You are on page 1of 48

Security Level:

2016/10/6

Huawei SingleRAN Hardware


Roadmap
2015 Q3
www.huawei.com

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Disclaimer
Huawei roadmap is revised and released quarterly. This version is released on Sep-2015.

The information contained in this document is for reference purpose only, and is subject to
change or withdrawal according to specific customer requirements and conditions, it can not
be used as contract content.

Copyright2010 Huawei Technologies Co., Ltd. All Rights Reserved.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 2

Update Record
Date

Item

Update Records

MBTS

Add on RRN3901 in SRAN11.1. Add on CGPS in MBTS Hardware Roadmap in SRAN12.1.


OPM30MOPM30AIBBS20L-E were add on the Enclosure & Power Hardware Roadmap.

GULS RF

Update RRU3953 900M, RRU3971 1800M, RRU3959 2100M, RRU3958 2100M, RRU3952 2100M, RRU3971 1900M, RRU3971 AWS-3, RRU3832 AWS-3
MRFUd 2100MMRFUc 2100MMRFUd V6 850MMRFU V6 900MMRFU V6 1800M from Planned to RFC.
Update RRU3281 2600M from Planning to RFC. Update RRU3249 700MMRFUd V6 1800M MRFUdw V6 1800M from RFC to GA.
Cancel AWS band in AAU3911 PCS 2T4R 2*60w 2*AWS p 700-900p.
Update AAU3911 2600M 2T4R 2*40w+1800M 2T4R 2*60w 700-900p, AAU3911 PCS 2T4R 2*60w 700-900p, AAU3961 2600M 4T4R 4*20W+1800M 4T4R
4*40W 2100P 700-900 P from planning to planned.
ADD RRU3971 2100M(16Q2), AAU3940 AWS~PCS 2T2R 2*40W(16Q1) as planned.

TDD RF

Update RRU3279 2.6G/2.3G 8T8R, Blade RRU3276 2.6G/2.3G 4T4R from Planned to RFC.
ADD AAU3910 2.6G/2.3G 4T4R(16Q1) as planning, AAU3911 2.6G/2.3G 4T4R(16Q2&later) as planning.

Small Cell

Release Version:
Add RRU3230E support 2.1G;
Change Prru3911 Any 3 Bands From 1.8/2.1/2.6/Wi-Fi/LAA support version from SRAN10.1 to SRAN11.1;
Micro:
Add RRU3230E 2.1G status Ready for contract in 2015Q3 TR5
Pico
Add BTS3912B 2.1+2.6/1.9+AWS/2.1+1.8 UL module in 2015Q4 TR5;Add BTS3912B specs;Postpone LTE features from 2016Q2 to 2017Q2:Visual
maintenance demand on indoor map;Cancel LTE Features from Atom12.1 2017Q2: CSG, Dedicated SeGW and PKI server for multi operators, Power
Optimization based on SVA(AE);Postpone UMTS features from 2016Q2 to 2017Q2: DC-HSDPA,HSDPA 28M,42M,Visual maintenance demand on
indoor map;
LamSite:
Add pRRU 3911(Any 3 Bands From 850/1.8G/2.1G/2.3G planned in 2016Q1;Add pRRU 3901 1.9G+2.6G module in 2015Q2 TR5 and 850+1.9G module in
2015Q4 TR5Add FDD feature Macro and LampSite Co-BBU in Atom9.0 and TDD feature Macro and LampSite Co-BBU in Atom10.1;Add FDD UMTS & LTE
feature LAA 1+1CA[Trial] in Atom11.1 2016Q2;Advance TDD LTE feature D-MIMO Phase1 and DL 256QAM in Atom11.1 2016Q2;Cancel FDD LTE
feature Dynamic capacity adjustment from Atom11.1 2016Q2;
Add FDD LTE feature SFN Auto Group and LAA LBT in Atom12.1 2017Q2;

20159

No update.
MBSC
HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 3

Update Record
Date

Item
MBTS

Update Records
The Enclosure & Power Hardware Roadmap is added on.
The Ver.E Cabinet Specification is added on.

GULS RF

Add RRU3971 2100M(16Q2), RRU3971 AWS-3(15Q4), RRU3832 AWS-3(16Q1), RRU3953 900M(16Q1), RRU3958 2100M(16Q1),
RRU3952 2100M(16Q1), RRU3281 2600M(15Q3), RRU3959 2100M(15Q4), MRFUd 2100M(15Q4), MRFUc(15Q4);
Update RRU3952m 1800M+2100M 2R,RRU3959 1800M, RRU3959W 1800M, RRU3952m 2100M+1800M 2R, RRU3262 APT700,
RRU3952 850M. RRU3953 1900M from RFC to Released.
Delay 3911 2600 2T4R 2*40W+1800 2T4R 2*60W+700-900 P to 16Q1.
Add 3961 2600 4T4R 4*20W+1800 4T4R 4*40W+2100P+700-900 16Q1.

TDD RF

Cancel RRU3279 3.5G 8T8R.


Add RRU3278 24L 3.5G B42 Up to 8*20W 160MHz
16Q2; Blade RRU3272 15Q3; RRU3236E 2.6G 2*5W,60MHz 2.3G 2*5W,60MHz
16Q2.

20156

Small Cell

Add BTS3911E 2.1+1.8 TR5 notes info.


Add RRU3230E 1.8G status Ready for contract in 2015Q3 TR5
Add BTS3911B 2.1+2.6/1.9+AWS TR5 notes info in 2015Q2
Add BTS3911B 2.1+1.8 TR5 notes info in 2015Q3
Add BTS3203B TDL2.3G TR5 notes info in 2015Q3
Modify pRRU3911 from Any 3 Bands From Any 3 Bands From one Low Band + 2 high band/2 high band +
Wi-Fi/LAA to Any 3 Bands From 900M/1.8G/2.1G/2.6G/WiFi;
Add pRRU 3911(Any 3 Bands From 1.8G/2.1G/2.6G/WiFi/LAA) planned in 2016Q1
Add pRRU 3911 spec

MBSC

Cancel SAUd board from SRAN11.1.


