BukitAsam
PT. TAMBANG BATUBARA BUKIT ASAM (Persero) Tbk.
2009
BukitAsam
CONTENT
THE PROJECT
BACKGROUND AND OBJECTIVES
GENERAL INFORMATION OF AIR LAYA
SCOPE OF WORK
WORK FOR DGMCG/PTBA
WORK FOR NEDO
PROPOSED SCHEDULE
PROJECT PLAN
CLOSING
BukitAsam
THE PROJECT
BukitAsam
Background :
Air Laya Open Pit Mineable Reserves for export quality
are limited (105 million ton with Geological Reserves 256
million ton)
Potential of High Wall mining and and U/G Mining of
deep seated coal in Air Laya to increase mining recovery
Objective :
Tg. Enim
Air Laya
Lahat
PROJECT AREA
+/- 3,000 Ha
SUMATRA ISLAND
Tg. Agung
Palembang
Project Area
Tg Enim
Tarahan
N
JAVA ISLAND
River
Road
Railway
MUARA ENIM
SUBAN JERIJI UTARA
Banjarsari
Anticline
Arahan Utara
Anticline
BANJARSARI
ARAHAN UTARA
Regional Stratigraphic
Column of Tanjung Enim
Niru seam
Jelawatan seam
MTBU
Arahan Selatan
Anticline
ARAHAN SELATAN
MTBS
TANJUNG ENIM
Enim seam
KUNGKILAN
Kebon seam
BANKO BARAT
Benuang seam
AIR SERELO
LAHAT
BUKIT KENDI
Burung seam
BANKO TENGAH
BUKIT BUNIAN
LEGENDS :
Mangus seam
Suban seam
BANKO TENGAH
VOLCANIC BRECCIA
BANKO TENGGARA
ANDESITE INTRUSION
Petai seam
M4
M3
BANKO SELATAN
M2
M1
FAULT
Merapi seam
SYNCLINE
ANTICLINE
Kladi seam
Arahan Selatan
Arahan Selatan
Anticline
Arahan Utara
Arahan Utara
Anticline
SumateraSelatan
Selatan
Sumatera
Tj Api-Api
.
-
Palembang
Kungkilan
Muara Tiga
Selatan
Muara Tiga
Anticline
Muara Tiga
Besar Utara
KERTAPATI
Banjarsari Syncline
Banjarsari
Lahat
Banjarsari Anticline
M.Enim
TJ. ENIM
SAMUDRA
SAMUDRA
TARAHAN
INDONESIA
BUKIT
KENDI
BUKIT ASAM
Banko Barat
Air Laya
Klawas Anticline
Liling Anticline
Enim River
MUARA
ENIM
TOWN
Laut Jawa
Selat
SURALAYA
Sunda
Suban Jeriji
Utara
Bukit Asam
2
3 km
M4
M3
M2
M1
BukitAsam
Geological Map
of AIRLAYA
BukitAsam
BukitAsam
BukitAsam
BukitAsam
BukitAsam
BukitAsam
PROJECT PLAN
BukitAsam
ACTIVITIES
Year
3rd Year Plan
2012/2013
Air Laya
holes
Total
Volume
1,067
1500
1500
Ha
km
10
10
10
holes
3,000
30
6
7. Drilling
a. Mobilization and Demobilizition
ls
b. Depth
meter
5200
5200
5200
c. Hole
holes
meter
5200
5200
5200
15,600
sample
224
224
224
672
sample
sample
376
376
376
8. Geophysical Logging
15,600
24
3
1,128
6
BukitAsam
CLOSING