Professional Documents
Culture Documents
Configuration Guide
Contents
Contents
1 Introducing the TransData ..........................................................................................................9
2 Introducing the Main Interface ................................................................................................10
About This Chapter .............................................................................................................................................. 10
2.1 Logging in to Server....................................................................................................................................... 11
2.2 Introducing the Entrance to the Task.............................................................................................................. 12
2.3 Introducing the Shortcut Menu....................................................................................................................... 15
2.4 Introducing the Menu Bar .............................................................................................................................. 19
2.4.1 Project Menu......................................................................................................................................... 19
2.4.2 Task Menu............................................................................................................................................. 20
2.4.3 View Menu............................................................................................................................................ 20
2.4.4 Help Menu ............................................................................................................................................ 21
2.5 Introducing the Toolbar .................................................................................................................................. 24
Issue 06 (2006-03-01)
Contents
ii
Issue 06 (2006-03-01)
Figures
Figures
Figure 2-1 Login Server dialog box .................................................................................................................... 11
Figure 2-2 Main interface of the Genex Nastar TransData.................................................................................. 12
Figure 2-3 All tasks displayed in the task pane ................................................................................................... 13
Figure 2-4 Tasks of the selected project .............................................................................................................. 14
Figure 2-5 Display tasks of a data ....................................................................................................................... 15
Figure 2-6 Shortcut menu of the WCDMA node................................................................................................ 15
Figure 2-7 Shortcut menu of the project node ..................................................................................................... 16
Figure 2-8 Right-click shortcut menu of a data ................................................................................................... 17
Figure 2-9 Imported MML file manage............................................................................................................... 17
Figure 2-10 Query Result dialog box .................................................................................................................. 18
Figure 2-11 Shortcut menu of a task.................................................................................................................... 18
Figure 2-12 System menu.................................................................................................................................... 19
Figure 2-13 Project menu .................................................................................................................................... 19
Figure 2-14 Task menu........................................................................................................................................ 20
Figure 2-15 View menu ....................................................................................................................................... 20
Figure 2-16 Output Bar ....................................................................................................................................... 21
Figure 2-17 Help menu........................................................................................................................................ 21
Figure 2-18 About TransData dialog box ............................................................................................................ 22
Figure 2-19 Get ESN Code dialog box................................................................................................................ 22
Figure 2-20 License Info dialog box ................................................................................................................... 23
Figure 2-21 Open dialog box............................................................................................................................... 24
Figure 2-22 Toolbar............................................................................................................................................. 24
Figure 3-1 Project menu ...................................................................................................................................... 27
Figure 3-2 New Project on the right-click shortcut menu ................................................................................... 27
Figure 3-3 Create WCDMA Project dialog box .................................................................................................. 28
Figure 3-4 New project listed in the Project View pane ...................................................................................... 29
Issue 06 (2006-03-01)
iii
Figures
iv
Issue 06 (2006-03-01)
Figures
Figure 4-23 Data Delete Task Setting dialog boxRTWP Data Delete ............................................................. 67
Issue 06 (2006-03-01)
Tables
Tables
Table 2-1 Login Server dialog box ...................................................................................................................... 11
Table 2-2 Main interface of the Genex Nastar TransData.................................................................................... 12
Table 2-3 Shortcut menu of the WCDMA node .................................................................................................. 16
Table 2-4 Shortcut menu of the project node....................................................................................................... 16
Table 2-5 Shortcut menu of a task ....................................................................................................................... 19
Table 2-6 Descriptions of the Project menu......................................................................................................... 19
Table 2-7 Descriptions of the Task menu............................................................................................................. 20
Table 2-8 Descriptions of the View menu............................................................................................................ 21
Table 2-9 Description of the button icons on the Toolbar.................................................................................... 24
Table 3-1 Descriptions of he Create WCDMA Project dialog box ...................................................................... 28
Table 3-2 Descriptions of the Manage WCDMA Projects dialog box ................................................................. 30
Table 3-3 Task states............................................................................................................................................ 33
Table 3-4 Descriptions of the data Import Task Setting dialog box..................................................................... 35
Table 3-5 General Time Setting dialog box ......................................................................................................... 39
Table 4-1 Descriptions of the Data Import Task Setting dialog box .................................................................... 47
Table 4-2 Descriptions of the Data Delete Task Setting dialog box. ................................................................... 49
Table 4-3 Descriptions of the Data Import Task Setting dialog box .................................................................... 51
Table 4-4 Descriptions of the Data Delete Task Setting dialog box .................................................................... 54
Table 4-5 Descriptions of the Data Import Task Setting dialog box .................................................................... 56
Table 4-6 Descriptions of the Data Delete Task Setting dialog boxCHR Data Delete .................................... 59
Table 4-7 Descriptions of the Data Import Task Setting dialog box .................................................................... 60
Table 4-8 Descriptions of the Data Delete Task Setting dialog box .................................................................... 62
Table 4-9 Descriptions of the Data Import Task Setting dialog box .................................................................... 64
Table 4-10 RTWP TXT File Information dialog box........................................................................................... 66
Table 4-11 Descriptions of the Data Delete Task Setting dialog box................................................................... 68
vi
Issue 06 (2006-03-01)
Issue 06 (2006-03-01)
Tables
vii
Tables
The TransData is the assistant software for Genex Nastar WCDMA. The TransData can
automatically import or delete project data of the Genex Nastar WCDMA projects to save
time for maintaining multiple projects, especially in the server mode when there are many
projects.
