ADELANTO DIRECTO
AD: 10 % Po = 10%PbxFr
Amortizacion:
Deduccion :
10 % Vr
.- % V/C (K/Ka -1)
Donde:
K = Coef. De reajuste
Ka= Coef. De reduccion del mes que se ad.
Ka>K D (t)
ADELANTO DE MATERIALES
Am: 20% Po =
20%PbXFr
A max = Cix%xPbxFrxIma/Imo
CI: coef. De incidencia
A max <= 20 % Pbx Fr
Amort: cant. De mat.usados valorizados x P unit.x Fr x (Ima/Imo)
Deduccion= CI x V ((Imr-Ima)/Imo)
ADELANTOS
01.-
A. DIRECTO
PB=
800,000.00
Fpb=
MAYO
Po=
790,000.00
Fr=
0.98750
FIRMA DEL CONTRATO: 15 AGOSTO
SOLICITA EL ADELANTO: 16 AGOSTO
ENTIDAD CANCELA EL ADELANTO: 21 DE AGOSTO}
MONTO DEL ADELANTO:
Ad= 10% Pb Fr
AD= 10% x 790,000.00
AD=
79,000.00
+
10%x800,000.00x0.98750 =
IGV
V1= 200000 x Fr
D= -
AxV
C
AMORT.=
k
ka
D= - 0.10 x 200,000.00 x Fr
10% V1
1.009
1.004
-1
DONDE:
A= MONTO DEL ADELANTO
V = VALORIZACION
C= MONTO EL CONTRATO
K= COEFICIIENTE DE REAJUSTE DEL MES QUE SE VALORIZA
Ka= COEF. REAJ. DEL MES QUE SE CANCELA EL ADELANTO
A=
C
79,000.00
19,750.00
98.3565737
D1
Am= CI x % x Pb x Fr x Ima
Imo
Pb=
Fpb =
FR=
Am=
43,789.98
ABRIL
0.98555
20% Pb x Fr
FORMULA POLINOMICA
OBRA:
AMPLIACION
CONTRATISTA:
ESPECIALIDAD: ESTRUCTURAS
MONOMIO
2
3
4
5
6
DESCRIPCION
CEMENTO P.T 1
PIEDRA CHANCADA
MAQUINARIA NACIONAL
LADRILLO ARCILLA
ARENA GRUESA
MADERA NACIONAL P/ENCOFRADO
HERR.
ACERO CORRUGADO
MANO DE OBRA INC. BS
G.G.U
P.B=
FECHA=
AREA GEOGRAFICA: 03
SIMBOLO
CPM
LA
DH
F
J
G.G.U
43,789.98
SET
ABRIL
ASUMIDO
JUL.
Imo
Ima
A GEOGRAFICA: 03
I.U
C.I
21
5
48
17
4
43
37
3
47
39
0.133
0.109
0.103
0.170
0.285
0.200
72.93
17.29
9.78
11.93
88.07
89.32
10.68
100.00
100.00
100.00
389.65
401.16
354.51
748.26
1,033.76
796.28
296.12
505.20
523.15
411.50
389.65
402.21
358.59
742.44
1040.14
819.25
296.62
457.96
544.49
418.76
Pb
43,789.98
FR
ADELANTO A
ADELANTO A
ADELANTO
SOLICITAR
4,186.12
995.03
0.98555
1,750.41
556.84
4,168.50
4,084.98
6,650.69
20,642.15
< 20 % Pbx Fr
8,631.44
8,631.44
1,700.00
JUL.
AG.
SET.
2