Reservoir Modelling and Simulation

PDB 3053
Eclipse Lab Assignment 1

Name

: Muhammad Hafiz bin Khairudin

ID

: 20319

Lecturer : Mr. Juhairi Aris bin Mohd Shuhaili

PRODUCTION RATE VS TIME

Discussion:
Based on the legend, the blue line represents the graph of
FOPR vs Time without DRSDT enabled while the green line
represents the graph of FOPR vs Time with DRSDT
enabled.
The rate of oil production for disabled DRSDT (blue line) is
constant throughout the time which is 20000 STB/day for
1220 days.
The rate of oil production for enabled DRSDT (green line) is
constant at 20000 STB/day for 970 days and the started to
decline which reach 1560 STB/day after reaching 1220
days operating.
The decline rate for the green graph is a result of free gas
started to dissolve in the oil at day 970 and causing
amount of GOR increases. This resulting in decreasing
amount of rate of oil production.

GAS OIL RATIO VS TIME

Discussion:
Based on the legend, the red line represents the graph of
FGOR vs Time with DRSDT enabled while the green line
represents the graph of FGOR vs Time without DRSDT
enabled.
The rate of gas production for enabled DRSDT (red line) is
constant at 1.3 MSCF/day for 140 days and the started to
increase which reach 8.6 MSCF/day after reaching 1220
days operating.
The rate of gas production for disabled DRSDT (green line)
is constant throughout the time which is 1.3 MSCF/day but
having a slight increase when reaching 1220 days.
The increasing rate based on the graphs is a result of
expansion of the gas in the oil which consecutively
increase the gas oil ratio.

WELL BOTTOM HOLE PRESSURE VS


TIME (PRODUCER)

Discussion:
Based on the legend, the red line represents the graph of
WBHP producer vs Time with DRSDT enabled while the
green line represents the graph of WBHP producer vs Time
without DRSDT enabled.
The initial pressure for enabled DRSDT (red line) was 3000
psia and having slight dropped during early time
production. As production continues, pressure increases
and reaching maximum value of 3680 psia after producing
for 760 days and having drop afterwards to minimum
value and remain constant till end of production.

The initial pressure for disabled DRSDT (green line) was


3000 psia and having slight dropped during early time
production. As production continues, pressure increases till
end of 1220 days.
Dropping of producer pressure in enabled DRSDT graph
(red line) is due to solution gas expansion.

WELL BOTTOM HOLE PRESSURE VS


TIME (INJECTOR)

Discussion:
Based on the legend, the red line represents the graph of
WBHP injector vs Time with DRSDT enabled while the
green line represents the graph of WBHP injector vs Time
without DRSDT enabled.
The initial pressure for enabled DRSDT (red line) was 8500
psia and having drastic dropped to 7000 psia and continue
with slow dropped till reach 6400 psia during early time

production. As production continues, pressure increases


and reaching maximum value of 7200 psia after producing
for 800 days and having drop afterwards reaching 6400
psia after 1220 days.
The initial pressure for disabled DRSDT (green line) was
8500 psia and having drastic dropped to 7000 psia and
continue with slow dropped till reach 6400 psia during
early time production. As production continues, pressure
increases and reaching 7700 psia after 1220 days.
Dropping of injector pressure in enabled DRSDT graph (red
line) is due to gas is dissolving in the solution.