You are on page 1of 30

C1 - BLOK PENTADBIRAN

WORK BELOW LOWEST FLOOR FINISH LEVEL

M3

90

15.00

M3
M3
M

74
3
184

15.00
300.00
15.00

Y16
Y20

KG
KG

2929
1540

4.00
4.00

R10
R10

KG
KG
M3

470
362
40

4.00
4.00
450.00

Y16
Y20

KG
KG

58
2123

4.00
4.00

R10

KG
M2
M3

279
32
5

4.00
20.00
450.00

M3
M3
M2

5
1
20

15.00
300.00
40.00

KG
M3

360
3

4.00
450.00

M3
M3

80
7

15.00
300.00

453
571

20.00
20.00

Excavation

Pile Cap
Excavation
Lean Concrete
Formwork
Main Bar

Link

Insitu Concrete
Stump
Main bar

Link
Formwork
Insitu Concrete
Cable Trench
Excavation
Lean Concrete
Formwork
Main bar
Y16
Insitu Concrete
Ground Beam
Excavation
Lean Concrete
formwork

250mm-500mM
500mm-1.00mM
Main bar
Y16
Y25

KG
KG

3376
4592

4.00
4.00

R10

KG
M3

2835
73

4.00
450.00

Link
Insitu Concrete

Ground Slab
Lean Concrete
Damp-Proofing
Main bar
Wiremesh
Insitu Concrete
Anti-Termite
Collection

RAMPS AND APRON


FRAME
UPPER FLOOR
STAIRCASE
ROOF
EXTERNAL WALLS AND BALUSTRADING
INTERNAL WALLS
DOORS AND WINDOWS
EXTERNAL FLOOR FINISHES
INTERNAL FLOOR FINISHES
EXTERNAL CEILING FINISHES
INTERNAL CEILING FINISHES
EXTERNAL WALL FINISHES
INTERNAL WALL FINISHES
FITTINGS AND FURNISHINGS

M3
M2
Y10
A393

KG
M2
M3
Item

23
449

300.00
10.00

2488
764
68

4
20.00
450.00

SANITARY FITTINGS

PLUMBING INSTALLATION

;SUNDRIES

1350.00
1110.00
900.00
2760.00
11716.00
6160.00
1880.00
1448.00
18000.00

232.00
8492.00
1116.00
640.00
2250.00

75.00
300.00
800.00
1440.00
1350.00

1200.00
2100.00
0.00
9060.00
11420.00
13504.00
18368.00
11340.00
32850.00

6900.00
4490.00
9952.00
15280.00
30600.00
1500.00
230583.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

C1-Block Pentadbiran
RAMPS AND APRON
Apron

Excavation
Lean Concrete
Formwork
Main bar
Y10
Wiremesh A393
Insitu Concrete

M3
M3
M

31
8
106

KG
M2
M3

851
154
23

1500*4200NO
925*1500 NO

1
1

10.00
15.00
10.00

310.00
120.00
1060.00

4.00 3404.00
20.00 3080.00
450.00 10350.00

Ramp
Size

Collection

2000.00
1500.00

2000.00
1500.00
21824.00

C1-Block Pentadbiran
Frame
Column
Main Bar
Y20

KG

6392

4.00

25568.00

R10

KG
M2
M3

2687
340
26

4.00
40.00
450.00

10748.00
13600.00
11700.00

Y12

KG

150

4.00

600.00

Y10

KG
M2
M3

60
32
2

4.00
40.00
450.00

240.00
1280.00
900.00

M2

492

40.00

19680.00

Y16
Y20

KG
KG

489
2131

4.00
4.00

1956.00
8524.00

R10
Insitu Concrete

KG
M3

2101
59

4.00
450.00

8404.00
26550.00

M2

198

40.00

7920.00

Y16
Y25

KG
KG

489
2131

4.00
4.00

1956.00
8524.00

R10
Insitu Concrete

KG
M3

744
23

4.00
450.00

2976.00
10350.00

Link
Formwork
Insitu Concrete
Stiffeners
Main bar
Link
Formwork
Insitu Concrete
In Floor Beam
Formwork
Main bar