Updated EGPUb/EXPUb/ENIUb description in SRAN11.1.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 4

Update Record
Date

Item
MBTS

Update Records
Add GTMUc/UMPTe/UBBPe in SRAN11.1
Add the specification of Blade BBU, Blade Power and Blade Battery.

GULS RF

Add RRU3952m (15Q2), RRU3261(15Q3), RRU3971(15Q4), RRU3281(16Q1), RRU3249(15Q3),


RRU3971(15Q4)
Add MRFU V6 900 (16Q1), updated MRFUd V6 1800M with 4DIN
Add AAU3911 2600 4T4R 4*20W+1800 4T4R 4*40W 700-900P(15Q4)
Delay AAU3911 1800 2T4R 2*60W 2*2100P 700-900P(16Q1) and AAU3911 PCS 2T4R 2*60W 2*AWSP 700900P(16Q1)

TDD RF

20153

Updated the name and GA date of Blade RRU: RRU3276(15Q3)

Small Cell

Add TDD Micro BTS3205E module and LampSite V1.5&v2.0 module


Add BTS3911B UO trial time at 2015Q3
Postpone BTS3911B UL dual mode from 2015Q3 to 2015Q4,and status is TR5.
Add pRRU3911 Any 3 Bands From 850/1.8/2.1/2.6 in 2015Q4

MBSC

Updated SAUd/EGPUb/EXPUb/ENIUb description in SRAN11.1

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 5

Update Record (con.)


Date

Item
MBTS

Update Records
Cloud BB specification with centralized mode is changed: 1-level USU from 10 BBU to 5 BBU, 2-level USU from
120 BBU to 60 BBU.

Two RF modules are added at 2016Q1: MRFUd 850M 2x80w,2T2R, IBW 25M, MRFU 1800M V6
1x80w,1T2R,IBW 45M
Three AAU3911 module are delayed from 2015Q3 to 2015Q4: 2600 2T4R 2*40W+1800 2T4R 2*60W,700-900
P, 1800 2T4R 2*60W, 2*2100 P, 700-900 P PCS 2T4R 2*60W, 2*AWS P, 700-900 P

GULS RF

Add RRU3279 2.3G at 2015Q2


Add RRU3279 2.6G BAND38 at 2015Q2
Postpone AAU3216 from 2014Q4 to 2015Q2
Cancel AAU3910 module
Cancel AAU3246 module

201412

TDD RF

Postpone Micro BTS3911E 2.1+1.8 from 2015Q2 to 2015Q3


Add two LampSite module, pRRU3901 PCS +AWS + Wi-Fi in 2015Q1, pRRU3902 2.1+1.8 in 2015Q1
Cancel Pico BTS3202B 2.6G module.
Postpone Pico BTS3911B UO from 2015Q2 to 2015Q3
Cancel the note TR5 .The module status will be stated in roadmap guide.

Small Cell

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 6

Update Record (con.)


Date

Item

Update Records

MBSC

Add SAUd board for BSC6900 at 2016Q2


Add EGPUb/EXPUb/ENIUb boards for BSC6910 at 2016Q2
Add specification for BSC6910 at 2016Q2

Lifecycle

201412

Delay EOM of DBS3900, BTS3900, BTS3900A, BTS3900L, BTS3900C from 2016Q4 to 2018Q4.

Notes: 1. GULST hardware roadmap are included in this slide from 2014Q4.
2. Hardware guide information still be in single mode guide document.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 7

Definition of Version Status


Version
Status

Name

IPD phase

Planning

NA

Before Charter

Planned

NA

Charter to
PDCP

Stand for that the version is planned, candidate features have been
scoped, but the final features and release date is still to be defined

RFC

Ready For
Contract

PDCP to GA

Stand for that the version is ready for contract, only minor changes
might be done before the release of the product

GA to EOM

Stands for that the version has been released and already
generally available for customers
The EOM (End of Marketing) date is the date from which the
receipts of POs (including POs of new offices and/or expansion
offices) are rejected.

Released

NA

HUAWEI TECHNOLOGIES CO., LTD.

Status Description
Stand for that the version is under planning, all the features and
release date are candidate

Huawei Confidential

Page 8

MBTS Roadmap

2
3
4
5

HUAWEI TECHNOLOGIES CO., LTD.

RF Module Roadmap

Small Cell Roadmap

MBSC Roadmap

Lifecycle Plan

Huawei Confidential

Page 9

3900 Family, Based on Module Design


Distributed Base station

Macro Indoor

Macro Outdoor

MBTS

DBS3900

Main
Module

RRU

BTS3900

RFU

APM30

OMB

AAU

BBU3900/3910

BBU3910A

HUAWEI TECHNOLOGIES CO., LTD.

BTS3900L

Radio Frequency
Cabinet

BTS3900A

Indoor Macro
Cabinet
Indoor Macro
Large Cabinet

USU

Huawei Confidential

BTS3900AL

Page 10

Outdoor Macro
Large Cabinet Indoor BBU
Cabinet

Released
Ready for Contract
Planned
Planning

MBTS Capacity Roadmap


SRAN 9.0
BBU3900
UMTS Mode(RAN16.0)
DL/UL 6144/6144CE
UL CE pooling among 12 cells
LTE Mode(eRAN7.0)
36 cells x 20M

BBU3910
GSM Mode(GBSS16.0)
Same as BBU3900 with UMPT
UMTS Mode(RAN16.0)
Same as BBU3900 with UMPT
LTE Mode(eRAN7.0)
Same as BBU3900 with UMPT
Board Support
Only support
UBBP&UMPT&UBRIb&UTRPc

2014Q2
HUAWEI TECHNOLOGIES CO., LTD.

