTS AND WASHER (2).
2. REMOVE CAPTIVE SCREWS (1) RETAINING
CONTACTOR (3).
3. REMOVE CONTACTOR WITH CARE TO NOT DAMAGE
THE ELECTRICAL CONNECTOR (4).
*** CONTINUED ***
AH
24-00-00
RAI 10010-002
2-400 PAGE
11
MAR 01/15
24-00-00
013
RAI 10010-002
12
MAR15
_______
REMOVAL
THIS REMOVAL/INSTALLATION PROCEDURE IS
APPLICABLE TO THE FOLLOWING ITEMS:
------ITEM---------------ZONE--ACCESS----FIN
FUSE-BUS TIE, DC GEN
212
123VU
36PU
1. REMOVE NUTS RETAINING FUSE.
2. REMOVE FUSE.
014
_______
REMOVAL
THIS REMOVAL/INSTALLATION PROCEDURE IS
APPLICABLE TO THE FOLLOWING ITEMS:
----ITEMS----------ZONE----ACCESS----FIN----SHUNT-MAIN BAT
212
123VU
22PA
SHUNT-EMER BAT
212
123VU
39PA
REF.
1.
2.
3.
4.
FIG. : 240000-RAI-00134
REMOVE SCREWS (2) TO DISCONNECT CABLES.
MARK AND DISCONNECT CABLES.
REMOVE STUDS (1) RETAINING SHUNT (3).
REMOVE SHUNT (3).
_______
REMOVAL
THIS REMOVAL/INSTALLATION PROCEDURE IS
APPLICABLE TO THE FOLLOWING ITEMS:
------ITEMS-------------------ZONE--ACCESS--FIN
CONTACTOR-EXTERNAL POWER, DC
212 123VU 11PG
REF. FIG. : 240000-RAI-00136
1. REMOVE NUTS AND WASHER (2).
2. REMOVE CAPTIVE SCREWS (1) RETAINING
CONTACTOR (3).
3. REMOVE CONTACTOR WITH CARE TO NOT DAMAGE
*** CONTINUED ***
AH
24-00-00
RAI 10010-002
2-400 PAGE
12
MAR 01/15
24-00-00
RAI 10010-002
13
MAR15
_______
REMOVAL
THIS REMOVAL/INSTALLATION PROCEDURE IS
APPLICABLE TO THE FOLLOWING ITEMS:
---------ITEM-----------ZONE--ACCESS--FIN-HALL EFF SNSR/DC GEN1 - 212
123VU
7PU
HALL EFF SNSR/DC GEN2 - 212
123VU
8PU
HALL EFF SNSR/EXT PWR - 212
123VU
3PG
REF.FIG.240000-REM-00050
1. UNPLUG ELECTRICAL CONNECTOR (13)
2. PUT BLANKING CAP ON ELECTRICAL CONNECTOR
3. REMOVE SCREW (1), WASHER (4) AND NUT (5) SECURING TERMINAL STRIP (3 OR 15)
4. REMOVE SCREW (7), WASHER (8) AND NUT (9) SECURING TERMINAL STRIP 6PP (6) OR 5PP (5) OR
13PP (10)
5. REMOVE TERMINAL STRIP (2 OR 14 OR 11)
6. UNSCREW CAPTIVE SCREWS (16) RETAINING HALL
EFFECT SENSOR (17)
017
____________
INSTALLATION
REF.FIG.240000-RAI-00111
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/OR
COMPONENT ADJACENT AREA.
2. INSTALL CONTACTOR(11)
3. INSTALL WASHERS(1) AND SCREWS(2). TIGHTEN
SCREWS
4. CONNECT WIRING(10) USING TERMINAL LUGS(9)
*** CONTINUED ***
AH
24-00-00
RAI 10010-002
2-400 PAGE
13
MAR 01/15
24-00-00
RAI 10010-002
14
MAR15
____________
INSTALLATION
REF.FIG.240000-RAI-00112
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/OR
COMPONENT ADJACENT AREA
2. INSTALL CONTACTOR (1)
3. INSTALL WASHERS (15) AND SCREWS(14). TIGHTEN
SCREWS
4. INSTALL TERMINAL LUGS (10), WASHERS (9) AND
SCREWS(8). TIGHTEN SCREWS (TIGHTENING TORQUE
VALUE:0,02 TO 0,03 MDAN-1,7 TO 2,6 LBF X IN)
5. INSTALL TERMINAL LUGS (2), WASHERS (3) AND
NUTS (4). TIGHTEN NUTS (TIGHTENING TORQUE
VALUE:0,21 TO 0,28 MDAN - 18,6 TO 24,7 LBF
X IN)
NOTE: MARK NUTS (4) WITH RED VARNISH
6. INSTALL COVER (5)
7. INSTALL TERMINAL LUGS (13), WASHERS (12) AND
NUTS (11). TIGHTEN NUTS (TIGHTENING TORQUE
VALUE:0,21 TO 0,28 MDAN-18,6 TO 24,7 LBF X
*** CONTINUED ***
AH
24-00-00
RAI 10010-002
2-400 PAGE
14
MAR 01/15
24-00-00
RAI 10010-002
15
MAR15
IN)
NOTE: MARK NUTS (11) WITH RED VARNISH
8. INSTALL COVER (6) AND SCREWS (7). TIGHTEN
SCREWS
019
____________
INSTALLATION
REF.FIG.240000-RAI-00113
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/OR
COMPONENT ADJACENT AREA
2. INSTALL CONTACTOR (1)
3. INSTALL WASHERS (18) AND SCREWS(17). TIGHTEN
SCREWS
4. INSTALL TERMINAL LUGS (2 AND 10), WASHERS (3
AND 9) AND SCREWS (4 AND 8). TIGHTEN SCREWS
(TIGHTENING TORQUEVALUE: 0,03 TO 0,05 MDAN
- 3,3 TO 4,4 LBF X IN)
5. INSTALL TERMINAL LUGS (16), WASHERS (15) AND
NUTS (14). TIGHTEN NUTS (TIGHTENING TORQUE
VALUE: 0,21 TO 0,28 MDAN - 18,6 TO 24,7 LBF
X IN)
NOTE: MARK NUTS (14) WITH RED VARNISH
6. INSTALL COVER (5)
7. INSTALL TERMINAL LUGS (13), WASHERS (12) AND
NUTS (11). TIGHTEN NUTS (TIGHTENING TORQUE
VALUE: 0,21 TO 0,28 MDAN -18,6 TO 24,7 LBF X
IN)
NOTE: MARK NUTS (11) WITH RED VARNISH
8. INSTALL COVER (6) AND SCREWS (7). TIGHTEN
SCREWS
24-00-00
RAI 10010-002
2-400 PAGE
15
MAR 01/15
24-00-00
020
RAI 10010-002
16
MAR15
____________
INSTALLATION
REF.FIG.240000-RAI-00121
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/OR
COMPONENT ADJACENT AREA
2. INSTALL BUSBAR (14) PREVIOUSLY REMOVED.
3. INSTALL TERMINAL LUGS (11), WASHERS (12) AND
NUTS (13). TIGHTEN NUTS(TIGHTENING TORQUE VA
LUE: 0,2 MDAN/17 LBF.IN NOM TO 0,27 MDAN/
24 LBF.IN MAX)
4. INSTALL PROTECTIVE COVER (1) AND SCREW (2).
TIGHTEN SCREW
5. INSTALL TERMINAL LUGS (10), WASHERS (9) AND
NUTS (8). TIGHTEN NUTS (TIGHTENING TORQUE
VALUE: 0,35 MDAN/30 LBF.IN NOM)
6. INSTALL CONTACTOR (7) WITH ITS ELECTRICAL
CONNECTOR (5)
7. TIGHTEN CAPTIVE SCREWS (6)
NOTE: MARK NUTS (8) WITH RED VARNISH
021
____________
INSTALLATION
REF.FIG.240000-RAI-00122
1. INSTALL CONTACTOR(1)
2. INSTALL AND TIGHTEN CLAMP(5)
3. CONNECT TERMINAL LUGS(6) AND INSTALL WASHERS(7) AND NUTS(8). TIGHTEN NUTS (TIGHTENING TORQUE VALUE: 0,25 TO 0,30 MDAN/ 22 TO
26,5 LBF X IN)
*** CONTINUED ***
AH
24-00-00
RAI 10010-002
2-400 PAGE
16
MAR 01/15
24-00-00
RAI 10010-002
17
MAR15
____________
INSTALLATION
REF.FIG.240000-RAI-00130
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/OR
COMPONENT ADJACENT AREA. CHECK FOR CORRECT
CONDITION OF ELECTRICAL CONNECTOR
2. INSTALL CONTACTOR (1)
3. INSTALL WASHERS (10) AND SCREWS (9). TIGHTEN
SCREWS
4. INSTALL (ON CONTACTS X1 AND X2) TERMINAL
LUGS (2), WASHERS (3) AND NUTS (4). TIGHTEN
NUTS AND PROVIDE THESE ONES WITH PROTECTIVE
INSULATION. (TIGHTENING TORQUE VALUE: 0,07
MDAN/6 LBF X IN NOM)
5. INSTALL (ON CONTACTS A1 AND A2) TERMINAL
LUGS (7), WASHERS (6) AND NUTS (5). TIGHTEN
NUTS (TIGHTENING TORQUE VALUE: 0,5 MDAN/
45 LBF.IN NOM)
6. REMOVE BLANKING CAP FROM ELECTRICAL CONNECTOR (8)
7. PLUG IN ELECTRICAL CONNECTOR
NOTE: MARK NUTS (4)(5) WITH RED VARNISH
24-00-00
RAI 10010-002
2-400 PAGE
17
MAR 01/15
24-00-00
023
RAI 10010-002
18
MAR15
____________
INSTALLATION
REF.FIG.240000-RAI-00131
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/OR
COMPONENT ADJACENT AREA
2. INSTALL CONTACTOR (7)
3. INSTALL WASHERS (8) AND SCREWS (9). TIGHTEN
SCREWS
4. INSTALL TERMINAL LUGS (6), WASHERS (5) AND
SCREWS (4). TIGHTEN SCREWS
5. INSTALL TERMINAL LUGS (3), WASHERS (2) AND
NUTS (1). TIGHTEN NUTS (TIGHTENING TORQUE
VALUE: 0,07 MDAN/6 LBF X IN NOM)
6. INSTALL TERMINALS LUGS (10), WASHERS(11) AND
NUTS(12). TIGHTEN NUTS (TIGHTENING TORQUE
VALUE: 0,5 MDAN/45 LBF.IN NOM)
NOTE: MARK NUTS (12)(1) WITH RED VARNISH
024
____________
INSTALLATION
REF.FIG.240000-RAI-00132
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/OR
COMPONENT ADJACENT AREA. CHECK FOR CORRECT
CONDITION OF ELECTRICAL CONNECTORS
2. INSTALL CONTACTOR (5) WITH ITS ELECTRICAL
CONNECTOR (6)
3. TIGHTEN CAPTIVE SCREWS (2)
4. -(16PU) INSTALL TERMINAL STRIPS(1)(2PP) AND
(3)(7PP) AND NUTS(4). TIGHTEN NUTS
-( 3KG) INSTALL TERMINAL STRIPS (1)(8PP) AND
*** CONTINUED ***
AH
24-00-00
RAI 10010-002
2-400 PAGE
18
MAR 01/15
24-00-00
RAI 10010-002
19
MAR15
____________
INSTALLATION
REF.FIG.240000-RAI-00133
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/OR
COMPONENT ADJACENT AREA. CHECK FOR CORRECT
CONDITION OF ELECTRICAL CONNECTORS
2. INSTALL CONTACTOR (5) WITH ITS ELECTRICAL
CONNECTOR (6)
3. TIGHTEN CAPTIVE SCREWS (2)
4. -( 2KG) INSTALL TERMINAL STRIPS (1)(8PP) AND
(3)(6PP) AND NUTS (4). TIGHTEN NUTS
-( 1KG) INSTALL TERMINAL STRIPS (1)(5PP) AND
(3)(8PP) AND NUTS(4). TIGHTEN NUTS
(TIGHTENING TORQUE VALUE: 1,35 TO 1,45 MDAN
- 119 TO 128 LBF X IN)
026
____________
INSTALLATION
REF. FIG. 240000-RAI-00135
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/
OR COMPONENT ADJACENT AREA. CHECK FOR
CORRECT CONDITION OF ELECTRICAL CONNECTORS.
2. INSTALL CONTACTOR (3) WITH ITS ELECTRICAL
CONNECTOR (4).
3. TIGHTEN CAPTIVE SCREWS (1).
4. INSTALL NUTS AND WASHER (2) PREVIOUSLY
REMOVED. TIGHTEN NUTS (TIGHTENING TORQUE
VALUE : 1,4 MDAN - 124 LBF.IN).
027
____________
INSTALLATION
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/OR
COMPONENT ADJACENT AREA.
*** CONTINUED ***
AH
24-00-00
RAI 10010-002
2-400 PAGE
19
MAR 01/15
24-00-00
RAI 10010-002
20
MAR15
2. INSTALL FUSE.
3. INSTALL NUTS. TIGHTEN NUTS (TIGHTENING
TORQUE VALUE: 1,05 TO 1,15 MDAN/93 TO 102
LBF.IN).
028
____________
INSTALLATION
REF. FIG. 240000-RAI-00134
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/
OR COMPONENT ADJACENT AREA.
2. INSTALL SHUNT (3).
3. INSTALL STUDS (1). TIGHTEN STUDS (TIGHTENING
TORQUE VALUE: 1,1 MDAN/97 LBF.IN NOM).
4. INSTALL CABLES AND TIGHTEN SCREWS (2)
(TIGHTENING TORQUE VALUE: 1,05 TO 1,15 MDAN/
93 TO 102 LBF.IN).
NOTE: MARK SCREWS (2) WITH RED VANISH.
029
____________
INSTALLATION
REF. FIG. 240000-RAI-00136
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/
OR COMPONENT ADJACENT AREA. CHECK FOR
CORRECT CONDITION OF ELECTRICAL CONNECTORS.
2. INSTALL CONTACTOR (3) WITH ITS ELECTRICAL
CONNECTOR (4).
3. TIGHTEN CAPTIVE SCREWS (1).
4. INSTALL NUTS AND WASHER (2).TIGHTEN NUTS
(TIGHTENING TORQUEVALUE : 1,4 MDAN 124 LBF.IN).
030
____________
INSTALLATION
REF.FIG.240000-RAI-00150
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/OR
COMPONENT ADJACENT AREA.
*** CONTINUED ***
AH
24-00-00
RAI 10010-002
2-400 PAGE
20
MAR 01/15
24-00-00
RAI 10010-002
21
MAR15
2. INSTALL HALL EFFECT SENSOR (17) ON ITS SUPPORT AND SCREW CAPTIVE SCREWS (16)
3. INSTALL TERMINAL STRIP (2 OR 14 OR 11) THROUGH SENSOR
4. INSTALL SCREW (1 AND 7), WASHER (4 AND 8)
AND NUT (5 AND 9) SECURING TERMINAL STRIP TO
LATERAL ONES (3 OR 15 AND 6 OR 12 OR 10)
5. REMOVE BLANKING CAP FROM ELECTRICAL CONNECTOR (13)
6. PLUG IN ELECTRICAL CONNECTOR
031
________
CLOSE
UP
REF. FIG. 240000-RAI-00100 (FIG.1)
REF. FIG. 240000-RAI-00103 (FIG.2)
1. ON DC/AC POWER CENTER 12OVU OR ON ELECTRONICS RACK 90VU (FIG.2 A OR B AND THE CORRESPONDING FIGURE OF EACH RAI)
120VU: CLOSE ACCESS PANEL 212TZ OR 212VZ OR
CIRCUIT BREAKER PANEL 121VU OR 122VU
OR 124VU OR 125VU OR 127VU OR 128VU
OR 129VU OR 130VU
90VU - SIDE SHELF: CLOSE ACCESS PANEL 222RZ
OR 222QZ OR 222PZ
- FRONT SHELF: CLOSE ACCESS PANEL 214CZ
OR 214BZ
2. REMOVE THE WARNING NOTICE FROM PANELS 29VU
AND 26VU (FIG.1-A AND B)
032
________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****
AH
E N D
O F
T E X T
*****
24-00-00
RAI 10010-002
2-400 PAGE
21
MAR 01/15
24-00-00
22
AH
RAI 10010-002
MAR15
24-00-00
RAI 10010-002
2-400
PAGE
22
MAR 01/15
24-00-00
23
AH
RAI 10010-002
MAR15
24-00-00
RAI 10010-002
2-400
PAGE
23
MAR 01/15
24-00-00
24
AH
REM/INS OF CONTACTORS
AND RELAYS IN 120VU
RAI 10010-002
MAR15
24-00-00
RAI 10010-002
2-400
PAGE
24
MAR 01/15
24-00-00
25
AH
REM/INS OF CONTACTORS
AND RELAYS IN 120VU
RAI 10010-002
MAR15
24-00-00
RAI 10010-002
2-400
PAGE
25
MAR 01/15
24-00-00
26
AH
REM/INS OF CONTACTORS
AND RELAYS IN 120VU
RAI 10010-002
MAR15
24-00-00
RAI 10010-002
2-400
PAGE
26
MAR 01/15
24-00-00
27
AH
RAI OF CONTACTORS
AND RELAYS IN 120VU
RAI 10010-002
MAR15
24-00-00
RAI 10010-002
2-400
PAGE
27
MAR 01/15
24-00-00
28
AH
REM/INS OF CNTOR
OF RELAY IN 120VU
RAI 10010-002
MAR15
24-00-00
RAI 10010-002
2-400
PAGE
28
MAR 01/15
24-00-00
29
AH
REM/INS OF CNTOR
AND RELAY IN 120VU
RAI 10010-002
MAR15
24-00-00
RAI 10010-002
2-400
PAGE
29
MAR 01/15
24-00-00
30
AH
REM/INS OF CNTOR
AND RELAY IN 120VU
RAI 10010-002
MAR15
24-00-00
RAI 10010-002
2-400
PAGE
30
MAR 01/15
24-00-00
31
AH
REM/INS OF CNTOR
AND RELAY IN 120VU
RAI 10010-002
MAR15
24-00-00
RAI 10010-002
2-400
PAGE
31
MAR 01/15
24-00-00
32
AH
REM/INS OF CNTOR
AND RELAY IN 120VU
RAI 10010-002
MAR15
24-00-00
RAI 10010-002
2-400
PAGE
32
MAR 01/15
24-00-00
33
AH
RAI 10010-002
MAR15
24-00-00
RAI 10010-002
2-400
PAGE
33
MAR 01/15
24-00-00
34
AH
RAI 10010-002
MAR15
24-00-00
RAI 10010-002
2-400
PAGE
34
MAR 01/15
24-00-00
35
AH
RAI 10010-002
MAR15
24-00-00
RAI 10010-002
2-400
PAGE
35
MAR 01/15
24-00-00
36
AH
REM/INS OF CONTACTORS
IN 120VU
RAI 10010-002
MAR15
24-00-00
RAI 10010-002
2-400
PAGE
36
MAR 01/15
24-00-00
RAI 10040-001
1
APR05
ZONING DATA
___________
ZONE
ACCESS
: 110
210
212
: 114BR 121VU 126VU
211FZ 212FZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELECTRIC
_________
MAN-HOURS
01
ELAPSED TIME
SPARE
: 02 CONTACTOR: 27DG-28DG
02 CONTACTOR: 30DG-31DG
30-42-80-03-040
30-42-80-XX-XXX
: OPERATIONAL TEST OF
WINDSHIELD HEATING
30-42-00-OPT-10000
PUBLICATION
___________
JIC
AH
24-00-00
RAI 10040-001
2-400 PAGE
1
APR 01/05
24-00-00
001
RAI 10040-001
2
APR05
_______
CAUTION
VU ASSEMBLIES ARE NOT EQUIPMENT,
INTERCHANGEABILITY BETWEEN AIRCRAFT IS NOT
AUTHORIZED.
002
___________
PREPARATION
REF.FIG.240000-RAI-00100 (FIG.1)
REF.FIG.240000-RAI-00140 (FIG.2)
1. MAKE CERTAIN THAT THE GROUND POWER UNIT IS
NOT CONNECTED TO THE DC EXTERNAL POWER RECEPTACLES (ON PANEL 5002VU / FIG.1-F)AND THE
ACCESS DOOR 114BR (FIG.1-E) IS CLOSED
2. ON PANEL 29VU (FIG.1-A) MAKE CERTAIN THAT:
BAT SELECTOR SWITCH 7PA IS IN OFF POSITION
3. DISPLAY A WARNING NOTICE ON PANEL 29VU PROHIBITING POWER SUPPLY TO SYSTEM
4. IN THE FLIGHT COMPARTMENT (FIG.2-A)
REMOVE ACCESS PANEL 211FZ (212FZ)
003
_______
REMOVAL
THIS REMOVAL/INSTALLATION PROCEDURE IS APPLICABLE TO THE FOLLOWING ITEMS:
---------ITEM--------------ZONE---ACCESS--FIN-1. RELAY-SIDE WINDOW
SUPPLY, L
2. RELAY-SIDE WINDOW
SUPPLY, R
3. RELAY-SIDE WINDOW
POWER, L
4. RELAY-SIDE WINDOW
POWER, R
POWER
POWER
MAIN
MAIN
210
211FZ
27DG
210
212FZ
28DG
210
211FZ
31DG
210
212FZ
30DG
24-00-00
RAI 10040-001
2-400 PAGE
2
APR 01/05
24-00-00
RAI 10040-001
3
APR05
REF.FIG.240000-RAI-00140
1. REMOVE CAPTIVE SCREWS(3) ATTACHING RELAY (1)
2. REMOVE RELAY FROM ITS BASE (2) TAKING CARE
NOT TO DAMAGE ELECTRICAL CONNECTOR
004
____________
INSTALLATION
REF.FIG.240000-RAI-00140
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/OR
COMPONENT ADJACENT AREA
2. CHECK FOR CORRECT CONDITION OF ELECTRICAL
CONNECTOR
3. INSTALL RELAY(1) ON ITS BASE(2) AND TIGHTEN
CAPTIVE SCREWS (3)
005
________
CLOSE
UP
REF.FIG.240000-RAI-00100 (FIG.1)
REF.FIG.240000-RAI-00140 (FIG.2)
1. IN THE FLIGHT COMPARTMENT (FIG.2-A)
INSTALL ACCESS PANEL 211FZ (212FZ)
2. REMOVE THE WARNING NOTICE FROM PANEL 29VU
(FIG.1-A)
006
________________
OPERATIONAL
TEST
SEE JOB INSTRUCTION CARD
304200-OPT-10000
*****
AH
E N D
O F
T E X T
*****
24-00-00
RAI 10040-001
2-400 PAGE
3
APR 01/05
24-00-00
4
AH
RAI 10040-001
APR05
24-00-00
RAI 10040-001
2-400
PAGE
4
APR 01/05
24-00-00
5
AH
RAI 10040-001
APR05
24-00-00
RAI 10040-001
2-400
PAGE
5
APR 01/05
24-00-00
RAI 10060-001
1
MAR13
ZONING DATA
___________
ZONE
ACCESS
: 114
212
: 512
612
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
SPARE
: 01
01
01
01
AH
___
MEN
_________
MAN-HOURS
01
24-32-60
24-32-60
24-32-60
24-32-60
24-00-00
RAI 10060-001
2-400 PAGE
1
MAR 01/13
24-00-00
001
RAI 10060-001
2
MAR13
___________
PREPARATION
REF.FIG.240000-RAI-00100
1. MAKE CERTAIN THAT THE GROUND POWER UNIT IS
NOT CONNECTED TO THE DC EXTERNAL POWER RECEPTACLE (ON PANELS 5002VU AND 5000VU/F AND D)
AND THE ACCESS DOORS 114BR AND 114CR (E AND
C) ARE CLOSED
2. ON PANEL 29VU(A) MAKE CERTAIN THAT:
BAT SELECTOR SWITCH 7PA IS IN OFF POSITION
3. DISPLAY A WARNING NOTICE ON PANEL 29VU AND
26VU(B) PROHIBITING POWER SUPPLY TO SYSTEM
4. ON L(R) WING (SEE ON THE CORRESPONDING FIGURE OF EACH REM/INS):
REMOVE PANEL 512(612)
002
_____________________________
REMOVAL
OF HALL EFFECT SENSOR
REF.FIG.240000-RAI-00160 OR 240000-RAI-00161
1. PULL THE PROTECTIVE CAP (3) (IF APPLICABLE)
FROM THE ELECTRICAL CONNECTOR (2)
2. UNPLUG ELECTRICAL CONNECTOR (2)
3. PUT BLANKING CAP ON ELECTRICAL CONNECTOR
4. REMOVE SCREW (9) AND NUT (12), WASHER (8)
TO DISCONNECT TERMINAL LUG (7)
5. REMOVE SCREWS (4) AND WASHERS (5) SECURING
CLAMPS (6)
6. REMOVE THE WIRE WITH TERMINAL LUG FROM HALL
EFFECT SENSOR (1)
7. REMOVE CAPTIVE SCREWS (11) SECURING HALL EF*** CONTINUED ***
AH
24-00-00
RAI 10060-001
2-400 PAGE
2
MAR 01/13
24-00-00
RAI 10060-001
3
MAR13
FECT SENSOR
8. REMOVE HALL EFFECT SENSOR
003
__________________________________
INSTALLATION
OF HALL EFFECT SENSOR
REF.FIG.240000-RAI-00160 OR 240000-RAI-00161
01. CLEAN AND INSPECT COMPONENT INTERFACE AND/
OR COMPONENT ADJACENT AREA.
02. INSTALL HALL EFFECT SENSOR (1). TIGHTEN CAP
TIVE SCREWS (11)
03. INSERT THE WIRE WITH TERMINAL LUG THROUGH
SENSOR
04. INSTALL CLAMPS (6)
05. INSTALL WASHERS (5) AND SCREWS (4). TIGHTEN
SCREWS
06. CONNECT TERMINAL LUG (7)
07. INSTALL WASHER (8), SCREW (9) AND NUT (12).
TIGHTEN SCREW AND NUT TO A TORQUE VALUE
BETWEEN 2.6 TO 3 M.DAN
(19.17 TO 22.12 LBF.FT)
CAUTION: CONTACT SURFACE ON GROUNDING
FITTING AT LEVEL OF THE TERMINAL LUG (7)
ATTACHMENT MUST BE UNPROTECTED OVER
A DIAMETER OF 24MM (0.94 IN)
08. APPLY A COAT OF VARNISH (16-003B)
ON THE SCREW (9), ON THE NUT (12)
AND ON ALL GROUDING FITTING BARE
AREAS AT LEVEL OF THE TERMINAL LUG
(7) ATTACHMENT
09. REMOVE BLANKING CAP FROM ELECTRICAL CONNEC*** CONTINUED ***
AH
24-00-00
RAI 10060-001
2-400 PAGE
3
MAR 01/13
24-00-00
RAI 10060-001
4
MAR13
TOR (2)
10. PLUG IN ELECTRICAL CONNECTOR
11. COVER ELECTRICAL CONNECTOR WITH PROTECTIVE
CAP (3) (IF APPLICABLE)
NOTE: MARK SCREW (9) WITH RED VARNISH
004
________
CLOSE
UP
REF.FIG.240000-RAI-00100
1. ON L(R) WING (SEE ON THE CORRESPONDING FIGURE OF EACH REM/INS)
CLOSE PANEL 512(612)
2. REMOVE THE WARNING NOTICE FROM PANEL 29VU
AND 26VU(A AND B)
005
________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****
AH
E N D
O F
T E X T
*****
24-00-00
RAI 10060-001
2-400 PAGE
4
MAR 01/13
24-00-00
5
AH
RAI 10060-001
MAR13
24-00-00
RAI 10060-001
2-400
PAGE
5
MAR 01/13
24-00-00
6
AH
RAI 10060-001
MAR13
24-00-00
RAI 10060-001
2-400
PAGE
6
MAR 01/13
24-00-00
7
AH
RAI 10060-001
MAR13
24-00-00
RAI 10060-001
2-400
PAGE
7
MAR 01/13
24-21-00
AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
OPT 10000-001
1
DEC14
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
AH
24-46-00-EAD-10000
24-21-00
OPT 10000-001
2-400 PAGE
1
DEC 01/14
24-21-00
AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
001
OPT 10000-001
2
DEC14
002
24-21-00
OPT 10000-001
2-400 PAGE
2
DEC 01/14
24-21-00
AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
OPT 10000-001
3
DEC14
- ON PANEL 175WW
ELEC CAUTION LIGHT REMAINS ON
- ON PANEL 29VU
.BUS OFF 1 LEGEND GOES OFF
.INV FAULT 1 LEGEND OF CAUTION LIGHT
COMES ON
D. 15 SEC AFTER C/B OPENING,
- CHECK THAT CAPT AND F/O MASTER CAUTION
LIGHTS GO OFF
- VERIFY THAT ONE AT LEAST OF THESE
INSTRUMENTS WORKS (ALL SUPPLIED
BY 26 AND 115VAC STBY BUSES):
- FLAPS IND
- CTL SURFACES POSITIONS SYNCHRO
DETECTOR
- PITOT STBY
- DFDR
- INFORMATION: VOR1 & ADF1 ON RMI &
SGU 1 & 2 HEADING ON RMI2
- ATTITUDE & HEADING INFORMATION ON
FDAU
- COURSE1 & HEADING
02. 0N PANEL 127VU
REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
3XA
A. ON PANEL 175WW VERIFY THAT:
ELEC CAUTION LIGHT GOES OFF
B. ON PANEL 29VU VERIFY THAT:
INV FAULT 1 LEGEND OF CAUTION LIGHT
GOES OFF
03. ON PANEL 124VU (A)
OPEN, SAFETY AND TAG THE FOLLOWING
CIRCUIT BREAKER:
10XA PWR SUPPLY ON PRIM DC BUS 2/INV 2
*** CONTINUED ***
AH
24-21-00
OPT 10000-001
2-400 PAGE
3
DEC 01/14
24-21-00
AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
OPT 10000-001
4
DEC14
__________________________________________
INV1
MAIN BUSES CTL RELAY OPERATIONAL TEST
REF.FIG.242100-OPT-00100 (FIG.1)
REF.FIG.314800-PRO-00100 (FIG.2)
01. ON PANEL 25VU (FIG.2-A)
RELEASE THE FOLLOWING PUSHBUTTON SWITCHES:
*** CONTINUED ***
AH
24-21-00
OPT 10000-001
2-400 PAGE
4
DEC 01/14
24-21-00
AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
OPT 10000-001
5
DEC14
6UA2 MFC/2B
7UA2 MFC/2A
(BOTH OFF LEGENDS COME ON)
NOTE: DO NOT TAKE INTO ACCOUNT VARIOUS ALERTS
FOLLOWING SWITCHING OF PUSHBUTTON
SWITCHES 6UA2 AND 7UA2 (STEPS 01 AND 11)
02. VERIFY THAT THE CREW ALERTING SYSTEM IS
ACTIVATED IN THE FOLLOWING WAY:
A - SINGLE CHIME SOUNDS
B - CAPT AND F/O MASTER CAUTION LIGHTS 13WW
AND 168WW COME ON
C - ON PANEL 175WW (FIG.1-C)
MFC CAUTION LIGHT COMES ON
D - THE VENTILATION TO L AND R ELECTRONICS
RACKS 80VU AND 90VU IS OFF
03. PUSH ON CAUTION LIGHT 13WW OR 168WW TO RESET EITHER THESE ONES OR SINGLE CHIME
04. ON PANEL 122VU (FIG.1-A)
OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
39XA MAIN ELEC PWR/AC/INV1 CAUTION BUS1
& TIE RLY SPLY
05. VERIFY THAT THE CREW ALERTING SYSTEM IS
ACTIVATED IN THE FOLLOWING WAY:
A - SINGLE CHIME SOUNDS
B - CAUTION LIGHTS 13WW AND 168WW COME ON
C - ON PANEL 175WW
ELEC CAUTION LIGHT COMES ON
06. ON PANEL 29VU (FIG.1-D) VERIFY THAT
BUS OFF 1/2 LEGENDS OF CAUTION LIGHT 7XN
AND 8XN COME ON
07. PUSH ON CAUTION LIGHT 13WW OR 168WW TO RESET EITHER THESE ONES OR SINGLE CHIME
*** CONTINUED ***
AH
24-21-00
OPT 10000-001
2-400 PAGE
5
DEC 01/14
24-21-00
AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
OPT 10000-001
6
DEC14
__________________________________________
INV2
MAIN BUSES CTL RELAY OPERATIONAL TEST
REF. FIG. 242100-OPT-00100 (FIG.1)
REF. FIG. 314800-PRO-00100 (FIG.2)
01. ON PANEL 25VU (FIG.2-A)
RELEASE THE FOLLOWING PUSHBUTTON SWITCHES:
6UA1 MFC/1B
7UA1 MFC/1A
(BOTH OFF LEGENDS COME ON)
NOTE: DO NOT TAKE INTO ACCOUNT VARIOUS ALERTS
FOLLOWING SWITCHING OF PUSHBUTTON
SWITCHES 6UA2 AND 7UA2 (STEPS 01 AND 09)
02. VERIFY THAT THE CREW ALERTING SYSTEM IS ACTIVATED IN THE FOLLOWING WAY:
*** CONTINUED ***
AH
24-21-00
OPT 10000-001
2-400 PAGE
6
DEC 01/14
24-21-00
AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
OPT 10000-001
7
DEC14
24-21-00
OPT 10000-001
2-400 PAGE
7
DEC 01/14
24-21-00
AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
OPT 10000-001
8
DEC14
AH
E N D
O F
T E X T
*****
24-21-00
OPT 10000-001
2-400 PAGE
8
DEC 01/14
24-21-00
9
AH
OPT 10000-001
DEC14
24-21-00
OPT 10000-001
2-400
PAGE
9
DEC 01/14
24-21-00
AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
OPT 10000-002
1
DEC14
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
: PRINCIPLE OF CDS USE
(DISPLAY UNITS
EXPLORATION)
AH
24-46-00-EAD-10000
31-63-00-PRO-10000
24-21-00
OPT 10000-002
2-400 PAGE
1
DEC 01/14
24-21-00
AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
001
OPT 10000-002
2
DEC14
002
003
24-21-00
OPT 10000-002
2-400 PAGE
2
DEC 01/14
AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
24-21-00
OPT 10000-002
3
DEC14
MESSAGES).
- ON PANEL 29VU
BUS OFF FOR AC BUS 1 CAUTION LIGHT
COMES ON
- ON MFD UPPER WINDOW, IN ELEC SD PAGE
AMBER AC BUS 1 OFF SYMBOL
IS DISPLAYED
B. CHECK THAT, DURING THE FIRST 15 SEC,
ON MFD UPPER WINDOW, IN ELEC SD PAGE:
- AMBER AC STBY BUS SYMBOL IS DISPLAYED
C. 10 SEC AFTER C/B OPENING, CHECK THAT:
- MASTER CAUTION LIGHTS GO OFF
- ON EWD, IN ALERT WINDOW, ELEC INV 1
MESSAGE AND INV FAULT ASSOCIATED
PROCEDURES ARE DISPLAYED (DO NOT PAY
ATTENTION TO OTHER MESSAGES)
- ON PANEL 29VU
. BUS OFF FOR AC BUS 1 CAUTION LIGHT
GOES OFF
. INV FAULT FOR INV 1 CAUTION LIGHT
COMES ON
- ON MFD UPPER WINDOW, IN ELEC SD PAGE:
GREEN AC BUS 1 SYMBOL AND
AMBER INV 1 FAULT SYMBOL ARE
DISPLAYED
D. 15 SEC AFTER C/B OPENING,
ON MFD UPPER WINDOW, IN ELEC SD PAGE:
GREEN AC STBY BUS SYMBOL IS DISPLAYED
3. ON PANEL 127VU
REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
3XA
A. ON EWD, IN ALERT WINDOW,
- ELEC INV1 MESSAGE AND INV FAULT
ASSOCIATED PROCEDURES ARE NO LONGER
DISPLAYED
- MASTER CAUTION LIGHTS GO OFF
*** CONTINUED ***
AH
24-21-00
OPT 10000-002
2-400 PAGE
3
DEC 01/14
AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
24-21-00
OPT 10000-002
4
DEC14
B. VERIFY THAT
- ON PANEL 29VU:
INV FAULT FOR INV1 CAUTION LIGHT
GOES OFF
- ON MFD UPPER WINDOW, IN ELEC SD PAGE:
GREEN INV 1 SYMBOL IS DISPLAYED
4. ON PANEL 124VU
OPEN, SAFETY AND TAG THE FOLLOWING CIRCUIT
BREAKER:
- 10XA PWR SUPPLY ON PRIM DC BUS 2/INV 2
A. VERIFY THAT THE CREW ALERTING SYSTEM IS
ACTIVATED IN THE FOLLOWING WAY:
- SINGLE CHIME SOUNDS
- MASTER CAUTION LIGHTS COME ON
- ON EWD, IN ALERT WINDOW, ELEC AC BUS
2 MESSAGE AND AC BUS 2 OFF
ASSOCIATED PROCEDURES ARE DISPLAYED.
