Scalable Systems LLC

XUP: XP + RUP + MSF

Version 1.1 beta

Peter Merel
March 28, 2000

TABLE OF CONTENTS
TABLE OF CONTENTS................................................................................................................................ 1
Conventions.................................................................................................................................................. 2
Source Methodologies.................................................................................................................................. 2
Development Values and Principles............................................................................................................... 4
Immediate, Unquantified Requirements......................................................................................................... 5
Estimation Techniques.................................................................................................................................. 5
Quantified Requirements: User Stories.......................................................................................................... 6
Iterations and Commitment Schedule............................................................................................................ 9
Development Process: Overview................................................................................................................. 10
Development Process: Engineering Task..................................................................................................... 10
Development Process: User Story............................................................................................................... 12
Development Process: Iteration................................................................................................................... 13
Development Process: Project..................................................................................................................... 15
Team Structure........................................................................................................................................... 17
Appendix A: Terminology............................................................................................................................. 18
Appendix B: Pathological Methodologies..................................................................................................... 19
Appendix C: Pair Programming................................................................................................................... 20
Appendix D: Architecture and Patterns......................................................................................................... 21
References................................................................................................................................................. 22

Conventions
Methodologies dont always use the same words to mean the same things. We use the terminology of
Appendix A throughout this document. Further definitions in the text are boldface to make them easy to locate.
UML Sequence Diagrams [1] summarize development process. Each object (box) on these diagrams
represents a development activity, and each message (arrow) between them either an intermediary product or a
deliverable. Time runs down the vertical access. Functional responsibilities are attached to each activity as
notes; assignment of these responsibilities to team members is described under Team Structure.

Introduction
No process is ideal for all situations and goals, but two schools of methodology have a consistent history of
failure. These are extremes that drain reliability and responsiveness from development activities. We describe
them not to recommend them, but to emphasize the pitfalls we intend to avoid.

Cowboy Coding is a state of affairs that survives through developer heroics and business determination.
While heroics and determination are commendable, their daily occurrence results in poor system quality,
inappropriate functionality, low developer morale, and unpleasant surprises for users and management.
Although we call this Cowboy Coding, its also a failure of business process.
The accepted formal standard for evaluating development process, the Software Engineering Institutes
Capability Maturity Model [2], ranks methodologies on a five point scale. Cowboy Coding corresponds with
level 1, the lowest, on the SEI CMM.

Big Brother derives from a reaction against Cowboy Coding. Its development by bureaucracy. Big Brother
is characterized by hierarchically delegated authority and zero-feedback process. Neither stakeholders nor
developers favor bureaucracy in and of itself, but, under Big Brother, efforts to improve matters somehow
always result in more bureaucracy, and less quality.
Though we call it Big Brother, bureaucracy occurs in small projects too. It can easily occur in projects with
SEI CMM levels as high as 2 or 3 when theyre afflicted with one or more of the pathologies described in
Appendix B.

Appendix B catalogs the shortcomings of each extreme in detail.


A raft of development methods have attempted to avoid these extremes. The most popular today are the
Microsoft Solutions Framework, or MSF [4]; Beck & Cunninghams Extreme Programming, or XP [5]; and the
Rational Unified Process, RUP [6]. Our aim in this paper is to describe a process that combines the three into a
consistent whole.

MSF

XP

RUP

Pedigree

Formal practices applied by


Microsofts internal development
groups and integral to MS
engineering structures.

A movement in the Design Patterns


community related to the Crystal & Scrum
methodologies. Early success at Chrysler
Comprehensive Compensation (C3).
Achieved critical acclaim at the Portland
Pattern Repository. In use by groups at
WyCash, First Union National Bank, CS
Life, BayerischeLandesbank, and Ford
Motor Company.

The Objectory phased methodology


updated to include iterative elements.
Applied in variations by many commercial
development groups.

Tools and
Techniques

Microsoft DNA/Visual Studio.

CRC, User Stories, Commitment Schedule

UML + the Rose suite of requirement,


design, testing, profiling and SCM
support tools

Originators

MS internal groups

Kent Beck and Ward Cunningham, pioneers


in Object Orientation who invented the
universally applied CRC design technique
[8]. Also Ron Jeffries, C3s Coach.

The Three Amigos of Object Oriented


software, Grady Booch, James
Rumbaugh, and Ivar Jacobsen.

Strengths

Closely defines business modeling


techniques, functional roles, and
testing practices.

Details consensual project standards,


iterative design, coding and testing
practices.

Defines UML modeling techniques,


phased development, and intermediary
formats

Weaknesses

Doesnt specify a step-by-step


development process.

Neglects business modeling, architecture


and deployment activities.

Doesnt support feature-driven


scheduling and refactoring activities

Figure 1 XUP Source Methodologies in a Nutshell

These methodologies are for the most part compatible, though each emphasizes different aspects of thinking
about and conducting development. Each is most effective when focused on its intended scale of development.
We see them as resolving points on a continuum of project scope:

1 week 2 developer fire-fights dont require and cant afford much process overhead little more than an XP
Engineering Task.

Small projects teams of 2-12 developers and timeframes of 3-6 months - are best served by the rapid but
rigorous iterations defined by XP and the functional responsibilities of MSF

Larger groups and larger contexts especially those concerned with enterprise-wide and architectural
concerns benefit from the business modeling aspects of MSF as well as abstract analysis tools and
techniques in RUP.

MSF and XP fit together very neatly; in fact some groups within MS have stated publicly that theyve gone XP.
MSF conflicts in some details with RUP, but Rational are working to resolve the disconnects [7]. Where we see
clashes in the methodologies we use practices that best fit our development values and principles.

Development Values and Principles


Development values are not goals to be achieved, but criteria to use to make decisions. We use these values to
structure our thinking about methodology and guide process from day to day.

Simplicity: We continually work to make business processes, development processes, and the systems
we build as simple as they can possibly be and still work. But no simpler.

Continuous Feedback: We dont let bad assumptions live long. We seek feedback from stakeholders and
tools as soon as possible. We prototype, measure and test.

Harmonious Aggressiveness: We go fast; we identify and repair anything that stresses or slows us
down. But we take care to stay open minded, impartial, and compassionate toward each other.