This tool provides the following functions:
z
Managing projects
For details, refer to section 3.1 "Managing a Project."
Managing tasks
For details, refer to section 3.2 "Managing a Task."
Managing data
For details, refer to chapter 4 "Managing the Data."
CHR data
IOS data
RTWP data
Issue 06 (2006-03-01)
Tables
10
Section
Describes
Issue 06 (2006-03-01)
Tables
Table 2-1 describes the elements in the Login Server dialog box.
Table 2-1 Login Server dialog box
Element
Description
SQL server
User name
Password
Step 2 Select the database server in the SQL server drop-down list.
Step 3 Type the user name and password in the User name and Password fields.
Step 4 Click Login.
After you succeed in logging in to the server, the main interface of the TransData is displayed,
as shown in Figure 2-2.
Issue 06 (2006-03-01)
11
Tables
Table 2-2 describes the elements in the main interface of the Genex Nastar TransData.
Table 2-2 Main interface of the Genex Nastar TransData
Element
Description
Task pane
Output pane
----End
12
Issue 06 (2006-03-01)
Tables
Issue 06 (2006-03-01)
13
Tables
Step 3 Click a data such as Config Data of a project in the Project View pane.
The tasks of the selected data are displayed, as shown in Figure 2-5.
14
Issue 06 (2006-03-01)
Tables
----End
Issue 06 (2006-03-01)
15
Tables
Description
New Project
Creates a project
Management
Refresh
Description
Refresh
16
Issue 06 (2006-03-01)
Tables
Step 2 Select Query on the shortcut menu of Config Data, the Imported MML file manage dialog
box is displayed, as shown in Figure 2-9.
Figure 2-9 Imported MML file manage
Step 3 Select Query on the shortcut menu of other data, the Query Result dialog box is displayed,
as shown in Figure 2-10.
Issue 06 (2006-03-01)
17
Tables
The Query Result dialog box lists the information of the imported data.
18
Issue 06 (2006-03-01)
Tables
Description
Start Task
Starts a task.
Stop Task
Stops a task.
Edit Task
Edits a task.
Description
New Project
Creates a project.
Management
Manages projects.
Issue 06 (2006-03-01)
19
Tables
Menu Item
Description
Refresh
Exit
Description
Start Task
Starts a task.
Stop Task
Stops a task.
Edit Task
Edits a task.
20
Issue 06 (2006-03-01)
Tables
Description
Toolbar
Status Bar
Work Space
Output Bar
Detail Log
Issue 06 (2006-03-01)
21
Tables
About TransData
Choose Help > About TransData, the About TransData dialog box is displayed, as
shown in Figure 2-18.
Figure 2-18 About TransData dialog box
The About TransData dialog box shows the version information and copyright information.
ESN Code
Choose Help > ESN Code, the Get ESN Code dialog box is displayed, as shown in Figure
2-19.
Figure 2-19 Get ESN Code dialog box
Get ESN Code dialog box provides relevant ESN code of the software.
License Information
Choose Help > License Information, the License Info dialog box is displayed, as shown in
Figure 2-20.
22
Issue 06 (2006-03-01)
Tables
In the License Info dialog box, you can view the license information.
Update License
To update license, perform the following steps:
Step 1 Choose Help > Update License.
The Open dialog box is displayed, as shown in Figure 2-21.
Issue 06 (2006-03-01)
23
Tables
24
Hint
Description
New Project
Creates a project.
Project Management
Manages projects.
Issue 06 (2006-03-01)
Tables
Icon
Issue 06 (2006-03-01)
Hint
Description
Start Task
Starts a task.
Stop Task
Stops a task.
Edit Task
Edits a task.