(DO NOT PAY ATTENTION TO OTHER
MESSAGES)
- ON PANEL 29VU
BUS OFF FOR AC BUS 2 CAUTION LIGHT
COMES ON
- ON MFD UPPER WINDOW, IN ELEC SD PAGE
AMBER AC BUS 2 OFF SYMBOL
IS DISPLAYED
B. AFTER 10 SEC VERIFY THAT:
- MASTER CAUTION LIGHTS GO OFF
- ON EWD, IN ALERT WINDOW, ELEC INV 2
MESSAGE AND INV FAULT ASSOCIATED
PROCEDURES ARE DISPLAYED (DO NOT PAY
ATTENTION TO OTHER MESSAGES)
- ON PANEL 29VU
- BUS OFF FOR AC BUS 2 CAUTION LIGHT
GOES OFF
- INV FAULT FOR INV 2 CAUTION LIGHT
GOES ON
- ON MFD UPPER WINDOW, IN ELEC SD PAGE
GREEN AC BUS 2 SYMBOL AND
*** CONTINUED ***
AH
24-21-00
OPT 10000-002
2-400 PAGE
4
DEC 01/14
24-21-00
AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
OPT 10000-002
5
DEC14
__________________________________________
INV1
MAIN BUSES CTL RELAY OPERATIONAL TEST
REF. FIG. 242100-OPT-00100
REF. FIG. 314800-PRO-00100
1. ON LH EFCP, PRESS CLR PUSH BUTTON
2. ON PANEL 25VU
RELEASE THE FOLLOWING PUSHBUTTON SWITCHES:
6UA2 MFC/2B
7UA2 MFC/2A
(BOTH OFF LEGENDS COME ON)
NOTE: DO NOT TAKE INTO ACCOUNT VARIOUS ALERTS
FOLLOWING SWITCHING OF PUSHBUTTON
SWITCHES 6UA2 AND 7UA2 (STEPS 02 AND 12)
3. VERIFY THAT THE CREW ALERTING SYSTEM IS
ACTIVATED IN THE FOLLOWING WAY:
- SINGLE CHIME SOUNDS
- MASTER CAUTION LIGHTS COME ON
- ON EWD, IN ALERT WINDOW, MFC 2A + 2B
MESSAGE IS DISPLAYED (DO NOT PAY
ATTENTION TO OTHER MESSAGES)
*** CONTINUED ***
AH
24-21-00
OPT 10000-002
2-400 PAGE
5
DEC 01/14
24-21-00
AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
OPT 10000-002
6
DEC14
24-21-00
OPT 10000-002
2-400 PAGE
6
DEC 01/14
24-21-00
AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
OPT 10000-002
7
DEC14
24-21-00
OPT 10000-002
2-400 PAGE
7
DEC 01/14
24-21-00
AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
OPT 10000-002
8
DEC14
__________________________________________
INV2
MAIN BUSES CTL RELAY OPERATIONAL TEST
REF. FIG. 242100-OPT-00100
REF. FIG. 314800-PRO-00100
1. ON LH EFCP, PRESS CLR PUSH BUTTON
2. ON PANEL 25VU
RELEASE THE FOLLOWING PUSHBUTTON SWITCHES:
6UA1 MFC/1B
7UA1 MFC/1A
(BOTH OFF LEGENDS COME ON)
NOTE: DO NOT TAKE INTO ACCOUNT VARIOUS ALERTS
FOLLOWING SWITCHING OF PUSHBUTTON
SWITCHES 6UA2 AND 7UA2 (STEPS 2 AND 10)
3. VERIFY THAT THE CREW ALERTING SYSTEM IS
ACTIVATED IN THE FOLLOWING WAY:
A - SINGLE CHIME SOUNDS
B - MASTER CAUTION LIGHTS COME ON
C - ON EWD, IN ALERT WINDOW,(DO NOT PAY
ATTENTION TO OTHER MESSAGES)
MFC 1A + 1B MESSAGE IS DISPLAYED
ELEC AC BUS 1 MESSAGE AND AC BUS 1
OFF ASSOCIATED PROCEDURES ARE DISPLAYED
4. VERIFY:
- ON PANEL 29VU
BUS OFF FOR AC BUS 1 CAUTION LIGHT
COMES ON
- ON MFD UPPER WINDOW, IN ELEC SD PAGE
AMBER AC BUS 1 OFF SYMBOL IS DISPLAYED
5. PUSH MASTER CAUTION LIGHTS TO RESET
EITHER THESE ALERTS OR SINGLE CHIME
*** CONTINUED ***
AH
24-21-00
OPT 10000-002
2-400 PAGE
8
DEC 01/14
AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
24-21-00
OPT 10000-002
9
DEC14
24-21-00
OPT 10000-002
2-400 PAGE
9
DEC 01/14
24-21-00
AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
OPT 10000-002
10
DEC14
AH
E N D
O F
T E X T
*****
24-21-00
OPT 10000-002
2-400 PAGE
10
DEC 01/14
24-21-00
11
AH
OPT 10000-002
DEC14
24-21-00
OPT 10000-002
2-400
PAGE
11
DEC 01/14
24-21-81
RAI 10000-001
1
APR05
ZONING DATA
___________
ZONE
ACCESS
: 210
214
: 214BZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
MECHANIC
___
MEN
_________
MAN-HOURS
01
01
ELAPSED TIME
SPARE
: 02 STATIC INVERTER:1XA-2XA
24-21-80-02-010
: AC CONSTANT FREQUENCY
GENERATION OPERATIONAL
TEST
24-21-00-OPT-10000
PUBLICATION
___________
JIC
AH
24-21-81
RAI 10000-001
2-400 PAGE
1
APR 01/05
24-21-81
001
RAI 10000-001
2
APR05
___________
PREPARATION
REF.FIG.240000-RAI-00103
1. OPEN THE FOLLOWING CIRCUIT BREAKERS:
- ON PANEL 122VU
5XA MAIN ELEC PWR-AC/BUS 1 RLY CTL
6XA MAIN ELEC PWR-AC/INV 2 CAUTION & BUS
2 RLY SPLY
36XA MAIN ELEC PWR-AC/BUS 2 & STBY BUS RLY
CTL
39XA MAIN ELEC PWR-AC/INV 1 CAUTION BUS 1
& TIE RLY SPLY
- ON PANEL 124VU
10XA PWR SUPPLY ON PRIM DC BUS 2/INV 2
- ON PANEL 127VU
3XA PWR SUPPLY ON PRIM DC BUS 1/INV 1
- ON PANEL 129VU
4XA INV 1 HOT MAIN BAT BUS
- ON PANEL 130VU
7XA INV 1 ON HOT EMER BAT BUS
2. ON R ELECTRONICS RACK 90VU
REMOVE ACCESS DOOR 214BZ
002
__________________________
REMOVAL
OF STATIC INVERTER
REF.FIG.242111-RAI-00110
1. UNPLUG ELECTRICAL CONNECTOR (9)
2. PUT BLANKING CAP ON ELECTRICAL CONNECTOR
3. LOOSEN KNURLED FASTENER (7) RETAINING PROTECTIVE COVER (8)
4. REMOVE COVER
5. REMOVE NUTS (6) SECURING TERMINAL LUGS (5)
OF ELECTRICAL POWER SUPPLY AND DISTRIBUTION
*** CONTINUED ***
AH
24-21-81
RAI 10000-001
2-400 PAGE
2
APR 01/05
24-21-81
RAI 10000-001
3
APR05
_______________________________
INSTALLATION
OF STATIC INVERTER
REF.FIG.242111-RAI-00110
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/OR
COMPONENT ADJACENT AREA
2. POSITION STATIC INVERTER (1) IN RACK 90VU(A)
ON SHELF 93VU(B) OR 94VU(C)
3. INSTALL CAPTIVE SCREWS (2) TO SECURE STATIC
INVERTER TO SHELF. TIGHTEN SCREWS
4. INSTALL BONDING STRIP (3) AND NUT (4).
TIGHTEN NUT
5. INSTALL TERMINAL LUGS (5) FOR THE ELECTRICAL
POWER SUPPLY AND DISTRIBUTION AND NUTS (6).
TIGHTEN NUTS
NOTE: THE APPLICABLE TORQUE VALUE FOR THE
POSITIVE TERMINAL IS BETWEEN 0.45 AND
0.52 MDAN (40 TO 46 LBF.IN), FOR THE
NEGATIVE TERMINAL IS BETWEEN 0.25 AND
0.27 MDAN (22 TO 24 LBF.IN)
6. INSTALL PROTECTIVE COVER (8)
7. INSTALL KNURLED FASTENER (7) AND TIGHTEN
8. REMOVE BLANKING CAP FROM ELECTRICAL CON_
NECTOR (9)
*** CONTINUED ***
AH
24-21-81
RAI 10000-001
2-400 PAGE
3
APR 01/05
24-21-81
RAI 10000-001
4
APR05
________
CLOSE
UP
REF.FIG.240000-RAI-00103
1. ON R ELECTRONICS RACK 90VU
CLOSE ACCESS DOOR 214BZ
2. REMOVE SAFETY CLIPS AND TAGS AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
- ON PANEL 122VU
5XA
6XA
36XA
39XA
- 0N PANEL 124VU
10XA
- ON PANEL 127VU
3XA
- ON PANEL 129VU
4XA
- ON PANEL 130VU
7XA
005
AH
E N D
O F
T E X T
*****
24-21-81
RAI 10000-001
2-400 PAGE
4
APR 01/05
24-21-81
5
AH
RAI 10000-001
APR05
24-21-81
RAI 10000-001
2-400
PAGE
5
APR 01/05
24-21-81
6
AH
RAI 10000-001
APR05
24-21-81
RAI 10000-001
2-400
PAGE
6
APR 01/05
24-21-85
RAI 10000-001
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 212
220
: 212TZ 212VZ 214BZ 214PZ 222CZ 222QZ 222RZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
SPARE
: 01 RELAY:33XA
AH
___
MEN
_________
MAN-HOURS
01
24-21-80-02-130
24-21-85
RAI 10000-001
2-400 PAGE
1
MAR 01/15
24-21-85
001
RAI 10000-001
2
MAR15
___________
PREPARATION
REF. FIG. 240000-RAI-00100 (FIG.1)
REF. FIG. 240000-RAI-00103 (FIG.2)
1. MAKE CERTAIN THAT THE GROUND POWER UNIT IS
NOT CONNECTED TO THE DC AND AC EXTERNAL POWER RECEPTACLES (ON PANELS 5002VU AND 5000VU
-FIG.1-F AND D) AND THE ACCESS DOORS 114BR
AND 114CR (FIG.1-E AND C) ARE CLOSED
2. ON PANEL 29VU (FIG.1-A) MAKE CERTAIN THAT:
BAT SELECTOR SWITCH 7PA IS IN OFF POSITION
3. DISPLAY A WARNING NOTICE ON PANELS 29VU AND
26VU (FIG.1-B) PROHIBITING POWER SUPPLY TO
SYSTEM
4. ON DC/AC POWER CENTER 120VU OR ON ELECTRONICS RACK 90VU (FIG.2 A AND B AND THE CORRESPONDING FIGURE OF EACH RAI)
120VU: REMOVE ACCESS PANEL 212TZ OR 212VZ
(123VU) OR CIRCUIT BREAKER PANEL 121V
U OR 122VU OR 124VU OR 125VU OR 126VU
OR 127VU OR 128VU OR 129VU OR 130VU
90VU - SIDE SHELF: REMOVE ACCESS PANEL 222RZ
(SHELF 91VU) OR 222QZ (SHELF 91VU OR
92VU OR 93VU) OR 222PZ (SHELF 94VU OR
95VU)
- FRONT SHELF: REMOVE ACCESS PANEL 214
CZ(SHELF 91VU OR 92VU) OR 214BZ(SHELF
93VU OR 94VU OR 95VU)
002
_____________________
REMOVAL
OF RELAY 33XA
REF.FIG.242185-RAI-00100
1. REMOVE SCREWS(1) RETAINING THE COVER(2)
2. REMOVE THE COVER
*** CONTINUED ***
AH
24-21-85
RAI 10000-001
2-400 PAGE
2
MAR 01/15
24-21-85
RAI 10000-001
3
MAR15
__________________________
INSTALLATION
OF RELAY 33XA
REF.FIG.242185-RAI-00100
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/OR
COMPONENT ADJACENT AREA
2. INSTALL RELAY(3)
3. INSTALL WASHERS(4) AND SCREWS(5). TIGHTEN
SCREWS
4. INSTALL TERMINAL LUGS(6), WASHERS(7) AND
NUTS(8). TIGHTEN NUTS
5. INSTALL COVER(2)
6. INSTALL SCREWS(1). TIGHTEN SCREWS
004
________
CLOSE
UP
REF. FIG. 240000-RAI-00100 (FIG.1)
REF. FIG. 240000-RAI-00103 (FIG.2)
1. ON DC/AC POWER CENTER 12OVU OR ON ELECTRONICS RACK 90VU (FIG.2 A OR B AND THE CORRESPONDING FIGURE OF EACH RAI)
120VU: CLOSE ACCESS PANEL 212TZ OR 212VZ OR
CIRCUIT BREAKER PANEL 121VU OR 122VU
OR 124VU OR 125VU OR 127VU OR 128VU
OR 129VU OR 130VU
*** CONTINUED ***
AH
24-21-85
RAI 10000-001
2-400 PAGE
3
MAR 01/15
24-21-85
RAI 10000-001
4
MAR15
________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****
AH
E N D
O F
T E X T
*****
24-21-85
RAI 10000-001
2-400 PAGE
4
MAR 01/15
24-21-85
5
AH
RAI 10000-001
MAR15
24-21-85
RAI 10000-001
2-400
PAGE
5
MAR 01/15
24-21-85
6
AH
RAI 10000-001
MAR15
24-21-85
RAI 10000-001
2-400
PAGE
6
MAR 01/15
24-21-85
7
AH
RAI 10000-001
MAR15
24-21-85
RAI 10000-001
2-400
PAGE
7
MAR 01/15
24-22-61
RAI 10000-001
1
MAR14
ZONING DATA
___________
ZONE
ACCESS
: 114
435
445
: 114BR 114CR
435AL 445AL 455AL
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
___
MEN
_________
MAN-HOURS
01
ELAPSED TIME
SPARE
: 01 ACW GENERATOR
242260-01
EXPENDABLE
: 01 O-RING
02 WASHER
242260-01
REF TO CMMV
04-004
03-002
PUBLICATION
___________
JIC
JIC
JIC
AH
72-00-00-ERU-10030
72-01-50-PWC-00000
54-00-00-OAC-10000
24-22-61
RAI 10000-001
2-400 PAGE
1
MAR 01/14
24-22-61
001
RAI 10000-001
2
MAR14
___________
PREPARATION
REF.FIG.242261-RAI-00100
1. MAKE CERTAIN THAT THE GROUND POWER UNIT IS
NOT CONNECTED TO DC EXTERNAL POWER RECEPTACLE (ON PANEL 5002VU-B) AND TO AC EXTERNAL
POWER RECEPTACLE (ON PANEL 5000VU-D) AND
THAN THE ACCESS DOORS 114BR(C) AND 114CR(A)
ARE CLOSED
2. ON PANEL 29VU (E) MAKE CERTAIN THAT:
BAT SELECTOR SWITCH 7PA IS IN OFF POSITION
3. DISPLAY A WARNING NOTICE ON PANEL 27VU (F)
AND 29VU, PROHIBITING POWER SUPPLY TO THE
SYSTEM AND ENGINE STARTING.
002
________________________
REMOVAL
OF ACW GENERATOR
REF.FIG.242261-RAI-00110
1. OPEN ENGINE COWLS 435AL(445AL)(A)
2. UNPLUG THE ELECTRICAL CONNECTOR(16)
3. PUT BLANKING CAP ON ELECTRICAL CONNECTOR
4. REMOVE SCREWS(18) AND WASHERS(19) ATTACHING
UPPER CASING AND BONDING BRAID(20)
5. REMOVE SCREWS(21),(7) AND (8) AND WASHERS
(22),(6) AND (9) ATTACHING ELECTRICAL
WIRING AND UPPER CASING
6. REMOVE SCREWS(24) AND WASHERS(23) ATTACHING
THE CASINGS
7. UNSAFETY AND REMOVE CLAMP(5) ATTACHING THE
TWO CASINGS
*** CONTINUED ***
AH
24-22-61
RAI 10000-001
2-400 PAGE
2
MAR 01/14
24-22-61
RAI 10000-001
3
MAR14
_____________________________
INSTALLATION
OF ACW GENERATOR
REF.FIG.242261-RAI-00110
1. REMOVE BLANKING CAPS FROM ORIFICES
2. POSITION A NEW O-RING(1) PREVIOUSLY
LUBRICATE WITH SYNTHETIC OIL
3. CLEAN AND INSPECT COMPONENT ATTACHMENT
LOCATION AND SURROUNDING AREA
*** CONTINUED ***
AH
24-22-61
RAI 10000-001
2-400 PAGE
3
MAR 01/14
24-22-61
RAI 10000-001
4
MAR14
24-22-61
RAI 10000-001
2-400 PAGE
4
MAR 01/14
24-22-61
RAI 10000-001
5
MAR14
________
CLOSE
UP
REF.FIG.242261-RAI-00100(FIG.1) AND 242261-RAI00110(FIG.2)
1. CLOSE ENGINE COWLS 435AL(445AL)
2. REMOVE WARNING NOTICE FROM PANELS 27VU(FIG.
1-F) AND 29VU(FIG.1-E)
005
_________________________
ENGINE
GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030
*** CONTINUED ***
AH
24-22-61
RAI 10000-001
2-400 PAGE
5
MAR 01/14
24-22-61
006
RAI 10000-001
6
MAR14
______________________________
LEAK
CHECK AFTER ENGINE RUN-UP
SEE JOB INSTRUCTION CARD
(PRATT & WHITNEY CANADA MAINTENANCE MANUAL,
CHAPTER 72-01-50, PAGE BLOCK 500).
1. PERFORM ENGINE RUN-UP AS REQUIRED BY
PRATT & WHITNEY CANADA.
2. CHECK FOR OIL LEAKS AFTER ENGINE SHUT DOWN.
007
______________________________________
SHUT
DOWN OF ENGINE GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030
008
_______________________
OPENING
OF HINGED COWLS
SEE JOB INSTRUCTION CARD
540000-OAC-10000
009
010
______________________________
CLOSING
OF HINGED ENGINE COWLS
SEE JOB INSTRUCTION CARD
540000-OAC-10000
*****
AH
E N D
O F
T E X T
*****
24-22-61
RAI 10000-001
2-400 PAGE
6
MAR 01/14
24-22-61
7
AH
RAI 10000-001
MAR14
24-22-61
RAI 10000-001
2-400
PAGE
7
MAR 01/14
24-22-61
8
AH
RAI 10000-001
MAR14
24-22-61
RAI 10000-001
2-400
PAGE
8
MAR 01/14
24-22-83
OPT 10000-001
1
DEC14
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
: AC WILD FREQUENCY
EXTERNAL POWER SUPPLY
AH
24-41-00-EAD-10000
24-22-83
OPT 10000-001
2-400 PAGE
1
DEC 01/14
24-22-83
001
OPT 10000-001
2
DEC14
___________________________________
ENERGIZATION
OF AIRCRAFT AC NETWORK
SEE JOB INSTRUCTION CARD
244100-EAD-10000
002
__________________________________
BUS
TIE CONTACTOR OPERATIONAL TEST
REF.FIG.242213-OPT-00100-001
1. ON PANEL 101VU (A)
PLACE ELEC/ACW BTC OPNG SWITCH 21XU IN BTC
1 OPEN(BTC 2 OPEN) POSITION
2. ON PANEL 26VU (B) MAKE CERTAIN THAT:
- THE FLOW BAR LEGEND OF BTC PUSHBUTTON
SWITCH 18XU IS OFF
- ACW BUS OFF 1(2) CAUTION LIGHT 7XB(8XB)
COMES ON
NOTE: IF THE CREW ALERTING SYSTEM IS ACTIVATED ELEC CAUTION LIGHT ON CREW ALERTING PANEL 175WW COMES ON
3. ON PANEL 101VU
PLACE ELEC/ACW BTC OPNG SWITCH 21XU IN
NORM/FLT POSITION
4. ON PANEL 26VU MAKE CERTAIN THAT:
- THE FLOW BAR LEGEND OF BTC PUSHBUTTON
SWITCH 18XU COMES ON
- ACW BUS OFF 1(2) CAUTION LIGHT 7XB(8XB)
GOES OFF
003
______________________________________
DE-ENERGIZATION
OF AIRCRAFT AC NETWORK
SEE JOB INSTRUCTION CARD
244100-EAD-10000
*****
AH
E N D
O F
T E X T
*****
24-22-83
OPT 10000-001
2-400 PAGE
2
DEC 01/14
24-22-83
3
AH
OPT 10000-001
DEC14
24-22-83
OPT 10000-001
2-400
PAGE
3
DEC 01/14
24-22-83
OPT 10000-002
1
DEC14
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
JIC
: AC WILD FREQUENCY
EXTERNAL POWER SUPPLY
: PRINCIPLE OF CDS USE
(DISPLAY UNITS
EXPLORATION)
AH
24-41-00-EAD-10000
31-63-00-PRO-10000
24-22-83
OPT 10000-002
2-400 PAGE
1
DEC 01/14
24-22-83
001
OPT 10000-002
2
DEC14
___________________________________
ENERGIZATION
OF AIRCRAFT AC NETWORK
SEE JOB INSTRUCTION CARD
244100-EAD-10000
002
003
__________________________________
BUS
TIE CONTACTOR OPERATIONAL TEST
REF. FIG. 242213-OPT-00100
1. ON PANEL 101VU
PLACE ELEC/ACW BTC OPNG SWITCH IN BTC 1
OPEN (BTC 2 OPEN) POSITION
2. ON PANEL 26VU MAKE CERTAIN THAT:
- THE FLOW BAR LEGEND OF BTC PUSHBUTTON
SWITCH IS OFF
- ACW BUS OFF FOR ACW BUS 1(2) CAUTION
LIGHT COMES ON
NOTE: IF THE CREW ALERTING SYSTEM IS ACTIVATED,
ON EWD, IN ALERT WINDOW:
- ELEC ACW BUS 1 (2) MESSAGE AND ACW
BUS 1 (2) OFF ASSOCIATED PROCEDURES
ARE DISPLAYED.
3. ON MFD UPPER WINDOW, IN ACW/HYD SD PAGE:
- LEFT (RIGHT) FLOW BAR IN BTC ITEM SHALL
NOT BE DISPLAYED
*** CONTINUED ***
AH
24-22-83
OPT 10000-002
2-400 PAGE
2
DEC 01/14
24-22-83
OPT 10000-002
3
DEC14
______________________________________
DE-ENERGIZATION
OF AIRCRAFT AC NETWORK
SEE JOB INSTRUCTION CARD
244100-EAD-10000
*****
AH
E N D
O F
T E X T
*****
24-22-83
OPT 10000-002
2-400 PAGE
3
DEC 01/14
24-22-83
4
AH
OPT 10000-002
DEC14
24-22-83
OPT 10000-002
2-400
PAGE
4
DEC 01/14
24-22-84
OPT 10000-001
1
MAR13
ZONING DATA
___________
ZONE
ACCESS
: 214
: 214BZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELECTRIC
ELAPSED TIME
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
AH
24-31-00-EAD-10000
24-22-84
OPT 10000-001
2-400 PAGE
1
MAR 01/13
24-22-84
001
OPT 10000-001
2
MAR13
___________
PREPARATION
REF. FIG. 240000-RAI-00103
1. ON R ELECTRONICS RACK 90VU (B)
OPEN ACCESS DOOR 214BZ
002
_________________________________
ENERGIZING
OF SYSTEM FROM BATTERY
SEE JOB INSTRUCTION CARD
243100-EAD-10000
003
___________________________________________
ACW
GENERATOR CONTROL UNIT OPERATIONAL TEST
REF.FIG.242214-OPT-00100
1. ON R ELECTRONICS RACK 90VU SHELF 5(3) (A)
ON ACW GCU 1(2) (B/C) FRONT PANEL PRESS AND
HOLD FOR 10 SECS THE CC SWITCH AND VERIFY
THAT CC INDICATOR LIGHT IS ON.
AFTER 7+/-1 SECS(TESTING TIME),IF GCU OPERATES CORRECTLY, CC INDICATOR LIGHT GOES OFF.
IF A FAILURE IS DETEDTED ON GCU,CC INDICATOR
LIGHT REMAINS ON AS LONG AS CC SWITCH IS
PRESSED.
004
____________________________________
DE-ENERGIZING
OF SYSTEM FROM BATTERY
SEE JOB INSTRUCTION CARD
243100-EAD-10000
005
________
CLOSE
UP
REF.FIG.240000-RAI-00103
1. ON R ELECTRONICS RACK 90VU (B)
CLOSE ACCESS DOOR 214BZ
*****
AH
E N D
O F
T E X T
*****
24-22-84
OPT 10000-001
2-400 PAGE
2
MAR 01/13
24-22-84
3
AH
ACCESS DOORS,CONTROLS
AND INDICATING
OPT 10000-001
MAR13
24-22-84
OPT 10000-001
2-400
PAGE
3
MAR 01/13
24-22-84
4
AH
OPT 10000-001
MAR13
24-22-84
OPT 10000-001
2-400
PAGE
4
MAR 01/13
24-22-84
RAI 10000-001
1
APR06
ZONING DATA
___________
ZONE
ACCESS
: 212
214
: 122VU
214BZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
MECHANIC
_________
MAN-HOURS
ELAPSED TIME
01
PUBLICATION
___________
JIC
AH
24-22-84-OPT-10000
24-22-84
RAI 10000-001
2-400 PAGE
1
APR 01/06
24-22-84
001
RAI 10000-001
2
APR06
___________
PREPARATION
REF. FIG. 240000-RAI-00103
1. ON PANEL 122VU (A)
OPEN, SAFETY CLIP AND TAG THE FOLLOWING CIRCUIT BREAKER:
19XU(20XU) ACW ELEC PWR/GCU ACW GEN 1 (ACW
GEN 2)
2. ON R ELECTRONICS RACK 90VU (B)
REMOVE ACCESS DOOR:
- 214BZ
002
003
24-22-84
RAI 10000-001
2-400 PAGE
2
APR 01/06
24-22-84
RAI 10000-001
3
APR06
________
CLOSE
UP
REF.FIG.240000-RAI-00103
1. ON R ELECTRONICS RACK 90VU (B)
CLOSE ACCESS DOOR:
- 214BZ
2. ON PANEL 122VU (A)
REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
19XU(20XU)
005
_____________________________________
ACW
GEN CONTROL UNIT OPERATIONAL TEST
SEE JOB INSTRUCTION CARD
242284-OPT-10000
*****
AH
E N D
O F
T E X T
*****
24-22-84
RAI 10000-001
2-400 PAGE
3
APR 01/06
24-22-84
4
AH
RAI 10000-001
APR06
24-22-84
RAI 10000-001
2-400
PAGE
4
APR 01/06
24-22-84
5
AH
L AND R ELECTRONICS
RACKS 80VU AND 90VU
EQUIPMENT
RAI 10000-001
APR06
24-22-84
RAI 10000-001
2-400
PAGE
5
APR 01/06
24-31-00
EAD 10000-001
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 210
: 122VU 124VU 125VU
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
AH
24-31-00
EAD 10000-001
2-400 PAGE
1
DEC 01/14
24-31-00
001
EAD 10000-001
2
DEC14
___________
PREPARATION
REF.FIG.243100-EAD-00100 (FIG.1)
REF.FIG.243100-EAD-00101 (FIG.2)
1. MAKE CERTAIN THAT THE GROUND POWER UNIT IS
NOT CONNECTED TO DC EXTERNAL POWER RECEPTACLE (ON PANEL 5002VU/FIG.2-C) AND THE ACCESS
DOOR 114BR(FIG.2-B) IS CLOSED
2. ON PANEL 29VU(FIG.1-A) MAKE CERTAIN THAT:
- BAT SELECTOR SWITCH IS IN OFF POSITION
- OVRD/UNDV PUSHBUTTON SWITCH IS IN
RELEASED POSITION
- MAIN AND EMER BAT CHG PUSHBUTTON SWITCHES
ARE IN RELEASED POSITION
002
__________
ENERGIZING
REF.FIG.243100-EAD-00100
1. ON PANEL 29VU (A)
PLACE BAT SELECTOR SWITCH 7PA IN ON POSITION
AND CHECK THAT:
- THE TWO ARROW LEGENDS OF BAT TIE CAUTION
LIGHT 6PA COME ON
- BUS OFF 1 AND 2 LEGENDS OF INV FAULT/BUS
OFF CAUTION LIGHTS 7XN AND 8XN COME ON AND
AFTER ABOUT 5 SECS. INV FAULT 2 LEGEND COMES ON TOO
003
_____________
DE-ENERGIZING
REF.FIG.243100-EAD-00100-001
1. ON PANEL 29VU(A)
PLACE BAT SELECTOR SWITCH 7PA IN OFF POSITION
*****
AH
E N D
O F
T E X T
*****
24-31-00
EAD 10000-001
2-400 PAGE
2
DEC 01/14
24-31-00
3
AH
EAD 10000-001
DEC14
24-31-00
EAD 10000-001
2-400
PAGE
3
DEC 01/14
24-31-00
4
AH
EAD 10000-001
DEC14
24-31-00
EAD 10000-001
2-400
PAGE
4
DEC 01/14
24-31-00
EAD 10000-003
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 210
: 122VU 124VU 125VU
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELECTRIC
_________
MAN-HOURS
ELAPSED TIME
01
PUBLICATION
___________
JIC
AH
31-63-00-PRO-10000
24-31-00
EAD 10000-003
2-400 PAGE
1
DEC 01/14
24-31-00
001
EAD 10000-003
2
DEC14
002
___________
PREPARATION
REF.FIG.243100-EAD-00100 (FIG.1)
REF.FIG.243100-EAD-00101 (FIG.2)
1. MAKE CERTAIN THAT THE GROUND POWER UNIT IS
NOT CONNECTED TO DC EXTERNAL POWER RECEPTACLE (ON PANEL 5002VU/FIG.2-C) AND THE ACCESS
DOOR 114BR(FIG.2-B) IS CLOSED
2. ON PANEL 29VU(FIG.1-A) MAKE CERTAIN THAT:
- BAT SELECTOR SWITCH IS IN OFF POSITION
- OVRD/UNDV PUSHBUTTON SWITCH IS IN
RELEASED POSITION
- MAIN AND EMER BAT CHG PUSHBUTTON SWITCHES
ARE IN RELEASED POSITION
003
__________
ENERGIZING
REF.FIG.243100-EAD-00100
1. ON PANEL 29VU (A)
PLACE BAT SELECTOR SWITCH 7PA IN ON POSITION
AND CHECK THAT:
- THE TWO ARROW LEGENDS OF BAT TIE CAUTION
LIGHT 6PA COME ON
- ON MFD, IN ELEC SD PAGE, THE TWO AMBER
*** CONTINUED ***
AH
24-31-00
EAD 10000-003
2-400 PAGE
2
DEC 01/14
24-31-00
EAD 10000-003
3
DEC14
_____________
DE-ENERGIZING
REF.FIG.243100-EAD-00100-001
1. ON PANEL 29VU(A)
PLACE BAT SELECTOR SWITCH 7PA IN OFF POSITION
*****
AH
E N D
O F
T E X T
*****
24-31-00
EAD 10000-003
2-400 PAGE
3
DEC 01/14
24-31-00
4
AH
EAD 10000-003
DEC14
24-31-00
EAD 10000-003
2-400
PAGE
4
DEC 01/14
24-31-00
5
AH
EAD 10000-003
DEC14
24-31-00
EAD 10000-003
2-400
PAGE
5
DEC 01/14
24-31-00
OPERATIONAL TEST OF DC
BATTERY TRANSFER RELAYS
OPT 10000-001
1
DEC14
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
AH
24-46-00-EAD-10000
24-31-00
OPT 10000-001
2-400 PAGE
1
DEC 01/14
24-31-00
OPERATIONAL TEST OF DC
BATTERY TRANSFER RELAYS
001
OPT 10000-001
2
DEC14
002
___________________________________________
DC
BATTERY TRANSFER RELAYS OPERATIONAL TEST
REF.FIG.242100-OPT-00100
1. OPEN, SAFETY AND TAGS THE FOLLOWING
CIRCUIT BREAKERS:
CAUTION: OPEN THE FOLLOWING CIRCUIT BREAKERS
IN THE ORDER LISTED BELOW
- ON PANEL 122VU (A)
29XA MAIN ELEC PWR/AC/AC BUS 1 & 2 TIE/26
VAC
30XA MAIN ELEC PWR/AC/AC BUS 1 & 2 TIE/115
VAC
- ON PANEL 124VU (A)
8PA DC EMER/ESS & STBY BUS ON PRIM DC BUS
2/PWR SUPPLY
28PA MAIN BAT CHG CNTOR & BUS V SNSG
- ON PANEL 127VU (A)
9PA DC EMER/ESS & STBY BUS ON PRIM DC BUS
1/PWR SUPPLY
47PA EMER BAT CHG CNTOR
3XA PWR SUPPLY ON PRIM DC BUS 1/INV 1
2. VERIFY THAT THE CREW ALERTING SYSTEM IS
ACTIVATED IN THE FOLLOWING WAY:
A - SINGLE CHIME
B - CAPT AND F/O MASTER CAUTION LIGHTS 13WW
AND 168WW COME ON (B)
C - ON CREW ALERTING PANEL (C)
ELEC CAUTION LIGHT COMES ON
3. ON PANEL 29VU (D) VERIFY THAT:
- THE TWO ARROW LEGENDS OF BAT TIE CAUTION
*** CONTINUED ***
AH
24-31-00
OPT 10000-001
2-400 PAGE
2
DEC 01/14
24-31-00
OPERATIONAL TEST OF DC
BATTERY TRANSFER RELAYS
OPT 10000-001
3
DEC14
AH
E N D
O F
T E X T
*****
24-31-00
OPT 10000-001
2-400 PAGE
3
DEC 01/14
24-31-00
4
AH
OPT 10000-001
DEC14
24-31-00
OPT 10000-001
2-400
PAGE
4
DEC 01/14
24-31-00
OPERATIONAL TEST OF DC
BATTERY TRANSFER RELAYS
OPT 10000-002
1
DEC14
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
: PRINCIPLE OF CDS USE
(DISPLAY UNITS
EXPLORATION)
AH
24-46-00-EAD-10000
31-63-00-PRO-10000
24-31-00
OPT 10000-002
2-400 PAGE
1
DEC 01/14
24-31-00
OPERATIONAL TEST OF DC
BATTERY TRANSFER RELAYS
001
OPT 10000-002
2
DEC14
002
003
___________________________________________
DC
BATTERY TRANSFER RELAYS OPERATIONAL TEST
REF. FIG. 242100-OPT-00100
1. ON LH EFCP, PRESS CLR PUSH BUTTON
2. OPEN, SAFETY AND TAG THE FOLLOWING
CIRCUIT BREAKERS:
CAUTION: OPEN THE FOLLOWING CIRCUIT BREAKERS
IN THE ORDER LISTED BELOW
- ON PANEL 124VU
8PA DC EMER/ESS & STBY BUS ON PRIM DC BUS
2/PWR SUPPLY
28PA MAIN BAT CHG CNTOR & BUS V SNSG
10XA PWR SUPPLY ON PRIM DC BUS 2/INV 2
- ON PANEL 127VU
47PA EMER BAT CHG CNTOR
9PA DC EMER/ESS & STBY BUS ON PRIM DC BUS
*** CONTINUED ***
AH
24-31-00
OPT 10000-002
2-400 PAGE
2
DEC 01/14
24-31-00
OPERATIONAL TEST OF DC
BATTERY TRANSFER RELAYS
OPT 10000-002
3
DEC14
1/PWR SUPPLY
3XA PWR SUPPLY ON PRIM DC BUS 1/INV 1
3. VERIFY THAT THE CREW ALERTING SYSTEM IS
ACTIVATED IN THE FOLLOWING WAY:
A - SINGLE CHIME
B - MASTER CAUTION LIGHTS COME ON
C - ON EWD, IN ALERT WINDOW (DO NOT PAY
ATTENTION TO OTHER MESSAGES)
. ELEC AC BUS 1 MESSAGE AND AC BUS 1
OFF ASSOCIATED PROCEDURES ARE
DISPLAYED MESSAGE IS DISPLAYED
. ELEC AC BUS 2 MESSAGE AND AC BUS 2
OFF ASSOCIATED PROCEDURES ARE
DISPLAYED
. ELEC INV 2 MESSAGE AND INV FAULT
ASSOCIATED PROCEDURES ARE DISPLAYED
4. ON PANEL 29VU VERIFY THAT:
- THE TWO ARROW LEGENDS OF BAT TIE CAUTION
LIGHT COME ON
- BUS OFF FOR AC BUS 1 CAUTION LIGHT
COMES ON
- BUS OFF FOR AC BUS 2 CAUTION LIGHT
COMES ON
- INV FAULT FOR INV 2 CAUTION LIGHT
COMES ON
ON MFD UPPER WINDOW, IN ELEC SD PAGE,
THE FOLLOWING INDICATIONS ARE DISPLAYED
- AMBER ARROW ON EMER BAT
- AMBER ARROW ON MAIN BAT
- AMBER AC BUS 1 OFF SYMBOL
- AMBER AC BUS 2 OFF SYMBOL
- GREEN AC BUS STBY SYMBOL
- GREEN INV 1 SYMBOL
- AMBER INV 2 FAULT SYMBOL
5. CLOSE THE CIRCUIT BREAKERS PREVIOUSLY
OPENED.
