Professional Documents
Culture Documents
Previous studies have shown that runoff and erosion processes control sediment budget and form
of a catchment. Here we attempt to understand how these processes work by conducting a study
of runoff, hillslope stability and sediment yields. Based on field observations and data gathered
at a small tributary in Lone Tree Creek, approximate theory based calculations were done to
estimate rates of runoff to range from 9-51 mm/yr along the scar, and sediment yield to be 205
tons/km/yr.
Introduction:
The evolution of a landscape is affected by many variables including runoff, sediment yield
bioturbation, and topography (Lehre et al. 1981). The rate of these variables play a crucial role
in the speed and change of a landscape, as well as the potential for hillslope failure. Although
these processes are better understood today, much uncertainty remains in the observed rates of these
factors (Syvitski and Millman 2007). Observations at the site suggest the prevalence of several factors
affecting the landscape: weathering from runoff and precipitation, animal burrowing, and tree throws
distance, azimuth and inclination reading was taken. This process was repeated to map the
perimeter of the catchment and landslide. (See figures 2-4 in appendix)
Calculations: Areas, Volumes, Densities and Masses and Time These were determined by
the field methods previously mentioned. The effective source area (as), which is essentially the
time-averaged source area, is calculated by subtracting the drainage area by half the depositional
area. Volumes of the colluvium, (Vc) and scar were calculated using the depth of the colluvium
to match the depth of the scar. The average bulk density of the weathered bedrock, (wb) and
3
fresh bedrock(b) were used as 2.0 g/cm and 2.4 g/cm ; and the average bulk density of the coll
3
uvium (c) and density of soil (s) as 1.9 g/cm and 1.25 g/cm respectively, using Reneau et. al.
1990 as a reference. Mass of the colluvium is determined by using the bulk density of colluvium
and the volume of the colluvium. It is assumed that colluvium deposit began around 13,000 years
ago, (T), from carbon dating done on charcoal found at the site.
dissolution as
Mass Transport Rates :
It is assumed that the direction of the flow of the sediment is perpendicular to the contour lines in
the map provided by Lehre. The effective length of the boundary between the source and
and alpha is the angle between the direction of mass transport and 10 chosen locations tangent to
assumed to be 0.25 m (Dietrich, et al., 1995). The sediment yield production rate was
determined using
[eq.
9]. The estimated average slope angle () was determined as the average of 5 arbitrary locations
[eq. 10]
assumed to be 17 m/day, h is the depth above the saturated ground. The degree of saturation, h/z
was assumed to be 1 for all of the cross sections.
Stability analysis: The average slope () of the failure plane and the average failure plane depth
(z) were calculated using field data. Using w as the density of water, the void ratio (e) can be
determined as
[eq. 12], f is the dry bulk density at depth h/z. The saturated bulk
density is calculated as
cohesion (C) are assumed to be 45 degrees and 0 (Reneau et al. 1990). Then the shear stress,
[eq. 14.]
Stability analysis: The average slope () of the failure plane, was determined to be 14 degrees.
The degree of saturation (h/z) was calculated to be 1.3. Log(q/T) for cross section 1 and the
lowest contour were found to be -3.0 and -3.4 respectively. Refer to table 8 in the appendix for
values related to these calculations.
Discussion:
Erosional Processes in the Lone Tree Creek area: In the Lone Tree Creek area, both biotic and
abiotic processes affect the landscape. The main biotic processes in this region include tree
throws and burrowing, and the main abiotic processes include dissolution induced collapse, and
shear deformation (Heimsath et al. 1997). Observations of several tree throws and an abundance
of burrowing support these findings. Surface erosion through saturated overland flow are
observed to cause channel incision (Wilson and Dietrich et al. 1987).
K Comparison: Our value of K was found to be approximately 44 cm/yr, while in McKean et
al. (1993), K is determined to be 345 and 375. This discrepancy in K ..The clay rich soils in the
Black Diamond area move at a faster rate than stronger granular soils, which is consistent with
the larger value of K. As stated in McKean et al. (1993), the average K in California is 4 ( / )
37 cm/yr. The weak clay soils present in Black Diamond cause K to be an order of magnitude
greater than our own, while our value is lower due to the sandstones present at our site.
Soil Production Rate Comparison: We calculated the soil production rate to be 210
tons/km/yr. According to Lehre et al. (1981), the annual production rate from 1971-1972 148
tons/km/yr; 985 t/km in 1972-1973, and 1575 t/km in 1973-1974. Starting around 1973, there
was an abundance of rainfall, which explains why the production rate was so high. It is
mentioned in Lehres work that 1971 was a dry year, which is congruent with the observations
we observed at the site. This is validated by how close our rate of 210 is to 148.
Compare Lowering Rate:Our bedrock lowering rate value of 0.068 mm/yr, or 68 m/Myr.
Heimsath et al. (1997) reported a similar range of 11-130m/Myr in this same region. Our value
fits in the middle of this range, thus validating our approximation. This suggests that our
calculations and assumptions previously made are in fact reasonable.
Erosion Rate Comparison: When comparing our erosion rate with other values from rivers
around the world, our data point falls in the middle of the cluster (Syvitski and Millman 2007).
This validates the accuracy of our assumptions and calculations used to determine our value. It is
reasonable for our value to fall in the middle of the spectrum since the annual precipitation and
intensity of storms at the site are not extreme.
Chemical Denudation: Chemical denudation is largely driven by water in the landscape, and
thus is directly related to the amount of precipitation received by the landscape. Heimsath et al.