25
Tables
26
Section
Describes
Issue 06 (2006-03-01)
Tables
Click
Right-click on the WCDMA node in the Project View pane, and then select New
Project on the shortcut menu, as shown in Figure 3-2.
on the toolbar.
The Create WCDMA Project dialog box is displayed, as shown in Figure 3-3.
Issue 06 (2006-03-01)
27
Tables
Table 3-1describes the elements of the Create WCDMA Project dialog box.
Table 3-1 Descriptions of he Create WCDMA Project dialog box
Element
Description
Version list
Name
Project Location
Description
Click
Step 2 Select the version, type a project name and set path.
Step 3 Click Create.
The new project is added to the WCDMA node in the Project View pane, as shown in Figure
3-4.
28
Issue 06 (2006-03-01)
Tables
----End
Click
Right-click on the WCDMA node in the Project View pane, and then select
Management on the shortcut menu, as shown in Figure 3-6.
on the Toolbar.
Issue 06 (2006-03-01)
29
Tables
The Manage WCDMA Projects dialog box is displayed, as show in Figure 3-7.
Figure 3-7 Manage WCDMA Projects
Description
Name
Description
Create Date
Edit Date
Disk Space
Version
30
Issue 06 (2006-03-01)
Tables
Step 3 Select a path for saving the selected project, and click OK.
The project is saved as a backup file with the same name as the selected project.
Issue 06 (2006-03-01)
31
Tables
Step 3 Select the backup file of the project, and click Open.
The program restores the selected project with the backup file.
----End
32
Issue 06 (2006-03-01)
Tables
Ensure the project is not in use before you delete it. Otherwise the project cannot be deleted.
Description
Unedited state.
Issue 06 (2006-03-01)
33
Tables
Task States
Description
Stopped state.
It means that the task is completed, or is stopped by user.
Executing state.
It means the data are in the process of importing or deleting.
Ready state.
It means the task is ready for processing.
Waiting state.
The Data Import Task Setting dialog box is displayed, as shown in Figure 3-12.
34
Issue 06 (2006-03-01)
Tables
Table 3-4 describes the elements in the Data Import Task Setting dialog box
Table 3-4 Descriptions of the data Import Task Setting dialog box
Element
Basic
Description
Task Name
Data Path
Execute At Once
Execute As Plan
Issue 06 (2006-03-01)
35
Tables
Element
Trigger Time
Description
Begin Time
Granularity
Data Process
Do not process
After import,
move date files to
Click
to select a path.
Step 2 Edit each element in the Data Import Task Setting dialog box, as described in Table 3-4.
Step 3 Click OK.
----End
The Data Delete Task Setting dialog box is displayed, as shown in Figure 3-14.
36
Issue 06 (2006-03-01)
Tables
Table 3-5 describes the elements in the Data Delete Task Setting dialog box.
Table 3-5 Descriptions of the Data Delete Task Setting dialog box
Element
Basic
Description
Task Name
Data Reserved
Days
Execute At Once
Execute As Plan
Begin Time
Granularity
Issue 06 (2006-03-01)
37
Tables
Step 2 Edit each element on the Data Delete Task Setting dialog box, as described in
Step 3 Click OK.
----End
on the toolbar.
The General Time Setting dialog box is displayed, as shown in Figure 3-15.
38
Issue 06 (2006-03-01)
Tables
Description
Time
Unit
Week
Month
Trigger Time
Time List
Period
Time Name
Issue 06 (2006-03-01)
39
Tables
Step 2 Type a name of the customized time, set time unit, and select the relevant dates.
Step 3 Click Add to add a customized time to the Time List
Step 4 Click Exit to close the General Time Setting dialog box.
----End
40
Issue 06 (2006-03-01)
Tables
Describes
Issue 06 (2006-03-01)
41
Tables
Select a project in the Project View pane, and select Import Project Parameter on the
shortcut menu, as shown in Figure 4-2.
on the toolbar.
42
Issue 06 (2006-03-01)
Tables
Issue 06 (2006-03-01)
43
Tables
The project parameters are matched automatically. That the signin front of a column name
means the name has been matched with a certain column and cannot be used to match with
the next column.
You can also match it manually.
z
Click the table column header and select the matched column name in the drop-down
list.
To cancel the match of a column, select Release Match on the shortcut menu.
It is suggested to select Clear Database to clear database before importing the project parameter. In this
way, you can avoid the errors appears during importing the project parameter.
----End
44
Issue 06 (2006-03-01)
Tables
Step 1 You can perform one of the following methods to delete the project parameters:
z
Select a project in the Project View pane, and then choose Project > Delete
Engineering Parameter, as shown in Figure 4-6Figure 4-1.