*** CONTINUED ***
AH
24-31-00
OPT 10000-002
2-400 PAGE
3
DEC 01/14
24-31-00
OPERATIONAL TEST OF DC
BATTERY TRANSFER RELAYS
OPT 10000-002
4
DEC14
AH
E N D
O F
T E X T
*****
24-31-00
OPT 10000-002
2-400 PAGE
4
DEC 01/14
24-31-00
5
AH
OPT 10000-002
DEC14
24-31-00
OPT 10000-002
2-400
PAGE
5
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY OVRD AND EMER
INDICATING
OPT 10010-001
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
AH
24-46-00-EAD-10000
24-31-00
OPT 10010-001
2-400 PAGE
1
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY OVRD AND EMER
INDICATING
001
OPT 10010-001
2
DEC14
002
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
003
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
________________
OPERATIONAL
TEST
REF.FIG.242100-OPT-00100 (FIG.1)
243100-EAD-00101 (FIG.2)
1. ON PANEL 29VU (FIG.1-D)
PLACE BAT SELECTOR SWITCH 7PA IN OVRD POSITION AND VERIFY THAT:
- THE TWO ARROW LEGENDS OF BAT TIE CAUTION
LIGHT 6PA COME ON
- INV FAULT 1 LEGEND OF CAUTION LIGHT 7XN
IS OFF
- UNDV AND OVRD LEGEND ON PUSHBUTTON SWITCH
9PD ARE OFF
- ON PANEL 175WW (FIG.1-C)
ELEC CAUTION LIGHT COMES ON
- CAPT AND F/O MASTER CAUTION LIGHTS 13WW
AND 168WW COME ON (FIG 1-B)
- SINGLE CHIME SOUNDS
2. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 129VU (FIG.2-A)
4XA INV 1 ON HOT MAIN BAT BUS
*** CONTINUED ***
AH
24-31-00
OPT 10010-001
2-400 PAGE
2
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY OVRD AND EMER
INDICATING
OPT 10010-001
3
DEC14
24-31-00
OPT 10010-001
2-400 PAGE
3
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY OVRD AND EMER
INDICATING
004
OPT 10010-001
4
DEC14
AH
E N D
O F
T E X T
*****
24-31-00
OPT 10010-001
2-400 PAGE
4
DEC 01/14
24-31-00
5
AH
OPT 10010-001
DEC14
24-31-00
OPT 10010-001
2-400
PAGE
5
DEC 01/14
24-31-00
6
AH
OPT 10010-001
DEC14
24-31-00
OPT 10010-001
2-400
PAGE
6
DEC 01/14
24-31-00
7
AH
UTILIZATION OF MFC
MAINTENANCE MEMORY
OPT 10010-001
DEC14
24-31-00
OPT 10010-001
2-400
PAGE
7
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY OVRD AND EMER
INDICATING
OPT 10010-002
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
AH
24-46-00-EAD-10000
24-31-00
OPT 10010-002
2-400 PAGE
1
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY OVRD AND EMER
INDICATING
001
OPT 10010-002
2
DEC14
002
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
003
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
________________
OPERATIONAL
TEST
REF.FIG.242100-OPT-00100 (FIG.1)
243100-EAD-00101 (FIG.2)
1. ON PANEL 29VU (FIG.1-D)
PLACE BAT SELECTOR SWITCH 7PA IN OVRD POSITION AND VERIFY THAT:
- THE TWO ARROW LEGENDS OF BAT TIE CAUTION
LIGHT 6PA COME ON
- INV FAULT 1 LEGEND OF CAUTION LIGHT 7XN
IS OFF
- UNDV AND OVRD LEGEND ON PUSHBUTTON SWITCH
9PD ARE OFF
- ON PANEL 175WW (FIG.1-C)
ELEC CAUTION LIGHT COMES ON
- CAPT AND F/O MASTER CAUTION LIGHTS 13WW
AND 168WW COME ON (FIG 1-B)
- SINGLE CHIME SOUNDS
2. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 129VU (FIG.2-A)
4XA INV 1 ON HOT MAIN BAT BUS
*** CONTINUED ***
AH
24-31-00
OPT 10010-002
2-400 PAGE
2
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY OVRD AND EMER
INDICATING
OPT 10010-002
3
DEC14
24-31-00
OPT 10010-002
2-400 PAGE
3
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY OVRD AND EMER
INDICATING
004
OPT 10010-002
4
DEC14
AH
E N D
O F
T E X T
*****
24-31-00
OPT 10010-002
2-400 PAGE
4
DEC 01/14
24-31-00
5
AH
OPT 10010-002
DEC14
24-31-00
OPT 10010-002
2-400
PAGE
5
DEC 01/14
24-31-00
6
AH
OPT 10010-002
DEC14
24-31-00
OPT 10010-002
2-400
PAGE
6
DEC 01/14
24-31-00
7
AH
UTILIZATION OF MFC
MAINTENANCE MEMORY
OPT 10010-002
DEC14
24-31-00
OPT 10010-002
2-400
PAGE
7
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY OVRD AND EMER
INDICATING
OPT 10010-003
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
: PRINCIPLE OF CDS USE
(DISPLAY UNITS
EXPLORATION)
AH
24-46-00-EAD-10000
31-63-00-PRO-10000
24-31-00
OPT 10010-003
2-400 PAGE
1
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY OVRD AND EMER
INDICATING
001
OPT 10010-003
2
DEC14
002
003
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
004
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
________________
OPERATIONAL
TEST
REF. FIG. 242100-OPT-00100
REF. FIG. 243100-EAD-00101
1. ON PANEL 127VU, OPEN, SAFETY AND TAG
THE FOLLOWING CIRCUIT BREAKER:
3XA
PWR SUPPLY ON PRIM DC BUS 1/INV 1
2. ON PANEL 29VU:
*** CONTINUED ***
AH
24-31-00
OPT 10010-003
2-400 PAGE
2
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY OVRD AND EMER
INDICATING
OPT 10010-003
3
DEC14
24-31-00
OPT 10010-003
2-400 PAGE
3
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY OVRD AND EMER
INDICATING
OPT 10010-003
4
DEC14
24-31-00
OPT 10010-003
2-400 PAGE
4
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY OVRD AND EMER
INDICATING
OPT 10010-003
5
DEC14
AH
E N D
O F
T E X T
*****
24-31-00
OPT 10010-003
2-400 PAGE
5
DEC 01/14
24-31-00
6
AH
OPT 10010-003
DEC14
24-31-00
OPT 10010-003
2-400
PAGE
6
DEC 01/14
24-31-00
7
AH
OPT 10010-003
DEC14
24-31-00
OPT 10010-003
2-400
PAGE
7
DEC 01/14
24-31-00
8
AH
UTILIZATION OF MFC
MAINTENANCE MEMORY
OPT 10010-003
DEC14
24-31-00
OPT 10010-003
2-400
PAGE
8
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY FAULT
INDICATING
OPT 10020-002
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 210
213
221
: 213AZ 221AZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
MECHANIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
01
PUBLICATION
___________
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
AH
24-46-00-EAD-10000
24-31-00
OPT 10020-002
2-400 PAGE
1
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY FAULT
INDICATING
001
OPT 10020-002
2
DEC14
002
___________
PREPARATION
REF.FIG.243117-OPT-00100
1. ON L ELECTRONICS RACK 80VU:
OPEN CORRESPONDING ACCESS DOOR:
- MAIN BATTERY : 213AZ
- EMER BATTERY : 221AZ
003
________________
OPERATIONAL
TEST
REF. FIG. 243100-OPT-00120
REF. FIG. 243117-OPT-00100
01. ON PANEL 25VU (D)
RELEASE MFC/1A AND 1B PUSHBUTTON SWITCHES
7UA1 AND 6UA1
- OFF LEGENDS COME ON
02. VERIFY THAT THE CREW ALERTING SYSTEM IS
ACTIVATED IN THE FOLLOWING WAY:
A. SINGLE CHIME
B. ON PANELS 3VU AND 5VU (FIG.1-A)
CAPT AND F/O MASTER CAUTION LIGHTS 13WW
AND 168WW COME ON
C. ON PANEL 175WW (FIG.1-B)
MFC AND ELEC CAUTION LIGHTS COME ON
03. ON PANEL 29VU (FIG.1-C)
BUS OFF 1 LEGEND OF INV FAULT/BUS OFF
CAUTION LIGHT 7XN COMES ON
04. ON PANEL 175WW
PRESS CLR AND CHECK THAT THE ALERTS GO OFF
*** CONTINUED ***
AH
24-31-00
OPT 10020-002
2-400 PAGE
2
DEC 01/14
OPERATIONAL TEST OF
BATTERY FAULT
INDICATING
24-31-00
OPT 10020-002
3
DEC14
24-31-00
OPT 10020-002
2-400 PAGE
3
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY FAULT
INDICATING
OPT 10020-002
4
DEC14
________
CLOSE-UP
REF. FIG. 243117-OPT-00100
1. ON L ELECTRONICS RACK 80VU:
CLOSE CORRESPONDING ACCESS DOOR:
- MAIN BATTERY : 213AZ
- EMER BATTERY : 221AZ
005
AH
E N D
O F
T E X T
*****
24-31-00
OPT 10020-002
2-400 PAGE
4
DEC 01/14
24-31-00
5
AH
OPT 10020-002
DEC14
24-31-00
OPT 10020-002
2-400
PAGE
5
DEC 01/14
24-31-00
6
AH
ACCESS DOORS
OPT 10020-002
DEC14
24-31-00
OPT 10020-002
2-400
PAGE
6
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY FAULT
INDICATING
OPT 10020-003
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 210
213
221
: 213AZ 221AZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
MECHANIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
01
PUBLICATION
___________
JIC
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
: PRINCIPLE OF CDS USE
(DISPLAY UNITS
EXPLORATION)
AH
24-46-00-EAD-10000
31-63-00-PRO-10000
24-31-00
OPT 10020-003
2-400 PAGE
1
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY FAULT
INDICATING
001
OPT 10020-003
2
DEC14
002
003
___________
PREPARATION
REF.FIG.243117-OPT-00100
1. ON L ELECTRONICS RACK 80VU:
OPEN CORRESPONDING ACCESS DOOR:
- MAIN BATTERY : 213AZ
- EMER BATTERY : 221AZ
004
________________
OPERATIONAL
TEST
REF. FIG. 243100-OPT-00120
REF. FIG. 243117-OPT-00100
01. - ON LH EFCP, PRESS CLR PUSH BUTTON
- ON PANEL 25VU:
RELEASE MFC/1A AND 1B PUSHBUTTON SWITCHES
.OFF LEGENDS COME ON.
02. VERIFY THAT THE CREW ALERTING SYSTEM IS
ACTIVATED IN THE FOLLOWING WAY:
*** CONTINUED ***
AH
24-31-00
OPT 10020-003
2-400 PAGE
2
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY FAULT
INDICATING
OPT 10020-003
3
DEC14
A. SINGLE CHIME
B. ON PANELS 133VU(VM) AND 134VU(VM),
MASTER CAUTION LIGHTS COME ON.
C. ON EWD, IN ALERT WINDOW (DO NOT PAY
ATTENTION TO OTHER MESSAGES)
MFC 1A+1B MESSAGE IS DISPLAYED
ELEC AC BUS 1 MESSAGE AND AC BUS 1
OFF ASSOCIATED PROCEDURES ARE
DISPLAYED
03. ON PANEL 29VU:
-BUS OFF CAUTION LIGHT COMES FOR AC BUS 1
COMES ON.
-ON MFD UPPER WINDOW, ON ELEC SD PAGE,
AMBER AC BUS 1 OFF SYMBOL IS DISPLAYED.
04. ON LH EFCP, PRESS CLR PUSH BUTTON.
05. ON L ELECTRONICS RACK 80 VU:
UNPLUG CONNECTORS 21PAB AND 72PAB
RESPECTIVELY FROM MAIN AND EMER BATTERIES
AND BRIDGE THE PINS C AND D OF THE SAME
CONNECTORS.
06. VERIFY THAT:
A. ON PANEL 29VU:
- FAULT LEGENDS ON MAIN AND EMER
PUSHBUTTON SWITCHES COME ON.
- THE TWO ARROW LEGENDS OF BAT TIE
CAUTION LIGHTS MOMENTARILY COME ON.
B. ON MFD UPPER WINDOW, IN ELEC SD PAGE,
AMBER CHG FAULT SYMBOLS AT RIGHT AND
LEFT SIDES OF MAIN AND EMER BAT ARE
DISPLAYED.
07. VERIFY THAT THE CREW ALERTING SYSTEM IS
ACTIVATED IN THE FOLLOWING WAY:
A. SINGLE CHIME
B. ON PANELS 133VU(VM) AND 134VU(VM),
MASTER CAUTION LIGHTS COME ON.
C. ON EWD, IN ALERT WINDOW (DO NOT PAY
*** CONTINUED ***
AH
24-31-00
OPT 10020-003
2-400 PAGE
3
DEC 01/14
OPERATIONAL TEST OF
BATTERY FAULT
INDICATING
24-31-00
OPT 10020-003
4
DEC14
24-31-00
OPT 10020-003
2-400 PAGE
4
DEC 01/14
24-31-00
OPERATIONAL TEST OF
BATTERY FAULT
INDICATING
OPT 10020-003
5
DEC14
________
CLOSE-UP
REF. FIG. 243117-OPT-00100
1. ON L ELECTRONICS RACK 80VU:
CLOSE CORRESPONDING ACCESS DOOR:
- MAIN BATTERY : 213AZ
- EMER BATTERY : 221AZ
006
AH
E N D
O F
T E X T
*****
24-31-00
OPT 10020-003
2-400 PAGE
5
DEC 01/14
24-31-00
6
AH
OPT 10020-003
DEC14
24-31-00
OPT 10020-003
2-400
PAGE
6
DEC 01/14
24-31-00
7
AH
ACCESS DOORS
OPT 10020-003
DEC14
24-31-00
OPT 10020-003
2-400
PAGE
7
DEC 01/14
24-31-81
OPT 10000-001
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
MECHANIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
AH
72-00-00-ERU-10030
24-31-81
OPT 10000-001
2-400 PAGE
1
DEC 01/14
24-31-81
001
OPT 10000-001
2
DEC14
____
NOTE
THIS JOB CARD INSTRUCTION WILL BE CARRIED OUT
WITH ENGINE RUNNING OR WITH AC WILD FREQUENCY
EXTERNAL PWR.
FOR EXTERNAL POWER PROCEDURE, USE JOB
INSTRUCTION CARD 243181-OPT-10005.
002
_________________________
ENGINE
GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030
003
___________
PREPARATION
REF.FIG.243181-OPT-00100
1. MAKE CERTAIN THAT THE GROUND POWER UNIT
IS NOT CONNECTED TO DC EXTERNAL POWER
RECEPTACLE (ON PANEL 5002VU) AND THE
ACCESS DOOR 114BR IS CLOSED.
2. ON PANEL 29VU (B)
RELEASE DC GEN 1 PUSHBUTTON SWITCH
AND DC GEN 2 PUSHBUTTON SWITCHES.
004
________________
OPERATIONAL
TEST
REF.FIG.243181-OPT-00100
1. ON PANEL 29VU (B) CHECK THAT:
- ARROW LEGENDS OF BAT TIE CAUTION LIGHT
ARE ON
- BUS OFF FOR AC BUS 1 CAUTION LIGHTS
IS ON
- BUS OFF FOR AC BUS 2 AND INV FAULT FOR
INV 2 CAUTION LIGHTS ARE ON
- DC BUS OFF CAUTION LIGHTS FOR DC BUS 1
AND 2 COME ON
- SHED LEGEND OF DC SVCE/UTLY BUS PUSHBUTTON
SWITCH IS ON
*** CONTINUED ***
AH
24-31-81
OPT 10000-001
2-400 PAGE
2
DEC 01/14
24-31-81
OPT 10000-001
3
DEC14
24-31-81
OPT 10000-001
2-400 PAGE
3
DEC 01/14
24-31-81
OPT 10000-001
4
DEC14
LIGHT IS OFF
9. ON PANEL 129VU
REMOVE SAFETY CLIPS AND TAGS AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
11PA
4XA
10. ON PANEL 130VU
REMOVE SAFETY CLIPS AND TAGS AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
64PA
7XA
NOTE: ON ELECTRONICS RACK 90VU, OPEN ACCESS
DOOR 214AZ
CHECK THAT THE TRU FAN IS OPERATIVE
11. ON PANEL 29VU
RELEASE PUSHBUTTON SWITCH P/BSW-MAIN ELEC
PWR/TRU
- ON AND ARROW LEGENDS GO OFF
- VERIFY THAT THE TWO ARROW LEGENDS OF BAT
CAUTION LIGHT COME ON.
005
________
CLOSE-UP
REF. FIG. 243181-OPT-00100
PRESS DC GEN 1 AND DC GEN 2 PUSHBUTTON
SWITCH
- VERIFY THAT ALL CAUTION LIGHTS ARE OFF
006
______________________________________
SHUT
DOWN OF ENGINE GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030
*****
AH
E N D
O F
T E X T
*****
24-31-81
OPT 10000-001
2-400 PAGE
4
DEC 01/14
24-31-81
5
AH
OPT 10000-001
DEC14
24-31-81
OPT 10000-001
2-400
PAGE
5
DEC 01/14
24-31-81
OPT 10000-002
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 210
: 214AZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
MECHANIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
JIC
AH
72-00-00-ERU-10030
31-63-00-PRO-10000
24-31-81
OPT 10000-002
2-400 PAGE
1
DEC 01/14
24-31-81
001
OPT 10000-002
2
DEC14
____
NOTE
THIS JOB CARD INSTRUCTION WILL BE CARRIED OUT
WITH ENGINE RUNNING OR WITH AC WILD FREQUENCY
EXTERNAL PWR.
FOR EXTERNAL POWER PROCEDURE, USE JOB
INSTRUCTION CARD 243181-OPT-10005.
002
_________________________
ENGINE
GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030
003
004
___________
PREPARATION
REF.FIG.243181-OPT-00100
1. MAKE CERTAIN THAT THE GROUND POWER UNIT
IS NOT CONNECTED TO DC EXTERNAL POWER
RECEPTACLE (ON PANEL 5002VU) AND THE
ACCESS DOOR 114BR IS CLOSED.
2. ON PANEL 29VU (B)
RELEASE DC GEN 1 PUSHBUTTON SWITCH
AND DC GEN 2 PUSHBUTTON SWITCHES.
24-31-81
OPT 10000-002
2-400 PAGE
2
DEC 01/14
005
24-31-81
OPT 10000-002
3
DEC14
________________
OPERATIONAL
TEST
REF. FIG. 243181-OPT-00100
1. CHECK THAT:
A. ON PANEL 29VU:
- OFF LEGENDS OF DC GEN 1 AND 2 CAUTION
LIGHTS ARE ON
- ARROW LEGENDS OF BAT TIE CAUTION LIGHT
ARE ON
- BUS OFF FOR AC BUS 1 AND 2 CAUTION
LIGHTS ARE ON
- INV FAULT FOR INV 2 CAUTION LIGHT IS
ON
- DC BUS OFF CAUTION LIGHTS FOR DC BUS
1 AND 2 COME ON
- SHED LEGEND OF DC SVCE/UTLY BUS
PUSHBUTTON SWITCH IS ON
B. ON MFD UPPER WINDOW, IN SD ELEC PAGE,
THE FOLLOWING ITEMS ARE DISPLAYED:
- WHITE DC GEN 1 AND DC GEN 2 SYMBOLS
- AMBER ARROW SYMBOL ON EMER BAT
- AMBER ARROW SYMBOL ON MAIN BAT
- AMBER AC BUS 1 OFF SYMBOL
- AMBER AC BUS 2 OFF SYMBOL
- AMBER INV 2 FAULT SYMBOL
- AMBER DC BUS 1 OFF SYMBOL
- AMBER DC BUS 2 OFF SYMBOL
- SHED LEGENDS ABOVE UTLY BUS 1 AND
UTLY BUS 2 SYMBOLS
- GREEN EMER BUS SYMBOL
- GREEN ESS BUS SYMBOL
- GREEN AC STBY BUS SYMBOL
ON EWD, IN ALERT WINDOW, THE FOLLOWING
ITEMS ARE DISPLAYED:
- ELEC DC GEN 1 + 2 MESSAGE
- DUAL DC LOSS ASSOCIATED PROCEDURES
2. ON PANEL 29VU:
*** CONTINUED ***
AH
24-31-81
OPT 10000-002
2-400 PAGE
3
DEC 01/14
24-31-81
OPT 10000-002
4
DEC14
24-31-81
OPT 10000-002
2-400 PAGE
4
DEC 01/14
24-31-81
OPT 10000-002
5
DEC14
7. ON PANEL 129VU:
CLOSE THE FOLLOWING CIRCUIT BREAKERS:
11PA
4XA
8. ON PANEL 130VU:
CLOSE THE FOLLOWING CIRCUIT BREAKERS:
64PA
7XA
NOTE: ON ELECTRONICS RACK 90VU, OPEN ACCESS
DOOR 214AZ
CHECK THAT THE TRU FAN IS OPERATING
9. ON PANEL 29VU:
RELEASE TRU PUSHBUTTON SWITCH
- ON AND ARROW LEGENDS GO OFF
- VERIFY THAT THE TWO ARROW LEGENDS OF BAT
TIE CAUTION LIGHT COME ON.
ON MFD UPPER WINDOW, IN SD ELEC PAGE,
VERIFY THAT:
- RECTANGLE OF TRU ITEM IS DISPLAYED
IN GREEN
- CIRCLES INSIDE TRU ITEM IS DISPLAYED
IN WHITE
- AMBER ARROW ITEM IS DISPLAYED ON
EMER BAT
- AMBER ARROW ITEM IS DISPLAYED ON
MAIN BAT
006
________
CLOSE-UP
REF. FIG. 243181-OPT-00100
PRESS DC GEN 1 AND DC GEN 2 PUSHBUTTON
SWITCH. VERIFY THE FOLLOWING:
- ALL PREVIOUSLY RELATED CAUTION LIGHTS ARE
OFF
- ELEC DC GEN 1 + 2 MESSAGE AND DUAL DC
LOSS ASSOCIATED PROCEDURES ARE NO LONGER
DISPLAYED ON EWD
*** CONTINUED ***
AH
24-31-81
OPT 10000-002
2-400 PAGE
5
DEC 01/14
24-31-81
OPT 10000-002
6
DEC14
______________________________________
SHUT
DOWN OF ENGINE GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030
*****
AH
E N D
O F
T E X T
*****
24-31-81
OPT 10000-002
2-400 PAGE
6
DEC 01/14
24-31-81
7
AH
OPT 10000-002
DEC14
24-31-81
OPT 10000-002
2-400
PAGE
7
DEC 01/14
24-31-81
OPT 10005-002
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
MECHANIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
: AC WILD FREQUENCY
EXTERNAL POWER SUPPLY
AH
24-41-00-EAD-10000
24-31-81
OPT 10005-002
2-400 PAGE
1
DEC 01/14
24-31-81
001
OPT 10005-002
2
DEC14
____
NOTE
THIS JOB CARD INSTRUCTION WILL BE PERFORMED
WITH ENGINES RUNNING OR WITH AC WILD FREQUENCY
EXTERNAL PWR.
TO PERFORM THIS OPERATIONAL TEST WITH ENGINES
RUNNING, SEE JOB INSTRUCTION CARD
243181-OPT-10000.
002
003
________________
OPERATIONAL
TEST
REF.FIG.243181-OPT-00100
1. ON PANEL 29VU (B) CHECK THAT:
- ARROW LEGENDS OF BAT TIE CAUTION LIGHT
ARE ON
- BUS OFF FOR AC BUS 1 CAUTION LIGHTS
IS ON
- BUS OFF FOR AC BUS 2 AND INV FAULT FOR
INV 2 CAUTION LIGHTS ARE ON
- DC BUS OFF CAUTION LIGHTS FOR DC BUS 1
AND 2 COME ON
- SHED LEGEND OF DC SVCE/UTLY BUS PUSHBUTTON
SWITCH IS ON
2. VERIFY THAT THE FOLLOWING SYSTEMS ARE
SUPPLIED:
- VHF 1
- FUEL QTY INDICATOR
- FLAPS POSITION INDICATOR
3. ON PANEL 29VU
A. PRESS TRU PUSHBUTTON SWITCH
- ON AND ARROW LEGENDS COME ON
B. VERIFY THAT THE TWO ARROW LEGENDS OF BAT
*** CONTINUED ***
AH
24-31-81
OPT 10005-002
2-400 PAGE
2
DEC 01/14
24-31-81
OPT 10005-002
3
DEC14
24-31-81
OPT 10005-002
2-400 PAGE
3
DEC 01/14
24-31-81
OPT 10005-002
4
DEC14
AH
E N D
O F
T E X T
*****
24-31-81
OPT 10005-002
2-400 PAGE
4
DEC 01/14
24-31-81
5
AH
OPT 10005-002
DEC14
24-31-81
OPT 10005-002
2-400
PAGE
5
DEC 01/14
24-31-81
OPT 10005-003
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
MECHANIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
JIC
: AC WILD FREQUENCY
EXTERNAL POWER SUPPLY
: PRINCIPLE OF CDS USE
(DISPLAY UNITS
EXPLORATION)
AH
24-41-00-EAD-10000
31-63-00-PRO-10000
24-31-81
OPT 10005-003
2-400 PAGE
1
DEC 01/14
24-31-81
001
OPT 10005-003
2
DEC14
____
NOTE
THIS JOB CARD INSTRUCTION WILL BE PERFORMED
WITH ENGINES RUNNING OR WITH AC WILD FREQUENCY
EXTERNAL PWR.
TO PERFORM THIS OPERATIONAL TEST WITH ENGINES
RUNNING, SEE JOB INSTRUCTION CARD
243181-OPT-10000.
002
003
004
________________
OPERATIONAL
TEST
REF. FIG. 243181-OPT-00100
1. CHECK THAT:
A. ON PANEL 29VU:
- ARROW LEGENDS OF BAT TIE CAUTION LIGHT
ARE ON
- BUS OFF FOR AC BUS 1 AND 2 CAUTION
LIGHTS ARE ON
- INV FAULT FOR INV 2 CAUTION LIGHT IS
ON
*** CONTINUED ***
AH
24-31-81
OPT 10005-003
2-400 PAGE
2
DEC 01/14
24-31-81
OPT 10005-003
3
DEC14
24-31-81
OPT 10005-003
2-400 PAGE
3
DEC 01/14
24-31-81
OPT 10005-003
4
DEC14
3. ON PANEL 129VU:
OPEN, SAFETY AND TAG THE FOLLOWING
CIRCUIT BREAKERS:
11PA DC ESS/STBY BUS ON HMBB/GEN PWR SPLY
4XA INV 1 HOT MAIN BAT BUS
4. ON PANEL 130VU:
OPEN, SAFETY AND TAG THE FOLLOWING
CIRCUIT BREAKERS:
64PA DC EMER & STBY BUS ON HEBB/GENERAL
PWR SPLY
7XA INV 1 ON HOT EMER BAT BUS
5. ON PANEL 29VU:
VERIFY THAT BATTERY AMMETER SHOWS A ZERO
LOAD EITHER IF BAT SEL SWITCH IS
PLACED IN EMER OR IN MAIN POSITION
6. ON MFD UPPER WINDOW, IN SD ELEC PAGE,
VERIFY THAT:
- GREEN EMER BUS SYMBOL IS DISPLAYED
- GREEN ESS BUS SYMBOL IS DISPLAYED
- GREEN AC STBY BUS SYMBOL IS DISPLAYED
7. ON PANEL 129VU:
CLOSE THE FOLLOWING CIRCUIT BREAKERS:
11PA
4XA
8. ON PANEL 130VU:
CLOSE THE FOLLOWING CIRCUIT BREAKERS:
64PA
7XA
NOTE: ON ELECTRONICS RACK 90VU, OPEN ACCESS
DOOR 214AZ
CHECK THAT THE TRU FAN IS OPERATING
9. ON PANEL 29VU:
RELEASE TRU PUSHBUTTON SWITCH
- ON AND ARROW LEGENDS GO OFF
*** CONTINUED ***
AH
24-31-81
OPT 10005-003
2-400 PAGE
4
DEC 01/14
24-31-81
OPT 10005-003
5
DEC14
AH
E N D
O F
T E X T
*****
24-31-81
OPT 10005-003
2-400 PAGE
5
DEC 01/14
24-31-81
6
AH
OPT 10005-003
DEC14
24-31-81
OPT 10005-003
2-400
PAGE
6
DEC 01/14
24-31-81
RAI 10000-002
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 212
214
222
: 212TZ 212VZ 214AZ 222AZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
___
MEN
_________
MAN-HOURS
01
ELAPSED TIME
SPARE
: 01 T R U
24-31-80
24-31-81-OPT-10000
PUBLICATION
___________
JIC
AH
24-31-81
RAI 10000-002
2-400 PAGE
1
DEC 01/14
24-31-81
001
RAI 10000-002
2
DEC14
___________
PREPARATION
REF. FIG. 240000-RAI-00100
NOTE:MAKE CERTAIN THAT THE GROUND POWER UNIT
IS NOT CONNECTED TO THE DC AND AC EXTERNAL
POWER.
1. ON PANEL 29VU:
- VERIFY THAT BAT SELECTOR SWITCH IS IN
OFF POSITION.
- DISPLAY A WARNING NOTICE PROHIBITING POWER
SUPPLY BY BATTERIES.
2. ON ELECTRICS RACK 90VU:
- REMOVE ACCESS PANELS:214AZ,222AZ.
3. ON AC/DC POWER CENTER 120VU (IF NECESSARY):
- REMOVE ACCESS PANELS 212VZ,212TZ.
002
_______
REMOVAL
REF.FIG.243181-RAI-00100
1. UNPLUG ELECTRICAL CONNECTOR (3).
2. PUT BLANKING CAP ON ELECTRICAL CONNECTOR.
3. REMOVE COVERS (5)(REMOVE SCREWS (4) IF
COVERS ARE ATTACHED BY SCREWS).
4. REMOVE NUTS (6 AND 7) AND WASHERS (8) TO
DISCONNECT TERMINAL LUGS (9).
5. MARK AND DISCONNECT TERMINAL LUGS.
6. REMOVE SCREW OR NUT (10) AND WASHER (11) TO
DISCONNECT CHASSIS GROUND TERMINAL LUG (12).
7. MARK AND DISCONNECT TERMINAL LUG.
*** CONTINUED ***
AH
24-31-81
RAI 10000-002
2-400 PAGE
2
DEC 01/14
24-31-81
RAI 10000-002
3
DEC14
____________
INSTALLATION
REF.FIG.243181-RAI-00100
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/OR
COMPONENT ADJACENT AREA.
2. INSTALL TRANSFORMER RECTIFIER UNIT (13).
3. INSTALL WASHERS (1) AND SCREWS (2). TIGHTEN
SCREWS.
4. INSTALL TERMINAL LUGS (9), WASHERS (8) AND
NUTS (6 AND 7), TIGHTEN AND MARK THEM WITH
RED VARNISH.
5. INSTALL CHASSIS GROUND TERMINAL LUG (12),
WASHER (11) AND SCREW OR NUT (10), TIGHTEN
AND MARK IT MARK WITH RED VARNISH.
6. INSTALL COVERS (5) (INSTALL AND TIGHTEN
SCREWS (4) IF COVERS ARE ATTACHED BY SCREWS)
7. REMOVE BLANKING CAP FROM ELECTRICAL
CONNECTOR (3).
8. PLUG IN ELECTRICAL CONNECTOR.
004
________
CLOSE
UP
1. ON PANEL 29VU:
- REMOVE WARNING NOTICE.