SRAN 10.1
BBU3910A
GSM Mode(GBSS17.1)
48TRX(IP o E1)
72TRX(IP o FE)
UMTS Mode(RAN17.1)
12 cells
DL/UL 1024/1024CE
LTE Mode(eRAN8.1)
6 cells x 20M
DL + UL 1.5Gbps

SRAN 11.1
BBU3900/3910
GSM Mode(GBSS18.1)
GTMUc@LegacyOM
32Cell, 126TRX(TDM), 48TRX(IP o
E1) , 60TRX(IP o FE)
GTMUc@SingleOM
12Cell, 48TRX(IP o E1), 72TRX(IP
o FE)
LTE Mode(eRAN11.1)
72 cells x 20M with UMPTe*&UBBPe*
DL + UL 10Gbps with UMPTe*

*2016Q3

2015Q2
Huawei Confidential

2016Q2

Released
Ready for Contract
Planned
Planning

MBTS Hardware Roadmap


SRAN 9.0
BBU Rack

BBU3910

UMPTb2(GULT,GPS)

SRAN 10.1
BBU3910A
USU3910

BB Board

UBBPd1(G,U,GU)
UBBPd2(G,U,GU)
UBBPd3(G,U,L,GU,GL)
UBBPd4(G,U,L,T,GU,GL)
UBBPd5(G,U,L,GU,GL)
UBBPd6(G,U,L,T,GU,GL,U
L,GUL)

SRAN 12.1

GTMUc(G)
UMPTe*(GULT)
Optical 10GEx2 + Electrical
GEx2
Trans and Signal capability
Enhancement
*2016Q3

UMPTb1(GULT)

Control Board

SRAN 11.1

UCCU(10GE)

Transmission &
CPRI & Relay

UBBPe1* (U,L,)
UBBPe2 * (U,L,T)
UBBPe3 * (U,L, UL)
UBBPe4 * (U,L,T,UL,LT)
UBBPe5 * (U,L,T,UL,LT)
UBBPe6 * (U,L,T,UL,LT)
*2016Q3

RRN3901

CGPS

Notes: GGSM, UUMTS, LLTE FDD, TLTE TDD

2014Q2
HUAWEI TECHNOLOGIES CO., LTD.

2015Q2

2016Q2
Huawei Confidential

2017Q2
Page 12

Released
Ready for Contract
Planned
Planning

Enclosure & Power Hardware Roadmap


Indoor
Enclosure

Outdoor
Enclosure

Battery
Backup

BTS3900
Ver.D

BTS3900L
Ver.D

BTS3900A
Ver.D

BTS3900AL
Ver.B

TMC
Ver.D

OMB
Ver.C

IBBS200D
IBBS200T

IBBS300D
IBBS300T

IBC10

BTS3900A
Ver.E

APM30
Ver.D

APM30
Ver.E

IBBS700D
IBBS700T

IBBS20L

IBBS20L-E

IBBS20D

OPM30M

Power

OPM15M

OPM50M

2014Q4&Before

OPM30A

2015Q2

2015Q3

2016Q1

2016Q2

Note For Software version & RAT info, pls refer toGUL Base Station Overview and Selection Guide.pptx
HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 13

Released
Ready for Contract
Planned
Planning

Cloud BB platform Roadmap


USU

USU

USU

USU

USU

USU

USU

USU

BBU

BBU

BBU

BBU

Distributed: USU & BBU in different site

UP+CP

User Plane

SRAN11.1

SRAN12.1

UCCU: used in BBU, support 10GE


IBC10: Cabinet for USU and BBU
3 USU3910 + 10BBU
USU3910
1-level USU
Centralized:5 BBU(6 BB
boards per BBU)
Distributed:50 BBU
2-level USU
Centralized:60 BBU
Distributed:300 BBU

UBBPe*: Support 40GE

USU3910: Centralized 2level USU backup

2015Q2

BBU

BBU

Centralized: USU & BBU in same site

Control plane

SRAN10.1

HUAWEI TECHNOLOGIES CO., LTD.

USU3910

UEFU:
ULPU:
Signaling&OM&Clock
User and scheduling data
switching
switching amongst BBUs
OM for USU connected to
2*10GE2*sRIO configurable
OSS
data switching amongst USU 1*40GE4*10GE
2*sCPRI+2*sRIO HW ready

*2016Q3

2016Q2

USU

UBBPe interconnection port:


2*6.25G SRIO40GE

2017Q2
Huawei Confidential

Page 14

Blade Site Solution Powers Clean Site


Blade Site Solution

Traditional Macro Site


Blade RRU

0 Footprint

12 L
More
Boxes

Blade BBU

Seamless Installation, Easy


Expansion

12 L
Blade Power

12 L
More Site
Spaces

Fast installation, saving 80%


deployment time

Blade VRLA Battery

All RATs, all bands with high


capacity

28 L
Blade Lithium Battery

12 L

HUAWEI TECHNOLOGIES CO., LTD.

Page 15

Blade Power, fast deploy to various scenes


AC+DC Solution, adapt to various scenes

Small-scale, Modular assembly, Fast Deployment

AC RRU

IBBS20L-E

12 L
Small cell
DC RRU
OPM30M

6L
Easy Marco

OPM30A

6L
LampSite

HUAWEI TECHNOLOGIES CO., LTD.

Page 16

Blade BBU Specification


BBU3910A1
GO: 72TRX(FE)/ 48TRX(E1)

BBU3910A2

BBU3910A3

GO: 72TRX(FE)/ 48TRX(E1)

GU/GL: 48TRX

GU/GL: 48TRX

GU/GL: 48TRX

UO: 6Cell / 512CE /


768CE(UL/DL)

UO: 6Cell / 768CE /


768CE(UL/DL)

FDD LTE: 3*20M 4T4R

FDD LTE: 6*20M 2T2R

TDD LTE: 3*20M 4T4R

UMTS+LTE:
6Cells/384CE/512CE+3*20M
2T2R

UMTS+LTE:
6Cells/256CE/384CE+3*20M
2T2R

UO: 12Cell / 1024CE(UL/DL)

FDD LTE: 6*20M 4T4R


TDD LTE: 6*20M 4T4R

Weight: 12 kg
Dimensions(Hx W x D): 400mmx100mmx300mm

BBU3910A

Operating temperature: -40C to +55C (no solar radiation)


Input power: -48v

Protection class: IP65


Heat Dissipation Capability: 150W

HUAWEI TECHNOLOGIES CO., LTD.