Select a project in the Project View pane, and select Delete Project Parameter on the
shortcut menu, as shown in Figure 4-7.
on the toolbar.
The Delete Engineering Parameter dialog box is displayed, as shown in Figure 4-8.
Figure 4-8 Delete Engineering Parameter dialog box
Issue 06 (2006-03-01)
45
Tables
----End
46
Issue 06 (2006-03-01)
Tables
Figure 4-11 Data Import Task Setting dialog boxConfig Data Delete
Table 4-1 describes the elements in the Data Import Task Setting dialog box.
Table 4-1 Descriptions of the Data Import Task Setting dialog box
Element
Basic
Description
Task Name
Data Path
Execute At Once
Execute As Plan
Issue 06 (2006-03-01)
47
Tables
Element
Trigger Time
Description
Begin Time
Granularity
Data Process
Do not process
After import,
move date files to
Click
to select a path.
Step 3 Type task name, and select the directory of the file to be imported.
Step 4 Select task execution type.
z
Select Execute As Plan to import the data automatically, and set Begin Time and
Granularity in Trigger Time.
48
Issue 06 (2006-03-01)
Tables
Table 4-2 describes the elements in the Data Delete Task Setting dialog box.
Table 4-2 Descriptions of the Data Delete Task Setting dialog box.
Element
Manual
Description
Execute At Once
Task Run
Data List
Execute As Plan
Task Name
Issue 06 (2006-03-01)
49
Tables
Element
Description
Begin Time
Granularity
Step 3 Set the elements in the Data Delete Task Setting dialog box, according to the descriptions in
the Table 4-2.
Step 4 Click OK.
----End
50
Issue 06 (2006-03-01)
Tables
Figure 4-13 Data Import Task Setting dialog boxPerformance Data Import
Table 4-3 describes the elements in the Data Import Task Setting dialog box.
Table 4-3 Descriptions of the Data Import Task Setting dialog box
Element
Basic
Description
Task Name
Issue 06 (2006-03-01)
Data Path
Item set
51
Tables
Element
Description
Execute At Once
Execute As Plan
Trigger Time
Begin Time
Granularity
Import File
Time Set
Data Process
Start Time
End Time
Do not process
After import,
move date files to
Click
to select a path.
Step 3 Type the task name, and select the directory of the file to be imported.
Step 4 Select the task execution type.
z
Select Execute As Plan to import the data automatically, and set Begin Time and
Granularity in Trigger Time.
52
Issue 06 (2006-03-01)
Tables
After the performance data is imported, select Performance Data node of a project in the
Project View pane, and then select Query on the shortcut menu. The Query Result dialog
box is displayed, as shown in Figure 4-14. The imported data is listed in the Query Result
dialog box.
Figure 4-14 Query Result dialog box
Issue 06 (2006-03-01)
53
Tables
Figure 4-15 Data Delete Task Setting dialog boxPerformance Data Delete
Table 4-4 describes the elements in the Data Delete Task Setting dialog box.
Table 4-4 Descriptions of the Data Delete Task Setting dialog box
Element
Manual Run
Description
Execute At Once
Delete Statistic
Data at the same
time
54
Data List
Begin Date
Issue 06 (2006-03-01)
Tables
Element
Task Run
Description
End Date
Task Name
Execute As Plan
Original Data
Reserved Days
Statistic Data
Reserved Days
Begin Time
Granularity
Step 3 Set the elements in the Data Delete Task Setting dialog box, according to the descriptions in
the Table 4-4.
Step 4 Click OK.
----End
Issue 06 (2006-03-01)
55
Tables
Figure 4-16 Data Import Task Setting dialog boxCHR Data Import
Table 4-5 describes the elements in the Data Import Task Setting dialog box.
Table 4-5 Descriptions of the Data Import Task Setting dialog box
Element
Basic
Description
Task Name
56
Data Path
Data Version
Issue 06 (2006-03-01)
Tables
Element
Description
Execute At Once
Execute As Plan
Trigger Time
Begin Time
Granularity
Import File
Time Set
Data Process
Start Time
End Time
Do not process
After import,
move date files to
Click
to select a path.
Issue 06 (2006-03-01)
57
Tables
Step 3 Type the task name, and select the directory of the file to be imported.
Step 4 Select the task execution type.
z
Select Execute As Plan to import the data automatically, and set Begin Time and
Granularity in Trigger Time.
Step 5 Select the contents of the CHR data to be imported on the Set CHR Import Condition dialog
box.
Step 6 Set the filter time.