2. CLOSE ALL ACCESS PANELS PREVIOUSLY OPENED.
*** CONTINUED ***
AH
24-31-81
RAI 10000-002
2-400 PAGE
3
DEC 01/14
24-31-81
005
RAI 10000-002
4
DEC14
______________________________________________
OPERATIONAL
TEST OF TRU AND ASSOCIATED CIRCUIT
SEE JOB INSTRUCTION CARD
243181-OPT-10000
*****
AH
E N D
O F
T E X T
*****
24-31-81
RAI 10000-002
2-400 PAGE
4
DEC 01/14
24-31-81
5
AH
RAI 10000-002
DEC14
24-31-81
RAI 10000-002
2-400
PAGE
5
DEC 01/14
24-31-81
6
AH
RAI 10000-002
DEC14
24-31-81
RAI 10000-002
2-400
PAGE
6
DEC 01/14
24-31-85
CHK 10000-002
1
DEC14
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
AH
24-46-00-EAD-10000
24-31-85
CHK 10000-002
2-400 PAGE
1
DEC 01/14
24-31-85
CHK 10000-002
2
001
DEC14
002
________________________
CHECK
OF BATTERY VOLTAGE
REF.FIG.243110-CHK-00130
1. ON PANEL 101VU
A. PLACE ELEC IND SELECTOR SWITCH TO MAIN
BAT POSITION
B. VERIFY THAT THE VOLTAGE ON DC VOLTMETER
IS 28V
2. ON PANEL 29VU
RELEASE MAIN BAT CHG PUSHBUTTON SWITCH
-OFF LEGEND COMES ON
3. ON PANEL 101VU
VERIFY THAT THE VOLTAGE IS AT LEAST 24V
4. ON THE SAME PANEL
A. PLACE ELEC IND SELECTOR SWITCH TO EMER
BAT POSITION
B. VERIFY THAT THE VOLTAGE IS 28V
5. ON PANEL 29VU
RELEASE EMER BAT CHG PUSHBUTTON SWITCH
- OFF LEGEND COMES ON
6. ON PANEL 101VU
VERIFY THAT THE VOLTAGE IS AT LEAST 24V
7. ON PANEL 29VU
PRESS MAIN AND EMER BAT CHG PUSHBUTTON
SWITCHES
- OFF LEGENDS GO OFF
24-31-85
CHK 10000-002
2-400 PAGE
2
DEC 01/14
24-31-85
CHK 10000-002
3
003
DEC14
AH
E N D
O F
T E X T
*****
24-31-85
CHK 10000-002
2-400 PAGE
3
DEC 01/14
24-31-85
4
AH
CHK 10000-002
DEC14
24-31-85
CHK 10000-002
2-400
PAGE
4
DEC 01/14
24-31-85
CHK 10000-003
1
DEC14
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
AH
24-46-00-EAD-10000
24-31-85
CHK 10000-003
2-400 PAGE
1
DEC 01/14
24-31-85
CHK 10000-003
2
001
DEC14
002
________________________
CHECK
OF BATTERY VOLTAGE
REF.FIG.243110-CHK-00130
1. ON PANEL 101VU
A. PLACE ELEC IND SELECTOR SWITCH TO MAIN
BAT POSITION.
B. VERIFY THAT THE VOLTAGE ON DC VOLTMETER
AND ON MFD UPPER WINDOW, IN ELEC SD PAGE,
IS 28V.
2. ON PANEL 29VU
RELEASE MAIN BAT CHG PUSHBUTTON SWITCH
- OFF LEGEND COMES ON
- ON MFD UPPER WINDOW, IN ELEC SD PAGE,
CHG OFF SYMBOL IS DISPLAYED FOR MAIN
BATTERY CHARGER.
3. VERIFY ON DC VOLTMETER (PANEL 101VU) AND ON
MFD UPPER WINDOW, IN ELEC SD PAGE THAT THE
VOLTAGE IS AT LEAST 24V.
4. A. ON PANEL 101VU, PLACE ELEC IND SELECTOR
SWITCH TO EMER BAT POSITION.
B. VERIFY ON DC VOLTMETER (PANEL 101VU) AND
ON MFD UPPER WINDOW, IN ELEC SD PAGE THAT
THE VOLTAGE IS 28V.
5. ON PANEL 29VU
RELEASE EMER BAT CHG PUSHBUTTON SWITCH
- OFF LEGEND COMES ON
- ON MFD UPPER WINDOW, IN ELEC SD PAGE,
CHG OFF SYMBOL IS DISPLAYED FOR
EMERGENCY BATTERY CHARGER.
*** CONTINUED ***
AH
24-31-85
CHK 10000-003
2-400 PAGE
2
DEC 01/14
24-31-85
CHK 10000-003
3
DEC14
AH
E N D
O F
T E X T
*****
24-31-85
CHK 10000-003
2-400 PAGE
3
DEC 01/14
24-31-85
4
AH
CHK 10000-003
DEC14
24-31-85
CHK 10000-003
2-400
PAGE
4
DEC 01/14
24-31-85
RAI 10010-003
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 213
214
: 213AZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
MECHANIC
___
MEN
_________
MAN-HOURS
01
01
ELAPSED TIME
SPARE
: 01 BATTERY 21PA
243110-01
EXPENDABLE
: 02 O-RING
212410-01
AH
24-31-00-EAD-10000
31-31-81-ADJ-10000
24-31-85
RAI 10010-003
2-400 PAGE
1
DEC 01/14
24-31-85
001
RAI 10010-003
2
DEC14
___________
PREPARATION
REF. FIG. 243115-RAI-00100
REF. FIG. 243115-RAI-00110
1. MAKE CERTAIN THAT THE GROUND POWER UNIT IS
NOT CONNECTED TO DC EXTERNAL POWER
RECEPTACLE (ON PANEL 5002VU) AND THE
ACCESS DOOR 114BR IS CLOSED
2. ON PANEL 29VU MAKE CERTAIN THAT:
BAT SELECTOR SWITCH 7PA IS IN OFF POSITION
3. ON PANEL 27VU MAKE CERTAIN THAT:
ENG START SELECTOR SWITCH 13KG IS IN OFF
POSITION
4. DISPLAY A WARNING NOTICE ON PANELS 27VU AND
29VU, PROHIBITING POWER SUPPLY TO THE SYSTEM
AND ENGINE STARTING
5. ON L ELECTRONICS RACK 80VU
OPEN ACCESS DOOR 213AZ.
002
________________________________________
DE-ENERGIZATION
OF AIR EXTRACTION SYSTEM
CAUTION : DISPLAY WARNING NOTICE INDICATING
THAT :
DURING MAINTENANCE OPERATIONS ON AIR
EXTRACTION SYSTEM, INSTRUMENT PANELS
AND ELECTRONICS RACKS ARE NOT
VENTILATED.
OPEN, SAFETY AND TAG THE FOLLOWING CIRCUIT
BREAKERS :
A. ON CIRCUIT BREAKER PANEL 121VU :
1HR AVIONICS VENT/IND
5HR AVIONICS VENT/VALVES
24HR AVIONICS VENT/EXTRACT FAN CTL
*** CONTINUED ***
AH
24-31-85
RAI 10010-003
2-400 PAGE
2
DEC 01/14
24-31-85
RAI 10010-003
3
DEC14
B. ON PANEL 124VU :
4HR PWR SUPLY ON PRIM DC BUS 2/EXTRACT FAN
C. ON PANEL 127VU :
3HR PWR SUPLY ON PRIM DC BUS 1/EXTRACT FAN
003
_______
REMOVAL
REF. FIG. 243115-RAI-00110
1. UNPLUG THE OVERHEAT DETECTION ELECTRICAL
CONNECTOR (5)
2. CUT AND REMOVE LOCKWIRE, LOOSE KNURLED
KNOB (7) AND UNPLUG THE BATTERY ELECTRICAL
CONNECTOR (8)
3. DISCONNECT THE TWO BATTERY VENTILATION
DUCTS (4)
4. UNLOCK AND DISENGAGE THE TWO LATCHES (10)
5. PULL, OUT OF THE ELECTRONIC RACK, THE
MAIN BATTERY (9) AND ITS TRAY (6) USING THE
SUPPORT HANDLE.
6. LOOSE THE LATCHES (11) AND REMOVE THE
STRAP (12) KEEPING THE BATTERY (9).
NOTE: REMOVE THE BATTERY FROM ITS SUPPORT
ONLY WHEN THE HANDLING IS FINISH
7. REMOVE THE BATTERY (9).
004
____________
INSTALLATION
REF. FIG. 243115-RAI-00110
1. CLEAN AND INSPECT BATTERY (9) INTERFACE
AND/OR COMPONENT ADJACENT AREA.
*** CONTINUED ***
AH
24-31-85
RAI 10010-003
2-400 PAGE
3
DEC 01/14
24-31-85
RAI 10010-003
4
DEC14
_____________________________________
ENERGIZATION
OF AIR EXTRACTION SYSTEM
REMOVE SAFETY CLIPS AND TAGS AND CLOSE CIRCUIT
BREAKERS PREVIOUSLY OPENED.
006
________
CLOSE-UP
REF. FIG. 243115-RAI-00110
1. ON L ELECTRONIC RACK 80VU
CLOSE ACCESS DOOR 213AZ.
2. REMOVE THE WARNING NOTICES.
007
___________________________
POWER
SUPPLY FROM BATTERIES
SEE JOB INSTRUCTION CARD
243100-EAD-10000
*** CONTINUED ***
AH
24-31-85
RAI 10010-003
2-400 PAGE
4
DEC 01/14
24-31-85
008
RAI 10010-003
5
DEC14
____________________________
ADJUSTMENT
OF FDAU TIME BASE
SEE JOB INSTRUCTION CARD
313181-ADJ-10000
009
________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****
AH
E N D
O F
T E X T
*****
24-31-85
RAI 10010-003
2-400 PAGE
5
DEC 01/14
24-31-85
6
AH
RAI 10010-003
DEC14
24-31-85
RAI 10010-003
2-400
PAGE
6
DEC 01/14
24-31-85
7
AH
MAIN BATTERY
REMOVAL AND INSTALLATION
RAI 10010-003
DEC14
24-31-85
RAI 10010-003
2-400
PAGE
7
DEC 01/14
24-31-85
RAI 10010-004
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 213
214
: 213AZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELECTRIC
MECHANIC
_________
MAN-HOURS
01
01
ELAPSED TIME
SPARE
: 01 BATTERY 21PA
243110-01
EXPENDABLE
: 02 O-RING
212410-01
AH
24-31-00-EAD-10000
24-31-85
RAI 10010-004
2-400 PAGE
1
DEC 01/14
24-31-85
001
RAI 10010-004
2
DEC14
___________
PREPARATION
REF. FIG. 243115-RAI-00100
REF. FIG. 243115-RAI-00110
1. MAKE CERTAIN THAT THE GROUND POWER UNIT IS
NOT CONNECTED TO DC EXTERNAL POWER
RECEPTACLE (ON PANEL 5002VU) AND THE
ACCESS DOOR 114BR IS CLOSED
2. ON PANEL 29VU MAKE CERTAIN THAT:
BAT SELECTOR SWITCH 7PA IS IN OFF POSITION
3. ON PANEL 27VU MAKE CERTAIN THAT:
ENG START SELECTOR SWITCH 13KG IS IN OFF
POSITION
4. DISPLAY A WARNING NOTICE ON PANELS 27VU AND
29VU, PROHIBITING POWER SUPPLY TO THE SYSTEM
AND ENGINE STARTING
5. ON L ELECTRONICS RACK 80VU
OPEN ACCESS DOOR 213AZ.
002
________________________________________
DE-ENERGIZATION
OF AIR EXTRACTION SYSTEM
CAUTION : DISPLAY WARNING NOTICE INDICATING
THAT :
DURING MAINTENANCE OPERATIONS ON AIR
EXTRACTION SYSTEM, INSTRUMENT PANELS
AND ELECTRONICS RACKS ARE NOT
VENTILATED.
OPEN, SAFETY AND TAG THE FOLLOWING CIRCUIT
BREAKERS :
A. ON CIRCUIT BREAKER PANEL 121VU :
1HR AVIONICS VENT/IND
5HR AVIONICS VENT/VALVES
24HR AVIONICS VENT/EXTRACT FAN CTL
*** CONTINUED ***
AH
24-31-85
RAI 10010-004
2-400 PAGE
2
DEC 01/14
24-31-85
RAI 10010-004
3
DEC14
B. ON PANEL 124VU :
4HR PWR SUPLY ON PRIM DC BUS 2/EXTRACT FAN
C. ON PANEL 127VU :
3HR PWR SUPLY ON PRIM DC BUS 1/EXTRACT FAN
003
_______
REMOVAL
REF. FIG. 243115-RAI-00110
1. UNPLUG THE OVERHEAT DETECTION ELECTRICAL
CONNECTOR (5)
2. CUT AND REMOVE LOCKWIRE, LOOSE KNURLED
KNOB (7) AND UNPLUG THE BATTERY ELECTRICAL
CONNECTOR (8)
3. DISCONNECT THE TWO BATTERY VENTILATION
DUCTS (4)
4. UNLOCK AND DISENGAGE THE TWO LATCHES (10)
5. PULL, OUT OF THE ELECTRONIC RACK, THE
MAIN BATTERY (9) AND ITS TRAY (6) USING THE
SUPPORT HANDLE.
6. LOOSE THE LATCHES (11) AND REMOVE THE
STRAP (12) KEEPING THE BATTERY (9).
NOTE: REMOVE THE BATTERY FROM ITS SUPPORT
ONLY WHEN THE HANDLING IS FINISH
7. REMOVE THE BATTERY (9).
004
____________
INSTALLATION
REF. FIG. 243115-RAI-00110
1. CLEAN AND INSPECT BATTERY (9) INTERFACE
AND/OR COMPONENT ADJACENT AREA.
*** CONTINUED ***
AH
24-31-85
RAI 10010-004
2-400 PAGE
3
DEC 01/14
24-31-85
RAI 10010-004
4
DEC14
_____________________________________
ENERGIZATION
OF AIR EXTRACTION SYSTEM
REMOVE SAFETY CLIPS AND TAGS AND CLOSE CIRCUIT
BREAKERS PREVIOUSLY OPENED.
006
________
CLOSE-UP
REF. FIG. 243115-RAI-00110
1. ON L ELECTRONIC RACK 80VU
CLOSE ACCESS DOOR 213AZ.
2. REMOVE THE WARNING NOTICES.
007
___________________________
POWER
SUPPLY FROM BATTERIES
SEE JOB INSTRUCTION CARD
243100-EAD-10000
*** CONTINUED ***
AH
24-31-85
RAI 10010-004
2-400 PAGE
4
DEC 01/14
24-31-85
008
RAI 10010-004
5
DEC14
________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****
AH
E N D
O F
T E X T
*****
24-31-85
RAI 10010-004
2-400 PAGE
5
DEC 01/14
24-31-85
6
AH
RAI 10010-004
DEC14
24-31-85
RAI 10010-004
2-400
PAGE
6
DEC 01/14
24-31-85
7
AH
MAIN BATTERY
REMOVAL AND INSTALLATION
RAI 10010-004
DEC14
24-31-85
RAI 10010-004
2-400
PAGE
7
DEC 01/14
24-31-85
RAI 10020-004
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 114
221
: 114CR
221AZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELECTRIC
MECHANIC
ELAPSED TIME
SPARE
: 01 BATTERY 243115
_________
MAN-HOURS
01
01
PUBLICATION
___________
JIC
JIC
AH
24-31-00-EAD-10000
31-31-81-ADJ-10000
24-31-85
RAI 10020-004
2-400 PAGE
1
DEC 01/14
24-31-85
001
RAI 10020-004
2
DEC14
___________
PREPARATION
REF.FIG.243115-RAI-00120-001(FIG.1) AND 243115RAI-00130-001(FIG.2)
1. MAKE CERTAIN THAT THE GROUND POWER UNIT IS
NOT CONNECTED TO DC EXTERNAL POWER RECEPTACLE (ON PANEL 5002VU/FIG.1-B) AND THE ACCESS DOOR 114BR(FIG.1-A) IS CLOSED
2. ON PANEL 29VU(FIG.1-C) MAKE CERTAIN THAT:
BAT SELECTOR SWITCH 7PA IS IN OFF POSITION
3. DISPLAY A WARNING NOTICE ON PANEL 29VU PROHIBITING POWER SUPPLY TO THE SYSTEM
4. ON L ELECTRONICS RACK 80VU
OPEN ACCESS DOOR 221AZ (FIG.2-A)
002
_______
REMOVAL
REF.FIG.243115-RAI-00130-001
1. UNPLUG THE OVERHEAT DETECTION ELECTRICAL
CONNECTOR(5)
2. CUT AND REMOVE LOCKWIRE, LOOSE KNURLED KNOB
(6) AND UNPLUG THE BATTERY ELECTRICAL CONNECTOR(7)
3. DISCONNECT THE TWO BATTERY VENTILATION DUCTS
(1)
4. LOOSE THE HOLD-DOWN(3) AND DISENGAGE AND REMOVE THE STRAPS(2) KEEPING THE BATTERY(8)
5. REMOVE THE BATTERY
24-31-85
RAI 10020-004
2-400 PAGE
2
DEC 01/14
003
24-31-85
RAI 10020-004
3
DEC14
____________
INSTALLATION
REF.FIG.243115-RAI-00130
1. CLEAN AND INSPECT BATTERY(8) INTERFACE AND/
OR COMPONENT ADJACENT AREA
2. POSITION BATTERY INTO THE RELEVANT BOX(4)
3. INSTALL AND ENGAGE THE STRAPS(2) IN THE HOLD
-DOWN(3). CLAMP THE HOLD-DOWN
4. CONNECT THE TWO BATTERY VENTILATION DUCTS(1)
5. PLUG THE BATTERY ELECTRICAL CONNECTOR(7) BY
MEANS OF KNURLED KNOB(6). SAFETY CONNECTOR
6. PLUG THE OVERHEAT DETECTION ELECTRICAL CONNECTOR(5)
004
________
CLOSE-UP
REF.FIG.243115-RAI-00120-001(FIG.1) AND 243115RAI-00130-001(FIG.2)
1. ON L ELECTRONICS RACK
CLOSE ACCESS DOOR 221AZ
2. REMOVE THE WARNING NOTICE FROM PANEL 29VU
(FIG.1-C)
005
________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
006
___________________________
POWER
SUPPLY FROM BATTERIES
SEE JOB INSTRUCTION CARD
243100-EAD-10000
24-31-85
RAI 10020-004
2-400 PAGE
3
DEC 01/14
24-31-85
007
RAI 10020-004
4
DEC14
____________________________
ADJUSTMENT
OF FDAU TIME BASE
SEE JOB INSTRUCTION CARD
313181-ADJ-10000
*****
AH
E N D
O F
T E X T
*****
24-31-85
RAI 10020-004
2-400 PAGE
4
DEC 01/14
24-31-85
5
AH
RAI 10020-004
DEC14
24-31-85
RAI 10020-004
2-400
PAGE
5
DEC 01/14
24-31-85
6
AH
RAI 10020-004
DEC14
24-31-85
RAI 10020-004
2-400
PAGE
6
DEC 01/14
24-31-85
RAI 10020-006
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 114
221
: 114CR
221AZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELECTRIC
MECHANIC
ELAPSED TIME
SPARE
: 01 BATTERY 243115
_________
MAN-HOURS
01
01
PUBLICATION
___________
JIC
AH
24-31-00-EAD-10000
24-31-85
RAI 10020-006
2-400 PAGE
1
DEC 01/14
24-31-85
001
RAI 10020-006
2
DEC14
___________
PREPARATION
REF.FIG.243115-RAI-00120-001(FIG.1) AND 243115RAI-00130-001(FIG.2)
1. MAKE CERTAIN THAT THE GROUND POWER UNIT IS
NOT CONNECTED TO DC EXTERNAL POWER RECEPTACLE (ON PANEL 5002VU/FIG.1-B) AND THE ACCESS DOOR 114BR(FIG.1-A) IS CLOSED
2. ON PANEL 29VU(FIG.1-C) MAKE CERTAIN THAT:
BAT SELECTOR SWITCH 7PA IS IN OFF POSITION
3. DISPLAY A WARNING NOTICE ON PANEL 29VU PROHIBITING POWER SUPPLY TO THE SYSTEM
4. ON L ELECTRONICS RACK 80VU
OPEN ACCESS DOOR 221AZ (FIG.2-A)
002
_______
REMOVAL
REF.FIG.243115-RAI-00130-001
1. UNPLUG THE OVERHEAT DETECTION ELECTRICAL
CONNECTOR(5)
2. CUT AND REMOVE LOCKWIRE, LOOSE KNURLED KNOB
(6) AND UNPLUG THE BATTERY ELECTRICAL CONNECTOR(7)
3. DISCONNECT THE TWO BATTERY VENTILATION DUCTS
(1)
4. LOOSE THE HOLD-DOWN(3) AND DISENGAGE AND REMOVE THE STRAPS(2) KEEPING THE BATTERY(8)
5. REMOVE THE BATTERY
24-31-85
RAI 10020-006
2-400 PAGE
2
DEC 01/14
24-31-85
003
RAI 10020-006
3
DEC14
____________
INSTALLATION
REF.FIG.243115-RAI-00130
1. CLEAN AND INSPECT BATTERY(8) INTERFACE AND/
OR COMPONENT ADJACENT AREA
2. POSITION BATTERY INTO THE RELEVANT BOX(4)
3. INSTALL AND ENGAGE THE STRAPS(2) IN THE HOLD
-DOWN(3). CLAMP THE HOLD-DOWN
4. CONNECT THE TWO BATTERY VENTILATION DUCTS(1)
5. PLUG THE BATTERY ELECTRICAL CONNECTOR(7) BY
MEANS OF KNURLED KNOB(6). SAFETY CONNECTOR
6. PLUG THE OVERHEAT DETECTION ELECTRICAL CONNECTOR(5)
004
________
CLOSE-UP
REF.FIG.243115-RAI-00120-001(FIG.1) AND 243115RAI-00130-001(FIG.2)
1. ON L ELECTRONICS RACK
CLOSE ACCESS DOOR 221AZ
2. REMOVE THE WARNING NOTICE FROM PANEL 29VU
(FIG.1-C)
005
________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
006
___________________________
POWER
SUPPLY FROM BATTERIES
SEE JOB INSTRUCTION CARD
243100-EAD-10000
*****
AH
E N D
O F
T E X T
*****
24-31-85
RAI 10020-006
2-400 PAGE
3
DEC 01/14
24-31-85
4
AH
RAI 10020-006
DEC14
24-31-85
RAI 10020-006
2-400
PAGE
4
DEC 01/14
24-31-85
5
AH
RAI 10020-006
DEC14
24-31-85
RAI 10020-006
2-400
PAGE
5
DEC 01/14
24-32-00
OPT 10000-001
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
AH
72-00-00-ERU-10035
24-32-00
OPT 10000-001
2-400 PAGE
1
DEC 01/14
001
24-32-00
OPT 10000-001
2
DEC14
___________
PREPARATION
REF.FIG.244000-CHK-00100
OPEN SAFETY CLIPS AND TAG THE FOLLOWING CIRCUIT
BREAKERS:
- ON PANEL 21VU
3KF ENG CTL/ENG1/FEATH CTL & AFU
4KF ENG CTL/ENG2/FEATH CTL & AFU
- ON PANEL 121VU
1HA AIR BLEED/COMPT TEMP/ENG 1 BLEED/SO VALVE
/BLEED
2HA AIR BLEED/COMPT TEMP/ENG 2 BLEED/SO VALVE
/BLEED
1QG FUEL/LP VALVES/ENG1 MOTOR 1
2QG FUEL/LP VALVES/ENG2 MOTOR 1
3QG FUEL/LP VALVES/ENG1 MOTOR 2
4QG FUEL/LP VALVES/ENG2 MOTOR 2
- ON PANEL 122VU
28DM DE ICING/SO & REG/VALVES 1 & 2
2KY ENG IND/PROP BRK/PWR SPLY
4KY ENG IND/PROP BRK/CTL & IND
002
003
________________
OPERATIONAL
TEST
NOTE: FOR AIRCRAFT WITH PEC PLACE THE CONDITION
LEVER IN RPM OR AUTO POSITION.
IN THIS CONFIGURATION BOTH ACW GENERATORS
AND DC STARTER/GENERATORS ARE ON LINE
(ACW BUS OFF FOR ACW BUS 1 (2) AND
DC BUS OFF FOR DC BUS 1 (2)ARE OFF)
REF.FIG.261000-OPT-00100
1. ON OVERHEAD PANEL PULL ENG 1 (2) FIRE HANDLE
*** CONTINUED ***
AH
24-32-00
OPT 10000-001
2-400 PAGE
2
DEC 01/14
24-32-00
OPT 10000-001
3
DEC14
7WD (8WD).
WARNING: DO NOT PRESS THE SQUIBS PUSHBUTTONS
REF.FIG.243181-OPT-00100
2. ON PANEL 26VU MAKE CERTAIN THAT:
- FAULT LEGEND OF ACW GEN 1 (2) PUSHBUTTON
SWITCH 15XU (16XU) COMES ON.
3. ON PANEL 29VU MAKE CERTAIN THAT:
- FAULT LEGEND OF DC GEN 1 (2) PUSHBUTTON
SWITCH 23PU (24PU) COMES ON.
REF.FIG.242100-OPT-00100
4. ON PANEL 175WW MAKE CERTAIN THAT:
- ELEC CAUTION LIGHT COMES ON.
5. MAKE CERTAIN THAT:
- CAPT AND F/O MASTER CAUTION LIGHT COME ON
ON WITH THE ACTIVATION OF ASSOCIATED
SINGLE CHIME.
004
________
CLOSE
UP
1. ON OVERHEAD PANEL PUSH IN ENG 1 (2) FIRE
HANDLE
NOTE: WIRELOCK FIRE HANDLES WITH LOCKWIRE
DIA 1MM (0,04 IN) ANNEALED ALUMINIUM
1050A (A5)
2. CHECK THAT ALL FAULT LEGENDS AND CAUTION
LIGHTS ARE OFF
3. CLOSE THE FOLLOWING CIRCUIT BREAKERS:
- ON PANEL 21
3KF
4KF
- ON PANEL 121VU
*** CONTINUED ***
AH
24-32-00
OPT 10000-001
2-400 PAGE
3
DEC 01/14
24-32-00
OPT 10000-001
4
DEC14
1HA
2HA
1QG
2QG
3QG
4QG
- ON PANEL 122VU
28DM
8DN
2KY
4KY
005
________________
ENGINE
SHUT-DOWN
SEE JOB INSTRUCTION CARD
720000-ERU-10035
*****
AH
E N D
O F
T E X T
*****
24-32-00
OPT 10000-001
2-400 PAGE
4
DEC 01/14
24-32-00
5
AH
C/B PANELS
OPT 10000-001
DEC14
24-32-00
OPT 10000-001
2-400
PAGE
5
DEC 01/14
24-32-00
6
AH
OPT 10000-001
DEC14
24-32-00
OPT 10000-001
2-400
PAGE
6
DEC 01/14
24-32-00
7
AH
OPT 10000-001
DEC14
24-32-00
OPT 10000-001
2-400
PAGE
7
DEC 01/14
24-32-00
8
AH
OPT 10000-001
DEC14
24-32-00
OPT 10000-001
2-400
PAGE
8
DEC 01/14
24-32-00
OPT 10000-002
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
JIC
AH
72-00-00-ERU-10035
31-63-00-PRO-10000
24-32-00
OPT 10000-002
2-400 PAGE
1
DEC 01/14
24-32-00
001
OPT 10000-002
2
DEC14
___________
PREPARATION
REF.FIG.244000-CHK-00100
OPEN SAFETY CLIPS AND TAG THE FOLLOWING CIRCUIT
BREAKERS:
- ON PANEL 21VU
3KF ENG CTL/ENG1/FEATH CTL & AFU
4KF ENG CTL/ENG2/FEATH CTL & AFU
- ON PANEL 121VU
1HA AIR BLEED/COMPT TEMP/ENG 1 BLEED/SO VALVE
/BLEED
2HA AIR BLEED/COMPT TEMP/ENG 2 BLEED/SO VALVE
/BLEED
1QG FUEL/LP VALVES/ENG1 MOTOR 1
2QG FUEL/LP VALVES/ENG2 MOTOR 1
3QG FUEL/LP VALVES/ENG1 MOTOR 2
4QG FUEL/LP VALVES/ENG2 MOTOR 2
- ON PANEL 122VU
28DM DE ICING/SO & REG/VALVES 1 & 2
2KY ENG IND/CTL/PROP BRK/PWR IND
4KY ENG IND/CTL/PROP BRK/CTL & IND
002
003
24-32-00
OPT 10000-002
2-400 PAGE
2
DEC 01/14
24-32-00
OPT 10000-002
3
DEC14
________________
OPERATIONAL
TEST
NOTE: FOR AIRCRAFT WITH PEC PLACE THE CONDITION
LEVER IN RPM OR AUTO POSITION.
IN THIS CONFIGURATION BOTH ACW GENERATORS
AND DC STARTER/GENERATORS ARE ON LINE
(ACW BUS OFF FOR ACW BUS 1 (2) AND
DC BUS OFF FOR DC BUS 1 (2) ARE OFF).
REF. FIG. 261000-OPT-00100
1. ON LH EFCP, PRESS CLR PUSH BUTTON
2. ON OVERHEAD PANEL PULL ENG 1 (2) FIRE HANDLE
WARNING: DO NOT PRESS THE SQUIBS PUSHBUTTONS
REF. FIG. 243181-OPT-00100
3. ON PANEL 26VU MAKE CERTAIN THAT:
- FAULT LEGEND OF ACW GEN 1 (2) PUSHBUTTON
SWITCH COMES ON.
4. ON PANEL 29VU MAKE CERTAIN THAT:
- FAULT LEGEND OF DC GEN 1 (2) PUSHBUTTON
SWITCH COMES ON.
REF. FIG. 242100-OPT-00100
5. ON MFD UPPER WINDOW, IN ELEC SD PAGE
- AMBER DC GEN 1 FAULT SYMBOL IS DISPLAYED
- AMBER DC GEN 2 FAULT SYMBOL IS DISPLAYED
- YELLOW ARROWS SYMBOLS ARE DISPLAYED ON
EMER AND MAIN BAT
- AMBER AC BUS 1 OFF AND AC BUS 2 OFF
SYMBOL ARE DISPLAYED
- AMBER DC BUS 1 OFF AND DC BUS 2 OFF
SYMBOL ARE DISPLAYED
- SHED LEGENDS ABOVE UTLY BUS 1 AND
*** CONTINUED ***
AH
24-32-00
OPT 10000-002
2-400 PAGE
3
DEC 01/14
24-32-00
OPT 10000-002
4
DEC14
________
CLOSE
UP
1. ON OVERHEAD PANEL PUSH IN ENG 1 (2) FIRE
HANDLE
NOTE: WIRELOCK FIRE HANDLES WITH LOCKWIRE
DIA 1MM (0,04 IN) ANNEALED ALUMINIUM
1050A (A5)
2. CHECK THAT ALL FAULT LEGENDS AND CAUTION
LIGHTS ARE OFF
A. ON MFD UPPER WINDOW, IN ELEC SD PAGE
AND HYD/ACW PAGE:
- YELLOW ARROWS SYMBOLS ON MAIN AND
EMER BAT ARE NO LONGER DISPLAYED.
- SHED LEGENDS ARE NO LONGER DISPLAYED.
- ALL AMBER SYMBOLS PREVIOUSLY
*** CONTINUED ***
AH
24-32-00
OPT 10000-002
2-400 PAGE
4
DEC 01/14
24-32-00
OPT 10000-002
5
DEC14
________________
ENGINE
SHUT-DOWN
SEE JOB INSTRUCTION CARD
720000-ERU-10035
*****
AH
E N D
O F
T E X T
*****
24-32-00
OPT 10000-002
2-400 PAGE
5
DEC 01/14
24-32-00
6
AH
C/B PANELS
OPT 10000-002
DEC14
24-32-00
OPT 10000-002
2-400
PAGE
6
DEC 01/14
24-32-00
7
AH
OPT 10000-002
DEC14
24-32-00
OPT 10000-002
2-400
PAGE
7
DEC 01/14
24-32-00
8
AH
OPT 10000-002
DEC14
24-32-00
OPT 10000-002
2-400
PAGE
8
DEC 01/14
24-32-00
9
AH
OPT 10000-002
DEC14
24-32-00
OPT 10000-002
2-400
PAGE
9
DEC 01/14
24-32-61
CHECK OF STARTER
GENERATOR BRUSHES WEAR
CHK 10000-003
1
MAR15
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
AH
24-32-61-CHK-10005
24-32-61-CHK-10006
24-32-61
CHK 10000-003
2-400 PAGE
1
MAR 01/15
24-32-61
CHECK OF STARTER
GENERATOR BRUSHES WEAR
001
CHK 10000-003
2
MAR15
_______
CAUTION
THIS PROCEDURE IS NOT APPLICABLE FOR
STARTER-GENERATOR P/N 8260-124.
002
____
NOTE
FOR THIS PROCEDURE, TWO METHODS ARE PURPOSED
USING DIFFERENT TOOLS. CHOOSE JIC YOU WANT TO
PERFORM.
003
004
AH
E N D
O F
T E X T
*****
24-32-61
CHK 10000-003
2-400 PAGE
2
MAR 01/15
24-32-61
CHK 10005-002
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 436
446
: 436AR 446AR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
MECHANIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
AH
24-32-61
CHK 10005-002
2-400 PAGE
1
MAR 01/15
24-32-61
001
CHK 10005-002
2
MAR15
_______
CAUTION
THIS PROCEDURE IS NOT APPLICABLE FOR
STARTER-GENERATOR P/N 8260-124.
002
___________
PREPARATION
REF. FIG. 242261-RAI-00100
1. MAKE CERTAIN THAT THE GROUND POWER UNIT IS
NOT CONNECTED TO THE DC EXTERNAL POWER
RECEPTACLE (ON PANEL 5002VU / DETAIL D)
AND TO THE AC EXTERNAL POWER RECEPTACLE (ON
PANEL 5000VU / DETAIL B) AND THE ACCESS
DOORS 114BR (DETAIL C) AND 114CR (DETAIL A)
ARE CLOSED.
2. DISPLAY A WARNING NOTICE ON PANELS 27VU
(DETAIL F) AND 29VU (DETAIL E) PROHIBITING
POWER SUPPLY TO THE SYSTEM AND ENGINE
STARTING.
3. OPEN ENGINE COWLS 436AR(446AR).
003
24-32-61
CHK 10005-002
2-400 PAGE
2
MAR 01/15
24-32-61
CHK 10005-002
3
MAR15
24-32-61
CHK 10005-002
2-400 PAGE
3
MAR 01/15
24-32-61
CHK 10005-002
4
MAR15
IF B EXPRESSED IN MILLIMETERS:
Y=(B-1) X FH / (23-B)
Y
B
24-32-61
CHK 10005-002
2-400 PAGE
4
MAR 01/15
24-32-61
CHK 10005-002
5
MAR15
POSITION.
004
________
CLOSE
UP
REF. FIG. 242261-RAI-00100
1. CLOSE ENGINE COWLS.
2. REMOVE WARNING NOTICE FROM PANELS 27VU AND
29VU.
*****
AH
E N D
O F
T E X T
*****
24-32-61
CHK 10005-002
2-400 PAGE
5
MAR 01/15
24-32-61
6
AH
CHK 10005-002
MAR15
24-32-61
CHK 10005-002
2-400
PAGE
6
MAR 01/15
24-32-61
7
AH
CHK 10005-002
MAR15
24-32-61
CHK 10005-002
2-400
PAGE
7
MAR 01/15
24-32-61
CHK 10006-002
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 436
446
: 436AR 446AR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
MECHANIC
ELAPSED TIME
GSE
: 01 BRUSH GAUGE
AH
___
MEN
_________
MAN-HOURS
01
P611845
24-32-61
CHK 10006-002
2-400 PAGE
1
MAR 01/15
24-32-61
001
CHK 10006-002
2
MAR15
_______
CAUTION
THIS PROCEDURE IS NOT APPLICABLE FOR
STARTER-GENERATOR P/N 8260-124.
002
___________
PREPARATION
REF. FIG. 242261-RAI-00100
1. MAKE CERTAIN THAT THE GROUND POWER UNIT IS
NOT CONNECTED TO THE DC EXTERNAL POWER
RECEPTACLE (ON PANEL 5002VU / DETAIL D)
AND TO THE AC EXTERNAL POWER RECEPTACLE (ON
PANEL 5000VU / DETAIL B) AND THE ACCESS
DOORS 114BR (DETAIL C) AND 114CR (DETAIL A)
ARE CLOSED.