Open Communication: We keep Business 100% aware of what were doing, and why, at all times. We
dont play politics or keep secrets. We work to resolve disconnects throughout our development process.

Business Negotiation: We work proactively to understand and support the business through regular,
careful, explicit negotiations. We dont specify or drive Business needs or priorities. Business doesnt
estimate, design, or specify technologies for our solutions.

To secure these values we employ a number of generic techniques. These form principles that underlie the
specific procedures and roles we define later in this document.

Do The Simplest Thing That Can Possibly Work: We dont try to do something grand and heroic. We do
something very simple that works. We do the simplest thing that can possibly work. Nevertheless, instead
of letting this continue as Cowboy Coding, we immediately and always refactor.

Refactor Mercilessly: Refactoring is eliminating redundancy, special cases, and unnecessary


interdependence. We refactor until all the functionality in the system is coded Once And Only Once each
element of functionality appearing in just one place in the source. Doing this immediately and mercilessly
contains source-complexity, promotes re-use, and reduces the cost of maintenance.

You Arent Going To Need It: During any activity, the only work that is done is work that is required right
then and there, never anything that will be needed later. Analysis constrains itself to specific requirements,
not completions. Design and coding are scoped to particular features, not generics. Completeness and
genericity will emerge naturally over time if we refactor mercilessly.

Features, Not Subsystems: Since were going fast, we need to make certain that what we deliver is
always something we can test. So we dont develop by subsystem. We develop by Feature, each of which
is a thread through all subsystems that corresponds with a concrete requirement. This way our work is
testable at all points of a project, not just a the end.

Continuous Integration: We use a merging rather than a locking SCM strategy. We communicate our
work with one another as soon as we possibly can. As developers we dont go dark for long. Left to sit
alone, even the most brilliant programming becomes prohibitively expensive to integrate.

Relentless Testing: The best way to facilitate Continuous Integration is Relentless Testing. Before any
component is written, a unit test is coded first. Before any code change is checked in, all unit tests for the
whole development are run to make sure the code change doesnt break anything. For every significant
deliverable feature we create a functional test. And every night a Smoke Test is automatically performed

all unit tests and all functional tests run with the results graphed for management. At all points, not just at
the end of the project, we have a demonstrably functional system.

Standards, Not Ownership: Our developers dont own code. Actually its more accurate to say we
collectively own it. Our project standards are a superset of enterprise standards, developed by, agreed by,
and changeable by the consensus of our developers. Our products all use the same style, so, when
refactoring, any developer can quickly and confidently alter any part of the system.

Pairing and Peering: We assure maintainability through Pair work and Peer review. Work that is produced
by a pair of developers needs much less oversight than work produced by a developer alone. Peer review
is time consuming, and can require onerous re-engineering too. So we work in pairs as often and as closely
as is comfortable. When pairing is not desirable, we require peer review before the result is integrated with
releases external to the project. More details on Pair work are given in Appendix C.

Immediate, Unquantified Requirements


Sometimes we have to do things informally we have fires to fight. We know this isnt smart work. Unexpected,
isolated, informal, immediate requirements derive from poor planning. Theyre unsupported by architecture
because our architects are given no time to prepare for them. They occur outside proper business context
because theyre adopted as emergency measures, often without budget or discipline. The results of working on
them still have to be tested, documented, and integrated into the main line of development, which is really
painful when the work to be integrated was done without adequate care. Regularly pursuing these requirements
places unacceptable stresses on developers too. These efforts are simply inefficient they have
disproportionate cost for only a small return.
Immediate requirements are nevertheless an unavoidable fact of business, and we define a development
process to deal with them. We call this process an Engineering Task. We emphasize rigor and maintainability
in these Engineering Tasks because they also serve as the building blocks of our larger development process.
They are our atoms the smallest units of work we expect our developers to perform and maintain.
Any work that cannot meet at least the minimum standards of an Engineering Task is considered a throwaway a spike. Sometimes we have no choice but to rush through spike, but we always throw it away as soon as
possible. We schedule Engineering Tasks to re-engineer and integrate Spikes into our main line of
development. This discipline provides the flexibility to attack immediate requirements without compromising
project continuity, lowering efficiency or morale, or degrading the quality of subsequent deliverables.

Estimation Techniques
Working with immediate requirements and individual Engineering Tasks provides us with no basis for estimating
budgets and timeframes. In fact one of the most common failures of software development groups is an inability
to reliably estimate project timeframes and costs. XP estimation techniques are designed to minimize these
failures:

Early and continual feedback prevents the deferral of integration, refactoring, and testing until the end of a
project, removing the risk of large surprises.

Estimates are made and reviewed by developers, not managers. Because the estimators are directly
responsible for accomplishing what they estimate, our estimates better describe capabilities and process
limitations All Developers review project scope estimates to try to improve them so the same estimating
mistakes are not repeated over and over.

Developers cant estimate time taken by meetings, environmental problems, and tool failures. Developers
cant estimate the cost of familiarizing themselves with required tools and techniques. Developers are very
poor at estimating buffer time needed for testing, refactoring, and integration so, we dont make
developers guess these things. Instead, we measure them.