GO: 72TRX(FE)/ 48TRX(E1)

Page 17

UMTS+LTE:
6Cells/512CE/768CE+3*20M
4T4R

Blade Power & Battery Specification


Dimensions (H x W x D): 400mmx100mmx300mm

Blade VRLA Battery

Output power: 3000W@220V,50

OPM50M

2600W@220V,50

Dimensions (H x W x D): 400mmx240mmx300mm

1500W@110V

Capacity: 20Ah, Support 2 IBBS20D(40Ah)

Loading Capability: 5*30A

IBBS20D
Dimensions (H x W x D): 400mmx50mmx300mm

Blade Lithium Battery

Output power: 1500W@220V

Dimensions (H x W x D): 400mmx100mmx300mm

750W@110V

Capacity: 20Ah, Support 5 IBBS20L(100Ah)

Loading Capability: 3*30A

OPM30M

IBBS20L
Dimensions (H x W x D): 400mmx50mmx300mm

Dimensions (H x W x D): 400mmx100mmx300mm

750W@110V

Capacity: 20Ah, Support 5 IBBS20L-E(100Ah)

Loading Capability: 3*30A


Output Voltage220V AC

HUAWEI TECHNOLOGIES CO., LTD.

Support OPM50M
Blade Lithium Battery

Output power: 1500W@220V

OPM30A

Support OPM50M

IBBS20L-E

Support OPM30M & OPM30A

Page 18

Ver.E Cabinet Specification


Capacity Specification
Configuration7B4M2BBU+21RxU
BBU1200W

Macro+DBS6*2x80W RFU+6*2x80W RRU+9*2x40W RRU


DBS6*2x80W RRU+6*2x60W RRU+9*2x40W RRU
Output power: PSU Number1~5PSU Capacity3000W

BTS3900A+IBBS

Power backup:
Support 100AH150AH200AH300AH400AH600AH with IBBS200D/T or IBBS300D/T

Heat dispassion: 1800W

Physical Specification
Dimensions (H x W x D): 1400mmx600mmx480mm
Input power220V AC/110V AC/-48V DC

DBS3900 APM30H+IBBS

HUAWEI TECHNOLOGIES CO., LTD.

Operating temperature40C to 50C with solar radiation of 1120 W/m 2A heater unit is
required if the temperature is lower than 20C.

Page 19

MBTS Roadmap

RF Module Roadmap

3
4
5

HUAWEI TECHNOLOGIES CO., LTD.

Small Cell Roadmap

MBSC Roadmap

Lifecycle Plan

Huawei Confidential

Page 20

Released
Ready for Contract
Planned
Planning

GUL RF Module Hardware Roadmap (RRU-1/2)


DD800
(B20)
900
(B08)

RRU3220
2x40w,2T2R
IBW 20M

RRU3961
2x60w,2T2R
IBW 60M

RRU3268[1]
2x40w,2T2R
IBW 30M

RRU3929
2x60w,2T2R
IBW 35M

RRU3938[1]
2x40w,2T2R
IBW 35M

RRU3959[1]
2x60w, 2T2R
IBW 35M

RRU3936[1]
1x80w,1T2R
IBW 35M

1800
(B03)

2100
(B01)

2600
(B07)

[1 ] Blade RRU 12L


[1*] Blade RRU 18L

RRU3936[1]
1x80w,1T2R
IBW 35M

RRU3929
2x60w,2T2R
IBW 35M

RRU3938[1]
2x40w,2T2R
IBW 35M

RRU3952m[1]
2x60w, 1.8G 2T4R/2T2R+2.1G 2R
IBW 45M
RRU3939[1*]
2x60w,2T2R
IBW 35M

RRU3824[1]
1x60w,1T2R
IBW 30M

RRU3826[1]
1x80w,1T2R
IBW 30M

RRU3838[1]
2x40w,2T2R
IBW 60M

RRU3839[1]
2x60w,2T2R
IBW 60M

RRU3832[1]
2x60w,2T4R
IBW 60M

RRU3268[1]
2x40w,2T2R
IBW 50M

RRU3260[1]
2x40w,2T4R
IBW 50M

RRU3262[1]
2x60w, 2T4R
IBW 60M

2014Q4&Before

RRU3953[1*]
2x80w,2T4R
IBW 35M

RRU3953[1*]
2x80w, 2T4R
IBW 45M

RRU3959[1]
2x60w,2T2R
IBW 45M

RRU3953w[1*]
2x80w, 2T4R
IBW 75M

RRU3959w[1]
2x60w,2T2R
IBW 75M

RRU3971 [1]
4x40w,4T4R
IBW 45M
RRU3958[1]
2x40w,2T2R
IBW 60M

RRU3952m[1]
2x60w,2.1G 2T4R/2T2R+1.8G 2R
IBW 60M

RRU3959[1]
2x60w,2T2R
IBW 60M

RRU3971 [1*]
4x40w,4T4R
IBW 60M

RRU3952[1]
2x60w,2T4R
IBW 60M

RRU3281 [1*]
4x40w,4T4R
IBW 60M

2015Q1

2015Q2 2015Q3

2015Q4

2016Q1

2016Q2&later

Note For Software version & RAT info, pls refer toGUL Base Station Overview and Selection Guide.pptx
HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 21

Released
Ready for Contract
Planned
Planning

GUL RF Module Hardware Roadmap (RRU-2/2)


RRU3668[1*]
2x40w, 2T2R
IBW 5M

450
US700
(B12)

RRU3203
2x40w,2T2R
IBW 15M

US700
(B13)

RRU3201
2x40w,2T2R
IBW 10M

APT700
(B28)
850
(B05)
1900
(B02)
AWS
(B04)