2. DISPLAY A WARNING NOTICE ON PANELS 27VU
(DETAIL F) AND 29VU (DETAIL E) PROHIBITING
POWER SUPPLY TO THE SYSTEM AND ENGINE
STARTING.
3. OPEN ENGINE COWLS 436AR(446AR).
003
24-32-61
CHK 10006-002
2-400 PAGE
2
MAR 01/15
24-32-61
CHK 10006-002
3
MAR15
24-32-61
CHK 10006-002
2-400 PAGE
3
MAR 01/15
24-32-61
CHK 10006-002
4
MAR15
________
CLOSE
UP
REF. FIG. 242261-RAI-00100
1. CLOSE ENGINE COWLS.
2. REMOVE WARNING NOTICE FROM PANELS 27VU AND
29VU.
*****
AH
E N D
O F
T E X T
*****
24-32-61
CHK 10006-002
2-400 PAGE
4
MAR 01/15
24-32-61
5
AH
CHK 10006-002
MAR15
24-32-61
CHK 10006-002
2-400
PAGE
5
MAR 01/15
24-32-61
6
AH
CHK 10006-002
MAR15
24-32-61
CHK 10006-002
2-400
PAGE
6
MAR 01/15
24-32-61
7
AH
ANALYSIS OF RESULTS
CHK 10006-002
MAR15
24-32-61
CHK 10006-002
2-400
PAGE
7
MAR 01/15
24-32-61
DC STARTER/GENERATOR 1/2
REMOVAL AND INSTALLATION
RAI 10000-002
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 436
446
: 436AR 446AR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
MECHANIC
___
MEN
_________
MAN-HOURS
01
ELAPSED TIME
SPARE
: 01 STARTER/GENERATOR-1PU(L)
01 STARTER/GENERATOR-1PU(R)
243260
243260
EXPENDABLE
: 02 O-RING
02 LOCKING-RING
02 O-RING, DRAIN
243260
243260
243260
04-004
03-002
08-038
PUBLICATION
___________
JIC
JIC
JIC
AH
72-00-00-ERU-10030
72-01-50-PWC-00000
54-00-00-OAC-10000
24-32-61
RAI 10000-002
2-400 PAGE
1
MAR 01/15
24-32-61
DC STARTER/GENERATOR 1/2
REMOVAL AND INSTALLATION
001
RAI 10000-002
2
MAR15
_______
CAUTION
IN CASE OF NEW STARTER-GENERATOR P/N 8260-124
INSTALLATION IN PLACE OF S/G OLDER P/N}S,
VERIFY THAT A/C IS WELL EQUIPPED WITH
MOD-07200 (OR ASSOCIATED SB) FOR FUEL DRAIN
REPLACEMENT.
002
___________
PREPARATION
REF.FIG.242261-RAI-00100 (FIG.1)
REF.FIG.243261-RAI-00100 (FIG.2)
1. MAKE CERTAIN THAT THE GROUND POWER UNIT IS
NOT CONNECTED TO DC EXTERNAL POWER RECEPTACLE (ON PANEL 5002VU-FIG.1-D) AND TO AC EXTERNAL POWER RECEPTACLE (ON PANEL 5000VUFIG.1-B)AND THAN THE ACCESS DOORS 114BR
(FIG.1-C) AND 114CR (FIG.1-A) ARE CLOSED
2. ON PANEL 29VU(FIG.1-E) MAKE CERTAIN THAT:
BAT SELECTOR SWITCH 7PA IS IN OFF POSITION
3. DISPLAY A WARNING NOTICE ON PANELS 27VU(FIG.
1-F) AND 29VU, PROHIBITING POWER SUPPLY TO
THE SYSTEM AND ENGINE STARTING
4. OPEN ACCESS DOOR 436AR (446AR) (FIG.2-A)
003
_______________________________
REMOVAL
OF DC STARTER/GENERATOR
REF.FIG.243261-RAI-00100 (FIG.A)
REF.FIG.243261-RAI-00110 (FIG.B)
01. UNPLUG ELECTRICAL CONNECTORS (FIG.B-6)
02. PUT BLANKING CAP ON ELECTRICAL CONNECTORS
03. SLIDE GENERATOR TERMINAL PROTECTIVE CAP
(FIG.A-14)
*** CONTINUED ***
AH
24-32-61
RAI 10000-002
2-400 PAGE
2
MAR 01/15
24-32-61
DC STARTER/GENERATOR 1/2
REMOVAL AND INSTALLATION
RAI 10000-002
3
MAR15
24-32-61
RAI 10000-002
2-400 PAGE
3
MAR 01/15
24-32-61
DC STARTER/GENERATOR 1/2
REMOVAL AND INSTALLATION
RAI 10000-002
4
MAR15
_________________________________
INSTALLATION
OF STARTER/GENERATOR
REF.FIG.243261-RAI-00100 (FIG.A)
REF.FIG.243261-RAI-00110 (FIG.B)
NOTE: FOR ADAPTER (FIG.B-8) THE TORQUE VALUE OF NUTS (FIG.B-9) IS BETWEEN 3.1
AND 3.4 M.DAN (275 AND 300 LBF X IN)
01. POSITION NEW O-RING (FIG.B-4) LUBRICATED
WITH SYNTHETIC OIL
NOTE: IF THE SHAFT SEAL IS NOT PROPERLY
INSTALLED, THERE WOULD BE HIGH RISK OF
ENGINE IFSD DUE TO OIL LOW PRESSURE
02. CLEAN AND INSPECT ENGINE HOUSING AND STARTER/GENERATOR INTERFACE AREA
03. LUBRICATE STARTER/GENERATOR (FIG.B-1) DRIVE
SHAFT BEFORE INSTALLATION WITH SYNTHETIC
GREASE
NOTE: STARTER/GENERATOR MUST BE INSTALLED
VERY CAREFULLY TO AVOID DAMAGING SPLI
NED DRIVE SHAFT AND O-RING
CAUTION:INSTALL BOTH HALF-RINGS (FIG.B-11) AND
CLAMP (FIG. B-10) FOLLOWING THE
INDICATIONS RECORDED DURING THE
REMOVAL.
04. INSTALL STARTER/GENERATOR ON ENGINE, ALIGN
WITH LOCATORS AND ATTACH BY MEANS OF
CLAMP (FIG.B-10) EQUIPPED WITH BOTH HALFRINGS (FIG.B-11) AND SAFETY WITH LOCKWIRE.
NOTE: THE APPLICABLE TORQUE VALUE IS BETWEEN 0.25 AND 0.30 M.DAN (21.6 AND 26
*** CONTINUED ***
AH
24-32-61
RAI 10000-002
2-400 PAGE
4
MAR 01/15
24-32-61
DC STARTER/GENERATOR 1/2
REMOVAL AND INSTALLATION
RAI 10000-002
5
MAR15
LBF.IN)
05. INSTALL VENTILATION DUCT (FIG.B-3)
06. INSTALL NUTS (FIG.B-2) SECURING VENTILATION
DUCT. TIGHTEN NUTS
NOTE: THE APPLICABLE TORQUE VALUE IS BETWEEN 0.45 AND 0.5 M.DAN (39 AND 44 LBF
X IN)
07. REMOVE BLANKING CAP FROM DRAIN LINE (FIG.B5)
08. CONNECT DRAIN LINE
NOTE: INSTALL A NEW O-RING (FIG.B-12)
CAUTION: ASSURE POWER WIRES ARE PROPERLY
CONNECTED TO RELEVANT GENERATOR
STUDS. IF NOT, THERE IS A HIGH
RISK OF MULTIPLE EQUIPMENT FAILURES
DUE TO GENERATOR OVERVOLTAGE.
09. CONNECT TERMINAL LUGS OF POWER SUPPLY WIRES
(FIG.A-1E AND 2B) AND THOSE OF MONITORING
WIRES (FIG.A-11A, 13D AND 12E) SO AS THEY
HAVE BEEN MARKED IN THE REMOVAL AND SECURE
BY MEANS OF WASHERS (FIG.A-8,6,10 AND 4)
AND NUTS (FIG.A-9,3,7 AND 5). TIGHTEN NUTS
NOTE: THE TIGHTENING TORQUES INDICATED
IN THE FOLLOWING TABLE FOR
ELECTRICAL CONNECTIONS ARE MANDATORY
------------------------------------------NUT ( WIRE )
TIGHTENING TORQUE
7 ( 11A )
0.4 M.DAN ( 35 LBF.IN )
5 ( 13D )
0.25 M.DAN ( 22 LBF.IN )
3 ( 2B )
1.2 M.DAN ( 106 LBF.IN )
9 (1E-12E)
1.9 M.DAN ( 168 LBF.IN )
------------------------------------------NOTE: USE PIPE WRENCHES TO PREVENT DAMAGING
THE SIDES OF THE TERMINAL BLOCK.
*** CONTINUED ***
AH
24-32-61
RAI 10000-002
2-400 PAGE
5
MAR 01/15
24-32-61
DC STARTER/GENERATOR 1/2
REMOVAL AND INSTALLATION
RAI 10000-002
6
MAR15
________
CLOSE
UP
REF.FIG.242261-RAI-00100 (FIG.1)
REF.FIG.243261-RAI-00100 (FIG.2)
1. CLOSE ENGINE COWL 436AR (446AR) (FIG.2-A)
2. REMOVE WARNING NOTICES FROM PANELS 27VU (FIG
1-F) AND 29VU (FIG.1-E)
006
_________________________
ENGINE
GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030
007
______________________________
LEAK
CHECK AFTER ENGINE RUN-UP
SEE JOB INSTRUCTION CARD
(PRATT & WHITNEY CANADA MAINTENANCE MANUAL,
CHAPTER 72-01-50, PAGE BLOCK 500).
1. PERFORM ENGINE RUN-UP AS REQUIRED BY
PRATT & WHITNEY CANADA.
2. CHECK FOR OIL LEAKS AFTER ENGINE SHUT DOWN.
*** CONTINUED ***
AH
24-32-61
RAI 10000-002
2-400 PAGE
6
MAR 01/15
24-32-61
DC STARTER/GENERATOR 1/2
REMOVAL AND INSTALLATION
008
RAI 10000-002
7
MAR15
______________________________________
SHUT
DOWN OF ENGINE GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030
009
_______________________
OPENING
OF HINGED COWLS
SEE JOB INSTRUCTION CARD
540000-OAC-10000
010
011
______________________________
CLOSING
OF HINGED ENGINE COWLS
SEE JOB INSTRUCTION CARD
540000-OAC-10000
*****
AH
E N D
O F
T E X T
*****
24-32-61
RAI 10000-002
2-400 PAGE
7
MAR 01/15
24-32-61
8
AH
RAI 10000-002
MAR15
24-32-61
RAI 10000-002
2-400
PAGE
8
MAR 01/15
24-32-61
9
AH
GENERATOR TERMINAL
RAI 10000-002
MAR15
24-32-61
RAI 10000-002
2-400
PAGE
9
MAR 01/15
24-32-61
10
AH
RAI OF DC STARTER/
GENERATOR
RAI 10000-002
MAR15
24-32-61
RAI 10000-002
2-400
PAGE
10
MAR 01/15
24-32-61
REMOVAL/INSTALLATION OF
STARTER GENERATOR
BRUSHES
RAI 10010-002
1
MAR15
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
: DC STARTER/GENERATOR 1/2
REMOVAL AND INSTALLATION
AH
24-32-61-RAI-10000
24-32-61
RAI 10010-002
2-400 PAGE
1
MAR 01/15
24-32-61
REMOVAL/INSTALLATION OF
STARTER GENERATOR
BRUSHES
001
RAI 10010-002
2
MAR15
_______
CAUTION
THIS PROCEDURE IS NOT APPLICABLE FOR
STARTER-GENERATOR P/N 8260-124.
002
________________________________
DC
STARTER/GENERATOR 1/2 REMOVAL
SEE JOB INSTRUCTION CARD
243261-RAI-10000
003
___________________
BRUSHES
REPLACEMENT
REFER TO SIL OF MANUFACTURER 8260-12X-24-017
004
_____________________________________
DC
STARTER/GENERATOR 1/2 INSTALLATION
SEE JOB INSTRUCTION CARD
243261-RAI-10000
*****
AH
E N D
O F
T E X T
*****
24-32-61
RAI 10010-002
2-400 PAGE
2
MAR 01/15
24-32-61
3
AH
RAI 10010-002
MAR15
24-32-61
RAI 10010-002
2-400
PAGE
3
MAR 01/15
24-32-81
OPT 10000-001
1
MAR13
ZONING DATA
___________
ZONE
ACCESS
: 214
: 214BZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELECTRIC
ELAPSED TIME
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
AH
24-31-00-EAD-10000
24-32-81
OPT 10000-001
2-400 PAGE
1
MAR 01/13
24-32-81
001
OPT 10000-001
2
MAR13
___________
PREPARATION
REF. FIG. 240000-RAI-00103
1. ON R ELECTRONICS RACK 90VU (B)
OPEN ACCESS DOOR 214BZ
002
_________________________________
ENERGIZING
OF SYSTEM FROM BATTERY
SEE JOB INSTRUCTION CARD
243100-EAD-10000
003
__________________________________________
DC
GENERATOR CONTROL UNIT OPERATIONAL TEST
REF.FIG.243211-OPT-00100
1. ON R ELECTRONICS RACK 90VU SHELF 5(4) (A)
ON DC GCU1(2) FRONT PANEL(B OR C) PRESS THE
CC SWITCH AND VERIFY THAT THE CC INDICATOR
LIGHT COMES ON. AFTER 15 SEC, IF GCU
OPERATES CORRECTLY, CC INDICATOR LIGHT GOES
OFF.IF A FAILURE IS DETECTED, THE CC
INDICATOR LIGHT REMAINS ON AS LONG AS THE
CC SWITCH IS PRESSED.
004
____________________________________
DE-ENERGIZING
OF SYSTEM FROM BATTERY
SEE JOB INSTRUCTION CARD
243100-EAD-10000
005
________
CLOSE
UP
REF.FIG.240000-RAI-00103
1. ON R ELECTRONICS RACK 90VU (B)
CLOSE ACCESS DOOR 214BZ
*****
AH
E N D
O F
T E X T
*****
24-32-81
OPT 10000-001
2-400 PAGE
2
MAR 01/13
24-32-81
3
AH
OPT 10000-001
MAR13
24-32-81
OPT 10000-001
2-400
PAGE
3
MAR 01/13
24-32-81
RAI 10000-002
1
APR07
ZONING DATA
___________
ZONE
ACCESS
: 210
214
: 122VU 124VU 125VU 127VU 128VU
214BZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELECTRIC
ELAPSED TIME
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
AH
24-32-81-OPT-10000
24-32-81
RAI 10000-002
2-400 PAGE
1
APR 01/07
24-32-81
001
RAI 10000-002
2
APR07
___________
PREPARATION
REF. FIG. 240000-RAI-00103
1. OPEN, SAFETY CLIP AND TAG THE FOLLOWING CIRCUIT BREAKERS:
- ON PANEL 122VU (A)
8PG MAIN ELEC PWR-DC/DC EXT PWR INTLK
15PG MAIN ELEC PWR-DC/BPCU DC
35PU(38PU) MAIN ELEC PWR-DC/GCU DC GEN 1
(GCU DC GEN 2)
- ON PANEL 124VU (A)
54PU DC BUS 2 V SNSG/GCU 2
- ON PANEL 125VU (A)
4PG EXT PWR/BPCU CTL
13PU(14PU ON PANEL 128VU) DC GEN1(DC GEN
2)/CTL/EXCN
51PU(52PU ON PANEL 128VU) DC GEN1(DC GEN
2)/CTL/POR
- ON PANEL 127VU (A)
53PU DC GEN1/CTL/BUS V SNSG
2. ON R ELECTRONICS RACK 90VU (B)
OPEN ACCESS DOOR:
- 214BZ
002
24-32-81
RAI 10000-002
2-400 PAGE
2
APR 01/07
24-32-81
RAI 10000-002
3
APR07
____
NOTE
THE GCU IS DELIVERED 29VDC SETTING.
TO IMPROVE THE PERFORMANCE OF THE BATTERY :
- SET 28 VDC VALUE FOR OPERATION IN HIGH
AMBIENT TEMPERATURE. (FOLLOWING GCU COMPONANT
MAINTENANCE MANUAL)
- SET 30VDC VALUE FOR OPERATION IN LOW
AMBIENT TEMPERATURE. (FOLLOWING GCU COMPONANT
MAINTENANCE MANUAL)
004
005
________
CLOSE
UP
REF.FIG.240000-RAI-00103
1. ON R ELECTRONICS RACK 90VU (B)
*** CONTINUED ***
AH
24-32-81
RAI 10000-002
2-400 PAGE
3
APR 01/07
24-32-81
RAI 10000-002
4
APR07
____________________________________
DC
GEN CONTROL UNIT OPERATIONAL TEST
SEE JOB INSTRUCTION CARD
243281-OPT-10000
*****
AH
E N D
O F
T E X T
*****
24-32-81
RAI 10000-002
2-400 PAGE
4
APR 01/07
24-32-81
5
AH
RAI 10000-002
APR07
24-32-81
RAI 10000-002
2-400
PAGE
5
APR 01/07
24-32-81
6
AH
L AND R ELECTRONICS
RACKS 80VU AND 90VU
EQUIPMENT
RAI 10000-002
APR07
24-32-81
RAI 10000-002
2-400
PAGE
6
APR 01/07
24-32-83
DC GEN CONTACTOR
REMOVAL AND INSTALLATION
RAI 10000-001
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 212
220
: 212TZ 212VZ 214BZ 214PZ 222CZ 222QZ 222RZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
SPARE
: 02
01
01
01
AH
___
MEN
_________
MAN-HOURS
01
CONTACTOR:11PU-12PU
TERMINAL STRIP: 8PP
TERMINAL STRIP: 7PP
TERMINAL STRIP:13PP
24-32-80-XX-XXX
24-69-80-XX-XXX
24-69-80-XX-XXX
24-69-80-XX-XXX
24-32-83
RAI 10000-001
2-400 PAGE
1
MAR 01/15
24-32-83
DC GEN CONTACTOR
REMOVAL AND INSTALLATION
001
RAI 10000-001
2
MAR15
___________
PREPARATION
REF. FIG. 240000-RAI-00100 (FIG.1)
REF. FIG. 240000-RAI-00103 (FIG.2)
1. MAKE CERTAIN THAT THE GROUND POWER UNIT IS
NOT CONNECTED TO THE DC AND AC EXTERNAL POWER RECEPTACLES (ON PANELS 5002VU AND 5000VU
-FIG.1-F AND D) AND THE ACCESS DOORS 114BR
AND 114CR (FIG.1-E AND C) ARE CLOSED
2. ON PANEL 29VU (FIG.1-A) MAKE CERTAIN THAT:
BAT SELECTOR SWITCH 7PA IS IN OFF POSITION
3. DISPLAY A WARNING NOTICE ON PANELS 29VU AND
26VU (FIG.1-B) PROHIBITING POWER SUPPLY TO
SYSTEM
4. ON DC/AC POWER CENTER 120VU OR ON ELECTRONICS RACK 90VU (FIG.2 A AND B AND THE CORRESPONDING FIGURE OF EACH RAI)
120VU: REMOVE ACCESS PANEL 212TZ OR 212VZ
(123VU) OR CIRCUIT BREAKER PANEL 121V
U OR 122VU OR 124VU OR 125VU OR 126VU
OR 127VU OR 128VU OR 129VU OR 130VU
90VU - SIDE SHELF: REMOVE ACCESS PANEL 222RZ
(SHELF 91VU) OR 222QZ (SHELF 91VU OR
92VU OR 93VU) OR 222PZ (SHELF 94VU OR
95VU)
- FRONT SHELF: REMOVE ACCESS PANEL 214
CZ(SHELF 91VU OR 92VU) OR 214BZ(SHELF
93VU OR 94VU OR 95VU)
002
___________________________
REMOVAL
OF DC GEN CONTACTOR
REF.FIG.243213-RAI-00100
1. REMOVE NUTS (3) AND WASHERS (4) TO DISCONNECT THE CONTACTOR (1) FROM TERMINAL STRIPS
8PP (2), 7PP (5) AND 13PP (6)
*** CONTINUED ***
AH
24-32-83
RAI 10000-001
2-400 PAGE
2
MAR 01/15
24-32-83
DC GEN CONTACTOR
REMOVAL AND INSTALLATION
RAI 10000-001
3
MAR15
________________________________
INSTALLATION
OF DC GEN CONTACTOR
REF.FIG.243213-RAI-00100
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/
OR COMPONENT ADJACENT AREA.
2. INSTALL CONTACTOR (1) WITH ITS ELECTRICAL
CONNECTOR (7)
3. TIGHTEN CAPTIVE SCREWS (8)
4. CONNECT CONTACTOR TO TERMINAL STRIPS 8PP
(2), 7PP(5) AND 13PP (6)
5. INSTALL WASHERS (4) AND NUTS (3). TIGHTEN
NUTS (TIGHTENING TORQUE VALUE: 1,65 MDAN /
146 LBF X IN)
NOTE: MARK NUTS (3) WITH RED VARNISH
004
________
CLOSE
UP
REF. FIG. 240000-RAI-00100 (FIG.1)
REF. FIG. 240000-RAI-00103 (FIG.2)
1. ON DC/AC POWER CENTER 12OVU OR ON ELECTRONICS RACK 90VU (FIG.2 A OR B AND THE CORRESPONDING FIGURE OF EACH RAI)
120VU: CLOSE ACCESS PANEL 212TZ OR 212VZ OR
CIRCUIT BREAKER PANEL 121VU OR 122VU
OR 124VU OR 125VU OR 127VU OR 128VU
OR 129VU OR 130VU
90VU - SIDE SHELF: CLOSE ACCESS PANEL 222RZ
OR 222QZ OR 222PZ
*** CONTINUED ***
AH
24-32-83
RAI 10000-001
2-400 PAGE
3
MAR 01/15
24-32-83
DC GEN CONTACTOR
REMOVAL AND INSTALLATION
RAI 10000-001
4
MAR15
________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****
AH
E N D
O F
T E X T
*****
24-32-83
RAI 10000-001
2-400 PAGE
4
MAR 01/15
24-32-83
5
AH
RAI 10000-001
MAR15
24-32-83
RAI 10000-001
2-400
PAGE
5
MAR 01/15
24-32-83
6
AH
RAI 10000-001
MAR15
24-32-83
RAI 10000-001
2-400
PAGE
6
MAR 01/15
24-32-83
7
AH
RAI 10000-001
MAR15
24-32-83
RAI 10000-001
2-400
PAGE
7
MAR 01/15
24-32-87
RAI 10000-001
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 212
220
: 212TZ 212VZ 214BZ 214PZ 222CZ 222FZ 222KZ 222QZ 222RZ
91VU
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
SPARE
: 04 SENSORS
AH
___
MEN
_________
MAN-HOURS
01
24-32-10-04-010
24-32-87
RAI 10000-001
2-400 PAGE
1
MAR 01/15
24-32-87
001
RAI 10000-001
2
MAR15
___________
PREPARATION
REF. FIG. 240000-RAI-00100 (FIG.1)
REF. FIG. 240000-RAI-00103 (FIG.2)
1. MAKE CERTAIN THAT THE GROUND POWER UNIT IS
NOT CONNECTED TO THE DC AND AC EXTERNAL POWER RECEPTACLES (ON PANELS 5002VU AND 5000VU
-FIG.1-F AND D) AND THE ACCESS DOORS 114BR
AND 114CR (FIG.1-E AND C) ARE CLOSED
2. ON PANEL 29VU (FIG.1-A) MAKE CERTAIN THAT:
BAT SELECTOR SWITCH 7PA IS IN OFF POSITION
3. DISPLAY A WARNING NOTICE ON PANELS 29VU AND
26VU (FIG.1-B) PROHIBITING POWER SUPPLY TO
SYSTEM
4. ON DC/AC POWER CENTER 120VU OR ON ELECTRONICS RACK 90VU (FIG.2 A AND B AND THE CORRESPONDING FIGURE OF EACH RAI)
120VU: REMOVE ACCESS PANEL 212TZ OR 212VZ
(123VU) OR CIRCUIT BREAKER PANEL 121V
U OR 122VU OR 124VU OR 125VU OR 126VU
OR 127VU OR 128VU OR 129VU OR 130VU
90VU - SIDE SHELF: REMOVE ACCESS PANEL 222RZ
(SHELF 91VU) OR 222QZ (SHELF 91VU OR
92VU OR 93VU) OR 222PZ (SHELF 94VU OR
95VU)
- FRONT SHELF: REMOVE ACCESS PANEL 214
CZ(SHELF 91VU OR 92VU) OR 214BZ(SHELF
93VU OR 94VU OR 95VU)
002
_______
REMOVAL
REF.FIG.243287-RAI-00100
NOTE: THE REMOVAL AND INSTALLATION OF THESE
SENSORS BEING SIMILAR, ONLY THAT RELEVANT TO 77PU WILL BE DESCRIBED
*** CONTINUED ***
AH
24-32-87
RAI 10000-001
2-400 PAGE
2
MAR 01/15
24-32-87
RAI 10000-001
3
MAR15
____________
INSTALLATION
REF.FIG.243287-RAI-00100
01. CUT SENSOR WIRE TO REQUIRED LENGTH
02. INSTALL SHEATH (6) ON SENSORS WIRES
03. CONNECT SENSOR WIRES TO ELECTRICAL CONNECTOR (5) FOLLOWING IDENTIFICATION DURING
REMOVAL
*** CONTINUED ***
AH
24-32-87
RAI 10000-001
2-400 PAGE
3
MAR 01/15
24-32-87
RAI 10000-001
4
MAR15
________
CLOSE
UP
REF. FIG. 240000-RAI-00100 (FIG.1)
REF. FIG. 240000-RAI-00103 (FIG.2)
1. ON DC/AC POWER CENTER 12OVU OR ON ELECTRONICS RACK 90VU (FIG.2 A OR B AND THE CORRESPONDING FIGURE OF EACH RAI)
120VU: CLOSE ACCESS PANEL 212TZ OR 212VZ OR
CIRCUIT BREAKER PANEL 121VU OR 122VU
OR 124VU OR 125VU OR 127VU OR 128VU
OR 129VU OR 130VU
90VU - SIDE SHELF: CLOSE ACCESS PANEL 222RZ
OR 222QZ OR 222PZ
- FRONT SHELF: CLOSE ACCESS PANEL 214CZ
OR 214BZ
2. REMOVE THE WARNING NOTICE FROM PANELS 29VU
AND 26VU (FIG.1-A AND B)
*** CONTINUED ***
AH
24-32-87
RAI 10000-001
2-400 PAGE
4
MAR 01/15
24-32-87
005
RAI 10000-001
5
MAR15
________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****
AH
E N D
O F
T E X T
*****
24-32-87
RAI 10000-001
2-400 PAGE
5
MAR 01/15
24-32-87
6
AH
RAI 10000-001
MAR15
24-32-87
RAI 10000-001
2-400
PAGE
6
MAR 01/15
24-32-87
7
AH
RAI 10000-001
MAR15
24-32-87
RAI 10000-001
2-400
PAGE
7
MAR 01/15
24-32-87
8
AH
RAI 10000-001
MAR15
24-32-87
RAI 10000-001
2-400
PAGE
8
MAR 01/15
24-40-00
CHECK OF CIRCUIT
BREAKERS
CHK 10000-001
1
MAR14
ZONING DATA
___________
ZONE
: 210
250
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
MECHANIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
AH
24-40-00
CHK 10000-001
2-400 PAGE
1
MAR 01/14
24-40-00
CHECK OF CIRCUIT
BREAKERS
001
CHK 10000-001
2
MAR14
_________________________
CHECK
OF CIRCUIT BREAKERS
REF.FIG.244000-CHK-00100
1. PUSH AND PULL ALL CIRCUIT BREAKERS LOCATED
IN THE FOLLOWING AREAS:
A. FLIGHT COMPARTMENT
- OVERHEAD PANEL 20VU (B): SECTION 21VU
- AC/DC POWER CENTER 120VU (A): SECTIONS
121VU, 122VU, 124VU, 125VU, 126VU,
127VU, 128VU, 129VU AND 130VU
B. AFT PASSENGER COMPT END AND/OR GALLEY
(FLIGHT) ATTENDANT PANEL (C)
2. CHECK THAT THEY ARE NOT MECCANICALLY STUCK
NOTE: DO NOT ENERGIZE THE AIRCRAFT
*****
AH
E N D
O F
T E X T
*****
24-40-00
CHK 10000-001
2-400 PAGE
2
MAR 01/14
24-40-00
3
AH
C/B PANELS
CHK 10000-001
MAR14
24-40-00
CHK 10000-001
2-400
PAGE
3
MAR 01/14
24-40-00
EAD 10000-003
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 114
210
: 114BR 114CR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
GSE
AH
___
MEN
_________
MAN-HOURS
24-40-00
EAD 10000-003
2-400 PAGE
1
DEC 01/14
24-40-00
001
EAD 10000-003
2
DEC14
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
002
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
_______
WARNING
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
1. BEFORE PROVIDING ELECTRICAL POWER SUPPLY TO
AIRCRAFT MAKE CERTAIN THAT SAFETY RULES MUST
BE OBSERVED.
2. ON (FLIGHT)ATTENDANT PANEL MAKE
CERTAIN THAT:
- P/BSW GND SVCE BUS DC IS
IN RELEASED POSITION.
- P/BSW GND SVCE BUS ACWIS
IN RELEASED POSITION.
3. ON PANEL 29VU MAKE CERTAIN THAT:
- SELECTOR SWITCH BAT IS IN OFF POSITION.
- P/BSW EXT PWR IS IN RELEASED POSITION.
- P/BSW MAIN ELEC PWR/DC SVCE/ULTY BUS
IS IN RELEASED POSITION.
4. ON PANEL 26VU MAKE CERTAIN THAT:
P/BSW EXT PWR IS IN RELEASED POSITION.
003
___________
PREPARATION
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
REF.FIG.244600-EAD-00110
*** CONTINUED ***
AH
24-40-00
EAD 10000-003
2-400 PAGE
2
DEC 01/14
24-40-00
EAD 10000-003
3
DEC14
REF.FIG.244100-EAD-00110
1. (ONLY IF THE A/C IS ON JACKS) ON PANEL 702VU
PLACE NORM/FLT MODE SWITCH IN FLT POSITION
2. ON PANEL 29VU
PLACE BAT SELECTOR SWITCH IN ON POSITION
AND CHECK THAT:
- TWO ARROW LEGENDS OF BAT TIE CAUTION LIGHT
COME ON
- BUS OFF 1 AND 2 AND INV2 FAULT LEGENDS OF
CAUTION LIGHTS COME ON
- DC BUS1 AND 2 OFF CAUTION LIGHTS COME ON
- SHED AND OFF LEGENDS OF DC SVCE/UTLY BUS
PUSHBUTTON SWITCH COME ON
NOTE: ON AIRCRAFT EQUIPPED WITH GROUND PROXIMITY WARNING SYSTEM (GPWS) WHOOP-WHOOP
-PULL UP WARNING SOUNDS WHEN THE SYSTEM IS ENERGIZED.
3. ON PANEL 26VU CHECK THAT:
ACW BUS1 AND 2 OFF CAUTION LIGHTS COME ON
REF. FIG. 244600-EAD-00110
4. OPEN DOOR 114BR GIVING ACCESS
TO DC EXTERNAL POWER RECEPTACLE
REF. FIG. 244100-EAD-00100
5. OPEN DOOR 114CR GIVING ACCESS
TO AC EXTERNAL POWER RECEPTACLE
REF. FIG. 244600-EAD-00110
6. ON PANEL 5002VU PLUG IN THE
GROUND POWER UNIT PLUG TO RECEPTACLE
REF. FIG. 244100-EAD-00100
*** CONTINUED ***
AH
24-40-00
EAD 10000-003
2-400 PAGE
3
DEC 01/14
24-40-00
EAD 10000-003
4
DEC14
24-40-00
EAD 10000-003
2-400 PAGE
4
DEC 01/14
24-40-00
EAD 10000-003
5
DEC14
_______________________________________
ENERGIZING
OF AC WILD FREQUENCY NETWORK
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
1. ON PANEL 101VU
A. PLACE ELEC IND SELECTOR SWITCH IN EXT PWR
POSITION
B. VERIFY THAT THE VOLTAGE ON AC VOLTMETER
IS 115V AND THE FREQUENCY 400HZ
C. MAKE CERTAIN THAT ELEC/ACW BTC OPNG
SWITCH IS IN NORM FLT POSITION
2. ON PANEL 26VU
A. MAKE CERTAIN THAT:
- AVAIL LEGEND OF EXT PWR PUSHBUTTON
SWITCH IS ON
- BTC PUSHBUTTON SWITCH IS IN RELEA*** CONTINUED ***
AH
24-40-00
EAD 10000-003
2-400 PAGE
5
DEC 01/14
24-40-00
EAD 10000-003
6
DEC14
SED POSITION
B. PRESS PUSHBUTTON SWITCH
- ON LEGEND COMES ON
C. VERIFY THAT:
- THE FLOW BAR LEGEND OF BTC PUSHBUTTON
SWITCH COMES ON
- ACW BUS1 AND 2 CAUTION LIGHTS ARE OFF
REF. FIG. 244100-EAD-00100
3. ON PANEL 5000VU CHECK THAT:
AC PWR NOT USED INDICATOR LIGHT GOES
OFF
006
24-40-00
EAD 10000-003
2-400 PAGE
6
DEC 01/14
007
24-40-00
EAD 10000-003
7
DEC14
__________________________________________
DE-ENERGIZING
OF AC WILD FREQUENCY NETWORK
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
1. ON PANEL 26VU
A. RELEASE EXT PWR PUSHBUTTON SWITCH
- ON LEGEND GOES OFF
B. VERIFY THAT:
- THE FLOW BAR LEGEND OF BTC PUSHBUTTON
SWITCH GOES OFF
- ACW BUS1 AND 2 CAUTION LIGHTS COME ON
REF.FIG.244100-EAD-00100
2. ON PANEL 5000VU CHECK THAT:
AC PWR NOT USED INDICATOR LIGHT COMES ON
008
________
CLOSE
UP
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
REF.FIG.244600-EAD-00110
1. CUT OFF THE EXTERNAL POWERS TO AIRCRAFT AND
SHUT-DOWN THE GROUND POWER UNIT
REF.FIG.244600-EAD-00110
2. ON PANEL 5002VU CHECK THAT:
- DC CNCTD INDICATOR LIGHT GOES OFF
- DC PWR NOT USED INDICATOR LIGHT GOES
OFF
REF.FIG.244100-EAD-00100
3. ON PANEL 5000VU CHECK THAT:
- AC CNCTD INDICATOR LIGHT GOES OFF
- AC PWR NOT USED INDICATOR LIGHT GOES
OFF
*** CONTINUED ***
AH
24-40-00
EAD 10000-003
2-400 PAGE
7
DEC 01/14
24-40-00
EAD 10000-003
8
DEC14
AH
E N D
O F
T E X T
*****
24-40-00
EAD 10000-003
2-400 PAGE
8
DEC 01/14
24-40-00
9
AH
CONTROLS,INDICATING AND
ACCESS DOOR
EAD 10000-003
DEC14
24-40-00
EAD 10000-003
2-400
PAGE
9
DEC 01/14
24-40-00
10
AH
EAD 10000-003
DEC14
24-40-00
EAD 10000-003
2-400
PAGE
10
DEC 01/14
24-40-00
11
AH
EAD 10000-003
DEC14
24-40-00
EAD 10000-003
2-400
PAGE
11
DEC 01/14
24-40-00
12
AH
EAD 10000-003
DEC14
24-40-00
EAD 10000-003
2-400
PAGE
12
DEC 01/14
24-40-00
EAD 10000-004
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 114
210
: 114BR 114CR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
_________
MAN-HOURS
ELAPSED TIME
GSE
31-63-00-PRO-10000
PUBLICATION
___________
JIC
AH
24-40-00
EAD 10000-004
2-400 PAGE
1
DEC 01/14
24-40-00
001
EAD 10000-004
2
DEC14
002
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
003
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
_______
WARNING
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
1. BEFORE PROVIDING ELECTRICAL POWER SUPPLY TO
AIRCRAFT MAKE CERTAIN THAT SAFETY RULES MUST
BE OBSERVED.