To measure the things developers cant estimate, MSF and XP both advise the use of two schedules. One is
internal, estimated in terms of Ideal Days where tools and designs are perfect, there are no interruptions, and
everything flows smooth as silk. In practice these Ideal Days never occur, so our other schedule is the external
one, the one Customers can rely on. The external schedule is obtained by measuring the ratio of typical past
Ideal estimates to past performance and multiplying Ideal Days by this ratio to obtain Real Days. The ratio of
Real Days to Ideal Days is called the Load Factor, and we apply it regularly and consistently in our external
estimates.
Load Factor isnt a measurement of efficiency per se. Its more like the degree to which we tend to over-estimate
our abilities. It measures our optimism. The change in Load Factor over Iterations, however, can reflect changes
in development efficiency, and should be tracked and analyzed carefully.
For initial estimates we cant use a measured Load Factor because we have no Iteration history to measure. We
could start with any Load Factor we please, so long as were consistent with the amount of work we estimate
can be done in an Ideal Day. In practice its standard to use a Load Factor of 3 for initial estimates. As soon as
possible we replace that with the directly measured quantity.
Our period of measurement is a fixed timeframe of 3 Real Weeks that we call an Iteration.
To understand all this, consider a project with 5 developers about to enter its second iteration. The first Iterations
Load Factor is 3. Real Days Expected for the first Iteration was 5 developers x 15 real days = 75 Real Days. In
fact it turns out that when we complete the initial iteration we deliver User Stories that were estimated with the
initial Load Factor to be worth 90 Real Days.
So our second iterations measured Load Factor is 2.5. Therefore we can schedule 30 Ideal Days of User
Stories to fit into it. If this Load Factor keeps up for a few Iterations, well want to use the rescheduling strategies
described in the section on Commitment Schedule below to recalculate the remaining Project scope.
Because we know how many Ideal Days we expect to fit into in a Real Iteration, we know how many features
we expect to deliver in a Real Iteration. By tracking the completion of each feature we get a value for the Real
Days accomplished in each Iteration, and thats the value we use to figure out the Load Factor to use in the next
Iteration.
We graph Load Factor over the projects whole life. We must be careful not to misinterpret Load Factor as a
quality that can be specified rather than measured. We can tell developers, "work harder and smarter, but it
makes no sense to say, "the Load Factor is now set at 0.5. See that it stays that way. Load Factor is feedback
for the purpose of management, not a dial that can be turned to speed anything up.

Quantified Requirements: User Stories


A User Story is a feature thats been fully quantified by Customers, properly estimated by Developers, and
which is no larger than a certain size. We use User Stories to determine what needs to be done and when.
Why not just combine Engineering Tasks arbitrarily? Well, business priorities cant be ranked if requirements just
dribble in as they emerge. Architectural decisions cant be made without gauging a projects scope. Functional
tests cant be developed without a concrete understanding of each requirements priority and qualities. Budgets
arent realistic without understanding the relationship between scope and timeframe.

So, for a project larger than fire-fight, requirements have to be proactively gathered, quantified, approved and
prioritized by a consistent process. This quantification work should be explicitly negotiated between Customers
and Development in terms that are meaningful to both. And each requirement has to be reduced to a
manageable granularity in order for estimates to obtain confidence and realism. If we do all that, what we get is
what we call a User Story.
Need
Quality
Priority
Scope

Who uses the feature, and what does it do for them?


What performance properties does the feature have?
How important is the feature to the Customer?
How long will it take to develop the feature?

Figure 2 Quantifying a User Story.

Need: Customers specify a business need; Development clarifies it by modeling. User Stories can be
functionally specified in one of three forms, each with a progressively greater level of detail and
accompanying maintenance burden. In practice we choose the simplest form that achieves a concrete
shared understanding between Customers and Developers.

User Stories that are well understood by both Customers and Developers are summarized
with a few sentences of English text.

User Stories that are not well understood by Customers, or that Developers feel have
redundant or questionable content, are also described by User Stories, but these User Stories are
further explored via CRC business modeling [8]. CRC involves role-playing a User Story to
discover external actors, internal objects, their responsibilities and necessary collaborations
between them. The common understanding achieved by CRC can be recorded as Use Case
Diagrams in the standard RUP diagram language, UML [9]. Use Case Diagrams can be combined
and split apart to refactor User Stories until theyre the right size.

Use Cases that dont obviously relate to known architectural elements can be further detailed
by Developers and Architects using CRC for Analysis and Design purposes, and the results can be
recorded as UML Collaboration Diagrams [10] and Sequence Diagrams. Collaboration
Diagrams show the functional interdependencies necessary for objects to reproduce the Story;
Sequence Diagrams map these functional interdependencies into the Storys time order.
Architectural refinement of these diagrams is detailed by architects using UML Class Diagrams
[11]. Class Diagrams show is-a, has-a, containment, indexing, and usage relationships between
objects. Implications of all these diagrams can propagate up to the corresponding Use Cases.

We use only those forms necessary to achieve a concrete common understanding between Customers
and Developers, and no more. The maintenance burden of unnecessary intermediary products is a prime
contributor to the Big Brother pathologies described in Appendix B.
These three forms are all functional specifications of a User Story. But even the most detailed functional
specifications, by themselves, are inadequate for estimation purposes. As User Stories are functionally
quantified, they must also be quantified in the three non-functional dimensions.

Quality: Customers specify this too. Quality answers questions like:

How fast?
How many?
How secure?
Etc.

Customers quantify only Qualities they feel are relevant to a User Story. Required Qualities may change
over time as User Stories are tested and reviewed, so Customers dont have to get all these Qualities
specified exactly right up front we revisit Customer estimates as often as every Iteration if need be. But
Quality is not something we can easily reverse-engineer, so the Qualities of User Stories that have already
been delivered cant be requantified after the fact. Instead, new User Stories must be introduced to account
for the late change in Customer requirements. A project never revisits Quality estimates more often than
once an Iteration, or else the development becomes unmanageable.

Priority: Customers specify this as well. Initially, they just sort User Stories into 3 piles:

Must Be Done Or The System Fails: These User Stories are the real reason Customers
want this system. If you cant deliver these, you may as well forget the whole thing.

Must Be Done Or We Lose Market Share: Customers can get by without these User Stories,
but itll hurt a lot. Customers have to do a lot of extra work without them. If somehow they cant be
delivered this project, theyll have to be done soon after or therell be big trouble.

We Really Want The System To Do This If Possible: We know development cant do


everything, but wed be delighted and thrilled if you could deliver these. If you get the stuff in the
first two piles finished, please try to make these User Stories happen too.

Next, Customers order the contents of each pile into a continuum in order of priority, most important first.
Customers dont have to get all this right up front like Qualities, Priorities can be adjusted as often as
every 3 weeks throughout the life of the project. But no more often than that.

Scope: Developers estimate this in Ideal Days. In order to do so, they sort User Stories into 4 piles:

Developers Know Exactly How To Do This, And Itll Take Less Than 3 Ideal Weeks. A firm
estimate is calculated, reviewed by all developers, and attached to the User Story.

The Best Estimate Of Developers Is More Than 3 Ideal Weeks. Developers cant estimate
Scope with enough confidence to be sure. Our understanding is too vague or the User Story is too
big. Take the Story back to the Customers and split it into smaller pieces until it can be stuck in the
first pile.

