You are on page 1of 5

NIOEC

NATIONAL IRANIAN OIL REFINING &


DISTRIBUTION COMPANY

NIOEC-DS-47-01(0)

NATIONAL IRANIAN OIL ENGINEERING &


CONSTRUCTION COMPANY

DOCUMENT CODE

PROJECT:

CONTRACTOR
LOGO

UNIT:

PLAN/PRJ/S
UB

UNIT

PHASE

DISC.

NIOEC

000

EG

ME

PAGE 1 OF 2

DOC. TYPE SER. NO.

DS

4701

REV. NO.

DATE

A0

JULY, 2005

STEAM JET EJECTOR


Performance
Manufacturer
Type:

Steam Condition:

Service:
No of stages:

No of ejectors per stage:

Vol of Evacuating Sys

m3

Max Evacuating Time:

Minute

Suction Condition
Discharg Condition

Pressure:
Temperature:

Water Condition:

Quality

Max. Pressure:

kPa abs

Temperature:

C Max.

Max. DP allowed

mm Hg

Max. DT allowed

C Max.
mm Hg Abs

Temperature:

Air Leakage

kPa abs

Temperature:
Source:

mm Hg Abs

Pressure:

Min Pressure:

Max/Min Flow availabel:

C Max. allowable

Pressure:

Evacuation initial
condition

#/hr

m3/hr
mm Hg Abs

Temperature:

C Max.

Ejector Load
Molecular
Cp
weight
(kJ/kgC)

Latent Heat
(kJ/kgC)

Corrosive
(yes/no)

1st stage 2nd stage

3rd stage

4th stage

Mass flow
rate (kg/hr)

Non-Condensable Gases

Condensable Gases

Mass flow
rate (kg/hr)

Molecular
weight

Cp
Latent Heat
(kJ/kgC)
(kJ/kgC)

Corrosive
(yes/no)

Design
5th stage

6th stage

7th stage

Propelling steam, kg/hr


Steam inlet size
Steam pressure class and facing
Water m3/hr
Water T
Water Inlet size
Water inlet press class and facing
Water exit size
Water exit press class and facing
Suction chamber press, mmHg abs
Suction chamber temp C
Condensers:
Pre, Inter, After
Barometric
No contact stages
Surface: Outside
Tube area, m2

Notes

3
2
1
0

JULY, 2005

REV.

DATE

S.GHASSEMI

DESCRIPTION

PREPARED

CHECKED

M.R.FARZAM

M.A.A.SAJEDI

APPROVED

AUTHORIZED

NIOEC-DS-4

NATIONAL IRANIAN OIL REFINING &


DISTRIBUTION COMPANY

NIOEC
CONTRACTOR
LOGO

NATIONAL IRANIAN OIL ENGINEERING &


CONSTRUCTION COMPANY

PROJECT:
UNIT:

DOCUMENT
PLAN/PRJ/S
UB

UNIT

NIOEC

000

STEAM JET EJECTOR


Materials of Construction
Nozzle(s)
Ejector(s)

Diffuser:
Steam Chest Design Pressure (bar g):
Steam Chest Design Temperature (C):
or

Shell and Tube

Shell

Internals:

Tube Sheet(s):
TEMA
Condensor(s)

ASME Code Construction

Yes

Design Pressure (barg)

Shell Side

Design Temperature (C)

Shell Side

Fouling Factors

Shell Side

Condensing in:

Shell or

No

Tubes

Accessories and Other Requirements

Notes

3
2
1
0

JULY, 2005

REV.

DATE

S.GHASSEMI

DESCRIPTION

PREPARED

NIOEC-DS-47-01(0)
DOCUMENT CODE
PHASE

DISC.

EG

ME

PAGE 2 OF 2

DOC. TYPE SER. NO.

DS

4701

REV. NO.

DATE

A0

JULY, 2005

ET EJECTOR

of Construction
Steam chest
Suction Chamber
Body Deisgn Pressure (barg):
Body Deisgn Temperature (C):
Barometric (Direct contact)
Channel(s):
Tubes:
or R

TEMA Type

Stamp:

Yes

No

Tube Side:
Tube Side:
Tube Side:
Tubes

Horizental or

d Other Requirements

Vertical

Notes

CHECKED

M.R.FARZAM

M.A.A.SAJEDI

APPROVED

AUTHORIZED

You might also like