2. ON (FLIGHT)ATTENDANT PANEL MAKE
CERTAIN THAT:
- P/BSW GND SVCE BUS DC IS
IN RELEASED POSITION.
- P/BSW GND SVCE BUS ACWIS
IN RELEASED POSITION.
*** CONTINUED ***
AH
24-40-00
EAD 10000-004
2-400 PAGE
2
DEC 01/14
24-40-00
EAD 10000-004
3
DEC14
___________
PREPARATION
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
REF.FIG.244600-EAD-00110
REF.FIG.244100-EAD-00110
1. (ONLY IF THE A/C IS ON JACKS) ON PANEL 702VU
PLACE NORM/FLT MODE SWITCH IN FLT POSITION
2. ON PANEL 29VU
PLACE BAT SELECTOR SWITCH IN ON POSITION
AND CHECK THAT:
- TWO ARROW LEGENDS OF BAT TIE CAUTION LIGHT
COME ON
- BUS OFF FOR AC BUS 1 AND 2 AND INV
FAULT FOR INV 2 CAUTION LIGHTS COME ON
- DC BUS OFF FOR DC BUS 1 AND 2 CAUTION
LIGHTS COME ON
- SHED AND OFF LEGENDS OF DC SVCE/UTLY BUS
PUSHBUTTON SWITCH COME ON
ON MFD UPPER WINDOW, IN ELEC SD PAGE:
- AMBER ARROWS ARE DISPLAYED ON EMER AND
MAIN BAT
- AMBER AC BUS 1 OFF AND AC BUS 2 OFF
SYMBOLS ARE DISPLAYED
- AMBER DC BUS 1 OFF AND DC BUS 2 OFF
SYMBOLS ARE DISPLAYED
- AMBER INV 2 FAULT SYMBOL IS DISPLAYED
- SHED LEGENDS ABOVE UTLY BUS 1 AND 2
*** CONTINUED ***
AH
24-40-00
EAD 10000-004
2-400 PAGE
3
DEC 01/14
24-40-00
EAD 10000-004
4
DEC14
24-40-00
EAD 10000-004
2-400 PAGE
4
DEC 01/14
24-40-00
EAD 10000-004
5
DEC14
24-40-00
EAD 10000-004
2-400 PAGE
5
DEC 01/14
24-40-00
EAD 10000-004
6
DEC14
_______________________________________
ENERGIZING
OF AC WILD FREQUENCY NETWORK
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
1. ON PANEL 101VU
A. PLACE ELEC IND SELECTOR SWITCH IN EXT PWR
POSITION
B. VERIFY THAT THE VOLTAGE ON AC VOLTMETER
IS 115V AND THE FREQUENCY 400HZ
C. MAKE CERTAIN THAT ELEC/ACW BTC OPNG
SWITCH IS IN NORM FLT POSITION
2. ON PANEL 26VU
*** CONTINUED ***
AH
24-40-00
EAD 10000-004
2-400 PAGE
6
DEC 01/14
24-40-00
EAD 10000-004
7
DEC14
24-40-00
EAD 10000-004
2-400 PAGE
7
DEC 01/14
24-40-00
EAD 10000-004
8
DEC14
__________________________________________
DE-ENERGIZING
OF AC WILD FREQUENCY NETWORK
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
1. ON PANEL 26VU
A. RELEASE EXT PWR PUSHBUTTON SWITCH
ON LEGEND GOES OFF
B. VERIFY THAT:
- THE FLOW BAR LEGEND OF BTC PUSHBUTTON
*** CONTINUED ***
AH
24-40-00
EAD 10000-004
2-400 PAGE
8
DEC 01/14
24-40-00
EAD 10000-004
9
DEC14
________
CLOSE
UP
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
REF.FIG.244600-EAD-00110
1. CUT OFF THE EXTERNAL POWERS TO AIRCRAFT AND
SHUT-DOWN THE GROUND POWER UNIT
REF.FIG.244600-EAD-00110
2. ON PANEL 5002VU CHECK THAT:
- DC CNCTD INDICATOR LIGHT GOES OFF
- DC PWR NOT USED INDICATOR LIGHT GOES
OFF
REF.FIG.244100-EAD-00100
3. ON PANEL 5000VU CHECK THAT:
- AC CNCTD INDICATOR LIGHT GOES OFF
- AC PWR NOT USED INDICATOR LIGHT GOES
OFF
WARNING:IT IS FORBIDDEN TO DISCONNECT THE
GROUND POWER UNIT PLUGS WHEN THE AIRCRAFT IS ENERGIZED AS THESE COULD CAUSE
*** CONTINUED ***
AH
24-40-00
EAD 10000-004
2-400 PAGE
9
DEC 01/14
24-40-00
EAD 10000-004
10
DEC14
AH
E N D
O F
T E X T
*****
24-40-00
EAD 10000-004
2-400 PAGE
10
DEC 01/14
24-40-00
11
AH
CONTROLS,INDICATING AND
ACCESS DOOR
EAD 10000-004
DEC14
24-40-00
EAD 10000-004
2-400
PAGE
11
DEC 01/14
24-40-00
12
AH
EAD 10000-004
DEC14
24-40-00
EAD 10000-004
2-400
PAGE
12
DEC 01/14
24-40-00
13
AH
EAD 10000-004
DEC14
24-40-00
EAD 10000-004
2-400
PAGE
13
DEC 01/14
24-40-00
14
AH
EAD 10000-004
DEC14
24-40-00
EAD 10000-004
2-400
PAGE
14
DEC 01/14
24-41-00
AC WILD FREQUENCY
EXTERNAL POWER SUPPLY
EAD 10000-003
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 114
210
: 114CR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
___
MEN
_________
MAN-HOURS
01
ELAPSED TIME
GSE
AH
24-41-00
EAD 10000-003
2-400 PAGE
1
DEC 01/14
24-41-00
AC WILD FREQUENCY
EXTERNAL POWER SUPPLY
001
EAD 10000-003
2
DEC14
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
002
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
_______
WARNING
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
1. THE OPERATION OF AC WILD FREQUENCY EXTERNAL
POWER SUPPLY WITHOUT ANY OTHER DC SOURCES
OPERATING (HOTEL MODE OR DC EXT PWR) CAUSES
THE DISCHARGE OF BOTH MAIN AND EMER
BATTERIES.
2. BEFORE TO PROVIDE ELECTRICAL POWER SUPPLY TO
AIRCRAFT MAKE CERTAIN THAT SAFETY RULES MUST
BE OBSERVED.
3. ON (FLIGHT) ATTENDANT PANEL MAKE CERTAIN
THAT:
- P/BSW GND SVCE BUS ACW IS IN OFF
POSITION.
4. ON PANEL 26VU, MAKE CERTAIN THAT:
- P/BSW EXT PWR IS IN OFF POSITION.
5. ON PANEL 29VU, MAKE CERTAIN THAT:
SELECTOR SWITCH BAT IS IN OFF POSITION.
003
___________
PREPARATION
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
*** CONTINUED ***
AH
24-41-00
EAD 10000-003
2-400 PAGE
2
DEC 01/14
24-41-00
AC WILD FREQUENCY
EXTERNAL POWER SUPPLY
EAD 10000-003
3
DEC14
_______________________________________
ENERGIZING
OF AC WILD FREQUENCY NETWORK
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
1. ON PANEL 101VU
A. PLACE ELEC IND SELECTOR SWITCH IN EXT PWR
POSITION
B. VERIFY THAT THE VOLTAGE ON AC VOLTMETER
IS 115V AND THE FREQUENCY 400HZ
C. MAKE CERTAIN THAT ELEC/ACW BTC OPNG
SWITCH IS IN NORM FLT POSITION
*** CONTINUED ***
AH
24-41-00
EAD 10000-003
2-400 PAGE
3
DEC 01/14
24-41-00
AC WILD FREQUENCY
EXTERNAL POWER SUPPLY
EAD 10000-003
4
DEC14
2. ON PANEL 26VU
A. MAKE CERTAIN THAT:
- AVAIL LEGEND OF EXT PWR PUSHBUTTON
SWITCH IS ON
- BTC PUSHBUTTON SWITCH IS IN RELEASED POSITION
B. PRESS PUSHBUTTON SWITCH
- ON LEGEND COMES ON
C. VERIFY THAT:
- THE FLOW BAR LEGEND OF BTC PUSHBUTTON
SWITCH COMES ON
- ACW BUS1 AND 2 CAUTION LIGHTS ARE OFF
REF. FIG. 244100-EAD-00100
3. ON PANEL 5000VU CHECK THAT:
AC PWR NOT USED INDICATOR LIGHT GOES
OFF
005
__________________________________________
DE-ENERGIZING
OF AC WILD FREQUENCY NETWORK
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
1. ON PANEL 26VU
A. RELEASE EXT PWR PUSHBUTTON SWITCH
- ON LEGEND GOES OFF
B. VERIFY THAT:
- THE FLOW BAR LEGEND OF BTC PUSHBUTTON
SWITCH GOES OFF
- ACW BUS1 AND 2 CAUTION LIGHTS COME ON
REF.FIG.244100-EAD-00100
2. ON PANEL 5000VU CHECK THAT:
AC PWR NOT USED INDICATOR LIGHT COMES ON
006
________
CLOSE
UP
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
*** CONTINUED ***
AH
24-41-00
EAD 10000-003
2-400 PAGE
4
DEC 01/14
24-41-00
AC WILD FREQUENCY
EXTERNAL POWER SUPPLY
EAD 10000-003
5
DEC14
AH
E N D
O F
T E X T
*****
24-41-00
EAD 10000-003
2-400 PAGE
5
DEC 01/14
24-41-00
6
AH
CONTROLS,INDICATING AND
ACCESS DOOR
EAD 10000-003
DEC14
24-41-00
EAD 10000-003
2-400
PAGE
6
DEC 01/14
24-41-00
7
AH
EAD 10000-003
DEC14
24-41-00
EAD 10000-003
2-400
PAGE
7
DEC 01/14
24-41-00
AC WILD FREQUENCY
EXTERNAL POWER SUPPLY
EAD 10000-004
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 114
210
: 114CR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELECTRIC
_________
MAN-HOURS
01
ELAPSED TIME
GSE
31-63-00-PRO-10000
PUBLICATION
___________
JIC
AH
24-41-00
EAD 10000-004
2-400 PAGE
1
DEC 01/14
24-41-00
AC WILD FREQUENCY
EXTERNAL POWER SUPPLY
001
EAD 10000-004
2
DEC14
002
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
003
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
_______
WARNING
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
1. THE OPERATION OF AC WILD FREQUENCY EXTERNAL
POWER SUPPLY WITHOUT ANY OTHER DC SOURCES
OPERATING (HOTEL MODE OR DC EXT PWR) CAUSES
THE DISCHARGE OF BOTH MAIN AND EMER
BATTERIES.
2. BEFORE TO PROVIDE ELECTRICAL POWER SUPPLY TO
AIRCRAFT MAKE CERTAIN THAT SAFETY RULES MUST
BE OBSERVED.
3. ON (FLIGHT) ATTENDANT PANEL MAKE CERTAIN
*** CONTINUED ***
AH
24-41-00
EAD 10000-004
2-400 PAGE
2
DEC 01/14
24-41-00
AC WILD FREQUENCY
EXTERNAL POWER SUPPLY
EAD 10000-004
3
DEC14
THAT:
- P/BSW GND SVCE BUS ACW IS IN OFF
POSITION.
4. ON PANEL 26VU, MAKE CERTAIN THAT:
- P/BSW EXT PWR IS IN OFF POSITION.
5. ON PANEL 29VU, MAKE CERTAIN THAT:
SELECTOR SWITCH BAT IS IN OFF POSITION.
004
___________
PREPARATION
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
1. ON PANEL 702VU (ONLY IF THE A/C IS ON JACKS)
PLACE NORM/FLT MODE SWITCH IN FLT POSITION
2. ON PANEL 29VU
PLACE BAT SELECTOR SWITCH IN ON POSITION
AND CHECK THAT:
- TWO ARROW LEGENDS OF BAT TIE CAUTION LIGHT
COME ON
- BUS OFF FOR AC BUS 1 AND 2 AND INV
FAULT 2 FOR INV 2 CAUTION LIGHTS COME ON
- DC BUS OFF FOR DC BUS 1 AND 2 CAUTION
LIGHTS COME ON
- SHED AND OFF LEGENDS OF DC SVCE/UTLY BUS
PUSHBUTTON SWITCH COME ON
ON MFD UPPER WINDOW, IN ELEC SD PAGE:
- AMBER ARROWS ARE DISPLAYED ON EMER AND
MAIN BAT
- AMBER AC BUS 1 OFF AND AC BUS 2 OFF
SYMBOLS ARE DISPLAYED
- AMBER DC BUS 1 OFF AND DC BUS 2 OFF
SYMBOLS ARE DISPLAYED
- AMBER INV 2 FAULT SYMBOL IS DISPLAYED
- SHED LEGENDS ABOVE UTLY BUS 1 AND 2
SYMBOLS ARE DISPLAYED.
*** CONTINUED ***
AH
24-41-00
EAD 10000-004
2-400 PAGE
3
DEC 01/14
24-41-00
AC WILD FREQUENCY
EXTERNAL POWER SUPPLY
EAD 10000-004
4
DEC14
_______________________________________
ENERGIZING
OF AC WILD FREQUENCY NETWORK
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
1. ON PANEL 101VU
A. PLACE ELEC IND SELECTOR SWITCH IN EXT PWR
POSITION
B. VERIFY THAT THE VOLTAGE ON AC VOLTMETER
IS 115V AND THE FREQUENCY 400HZ
C. MAKE CERTAIN THAT ELEC/ACW BTC OPNG
SWITCH IS IN NORM FLT POSITION
2. ON PANEL 26VU
A. MAKE CERTAIN THAT:
- AVAIL LEGEND OF EXT PWR PUSHBUTTON
SWITCH IS ON
- BTC PUSHBUTTON SWITCH IS IN RELEASED
*** CONTINUED ***
AH
24-41-00
EAD 10000-004
2-400 PAGE
4
DEC 01/14
24-41-00
AC WILD FREQUENCY
EXTERNAL POWER SUPPLY
EAD 10000-004
5
DEC14
POSITION
ON MFD UPPER WINDOW, IN ACW/HYD SD PAGE:
- EXT PWR AVAIL SYMBOL IS DISPLAYED
- BTC SYMBOL IS DISPLAYED IN GREEN
WITHOUT FLOW BAR
B. PRESS EXT PXR PUSHBUTTON SWITCH
ON LEGEND COMES ON
C. VERIFY THAT:
- THE FLOW BAR LEGEND OF BTC PUSHBUTTON
SWITCH COMES ON
- ACW BUS OFF FOR ACW BUS 1 AND 2
CAUTION LIGHTS GO OFF
ON MFD UPPER WINDOW, IN ACW/HYD SD PAGE:
- EXT PWR AVAIL ON SYMBOLL IS DISPLAYED
- THE FLOW BAR LEGEND ON BTC SYMBOL IS
DISPLAYED
- GREEN ACW BUS 1 AND ACW BUS 2 ARE
DISPLAYED
REF.FIG. 244100-EAD-00100
3. ON PANEL 5000VU CHECK THAT:
AC PWR NOT USED INDICATOR LIGHT GOES
OFF
006
__________________________________________
DE-ENERGIZING
OF AC WILD FREQUENCY NETWORK
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
1. ON PANEL 26VU
A. RELEASE EXT PWR PUSHBUTTON SWITCH
ON LEGEND GOES OFF
B. VERIFY THAT:
- THE FLOW BAR LEGEND OF BTC PUSHBUTTON
SWITCH GOES OFF
- ACW BUS OFF FOR ACW BUS 1 AND 2
CAUTION LIGHTS COME ON
ON MFD UPPER WINDOW, IN ACW/HYD SD PAGE:
- EXT PWR AVAIL SYMBOL IS DISPLAYED
- BTC SYMBOL IS DISPLAYED IN GREEN
*** CONTINUED ***
AH
24-41-00
EAD 10000-004
2-400 PAGE
5
DEC 01/14
AC WILD FREQUENCY
EXTERNAL POWER SUPPLY
24-41-00
EAD 10000-004
6
DEC14
________
CLOSE
UP
REF.FIG.244100-EAD-00100
REF.FIG.244100-EAD-00110
1. CUT OFF THE EXTERNAL POWER TO AIRCRAFT AND
SHUT-DOWN THE GROUND POWER UNIT
REF.FIG.244100-EAD-00100
2. ON PANEL 5000VU CHECK THAT:
- AC CNCTD INDICATOR LIGHT GOES OFF
- AC PWR NOT USED INDICATOR LIGHT GOES OFF
WARNING:IT IS FORBIDDEN TO UNPLUG THE GROUND
POWER UNIT PLUG WHEN THE AIRCRAFT IS
ENERGIZED AS THIS COULD CAUSE ARGING
WHICH WOULD BE DANGEROUS FOR PERSONNEL, OR DAMAGE TO EQUIPMENT
3. ON PANEL 5000VU UNPLUG THE GROUND POWER
UNIT PLUG FROM AC EXT PWR RECEPTACLE
4. CLOSE ACCESS DOOR 114CR
REF.FIG.244100-EAD-00110
5. ON PANEL 29VU
PLACE BAT SELECTOR SWITCH IN OFF POSITION
6. ON PANEL 702VU (ONLY IF YHE A/C IS ON JACKS)
REPLACE NORM/FLT MODE SWITCH IN NORM
*** CONTINUED ***
AH
24-41-00
EAD 10000-004
2-400 PAGE
6
DEC 01/14
24-41-00
AC WILD FREQUENCY
EXTERNAL POWER SUPPLY
EAD 10000-004
7
DEC14
POSITION
*****
AH
E N D
O F
T E X T
*****
24-41-00
EAD 10000-004
2-400 PAGE
7
DEC 01/14
24-41-00
8
AH
CONTROLS,INDICATING AND
ACCESS DOOR
EAD 10000-004
DEC14
24-41-00
EAD 10000-004
2-400
PAGE
8
DEC 01/14
24-41-00
9
AH
EAD 10000-004
DEC14
24-41-00
EAD 10000-004
2-400
PAGE
9
DEC 01/14
24-41-11
RAI 10000-001
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 114
: 114CR
212HF
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
SPARE
: 01 RECEPTACLE
244110-55
EXPENDABLE
: 10 NUT
244110-55
_________
MAN-HOURS
09-001
PUBLICATION
___________
JIC
JIC
AH
25-13-16-RAI-10000
24-46-00-EAD-10000
24-41-11
RAI 10000-001
2-400 PAGE
1
DEC 01/14
24-41-11
001
RAI 10000-001
2
DEC14
____________________________________________
REMOVAL
OF FLIGHT COMPARTMENT FLOOR COVERING
SEE JOB INSTRUCTION CARD
251316-RAI-10000
002
___________
PREPARATION
1. REMOVE ACCESS PANEL 212HF.
2. OPEN DOOR 114CR.
003
_____________________________________
REMOVAL
OF AC GROUND POWER RECEPTACLE
REF. FIG. 244111-RAI-00100
1. REMOVE AND DISCARD NUTS (3) AND WASHERS (2).
REMOVE COVER (5).
2. NOTE THE POSITION OF WIRE AND DISCONNECT
THEM.
3. REMOVE AND DISCARD NUTS (8) AND WASHERS (7).
4. REMOVE SCREWS (1) AND (9) AND REMOVE COVER
(4).
5. REMOVE RECEPTACLE (6).
004
__________________________________________
INSTALLATION
OF AC GROUND POWER RECEPTACLE
REF. FIG. 244111-RAI-00100
1. APPLY PRODUCT 09-001F (REF. AMM 20-31-00)
ON THE BASE OF THE RECEPTACLE (6).
2. INSTALL THE RECEPTACLE (6), COVER (4) AND
SCREWS (1) AND (9).
3. FROM INTERNAL ACCESS, INSTALL WASHERS (7)
AND NUTS (8) AND TIGHTEN NUTS.
4. RECONNECT WIRES FOLLOWING THE POSITION NOTED
DURING REMOVAL
(TIGHTENNING TORQUE VALUE:
- FOR CONTACT WITH A DIAMETER OF 11.07 MM /
0.4358 IN: TIGHTEN AT 0.86 MDAN TO 0.95
MDAN / 76.10 LBF.IN TO 84.07 LBF.IN.
- FOR CONTACT WITH A DIAMETER OF 7.89 MM /
0.3106 IN: TIGHTEN AT 0.21 MDAN TO 0.24
MDAN / 18.58 LBF.IN TO 21.23 LBF.IN.)
5. POSTION THE COVER (5) AND INSTALL WASHERS
*** CONTINUED ***
AH
24-41-11
RAI 10000-001
2-400 PAGE
2
DEC 01/14
24-41-11
RAI 10000-001
3
DEC14
________
CLOSE-UP
1. INSTALL ACCESS PANEL 212HF.
2. CLOSE DOOR 114CR.
006
007
______________________________________________
OPERATIONAL
TEST OF AC GROUND POWER RECEPTACLE
DO AN ENERGIZATION AND DE-ENERGIZATION OF DC
AND AC CONSTANT FREQUENCY EXTERNAL POWER SUPPLY
ACCORDING TO THE FOLLOWING CARDS.
008
009
AH
E N D
O F
T E X T
*****
24-41-11
RAI 10000-001
2-400 PAGE
3
DEC 01/14
24-41-11
4
AH
RAI 10000-001
DEC14
24-41-11
RAI 10000-001
2-400
PAGE
4
DEC 01/14
24-41-83
OPT 10000-001
1
MAR13
ZONING DATA
___________
ZONE
ACCESS
: 214
: 214BZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELECTRIC
ELAPSED TIME
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
AH
24-31-00-EAD-10000
24-41-83
OPT 10000-001
2-400 PAGE
1
MAR 01/13
24-41-83
001
OPT 10000-001
2
MAR13
___________
PREPARATION
REF. FIG. 240000-RAI-00103
NOTE: BPCU OPERATIONAL TEST CAN BE PERFORMED
ON GROUND WITH THE EXTERNAL POWER NOT
USED.
1. ON R ELECTRONICS RACK 90VU
OPEN ACCESS DOOR 214BZ (B)
002
_________________________________
ENERGIZING
OF SYSTEM FROM BATTERY
SEE JOB INSTRUCTION CARD
243100-EAD-10000
003
___________________________________________
ACW
BUS POWER CONTROL UNIT OPERATIONAL TEST
REF.FIG.244113-OPT-00100
1. ON R ELECTRONICS RACK 90VU SHELF 6
ON ACW BPCU FRONT PANEL (B) PRESS THE CC
SWITCH AND VERIFY THAT THE CC INDICATOR
LIGHT COMES ON. AFTER 7+/-1 SECS, IF ACW
BPCU OPERATES CORRECTLY, CC INDICATOR LIGHT
GOES OFF.
IF A FAILURE IS DETECTED ON ACW BPCU, THE CC
INDICATOR LIGHT REMAINS ON, AS LONG AS CC
SWITCH IS PRESSED.
004
____________________________________
DE-ENERGIZING
OF SYSTEM FROM BATTERY
SEE JOB INSTRUCTION CARD
243100-EAD-10000
005
________
CLOSE
UP
REF. FIG. 240000-RAI-00103
1. ON R ELECTRONICS RACK 90VU
CLOSE ACCESS DOOR 214BZ (B)
*****
AH
E N D
O F
T E X T
*****
24-41-83
OPT 10000-001
2-400 PAGE
2
MAR 01/13
24-41-83
3
AH
OPT 10000-001
MAR13
24-41-83
OPT 10000-001
2-400
PAGE
3
MAR 01/13
24-41-83
4
AH
OPT 10000-001
MAR13
24-41-83
OPT 10000-001
2-400
PAGE
4
MAR 01/13
24-41-83
RAI 10000-001
1
APR05
ZONING DATA
___________
ZONE
ACCESS
: 210
214
: 122VU 126VU
214AZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
AH
24-41-83-OPT-10000
24-41-83
RAI 10000-001
2-400 PAGE
1
APR 01/05
24-41-83
001
RAI 10000-001
2
APR05
___________
PREPARATION
REF.FIG.240000-RAI-00103
1. OPEN, SAFETY CLIP AND TAG THE FOLLOWING CIRCUIT BREAKERS:
- ON PANEL 122VU (A)
15XG ACW ELEC PWR/BPCU ACW
19XU ACW ELEC PWR/GCU ACW GEN 1
20XU ACW ELEC PWR/GCU ACW GEN 2
- ON PANEL 126VU (A)
4XG EXT PWR/CTL
2. ON R ELECTRONICS RACK 90VU (B)
OPEN ACCESS DOOR 214BZ
002
24-41-83
RAI 10000-001
2-400 PAGE
2
APR 01/05
24-41-83
003
RAI 10000-001
3
APR05
004
________
CLOSE
UP
REF.FIG.240000-RAI-00103
1. ON R ELECTRONICS RACK 90VU (B)
CLOSE ACCESS DOOR 214BZ
2. REMOVE SAFETY CLIPS AND TAGS AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
- ON PANEL 122VU (A)
15XG
19XU
20XU
- ON PANEL 126VU (A)
4XG
005
___________________________________________
ACW
BUS POWER CONTROL UNIT OPERATIONAL TEST
SEE JOB INSTRUCTION CARD
244183-OPT-10000
*****
AH
E N D
O F
T E X T
*****
24-41-83
RAI 10000-001
2-400 PAGE
3
APR 01/05
24-41-83
4
AH
RAI 10000-001
APR05
24-41-83
RAI 10000-001
2-400
PAGE
4
APR 01/05
24-41-83
5
AH
L AND R ELECTRONICS
RACKS 80VU AND 90VU
EQUIPMENT
RAI 10000-001
APR05
24-41-83
RAI 10000-001
2-400
PAGE
5
APR 01/05
24-42-00
EAD 10000-003
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 114
210
: 114CR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
___
MEN
_________
MAN-HOURS
01
ELAPSED TIME
GSE
AH
24-42-00
EAD 10000-003
2-400 PAGE
1
DEC 01/14
001
24-42-00
EAD 10000-003
2
DEC14
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
002
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
_______
WARNING
REF. FIG. 244200-EAD-00100
REF. FIG. 244200-OPT-00100
1. BEFORE AIRCRAFT POWER SUPPLY MAKE CERTAIN
THAT SAFETY RULES MUST BE OBSERVED
2. ON (FLIGHT) ATTENDANT PANEL MAKE CERTAIN
THAT:
- P/BSW GND SVCE BUC ACW IS IN
RELEASED POSITION.
3. ON PANEL 26VU MAKE CERTAIN THAT:
- P/BSW EXT PWR IS IN RELEASED POSITION.
4. ON PANEL 29VU MAKE CERTAIN THAT:
- SELECTOR SWITCH BAT IS IN OFF POSITION.
003
___________
PREPARATION
REF. FIG. 244200-EAD-00100
REF. FIG. 244200-OPT-00100
REF. FIG. 244200-EAD-00100
1. ON PANEL 702VU (ONLY IF THE A/C IS ON JACKS)
PLACE NORM/FLT MODE SWITCH IN FLT POSITION
2. ON PANEL 29VU
*** CONTINUED ***
AH
24-42-00
EAD 10000-003
2-400 PAGE
2
DEC 01/14
24-42-00
EAD 10000-003
3
DEC14
_______________________________
ENERGIZATION
OF ACW SERVICE BUS
REF.FIG.244200-EAD-00100
REF.FIG.244200-OPT-00100
1. ON PANEL 101VU
A. PLACE ELEC IND SELECTOR SWITCH TO EXT PWR
POSITION
B. VERIFY THAT THE VOLTAGE ON AC VOLTMETER
IS 115V AND THE FREQUENCY 400HZ
2. ON PANEL 26VU CHECK THAT:
AVAIL LEGEND OF EXT PWR PUSHBUTTON SWITCH
IS ON
3. ON (FLIGHT) ATTENDANT PANEL:
A. CHECK THAT SHED LEGEND OF ACW GND SVCE
BUS PUSHBUTTON SWITCH IS ON
B. PRESS PUSHBUTTON SWITCH
- ON LEGEND COMES ON
- SHED LEGEND GOES OFF
4. ON PANEL 5000VU CHECK THAT:
AC PWR NOT USED INDICATOR LIGHT GOES OFF
*** CONTINUED ***
AH
24-42-00
EAD 10000-003
2-400 PAGE
3
DEC 01/14
24-42-00
005
EAD 10000-003
4
DEC14
__________________________________
DE-ENERGIZATION
OF ACW SERVICE BUS
REF.FIG.244200-OPT-00100
1. ON (FLIGHT) ATTENDANT PANEL:
RELEASE ACW GND SVCE BUS PUSHBUTTON SWITCH
- SHED LEGEND COMES ON
- ON LEGEND GOES OFF
2. ON PANEL 5000VU CHECK THAT:
AC PWR NOT USED INDICATOR LIGHT COMES ON
006
________
CLOSE
UP
REF.FIG.244200-EAD-00100
REF.FIG.244200-OPT-00100
1. CUT OFF THE EXTERNAL POWER TO AIRCRAFT AND
SHUT-DOWN THE GROUND POWER UNIT
REF.FIG.244200-OPT-00100
2. ON PANEL 5000VU CHECK THAT:
- AC CNCTD INDICATOR LIGHT GOES OFF
- AC PWR NOT USED INDICATOR LIGHT GOES OFF
WARNING: IT IS FORBIDDEN TO UNPLUG THE GROUND
POWER UNIT PLUG WHEN THE AIRCRAFT IS
ENERGIZED AS THIS COULD CAUSE ARCING
WHICH WOULD BE DANGEROUS FOR PERSONNEL OR DAMAGE TO EQUIPMENT
3. ON PANEL 5000VU UNPLUG THE GROUND POWER UNIT
PLUG FROM AC EXT PWR RECEPTACLE
4. CLOSE ACCESS DOOR 114CR
REF.FIG.244200-EAD-00100
5. ON PANEL 702VU (ONLY IF THE A/C IS ON JACKS)
REPLACE NORM/FLT MODE SWITCH IN NORM
*** CONTINUED ***
AH
24-42-00
EAD 10000-003
2-400 PAGE
4
DEC 01/14
24-42-00
EAD 10000-003
5
DEC14
POSITION
*****
AH
E N D
O F
T E X T
*****
24-42-00
EAD 10000-003
2-400 PAGE
5
DEC 01/14
24-42-00
6
AH
CONTROLS,INDICATING AND
ACCESS DOOR
EAD 10000-003
DEC14
24-42-00
EAD 10000-003
2-400
PAGE
6
DEC 01/14
24-42-00
7
AH
EAD 10000-003
DEC14
24-42-00
EAD 10000-003
2-400
PAGE
7
DEC 01/14
24-42-00
EAD 10000-004
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 114
210
: 114CR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
___
MEN
_________
MAN-HOURS
01
ELAPSED TIME
GSE
AH
24-42-00
EAD 10000-004
2-400 PAGE
1
DEC 01/14
001
24-42-00
EAD 10000-004
2
DEC14
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
002
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
_______
WARNING
REF. FIG. 244200-EAD-00100
REF. FIG. 244200-OPT-00100
1. BEFORE AIRCRAFT POWER SUPPLY MAKE CERTAIN
THAT SAFETY RULES MUST BE OBSERVED
2. ON (FLIGHT) ATTENDANT PANEL MAKE CERTAIN
THAT:
- P/BSW GND SVCE BUC ACW IS IN
RELEASED POSITION.
3. ON PANEL 26VU MAKE CERTAIN THAT:
- P/BSW EXT PWR IS IN RELEASED POSITION.
4. ON PANEL 29VU MAKE CERTAIN THAT:
- SELECTOR SWITCH BAT IS IN OFF POSITION.
003
___________
PREPARATION
REF. FIG. 244200-EAD-00100
REF. FIG. 244200-OPT-00100
REF. FIG. 244200-EAD-00100
1. ON PANEL 702VU (ONLY IF THE A/C IS ON JACKS)
PLACE NORM/FLT MODE SWITCH IN FLT POSITION
2. ON PANEL 29VU
*** CONTINUED ***
AH
24-42-00
EAD 10000-004
2-400 PAGE
2
DEC 01/14
24-42-00
EAD 10000-004
3
DEC14
_______________________________
ENERGIZATION
OF ACW SERVICE BUS
REF.FIG.244200-EAD-00100
REF.FIG.244200-OPT-00100
1. ON PANEL 101VU
A. PLACE ELEC IND SELECTOR SWITCH TO EXT PWR
POSITION
B. VERIFY THAT THE VOLTAGE ON AC VOLTMETER
IS 115V AND THE FREQUENCY 400HZ
2. ON PANEL 26VU CHECK THAT:
AVAIL LEGEND OF EXT PWR PUSHBUTTON SWITCH
IS ON
3. ON (FLIGHT) ATTENDANT PANEL:
A. CHECK THAT SHED LEGEND OF ACW GND SVCE
BUS PUSHBUTTON SWITCH IS ON
B. PRESS PUSHBUTTON SWITCH
- ON LEGEND COMES ON
- SHED LEGEND GOES OFF
4. ON PANEL 5000VU CHECK THAT:
AC PWR NOT USED INDICATOR LIGHT GOES OFF
*** CONTINUED ***
AH
24-42-00
EAD 10000-004
2-400 PAGE
3
DEC 01/14
24-42-00
005
EAD 10000-004
4
DEC14
__________________________________
DE-ENERGIZATION
OF ACW SERVICE BUS
REF.FIG.244200-OPT-00100
1. ON (FLIGHT) ATTENDANT PANEL:
RELEASE ACW GND SVCE BUS PUSHBUTTON SWITCH
- SHED LEGEND COMES ON
- ON LEGEND GOES OFF
2. ON PANEL 5000VU CHECK THAT:
AC PWR NOT USED INDICATOR LIGHT COMES ON
006
________
CLOSE
UP
REF.FIG.244200-EAD-00100
REF.FIG.244200-OPT-00100
1. CUT OFF THE EXTERNAL POWER TO AIRCRAFT AND
SHUT-DOWN THE GROUND POWER UNIT
REF.FIG.244200-OPT-00100
2. ON PANEL 5000VU CHECK THAT:
- AC CNCTD INDICATOR LIGHT GOES OFF
- AC PWR NOT USED INDICATOR LIGHT GOES OFF
WARNING: IT IS FORBIDDEN TO UNPLUG THE GROUND
POWER UNIT PLUG WHEN THE AIRCRAFT IS
ENERGIZED AS THIS COULD CAUSE ARCING
WHICH WOULD BE DANGEROUS FOR PERSONNEL OR DAMAGE TO EQUIPMENT
3. ON PANEL 5000VU UNPLUG THE GROUND POWER UNIT
PLUG FROM AC EXT PWR RECEPTACLE
4. CLOSE ACCESS DOOR 114CR
REF.FIG.244200-EAD-00100
5. ON PANEL 702VU (ONLY IF THE A/C IS ON JACKS)
REPLACE NORM/FLT MODE SWITCH IN NORM
*** CONTINUED ***
AH
24-42-00
EAD 10000-004
2-400 PAGE
4
DEC 01/14
24-42-00
EAD 10000-004
5
DEC14
POSITION
*****
AH
E N D
O F
T E X T
*****
24-42-00
EAD 10000-004
2-400 PAGE
5
DEC 01/14
24-42-00
6
AH
EAD 10000-004
DEC14
24-42-00
EAD 10000-004
2-400
PAGE
6
DEC 01/14
24-42-00
7
AH
EAD 10000-004
DEC14
24-42-00
EAD 10000-004
2-400
PAGE
7
DEC 01/14
24-42-00
OPT 10000-001
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 114
210
: 114CR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
___
MEN
_________
MAN-HOURS
01
ELAPSED TIME
GSE
AH
24-42-00
OPT 10000-001
2-400 PAGE
1
DEC 01/14
001
24-42-00
OPT 10000-001
2
DEC14
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
002
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
_______
WARNING
REF. FIG. 244200-EAD-00100
REF. FIG. 244200-OPT-00100
1. BEFORE AIRCRAFT POWER SUPPLY MAKE CERTAIN
THAT SAFETY RULES MUST BE OBSERVED
2. ON (FLIGHT) ATTENDANT PANEL MAKE CERTAIN
THAT:
- P/BSW GND SVCE BUC ACW IS IN
RELEASED POSITION.