[1 ] Blade RRU 12L


[1*] Blade RRU 18L

RRU3249[1*]
2x60w, 2T2R
IBW 15M

RRU3942
2x60w,2T4R
IBW 25M

RRU3268[1]
2x40w,2T2R
IBW 25M

RRU3262[1*]
2x60w, 2T4R
IBW 25M

RRU3936[1]
1x80w,1T2R
IBW 25M

RRU3952[1*]
2x60w, 2T4R
IBW 25M

RRU3936[1]
1x80w,1T2R
IBW 35M
RRU3942
2x60w,2T4R
IBW 35M
RRU3808
2x40w,2T2R
IBW 30M

RRU3953[1*]
2x80w, 2T4R
IBW 40M
RRU3841
4x30w,4T4R
IBW 40M

RRU3971[1*]
4x40w,4T4R
IBW 40M

RRU3832[1]
2x60w,2T4R
IBW 45M
RRU3971 [1*]
4x40w,4T4R
IBW 70M

AWS-3

2014Q4&Before

2015Q1

2015Q2

2015Q3 2015Q4

RRU3832[1]
2x60w,2T4R
IBW 70M

2016Q1

2016Q2&later

Note For Software version & RAT info, pls refer toGUL Base Station Overview and Selection Guide.pptx
HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 22

Released
Ready for Contract
Planned
Planning

GUL RF Module Hardware Roadmap (RFU)


LRFUe
2x80w,2T2R
IBW 25M

APT700
(B28)
DD800
(B20)

LRFUe
2x60w,2T2R
IBW 30M

850
(B05)

WRFU
1x80w,1T2R
IBW 20M

MRFU V2
1x80w,1T2R
IBW 20M

900
(B08)

MRFU V2
1x80w,1T2R
IBW 20M

MRFUe
1x125w,1T2R
IBW 35M

MRFUd
2x80w,2T2R
IBW 35M

1800
(B03)

MRFU V2
1x80w,1T2R
IBW 20M

MRFUe
1x125w,1T2R
IBW 35M

MRFUd
2x80w,2T2R
IBW 35M

WRFU
1x80w
IBW 25M

WRFUa
1x100w
IBW 25M

WRFUd
2x60w,2T2R
IBW 40M

WRFUe
2x80w,2T2R
IBW 60M

2100
(B01)
AWS
(B04)

CRFUd
2x60w,2T2R
IBW 40M

2600
(B07)

LRFU
2x40w,2T2R
IBW 30M

MRFUd V6
2x80w,2T2R
IBW 25M
MRFU V6
1x80w,1T2R
IBW 35M
MRFUd V6
2x80w,2T2R
IBW 45M

MRFUdw V6
2x80w,2T2R
IBW 75M/4DIN

RX
RX
TX
TX

MRFU V6
1x80w,1T2R
IBW 35M
MRFUd
2x80w,2T2R
IBW 60M

MRFUc
2x60w,2T2R
IBW 60M

4DIN:
TX and RX separated to
avoid PIM
LRFUe
2x60w,2T2R
IBW 60M

2013Q4&Before

2015Q2

2015Q3

2015Q4

2016Q1

2016Q2&later

Note For Software version & RAT info, pls refer toGUL Base Station Overview and Selection Guide.pptx
HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 23

Wideband Receiver RRU: supports Single antenna with dual-band 2T4R

Use combiner
XX
XX
XX

XX
XX
XX

2.1
2T4R

1.8
2T4R

Significantly increase the

1 antenna, 2 band 2T4R


XX
XX
XX

XX
XX
XX

2.1
2T4R

2.1 2T4R 1.8 2T4R


+1.8 2R +2.1 2R

cost and

No additional antenna,
No Combiner

complexity
HUAWEI TECHNOLOGIES CO., LTD.

Configuration:
1.8 2T4R
1.8 2T2R+2.1 2R
1.8 2T4R
+2.1 2R

1.8
2T4R

Antenna x2

Huawei Confidential

Page 24

1.8T/1.8-2.1 WB RX
1.8R
1.8R
1.8T/1.8-2.1 WB RX

AAS Module Hardware Roadmap


SRAN8.0

SRAN9.0

SRAN10.1
2100 2T4R 2*60W
2*1800 P 700-900 P
AWS 2T4R 2*60W
2*PCS P 700-900 P
AWS 2T4R 2*60W
700-900 P
2600 2T4R 2*40W
2*1800-2100 P 700-900 P
2600 2T4R 2*40W
+AWS 2T4R 2*60W
700-900 P

AAU3911

AAU3910

2100 2T4R 2*60W


2*1800/2600 P
2600 2T4R 2*40W
2*1800-2100 P
AWS 2T4R 2*60W
2*PCS P
2600 2T4R 2*40W
+2100 2T4R 2*60W

Released
Ready for Contract
Planned
Planning

1800 2T4R 2*60W


+2100 2T4R 2*60W
2*2600 P
700-900 P
2100 2T4R 2*60W 2600 2T4R 2*40W
2*1800 P+2*2600 P +1800 2T4R 2*60W
700-900 P
700-900 P
1800 2T4R 2*60W
2*2100 P+2*2600 P
700-900 P

PCS 2T4R 2*60W


700-900 P

1800 2T2R 2*40W


2*2100/2600 P
1800 2T2R 2*40W
+2100 2T4R 2*60W
1800 2T2R 2*40W
+2600 2T4R 2*40W

2600 4T4R 4*20W


+1800 4T4R 4*40W
2100P
700-900 P

AAU3961

2013Q2

2013Q3

HUAWEI TECHNOLOGIES CO., LTD.

2014Q4

2015Q1

Huawei Confidential

2015Q2

2015Q4

2016Q1

2016Q2&later

Released
Ready for Contract
Planned
Planning

AAS Module Hardware Roadmap(AAU390X & 2X & 4x)


SRAN8.0

SRAN9.0

AAU3940
(EasyMacro)

1.8~2.1 2T2R
2*40W *

AAU3920

1.8~2.1 2T4R 2*80W


2*2600 P

AAU3902

2013Q2

2100 4T4R 4*20W


1800-2600 P
800-900 P

2100 4T4R 4*20W


+1800 4T4R 4*20W
1800-2600 P
800-900 P

2013Q3

2014Q2

2015Q1

AWS~PCS 2T2R
2*40W *

2016Q1
* 2*40w @ -40~40C
2*30w @ -40~50C

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Released
Ready for Contract
Planned
Planning

