Site layout proposal

General
1
2
3
4

C-1
AL-1
A-1
AD-1

Cover sheet . Table of contents


Site requirements
Site layout
Schematic cross section(s)

Rev Date

Drw

TTH

Proposal

Layout proposal - with config

Chk

Proj. phase

Description

Cover sheet
Table of contents

03 Aug 2016 NDI

ID-16-00108

Sheet Subject

Revision history
H
G
F
E
D
C
B
A

Semarang , Indonesia

Subject

Achieva 1.5T
RSUD Kota Semarang

Type

Project

Sheet

Drawing

Typical configuration shown (not site specific)

Important notes

Philips assumes no liability nor offers any warranty for the fitness
or adequacy of the premises or the utilities available at the premises
in which the equipment is to be installed, used or stored.

Philips contact
Isnadi Syukri, +628111001819, isnadi.syukri@philips.com

Philips Healthcare

Customer ID

Technical ID

A3

a business of Royal Philips N.V.


PT Philips Indonesia Commercial
Gedung Philips, Jl. Buncit Raya, Kav 99-100, Pejaten Barat, Pasar Minggu, Jakarta Seletan 12510, Indonesia
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C-1 AND SHOULD NOT BE SEPARATED

Quote No
Order No

The information in this package is provided as a customer convenience,


and is not to be construed as architectural drawings or
construction documents.

Koninklijke Philips Electronics N.V. 2016

All rights reserved. Reproduction in whole or in part is prohibited without prior written consent of the copyright holder.

Table of contents

mm

C-1
Sheet

1/4

Maximum Cable lengths between the Cable in- and Outlets of the Cabinets
From:

System Filter Box


System Filter Box
System Filter Box
DACC (*)
DACC (*)
Gradient Amplifier (**)
MDU
MDU
MDU
(*)

(**)

To:
DACC (*)
LCC (*)
Gradient Amplifier (**)
Gradient Amplifier (**)
LCC (*)
LCC (*)
Gradient Amplifier (**)
LCC (*)
All other components

Meter:
7
7
7
7
7
7
10
13
10

Remote service diagnostics


To establish this feature, a RJ45 type Ethernet connector must be
installed with access to the customer's network (10/100/1000 Mbps)
Environmental requirements
Examination room:
Temperature 18C-22C
Maximum temperature change 5C per 10min
Relative humidity 40% - 70%, no condensation
Required Air Conditioning Capacity: 2kW
- Energy dissipated in the examination room will be removed from the room by an
additional air exhaust system.
- Gradient coil heat dissipation (1 to 15 kW) will be removed via liquid cooling of the
Gradient coil.

Technical room:
Temperature 15C-24C
Maximum temperature change 5C per 10min
Relative humidity 30% - 70%, no condensation
Required Air Conditioning Capacity: 7 kW
- Standby heat dissipation: 2 kW
- Heat dissipation to Water: 7 - 40kW
- Min. flow 4200L/h.
- Pressure drop (with 100% water) 1.8bar.

Examination area
A

1.1

Scanner gantry 1.5T

1.2

Patient table

4630

165

1.3

System filter box

80 1000*

1.4

He gas exhaust pipe inside RF-cage

1.5

He gas exhaust RF feed through

1.6

He gas exhaust pipe outside RF-cage

1.7

Accessory cabinet (Optional)

300

1.8

Patient trolley (Optional)

51

1.9

Patient observation wall camera

1.10 Injector

63

76

65

Control area
A

2.1

Operating station

2.2

Emergency run down button

2.3

Operator's equipment / computer trolley

2.4

Operator's table (optional)

100

2.5

Patient observation monitor

4.2

100*

2.6

Intellispace Portal Workstation IX

11

Technical area
A

3.1

Mains distribution unit 400V 50Hz

135

200*

3.2

Liquid cooling cabinet

300 1000*

3.3

Gradient amplifier cabinet 781

467

200*

3.4

Data Acquisition & Control Cabinet

265 7000*

3.5

Chilled water connection

3.6

Mains switch

3.7

Earth reference terminal

General
B

4.1

RF door

4.2

RF window

Responsibilities
A Delivered and installed by philips
B Delivered and installed by customer/contractor
C (Pre) Delivered by Philips, installed by customer
D (Pre) Delivered by customer and installed by Philips
E Existing

Control room:
Temperature for human comfort 18C-24C
Temperature required for X-ray films15C-30C
Temperature MR equipment 10C-35C
Maximum temperature change 5C per 10min
Relative humidity 30% - 70%, no condensation
Required Air Conditioning Capacity: 0.5 kW

Cable connection preferably above cabinet (7 m max. Cable length) or below


cabinet (5 m max. Cable length) possible. Cable LCC and Gradient Amplifier is only
possible from above.
Gradient cable is delivered in a length of 15 m. However 18 m length is possible with
an extra cable set. The length inside and outside the RF-Cage can be variable.

* Heat load indicated is peak dissipation for each cabinet measured individually. Peak room
heat dissipation as indicated in Site Requirements column will be less than the sum of each
individual cabinet in a given room due to the fact that not all cabinets will run peak heat
loads at the same time.