3. ON PANEL 26VU MAKE CERTAIN THAT:
- P/BSW EXT PWR IS IN RELEASED POSITION.
4. ON PANEL 29VU MAKE CERTAIN THAT:
- SELECTOR SWITCH BAT IS IN OFF POSITION.
003
___________
PREPARATION
REF. FIG. 244200-EAD-00100
REF. FIG. 244200-OPT-00100
REF. FIG. 244200-EAD-00100
1. ON PANEL 702VU (ONLY IF THE A/C IS ON JACKS)
PLACE NORM/FLT MODE SWITCH IN FLT POSITION
2. ON PANEL 29VU
*** CONTINUED ***
AH
24-42-00
OPT 10000-001
2-400 PAGE
2
DEC 01/14
24-42-00
OPT 10000-001
3
DEC14
______________________
OPERATIONAL
TEST (2XX)
REF.FIG.244200-EAD-00100
REF.FIG.244200-OPT-00100
1. ON PANEL 101VU
A. PLACE ELEC IND SELECTOR SWITCH TO EXT
PWR POSITION.
B. VERIFY THAT THE VOLTAGE ON AC VOLTMETER
IS 115V AND THE FREQUENCY IS 400HZ.
2. ON PANEL 26VU CHECK THAT:
AVAIL LEGEND OF EXT PWR PUSHBUTTON SWITCH
IS ON.
3. ON (FLIGHT) ATTENDANT PANEL:
A. CHECK THAT SHED LEGEND OF P/BSW GND
SVCE BUS ACW IS ON.
B. PRESS P/BSW GND SVCE BUS ACW
AND CHECK THAT:
- ON LEGEND COMES ON
- SHED LEGEND IS GOES OFF
4. ON PANEL 5000VU VERIFY THAT:
*** CONTINUED ***
AH
24-42-00
OPT 10000-001
2-400 PAGE
3
DEC 01/14
24-42-00
OPT 10000-001
4
DEC14
______________________
OPERATIONAL
TEST (8XX)
REF. FIG. 244200-EAD-00100
REF. FIG. 244200-OPT-00100
1. ON PANEL 101VU
A. PLACE ELEC IND SELECTOR SWITCH TO EXT
PWR POSITION
B. VERIFY THAT THE VOLTAGE ON AC VOLTMETER
IS 115V AND THE FREQUENCY IS 400HZ
2. ON (FLIGHT) ATTENDANT PANEL VERIFY THAT
SHED LEGEND OF P/BSW GND SVCE BUS ACW
IS ON.
3. ON PANEL 26VU
A. CHECK THAT AVAIL LEGEND OF EXT PWR PUSHBUTTON SWITCH IS ON.
B. PRESS PUSHBUTTON SWITCH
- ON LEGEND COMES ON.
4. ON PANEL 5000VU, CHECK THAT:
AC PWR NOT USED INDICATOR LIGHT GOES OFF.
*** CONTINUED ***
AH
24-42-00
OPT 10000-001
2-400 PAGE
4
DEC 01/14
24-42-00
OPT 10000-001
5
DEC14
________
CLOSE
UP
REF.FIG.244200-EAD-00100
REF.FIG.244200-OPT-00100
1. CUT OFF THE EXTERNAL POWER TO AIRCRAFT AND
SHUT-DOWN THE GROUND POWER UNIT
REF.FIG.244200-OPT-00100
2. ON PANEL 5000VU CHECK THAT:
- AC CNCTD INDICATOR LIGHT GOES OFF
- AC PWR NOT USED INDICATOR LIGHT GOES OFF
WARNING: IT IS FORBIDDEN TO UNPLUG THE GROUND
POWER UNIT PLUG WHEN THE AIRCRAFT IS
ENERGIZED AS THIS COULD CAUSE ARCING
WHICH WOULD BE DANGEROUS FOR PERSON*** CONTINUED ***
AH
24-42-00
OPT 10000-001
2-400 PAGE
5
DEC 01/14
24-42-00
OPT 10000-001
6
DEC14
AH
E N D
O F
T E X T
*****
24-42-00
OPT 10000-001
2-400 PAGE
6
DEC 01/14
24-42-00
7
AH
CONTROLS,INDICATING AND
ACCESS DOOR
OPT 10000-001
DEC14
24-42-00
OPT 10000-001
2-400
PAGE
7
DEC 01/14
24-42-00
8
AH
OPT 10000-001
DEC14
24-42-00
OPT 10000-001
2-400
PAGE
8
DEC 01/14
24-42-00
OPT 10000-002
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 114
210
: 114CR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
___
MEN
_________
MAN-HOURS
01
ELAPSED TIME
GSE
AH
24-42-00
OPT 10000-002
2-400 PAGE
1
DEC 01/14
001
24-42-00
OPT 10000-002
2
DEC14
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
002
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
_______
WARNING
REF. FIG. 244200-EAD-00100
REF. FIG. 244200-OPT-00100
1. BEFORE AIRCRAFT POWER SUPPLY MAKE CERTAIN
THAT SAFETY RULES MUST BE OBSERVED
2. ON (FLIGHT) ATTENDANT PANEL MAKE CERTAIN
THAT:
- P/BSW GND SVCE BUC ACW IS IN
RELEASED POSITION.
3. ON PANEL 26VU MAKE CERTAIN THAT:
- P/BSW EXT PWR IS IN RELEASED POSITION.
4. ON PANEL 29VU MAKE CERTAIN THAT:
- SELECTOR SWITCH BAT IS IN OFF POSITION.
003
___________
PREPARATION
REF. FIG. 244200-EAD-00100
REF. FIG. 244200-OPT-00100
REF. FIG. 244200-EAD-00100
1. ON PANEL 702VU (ONLY IF THE A/C IS ON JACKS)
PLACE NORM/FLT MODE SWITCH IN FLT POSITION
2. ON PANEL 29VU
*** CONTINUED ***
AH
24-42-00
OPT 10000-002
2-400 PAGE
2
DEC 01/14
24-42-00
OPT 10000-002
3
DEC14
______________________
OPERATIONAL
TEST (2XX)
REF.FIG.244200-EAD-00100
REF.FIG.244200-OPT-00100
1. ON PANEL 101VU
A. PLACE ELEC IND SELECTOR SWITCH TO EXT
PWR POSITION.
B. VERIFY THAT THE VOLTAGE ON AC VOLTMETER
IS 115V AND THE FREQUENCY IS 400HZ.
2. - ON PANEL 26VU CHECK THAT:
AVAIL LEGEND OF EXT PWR PUSHBUTTON
SWITCH IS ON.
- ON MFD UPPER WINDOW, IN ACW/HYD SD PAGE,
EXT PWR AVAIL SYMBOL IS DISPLAYED.
3. ON (FLIGHT) ATTENDANT PANEL
A. CHECK THAT SHED LEGEND OF P/BSW GND
SVCE BUS ACW IS ON.
B. PRESS P/BSW GND SVCE BUS ACW
AND CHECK THAT:
- ON LEGEND COMES ON
- SHED LEGEND IS GOES OFF
*** CONTINUED ***
AH
24-42-00
OPT 10000-002
2-400 PAGE
3
DEC 01/14
24-42-00
OPT 10000-002
4
DEC14
______________________
OPERATIONAL
TEST (8XX)
REF. FIG. 244200-EAD-00100
REF. FIG. 244200-OPT-00100
1. ON PANEL 101VU
A. PLACE ELEC IND SELECTOR SWITCH TO EXT
PWR POSITION
B. VERIFY THAT THE VOLTAGE ON AC VOLTMETER
IS 115V AND THE FREQUENCY IS 400HZ
2. ON (FLIGHT) ATTENDANT PANEL CHECK THAT:
SHED LEGEND OF P/BSW GND SVCE BUS ACW
IS ON.
3. ON PANEL 26VU
A. CHECK THAT AVAIL LEGEND OF EXT PWR
BUTTON SWITCH IS ON.
B. PRESS EXT PWR PUSHBUTTON SWITCH
- ON LEGEND COMES ON.
ON MFD UPPER WINDOW, IN ACW/HYD SD PAGE,
EXT PWR AVAIL ON SYMBOL IS DISPLAYED.
*** CONTINUED ***
AH
24-42-00
OPT 10000-002
2-400 PAGE
4
DEC 01/14
24-42-00
OPT 10000-002
5
DEC14
________
CLOSE
UP
REF.FIG.244200-EAD-00100
REF.FIG.244200-OPT-00100
1. CUT OFF THE EXTERNAL POWER TO AIRCRAFT AND
SHUT-DOWN THE GROUND POWER UNIT
REF.FIG.244200-OPT-00100
2. ON PANEL 5000VU CHECK THAT:
- AC CNCTD INDICATOR LIGHT GOES OFF
- AC PWR NOT USED INDICATOR LIGHT GOES OFF
*** CONTINUED ***
AH
24-42-00
OPT 10000-002
2-400 PAGE
5
DEC 01/14
24-42-00
OPT 10000-002
6
DEC14
AH
E N D
O F
T E X T
*****
24-42-00
OPT 10000-002
2-400 PAGE
6
DEC 01/14
24-42-00
7
AH
OPT 10000-002
DEC14
24-42-00
OPT 10000-002
2-400
PAGE
7
DEC 01/14
24-42-00
8
AH
OPT 10000-002
DEC14
24-42-00
OPT 10000-002
2-400
PAGE
8
DEC 01/14
24-46-00
DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
EAD 10000-003
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 114
210
: 114BR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
___
MEN
_________
MAN-HOURS
01
ELAPSED TIME
GSE
AH
24-46-00
EAD 10000-003
2-400 PAGE
1
DEC 01/14
DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
001
24-46-00
EAD 10000-003
2
DEC14
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
002
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
_______
WARNING
REF.FIG.244600-EAD-00100
1. BEFORE AIRCRAFT POWER SUPPLY MAKE CERTAIN
THAT SAFETY RULES MUST BE OBSERVED
2. ON PANEL 29VU MAKE CERTAIN THAT:
- BAT SELECTOR SWITCH IS IN OFF POSITION
- EXT PWR PUSHBUTTON SWITCH IS IN
RELEASED POSITION
003
___________
PREPARATION
REF.FIG.244600-EAD-00100
REF.FIG.244600-EAD-00110
REF.FIG.244600-EAD-00100
(ONLY IF THE A/C IS ON JACKS)
1. ON PANEL 702VU
PLACE NORM/FLT MODE SWITCH IN FLT POSITION
2. ON PANEL 29VU
PLACE BAT SELECTOR SWITCH IN ON POSITION
AND VERIFY THAT:
- THE TWO ARROW LEGENDS OF BAT TIE CAUTION
LIGHT COME ON
- BUS OFF 1 AND 2 LEGENDS OF CAUTION LIGHTS
COME ON AND AFTER ABOUT 5 SECS
*** CONTINUED ***
AH
24-46-00
EAD 10000-003
2-400 PAGE
2
DEC 01/14
24-46-00
DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
EAD 10000-003
3
DEC14
24-46-00
EAD 10000-003
2-400 PAGE
3
DEC 01/14
24-46-00
DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
EAD 10000-003
4
DEC14
24-46-00
EAD 10000-003
2-400 PAGE
4
DEC 01/14
DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
24-46-00
EAD 10000-003
5
DEC14
________
CLOSE
UP
REF. FIG. 244600-EAD-00100
REF. FIG. 244600-EAD-00110
1. CUT OFF THE EXTERNAL POWER TO AIRCRAFT AND
SHUT-DOWN THE GROUND POWER UNIT
REF. FIG. 244600-EAD-00110
2. ON PANEL 5002VU CHECK THAT:
- DC CNCTD INDICATOR LIGHT GOES OFF
- DC PWR NOT USED INDICATOR LIGHT GOES OFF
WARNING: IT IS FORBIDDEN TO UNPLUG THE GROUND
POWER UNIT PLUG WHEN THE CIRCUITIS
ENERGIZED AS THIS COULD CAUSE ARGING
WHICH WOULD BE DANGEROUS FOR PERSONNEL, OR DAMAGE TO EQUIPMENT
3. ON PANEL 5002VU UNPLUG THE GROUND POWER UNIT
PLUG FROM RECEPTACLE
4. CLOSE ACCESS DOOR 114BR
*** CONTINUED ***
AH
24-46-00
EAD 10000-003
2-400 PAGE
5
DEC 01/14
24-46-00
DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
EAD 10000-003
6
DEC14
REF.FIG. 244600-EAD-00100
5. ON PANEL 29VU
PLACE BAT SELECTOR SWITCH IN OFF POSITION
6. (ONLY IF THE A/C IS ON JACKS) ON PANEL 702VU
REPLACE NORM/FLT MODE SWITCH IN NORM
POSITION
*****
AH
E N D
O F
T E X T
*****
24-46-00
EAD 10000-003
2-400 PAGE
6
DEC 01/14
24-46-00
7
AH
EAD 10000-003
DEC14
24-46-00
EAD 10000-003
2-400
PAGE
7
DEC 01/14
24-46-00
8
AH
EAD 10000-003
DEC14
24-46-00
EAD 10000-003
2-400
PAGE
8
DEC 01/14
24-46-00
DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
EAD 10000-004
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 114
210
: 114BR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELECTRIC
_________
MAN-HOURS
01
ELAPSED TIME
GSE
31-63-00-PRO-10000
PUBLICATION
___________
JIC
AH
24-46-00
EAD 10000-004
2-400 PAGE
1
DEC 01/14
24-46-00
DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
001
EAD 10000-004
2
DEC14
002
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
003
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
_______
WARNING
REF.FIG.244600-EAD-00100
1. BEFORE AIRCRAFT POWER SUPPLY MAKE CERTAIN
THAT SAFETY RULES MUST BE OBSERVED
2. ON PANEL 29VU MAKE CERTAIN THAT:
- BAT SELECTOR SWITCH IS IN OFF POSITION
- EXT PWR PUSHBUTTON SWITCH IS IN
RELEASED POSITION
004
___________
PREPARATION
REF.FIG.244600-EAD-00100
REF.FIG.244600-EAD-00110
*** CONTINUED ***
AH
24-46-00
EAD 10000-004
2-400 PAGE
2
DEC 01/14
24-46-00
DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
EAD 10000-004
3
DEC14
REF.FIG.244600-EAD-00100
(ONLY IF THE A/C IS ON JACKS)
1. ON PANEL 702VU
PLACE NORM/FLT MODE SWITCH IN FLT POSITION
2. ON PANEL 29VU
PLACE BAT SELECTOR SWITCH IN ON POSITION
AND VERIFY THAT:
- THE TWO ARROW LEGENDS OF BAT TIE CAUTION
LIGHT COME ON
- BUS OFF FOR AC BUS 1 AND 2 CAUTION
LIGHTS COME ON
- INV FAULT FOR INV 2 CAUTION LIGHT COMES
ON TOO
- DC BUS OFF FOR DC BUS 1 AND 2 CAUTION
LIGHTS COME ON
- SHED LEGEND OF DC SVCE/UTLY BUS PUSHBUTTON
SWITCH COMES ON
ON MFD UPPER WINDOW, IN ELEC SD PAGE:
- AMBER ARROWS ARE DISPLAYED ON EMER AND
MAIN BAT
- AMBER AC BUS 1 OFF AND AC BUS 2 OFF
SYMBOLS ARE DISPLAYED
- AMBER DC BUS 1 OFF AND DC BUS 2 OFF
SYMBOLS ARE DISPLAYED
- AMBER INV 2 FAULT SYMBOL IS DISPLAYED
- SHED LEGENDS ABOVE UTLY BUS 1 AND 2
SYMBOLS ARE DISPLAYED.
REF.FIG.244600-EAD-00110
3. OPEN DOOR 114BR GIVING ACCESS TO
DC EXTERNAL POWER RECEPTABLE
4. ON PANEL 5002VU PLUG IN THE GROUND
POWER UNIT PLUG TO RECEPTABLE
5. START THE GROUND POWER UNIT AND SUPPLY THE
AIRCRAFT BY MEANS OF IT
6. ON PANEL 5002VU CHECK THAT:
*** CONTINUED ***
AH
24-46-00
EAD 10000-004
2-400 PAGE
3
DEC 01/14
24-46-00
DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
EAD 10000-004
4
DEC14
24-46-00
EAD 10000-004
2-400 PAGE
4
DEC 01/14
24-46-00
DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
EAD 10000-004
5
DEC14
24-46-00
EAD 10000-004
2-400 PAGE
5
DEC 01/14
DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
24-46-00
EAD 10000-004
6
DEC14
________
CLOSE
UP
REF. FIG. 244600-EAD-00100
REF. FIG. 244600-EAD-00110
1. CUT OFF THE EXTERNAL POWER TO AIRCRAFT AND
SHUT-DOWN THE GROUND POWER UNIT
REF. FIG. 244600-EAD-00110
2. ON PANEL 5002VU CHECK THAT:
- DC CNCTD INDICATOR LIGHT GOES OFF
- DC PWR NOT USED INDICATOR LIGHT GOES OFF
*** CONTINUED ***
AH
24-46-00
EAD 10000-004
2-400 PAGE
6
DEC 01/14
24-46-00
DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
EAD 10000-004
7
DEC14
AH
E N D
O F
T E X T
*****
24-46-00
EAD 10000-004
2-400 PAGE
7
DEC 01/14
24-46-00
8
AH
EAD 10000-004
DEC14
24-46-00
EAD 10000-004
2-400
PAGE
8
DEC 01/14
24-46-00
9
AH
EAD 10000-004
DEC14
24-46-00
EAD 10000-004
2-400
PAGE
9
DEC 01/14
24-46-00
SHEDDING PROCEDURE TO
REDUCE ON GROUND THE DC
LOAD DEMAND
PRO 10000-001
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
AH
24-46-00
PRO 10000-001
2-400 PAGE
1
DEC 01/14
24-46-00
SHEDDING PROCEDURE TO
REDUCE ON GROUND THE DC
LOAD DEMAND
001
PRO 10000-001
2
DEC14
___________
PREPARATION
1. BEFORE THE DC EXT PWR AIRCRAFT ENERGIZATION,
CHECK THE DC LOAD CAPABILITY OF GPU UTILIZED
2. IF FOR ANY REASON, IT IS NOT POSSIBLE TO
KNOW THE DC LOAD CAPABILITY OF GPU UTILIZED,
PERFORM COMPLETELY THE FOLLOWING SHEDDING
PROCEDURE.
IN THIS CASE THE TOTAL ATR72 DC LOAD REDUCTION IS : 116 AMPS.
NOTE : THE ATR72 DC LOAD DEMAND IS :
400 AMPS.
002
003
________________________________________
SHEDDING
PROCEDURE OF FUEL PUMPS 1 AND 2
REF. FIG. 282100-OPT-00120
FUEL PUMPS 1 AND 2
LOAD
: 9.5 AMPS
QUANTITY
: 2
TOTAL LOAD ERDUCTION: 19 AMPS
ON PANEL 25VU FUEL SECTION, SELECT OFF BOTH
PUMP PUSHBUTTON SWITCHES:
*** CONTINUED ***
AH
24-46-00
PRO 10000-001
2-400 PAGE
2
DEC 01/14
24-46-00
SHEDDING PROCEDURE TO
REDUCE ON GROUND THE DC
LOAD DEMAND
PRO 10000-001
3
DEC14
AH
E N D
O F
T E X T
*****
24-46-00
PRO 10000-001
2-400 PAGE
3
DEC 01/14
24-46-00
4
AH
PRO 10000-001
DEC14
24-46-00
PRO 10000-001
2-400
PAGE
4
DEC 01/14
24-46-00
5
AH
FUEL DISTRIBUTION
OPERATIONAL TEST
PRO 10000-001
DEC14
24-46-00
PRO 10000-001
2-400
PAGE
5
DEC 01/14
24-46-00
6
AH
OPERATIONAL TEST
OF PASSENGER COMPARTMENT
LIGHTING
PRO 10000-001
DEC14
24-46-00
PRO 10000-001
2-400
PAGE
6
DEC 01/14
24-46-00
SHEDDING PROCEDURE TO
REDUCE ON GROUND THE DC
LOAD DEMAND
PRO 10000-002
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
AH
24-46-00
PRO 10000-002
2-400 PAGE
1
DEC 01/14
24-46-00
SHEDDING PROCEDURE TO
REDUCE ON GROUND THE DC
LOAD DEMAND
001
PRO 10000-002
2
DEC14
___________
PREPARATION
1. BEFORE THE DC EXT PWR AIRCRAFT ENERGIZATION,
CHECK THE DC LOAD CAPABILITY OF GPU UTILIZED
2. IF FOR ANY REASON, IT IS NOT POSSIBLE TO
KNOW THE DC LOAD CAPABILITY OF GPU UTILIZED,
PERFORM COMPLETELY THE FOLLOWING SHEDDING
PROCEDURE.
IN THIS CASE THE TOTAL ATR72 DC LOAD REDUCTION IS : 116 AMPS.
NOTE : THE ATR72 DC LOAD DEMAND IS :
400 AMPS.
002
003
________________________________________
SHEDDING
PROCEDURE OF FUEL PUMPS 1 AND 2
REF. FIG. 282100-OPT-00120
FUEL PUMPS 1 AND 2
LOAD
: 9.5 AMPS
QUANTITY
: 2
TOTAL LOAD ERDUCTION: 19 AMPS
*** CONTINUED ***
AH
24-46-00
PRO 10000-002
2-400 PAGE
2
DEC 01/14
24-46-00
SHEDDING PROCEDURE TO
REDUCE ON GROUND THE DC
LOAD DEMAND
PRO 10000-002
3
DEC14
AH
E N D
O F
T E X T
*****
24-46-00
PRO 10000-002
2-400 PAGE
3
DEC 01/14
24-46-00
4
AH
PRO 10000-002
DEC14
24-46-00
PRO 10000-002
2-400
PAGE
4
DEC 01/14
24-46-00
5
AH
FUEL DISTRIBUTION
OPERATIONAL TEST
PRO 10000-002
DEC14
24-46-00
PRO 10000-002
2-400
PAGE
5
DEC 01/14
24-46-00
6
AH
OPERATIONAL TEST
OF PASSENGER COMPARTMENT
LIGHTING
PRO 10000-002
DEC14
24-46-00
PRO 10000-002
2-400
PAGE
6
DEC 01/14
24-46-11
RAI 10000-001
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 114
: 114BR
212HF
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
SPARE
: 01 RECEPTACLE
244610-50
EXPENDABLE
: 02 NUT
244610-50
_________
MAN-HOURS
09-001
09-002
PUBLICATION
___________
JIC
JIC
AH
25-13-16-RAI-10000
24-46-00-EAD-10000
24-46-11
RAI 10000-001
2-400 PAGE
1
DEC 01/14
24-46-11
001
RAI 10000-001
2
DEC14
____________________________________________
REMOVAL
OF FLIGHT COMPARTMENT FLOOR COVERING
SEE JOB INSTRUCTION CARD
251316-RAI-10000
002
___________
PREPARATION
1. REMOVE ACCESS PANEL 212HF.
2. OPEN DOOR 114BR.
003
_____________________________________
REMOVAL
OF DC GROUND POWER RECEPTACLE
REF. FIG. 244611-RAI-00100
1. REMOVE THE SCREWS (1) AND WASHERS (2).
REMOVE COVER (3).
2. NOTE THE POSITION OF WIRES AND DISCONNECT
THEM.
3. REMOVE AND DISCARD NUTS (7) AND REMOVE
WASHERS (6).
4. REMOVE SCREWS (4) AND RECEPTACLE (5).
004
__________________________________________
INSTALLATION
OF DC GROUND POWER RECEPTACLE
REF. FIG. 244611-RAI-00100
1. APPLY PRODUCT 09-001F (REF. AMM 20-31-00)
ON THE BASE OF THE RECEPTACLE (5).
2. INSTALL THE RECEPTACLE (5) AND THE TWO
SCREWS (4).
3. FROM INTERNAL ACCESS, INSTALL WASHERS (6)
AND NUTS (7) AND TIGHTEN NUTS.
4. RECONNECT WIRES FOLLOWING THE POSITION NOTED
DURING REMOVAL
(TIGHTENNING TORQUE VALUE:
- FOR CONTACT WITH A DIAMETER OF 11.07 MM /
0.4358 IN : TIGHTEN AT 0.86 MDAN TO 0.95
MDAN / 76.10 LBF.IN TO 84.07 LBF.IN.
- FOR CONTACT WITH A DIAMETER OF 7.89 MM /
0.3106 IN : TIGHTEN AT 0.21 MDAN TO 0.24
MDAN / 18.58 LBF.IN TO 21.23 LBF.IN.)
5. POSITION THE COVER (3) AND INSTALL WASHERS
(2) AND THE SCREWS (1).
*** CONTINUED ***
AH
24-46-11
RAI 10000-001
2-400 PAGE
2
DEC 01/14
24-46-11
005
RAI 10000-001
3
DEC14
________
CLOSE-UP
1. INSTALL ACCESS PANEL 212HF.
2. CLOSE DOOR 114BR.
006
007
______________________________________________
OPERATIONAL
TEST OF DC GROUND POWER RECEPTACLE
DO AN ENERGIZATION AND DE-ENERGIZATION OF DC
AND AC CONSTANT FREQUENCY EXTERNAL POWER SUPPLY
ACCORDING TO THE FOLLOWING CARDS.
008
009
AH
E N D
O F
T E X T
*****
24-46-11
RAI 10000-001
2-400 PAGE
3
DEC 01/14
24-46-11
4
AH
RAI 10000-001
DEC14
24-46-11
RAI 10000-001
2-400
PAGE
4
DEC 01/14
24-46-83
OPT 10000-001
1
MAR13
ZONING DATA
___________
ZONE
ACCESS
: 214
: 214BZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELECTRONIC
ELAPSED TIME
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
AH
24-31-00-EAD-10000
24-46-83
OPT 10000-001
2-400 PAGE
1
MAR 01/13
24-46-83
001
OPT 10000-001
2
MAR13
_________________________________
ENERGIZING
OF SYSTEM FROM BATTERY
SEE JOB INSTRUCTION CARD
243100-EAD-10000
002
___________
PREPARATION
REF.FIG. 240000-RAI-00103
1. ON R ELECTRONICS RACK 90VU (B)
OPEN ACCESS DOOR 214BZ
003
__________________________________________
DC
BUS POWER CONTROL UNIT OPERATIONAL TEST
REF.FIG.244613-OPT-00100
1. ON R ELECTRONICS RACK 90VU SHELF 5
ON DC BPCU FRONT PANEL (B) PRESS AND HOLD
THE CL SWITCH.VERIFY THAT THE CC INDICATOR
LIGHT COMES ON.
IF DC BPCU ARE IN SATISFACTORY CONDITION,
THE INDICATOR LIGHT WILL BE ON FOR
15 SEC +/- 1SEC THEN IT GOES OFF.
IF ONE CIRCUIT OF THE BPCU IS DEFECTIVE,
THE INDICATOR LIGHT WILL BE ON FOR 15 SEC,
THEN IT GOES OFF FOR 100 MILLISECONDS,
SUBSEQUENTLY AGAIN IT COMES ON AND IT
REMAINS ON AS LONG THE PUSH-BUTTON IS KEPT
PRESSED.
004
________
CLOSE
UP
REF.FIG.240000-RAI-00103
1. ON R ELECTRONICS RACK 90VU (B)
CLOSE ACCESS DOOR 214BZ
005
____________________________________
DE-ENERGIZING
OF SYSTEM FROM BATTERY
SEE JOB INSTRUCTION CARD
243100-EAD-10000
*****
AH
E N D
O F
T E X T
*****
24-46-83
OPT 10000-001
2-400 PAGE
2
MAR 01/13
24-46-83
3
AH
OPT 10000-001
MAR13
24-46-83
OPT 10000-001
2-400
PAGE
3
MAR 01/13
24-46-83
4
AH
OPT 10000-001
MAR13
24-46-83
OPT 10000-001
2-400
PAGE
4
MAR 01/13
24-46-83
RAI 10000-001
1
APR05
ZONING DATA
___________
ZONE
ACCESS
: 120
214
: 122VU 124VU 125VU 127VU 128VU
214BZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
___
MEN
_________
MAN-HOURS
01
PUBLICATION
___________
JIC
AH
24-46-83-OPT-10000
24-46-83
RAI 10000-001
2-400 PAGE
1
APR 01/05
24-46-83
001
RAI 10000-001
2
APR05
___________
PREPARATION
REF. FIG. 240000-RAI-00103
1. OPEN, SAFETY CLIP AND TAG THE FOLLOWING CIRCUIT BREAKERS:
- ON PANEL 122VU (A)
8PG MAIN ELEC PWR-DC/DC EXT PWR INTLK
15PG MAIN ELEC PWR-DC/BPCU DC
35PU(38PU) MAIN ELEC PWR-DC/GCU DC GEN 1
(GCU DC GEN 2)
- ON PANEL 125VU (A)
4PG EXT PWR/BPCU CTL
13PU DC GEN1/CTL/EXCN
51PU DC GEN1/CTL/POR
- ON PANEL 127VU (A)
53PU DC GEN 1/CTL/BUS V SNSG
- ON PANEL 128VU (A)
14PU DC GEN 2/CTL/EXCN
52PU DC GEN 2/CTL/POR
2. ON R ELECTRONICS RACK 90VU (B)
OPEN ACCESS DOOR 214BZ
002
24-46-83
RAI 10000-001
2-400 PAGE
2
APR 01/05
24-46-83
RAI 10000-001
3
APR05
RACK (4).
4. INSTALL PROTECTIVE PLUGS ON EQUIPMENT SIDE
ELECTRICAL CONNECTORS (5).
003
004
________
CLOSE
UP
REF. FIG. 240000-RAI-00103
1. ON R ELECTRONICS RACK 90VU(B)
CLOSE ACCESS DOOR 214BZ
2. REMOVE SAFETY CLIPS AND TAGS AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
- ON PANEL 122VU (A)
8PG
15PG
35PU(38PU)
- ON PANEL 125VU (A)
4PG
13PU
51PU
- ON PANEL 127VU (A)
53PU
- ON PANEL 128VU (A)
*** CONTINUED ***
AH
24-46-83
RAI 10000-001
2-400 PAGE
3
APR 01/05
24-46-83
RAI 10000-001
4
APR05
14PU
52PU
005
__________________________________________
DC
BUS POWER CONTROL UNIT OPERATIONAL TEST
SEE JOB INSTRUCTION CARD
244683-OPT-10000
*****
AH
E N D
O F
T E X T
*****
24-46-83
RAI 10000-001
2-400 PAGE
4
APR 01/05
24-46-83
5
AH
RAI 10000-001
APR05
24-46-83
RAI 10000-001
2-400
PAGE
5
APR 01/05
24-46-83
6
AH
L AND R ELECTRONICS
RACKS 80VU AND 90VU
EQUIPMENT
RAI 10000-001
APR05
24-46-83
RAI 10000-001
2-400
PAGE
6
APR 01/05
24-46-84
RAI 10000-001
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 212
220
: 212TZ 212VZ 214BZ 214PZ 222CZ 222QZ 222RZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
ELAPSED TIME
SPARE
: 01
01
01
01
01
AH
___
MEN
_________
MAN-HOURS
01
CONTACTOR:11PG
TERMINAL STRIP:1PP
TERMINAL STRIP:2PP
TERMINAL STRIP:5PP
TERMINAL STRIP:6PP
24-46-80-XX-XXX
24-69-80-XX-XXX
24-69-80-XX-XXX
24-69-80-XX-XXX
24-69-80-XX-XXX
24-46-84
RAI 10000-001
2-400 PAGE
1
MAR 01/15
24-46-84
001
RAI 10000-001
2
MAR15
___________
PREPARATION
REF. FIG. 240000-RAI-00100 (FIG.1)
REF. FIG. 240000-RAI-00103 (FIG.2)
1. MAKE CERTAIN THAT THE GROUND POWER UNIT IS
NOT CONNECTED TO THE DC AND AC EXTERNAL POWER RECEPTACLES (ON PANELS 5002VU AND 5000VU
-FIG.1-F AND D) AND THE ACCESS DOORS 114BR
AND 114CR (FIG.1-E AND C) ARE CLOSED
2. ON PANEL 29VU (FIG.1-A) MAKE CERTAIN THAT:
BAT SELECTOR SWITCH 7PA IS IN OFF POSITION
3. DISPLAY A WARNING NOTICE ON PANELS 29VU AND
26VU (FIG.1-B) PROHIBITING POWER SUPPLY TO
SYSTEM
4. ON DC/AC POWER CENTER 120VU OR ON ELECTRONICS RACK 90VU (FIG.2 A AND B AND THE CORRESPONDING FIGURE OF EACH RAI)
120VU: REMOVE ACCESS PANEL 212TZ OR 212VZ
(123VU) OR CIRCUIT BREAKER PANEL 121V
U OR 122VU OR 124VU OR 125VU OR 126VU
OR 127VU OR 128VU OR 129VU OR 130VU
90VU - SIDE SHELF: REMOVE ACCESS PANEL 222RZ
(SHELF 91VU) OR 222QZ (SHELF 91VU OR
92VU OR 93VU) OR 222PZ (SHELF 94VU OR
95VU)
- FRONT SHELF: REMOVE ACCESS PANEL 214
CZ(SHELF 91VU OR 92VU) OR 214BZ(SHELF
93VU OR 94VU OR 95VU)
002
______________________________________
REMOVAL
OF DC EXTERNAL POWER CONTACTOR
REF.FIG.244614-RAI-00100
1. REMOVE NUTS (2) AND WASHERS (3) TO DISCONNECT THE CONTACTOR (1) FROM TERMINAL STRIPS
5PP(2PP) (6) AND 1PP(6PP) (4)
*** CONTINUED ***
AH
24-46-84
RAI 10000-001
2-400 PAGE
2
MAR 01/15
24-46-84
RAI 10000-001
3
MAR15
___________________________________________
INSTALLATION
OF DC EXTERNAL POWER CONTACTOR
REF.FIG.244614-RAI-00100
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/
OR COMPONENT ADJACENT AREA.