Link

In Roof Beam
Formwork
Main bar

Link

Collection

161476.00

C1-Block Pentadbiran
Upper Floor
Formwork
Soffit
Side

M2
M

442
126

Y10
Wiremesh A393
Insitu Concrete

KG
M2
M3

2479
751
67

Main bar

Collection

40.00 17680.00
10.00 1260.00
0.00
4.00 9916.00
20.00 15020.00
450.00 30150.00
74026.00

C1-Block Pentadbiran
Staircase
Formwork
Soffit slopping
Soffit landing
Edge open string
Edge riser

M2
M
M
M

23
20
36
119

40.00
10.00
10.00
10.00

920.00
200.00
360.00
1190.00

Y16
KG
Y10
KG
Insitu Concrete
Staircase
M3
Landing slab
M3
Plastering
Soffit staircase
M2
Soffit Landing
M2
High side of raking M
Bed and baking
Concrete base
M2
Riser (150mm)
M
Tread (300mm)
M
Tiles, Slab and block Finishing
Landing slab
M2
Skirting tiles
M
Riser (150mm)
M
Skirting tiles
NO
Tread (300mm)
M
Skirting tiles
NO
Non-slip nosing tileM

960
520

4.00
4.00

3840.00
2080.00

8
4

450.00
450.00

3600.00
1800.00

23
20
36

20.00
20.00
5.00

460.00
400.00
180.00

20
36
36

20.00
10.00
10.00

400.00
360.00
360.00

20
13
36
36
36
36
36

80.00
40.00
12.00
12.00
24.00
24.00
24.00

1600.00
520.00
432.00
432.00
864.00
864.00
864.00

20
23
11

12.00
12.00
12.00

240.00
276.00
132.00

22

250.00

5500.00

Main bar

Painting and decorating


Soffit landing slab M2
Soffit Staircase
M2
Side of raking openM2
Metal Works
Railing
Collection

27874.00

C1-Block Pentadbiran
Roof slab
Formwork
Soffit roof slab M2
Edges of roof sl M2

29
18

40.00
40.00

Y10

KG

53

4.00

1160.00
720.00
0.00
212.00

M2
M3
M

46
5
5.4

25.00
450.00
50.00

1150.00
2250.00
270.00

Main bar
Wiremesh
A393
Insitu concrete
Scupper drain
Plinth
13

10.00

M2
M3

9
2

25.00
450.00

0.00
130.00
0.00
225.00
900.00

M2

29

15.00

435.00

M
M
NO
NO

8
6
1
1

30.00
30.00
30.00
30.00

240.00
180.00
30.00
30.00

Formwork
Wiremesh

A393
Insitu Concrete
Water Proofing
RWDP
To wall and column
In concrete slab
Bend
Shoes
Roof trusses
Steel roof trusses

Item

Roof decking and wall cladding


Covering sloping
Pitch 5 degreesM2
Pitch 15 degreeM2
Underlay

94200.00

21
683

500.00 10500.00
120.00 81960.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Salah di BQ
Salah di BQ

Salah di BQ

C1-Block Pentadbiran
External walls and balustrading
Non-load bearing superstructure
Half brick tM2

646

Damp proof course

142

5.00

710.00

Precast concrete sill M

67

50.00

3350.00

Glass fibre reinforced M

67

50.00

3350.00

Metal works
Railing
M
Sun louverM
Fixed glassM2

44
42
12

Collection

M2

55.00 35530.00

250.00 11000.00
100.00 4200.00
300.00 3600.00
61740.00

C1-Block Pentadbiran
Internal walls
Damp proof course M
Non-load bearing supeM2
Collection

134
525

5.00
670.00
55.00 28875.00
29545.00

C1-Block Pentadbiran
Doors and windows
Precast concrete
Lintel

Metal works
Metal frame
P2CA
NO
P2Lf
NO
P1Lk
NO
P1Cb
NO
P1Ca
NO
PR1b
NO
P61
NO
P62
NO
P4
NO
Bronze annodised aluminium
PK1-1b
NO
PK1-2b
NO
PK2-3b
NO
PK2-4b
NO
PK2-4b
NO
PK2-6b
NO