Developers Dont Know Exactly How To Do This. Customers and Developers meet for
CRC to build Use Cases. If Developers figure a good way to work, they stick the Story in the first or
second piles. If not, they get the Architects involved. Together, Architects and Developers do
Analysis and Design CRC. If this makes new Architecture, Developers record the User Story as
Collaboration or Sequence Diagrams, and Architects record the architecture as small UML Class
Diagrams (Appendix D). Architects spike new Architecture too. If the User Story is still a mystery,
its stuck into the fourth pile.

Developers Dont Have The Faintest Idea How To Do This. Developers take the Story back
to the Customers and do some business modeling CRC, recording the results as a Use Case
Diagram. If Developers still cant put this User Story in one of the other piles, they ask the
Customers more questions, or seek out an expert, or ask the Customers to give it up.

Developers discuss each User Storys scope estimate as a group. When all the concerns underlying
conflicting estimates have been exposed, the lowest estimate is adopted.
Conducted as a phase, resolving requirements this way produces a consistent set of well-quantified User
Stories, each of a granularity suitable for Scheduling, along with just enough modeling products for a projects
Iterative Development Process to be initiated. And nothing more. Rather than attempting completeness in an

absence of empirical feedback that is, rather than just guessing we use Iterative Development to refine and
extend the understanding of required User Stories through the orderly, regular process described in the
following sections.
Outside of these phases, new requirements often emerge over the life of the project. As they do, we quantify
them as User Stories. Fixed project timeframes may not permit new User Stories to be included within an
existing Projects schedule, but because of the formality of our quantification process this isnt a decision that
developers make. Customers control Story priorities, and with every Iteration Customers are able to alter these
priorities and thereby influence the placement of User Stories into a Schedule. The actual process of scheduling
User Stories is described in the next section.

Iterations and Commitment Schedule


Once the Customers are satisfied that all the User Stories required in the system have been properly
quantified, they work with the Developers to define a Commitment Schedule. The Commitment
Schedule is defined in terms of Iterations, each of which is 3 Real Weeks (15 Real Days) of project time.
The Commitment Schedule specifies the number of Developers and the number of User Stories that are
expected to be delivered in each Iteration. The Commitment Schedule is initially drawn up before the first
Iteration of a Project, but via the following procedure it can be revisited and altered as often as once per
Iteration though usually its not done nearly that often.
There are two ways to go about drawing up a Commitment Schedule:

Story Driven Commitment: Business starts putting the User Stories for the project on the table. As each
Story is introduced, Development calculates and announces the Project release date. This stops when
Business is satisfied that the User Stories on the table make sense as a coherent system.

Date Driven Commitment: Business picks a project release date. Development calculates and
announces the cumulative cost of User Stories they can accomplish between now and the date.
Business picks User Stories whose cost adds up to that number.

Other heuristics are often useful:

Priority and Risk First: Development orders the User Stories in the schedule so:

A fully working but sketchy solution is completed immediately (like in a few weeks)
Higher Priority User Stories are moved earlier in the schedule
Riskier User Stories are moved earlier in the schedule

Overcommitment Recovery: Development had predicted they could do 150 User Stories between
now and the deadline. Based on Load Factor extrapolations and other measures of project velocity,
they find and immediately announce that they can only do 120 User Stories in the time that remains.
Business selects the 120 User Stories to retain, deferring the others to a future release. (Highly
Unlikely: Business decides to defer the deadline to get the extra 30 User Stories done.)

Change Priorities: Business changes the Priority of one or more User Stories. In response,
Development may change the order of User Stories not yet completed.

New User Stories: Business comes up with a new Requirement. With Development they break it
down into User Stories. Business defers User Stories in the Commitment Schedule whose cumulative
cost is the cost of the new User Stories. Development re-evaluates Value and Risk First to insert the
new User Stories into the Schedule.

Split User Stories: When resources do not permit the whole User Story to be done soon enough,
Business can split the Story into two or more. Business assigns Quality and Priority to each, and
Development re-estimates the Scope of each. The results are re-scheduled as per New User Stories.

Re-estimate: Every Iteration, Development may find some User Stories in the Commitment Schedule
that need to be Re-estimated. This could spark an Overcommitment Recovery, or it may permit New
User Stories to be added to the Schedule.

Resourcing expectations are used to determine the association between Iterations and User Stories according
to the Load Factor formula described in the section on Estimating Techniques above. This is a matter of
arithmetically determining how many Ideal Days are expected to be available for each Iteration and then
reviewing the delivery dates of each User Story with the Customers.
As an Iteration occurs, the User Stories contained by it are further broken down (by Developers only) into
Engineering Tasks as described in the sections on User Story and Iteration Development Process below.

Development Process: Overview


We use no more process than is necessary. The smallest units of work that we dont throw away follow
the Engineering Task Development Process. Stories are decomposed into a number of Engineering tasks
that are developed using the User Story Development Process. Iterations are 3 week periods in which a
number of User Stories are constructed according to the Iteration Development Process. Iterations exist
within Projects that split into four phases defined by the Project Development Process. Projects contain
Iterations which contain User Stories which contain Engineering Tasks.
It sometimes happens that fire-fights occur simultaneously with new projects and we are called on to
divert some of our resources to fight the fire and solve it the simplest way that can possibly work. We do
this promptly, but we dont integrate it into the main line of our development; instead we define a User
Story to correctly re-engineer and integrate the resulting solution into our main line of development. Our
Story Quantification process determines whether and where these new User Stories fit in a Projects
Commitment Schedule, and measurements of Load Factor directly represent the impact of the diversion
of resources for management purposes.

Development Process: Engineering Task


High Load Factor and required rigor means the immediate requirements we can properly address in an
Engineering Task are scoped to at least 1 and no more than 3 Ideal Days. Smaller requirements than this are
preferably combined together by development, even if logically unrelated, until the developers judge they
constitute at least 1 complete Ideal Day of work. Requirements of more than 3 Ideal Days require more rigor
than we can apply in this process and should be folded into a larger, iterative process. Small requirements that
have the highest priority may be satisfied by throwaway work until we have schedule re-engineering them as a
User Story.
Each Engineering Task involves at least one Pair for at least one Ideal Day. Each Task will employ at least the
following minimal process:

10

CRC is collaborative design. Spike is a small


throwaway prototype. Model is a detailed
class/collaboration/sequence diagram.
Model//CRC/Spike : Optional

Automated test harness that concretes and


exactly reflects Spike / CRC understanding.
Manual procedures not permitted here.