TDD RRU/AAS Roadmap


RRU3279
RRU3259
2.6G 8*12.5W,80MHz

8T8R

2.6G/BAND38 8*20W,
100MHz
2.3G 8*20W100MHz

RRU3252

3.5G B42
Up to 8*20W160MHz

Blade RRU3276

2.6G 4* 20W, 40MHz


2.3G 4* 20W, 40MHz

4T4R

RRU3278 24L

2.6G 4*40W 150MHz


2.3G 4*40W 100MHz

RRU3256

Blade RRU3272

2.6G 4* 30W, 80MHz


2.3G 4* 30W, 80MHz
3.5G 4*15W,80MHz

2.6G 4*20W 80MHz


2.3G 4*20W 80MHz

RRU

RRU3236E

2T2R

2.6G 2*5W,60MHz
2.3G 2*5W,60MHz

AAU3216
BAND38 8T8R
8*20W, 50MHz

AAU 3910

AAU 3911

2.6G /2.3G
4T4R

2.6G /2.3G
4T4R

AAS

Before 2013Q4
HUAWEI TECHNOLOGIES CO., LTD.

2014Q2

2015Q2
Huawei Confidential

2015Q4

2016Q1

2016Q2 and Later

Easy Macro Specification


AAU3940

Easy Macro (AAU3940)

1.8~2.1 GHz (Wide Band)

Active Part
1.8GHz
L

RAT
No Indoor Site Room
No Tower
No External Antenna

2.1GHz
UL

LTE: 2

Number of carrier

IBW

Tx
Rx

DUP bandwidth

AWS
L

PCS
UL

2*40w @ -40C~40C (without solar radiation)


2*30w @ -40C~50C (without solar radiation)

Output Power

No Feeder

Fiber

AWS~PCS (Wide Band)

UMTS: 4

LTE: 2

UMTS: 4
U&L4U2L
40MHZ
40MHZ
40MHZ
40MHZ
TX: 2110~2155,
TX: 1930~1990,
RX: 1710~1755
RX: 1850~1910

U&L4U2L
40MHZ
40MHZ
TX: 1805~1880,
RX: 1710~1785

40MHZ
40MHZ
TX: 2110~2170,
RX: 1920~1980

1710~1880

1920~2170

Antenna Part
Polarization
Gain(dBi)
Horizontal half-power
beam width
Electrical tilt

1710~1910

1930~2155

14

14.5

+/-45
14

14.5
~70

-3~12

Mechanical Part
Height (cm)
Diameter (cm)
Weight (Kg)
Heat Dissipation

HUAWEI TECHNOLOGIES CO., LTD.

75
15
15
Natural Cooling

Page 28

Easy MacroTM Deployment


With Blade BBU

With Remote BBU


Equipment

Remark

AAU3940*3

On pole

BBU3900/3910*1

Remote
indoor

Equipment

ODM*1

Power & fiber


splitter

Mounting
Accessories

For different
scenarios

Fiber
inside
pole

ODM

Remark

AAU3940*3

On pole

BBU3910A*1

Outdoor BBU

Blade Power*1

Outdoor Power

ODM*1

Power & fiber


splitter

Mounting
Accessories

For different
scenarios
Blade BBU/Power

Core network

Fiber
Backhaul

Seamless assembled as
Blade Site
HUAWEI TECHNOLOGIES CO., LTD.

0 Room for full


outdoor

Fast installation, saving


70% deployment time
Page 29

FE/GE

All RATs, all bands with


high capacity

AAU3961 Specification
AAU3961

AAU3961 1800A 4T4R 4*40W+2600A 4T4R 4*20W+


690~960P+1710~2690P
Dimensions (H x W x D)
Weight
Temperature
Heat Dissipation
Wind load
Survival wind speed (km/h)
Active Radio Unit

Frequency (MHz)
IBW

TX

DUP bandwidth

Frequency range (MHz)


Gain(dBi)
Horizontal 3dB beam width ()
Vertical 3dB beam width ()
Electrical downtilt ()

HUAWEI TECHNOLOGIES CO., LTD.

1550mm(H)*370mm(W)*230mm(D)
1A45kg 2A63kg
- 40~45 (without solar radiation)
Natural Cooling
Frontal/lateral/rearside:665N/500N/985N at 150km/h
200
1800M Active
2600M Active
UL: 1710-1785
UL:2500-1785
DL: 1805-1880
DL: 2620-2690
45MHz
60MHz
70MHz
70MHz
Passive Antenna Unit
690-820 790~862 824-894 880-960
13.7

14

14.3

14.7

65
9.5
0 - 14 , continuously adjustable

Page 30

17101880
16

1920-2170 2500-2690
16.7
63
6.4

17.5

2 - 12,Continuously adjustable

MBTS Roadmap

2
3
4
5

HUAWEI TECHNOLOGIES CO., LTD.

RF Module Roadmap

Small Cell Roadmap

MBSC Roadmap

Lifecycle Plan

Page 31

Page 31

Released Version
Product
BTS3902E

BTS3803E
BTS3203E
BTS3911E
BTS3911B

Frequency
U AWS, U 1.9G, U 2.1G
L 2.6G, L AWS
L 2.1G
L 1.8G
U 2.1G
L 1.8G, L2.6G
U2.1G+L1.8G,U1.9+L AWS
U1.9+L AWS,U 2.1G+L 2.6G,2.1+1.8

BTS3205E

2.3G,2.6G

eRAN6.1/eRAN8.1/eRAN11.1

RRU3230E

1.8G, 2.1G

eRAN8.1/eRAN11.1

BTS3202E

U 2.1G

DBS3900
LampSite

pRRU3901

pRRU3902
pRRU3911

U 2.1G+L2.1G,U2.1G+L1.8G
U 2.1G+L2.6G,L 2.6G,L1.8G
U 1.9G+L AWS
L 1.8G+ L2.6G,L2.1G+ L2.6G
U 2.1G+L1.8G+Wi-Fi
U1.9G+AWS L+ Wi-Fi,U2.1+L2.6+Wi-Fi
TDD LTE 2.6G
U2.1+L1.8,G1.8+U2.1,G1.8+TDL2.3
Any 3 Bands From 900/1.8/2.1/2.6/Wi-Fi
Any 3 Bands From 850/1.8/2.1/2.3
Any 3 Bands From 1.8/2.1/2.6/Wi-Fi/LAA