46

50

2300.00

3
5
1
6
3
1
5
6
1

156.00
228.00
204.00
156.00
156.00
156.00
156.00
152.00
204.00

1
1
1
1
1
1

4900.00
4600.00
1200.00
560.00
500.00
1260.00

468.00
1140.00
204.00
936.00
468.00
156.00
780.00
912.00
204.00
0.00
4900.00
4600.00
1200.00
560.00
500.00
1260.00

1
6
3

630.00
400.00
400.00

630.00
2400.00
1200.00

3
5

600.00
1200.00

1800.00
6000.00

950.00

950.00

5
6

660.00
650.00

3300.00
3900.00

2500.00

19
2
2

300.00
300.00
100.00

2500.00
0.00
0.00
0.00
5700.00
600.00
200.00

Doors
Flush hollow core door
P1LK
NO
P1Cb
NO
P1Ca
NO
Solid timber panel door
P2Ca
NO
P2Lf
NO
Alluminum Louvers door
P4
NO
Phenolic Door
P61
NO
P62
NO
Fire Rates door
PR1b
NO
Ironmongery
Lockset
Type L1
Type L2
Type L3

NO
NO
NO

Door closer
Type DC1
Rebate set/Accessories
Type A1
Type A2
Type A3
Type A4
Type A1
Others
Master key
Painting and decorating
Surface of door
Surface of metal

NO

11

400.00

NO
NO
NO
NO
NO

7
7
26
2
4

50.00
50.00
30.00
30.00
50.00

87
118

12.00
3.00

48
40

55.00
55.00

4
1
1
2
7
29

220.00
330.00
330.00
650.00
650.00
980.00

Item

M2
M

Windows
Lintel
Cill

M
M

Metal works
Bronze annodised alluminium
Type T1-1b NO
Type T1-2b NO
Type T1-3b NO
Type T1-21b NO
Type T1-22b NO
Type T1-23b NO
Collection

0.00
4400.00
0.00
350.00
350.00
780.00
60.00
200.00
0.00
1500.00
0.00
0.00
1044.00
354.00
0.00
0.00
2640.00
2200.00
0.00
0.00
0.00
880.00
330.00
330.00
1300.00
4550.00
28420.00
97156.00

Salah di BQ
Salah di BQ

C1-Block Pentadbiran
EXTERNAL FLOOR FINISHES

Screeding
Insitu finis M2

276

20.00

5520.00

C1-Block Pentadbiran
INTERNAL FLOOR FINISHES

Insitu finishings

M2

61

Bed and backing


Concrete Base
Skirting

M2
M2

626
320

20.00 12520.00
20.00 6400.00

456
320
15

80.00 36480.00
10.00 3200.00
10.00
150.00

170

80.00 13600.00

Tiles, Slab and Block Finishing


Glazed homogeneous floor tiles
Floor
M2
Skirting
M2
Drop
M2
Semi-Glazed homogeneous floor tiles
Floor
M2
Collection

20.00

1220.00

73570.00

C1-Block Pentadbiran
EXTERNAL CEILING FINISHES

Ceiling Board

M2

138

60.00

8280.00

Painting and decoration


On cementM2

138

60.00

8280.00

Collection

16560.00

C1-Block Pentadbiran
Internal Ceiling Finishes
Skim coat

M2

208

10.00

Ceiling board
Mineral board fibre ceiling
Cement board ceiling

M2
M2

459
183

60.00
60.00

Painting and decorating


On skim coat
On cement board ceiling

M2
M2

208
183

12.00
12.00

Collection

2080.00
0.00
0.00
27540.00
10980.00
0.00
0.00
2496.00
2196.00
45292.00

C1-Block Pentadbiran
EXTERNAL WALL FINISHES

Plastering
20mm thk Brickwork, blockM2
Groove line
M
Painting and decorating
On plastered wall
Collection