Write Unit Test

Just enough to satisfy Unit


Test - otherwise "You
Aren't Going To Need It"

All functionality in the


whole system should be
"Once And Once Only"

Refactor

Unit Regression Test

Code

Fix any new bugs until


100% unit tests work

Release

Common Understanding
Concrete Implementation Plan
Simplest Change That
Could Possibly Work

Working Unit Test

Simplest System That


Could Possibly Work
100% Working System +
100% Working New Feature

Engineering Task
Timeframe: 1-3 Ideal Days = ~1 Real Week for 1 Pair

1. An Engineering Task begins in one of four ways:

A detailed design model has been prepared previously as part of the User Story Quantification
process.

A CRC session is held that involves the developers and whatever Customers are necessary to
detail a common understanding.

An throwaway prototype (a Spike) is prepared to explore the solution space, or

The Customers agree the pair already has an adequate understanding to deliver a solution.

2. The pair produces a Scope estimate for the task in Ideal Days. The aggregate Scope for all a User Storys
Engineering Tasks might exceed the original estimate for the Story. These discrepancies will be accounted
for by subsequent calculations of Load Factor. Its important that the Task estimate is made without
pressure by the Pair taking the responsibility.
3. Before coding anything else, the Pair codes a unit test that fits into the projects automated testing
framework. This test is completed before any other code; it faithfully represents a typical use scenario
according to the Pairs understanding of the specific problem that the Engineering Task aims to solve.

11

4. The pair codes the simplest solution that could possibly work. They work as fast as possible to build
something that does nothing but satisfy their unit test.
5. The pair refactors the entire system to make the whole as simple as it could possibly be. Usually this
refactoring is not dramatic or extensive but it must be done carefully.
6. The pair runs the entire unit test suite to detect and fix any bugs they have introduced by refactoring. They
do this until 100% of the unit tests run fine.
7. The pair checks in the 100% working solution plus their new unit test.
This is the simplest process that can maintain system quality. It doesnt require a functional test because it
doesnt correspond with a whole User Story. Nevertheless, it ensures that a small, quick, dirty hack is
transformed into a demonstrably tested solution plus whatever fully tested system changes are needed to
support it. This process leaves no mess for anyone else to waste time cleaning up afterward.

Development Process: User Story


User Stories each correspond to 1-3 Ideal Weeks. At the start of each Iteration its scheduled User Stories are
broken down by the Architects and Developers following the procedure described in the Iteration Development
Process section below. A User Story decomposes into a number of Engineering Tasks, along with one
Functional Test.
Story development requires at least the following minimal process:

First CRC was done for the Commitment


Schedule. But we revisit before
engineering tasks commence.
CRC Into
Engineering Tasks

Write Functional
Test

Usually a separate team writes


functional test. Can be automated
harness and/or manual procedure.
Engineering Task 1 ...

Common Understanding
Functional Test Code

Each task takes no more


than 3 ideal days.

Engineering Task N

Optional but likely. We want


to get the simplest system
that could possibly work.

Functional Test
Debug + Run

100% working code


+ refactorings

Refactor + Integrate :
Optional

100% functional
new feature

Fix new bugs until


100% unit and
functional tests work.

Unit + Functional
Regression Test

100% functional
new feature

100% functional system +


100% functional new feature

Feature
Timeframe: 1-3 Ideal Weeks
1. The User Storys estimation products are used as a basis for CRC by the developers. If CRC doesnt easily
map onto the known Architectural elements, the Developers get the Architects involved; together, Architects
and Developers do some Analysis and Design CRC. If this makes new Architecture, Developers document
the User Story as Collaboration or Sequence Diagrams, and Architects document the new Architecture as

12

Release

small UML Class Diagrams (See Appendix D). Architects usually Spike any new Architecture too. The end
result is just enough detailed design product for all Developers to agree they know exactly how to construct
the User Story.
2. The User Story is broken down into logically self-contained Engineering Tasks, each of a duration of 1-3
Ideal Days. One extra Engineering Task is added: the construction of a Functional Test.
3. The Functional Test is constructed by QA, sometimes supported by a Developer Pair. A Functional Test
attempts to realistically represent the User Story, Use Case, or Collaboration/Sequence diagrams that were
detailed when its User Story was estimated. Like a Unit Test, a Functional Test is maintained as part of the
automated testing framework.
4. All Engineering Tasks are implemented in parallel.
5. When all a User Storys Engineering Tasks are complete, the Functional Test is run. Debugging proceeds
until the Functional Test succeeds.
6. Functional testing may optionally prompt another round of refactoring if Debugging uncovers logical errors
or performance problems.
7. All available Functional Tests and Unit Tests are made to run perfectly.
8. The User Story is released.
Again, this is the simplest process that can maintain deliverable quality. It requires some extra effort to create a
functional test, but otherwise its impossible to be certain that deliverables meet Customer requirements. By
focusing on the context of a User Story, this process coordinates Engineering Tasks within a tight scope so that
Developers can determine what is and what is not needed. And regression testing ensures that the delivered
User Story doesnt break the functionality of any other User Story.

Development Process: Iteration


An Iteration is a 3 Real Week period during which we conduct a simple process made up of elements weve
already discussed above. The sequence of an Iteration is as follows:
Together with Stakeholders, review project performance and
priorities, change order of user stories, add/subtract/refactor
Features. Usually don't re-estimate.
Revisit Commitment
Schedule

Select Features To fit in 3 real weeks

Prioritorized User Stories

Multiply feature estimates by load factor,


consider resources, priorities and fit. A large
Feature may take more than 1 Iteration.
Feature 1 ...