2. INSTALL CONTACTOR (1) WITH ITS ELECTRICAL
CONNECTOR (5)
3. TIGHTEN CAPTIVE SCREWS (5)
4. CONNECT CONTACTOR TO TERMINAL STRIPS 5PP
(2PP) (6) AND 1PP(6PP) (4)
5. INSTALL WASHERS (3) AND NUTS (2). TIGHTEN
NUTS (TIGHTENING TORQUE VALUE: 1,65 MDAN /
146 LBF X IN)
NOTE: MARK NUTS (2) WITH RED VARNISH
004
________
CLOSE
UP
REF. FIG. 240000-RAI-00100 (FIG.1)
REF. FIG. 240000-RAI-00103 (FIG.2)
1. ON DC/AC POWER CENTER 12OVU OR ON ELECTRONICS RACK 90VU (FIG.2 A OR B AND THE CORRESPONDING FIGURE OF EACH RAI)
120VU: CLOSE ACCESS PANEL 212TZ OR 212VZ OR
CIRCUIT BREAKER PANEL 121VU OR 122VU
OR 124VU OR 125VU OR 127VU OR 128VU
OR 129VU OR 130VU
90VU - SIDE SHELF: CLOSE ACCESS PANEL 222RZ
OR 222QZ OR 222PZ
*** CONTINUED ***
AH
24-46-84
RAI 10000-001
2-400 PAGE
3
MAR 01/15
24-46-84
RAI 10000-001
4
MAR15
________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****
AH
E N D
O F
T E X T
*****
24-46-84
RAI 10000-001
2-400 PAGE
4
MAR 01/15
24-46-84
5
AH
RAI 10000-001
MAR15
24-46-84
RAI 10000-001
2-400
PAGE
5
MAR 01/15
24-46-84
6
AH
RAI 10000-001
MAR15
24-46-84
RAI 10000-001
2-400
PAGE
6
MAR 01/15
24-46-84
7
AH
RAI 10000-001
MAR15
24-46-84
RAI 10000-001
2-400
PAGE
7
MAR 01/15
24-47-00
EAD 10000-003
1
MAR14
ZONING DATA
___________
ZONE
ACCESS
: 114
210
221
: 114BR
221AL
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
MECHANIC
___
MEN
_________
MAN-HOURS
01
01
ELAPSED TIME
GSE
AH
24-47-00
EAD 10000-003
2-400 PAGE
1
MAR 01/14
24-47-00
001
EAD 10000-003
2
MAR14
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
002
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
_______
WARNING
REF.FIG.244600-EAD-00100
1. BEFORE AIRCRAFT POWER SUPPLY MAKE CERTAIN
THAT SAFETY RULES MUST BE OBSERVED
2. ON PANEL 29VU MAKE CERTAIN THAT:
- BAT SELECTOR SWITCH IS IN OFF POSITION
- EXT PWR PUSHBUTTON SWITCH IS IN
RELEASED POSITION
003
___________
PREPARATION
REF.FIG.244600-EAD-00100
REF.FIG.244600-EAD-00110
REF.FIG.244700-EAD-00100
REF.FIG.244600-EAD-00100
1. (ONLY IF THE A/C IS ON JACKS) ON PANEL 702VU
PLACE NORM/FLT MODE SWITCH IN FLT POSITION
REF.FIG.244700-EAD-00100
2. OPEN DOOR 221AL GIVING ACCESS TO
PANEL 5001VU
REF.FIG.244600-EAD-00110
*** CONTINUED ***
AH
24-47-00
EAD 10000-003
2-400 PAGE
2
MAR 01/14
24-47-00
EAD 10000-003
3
MAR14
24-47-00
EAD 10000-003
2-400 PAGE
3
MAR 01/14
24-47-00
EAD 10000-003
4
MAR14
OFF.
005
006
________
CLOSE
UP
REF.FIG.244600-EAD-00100
REF.FIG.244600-EAD-00110
REF.FIG.244700-EAD-00100
1. CUT OFF THE EXTERNAL POWER TO AIRCRAFT AND
SHUT-DOWN THE GROUND POWER UNIT
REF.FIG.244600-EAD-00110
2. ON PANEL 5002VU CHECK THAT:
- DC CNCTD INDICATOR LIGHT GOES OFF
- DC PWR NOT USED INDICATOR LIGHT GOES
OFF
WARNING: IT IS FORBIDDEN TO UNPLUG THE GROUND
POWER UNIT PLUG WHEN THE CIRCUITIS
ENERGIZED AS THIS COULD CAUSE ARCING
WHICH WOULD BE DANGEROUS FOR PERSONNEL OR DANNAGE TO EQUIPMENT
3. ON PANEL 5002VU UNPLUG THE GROUND POWER UNIT
PLUG FROM THE DC EXTERNAL POWER RECEPTACLE
*** CONTINUED ***
AH
24-47-00
EAD 10000-003
2-400 PAGE
4
MAR 01/14
24-47-00
EAD 10000-003
5
MAR14
AH
E N D
O F
T E X T
*****
24-47-00
EAD 10000-003
2-400 PAGE
5
MAR 01/14
24-47-00
6
AH
EAD 10000-003
MAR14
24-47-00
EAD 10000-003
2-400
PAGE
6
MAR 01/14
24-47-00
7
AH
EAD 10000-003
MAR14
24-47-00
EAD 10000-003
2-400
PAGE
7
MAR 01/14
24-47-00
8
AH
EAD 10000-003
MAR14
24-47-00
EAD 10000-003
2-400
PAGE
8
MAR 01/14
24-50-00
OPT 10000-001
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
AH
24-40-00-EAD-10000
24-50-00
OPT 10000-001
2-400 PAGE
1
DEC 01/14
24-50-00
001
OPT 10000-001
2
DEC14
___________________________________________
ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000
002
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
003
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
ANNUNCIATOR LIGHT
MAIN ELEC PWR/AC BUS
MAIN ELEC PWR/AC BUS
AC WILD ELEC PWR/ACW
AC WILD ELEC PWR/ACW
MAIN ELEC PWR/DC BUS
MAIN ELEC PWR/DC BUS
1/BUS OFF/INV
2/BUS OFF/INV
BUS 1/ACW BUS
BUS 2/ACW BUS
1/DC BUS OFF
2/DC BUS OFF
FAULT
FAULT
OFF
OFF
24-50-00
OPT 10000-001
2-400 PAGE
2
DEC 01/14
24-50-00
OPT 10000-001
3
DEC14
______________________________________________
DE-ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000
*****
AH
E N D
O F
T E X T
*****
24-50-00
OPT 10000-001
2-400 PAGE
3
DEC 01/14
24-50-00
4
AH
OPERATIONAL TEST OF
ELECTRICAL LOAD
DISTRIBUTION
OPT 10000-001
DEC14
24-50-00
OPT 10000-001
2-400
PAGE
4
DEC 01/14
24-50-00
OPT 10000-002
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
AH
24-40-00-EAD-10000
31-63-00-PRO-10000
24-50-00
OPT 10000-002
2-400 PAGE
1
DEC 01/14
24-50-00
001
OPT 10000-002
2
DEC14
___________________________________________
ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000
002
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
003
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
004
24-50-00
OPT 10000-002
2-400 PAGE
2
DEC 01/14
24-50-00
OPT 10000-002
3
DEC14
ANNUNCIATOR LIGHT
MAIN ELEC PWR/AC BUS
MAIN ELEC PWR/AC BUS
AC WILD ELEC PWR/ACW
AC WILD ELEC PWR/ACW
MAIN ELEC PWR/DC BUS
MAIN ELEC PWR/DC BUS
1/BUS OFF/INV
2/BUS OFF/INV
BUS 1/ACW BUS
BUS 2/ACW BUS
1/DC BUS OFF
2/DC BUS OFF
FAULT
FAULT
OFF
OFF
SD PAGE:
DISPLAYED
DISPLAYED
DISPLAYED
DISPLAYED
24-50-00
OPT 10000-002
2-400 PAGE
3
DEC 01/14
24-50-00
OPT 10000-002
4
DEC14
______________________________________________
DE-ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000
*****
AH
E N D
O F
T E X T
*****
24-50-00
OPT 10000-002
2-400 PAGE
4
DEC 01/14
24-50-00
5
AH
OPERATIONAL TEST OF
ELECTRICAL LOAD
DISTRIBUTION
OPT 10000-002
DEC14
24-50-00
OPT 10000-002
2-400
PAGE
5
DEC 01/14
24-50-00
RAI 10000-001
1
APR05
ZONING DATA
___________
ZONE
ACCESS
: 212
222
: 222PZ 222QZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
SPARE
: 01 RELAY
01 RELAY
___
MEN
_________
MAN-HOURS
245180-02-020
245280-02-020
PUBLICATION
___________
JIC
AH
24-50-00-OPT-10000
24-50-00
RAI 10000-001
2-400 PAGE
1
APR 01/05
24-50-00
001
RAI 10000-001
2
APR05
002
________________________________________
REMOVAL
OF RELAYS 5XN, 6XN, 9XB AND 10XB
REF. FIG. 245000-RAI-00100
1. REMOVE ACCESS PANEL 222PZ, TO GAIN ACCESS
TO THE FOLLOWING RELAYS :
ON SHELF 94VU : 9XB, 6XN
*** CONTINUED ***
AH
24-50-00
RAI 10000-001
2-400 PAGE
2
APR 01/05
24-50-00
2. REMOVE ACCESS
THE FOLLOWING
ON SHELF 92VU
ON SHELF 93VU
RAI 10000-001
3
APR05
_____________________________________________
INSTALLATION
OF RELAYS 5XN, 6XN, 9XB AND 10XB
REF. FIG. 245000-RAI-00100
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/OR
COMPONENT ADJACENT AREA.
2. CHECK FOR CORRECT CONDITION OF ELECTRICAL
CONNECTORS.
3. INSTALL RELAY (1) ON ITS SUPPORT (2).
4. ATTACH ASSEMBLY USING SCREWS (3).
5. INSTALL ACCESS DOORS 222PZ AND 222QZ.
004
_____________________________________________
ENERGIZATION
OF RELAYS 5XN, 6XN, 9XB AND 10XB
1. RELAY 9XB
ON CIRCUIT BREAKER PANEL 122VU, CLOSE THE
FOLLOWING CIRCUIT BREAKER :
3XB
ACW ELEC PWR/ACW BUS CAUTION LT/BUS 1
5XB
ACW ELEC PWR/ACW BUS CAUTION RLY/BUS 1
7DA
PROBES HTG/STBY PITOT/EMER SPLY
57DA PROBES HTG/STBY PITOT/NORM SPLY
2. RELAY 10XB
ON CIRCUIT BREAKER PANEL 122VU, CLOSE THE
FOLLOWING CIRCUIT BREAKER :
4XB
ACW ELEC PWR/ACW BUS CAUTION LT/BUS 2
6XB
ACW ELEC PWR/ACW BUS CAUTION RLY/BUS 2
*** CONTINUED ***
AH
24-50-00
RAI 10000-001
2-400 PAGE
3
APR 01/05
24-50-00
RAI 10000-001
4
APR05
4LF
THE
LT/
LT/
RLY/
RLY/
AH
E N D
O F
T E X T
*****
24-50-00
RAI 10000-001
2-400 PAGE
4
APR 01/05
24-50-00
5
AH
RAI 10000-001
APR05
24-50-00
RAI 10000-001
2-400
PAGE
5
APR 01/05
24-65-00
OPT 10000-002
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
JIC
AH
24-31-00-EAD-10000
45-13-00-RDG-10000
45-13-00-RON-10000
24-65-00
OPT 10000-002
2-400 PAGE
1
DEC 01/14
24-65-00
001
OPT 10000-002
2
DEC14
_________________________________
ENERGIZING
OF SYSTEM FROM BATTERY
SEE JOB INSTRUCTION CARD
243100-EAD-10000
002
___________
PREPARATION
NOTE:TO CONTINUE THIS TASK, DO NOT TAKE INTO
ACCOUNT THE ENERGIZATION AND DE-ENERGIZATION FROM THE GROUND POWER UNIT.
WITH THE BELOW PROCEDURE, CHECK IF:
ELEC:STBY CONTACTOR DEFAULT
IS RECORDED IN THE MFC MAINTENANCE MEMORY.
003
_________________________________
READING
OF MFC MAINTENANCE MEMORY
SEE JOB INSTRUCTION CARD
451300-RDG-10000
004
_________________________________
ERASURE
OF MFC MAINTENANCE MEMORY
SEE JOB INSTRUCTION CARD
451300-RON-10000
NOTE:THIS TASK MUST BE PERFORMED ONLY IF FAULTS
RELATIVE TO THE SYSTEM TO BE CHECKED HAVE
BEEN RECORDED BY THE MFC MAINTENANCE
MEMORY.
005
24-65-00
OPT 10000-002
2-400 PAGE
2
DEC 01/14
24-65-00
OPT 10000-002
3
DEC14
_________________________________
READING
OF MFC MAINTENANCE MEMORY
SEE JOB INSTRUCTION CARD
451300-RDG-10000
007
24-65-00
OPT 10000-002
2-400 PAGE
3
DEC 01/14
24-65-00
OPT 10000-002
4
DEC14
_________________________________
READING
OF MFC MAINTENANCE MEMORY
SEE JOB INSTRUCTION CARD
451300-RDG-10000
009
_________________________________
ERASURE
OF MFC MAINTENANCE MEMORY
SEE JOB INSTRUCTION CARD
451300-RON-10000
010
____________________________________
DE-ENERGIZING
OF SYSTEM FROM BATTERY
SEE JOB INSTRUCTION CARD
243100-EAD-10000
*****
AH
E N D
O F
T E X T
*****
24-65-00
OPT 10000-002
2-400 PAGE
4
DEC 01/14
24-65-00
5
AH
OPERATIONNAL TEST OF
STBY DISTRIBUTION AND
ASSOCIATED INDICATING
OPT 10000-002
DEC14
24-65-00
OPT 10000-002
2-400
PAGE
5
DEC 01/14
24-65-00
OPT 10000-003
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
JIC
JIC
AH
24-31-00-EAD-10000
31-63-00-PRO-10000
45-13-00-RDG-10000
45-13-00-RON-10000
24-65-00
OPT 10000-003
2-400 PAGE
1
DEC 01/14
24-65-00
001
OPT 10000-003
2
DEC14
_________________________________
ENERGIZING
OF SYSTEM FROM BATTERY
SEE JOB INSTRUCTION CARD
243100-EAD-10000
002
___________
PREPARATION
NOTE:TO CONTINUE THIS TASK, DO NOT TAKE INTO
ACCOUNT THE ENERGIZATION AND DE-ENERGIZATION FROM THE GROUND POWER UNIT.
WITH THE BELOW PROCEDURE, CHECK IF:
ELEC:STBY CONTACTOR DEFAULT
IS RECORDED IN THE MFC MAINTENANCE MEMORY.
003
004
_________________________________
READING
OF MFC MAINTENANCE MEMORY
SEE JOB INSTRUCTION CARD
451300-RDG-10000
005
_________________________________
ERASURE
OF MFC MAINTENANCE MEMORY
SEE JOB INSTRUCTION CARD
451300-RON-10000
NOTE:THIS TASK MUST BE PERFORMED ONLY IF FAULTS
RELATIVE TO THE SYSTEM TO BE CHECKED HAVE
*** CONTINUED ***
AH
24-65-00
OPT 10000-003
2-400 PAGE
2
DEC 01/14
24-65-00
OPT 10000-003
3
DEC14
24-65-00
OPT 10000-003
2-400 PAGE
3
DEC 01/14
24-65-00
OPT 10000-003
4
DEC14
A. ON PANEL 29VU,
RELEASE OVRD/UNDV PUSHBUTTON SWITCH AND
MAKE CERTAIN THAT OVRD LEGEND GOES OFF
WHILST INV FAULT AND UNDV LEGENDS
REMAIN OFF.
B. ON MFD UPPER WINDOW, IN ELEC SD PAGE,
VERIFY THAT:
- GREEN INV 1 SYMBOL IS DISPLAYED
- UNDV LEGEND ON DC STBY BUS SYMBOL
IS NO MORE DISPLAYED
- OVRD LEGEND ON DC STBY BUS SYMBOL
IS NO MORE DISPLAYED
4. WITH BELOW PROCEDURE, MAKE CERTAIN THAT:
ELEC: STBY CONTACTOR DEFAULT
IS NOT RECORDED IN MFC MAINTENANCE MEMORY.
007
_________________________________
READING
OF MFC MAINTENANCE MEMORY
SEE JOB INSTRUCTION CARD
451300-RDG-10000
008
009
_________________________________
READING
OF MFC MAINTENANCE MEMORY
SEE JOB INSTRUCTION CARD
451300-RDG-10000
24-65-00
OPT 10000-003
2-400 PAGE
4
DEC 01/14
24-65-00
010
OPT 10000-003
5
DEC14
_________________________________
ERASURE
OF MFC MAINTENANCE MEMORY
SEE JOB INSTRUCTION CARD
451300-RON-10000
011
____________________________________
DE-ENERGIZING
OF SYSTEM FROM BATTERY
SEE JOB INSTRUCTION CARD
243100-EAD-10000
*****
AH
E N D
O F
T E X T
*****
24-65-00
OPT 10000-003
2-400 PAGE
5
DEC 01/14
24-65-00
6
AH
OPERATIONNAL TEST OF
STBY DISTRIBUTION AND
ASSOCIATED INDICATING
OPT 10000-003
DEC14
24-65-00
OPT 10000-003
2-400
PAGE
6
DEC 01/14
24-65-81
RAI 10000-001
1
APR05
ZONING DATA
___________
ZONE
ACCESS
: 212
: 212VZ
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
_________
MAN-HOURS
ELAPSED TIME
SPARE
246580-01-120
24-65-00-OPT-10000
PUBLICATION
___________
JIC
AH
24-65-81
RAI 10000-001
2-400 PAGE
1
APR 01/05
24-65-81
001
RAI 10000-001
2
APR05
__________________________________________
DE-ENERGIZATION
OF CONTACTORS 4PD AND 13PD
REF. FIG. 246581-RAI-00100
OPEN SAFETY AND TAG THE FOLLOWING CIRCUIT
BREACKERS :
ON PANEL 122VU
8PD MAIN ELEC PWR-DC/STBY BUS/CTL
ON PANEL 127VU
3XA PWR SPLY ON PRIM DC BUS 1/INV 1
ON PANEL 129VU
3PD DC STBY BUS ON HMBB
4XA INV 1 ON HOT MAIN BAT BUS
ON PANEL 130VU
11PD DC EMER & STBY BUS ON HEBB/DC STBY BUS
60PA DC EMER BUS/INV 1 ON HEBB IND
7XA INV 1 ON HOT EMER BAT BUS
002
___________
PREPARATION
REF. FIG. 246581-RAI-00100
1. REMOVE ACCESS PANEL 212VZ.
2. DETACH PANEL 130VU FROM 123VU WITHOUT
REMOVING IT.
003
__________________________________
REMOVAL
OF CONTACTORS 4PD AND 13PD
REF. FIG. 246581-RAI-00100
1. REMOVE NUTS (1) AND (7), WASHERS (2) AND BAR
(3). IDENTIFY AND DISCONNECT TERMINAL LUGS
(4).
2. LOOSEN SCREWS (5).
3. DISCONNECT CONTACTOR (6).
4. INSTALL PROTECTIVE CAPS ON CONNECTORS (8).
*** CONTINUED ***
AH
24-65-81
RAI 10000-001
2-400 PAGE
2
APR 01/05
24-65-81
004
RAI 10000-001
3
APR05
_______________________________________
INSTALLATION
OF CONTACTORS 4PD AND 13PD
REF. FIG. 246581-RAI-00100
1. CLEAN AND INSPECT CONTACTOR (6) INTERFACE
AND/OR ADJACENT AREA.
2. REMOVE PROTECTIVE CAPS FROM CONNECTORS (8).
3. MAKE CERTAIN THAT CONTACTS ARE IN CORRECT
CONDITION.
4. CONNECT CONTACTOR (6).
5. TIGHTEN SCREW (5).
6. CONNECT TERMINAL LUGS (4), INSTALL BAR (3),
WASHERS (2) SCREW AND TORQUE
- NUTS (1) TO 0,35 M.DAN (31 LBF.IN)
- NUTS (7) TO 0,20 M.DAN (17.5 LBF.IN).
005
________
CLOSE-UP
REF. FIG. 246581-RAI-00100
1. PLACE PANEL 130VU ON 123VU AND ATTACH.
2. FIX ACCESS PANEL 212VZ.
006
_______________________________________
ENERGIZATION
OF CONTACTORS 4PD AND 13PD
REF. FIG. 246581-RAI-00100
REMOVE SAFETY CLIPS AND CLOSE THE FOLLOWING
CIRCUIT BREACKERS :
ON PANEL 122VU
8PD MAIN ELEC PWR-DC/STBY BUS/CTL
ON PANEL 127VU
3XA PWR SPLY ON PRIM DC BUS 1/INV 1
ON PANEL 129VU
3PD DC STBY BUS ON HMBB
*** CONTINUED ***
AH
24-65-81
RAI 10000-001
2-400 PAGE
3
APR 01/05
24-65-81
RAI 10000-001
4
APR05
________________________________________
TEST
CONTACTORS 4PD , 13PD AND RELAY 7PD
SEE JOB INSTRUCTION CARD
246500-OPT-10000
*****
AH
E N D
O F
T E X T
*****
24-65-81
RAI 10000-001
2-400 PAGE
4
APR 01/05
24-65-81
5
AH
RAI 10000-001
APR05
24-65-81
RAI 10000-001
2-400
PAGE
5
APR 01/05
24-70-00
BONDING INSPECTION
MSN 10000-002
1
DEC14
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
GSE
: 01 MEGOHMMETER
01 MILLIOHMETER
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
: REMOVAL/INSTALLATION
OF RADOME
AH
53-91-21-RAI-10000
24-70-00
MSN 10000-002
2-400 PAGE
1
DEC 01/14
24-70-00
BONDING INSPECTION
MSN 10000-002
2
001
DEC14
___________
PREPARATION
THE AIRCRAFT MUST BE CONNECTED NEITHER TO THE
GROUND POWER UNIT NOR TO THE GROUND. IT MUST BE
ON ITS WHEELS, DRY AND IN A SHELTERED AREA. THE
DOORS MUST BE CLOSED.
SAFETY DEVICES AND WARNING NOTICES MUST BE
INSTALLED. THE AIRCRAFT ELECTRICAL NETWORK MUST
NOT BE ENERGIZED.
ACCESS PLATFORMS MUST BE INSTALLED IN THE
INSPECTION AREA.
002
_________________
REMOVAL
OF RADOME
SEE JOB INSTRUCTION CARD
539121-RAI-10000
003
24-70-00
MSN 10000-002
2-400 PAGE
2
DEC 01/14
BONDING INSPECTION
24-70-00
MSN 10000-002
3
004
DEC14
___________________________________________
VALIDATION
OF A (PT) SECONDARY GROUND POINT
REF. FIG. 247000-MSN-00100
THE (PR) FRAME-01 REFERENCE GROUND POINTS
(STRUCTURAL BASES OF RADOME GROUNDING SPRINGS)
BEING NO MORE ACCESSIBLE WHEN THE RADOME IS
INSTALLED, IT IS NECESSARY TO DEFINE A (PT)
SECONDARY GROUND POINT ON THE NLG DOOR
BONDING BRAID FOR THE CONTINUITY MEASUREMENTS.
1. USING A MILLIOHMETER, CHECK THE RESISTANCE
VALUE BETWEEN ONE (PR)(FRAME-01) REFERENCE
GROUND POINT AND THE (PT) SECONDARY
REFERENCE POINT.
- VALUE MUST BE LESS THAN 2 MILLIOHMS.
005
______________________
INSTALLATION
OF RADOME
SEE JOB INSTRUCTION CARD
539121-RAI-10000
006
________________________
BONDING
CONTINUITY CHECK
NOTE : THIS BONDING CONTINUITY MEASUREMENT IS
PERFORMED WITH RESPECT TO THE (PT)
SECONDARY REFERENCE GROUND POINT
PREVIOUSLY DEFINED.
REF. FIG. 247000-MSN-00105
1. RADOME :
USING A MILLIOHMETER, MESURE, FOR EACH
LIGHTNING ARRESTOR STRIP, THE CONTINUITY
VALUE BETWEEN A BONDING PICK-UP SCREW
AND THE (PT) SECONDARY REFERENCE POINT.
- FOR EACH OF THESE MEASUREMENTS, THE
VALUE MUST BE 4 MILLIOHMS MAXI.
NOTE : IF THE LIGHTNING ARRESTOR STRIPS ARE
PAINTED, REMOVE THE SCREW IN ORDER
TO ACCESS TO A METALLICAL PART
*** CONTINUED ***
AH
24-70-00
MSN 10000-002
2-400 PAGE
3
DEC 01/14
24-70-00
BONDING INSPECTION
MSN 10000-002
4
DEC14
(THREADING).
REF. FIG. 247000-MSN-00105
2. TAIL CONE :
USING A MILLIOHMETER, MESURE, FOR EACH
LIGHTNING ARRESTOR STRIP, THE CONTINUITY
VALUE BETWEEN THE ATTACHMENT SCREW AND
THE (PT) SECONDARY REFERENCE POINT.
- FOR EACH OF THESE MEASUREMENTS, THE
VALUE MUST BE 4 MILLIOHMS MAXI.
NOTE : IF THE LIGHTNING ARRESTOR STRIPS ARE
PAINTED, REMOVE THE SCREW IN ORDER
TO ACCESS TO A METALLICAL PART
(THREADING).
007
________
CLOSE-UP
1. INSTALL THE SCREWS PREVIOUSLY REMOVED ON
RADOME AND TAIL CONE.
2. MAKE CERTAIN THAT ACCESS PANELS RADOME AND
ENGINE COWLS ARE CORRECTLY LOCKED.
3. REMOVE ACCESS PLATFORM FROM WORK AREA.
4. REMOVE WARNING NOTICES.
*****
AH
E N D
O F
T E X T
*****
24-70-00
MSN 10000-002
2-400 PAGE
4
DEC 01/14
24-70-00
5
AH
VALIDATION OF A
SECONDARY GROUND POINT
MSN 10000-002
DEC14
24-70-00
MSN 10000-002
2-400
PAGE
5
DEC 01/14
24-70-00
6
AH
BONDING MEASUREMENTS
OF RADOME AND TAIL
CONE
MSN 10000-002
DEC14
24-70-00
MSN 10000-002
2-400
PAGE
6
DEC 01/14
24-70-00
BONDING INSPECTION
MSN 10000-003
1
MAR14
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
GSE
: 01 MEGOHMMETER
01 MILLIOHMETER
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
: REMOVAL/INSTALLATION
OF RADOME
AH
53-91-21-RAI-10000
24-70-00
MSN 10000-003
2-400 PAGE
1
MAR 01/14
24-70-00
BONDING INSPECTION
MSN 10000-003
2
001
MAR14
___________
PREPARATION
THE AIRCRAFT MUST BE CONNECTED NEITHER TO THE
GROUND POWER UNIT NOR TO THE GROUND. IT MUST BE
ON ITS WHEELS, DRY AND IN A SHELTERED AREA. THE
DOORS MUST BE CLOSED.
SAFETY DEVICES AND WARNING NOTICES MUST BE
INSTALLED. THE AIRCRAFT ELECTRICAL NETWORK MUST
NOT BE ENERGIZED.
ACCESS PLATFORMS MUST BE INSTALLED IN THE
INSPECTION AREA.
002
_________________
REMOVAL
OF RADOME
SEE JOB INSTRUCTION CARD
539121-RAI-10000
003
24-70-00
MSN 10000-003
2-400 PAGE
2
MAR 01/14
BONDING INSPECTION
24-70-00
MSN 10000-003
3
004
MAR14
___________________________________________
VALIDATION
OF A (PT) SECONDARY GROUND POINT
REF. FIG. 247000-MSN-00100
THE (PR) FRAME-01 REFERENCE GROUND POINTS
(STRUCTURAL BASES OF RADOME GROUNDING SPRINGS)
BEING NO MORE ACCESSIBLE WHEN THE RADOME IS
INSTALLED, IT IS NECESSARY TO DEFINE A (PT)
SECONDARY GROUND POINT ON THE NLG DOOR
BONDING BRAID FOR THE CONTINUITY MEASUREMENTS.
1. USING A MILLIOHMETER, CHECK THE RESISTANCE
VALUE BETWEEN ONE (PR)(FRAME-01) REFERENCE
GROUND POINT AND THE (PT) SECONDARY
REFERENCE POINT.
- VALUE MUST BE LESS THAN 2 MILLIOHMS.
005
______________________
INSTALLATION
OF RADOME
SEE JOB INSTRUCTION CARD
539121-RAI-10000
006
________________________
BONDING
CONTINUITY CHECK
NOTE : THIS BONDING CONTINUITY MEASUREMENT IS
PERFORMED WITH RESPECT TO THE (PT)
SECONDARY REFERENCE GROUND POINT
PREVIOUSLY DEFINED.
REF. FIG. 247000-MSN-00105
1. RADOME :
USING A MILLIOHMETER, MESURE, FOR EACH
LIGHTNING ARRESTOR STRIP, THE CONTINUITY
VALUE BETWEEN A BONDING PICK-UP SCREW
AND THE (PT) SECONDARY REFERENCE POINT.
- FOR EACH OF THESE MEASUREMENTS, THE
VALUE MUST BE 4 MILLIOHMS MAXI.
NOTE : IF THE LIGHTNING ARRESTOR STRIPS ARE
PAINTED, REMOVE THE SCREW IN ORDER
TO ACCESS TO A METALLICAL PART
*** CONTINUED ***
AH
24-70-00
MSN 10000-003
2-400 PAGE
3
MAR 01/14
24-70-00
BONDING INSPECTION
MSN 10000-003
4
MAR14
(THREADING).
REF. FIG. 247000-MSN-00105
2. TAIL CONE :
USING A MILLIOHMETER, MESURE, FOR EACH
LIGHTNING ARRESTOR STRIP, THE CONTINUITY
VALUE BETWEEN THE ATTACHMENT SCREW AND
THE (PT) SECONDARY REFERENCE POINT.
- FOR EACH OF THESE MEASUREMENTS, THE
VALUE MUST BE 4 MILLIOHMS MAXI.
NOTE : IF THE LIGHTNING ARRESTOR STRIPS ARE
PAINTED, REMOVE THE SCREW IN ORDER
TO ACCESS TO A METALLICAL PART
(THREADING).
007
________
CLOSE-UP
1. INSTALL THE SCREWS PREVIOUSLY REMOVED ON
RADOME AND TAIL CONE.
2. MAKE CERTAIN THAT ACCESS PANELS RADOME AND
ENGINE COWLS ARE CORRECTLY LOCKED.
3. REMOVE ACCESS PLATFORM FROM WORK AREA.
4. REMOVE WARNING NOTICES.
*****
AH
E N D
O F
T E X T
*****
24-70-00
MSN 10000-003
2-400 PAGE
4
MAR 01/14
24-70-00
5
AH
VALIDATION OF A
SECONDARY GROUND POINT
MSN 10000-003
MAR14
24-70-00
MSN 10000-003
2-400
PAGE
5
MAR 01/14
24-70-00
6
AH
BONDING MEASUREMENTS
OF RADOME AND TAIL
CONE
MSN 10000-003
MAR14
24-70-00
MSN 10000-003
2-400
PAGE
6
MAR 01/14
12 - MAR 01/15
24-00-00-RAI-10000-001
24-00-00-RAI-10000-002
24-00-00-RAI-10010-002
24-21-85-RAI-10000-001
24-32-61-CHK-10000-002
24-32-61-CHK-10000-003
24-32-61-CHK-10005-001
24-32-61-CHK-10005-002
24-32-61-CHK-10006-001
24-32-61-CHK-10006-002
24-32-61-RAI-10000-001
24-32-61-RAI-10000-002
24-32-61-RAI-10010-001
24-32-61-RAI-10010-002
24-32-83-RAI-10000-001
24-32-87-RAI-10000-001
24-46-84-RAI-10000-001
AH
TASK DELETED
NEW TASK
MINOR INFORMATION
MINOR INFORMATION
TASK DELETED
NEW TASK
TASK DELETED
NEW TASK
TASK DELETED
NEW TASK
TASK DELETED
NEW TASK
TASK DELETED
NEW TASK
MINOR INFORMATION
MINOR INFORMATION
MINOR INFORMATION
ADDITION
ADDITION
ADDITION
ADDITION
ADDITION
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
12
PAGE
1
MAR 01/15
PAGE
1 TO
5 APR/05
ALL
1 TO
7 APR/05
ALL
TO
DEC/14
ALL
1 TO
7 MAR/15
ALL
1 TO
36 MAR/15
ALL
1 TO
5 APR/05
ALL
1 TO
7 MAR/13
ALL
1 TO
9 DEC/14
51 TO
62
1 TO
11 DEC/14
63 TO
65
1 TO
6 APR/05
ALL
1 TO
7 MAR/15
ALL
1 TO
8 MAR/14
ALL
1 TO
3 DEC/14
51 TO
62
1 TO
4 DEC/14
63 TO
65
1 TO
4 MAR/13
ALL
REVISION NO 12 - MAR/15
N
R
AH
1
MAR/15
PAGE
1 TO
5 APR/06
ALL
1 TO
4 DEC/14
51 TO
62
1 TO
5 DEC/14
63 TO
65
1 TO
4 DEC/14
51 TO
62
1 TO
5 DEC/14
63 TO
65
1 TO
7 DEC/14
51 TO
58
1 TO
7 DEC/14
59 TO
62
1 TO
8 DEC/14
63 TO
65
1 TO
6 DEC/14
51 TO
62
1 TO
7 DEC/14
63 TO
65
1 TO
5 DEC/14
51 TO
62
1 TO
7 DEC/14
63 TO
65
1 TO
5 DEC/14
51 TO
62
1 TO
6 DEC/14
63 TO
65
1 TO
6 DEC/14
ALL
1 TO
1 TO
1 TO
4 DEC/14
4 DEC/14
7 DEC/14
51 TO
63 TO
51 TO
62
65
62
1 TO
7 DEC/14
63 TO
65
REVISION NO 12 - MAR/15
AH
2
MAR/15
PAGE
1 TO
6 DEC/14
51 TO
62
1 TO
5 DEC/14
63 TO
65
1 TO
8 DEC/14
51 TO
62
1 TO
9 DEC/14
63 TO
65
TO
MAR/11
ALL
1 TO
2 MAR/15
ALL
TO
MAR/14
ALL
1 TO
7 MAR/15
ALL
TO
MAR/14
ALL
1 TO
7 MAR/15
ALL
TO
MAR/14
ALL
1 TO
10 MAR/15
ALL
TO
DEC/14
ALL
1 TO
3 MAR/15
ALL
1 TO
3 MAR/13
ALL
1 TO
6 APR/07
ALL
1 TO
7 MAR/15
ALL
1 TO
8 MAR/15
ALL
REVISION NO 12 - MAR/15
N
D
N
D
N
D
N
D
N
R
R
AH
3
MAR/15
PAGE
1 TO
3 MAR/14
ALL
1 TO
12 DEC/14
51 TO
62
1 TO
14 DEC/14
63 TO
65
1 TO
7 DEC/14
51 TO
62
1 TO
9 DEC/14
63 TO
65
1 TO
4 DEC/14
ALL
1 TO
4 MAR/13
ALL
1 TO
5 APR/05
ALL
1 TO
7 DEC/14
51 TO
62
1 TO
7 DEC/14
63 TO
65
1 TO
8 DEC/14
51 TO
62
1 TO
8 DEC/14
63 TO
65
1 TO
8 DEC/14
51 TO
62
1 TO
9 DEC/14
63 TO
65
1 TO
6 DEC/14
51 TO
62
1 TO
6 DEC/14
63 TO
65
1 TO
4 DEC/14
ALL
1 TO
4 MAR/13
ALL
REVISION NO 12 - MAR/15
AH
4
MAR/15
PAGE
1 TO
6 APR/05
ALL
1 TO
7 MAR/15
ALL
1 TO
8 MAR/14
ALL
1 TO
4 DEC/14
51 TO
62
1 TO
5 DEC/14
63 TO
65
1 TO
5 APR/05
ALL
1 TO
5 DEC/14
51 TO
62
1 TO
6 DEC/14
63 TO
65
1 TO
5 APR/05
ALL
1 TO
6 DEC/14
1 TO
6 MAR/14
51 TO
59 TO
58 TO
REVISION NO 12 - MAR/15
AH
57
65
58
5