Check List - Stress Analysis of Piping

Petrofac

PEC-BMS-EN-FRM-L-4793 Rev. 0

Project: UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT - EPC2


Job No.: PE-103
By: MS
Rev.: B2
Date: 11-Jan-2015
Type: SELF CHECK LIST
Stress System No.: CI-SYS-180
RATING ENTRY
(COMPLIEDSL NO.

DESCRIPTION

REMARKS

NOT COMPLIED- ,
NOT APPLICABLE- )

ADHERENCE TO DESIGN BASIS


LINE CRITICALITY SELECTION

2
3

INSTALLATION TEMPERATURE
MODEL BOUNDARY CONDITIONS

PROCESS DATA / LINE LIST DATA


ANALYSIS PRESSURE

5
6
7

ANALYSIS TEMPERATURES
TEST PRESSURE
INSULATION THK/INSULATION DENSITY

FLUID DENSITY

BY PESIL

BY PESIL

BY PESIL
BY PESIL

BY PESIL
BY PESIL

BY PESIL
BY PESIL
BY PESIL
BY PESIL

PHYSICAL, MATERIAL PROPERTIES, VENDOR DATA


9
10

LINE SIZE
WALL THK/ FLANGE RATING

11
12

MOC AS PER PMS


COROSION ALLOWANCE

13

WEIGHTS OF HEAVY ITEMS FROM VENDOR DATA

14

SLUG DATA, IF APPLICABLE

15

MODELING IN CAESAR-II
CAESAR CONFIGURATION FILE

16
17

NODE NUMBERING SEQUENCE


TITLE PAGE AS PER STD

18
19

MODEL GEOMETRY
BRANCH TYPES AS PER ISOS. / PMS

20
21

TRUNION MODELING
TEES / BRANCHES SIFS

22
23

HDR. SIFS
OCCASIONAL LOAD INPUTS

24
25
26

TYPE OF SUPPORTS ISO. VS MODEL


GUIDE & AXIAL STOP GAPS
FRICTION

27
28

RIGID ITEMS MODELING


MULTIPLE OPERATION CASE FOR PSVS/PUMPS

29
30

EQPT. MODELING/CLIPS MODELING


SPL. ITEMS (SPRINGS,STRUTS,EXPANSION JOINTS)

31

REMARKS FOR FRICTION IN TITLE PAGE


ASSUMPTIONS/RECOMMENDATIONS

32
33

ASSUMPTIONS
RECOMMENDATIONS IN REPORT SUMMARY

34

OUTPUT PROCESSING / LOAD CASES


ERROR CHECK DONE,WARNINGS CHECKED

BY PESIL
BY PESIL
AS PER CODE-2 VENDOR GA (BY PESIL)
BY PESIL
BY PESIL
BY PESIL
BY THIRD PARTY
MAJOR-PESIL / MINOR-THIRD PARTY
BY PESIL
BY THIRD PARTY
BY PESIL
BY PESIL
BY PESIL
BY PESIL
BY PESIL/THIRD PARTY
BY THIRD PARTY
BY PESIL
BY PESIL
AS PER CODE-2 VENDOR GA (BY PESIL)
BY PESIL/THIRD PARTY
BY THIRD PARTY

BY PESIL/THIRD PARTY (IFR ATTACHED)


BY PESIL/THIRD PARTY (APPEDIX 1) (IFR ATTACHED)

BY PESIL/THIRD PARTY

BY PESIL/THIRD PARTY
BY PESIL/THIRD PARTY

35

LOAD CASE FILE-ALL LOADS COVERED


CODE COMPLIANCE

BY PESIL

36
37

STRESSES WITHIN LIMITS


SAGGING/THERMAL MOVEMENT WITHIN LIMITS

38

LIFTING SUPPORTS-CHEK OPERATING STRESS LEVEL

39

SAGGING AT FREE END NOZZLE OF CRITICAL ROTATING


EQUIPMENT DUE TO WNC CASE

BY PESIL

BY PESIL

BY PESIL/THIRD PARTY

SUPPORT TYPES & LOADS


40

RESTRAINT LOADS

41

SUPPORT TYPES FOR SLUG / 2-PHASE LINES / PSV /


CONTROL VALVE LINES

BY PESIL

42

TRUNION CHECKS

BY THIRD PARTY

NOZZLE LOADS & FLANGE LEAKAGE SUMMARY


43

FLANGE LOADS

44

NOZZLE LOADS-CHECK WITH VENDOR ALLOWABLES

45
46

SKEW-LINES-MODEL ROTATED & CHECKED


WRC-107 / OTHER CALCULATIONS

47

ARCHIVING / CHECK LISTS / BACK-UPS


CHECK LISTS MAINTAINED

__________________________________
Petrofac E & C

____________________________________________________
Business Management System

BY THIRD PARTY
BY PESIL/THIRD PARTY
BY PESIL/THIRD PARTY
NOT APPLICABLE
BY THIRD PARTY
__________________________
1 of 2

Check List - Stress Analysis of Piping


PEC-BMS-EN-FRM-L-4793 Rev. 0

Petrofac

Project: UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT - EPC2


Job No.: PE-103
By: MS
Rev.: B2
Date: 11-Jan-2015
Type: SELF CHECK LIST
Stress System No.: CI-SYS-180
RATING ENTRY
(COMPLIED-

DESCRIPTION

SL NO.

REMARKS

NOT COMPLIED- ,
NOT APPLICABLE- )

48
49

BACK-UPS FILED & MAINTAINED


INPUTS TO LAYOUT-STRESS ISOS.

50

UNIFORMITY ON DOCUMENTATION

Total Number of Entires with Tick Mark

35

Total Number of Entries Applicable to the Stress System


Total % Rating for the Stress System

BY PESIL/THIRD PARTY
NOT APPLICABLE
BY THIRD PARTY

35
100.00

NOTES:
1) THIS CHECK PRINT SHALL BE USED FOR SELF CHECKING, CHECKING & REVIEWING PURPOSE. ACCORDINGLY "TYPE" NEEDS TO BE
SELECTED BY USER. DURING REVIEW, PRE-AGREED NUMBER OF STRESS SYSTEMS SHALL BE RANDOMLY SELECTED BASED ON CRITICALITY
AND EACH POINT LISTED IN THIS SHEET SHALL BE REVIEWED FOR ALL SELECTED STRESS SYSTEMS. FOR CLARITY, USER NEEDS TO TAKE
PRINT OF THIS SHEET IN A3 FORMAT.
2) RATING
FOR
EACH
ITEM SHALL BE AS FOLLOW:
COMPLIED,
NOT COMPLIED- ,
NOT APPLICABLE-

3) USER NEEDS TO FILL ALL CELLS COLORED WITH "YELLOW" ONLY. THIS SHEET NEEDS TO BE RENAMED AS PER STRESS SYSTEM.
4) FOR ALL NON COMPLIED ITEMS, A BRIEF DESCRIPTION NEEDS TO BE FILLED IN REMARKS COLUMN. HOWEVER DETAILED OF THE NON
COMPLIANCE CAN BE SEEN AS MARK-UP IN RELEVANT STRESS ANALYSIS REPORT SHEETS.