(1997) reports that this area receives an average rainfall of 760mm. Although the rainfall is not
abundant, there is enough water to allow for the dissolution of the bedrock to occur. Our
estimated value of annual mass loss from dissolution is 1790 tons supports this idea. This process
weakens and allows the conversion of bedrock to colluvium to occur, namely dissolution helps to
destroy the relict rock structure.
Land use influence on Slope Stability: The proposal made in (Lehre et al. 1981) proposed that
cattle grazing on hillslope caused a ten fold increase in landslides over the past 50-150 years. We
agree with his analysis because cattle grazing on the land will likely cause the grassland and
vegetation to decrease. As a result, root strength decreases, which leads to a decrease in the net
strength of the hillslope, thus making it more susceptible to hillslope failure (ie. landslide).
Reasons why site failed in 1974: There are several reasons for the site failure to have occurred
in 1974 rather than in previous years. The higher amount of precipitation in 1974 compared to
previous years is perhaps the most reasonable explanation for the site failure to occur in this year.
However, it may also be due to the gradual decrease in root strength (Dietrich 1982). Although
previous years may have had as much precipitation as in 1974, but the root strength would have
been higher, thus keeping the hillslope from failing.
Steady State Precipitation: The steady state daily precipitation required for steady state
saturation are 15 mm/day, 33 mm/day, 48 mm/day, 51 mm/day for cross sections 1-4 and 10
mm/day for the lowest contour (See table 7). These estimates seem reasonable when compared to
the majority of daily rainfall are less than 65 mm (Lehre et al. 1981). Since all of our estimated
precipitations required for saturation fall under this range, then it is an accurate assumption.
q/T comparison: Using the SHALSTAB theory, our q/T values for cross section 1 and the
lowest contour were 0.001 and 0.00038 respectively. However, when compared to the value of
q/T using the effective precipitation in the shallow subsurface slope stability analysis and
transmissivity (T) as 17m/day, q/T is 8x10 for saturation of the site. The fact that we have a
higher value than needed for saturation suggests that this is an unstable hillslope.
The q/T value calculated from the 1 m digital elevation data derived from airborne laser swath
mapping compared to our q/T value of for cross section 1 suggest that as the root strength
decreases, this area has the potential for landslides . However our q/T value of for the lowest
contour may be too high, suggesting that the hillside was too steep for hillslope instability.
Conclusion:
We have shown how runoff and erosion processes control sediment flux. As water flows through
a hillslope, dissolution occurs and weakens the bedrock. Over time this bedrock is weathered and
converted to soil resulting in a mass loss from the bedrock which leads to several processes,
including surface lowering and the transport of soil. In previous studies in this region, the
sediment transport law is determined to be linearly dependent on surface slope. Based on this
information we determined the stability of a slope by estimating the required precipitation for
surface saturation. Mean annual rainfall recorded in this region are within this amount of
precipitation, suggesting potential for hillslope failure. Note that the shorter the longer the
landslide scar width, the larger the upslope drainage area. This leads to a smaller effective
precipitation needed for site failure. Geomorphic modeling and theory-based calculations are still
unable to incorporate all processes influencing landscape evolution. By comparing our sediment
yield for this tributary with other basins throughout the world, we get our approximation to lie in
the middle of the global data. This suggests that the assumptions made in our calculations were
valid, thus giving our findings some empirical backing.
Appendix
Table 1.
Cross Sectional
Area
Cross Sectional
Number
Colluvial
Deposit
Landslide Scar
Gully
Units
12.5
15.85
11.8
25.5
1.2
32.1
45
4.9
46.2
36.46
5.8
Table 2.
Volumes
Total Colluvial Deposit
Table 3.
2900
m 2,900,000,000
cm
Landslide Scar
1110
m 1,110,000,000
cm
Gully
125
cm
125,000,000
Basin Area
Drainage Basin Area
3600
925
Source Area
2700
3100
Table 4.
Bulk Densities and
Masses
Avg. Bulk Density, c
1.9
g/ cm
1.25
g/ cm
g/ cm
2.4
g/ cm
5,510,000
kg
1,790
tons
1,790,000
kg
Table 5.
Lowering Rates
1.08 x 10^Surface Lowering Rate
m/yr
0.108
mm/yr
6.75 x 10^-5
m/yr
0.0675
mm/yr
Lowering due to
Dissolution
1.66 x 10^-5
m/yr
0.0166
mm/yr
144
30
degrees
pi/6
rad
71
7100
cm
0.25
25
cm
6.21
mm/yr
20
degrees
pi/9
rad
Soil diffusivity, K
44
cm/yr
Table 6.
Mass Transport Rates
length (l)
16
cm/cm/yr
0.21
kg/m/yr
205 tonnes/km/yr
205
tons/km/yr
Table 7.
Shallow
Subsurface
Flow
Cross-Section
Upslope
Drainage
Area (m)
Cross
Sectional
Width (m)
Reconstructed
Effective precipitation
Ground Surface Slope or steady state runoff
(degrees)
(mm/day)
theta
4180
13
17
15
2950
18.5
18
33
2050
22
15
48
1350
21.5
11
51
lowest contour
4830
6.5
23
Table 8.
Stability Analysis
, Average slope of failure
plane
14
degrees
3.5
1.6
g/cm
e, Void rate
0.27
g/cm
1.79
g/cm
45
degree
Pa
, Shear stress
14.4
Pa
, Normal Stress
58,000
Pa
u, Pore Pressure
43,000
Pa
-3
-3.4
Figure 1.
Table of Contents
Abstract.pg.1
Introduction.pg.2
Methods.pg.2
Results.pg.5
Discussion.pg.6
Conclusion.pg.9
Appendix .pg.10
References Cited..pg. 23