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Supported Version
RAN13.0/RAN14.0/RAN15.0/RAN16.0 /RAN17.1
eRAN3.0/eRAN6.0/eRAN7.0/eRAN8.1/eRAN11.1
eRAN6.1/eRAN7.0/eRAN8.1/eRAN11.1
eRAN6.0/eRAN7.0/eRAN8.1/eRAN11.1
RAN14.0/RAN15.0/RAN16.0
eRAN6.0/eRAN7.0/eRAN11.1
SRAN10.1/SRAN11.1
SRAN10.1/SRAN11.1

RAN14.1/RAN15.0/RAN16.0/RAN17.1/RAN18.1

SRAN8.0/SRAN9.0/SRAN10.1/SRAN11.1

SRAN9.0/SRAN10.1/SRAN11.1
eRAN6.0/eRAN7.0/eRAN8.1/eRAN11.1
SRAN9.0/SRAN10.1/SRAN11.1
SRAN10.1/SRAN11.1

SRAN11.1

Page 32

Small Cell Hardware Overview


Micro BTS

Micro BTS

Outdoor

BTS3902E
BTS3202E
2*5W U/L
2011Q4

2012 & Before

BTS3803E
BTS3203E
4*1W U/L

RRU3230E
2*5W
Single
Band
LTE

2015Q3

2015

2013
pRRU3902

Indoor

LampSite 1.0

Micro RRU

BTS3911E
2*2*5W UL
Dual Band and
Dual Mode

BTS3205E
2013Q2 2*5W LTE TDD

pRRU3901

2013Q2

Micro BTS

LampSite 1.5
2015Q1

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

pRRU3911

BTS3911B
2*2*125mW
Dual Band

SVA3200/SVA3100

Pico BTS

Service Anchor

LampSite 2.0

2015Q3

2015Q4

2015Q2

Page 33

Released
Ready for Contract
Planned
Planning

Micro Hardware Roadmap


2.1G

BTS3803E (U)

4x1W
1.8G*

BTS3203E (L)

2x5W

BTS3902E (U)

BTS3202E (L)
BTS3205E(TDD)

2.6G*

2.1G / 1.9G / AWS


1.8G*
(1830-1880)

2.6G /AWS/2.1G

2.3G/2.6G
1.8G+2.1G*

2x2x5W

2.1+2.6

BTS3911E (UL)
1.9G+AWS*

2x5W

RRU3930E(UL)

2.1G*

RRU3230E(L)

1.8G*
2013Q4 & before

2014Q2

2014Q3

2015Q3

Note: *Status is TR5;

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page 34

Other bands

2016Q4 & Later

Released
Ready for Contract
Planned
Planning

Pico Hardware Roadmap

BTS3911B
2x2x125mW
UMTS&LTE & Wi-Fi
LTE: 384 RRC

1.9G +AWS+Wi-Fi*
LO
2.1+2.6+Wi-Fi
LO

1.9G+AWS+Wi-Fi
2.1+2.6+Wi-Fi
UO*

1.9G +AWS+Wi-Fi
2.1+2.6+Wi-Fi
2.1+1.8+Wi-Fi
UL dual Mode*

2.1+1.8+Wi-Fi*
LO,UO+Wi-Fi*

BTS3912B

1.9G +AWS+Wi-Fi
2.1+2.6+Wi-Fi
2.1+1.8+Wi-Fi
UL dual Mode*

2x2x125mW
UMTS&LTE & Wi-Fi
LTE: 96 RRC

2015Q2

2015Q3

2015Q4

Note:*Status is TR5.

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page 35

2016Q1&later

LampSite Key Specification Evolution


ATOM8.0(2013Q2)
BBU

ATOM 9.0 (2014Q2)

96 pRRUs per BBU


12 cells per BBU(U)
18 cells per BBU(L)
96 pRRUs co-cell per BBU(U)
48 pRRUs co-cell per BBU(L)
12 RHUBs per BBU

24 cells per BBU(U)


36 cells per BBU(L)
96 pRRUs co-cell per BBU(L)
24 RHUBs per BBU

2C UMTS or 20M LTE in one cable

RHUB & pRRU

ATOM 10.1(2015Q2)

20M LTE+20M LTE in one


cable
Wi-Fi and Cell Transmit in
pRRU3901 is segregate cable

2013Q2

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

ATOM 11.1(2016Q2)

Page 36Page 36

48 cells per BBU(U)

Released
Ready for Contract
Planned
Planning

Small Cell Hardware Roadmap-LampSite


U2.1

L2.1+L2.6

U2.1+L2.1

U2.1+L1.8
+Wi-Fi*

U2.1+L1.8
FDD/TDD

pRRU3901

LampSite
pRRU

TDL 2.3G
2320-2370
TDL 2.6G
2545-2575
L1.8

**G1.8 +U2.1
U2.1+L2.6

U2.1+L 2.6
+Wi-Fi*

L2.6
U1.9+AWS L

U1.9+L 2.6

L1.8+L2.6

pRRU3902

U850+L1.9

U2.1+L1.8 **G1.8 +U2.1


FDD

LampSite
RHUB

U1.9+AWS L
+Wi-Fi*

**G1.8+TDL2.3G

RHUB3908

2014Q3 and before

RHUB3918

2015Q1

2015Q2

2015Q4

2016Q4 & Later

Note:1. * The status is TR5; **GSM is DCU solution. 2. 2.1G/1.9G/AWS support U/L or UL mode, 1.8G support G/L mode.

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page 37

Released
Ready for Contract
Planned
Planning

Small Cell Hardware Roadmap-LampSite

pRRU3911
Any 3 Bands From
900M/1.8G/2.1G/2.6G/WiFi
LampSite
pRRU

Any 3 Bands From


1.8G/2.1G/2.6G/WiFi/LAA*

Other bands

FDD/TDD

Any 3 Bands From


850/1.8G/2.1G/2.3G/WiFi

2015Q4

2016Q1

2016Q4 & Later

Note:1. * LAA is trial.