The equipment proposed in this room layout produces a strong magnetic field. It is the
customer's responsibility to comply with the local regulation. Normally this field has to be
contained in a controlled area that is only accessible by authorised personnel and screened
patients. Consult the Philips contact for details and support.

Drawing

Project notes MR
The feasibility of this project is based on site information (like drawings) provided to
Philips. Philips cannot assume any liability for the accuracy of this information and the
consequences.

A3

mm

AL-1
Sheet

THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C-1 AND SHOULD NOT BE SEPARATED

Semarang , Indonesia

Maximum Cable lengths:

(**)
For 230V Y-configuration ( = fase to neutral ), type AM or GL according DIN 43620, VDE
0636 part 1 and 2a

Heat Noise
[W] [dB(A)]

Quote No
Order No
Technical ID

For the square area of 3000 mm x 3000 mm symmetrically around magnet isocentre,
ferro-magnetic reinforcement must be:
- NO less than 50 mm below finished floor.
- NO greater than 25 kg/m average concentration between 50 mm and 250 mm
below the finished floor. Reinforcements below 250 mm can be ignored.
- Evenly distributed.

Koninklijke Philips Electronics N.V. 2016

All rights reserved. Reproduction in whole or in part is prohibited without prior written consent of the copyright holder.

Ferromagnetic beams perpendicular to the Z-axis of the magnet must be located at


least 250 mm below the finished floor. All other ferromagnetic beams must be
located at least 600 mm below the finished floor.

(*)
If an UPS for the complete MR system is required, provide the UPS supplier that not only
the required kVA but also the required above-mentioned peak current. This can result in a
higher (kVA) specification of the UPS needed.

Mass
[kg]

Achieva 1.5T
RSUD Kota Semarang

Philips strongly recommends the RF door opens outwards to aid opening in the
event of a possible quench. If the door opens inwards an overpressure feed through
with minimum dimensions of 600 mm x 600 mm must be installed.

Electrical power rating (230/400 voltage input)


Apparent Power: 60 kVA
Rated current: 90 A/phase
Peak current: 400 A/phase <5ms (*)
Peak current: 500 A/phase <1ms (*)
Nominal fuse rating (**): 100 A rms

Description

Site requirements
Equipment legend

Passive shielding or fencing may be required to contain the 0.5mt field line within the
back and side wall of the examination room.

Resp No

03 Aug 2016
NDI

Passive shielding or fencing may be required to contain the 0.5mt field line within the
floor and ceiling of the examination room.

Achieva 1.5T Pulsar

ID-16-00108

Dimensions for building works in the examination room (like RF-cage construction
and wall openings) are for indication and bidding only! Refer to the drawing of the RF
cage vendor for actual construction dimensions. For ranges refer to AD-1 sheet.

Mains power
Supply configuration:
Star, 3 phase+neutral+protective earth (PE).
Delta is allowed for the 480V version.
MDU version to be ordered via order questionnaire,
Nominal Line Voltage:
230/400V +/-10% 50/60Hz +/-1Hz
480V +/-10% 60Hz +/-1Hz
Mains impedance (at nominal voltage):
< 200 mOhm

Sheet Subject

Site requirements

Project

Drawing alerts:

2/4

5m

5500

Customer Acceptance

2500

Accepted by: ______________________________________________

AHU CHILLER
1m

Designation: ______________________________________________
Date:

______________________________________________

Signature:

______________________________________________

1850

3.6
3.3

3.4

3.7

3.5

Technical Room
3.1

10mT

3.2

1.3
1.6

1.5

UPS Room

1.10

1.4

6500

R.

1.1

GANTI

3mT

MAIN
ENTRANCE
1.8

1.2

MRI SUITE

0.3mT

Project

0.5mT

1mT

1.7

4.2

Semarang , Indonesia

Examination Room

Achieva 1.5T
RSUD Kota Semarang

2500

2.2

0.1mT

4.1

2000

2.2

Site layout

Sheet Subject

RECOVERY AREA

Control Room
2.5 2.3 2.1

2.4

1. Site Survey is required to determine the feasibility of this layout.


2. RF Cage design to be confirmed with RF Cage supplier.
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C-1 AND SHOULD NOT BE SEPARATED

A3

Quote No
Order No
Technical ID

03 Aug 2016
NDI

ID-16-00108

Important Note:

Drawing

2.6

Koninklijke Philips Electronics N.V. 2016

All rights reserved. Reproduction in whole or in part is prohibited without prior written consent of the copyright holder.

2300

1.9

1 : 50

mm

A-1
Sheet

3/4

Koninklijke Philips Electronics N.V. 2016

Situation (scale 1:100)

THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C-1 AND SHOULD NOT BE SEPARATED

Schematic cross section B-B


0.5mT

A
0.3mT

0.1mT

A3

Sheet

Quote No
Order No
Technical ID

Suspended ceiling

Semarang , Indonesia

Achieva 1.5T
RSUD Kota Semarang

0.1mT

Schematic cross sections

Schematic cross section A-A

Project

(4000)

0.5mT

3000

0.3mT

3000

2520

2800

(4000)

1m

03 Aug 2016
NDI

B
4

2520

2800

1000

Sheet Subject

1000

1490

ID-16-00108

1490

2395

Drawing

2395

All rights reserved. Reproduction in whole or in part is prohibited without prior written consent of the copyright holder.