Story Specs + CRC if needed

Feature N

Pairs review eachothers' work. Stakeholders


review functional tests. Outstanding issues
are dealt with next iteration.
Functional and Unit
Review

100% working code, unit


tests, refactorings,
functional tests

Adjust Standards :
Optional

architectural/
stylistic
issues

Standards are consensual rules that


fit within enterprise Standards.
Reviews lead to changes over time.
Adjust Load Factor

difference between
expected and real
accomplishments

Iteration

Timeframe: 3 Real Weeks

13

Load factor relates ideal days to real


days. We use this to figure out how
much we can do in 1 Iteration.
Deploy

1. Developers and Customers revisit the Commitment Schedule to determine which User Stories will be
developed this Iteration.
2. Developers deliver each User Story in sequence, never in parallel.
3. Pairs review each others work. Customers review all Functional Tests. These reviews note implications for
the following Iteration.
4. Architectural and stylistic concerns are resolved and this is recorded in the Project Standards document.
5. Load Factor is calculated for the next Iteration

Development Process: Project


Our Project development process closely adheres to RUP phases and milestones.

Inception : Phase

Approve Lifecycle
Objectives : Milestone

Vision Document
Initial Features (Stories & Actors)
Initial Project Glossary
Initial Business Case
Initial Risk Assessment
Project Plan
Business Model
Architectural Prototypes

Elaboration : Phase

Approve Lifecycle
Architecture : Milestone

Construction : Phase

Initial Operational
Capability : Milestone

Transition : Phase

Product Release :
Milestone

Stakeholders Review/Re-think
scope, cost, schedule,
stories, priorities, risks,
process, prototypes, expenditures

Concurrence, Buy-In & Approval

Initial Commitment Schedule (Function,


Qualities, Priorities, Ideal Scope per Feature)
Software Architecture Diagrams
Revised Architectural Prototypes
Revised Risk Assessment and Business Case
Preliminary User Manual

Stakeholders review/re-think
Vision Stability
Architectural Stability
Risk Assessment Completeness
Project plan and estimates
Achievability
Expenditures

Concurrence, Buy-In & Approval


Functional, Tested,
Simplest Possible System
Complete User Manuals
Release Description
Stakeholders review / defer
Product Stability
Stakeholder readiness
Expenditures

Ready for Beta Test

Validate User Expectations


Operate in parallel with legacies
Convert operational databases
Train users and maintainers
Rollout
Stakeholders review
satisfaction and
expenditures. May occur
in parallel with inception
phase of next project.

Project
Timeframe: 3-6 Months

14

RUP consists of four phases, each of which is completed by a milestone including a Customer review of all
substantial products. Because we intend to apply this development process to both large and small projects,
were careful not to pursue any of these activities beyond the point that they are actually useful to our project.
We have extended the RUP phases as appropriate to the processes defined above:

Inception: Business modeling occurs. The business case for the project is established. A Vision document
is constructed to determine boundaries and focus for the gathering of requirements. Requirements are
gathered in terms of User Stories. Logical architecture and a project glossary are fleshed out. A Risk
assessment and Project Plan are prepared.

Elaboration: User Stories that require elaboration and refactoring are transformed via CRC into Use Case
and other UML diagrams. An initial Commitment Schedule is worked out and a preliminary User Manual is
created. Architectural Diagrams and working architectural Spikes are tested. The business case, risk
assessments and other Inception products are revised.

Construction: Iterations commence as described in the Iteration process above, continuing until the entire
Commitment Schedule is achieved.

Transition: Deliverables are beta-tested and deployed. Deliverables are operated in parallel with legacies.
Operational databases are created/converted. Users are trained and the final User Manual is revised and
delivered.

Architecture activities in the Inception and Elaboration phases are described in detail in Appendix D.
Between each of these phases there are milestone meetings where the Customers review all project products
and determine whether or not the project is ready to proceed to the next phase. The project cannot proceed until
each milestone is satisfactorily achieved. These milestones are:

Approve Lifecycle Objectives: Occurs at the end of Inception Phase. Customers review and possibly
rethink project scope, costs, schedule, stories, priorities, risks, process, prototypes and expenditures. They
need to reach concurrence about the Projects objectives, buy-in to them, and either approve continuing to
the Elaboration Phase, continue the Inception Phase to account for any shortcomings, or cancel the project
if it seems the Vision isnt worth pursuing after all.

Approve Lifecycle Architecture: Occurs at the end of Elaboration Phase. Customers review and possibly
rethink the stability of the Vision document, proposed architecture, and Project Plan in the light of the
Elaboration products. They assess the completeness of the Commitment Schedule, possibly reprioritizing
User Stories in the light of the Developers scope estimates. They assess the projects expenditures and
achievability, and either approve continuing on to the Construction Phase, continue the Elaboration Phase
to account for any shortcomings, or cancel the project if it achievability or expenditures dont meet business
criteria.

Initial Operational Capability: Occurs at the end of Construction Phase. Customers review product
stability, expenditures, and their readiness for deployment. The project cant be cancelled now most of it
has already been delivered but Customers may opt to defer deployment or extend the Construction
phase before Beta Testing is allowed to begin.

Product Release: Customers review user satisfaction and project expenditures. This review may occur in
parallel with the Inception of a new project.

There are no functional differences between this process and standard RUP except that we spend much less
time in the Elaboration phase and more time in the Construction Phase as we rely on the iterative completion of
User Stories to complete detailed design work. Theres also more integration and testing placed in the

15

construction phase than RUP prescribes. The RUP Process is detailed in great detail in the RUP CD-ROM [16]
and at the Rational website online [17].

Team Structure
Both MSF and XP emphasize the need for teams of peers instead of hierarchies. The MSF Team Model
document describes team structure this way:
Everybody has exactly the same job. They have exactly the same job description. And that is to ship products.
Your job is not to write code. Your job is not to test. Your job is not to write specs. Your job is to ship products.
Your role as a developer or as a tester is secondary []
To encourage team members to work closely with each other, they are given broad, interdependent, and
overlapping roles.
XP Pairing further encourages this identification of developers with responsibility for the entire deliverable. MSF
focuses responsibility for the Development Process by closely defining six functional roles in each team. MSF is
careful to emphasize that these are not organizational roles; one person may adopt more than one role, or a
role may be shared by more than one person. It is vital, however, to explicitly account for the all responsibilities
of each role so that they are well covered throughout the development process.
We recognize MSF roles in the processes above as follows:
Product
Management

Meets with and represents Customers. Structures Business Case & Project Vision. Gathers
and Refines User Stories.

Program
Management

Coordinates and Tracks Commitment Schedule, Scope Estimates, Load Factor, Budget, Tool
and Resource Decisions. Meets with and represents Development. Takes action if process
goes off track.