Step 7 Select the data process type.
Step 8 Click OK.
----End
58
Issue 06 (2006-03-01)
Tables
The Data Delete Task Setting dialog box is displayed, as shown in Figure 4-18.
Figure 4-18 Data Delete Task Setting dialog box CHR Data Delete
Figure 4-18 describes the elements in the Data Delete Task Setting dialog box.
Table 4-6 Descriptions of the Data Delete Task Setting dialog boxCHR Data Delete
Element
Description
Task Name
Data List
Step 3 Type the task name and select CHR data to delete.
Step 4 Click OK.
----End
Issue 06 (2006-03-01)
59
Tables
The Data Import Task Setting dialog box is displayed, as shown in Figure 4-19.
Figure 4-19 Data Import Task Setting dialog boxIOS Data Import
Table 4-7 describes the elements in the Data Import Task Setting dialog box.
Table 4-7 Descriptions of the Data Import Task Setting dialog box
Element
Basic
Description
Task Name
Data Path
Execute At Once
Execute As Plan
60
Issue 06 (2006-03-01)
Tables
Element
Trigger Time
Description
Begin Time
Granularity
Data Process
Do not process
After import,
move date files to
Click
to select a path.
Step 3 Type task name, and select the directory of the file to be imported.
Step 4 Select task execution type.
z
Select Execute As Plan to import the data automatically, and set Begin Time and
Granularity in Trigger Time.
Issue 06 (2006-03-01)
61
Tables
Figure 4-20 Data Delete Task Setting dialog boxIOS Data Delete
Table 4-8 describes the elements in the Data Delete Task Setting dialog box.
Table 4-8 Descriptions of the Data Delete Task Setting dialog box
Element
Manual
Description
Execute At Once
62
Select All
Select None
Reverse
Data List
Issue 06 (2006-03-01)
Tables
Element
Task Run
Description
Execute As Plan
Task Name
Data Reserved
Days
Begin Time
Granularity
Step 3 Set the elements in the Data Delete Task Setting dialog box, according to the descriptions in
the Table 4-8.
Step 4 Click OK.
----End
Binary format
Text format
Issue 06 (2006-03-01)
63
Tables
Figure 4-21 Data Import Task Setting dialog boxRTWP Data Import
Table 4-9 describes the elements in the Data Import Task Setting dialog box.
Table 4-9 Descriptions of the Data Import Task Setting dialog box
Element
Basic
Description
Task Name
Data Path
Execute At Once
Execute As Plan
64
Issue 06 (2006-03-01)
Tables
Element
Description
TxtFile Set
RNCID and
CelllID
Trigger Time
Begin Time
Granularity
Data Process
Do not process
After import,
move date files to
Click
to select a path.
Step 3 Type the task name, and select the directory of the data to be imported.
Step 4 Select the task execution type.
z
Select Execute As Plan to import the data automatically, and set Begin Time and
Granularity in Trigger Time.
Step 5 Select the data process type after import setting finishes.
Step 6 Click OK.
----End
Issue 06 (2006-03-01)
65
Tables
z
Select Execute As Plan to import the data automatically, and set Begin Time and
Granularity in Trigger Time.
Step 4 Click Enter Set Form on the Data Import Task Setting dialog box.
The RTWP TXT File Information dialog box is displayed, as shown Figure 4-22.
Figure 4-22 RTWP TXT File Information dialog box
Table 4-10 describes the elements in the RTWP TXT File Information dialog box.
Table 4-10 RTWP TXT File Information dialog box
Element
Description
ROWID
Row ID.
RNCID
RNC ID.
Click to input the RNC ID.
CELLID
Cell ID.
Click to input the cell ID.
FILE PATH
Step 5 Input RNC ID and cell ID, click OK in the RTWP TXT File Information dialog box.
Step 6 Select the data process type after data file setting finishes.
Step 7 Click OK.
Return to the RTWP TXT File Information dialog box.
Step 8 Click OK to confirm.
----End
66
Issue 06 (2006-03-01)
Tables
Table 4-11 describes the elements in the Data Delete Task Setting dialog box.
Issue 06 (2006-03-01)
67
Tables
Table 4-11 Descriptions of the Data Delete Task Setting dialog box
Element
Manual
Description
Execute At Once
Task Run
Select All
Select None
Reverse
Data List
Execute As Plan
Task Name
Data Reserved
Days
Begin Time
Granularity
Step 3 Set the elements in the Data Delete Task Setting dialog box, according to the descriptions in
the Table 4-11.
Step 4 Click OK.
----End
68
Issue 06 (2006-03-01)