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page 38

MBTS Roadmap

RF Module Roadmap

3
4
5

HUAWEI TECHNOLOGIES CO., LTD.

Small Cell Roadmap

MBSC Roadmap
Lifecycle Plan

Page 39

Page 39

Released
Ready for Contract
Planned
Planning

BSC6900&BSC6910 Roadmap
SRAN 8.0
Dual Mode
5120 TRX + 24G (typical, on IP )

SRAN 9.0

BSC Mode

BSC6900

SRAN10.1

8192 TRX (on IP)

boards

boards

RNC Mode

TNUb (BSC)

40Gbps Iub throughput (DL+UL)

GCGb/GCUb

DEUa: voice
optimization(RNC)

5300K BHCA

GOUe

boards

XPUc (BSC)/SPUc

ASUa (Built-in
Coordinator)

EIUb (BSC)/ OIUb (BSC)/ PEUc

2013Q2
SRAN 8.0

BSC6910

SRAN 9.0

Dual Mode
8000 TRX + 90G (typical, on IP)

Up to 7000TRX(ABIS TDM +
A TDM)
boards

24000 TRX(on IP)


RNC Mode
120Gbps Iub throughput (DL+UL)

GCGb/GCUb

boards

boards

DEUa: voice
optimization(RNC)

EGPUb/EXPUb(BSC)

SCUc: Switching Board

GOUe

64000K BHCA
boards
EGPUa/EOMUa/EXOUa
EXPUa (BSC)/ ENIUa/ESAUa

HUAWEI TECHNOLOGIES CO., LTD.

SRAN11.1

SRAN10.1

BSC Mode

BSC Mode

2016Q2

2015Q2

2014Q2

Note: All data is based on Huaweis traffic model


BSC Mode is based on 1 Cabinet and RNC/Dual Mode is based
on 2 Cabinets
Huawei Confidential

Page 40

ENIUb

RNC Capacity Evolution


CP Capacity
(BHCA)

BSC6900 Capacity (2 cab.)


RAN15

2.5x
RAN14
1.77x
1.35x
1x

RNC in pool with BSC6910,


>1.6x
CP capacity evolution vs.
RAN14.0

BSC6910
Future

5.7x

RAN13

BSC6910
2013

RAN12
1x

BSC6900
RAN11

BSC6910 Capacity (One cab.)

CP Capacity
(BHCA)
10.2x

12

24

40

UP Capacity
(Gbps)

BSC6900 capacity keeps improving continuously


Flexible configuration principle, adaptive to various
traffic model
RNC in pool solution enable BSC6900 scale out
capability, benefit from BSC6910 introduction

HUAWEI TECHNOLOGIES CO., LTD.

BSC6900
2009

60

100

UP Capacity
(Gbps)

BSC6910 is the first tera RNC in industry (Max. 2 Cab.)


Dynamic CP/UP reconfiguration, maximize resource
utilization according to offered traffic characteristics
Capacity enhancement with software optimization
and new hardware introduction

Huawei Confidential

Page 41

Released
Ready for Contract
Planned
Planning

SRC Roadmap

MAG9811

BSC6910

ECO6910

BSC6910 C

BSC6910

BSC6900

BSC6910 C

EGPUa
BSC6910

BSC6900 C

ASUa

BSC6910

BSC6900

BSC6910

2013Q2

2014Q2

2015Q2

2017~

SRAN8.0

SRAN9.0

SRAN10.1

Future

BSC6910&ECO6910&MAG9811
Co-cabinet

BSC6910&ECO6910 Cosubrack

HUAWEI TECHNOLOGIES CO., LTD.

BSC6910&WLAN AC Cosubrack

BSC6900&ECO6910 Cosubrack

Huawei Confidential

Page 42

MBTS Roadmap

RF Module Roadmap

3
4

HUAWEI TECHNOLOGIES CO., LTD.

Small Cell Roadmap

MBSC Roadmap

Lifecycle Plan

Huawei Confidential

Page 43

Definition of Lifecycle Milestone


Milestone
GA

Full Name

Status Description

General Availability

EOM

End of Marketing

The EOM date (EOM point) is the date from which the
receipts of POs (including POs of new offices and/or
expansion offices) are rejected.

LODSP (hardware)

Last Order Date of Spare Parts

The LODSP date (LODSP point) is the last date that


POs of spare parts can be received.

EOFS (software)

End of Full Support

The EOFS date (EOFS point) is the date from which


Huawei R&D will not develop the patch for bug fixing.

EOS

End of Service and Support

The EOS date (EOS point) is the date from which any
service of the software is not provided.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 44

MBTS Life Cycle


2012

2013

2014

2015

2016

2017

2018
EOM TBD

DBS3900
EOM TBD
BTS3900
EOM TBD
BTS3900A
EOM TBD
BTS3900L
GA

EOM TBD

BTS3900AL
GA

EOM TBD

BTS3900C
GA

EOM TBD

USU3910

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 45

2022

MBSC Life Cycle


2012

2013

2014

2015

2016

2017

2018

EOM TBD
BSC6900
GA

EOM TBD

GA

EOM TBD

BSC6910

ECO6910

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 46

2022

Small Cell Life Cycle Plan


2011

2012

2013

2014

2015

2016

2018

2017

GA

2022

EOM

BTS3202E
GA
BTS3902E
BTS3203E
BTS3803E

EOM
GA
EOM TBD
GA
GA

BTS3911E

EOM TBD

GA

BTS3911B
DBS3900
LampSite

EOM

EOM TBD

GA
EOM TBD

About module hardware EOX detailplease refer to the link

http://3ms.huawei.com/mm/docMaintain/mmMaintain.do?method=showMMDetail&f_id=SR15033138330182

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page 47

Thank you
www.huawei.com

Copyright2009 Huawei Technologies Co., Ltd. All Rights Reserved.


The information contained in this document is for reference purpose only, and is subject to
change or withdrawal according to specific customer requirements and conditions.

You might also like