Development

Prototypes Architecture, Performs Design, Estimates and Builds Deliverables & Unit Tests.

Testing

Meets with and represents QA. Designs and Constructs Functional Tests. Graphs Results and
keeps Management clued in.

User
Education

Meets with and represents End Users. Reviews and Influences User Story Design Specs.
Designs, Builds and Tests Reference Cards, Keyboard Templates, User Manuals, On-Line
Help, Wizards, and Courseware. Uses Functional Tests to Validate Usability.

Logistics
Management

Meets with and represents Operations, Product Support, Help Desk, and other Delivery
Channels. Reviews and Influences User Story Design Specs. Plans and Validates
Deployment. Supports Team Logistical Needs and Trains Operations and Help Desk
Personnel.

Figure 3 Functional Roles

XP adds a couple of extra Development-specific Functional Roles to these:


Tracker

A logical extension of Program Management. Goes around once or twice a week, asks each
Developer how theyre doing, listens to the answer, takes action if things seem to be going off track.

16

Actions include suggesting a CRC session, setting up a meeting with Customers, asking Coach or
another Developer to help.
Coach

Helps everyone follow Project Plan and Process. The Coach gets his respect to show through for
people who try hard to do the right thing. He regulates the healthy flow of ego towards Harmonious
Aggressiveness rather than friction, encouraging each person to accept and refine the problems,
requirements, and ideas of others.

Before a project can begin, a Project Plan must be drawn up to assign these functional responsibilities to
real live team members. Team members are responsible for the success of their project as a whole, but
these explicit assignments make each team member additionally responsible for ensuring their particular
functions are correctly carried out by the team.

Appendix A: Terminology
All methodologies use two methods to partition development time:

Phases order development activities; different activities are conducted in one phase to those
conducted in another. Phased development assumes that all of the prerequisites for an activity can
be more or less completed before that activity is undertaken.

Iterations repeat development activities; the same activities are conducted in every iteration,
but with different inputs. Iterative development assumes that development activities can be
extended and refined in small chunks without losing overall development context.

All methodologies attempt to structure and coordinate the same basic activities:

planning to quantify project vision, scope, resources and timeframe

requirements to capture and detail functionality within the planned vision and scope

analysis to synthesize requirements into a detailed specification of the problem domain

architecture to define standard solution techniques, structures and processes appropriate to


the problem domain

design to combine and extend architectural elements to solve specific problems identified by
analysis

prototyping to build a quick and dirty component intended to be thrown away. When the
prototype is as simple as it could possibly be and still work, we call it a spike

construction to build components and integrate them into deliverables based upon the design

unit testing to create small non-exhaustive tests of component correctness

functional testing to create formal end-to-end tests that validate deliverables against
requirements.

17

performance testing a variety of functional testing that assures deliverables meet required
performance criteria

regression testing to maintain collections of unit and functional tests that ensure new
deliverables and their components dont break old deliverables and their components

deployment to configure and install tested deliverables within a production context

All methodologies divide responsibilities between a number of different types of personnel:

Customers are business specialists who use, specify, own, and fund a development.

Developers are technologists who design, construct, unit-test, integrate and deploy a
development.

Architects are technologists who analyze the business to build generic tools, prototypes,
analyses and high level designs to support the developers.

QA are technologists who construct, automate, maintain and run functional and regression test
harnesses and procedures

Infrastructure are technologists who configure, deploy, install and maintain the deliverables
produced by the developers.

Managers are facilitators who envision, coordinate and maintain the development within
timeframe, resource, quality and scope constraints.

Appendix B: Pathological Methodologies


Cowboy Coding is characterized by:

No organized requirement gathering, project planning or process review.

Unmaintainable, unscalable, inflexible, non-standard architecture.

Developer assignments change frequently, discontinuously, and inconsistently.

Project planning a euphemism for scope-creep.

Late, gross, or missing quantification of requirement quality, resource and timeframe.

Development making business decisions. Business making development decisions.

Waterfall process; no significant developer involvement in planning or estimating.

No unit testing. No regression testing. No automated testing. No systematic functional testing.

Large disconnects and no organized feedback between development and stakeholders.

Big Brother is characterized by:

18

Big Design Up Front: requirements are transformed into analysis and design products without
experimental validation of tool assumptions or iterative feedback from Customers. Bad assumptions and
incorrectly described/scoped requirements are mandated in bulk.

Big Models: to achieve completeness and minimize risk, analysis and design models are produced that
are larger than developers and stakeholders can easily agree upon. Time is wasted in Big Meetings
attempting to resolve the many inconsistencies in the Big Models. Big Models age rapidly as business
requirements and tool context change over time. Constructing Big Models confuses and destroys context
present in the small models that make them up.

Useless Intermediaries: intermediary, non-deliverable models are constructed whether or not they are
actually needed by system developers and maintainers. The cost of maintaining these non-deliverables
increases steadily over the projects life until it becomes too large for the development to afford

Complete Subsystems: milestones are defined and deliverables deployed by complete subsystem,
usually front-end first. There are initial bouts of stakeholder enthusiasm as functionality is immediately
demonstrated lights flash and screens format data. Each subsequent complete subsystem, however,
adds little or nothing to this front-end functionality because required system features need integrated
functionality from subsystems that havent been built yet. By the time functional delivery, testing and review
occurs, the project cant afford the re-engineering required to correct its integrated deficiencies.

All Chiefs: Developers have little input, responsibility, or visibility in the early parts of the development
process. Managers, architects and consultants are required for even trivial projects. Estimates become
abstract. Methodological jargon disconnects stakeholders from developers. Objective project considerations
are sidelined by political forces.

Analysis Paralysis: A facile alternative to All Chiefs: Developers are tasked to spend months drawing
diagrams, writing specs, and sitting through design reviews. Developers feel the tasks before them are
meaningless, that nothing they produce is tangible, and that the project is crawling. To get some real work
done, analysis and design activities are skimped or prematurely concluded and ad-hoc processes used to
make up the shortfall, resulting in more Cowboy Coding. The remedy that usually follows is All Chiefs.

Pitfalls of Object-Oriented Development [3] by the Object Systems Groups Chief Director, Bruce F.
Webster, describes these and many further pathological process variants in great detail.