M2

645
106

20.00 12900.00
20.00 2120.00

645

12.00

7740.00
22760.00

C1-Block Pentadbiran
INTERNAL WALL FINISHES

Plastering
20mm thk Brickwork, blockwork or coM2

1481

Tiles, slab and block finishes


Tile on wall

M2

215

Painting and decorating


On plastered wall

M2

1481

Collection

20.00 29620.00
0.00
0.00
60.00 12900.00
0.00
0.00
12.00 17772.00
60292.00

C1-Block Pentadbiran
FITTINGS AND FURNISHINGS

Built-in cabinet
kitchen
Kitchen concrete top
NO
Kitchen low level counteNO
Meeting room
Built-in Panel
NO
Canteen
Wall tiles
NO
Pantry
Kitchen concrete top
NO

1
1

3500.00
1500

3500.00
1500.00

5000

3500

5000.00
0.00
3500.00

2000

Directional board signages


NO
High wall signages
250*250
NO
150*450
NO
High M&E signages
NO
High directional signages
NO
High door signages
NO
High Bomba signages
NO
"PENTADBIRAN" building sign
NO
GIATMARA logo building sign (optioNO
GIATMARA logo building sign (optioNO

1500

2000.00
0.00
0.00
1500.00

2
4
2
21
21
5
1
1
1

150
150
150
150
150
150
2000
2500
3500

300.00
600.00
300.00
3150.00
3150.00
750.00
2000.00
2500.00
3500.00

Signages

Collection

33250.00

C1-Block Pentadbiran
SANITARY FITTINGS
Basin
400*575*210
475*510*210

NO
NO

8
3

600.00
600.00

4800.00
1800.00

Water closet

NO

600.00

2400.00

Squatting pan

NO

600.00

1200.00

Stainless steel kitchen sinkNO

200.00

400.00

Toilet roll holder

NO

80.00

480.00

Angle valve

NO

19

100.00

1900.00

Hand bidet

NO

300.00

1800.00

Wall mounted ablution tap NO

100.00

200.00

Stainless steel soap dispenNO

350.00

1400.00

Automatic hand dryer

NO

500.00

2000.00

Stainless steel hook

NO

100.00

600.00

3000*750*4
NO
1200*750*4
NO
Stainless steel f NO

1
1
12

1000.00
1000.00
50.00

1000.00
1000.00
600.00

Builder work in connection


Counter top
3000*600*75 NO
1200*300*75 NO

2
2

1500
1200

3000.00
2400.00

Concrete stool
1000*800*150 wc
NO

1000

2000.00

Ablution kerb
900*725*100

500

1000.00

Mirror

Collection

29980.00

C1-Block Pentadbiran
Plumbing Installation
Cold water system, Internally
Stainless steel pipe
65mm
ABS pipe
20mm
25mm
32mm
40mm
50mm

LS

2000.00

LS
LS
LS
LS
LS

1500.00
1500.00
1500.00
1500.00
1500.00

Storage water tank


500 gallons

NO

Sanitary Installation pipework


UPVC pipe class D

LS

1000.00

Item
Item

1500.00
1000.00

2500.00

5000.00

Testing
Cold water installation
Sanitary installation
Collection

18000.00

C1-Block Pentadbiran
Sundries
Planter box
1200*500*NO
9900*500*NO

1
1

Decorative wall
12525*250NO

1 12500.00 12500.00

Metal works
1000*1000NO

Collection

1000.00
5000.00

2000.00

1000.00
5000.00

2000.00
20500.00

C1-Block Pentadbiran
Summary
Work floor finish level
Ramps and apron
Frame
Upper floor
Staircase
Roof
External wall and balustrading
Internal wall
Doors and windows
External floor finishing
Internal floor finishing
External ceiling finishing
Internal Ceiling finishing
External wall finishing
Internal wall finishing
Fitting and furnishings
Sanitary fittings
Plumbing installation
Sundries

74026.00
27874.00
61740.00
29545.00
97156.00
5520.00
73570.00
16560.00
45292.00
22760.00
60292.00
33250.00
29980.00
18000.00
20500.00

You might also like