Appendix C: Pair Programming


In order to maintain the quality of deliverables, all Engineering Tasks Involve two developers working as a Pair.
Ideally, the two actually sit down at the same keyboard, and we provide office space suitable for that purpose;
the actual working method of each Pair remains a matter for the developers themselves to determine. From a
management perspective its only important that the two collaborate and share responsibility for delivering a
whole Engineering Task.
This is not to say we expect each task to cost twice as much; in fact we expect each task to cost exactly as
much as if it were chopped in two and each developer individually assigned half of it. Were not estimating User
Stories or Tasks in terms of Pair days above, but in individual developer days. We lose no efficiency and cost
no extra money by pairing.
If theres no cost in pairing, whats the benefit? Simply, developers dont work as well in isolation as they do in
Pairs. Two minds are as useful for development perspective as two eyes are for visual perspective. Pairs of
programmers produce better quality work than do isolated developers. They work smarter and so to better
effect. Several studies have verified that Pair Programming, when conducted as an open, shared process,
dramatically improves productivity and deliverable quality, The most recent of these is John Noseks "The Case

19

for Collaborative Programming" in the March 1998 CACM [12]. Methodologists including Lister & DeMarco [13],
Cockburn [14], and most notably Cunningham & Beck [15] strongly support pair programming.
Each member of a Pair provides feedback, an audience, a source of expertise, a tester, a reviewer, a sounding
board, and a backup for the other. Developer Pairs should be rotated regularly to spread expertise and ensure
collective code ownership. There are ergonomic and tool support challenges that we need to resolve in order to
pair, but these should be simple to overcome as developers perceive the resulting benefits.
The chief of these from a Developer standpoint is that Pair Programming reduces the need for formal
code reviews. We make provisions to conduct informal reviews once per Iteration, but through the use of
Pairs we expect these reviews to be brief and chiefly concerned with revisiting standards concerns. Over
the life of a project we expect even these reviews will become less involved as project standards mature.

Appendix D: Architecture and Patterns


Architecture constructs a space within which Developers can work comfortably from day to day and a
perspective that elevates their work to a modern professional standard. To achieve this, Architects employ two
overlapping perspectives: Project Architecture and Enterprise Architecture.
Project Architecture provides tools and techniques for Developers to apply to their Projects typical range of
User Stories. Project Architecture resolves questions and establishes contexts necessary for User Story
construction to occur:

Toolset: Which compilers, libraries, IDEs, test benches, SCM, Databases, target platforms and so on?
Which existing projects can supply experience and support? Do we apply, integrate, upgrade or reconfigure
existing tools? What other alternatives are there and how accessible are they?

Standards: What corporate, proprietary, national, or international standards apply? How should we meet
them? How do we resolve conflicts between them?

Testing framework: What qualities of our deliverables need to be tested and how? How can we automate
these tests? What optimization techniques do we use and when are they applied by whom?

Generic Components: To what extent can User Stories be constructed from readymade components?
What protocols tie these components together? How should components best be specialized and
combined?

Logical Framework: What business entities and concepts are central to our solutions? What are their
behaviors and responsibilities? How do they usually collaborate? Whats the simplest and most effective
way to model them? How will developers specialize this framework?

Data Model: How much data, what varieties and what sources? What forms of indexing are needed? What
scaling issues are there? What are typical queries and manipulations and how can we optimize them?

Distribution and Concurrency Techniques: What process architecture? What mutual exclusion
techniques? How do we configure and trace components? What mechanism underpins distributed /
concurrent components? How can we make it all maintainable and transparent?

Mapping Between Relational and Object models How do we map a projects code classes onto its
relational database? [18].

Architecture is best defined by reference to Patterns. Patterns are proven generic solutions to well known
problems in well defined contexts. Patterns combine to form self-consistent languages that enable the efficient

20

communication of architecture. In order to adhere to established industry practices, XP architects draw on the
published standards of Architectural Patterns [19] and Design Patterns [20], and stay current by following peer
forums such as the Portland Pattern Repository [21] and Pattern Languages of Programming conferences [22].
When applied with perspective and craft, Patterns make architecture reproducible and maintainable.
Where practical we prefer to buy, refine and extend existing architecture than to start it from scratch. Where we
have no choice but to start fresh, we never construct anything we dont actually need for a particular project.
Nevertheless, we always architect with an eye to future re-use. As enterprise standards mature we catalog each
Projects architectural work to contribute to our own domain-specific Pattern Languages. The activity of
documenting, maintaining, refining and propagating these Patterns is Enterprise Architecture.

References
1. http://www.rational.com/uml/resources/documentation/notation/notation7.jtmpl
2. http://www.sei.cmu.edu/pub/documents/93.reports/pdf/tr24.93.pdf
3. http://www.amazon.com/exec/obidos/ASIN/1558513973/
4. http://www.microsoft.com/solutionsframework/
5. http://c2.com/cgi/wiki?ExtremeProgrammingRoadmap
6. http://www.rational.com/products/rup/prodinfo/whitepapers/dynamic.jtmpl?doc_key=100420
7. http://www.rational.com/products/rup/prodinfo/whitepapers/dynamic.jtmpl?doc_key=389
8. http://www.amazon.com/exec/obidos/ASIN/0201895358/
9. http://www.rational.com/uml/resources/documentation/notation/index.jtmpl
10. http://www.rational.com/uml/resources/documentation/notation/notation8a.jtmpl
11. http://www.rational.com/uml/resources/documentation/notation/notation5a.jtmpl
12. http://www.acm.org/pubs/articles/journals/cacm/1998-41-3/p105-nosek/p105-nosek.pdf
13. http://www.amazon.com/exec/obidos/ISBN%3D0932633056/
14. http://members.aol.com/acockburn/
15. http://c2.com/cgi/wiki?ProgrammingInPairs
16. http://www.rational.com/products/rup/tryit/rupcd.jtmpl
17. http://www.rational.com/products/rup/index.jtmpl
18. http://members.aol.com/kgb1001001/Chasms.htm
19. http://www.amazon.com/exec/obidos/ASIN/0471958697/
20. http://www.amazon.com/exec/obidos/ASIN/0201633612/
21. http://c2.com/cgi/wiki?StartingPoints
22. http://hillside.net/patterns/conferences/